NR544

Marine & Offshore Division
Website: http://www.veristar.com
Email: [email protected]
Equipment and Materials Certification
Requirements for the Classification of
Inland Navigation Vessels/Units
April 2015
Rule Note
NR 544 DNI R02 E
The accredidation certificate
is available on NR217, Part A
Inland Navigation Management
Mechelsesteenweg 128/136
B-2018 Antwerpen - Belgium
Tel: + 32 (0)3 247 94 00 / + 32 (0)3 247 94 70
Email: [email protected]
 2015 Bureau Veritas - All rights reserved
MARINE & OFFSHORE DIVISION
GENERAL CONDITIONS
ARTICLE 1
1.1. - BUREAU VERITAS is a Society the purpose of whose Marine & Offshore Division (the "Society") is
the classification (" Classification ") of any ship or vessel or offshore unit or structure of any type or part of
it or system therein collectively hereinafter referred to as a "Unit" whether linked to shore, river bed or sea
bed or not, whether operated or located at sea or in inland waters or partly on land, including submarines,
hovercrafts, drilling rigs, offshore installations of any type and of any purpose, their related and ancillary
equipment, subsea or not, such as well head and pipelines, mooring legs and mooring points or otherwise
as decided by the Society.
The Society:
• "prepares and publishes Rules for classification, Guidance Notes and other documents (" Rules ");
• "issues Certificates, Attestations and Reports following its interventions (" Certificates ");
• "publishes Registers.
1.2. - The Society also participates in the application of National and International Regulations or Standards, in particular by delegation from different Governments. Those activities are hereafter collectively referred to as " Certification ".
1.3. - The Society can also provide services related to Classification and Certification such as ship and
company safety management certification; ship and port security certification, training activities; all activities and duties incidental thereto such as documentation on any supporting means, software, instrumentation, measurements, tests and trials on board.
1.4. - The interventions mentioned in 1.1., 1.2. and 1.3. are referred to as " Services ". The party and/or its
representative requesting the services is hereinafter referred to as the " Client ". The Services are prepared and carried out on the assumption that the Clients are aware of the International Maritime
and/or Offshore Industry (the "Industry") practices.
1.5. - The Society is neither and may not be considered as an Underwriter, Broker in ship's sale or chartering, Expert in Unit's valuation, Consulting Engineer, Controller, Naval Architect, Manufacturer, Shipbuilder, Repair yard, Charterer or Shipowner who are not relieved of any of their expressed or implied
obligations by the interventions of the Society.
ARTICLE 2
2.1. - Classification is the appraisement given by the Society for its Client, at a certain date, following surveys by its Surveyors along the lines specified in Articles 3 and 4 hereafter on the level of compliance of
a Unit to its Rules or part of them. This appraisement is represented by a class entered on the Certificates
and periodically transcribed in the Society's Register.
2.2. - Certification is carried out by the Society along the same lines as set out in Articles 3 and 4 hereafter
and with reference to the applicable National and International Regulations or Standards.
2.3. - It is incumbent upon the Client to maintain the condition of the Unit after surveys, to present
the Unit for surveys and to inform the Society without delay of circumstances which may affect the
given appraisement or cause to modify its scope.
2.4. - The Client is to give to the Society all access and information necessary for the safe and efficient
performance of the requested Services. The Client is the sole responsible for the conditions of presentation of the Unit for tests, trials and surveys and the conditions under which tests and trials are carried out.
ARTICLE 3
3.1. - The Rules, procedures and instructions of the Society take into account at the date of their
preparation the state of currently available and proven technical knowledge of the Industry. They
are a collection of minimum requirements but not a standard or a code of construction neither a
guide for maintenance, a safety handbook or a guide of professional practices, all of which are
assumed to be known in detail and carefully followed at all times by the Client.
Committees consisting of personalities from the Industry contribute to the development of those documents.
3.2. - The Society only is qualified to apply its Rules and to interpret them. Any reference to them
has no effect unless it involves the Society's intervention.
3.3. - The Services of the Society are carried out by professional Surveyors according to the applicable
Rules and to the Code of Ethics of the Society. Surveyors have authority to decide locally on matters related to classification and certification of the Units, unless the Rules provide otherwise.
3.4. - The operations of the Society in providing its Services are exclusively conducted by way of random inspections and do not in any circumstances involve monitoring or exhaustive verification.
ARTICLE 4
4.1. - The Society, acting by reference to its Rules:
• "reviews the construction arrangements of the Units as shown on the documents presented by the Client;
• "conducts surveys at the place of their construction;
• "classes Units and enters their class in its Register;
• "surveys periodically the Units in service to note that the requirements for the maintenance of class are
met.
The Client is to inform the Society without delay of circumstances which may cause the date or the
extent of the surveys to be changed.
ARTICLE 5
5.1. - The Society acts as a provider of services. This cannot be construed as an obligation bearing
on the Society to obtain a result or as a warranty.
5.2. - The certificates issued by the Society pursuant to 5.1. here above are a statement on the level
of compliance of the Unit to its Rules or to the documents of reference for the Services provided for.
In particular, the Society does not engage in any work relating to the design, building, production
or repair checks, neither in the operation of the Units or in their trade, neither in any advisory services, and cannot be held liable on those accounts. Its certificates cannot be construed as an implied or express warranty of safety, fitness for the purpose, seaworthiness of the Unit or of its value
for sale, insurance or chartering.
5.3. - The Society does not declare the acceptance or commissioning of a Unit, nor of its construction in conformity with its design, that being the exclusive responsibility of its owner or builder.
5.4. - The Services of the Society cannot create any obligation bearing on the Society or constitute any
warranty of proper operation, beyond any representation set forth in the Rules, of any Unit, equipment or
machinery, computer software of any sort or other comparable concepts that has been subject to any survey by the Society.
ARTICLE 6
6.1. - The Society accepts no responsibility for the use of information related to its Services which was not
provided for the purpose by the Society or with its assistance.
6.2. - If the Services of the Society or their omission cause to the Client a damage which is proved
to be the direct and reasonably foreseeable consequence of an error or omission of the Society,
its liability towards the Client is limited to ten times the amount of fee paid for the Service having
caused the damage, provided however that this limit shall be subject to a minimum of eight thousand (8,000) Euro, and to a maximum which is the greater of eight hundred thousand (800,000)
Euro and one and a half times the above mentioned fee. These limits apply regardless of fault including breach of contract, breach of warranty, tort, strict liability, breach of statute, etc.
The Society bears no liability for indirect or consequential loss whether arising naturally or not as
a consequence of the Services or their omission such as loss of revenue, loss of profit, loss of production, loss relative to other contracts and indemnities for termination of other agreements.
6.3. - All claims are to be presented to the Society in writing within three months of the date when the Services were supplied or (if later) the date when the events which are relied on of were first known to the Client,
and any claim which is not so presented shall be deemed waived and absolutely barred. Time is to be interrupted thereafter with the same periodicity.
ARTICLE 7
7.1. - Requests for Services are to be in writing.
7.2. - Either the Client or the Society can terminate as of right the requested Services after giving
the other party thirty days' written notice, for convenience, and without prejudice to the provisions
in Article 8 hereunder.
