PDF

Powering Up the Cisco cBR Chassis
Powering Up the Cisco cBR Chassis 2
Powering Up the Cisco cBR 2
Revised: May 28, 2015,
Powering Up the Cisco cBR Chassis
Powering Up the Cisco cBR
Before You Begin
After all the interfaces and other cables are connected, perform a visual check of all connections and check that:
• The ejector levers on each line card are in the locked position.
• All the top and bottom line card captive screws are tight.
• All network interface cables are connected.
• The console terminal is turned on.
Procedure
Step 1
Step 2
Make sure the chassis ground connection is attached.
Push the toggle switch on the FPIM (AC or DC) on the rear of the chassis to ON position.
What to Do Next
Ensure the POWER ENABLE LED on the FPIM illuminates green.
Verify if the LEDs on the Power Module indicate input voltage presence within correct range.
2
© 2015
Cisco Systems, Inc. All rights reserved.
Americas Headquarters
Cisco Systems, Inc.
San Jose, CA 95134-1706
USA
Asia Pacific Headquarters
Cisco Systems (USA) Pte. Ltd.
Singapore
Europe Headquarters
Cisco Systems International BV
Amsterdam, The Netherlands
Cisco has more than 200 offices worldwide. Addresses, phone numbers, and fax numbers are listed on the
Cisco Website at www.cisco.com/go/offices.