Snoeyenbos Renovation Pictures

SNOEYENBOS HALL
RENOVATION PICTURES
Valley City State University
Project Start Date:
December 2010
Estimated Completion Date:
July 2011
Snoyenbos Hall
Renovation
Getting Started…
Snoyenbos Hall
Renovation
This open area is where the lounge and study room will
be located. There will be a lounge, study room and
laundry room on each floor.
Snoyenbos Hall
Renovation
Looking down a hallway. All new steel
framework was added to the building.
Snoyenbos Hall
Renovation
More Demolition!
Snoyenbos Hall
Renovation
New showers ready to be installed.
There will be a shower in each of the
suites personal bathrooms.
Snoyenbos Hall
Renovation
Digging for sewer lines.
Snoyenbos Hall
Renovation
A closer look at the sewer lines.
Snoyenbos Hall
Renovation
Sewer lines finished!
All new sewer and water lines were put in to the building.
Snoyenbos Hall
Renovation
Looking at a study room from the hallway on 4th floor.
Snoyenbos Hall
Renovation
A different angle of the study room.
The study rooms are separated from the lounge
area for optimal studying!
Snoyenbos Hall
Renovation
This is a heating coil on the first floor. There will be air
conditioning throughout the entire building.
Snoyenbos Hall
Renovation
This is the plumbing for one of the suite bathrooms. Each
bathroom will have a standup shower, separate toilet area
and a double sink vanity.
Snoyenbos Hall
Renovation
Looking into a double bedroom from the doorway. Each suite
is unique in the fact that there are some with double and some
with single bedrooms. There will be three bedrooms per suite.
Snoyenbos Hall
Renovation
These are two closet areas and the doorway in a double
bedroom. There will also be more storage area near the
entrance of each suite.
Snoyenbos Hall
Renovation
This is how the sheetrock was transported to the top
floors to be installed. So far it has taken 3 semi-loads of
sheetrock for the walls on 4th and 3rd floors.
Snoyenbos Hall
Renovation
Complete plumbing on first floor. The sewer and
domestic water systems are complete throughout the
building.
Snoyenbos Hall
Renovation
Completed framing on first floor.
Snoyenbos Hall
Renovation
Construction crews work to complete framework on first
floor.
Snoyenbos Hall
Renovation
Prepping to install the new elevator.
Snoyenbos Hall
Renovation
Hallway view of a lounge.
Snoyenbos Hall
Renovation
Painting on 4th floor.
Snoyenbos Hall
Renovation
Updated stair rails.
Snoyenbos Hall
Renovation
Snoeyenbos Entrance- new windows were installed to add
natural light to the main floor lounge and kitchen areas.
Snoyenbos Hall
Renovation
Another view of the windows.
Snoyenbos Hall
Renovation
Coming in the front door entrance of the building.
Snoyenbos Hall
Renovation
1st floor Lounge.
Snoyenbos Hall
Renovation
Looking into the kitchen on 1st Floor.
Snoyenbos Hall
Renovation
1st Floor.
Snoyenbos Hall
Renovation
Front entrance- new elevator and kitchen to the right.
Snoyenbos Hall
Renovation
Another view of the kitchen area on 1st Floor.
Snoyenbos Hall
Renovation
Another view of the kitchen area on 1st Floor.
Snoyenbos Hall
Renovation
Artwork at the front entrance.
Snoyenbos Hall
Renovation
Artwork in the 1st floor lounge.
Snoyenbos Hall
Renovation
RA’s desk at the front entrance on 1st floor.
CHECK BACK FOR
MORE UPDATES!!