7.3. - The class granted to the concerned Units and the previously issued certificates remain valid until the
date of effect of the notice issued according to 7.2. here above subject to compliance with 2.3. here above
and Article 8 hereunder.
7.4. - The contract for classification and/or certification of a Unit cannot be transferred neither assigned.
ARTICLE 8
8.1. - The Services of the Society, whether completed or not, involve, for the part carried out, the payment
of fee upon receipt of the invoice and the reimbursement of the expenses incurred.
8.2. - Overdue amounts are increased as of right by interest in accordance with the applicable legislation.
8.3. - The class of a Unit may be suspended in the event of non-payment of fee after a first unfruitful
notification to pay.
ARTICLE 9
9.1. - The documents and data provided to or prepared by the Society for its Services, and the information
available to the Society, are treated as confidential. However:
• "Clients have access to the data they have provided to the Society and, during the period of classification of the Unit for them, to the classification file consisting of survey reports and certificates which
have been prepared at any time by the Society for the classification of the Unit ;
• "copy of the documents made available for the classification of the Unit and of available survey reports
can be handed over to another Classification Society, where appropriate, in case of the Unit's transfer
of class;
• "the data relative to the evolution of the Register, to the class suspension and to the survey status of
the Units, as well as general technical information related to hull and equipment damages, may be
passed on to IACS (International Association of Classification Societies) according to the association
working rules;
• "the certificates, documents and information relative to the Units classed with the Society may be
reviewed during certificating bodies audits and are disclosed upon order of the concerned governmental or inter-governmental authorities or of a Court having jurisdiction.
The documents and data are subject to a file management plan.
ARTICLE 10
10.1. - Any delay or shortcoming in the performance of its Services by the Society arising from an event
not reasonably foreseeable by or beyond the control of the Society shall be deemed not to be a breach of
contract.
ARTICLE 11
11.1. - In case of diverging opinions during surveys between the Client and the Society's surveyor, the Society may designate another of its surveyors at the request of the Client.
11.2. - Disagreements of a technical nature between the Client and the Society can be submitted by the
Society to the advice of its Marine Advisory Committee.
ARTICLE 12
12.1. - Disputes over the Services carried out by delegation of Governments are assessed within the
framework of the applicable agreements with the States, international Conventions and national rules.
12.2. - Disputes arising out of the payment of the Society's invoices by the Client are submitted to the Court
of Nanterre, France, or to another Court as deemed fit by the Society.
12.3. - Other disputes over the present General Conditions or over the Services of the Society are
exclusively submitted to arbitration, by three arbitrators, in London according to the Arbitration
Act 1996 or any statutory modification or re-enactment thereof. The contract between the Society
and the Client shall be governed by English law.
ARTICLE 13
13.1. - These General Conditions constitute the sole contractual obligations binding together the
Society and the Client, to the exclusion of all other representation, statements, terms, conditions
whether express or implied. They may be varied in writing by mutual agreement. They are not varied by any purchase order or other document of the Client serving similar purpose.
13.2. - The invalidity of one or more stipulations of the present General Conditions does not affect the validity of the remaining provisions.
13.3. - The definitions herein take precedence over any definitions serving the same purpose which may
appear in other documents issued by the Society.
BV Mod. Ad. ME 545 L - 7 January 2013
RULE NOTE NR 544
NR 544
Equipment and Materials Certification
Requirements for the Classification of
Inland Navigation Vessels/Units
SECTION 1
GENERAL
SECTION 2
ALL VESSELS/UNITS (CARRIAGE OF DANGEROUS GOODS
EXCEPTED) WITH ASSIGNMENT OF CHARACTER OF
CONSTRUCTION {
SECTION 3
ALL VESSELS/UNITS (CARRIAGE OF DANGEROUS GOODS
EXCEPTED) WITH ASSIGNMENT OF CHARACTER OF
CONSTRUCTION µ
SECTION 4
VESSELS INTENDED FOR THE CARRIAGE OF DANGEROUS
GOODS WITH ASSIGNMENT OF CHARACTER OF
CONSTRUCTION {
SECTION 5
VESSELS INTENDED FOR THE CARRIAGE OF DANGEROUS
GOODS WITH ASSIGNMENT OF CHARACTER OF
CONSTRUCTION µ
APPENDIX 1
GENERAL INDEX
April 2015
Section 1
General
1
Scope of application
1.1
2
5
Vessels/units with assignment of character of construction {
All Vessels/Units (Carriage of Dangerous Goods Excepted) with
Assignment of Character of Construction µ
1
Summary
1.1
24
Vessels/units with assignment of character of construction µ
Vessels Intended for the Carriage of Dangerous Goods with
Assignment of Character of Construction {
1
Summary
1.1
Section 5
General
Character {
Character µ
Explanatory notes, symbols and abbreviations
Notice regarding column 5 (Survey during fabrication)
Notice regarding item K (Electrical equipment)
Summary
1.1
Section 4
3
All Vessels/Units (Carriage of Dangerous Goods Excepted) with
Assignment of Character of Construction {
1
Section 3
Purpose
Application
2.1
2.2
2.3
2.4
2.5
2.6
Section 2
3
43
Vessels with assignment of character of construction {
Vessels Intended for the Carriage of Dangerous Goods with
Assignment of Character of Construction µ
1
Summary
1.1
66
Vessels with assignment of character of construction µ
Appendix 1 General Index
1
Key-words and labels (from A to Z)
1.1
2
87
Index
Bureau Veritas
April 2015
NR 544, Sec 1
SECTION 1
1
1.1
GENERAL
2.3.3 Provisions of Section 5 cover, as applicable, survey of
materials and equipment at works for vessels intended for
the carriage of dangerous goods.
Scope of application
Purpose
1.1.1 This Rule Note summarizes the certification requirements for materials and equipment covered by the class and
used or fitted on-board inland navigation vessels/units.
2
2.1
2.4.2
General
In the case of discrepancy, the Rules for the Classification of
Inland Navigation Vessels prevail over the provisions of the
Rules for the Classification of Steel Ships.
Character {
2.2.2 Provisions related to survey at works for assignment
of character of construction { are summarized in Section 2,
for all vessels/units, excepted the vessels intended to carry
dangerous goods.
2.2.3 Provisions of Section 4 cover, as applicable, survey of
materials and equipment at works for vessels intended for
the carriage of dangerous goods.
Character µ
2.3.1 Vessel/unit hull or equipment built in accordance
with the Rules, but without survey by the Society of materials and equipment, will be assigned the character of construction µ.
Adequate workshop certificates for materials and equipment are to be submitted to ascertain that they meet satisfactorily the Rule requirements.
2.3.2 Provisions related to survey at works for assignment
of character of construction µ are summarized in Section 3
for all vessels/units, excepted the vessels intended to carry
dangerous goods.
April 2015
Column 1 (Item code)
Column 1 contains an alpha-numeric code for ease of reference.
2.4.3
Column 2 (Item name)
Column 2 contains the name of the equipment or component with, eventually, its sub-systems.
2.4.4
Column 3 (Material certification)
Column 3 indicates the nature of the document that is to be
submitted by the manufacturer or supplier of the concerned
material.
