Renewable Energy Projects in Washington

RENEWABLE ENERGY PROJECTS
on Lands with a Federal Interest 1,2
Washington
March 2016
Bellingham
14
11
Transmission Lines
Tacoma
Olympia
4
i ve
r
R
N
Yakima
Longview
Kennewick
Ri
v
e
ak
er
OCEA
BLM Administered Land
BORDER
Wenatchee
Ya
BLM District Boundary
BLM Resource Area Boundary
River
a
kim
Vantage to Pomona Heights 230 kV
(SDEIS Preferred Route)
with Federal Interest
Spokane
W E N AT C H E E
Vantage to Pomona Heights 230 kV
(DEIS Preferred Route) (WAOR 65753)
FERC Hydro Energy Withdrawal
ka
Spo ne
Seattle
McNary - John Day 500 kV (Authorized)
Transmission Line Right-of-Way
RIV
Lake
Chelan
Sn
Nominated Geothermal Parcels
14. Mt. BakerNational ForestMt. Baker Ranger District
(WAOR 67715)
MBIA
LU
O
C
Everett
PA C I F I C
Authorized Geothermal Leases
11. Mt. Baker National ForestMt. Baker Ranger District
(WAOR 056024-056029)
ER
Wind Testing ROWs
4. Saddle Mountain Wind (WAOR 67856)
Walla Walla
USFS Administered Land
Department of Defense
Vancouver
COLU B I A
M
Indian Reservation
Note: Missing numbers can be
found on other maps
ER
RIV
Scale 1:2,000,000 when plotted at 11x17
20
0
20
40 Miles
20
0
20
40 Kilometers
No warranty is made by the Bureau of Land Management as to the accuracy, reliability, or
completeness of these data for individual or aggregate use with other data. Original data were
compiled from various sources. This information may not meet National Map Accuracy
Standards. This product was developed through digital means and may be updated without
notification.
1
Excluding biomass and there are no solar projects at this time.
Includes only those projects that have been officially entered into BLM’s LR2000 land recordation system. That includes projects that are wholly on federal lands or partially on federal lands via a “connected action”. Any project wholly on private lands is excluded, with the possible exception of split estates.
2
M16-02-02