Document type of certification is elaborated in [2.4.9].
2.4.5
2.2.1 Vessel/unit hull and equipment are subject to work
inspections and tests which are detailed in the relevant Sections of the Rules and are, as a rule, to be presented to the
Surveyor.
2.3
Explanatory notes, symbols and
abbreviations
2.4.1 The following gives explanatory notes concerning the
tables implemented in Section 2 to Section 5.
Application
2.1.1 The requirements of the Rules for the Classification of
Inland Navigation Vessels prevail over the provisions of this
Rule Note.
As a rule, the type approval by the Society for materials and
equipment in compliance with Bureau Veritas Rules for the
Classification of Steel Ships is considered acceptable within
the scope of the Rules for the Classification of Inland Navigation Vessels.
2.2
2.4
Column 4 (Design assessment index)
Column 4 contains the design index. The meaning of letters
TA and DA is the following:
TA
: Type Approval is required
DA
: Design Assessment of the product is required;
this may be carried out, at choice:
-
either for a specific unit, or
-
using the Type Approval procedure.
Note 1: Where nothing is mentioned in column 4, design assessment of the specific unit is not required. However, further inspection may be necessary according to the Surveyor’s satisfaction.
2.4.6
Columns 5, 6 and 7 (Examinations and tests)
Column 5, column 6 and column 7 indicate the type of
examinations and tests required and to be carried out by the
manufacturer, respectively:
a) During fabrication: for welded construction or, as a general rule, depending on the type of equipment concerned
b) After completion: consistently with the relevant activities mentioned in a), this includes the final test after
completion of the fabrication
c) Running test: this includes function tests at works or on
board, where applicable.
The index, if any, indicates the different types of specific test
as mentioned in [2.4.8].
Bureau Veritas
3
NR 544, Sec 1
2.4.7
Column 8 (Product certification)
Column 8 indicates the nature of the document that is to be
submitted by the manufacturer or supplier of the concerned
product.
As defined in NR217, Pt C, Ch 2, Sec 1, the auxiliaries considered as essential are typically as follows:
The document type for certification is defined in [2.4.9].
2.4.8
together with the requirements for their carrying out, and
the conditions of validity of the Type approval certificate are
given in the relevant Sections of the Rules for the Classification of Inland Navigation Vessels (NR217).
Examinations and tests
Symbols for examinations and tests used in the tables
implemented in Section 2 to Section 5 have the following
meaning:
a) Equipment for primary essential services (services which
need to be maintained in continuous operation):
• steering gear
• actuating systems for controllable pitch propellers
“X” indicates that examinations and tests are required.
• scavenging air blowers, fuel oil supply pumps, lubricating oil pumps and cooling water pumps for main
and auxiliary engines and turbines necessary for the
propulsion.
The index, if any, indicates a specific type of test:
h
: Pressure test
ht
: Tightness test
hose
: Hose testing
s
: Non-destructive test
bt
: Test bed trials.
• electrical equipment for electric propulsion plant
with lubricating oil pumps and cooling water pumps
2.4.9
Certifications
• hydraulic pumps supplying the above equipment
• azimuth thrusters which are the sole means for propulsion/steering with lubricating oil pumps, cooling
water pumps
• control, monitoring and safety devices/systems for
the equipment for primary essential services.
The document type is agreed according to the applicable
certification frame and/or production survey scheme implemented.
The symbols used in the tables regarding item certification
have the following meaning:
• “C” indicates that a Bureau Veritas certificate is required
with invitation of the Society’s Surveyor to attend the
tests unless otherwise agreed, in addition to the manufacturer’s document stating the results of the tests performed and/or compliance with the approved type, as
applicable
• speed regulators dependent on electrical energy for
main or auxiliary engines necessary for propulsion
b) Equipment for secondary essential services (services
which need not necessarily be in continuous operation):
• thrusters
• starting air and control air compressors
• bilge pumps
• fire pumps and other fire-extinguishing medium
pumps
• “W” indicates that a manufacturer’s certificate is
required, stating the results of the tests performed and/or
compliance with the approved type, as applicable
• ventilation fans for engine rooms
• services considered necessary to maintain dangerous cargo in safe condition
• “D” indicates that a manufacturer’s evidence of compliance with the approved type is required.
• navigation lights, aids and signals
2.5
Notice regarding column 5 (Survey
during fabrication)
• internal safety communication equipment
• fire detection and alarm system
2.5.1 As a general rule, even if a cell under column 5 is not
filled with a cross “X”, survey during fabrication (examinations and tests) may be required with invitation/attendance
of the Society’s Surveyor.
• electrical equipment for watertight closing system
2.6
• control, monitoring and safety for cargo containment systems
• hydraulic pumps supplying the above equipment
Notice regarding item K (Electrical
equipment)
2.6.1 Due to the great variety of electrical equipment (item
K), it has not been possible to give herewith the details of
the surveys to which these electrical equipment are to be
submitted. For certain given types of equipment, special test
leading to their approval are required; the programmes for
such type tests are set up for each category of equipment,
4
• electrical generators and associated power supplying the above equipment
• control, monitoring and safety devices/systems for
equipment for secondary essential services.
• windlasses.
The Society reserves the right to add other auxiliaries to this
list, whenever deemed necessary and more especially for
installations of peculiar types.
Bureau Veritas
April 2015
NR 544, Sec 2
SECTION 2
1
1.1
ALL VESSELS/UNITS (CARRIAGE OF DANGEROUS
GOODS EXCEPTED) WITH ASSIGNMENT OF
CHARACTER OF CONSTRUCTION {
Summary
Vessels/units with assignment of character of construction {
1.1.1 Provisions related to survey at works for assignment of character of construction
intended to carry dangerous goods, are summarized in the Table below.
{ for all vessels/units, excepted those
ALL VESSELS/UNITS (CARRIAGE OF DANGEROUS GOODS EXCEPTED) with assignment of character of construction {
Item
Title
Reference
Item A
Raw materials for hull
Tab 1
Item B
Hull outfitting
Tab 2
Item C
Fire protection, detection and extinguishing
Tab 3
Item E
Main diesel engine engines & their auxiliaries
Tab 4
Item G
Auxiliary machinery
Tab 5
Item K
Electrical installations
Tab 6
Item S
Pollution prevention installation covered by additional class notation Cleanvessel
Tab 7
April 2015
Bureau Veritas
5
Bureau Veritas
A9
A8
W
TA
TA
W
4 - Adhesives
C
W
3 - Core material for sandwiches
Cast steel shaft brackets (1)
W
2 - Reinforcement fibers
DA
DA (1)
TA (3)
TA (3)
TA (3)
Welding consumables (1)
A7
C
DA (1)
Transition joints steel / aluminium alloy (1)
A6
C
1 - Resin systems
Aluminium alloy plates, profiles, bars and tubes (1)
A5
C
C
Composite materials
Iron castings (1)
A4
Steel castings (1)
A3
C
C
2 - Tubes (2)
Steel forgings (1)
C
Item
Material
certification
1 - Plates, sections and bars (1)
Steel plates and profiles
A2
A1
N°
Design
assessment
index
X (2)
Xs (2)
X (2)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
RAW MATERIALS FOR HULL - ITEM A - {
C
W
W
W
W
C
D
C
Certification
6
All vessels/units (carriage of dangerous goods excepted)
Table 1: Raw materials for hull - item A - {
(1)
(2)
(3)
(1)
(2)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
As per NR216
Vibration analysis is recommended for single arm propeller shaft
DA for structure assembly
Representative sample of the structural assembly is to
be carried out by a testing laboratory accepted by the
Society
TA as per NR546, Sec 8
As per NR216, Ch 5, Sec 2
As per NR216, Ch 3, Sec 2
As per NR216, Ch 3, Sec 2
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 1
As per NR216, Ch 2 Sec 2
Remarks
NR 544, Sec 2
April 2015
C
C
C
C
W
Ropes (Steel wire ropes and fibre ropes) (1)
Sidescuttles and windows (1)
Shell doors
Hatchcovers (1)
Watertight doors
B5
B6
Bureau Veritas
B7
B8
B9
B10 External ramp (1)
B11 Movable deck and inner ramp (1)
B12 Independent tanks
B13 Elastic bedding
C
C
C
C
Anchor chain cable accessories (1)
(shackles, swivels and other attachment pieces)
C
C
B4
Anchor chain cables (1)
B3
C
C
2 - Rudder blade / nozzle shell
Anchors (1)
C
Item
1 - Rudder stock, shaft, pintles, coupling
Rudders / nozzles (1)
B2
B1
N°
Material
certification
DA
DA
DA
DA
DA
DA
DA
TA
TA
TA
DA
DA
X
X
X
X
X
X
X
X
Xs (1)
X
Xs
Xh (1)
Xhose
Xhose (1)
X (2)
X (2)
Xs (2)
Xs (2)
Xs
Xh (2)
X
During
After
fabrica- completion
tion
X
X
Running
tests
Examinations and tests
Product certification
HULL OUTFITTING - ITEM B - {
Design
assessment
index
April 2015
W
C
C
C
C
C
C
C
C
C
C
C
C
C
Certification
All vessels/units (carriage of dangerous goods excepted)
Table 2: Hull outfitting - item B - {
As per NR217, Pt B, Ch 6, Sec 7
Tests as per NR216, Ch 4, Sec 3
(1)
(2)
As per NR217, Pt B, Ch 6, Sec 6
Structural test is to be carried out for independent tanks
not used as cargo tanks
(1)
(1)
As per NR217, Pt B, Ch 6, Sec 6
Structural test is to be carried out for watertight doors
below freeboard or bulkhead deck either before or after
the door is fitted on board
(1)
(1)
As per NR217, Pt B, Ch 6, Sec 5
(1)
Hose test as per NR217, Pt B, Ch 8, Sec 3
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 1
(1)
(2)
(1)
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 1
As per NR217, Pt B, Ch 7, Sec 4
Additional approval for manufacturing process is required
for rolled bars of grade K2 and K3 (or Q2 and Q3)
(1)
(2)
(1)
(2)
As per NR217, Pt B, Ch 7, Sec 4
As per NR217, Pt B, Ch 7, Sec 1
Leak test is to be carried out for double plate rudder as
per NR217, Pt B, Ch 8, Sec 3
(1)
(1)
(2)
Remarks
NR 544, Sec 2
7
Bureau Veritas
W
4 - Water spray nozzles
W
5 - Water spray nozzles
W
3 - Discharge nozzles
Portable fire extinguishers (1)
Detection and alarm system (1)
C7
4 - Extinguishing agents
W
2 - Pressure tank
1 - Piping system
W
W
4 - Pressure water tank
Fixed gas fire extinguishing system (1)
W
3 - Water spray piping system
TA
TA
TA
TA
DA
TA
X
X
Xh
Xh
Xh
X
2 - Pump prime movers
X
Xh
X
X
Xh
DA
TA
TA
TA
TA
During
After
fabrica- completion
tion
X
X
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Pressure pumps
Automatic pressure water spraying system (1)
W
W
W
Material
certification
3 - Hoses
2 - Pump prime movers
1 - Fire pumps
C6
C5
C4
C3
Fire dampers (1)
C2
Water supply system (1)
Fire bulkheading, fire doors (1)
Item
C1
N°
Design
assessment
index
C
W
W
W
W
W
W
W
W
C
C
W
W
C
C
C
C
(1)
(1)
(1)
(1)
(1)
(1)
(1)
FIRE PROTECTION, DETECTION AND EXTINGUISHING - ITEM C - {
Certification
8
All vessels/units (carriage of dangerous goods excepted)
Table 3: Fire protection, detection and extinguishing - item C - {
As per NR217, Pt C, Ch 3, Sec 3
As per NR217, Pt C, Ch 3, Sec 4, [2]
As per NR217, Pt C, Ch 3, Sec 4, [4]
As per NR217, Pt C, Ch 3, Sec 4, [3]
As per NR217, Pt C, Ch 3, Sec 4, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
As per NR217, Pt C, Ch 3, Sec 1, [2]
Remarks
NR 544, Sec 2
April 2015
Bureau Veritas

E1
N°
C (4)
16 - Steer gear wheels for camshaft drives
Xh (13)
Xh
Xh
X
X
X
Xh
X
X
X
19 - Cylinder jacket, cooling space
Xs (11)
Xs (11)
Xs (11)
Xs
18 - Cylinder cover, cooling space
17 - Cylinder liner, over the whole length of cooling space
C (9)
15 - Bolts and studs for cylinder covers, crossheads, main
bearings and connecting rod bearings; nuts for tie rods
C
13 - Tie rods
C (12)
C
12 - Entablatures of welded construction
14 - Shaft and rotors, including blades for turbochargers
C
11 - Frames and crankcases of welded construction
10 - Bedplates of welded construction; plates and transverse
C
bearing girders made of forged or cast steel
(5) (10)
Xh
C
(5) (9)
9 - Steel cylinder covers
Xs (6)
Xh
C (9)
X
Xh
8 - Cylinder liners
Xs (8)
C (4)
C
7 - Crossheads
6 - Connecting rods, together with connecting rod bearing caps
Xh
C
C
C
W
W
W
W
W
W
W
W
W
W
W
W
C (4)
5 - Pistons rods
Xs (7)
W
4 - Steel piston crowns
X
W
Xs (6)
C
(4) (5)
W
C
C
C (4)
X
Xbt (2)
3 - Coupling bolts for crankshaft
Xs (3)
X
Running
tests
C (4)
DA
C
1 - Crankshaft
X
During
After
fabrica- completion
tion
Examinations and tests
2 - Crankshaft coupling flange (non-integral) for main power
transmissions
TA
Material
certification
Main diesel engines with diameter of cylinder bore,
D > 300 mm (1)
Item
Design
assessment
index
Product certification
Certification
April 2015
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - {
All vessels/units (carriage of dangerous goods excepted)
(15)
(16)
(14)
(13)
(12)
(11)
(9)
(10)
(8)
(7)
(6)
(3)
(4)
(5)
(1)
(2)
Table 4: Main diesel engines & their auxiliaries - item E - {
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be in accordance with stage A, B and C as
per NR217, in the presence of Surveyor
NDT of magnetic particle and ultrasonic
Material test is required if bore > 400 mm
Material tests are also required for parts made of material other than steel
NDT of magnetic particle or liquid penetrant (if
bore > 400 mm) and ultrasonic (all)
NDT of magnetic particle or liquid penetrant and ultrasonic are required if bore > 400 mm
NDT of magnetic particle or liquid penetrant (all) and
ultrasonic (if bore > 400 mm)
Material test is required if bore > 300 mm
Material tests are required even these parts are not
welded and for any material except grey cast iron
NDT of magnetic particle or liquid penetrant if
bore > 400 mm
Material certification and test as per NR217, Pt C, Ch 1,
Sec 14
For forged steel, test methods other than hydrostatic
testing may be accepted e.g. suitable NDT and documented dimensional test
Where the cooling space is sealed by the piston rod, or
by the piston ron and the shell, the pressure test is to be
carried out after the assembly
See item Turbochargers
Turbocharger air cooler are tested on the water side
only
Remarks
NR 544, Sec 2
9
Bureau Veritas
TA
DA
TA
Control and safety devices (1)
Mass produced diesel engines with diameter of cylinder bore,
D < 300 mm (1)
E5
E6
C
TA
Scavenging and supercharging compressors or blowers (1)
E4
C (2)
Turning gears of main diesel engines (1)
E3
X
Xs (2)
X (2)
X (2)
Xh
X
X h, s
Xh
29 - Engine driven pumps (oil, water, fuel, bilge)
C
Xh
28 - Engine driven air compressor if any (cylinders, covers, intercoolers and aftercoolers); air side, water side
Heat exchangers (1)
Xh
Xh
Xh
Xh (16)
Xh
27 - Scavenge pump cylinder
26 - Hydraulic system (piping pumps, actuators, etc for hydraulic drive of valves)
E2
E1
25 - Fuel injection system (injection pump body pressure side,
injection valve, injection pipes)
24 - Coolers, each side
23 - Exhaust pipe, cooling space
X (2)
X
Xbt (3)
X (2)
X
Xh
22 - Turbocharger, cooling space
C
C
C
C
C
C
C
C
C
C
C
C
Xh
(13) (14)
21 - Piston crown, cooling space
(15)
C
Xh
20 - Exhaust valve, cooling space
Running
tests

During
After
fabrica- completion
tion
Examinations and tests
Product certification
Item
Material
certification
N°
Design
assessment
index
10
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - {
As per NR217, Pt C, Ch 1, Sec 3
As per NR217, Pt C, Ch 1, Sec 2
Test to be done on board
As per NR217, Pt C, Ch 1, Sec 2
Shaft and rotor where D > 300 mm
Test to be carried out during bench trials of the engine
of which these equipment are mounted
As per NR217, Pt C, Ch 1, Sec 2
During load test
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be performed in accordance with NR217,
Pt C, Ch 1, Sec 2, [4.3]
(1)
(1)
(2)
(1)
(2)
(3)
(1)
(2)
(1)
(2)
Remarks
NR 544, Sec 2
April 2015
E8
E7
N°
Starting air receiver (1)
2 - Turbochargers not included as above
1 - Turbochargers having a power of 1000 kW and above and
fitted on diesel engines as listed below:
• main propulsion engines
• engines driving electric generators, including emergency
generators
• engines driving other auxiliaries essential for safety and
navigation and cargo pumps in tankers
Turbochargers (1)
Item
C
C (2)
Material
certification
April 2015
DA or TA
(3)
TA
Design
assessment
index
Xh
Xh, s
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
C
C
C
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - {
(1)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 14
Material test are required for shafts and rotors, including blades
Turbochargers are to be designed and constructed according to sound marine practice and delivered with
certificate relevant to the bench running test and the
hydrostatic test as per Rules
Remarks
NR 544, Sec 2
Bureau Veritas
11
Bureau Veritas

G3
G2
G1
N°
with transmitted power P < 220 kW
with transmitted power P ≥ 220 kW
C
5 - Cardan shafts
W
C
4 - Thrust shafts
7 - Sterntubes bushes and other shaft bearings
C
3 - Intermediate shafts
W
C
2 - Propeller shafts
6 - Sterntubes
C
1 - Coupling
W
(2)
with transmitted power P < 110 kW
•
C
W
Main propulsion shafting (1)
with transmitted power P ≥ 110 kW
•
2 - Other reduction and step-up gears:
•
•
C
DA
DA
DA
DA
DA
DA
DA
DA
TA
Gears and couplings (1)
1 - Reduction and/or reverse gears intended for propulsion:
TA
(2)
Material
certification
Auxiliary diesel engines (1)
Item
Design
assessment
index
Xs (5)
Xs (5)
Xs (3)
X
Xh
Xh (4)
Xh
X
X
Xh
X
Xh (3)
Xh, s (6)
Xh, s (6)
X (4)
X
During
After
fabrica- completion
tion
X
X
X
X
X
X
Xbt
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
W
W
C
C
C
C
C
C
W
C
W
C
C
Certification
12
All vessels/units (carriage of dangerous goods excepted)
Table 5: Auxiliary machinery - item G - {
(4)
(1)
(2)
(3)
(6)
(5)
(4)
As per NR217, Pt C, Ch 1, Sec 7
Material tests are required for all shaft components
Parts of hydraulic couplings, clutches of hydraulic reverse gears and control units, hubs and hydraulic cylinders of controllable pitch propellers, including piping
systems and associated fittings, are to be hydrostatically
tested to 1,5 times the maximum working pressure
Sterntubes, when machine-finished, and propeller shaft
liners, when machine-finished on the inside and with
an overthickness not exceeding 3 mm on the outside,
are to be hydrostatically tested to 0,2 N/mm2
As per NR217, Pt C, Ch 1, Sec 6
Material tests as per NR216, Ch 2, Sec 3 for the following items:
• pinions and wheel bodies
• rims
• plates and other elements intended for propulsion
gear casings of welded construction
Mechanical test and NDT are to be carried out for
pinions and wheel forgings in accordance with NR216,
Ch 2, Sec 3
Survey of shafts and their connections (flange couplings,
hubs, bolt pins) as per item G3 Main propulsion shafting
Static balancing test of rotating components in particular gear wheel and pinion shaft assemblies with the
coupling part attached. Where n2⋅d ≥ 1,5⋅109, gear
wheel and pinion shaft assemblies are also to undergo
a dynamic balancing test
Verification of cutting accuracy, meshing test and hydrostatic tests as per NR217
(1)
(2)
(3)
As per NR217, Pt C, Ch 1, Sec 2
(1)
Remarks
NR 544, Sec 2
April 2015
Bureau Veritas
G5
G4
C
4 - Pipes, valves and fittings (4)
X
Xh, ht
C
3 - Load transmitting components
Xs
Xh, ht
C
X
X
Xh, ht (5)
Xh
Xs (4)
2 - Pressure components
Xs
Xs (3)
X
X
X
X
Xh
X
Xh (4)
Xh
DA
DA
DA
DA
DA
DA or TA
(3)
DA
DA
DA
DA
During
After
fabrica- completion
tion
X
Xbt
Xbt
X (6)
X
X
Running
tests
Examinations and tests
Product certification
1 - Power unit
power < 50 kW
•
(2)
Steering gears (1)
power ≥ 50 kW
C
2 - Built-up and controllable pitch propeller (CPP)
•
C
(2)
Propellers (1)
1 - Solid propeller
C
W
G3
11 - Thrust sliding-blocks
W
9 - Coupling bolt or studs

10 - Flexible couplings
W
Item
8 - Propeller shaft liners
N°
Material
certification
April 2015
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - {
Certification
W
C
C
C
C
W
C
W
W
As per NR217, Pt C, Ch 1, Sec 11
Material tests, including examinations for internal defects, to be performed to components subject to pressure or transmitting mechanical forces as per NR216.
Works’ certificate may be accepted for low stressed
parts, provided all characteristics for which verification
is required are guaranteed
NDT are to be carried out for mechanical components
subjected to pressure or transmitting mechanical forces
Tests for pipes, valves and fittings are to comply with
NR217, Pt C, Ch 1, Sec 10, [20]
(1)
(2)
(4)
(3)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 8
Material tests to be in accordance with NR216 in the
presence of the Surveyor
Mass produced propellers may be accepted within the
framework of the type approval program of the Society
Static balancing is required for all finished propellers in
accordance with the specified ISO 484 tolerance class.
Dynamic balance is required for propellers running
above 500 rpm
Required static balancing of complete built-up and CPP
propellers may be replaced by an individual check of
blade weight and gravity centre position
Complete hydraulic system for the control of CPP
mechanism is to be hydrotested at a pressure equal to
1,5 times the design pressure. The proper operation of
the safety valve is to be tested in the presence of the
Surveyor
(1)
(2)
Remarks
NR 544, Sec 2
13
G7
G6
N°
Bureau Veritas
W (5)
C
2 - Thrusters intended for propulsion and steering
W (2)
1 - Transverse thrusters intended for manoeuvring
Thrusters and their prime movers (1) (2) (3)
3 - Systems
2 - Power unit
1 - Power transmitting components
Windlasses (1)
Item
Material
certification
14
DA or TA
(4)
TA
Design
assessment
index
X
X
X
Xh, ht
Xh, ht
X
Xh, ht
X
X
X (3) (4)
During
After
fabrica- completion
tion
X
X
X (5) (6)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
C
As per NR217, Pt C, Ch 1, Sec 12
Thrusters developing power less than 110 kW are to be
built in accordance with sound marine practice and
tested as required to the satisfaction of the Surveyor
Prime movers are to be tested in accordance with the
requirements applicable to the type of mover used
Mass produced thrusters may be accepted with the
frame work of type approval program of the Society
Material testing for parts of athwartship thrusters does
not need to be witnessed by a Surveyor, provided full
test reports are made available to him
(1)
(2)
(5)
(4)
(3)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 5
The material of component which are stressed by the
pull of the chain when the cable lifter is disengaged
(main shaft, cable lifter, brake bands, brake spindles,
brake bolts, tension strap) must possess mechanical
characteristics in conformity with NR216
Pressure test to be done to pressure components at
1,5 p, p being the working pressure. For working pressure over 200 bar, test pressure need not exceed
p + 100
Tightness tests are to be performed on components to
which this is appropriate
Operational test at twice the nominal pull. Where manufacturing works do not have adequate facilities, the
tests including the adjustment of the overload protection may be carried out on board the vessel. In these
cases, functional testing in the manufacturer’s works is
to be performed under load conditions
Working test to be carried out in the presence of the
Surveyor
(1)
(2)
Remarks
NR 544, Sec 2
April 2015
Bureau Veritas

G8
N°
Class 1: all in class 1
W
Class 2: if not in class 1
W
W
Class 2: V > 1 and p⋅V > 100 and not in class 1
Class 3: all pressure vessels which are not class 1 or class 2
W
Class 3: all pressure vessels and heat exchangers which
are not class 1 or class 2
W (4)
W (4)
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 150
Class 1: p > 1,6 or T > 300
C
W
Class 2: (V ≤ 10 and p > 100) or (1 < p ≤ 50 and p⋅V>1000)
6 - Pressure vessels for thermal oil
C
Class 1: V > 10 and p⋅V > 1000 and p > 50
5 - Pressure vessels for liquid substances
C
Class 1: p > 100 or p⋅V > 300
4 - Pressure vessels for gaseous substances
C
Class 1: p > 20 or p⋅V > 20 or T > 350
3 - Pressure vessels for corrosive substances
C
W (6)
Class 3: p⋅V ≤ 5 or V ≤ 2
2 - Pressure vessels for toxic substances
W (6)
C
(3) (4)
Class 2: if not class 1 or class 3
Class 1: (p > 3,2 and V > 2) or (p⋅V > 20 and V > 2)
1 - Steam generators or boilers
Pressure equipment (1) (2)
Item
Material
certification
April 2015
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
Design
assessment
index
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
(5)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
(4)
(7)
(8)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 5
Definitions:
p : Design pressure, in MPa
V : Volume, in liters
T : Design temperature, in °C
tA : Actual thickness of the vessel, in mm
In addition to the general requirement, material test for
the construction of pressure parts of boilers, other steam
generators, oil fired thermal oil heaters and exhaust gas
thermal oil heaters to be witnessed by the Surveyor
Material test to be witnessed by the Surveyor for class 1
pressure vessels and heat exchangers. This may be
waived for mass produced small pressure vessels e.g.
accumulators for valve controls, gas bottles, etc.
Hydrostatic test of all class 1, class 2 and class 3 pressure vessels are to be witnessed by the Surveyor with
the exception of mass produced pressure vessels which
are built under the conditions stated in (6)
Product certificate W may be accepted for mass produced small pressure vessels of class 1, class 2 and
class 3 which are type approved by the Society
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Remarks
NR 544, Sec 2
15
G9
G8

N°
W
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 60
Bureau Veritas
4 - Gas-consuming appliances
3 - Receptacle fittings subjected to pressure
2 - Other pipes
1 - Medium-pressure pipes
Domestic gas installations (1)
Class III piping system if design pressure exceeds 3,5 bar
Class II piping system
W
W (8)
W
Class 2: 15 ≤ tA ≤ 40
9 - Oil firing equipment (7)
C
Class 1: tA > 40
8 - Whatever type of equipment
C
W
Class 1: p > 1,6 or T > 150
7 - Pressure vessels for fuel oil, lubricating oil or flammable
hydraulic oil
Item
Material
certification
16
DA
DA
DA
DA
DA
Design
assessment
index
Xht (7)
Xht (4) (5)
Xh, ht (2)
(3)
X (6)
Xh
Xh
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
During
After
fabrica- completion
tion
X (8)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
W
W
W
C
C
C
C
C
(8)
(7)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 13
Pressure test is carried out with air, an inert gas or liquid
at a pressure of 20 bar above atmospheric pressure
Gastightness test is carried out with air or an inert gas
at a pressure of 3,5 bar above atmospheric pressure
Tightness test, for concerning pipes, is to be carried out
with air or an inert gas at a pressure of 1 bar above atmospheric pressure
Leak test, for concerning pipes, is to be carried out at a
pressure of 0,15 bar above atmospheric pressure
Gastightness, tightness and leak tests for the pipes are
deemed gastight if, after sufficient time to allow for normal balancing, no fall in the test pressure is observed
during the following 10 minutes
Tightness test is carried out with a foaming substance at
the operating pressure
All gas-consuming appliances shall be brought into service and tested at the nominal pressure to ensure that
combustion is satisfactory with the regulating knobs in
the different positions. Flame failure devices shall be
checked to ensure that they operate satisfactorily
Remarks
NR 544, Sec 2
April 2015
2 - Class III piping system if design pressure exceeds 3,5 bar (4)
1 - Class II piping system
Pumps and compressors (1)
Item
Bureau Veritas
C
6 - Forced circulation pumps for main boilers
G12
Xh
Xht
3 - Systems
Xh
Xh
Xh
Xh
DA
X (5) (6)
2 - Power unit
W
DA or TA
DA
DA
Xh
Xh
Xh
Xh (3)
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Pressure casings and oil lines
Hydraulic system (1)
C
C
5 - Feed pumps for main boilers
G11 Starting air receiver (1)
W
W
W (2)
(7)
4 - Bilge and fire pumps
G10 3 - Class III piping system other than above
N°
Material
certification
April 2015
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
C
C
W
C
C
(7)
(1)
(1)
(6)
(7)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 10, [20]
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Cylinders, covers and casings of pumps and compressors are to be subjected to an hydrostatic test. Tightness
tests are to be performed on components to which this
is appropriate
Pumps within this category:
• boiler feed water or forced circulating
• fuel oil or other flammable oil
• compressed air
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
For main parts before assembling
For product certificate C, alternative type of certificate
may be accepted depending on the Survey Scheme.
See NR217, Part A
Remarks
NR 544, Sec 2
17
1 - Class II
Pipes, Piping (1)
Bureau Veritas
diameter > 100 mm
•
4 - Remote controlled valves
3 - For plastic pipes
diameter ≤ 100 mm
G14 •
2 - Valves for pipe Class III
1 - Valves for pipe Class II
Pipe fittings (1)
C
C
W
C
C
4 - Plastic piping
W
C (2)
C
Item
3 - Hose assemblies and compensators
G13 2 - Class III
N°
Material
certification
18
DA
DA
DA
TA (6)
Design
assessment
index
X (2)
X (2)
X
X (3)
X (3)
X
Xh (3)
Xh (3)
Xh (3)
Xh
Xh (7)
Xh (4)
Xh (4) (5)
During
After
fabrica- completion
tion
X
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
W
C
C
C
W
C
As per NR217, Pt C, Ch 1, Sec 10, [20]
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
The following valves are to be subjected in the manufacture’s work to an hydraulic pressure test in the presence of the Surveyor and are also subjected to undergo
a tightness test at 1,0 times the nominal pressure:
• valves of pipe Class II to 1,5 PR
• valves mounted on the vessel’s side not less than
5 bar
(1)
(2)
(3)
(7)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials is to be in the form
of an inspection certificate according to EN 10.204. 3.1
or equivalent
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
All pipe systems are to be tested for leakage under operational conditions. If necessary, special techniques
other than hydraulic pressure tests are to be applied:
• heating coils in tanks and fuel lines must be tested
to not less than 1,5 PB but in no case less than 4 bar
• liquefied gas process piping systems are to be leak
tested (by air, halides, etc.) to a pressure depending
on the leak detection method applied
All Class II pipes (and other concerning items) having a
design pressure PR greater than 3,5 bar shall be subjected to an hydraulic pressure test in the presence of
the Surveyor
Relevant tests are to be carried out on each type and
each size as per NR467, Pt C, Ch 1, Sec 10, [2.1.3]
Hydrostatic tests under supervision of the Society
(1)
(2)
Remarks
NR 544, Sec 2
April 2015
Bureau Veritas
K3
K2
K1
N°
power < 50 kW/kVA
power ≥ 50 kW/kVA
power < 50 kW/kVA
power ≥ 50 kW/kVA
power ≥ 50 kW/kVA
power < 50 kW/kVA
•
•
Transformers (1)
•
•
Electrical machines (1)
•
•
Generators (1)
Item
W
C
W
C
Material
certification
TA
TA
TA
X (2)
X (2)
X (2) (3)
X (2) (3)
X (2) (3)
X (2) (3)
During
After
fabrica- completion
tion
X
X
X
X
X
X
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - {
Design
assessment
index
April 2015
W
C
W
C
W
C
Certification
All vessels/units (carriage of dangerous goods excepted)
Table 6: Electrical installations - item K - {
As per NR217, Pt C, Ch 2, Sec 4
Power transformers are to be tested according to IEC
60076
(1)
(2)
(3)
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
(1)
(2)
(3)
(1)
(2)
Remarks
NR 544, Sec 2
19
Bureau Veritas
power < 2 kW/kVA
•
Cables and insulated wires (1)
Control, monitoring, alarm and safety systems (1)
K8
K9
power < 100 kW/kVA
•
Switchgear (1)
power ≥ 100 kW/kVA (2)
•
Switchboards (1)
power ≥ 2 kW/kVA
•
Storage battery chargers (1)
Storage batteries (1)
Item
K7
K6
K5
K4
N°
Material
certification
20
TA
TA (2)
TA (2)
DA or TA
DA or TA
TA
TA
Design
assessment
index
X
X
X
X (3)
X
X
During
After
fabrica- completion
tion
X (2)
X
X
X
X
X
X (2)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - {
Certification
C
W
W
W
C
W
C
W
As per NR217, Pt C, Ch 2, Sec 7
Including switchboards for emergency generator sets
Tests to be performed:
• operational test
• high voltage test
• insulation resistance measurement
As per NR217, Pt C, Ch 2, Sec 7.
As a general principle, switchgear shall be type approved, designed and constructed in accordance with
standard IEC, EN or other standards recognized by the
Society
As per NR217, Pt C, Ch 2, Sec 12
As a general principle, the use of the types of cables
and wired according to IEC 60092 is permitted
As per NR217, Pt C, Ch 2, Sec 13
Operational test to be performed
(1)
(2)
(1)
(2)
(1)
(2)
As per NR217, Pt C, Ch 2, Sec 5
(1)
(1)
(2)
(3)
As per NR217, Pt C, Ch 2, Sec 5
The following shall be tested:
• installation of storage batteries
• ventilation of battery rooms, cupboards/containers;
and cross-section of ventilation ducts
• storage battery charging equipment
• required caution labels and information plates
(1)
(2)
Remarks
NR 544, Sec 2
April 2015
power < 50 kW/kVA
•
Item
Bureau Veritas
power < 50 kW/kVA
•
2 - Class 3, class 4 and class 5
K12 1 - Class 1 and class 2
Computer systems (1)
power ≥ 50 kW/kVA
K11 •
Electrical propulsion plants (1)
power ≥ 50 kW/kVA
Power electronics (1)
K10 •
N°
DA or TA
TA
TA
W (2) DA or TA
(3)
C (2)
(3)
Material
certification
April 2015
Design
assessment
index
X (4)
X (4)
X (2)
X (2)
X (5)
X (5)
X (2)
X (2)
During
After
fabrica- completion
tion
X
X
X (6) (7)
X (6) (7)
X (3)
X (3)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - {
Certification
C
W
W
C
W
C
As per NR217, Pt C, Ch 2, Sec 15
Material certificate for shafts. Shafts are to be made of
material complying with NR216, Ch 2, Sec 3 or, where
rolled products are allowed in place of forgings, with
NR216, Ch 2, Sec 1
Shaft material for electric propulsion motors and for
main engine driven generators where the shaft is part of
the propulsion shafting is to be certified by the Society
If appropriate, where welded parts are foreseen on
shafts and rotors, the provisions of NR216, Chapter 5
apply
Type test are to be carried out on a prototype machine
or on the first of a batch of machines, and routine tests
carried out on the subsequent machines
Functioning of the propulsion plant shall be proved by
dock trial before river trials
Testing during trial voyages as per NR217, Pt C, Ch 2,
Sec 17
As per NR217, Pt C, Ch 2, Sec 16
Following test shall be carried out in the manufacturer’s
works:
• function test
• operating conditions simulation
• fault simulation
• simulation of the application environment
(1)
(2)
(1)
(2)
(7)
(6)
(5)
(4)
(3)
(3)
As per NR217, Pt C, Ch 2, Sec 14
Routine tests to be performed:
• voltage test
• insulation resistance test
Operational test to be performed on the subsequent
machines
(1)
(2)
Remarks
NR 544, Sec 2
21
Bureau Veritas
Grey water treatment plants (1)
S5
S7
Oily water separator (OWS) systems (1)
Onboard NOx monitoring systems (1)
Advanced water treatment plants (1)
S4
S6
Anti-fouling system (1)
Incinerator (1)
S2
Material
certification
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
Remarks
TA
TA
TA
TA
TA (2)
TA
TA
Xh
X
X
X
X
X
Xh
X
X
X
X
X
X
C
C
C
C
C
C
C
In accordance with International Convention on the
Control of Harmful and Anti-fouling Systems, 2001,
Annex 4, Appendices 1 and 2
Anti-fouling paint are to be a type approved by the Society, on the basis of the following criteria:
• TBT-free
• small quantities of organotin compounds acting as
a chemical catalyst are allowed provided their concentration does not exceed 2500 mg total tin per kg
of dry paint
(1)
In accordance with IMO Resolution MEPC. 107 (49)
Where NOx reduction methods (such as water injection, fuel oil emulsification, charge air humidification,
exhaust gas after-treatment) are used, they are to be approved by the Society and taken into account in type
approval certification of the engine
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
In accordance with IMO Resolution MEPC. 76 (40) as
amended by Resolution MAPC.93 (45) and Annex VI of
MARPOL 73/78, Appendix IV
(1)
(2)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
Pollution prevention installation covered by additional class notation Cleanvessel as per NR217, Pt D, Ch 2, Sec 11
Item
S3
Sewage treatment plant (1)
S1
S
N°
Design
assessment
index
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - {
Certification
22
All vessels/units (carriage of dangerous goods excepted)
Table 7: Pollution prevention installation covered by additional class notation Cleanvessel - item S - {
NR 544, Sec 2
April 2015
Exhaust gas cleaning (EGC) systems (1)
Oil content meter
Oil sealing glands
Leak detector for refrigeration systems
S9
S10
S11
Item
S8
N°
Material
certification
April 2015
TA
TA
TA
TA
Design
assessment
index
X
X
X
X
During
After
fabrica- completion
tion
X
X
X
X
Running
tests
Examinations and tests
Product certification
C
C
C
C
Certification
(1)
In accordance with IMO Resolution MEPC.184 (59):
2009 Guidelines for exhaust gas cleaning systems
Remarks
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - {
NR 544, Sec 2
Bureau Veritas
23
NR 544, Sec 3
SECTION 3
1
1.1
ALL VESSELS/UNITS (CARRIAGE OF DANGEROUS
GOODS EXCEPTED) WITH ASSIGNMENT OF
CHARACTER OF CONSTRUCTION µ
Summary
Vessels/units with assignment of character of construction µ
1.1.1 Provisions related to survey at works for assignment of character of construction
intended to carry dangerous goods, are summarized in the Table below.
µ for all vessels/units, excepted those
ALL VESSELS/UNITS (CARRIAGE OF DANGEROUS GOODS EXCEPTED) with assignment of character of construction µ
Item
24
Title
Reference
Item A
Raw materials for hull
Tab 8
Item B
Hull outfitting
Tab 9
Item C
Fire protection, detection and extinguishing
Tab 10
Item E
Main diesel engine engines & their auxiliaries
Tab 11
Item G
Auxiliary machinery
Tab 12
Item K
Electrical installations
Tab 13
Item S
Pollution prevention installation covered by additional class notation Cleanvessel
Tab 14
Bureau Veritas
April 2015
Bureau Veritas
A9
A8
W
TA
TA
W
4 - Adhesives
W
W
3 - Core material for sandwiches
Cast steel shaft brackets (1)
W
2 - Reinforcement fibers
DA
DA (1)
TA (3)
TA (3)
TA (3)
Welding consumables (1)
A7
W
1 - Resin systems
Transition joints steel / aluminium alloy (1)
A6
W
DA (1)
Aluminium alloy plates, profiles, bars and tubes. (1)
A5
W
W
Composite materials
Iron castings (1)
Steel castings (1)
W
W
2 - Tubes (2)
Steel forgings (1)
W
1 - Plates, sections & bars (1)
Steel plates and profiles
Item
A4
A3
A2
A1
N°
Material
certification
X (2)
Xs (2)
X (2)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
RAW MATERIALS FOR HULL - ITEM A - µ
Design
assessment
index
April 2015
W
W
W
W
W
D
D
W
Certification
All vessels/units (carriage of dangerous goods excepted)
Table 8: Raw materials for hull - item A - µ
(1)
(2)
As per NR217, Pt B, Ch 7, Sec 3
Vibration analysis is recommended for single arm propeller shaft
DA for structure assembly
Representative sample of the structural assembly is to
be carried out by a testing laboratory accepted by the
Society
TA as per NR546, Sec 8
(1)
(2)
(3)
As per NR216, Ch 5, Sec 2
As per NR216, Ch 3, Sec 2
As per NR216, Ch 3, Sec 2
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 1
As per NR216, Ch 2, Sec 2
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
Remarks
NR 544, Sec 3
25
Bureau Veritas
W
W
W
Sidescuttles and windows (1)
Shell doors
Hatchcovers (1)
Watertight doors
B6
B7
B8
B9
B10 External ramp (1)
B11 Movable deck and inner ramp (1)
B12 Independent tanks
B13 Elastic bedding
W
Ropes (Steel wire ropes and fibre ropes) (1)
B5
W
W
W
W
W
Anchor chain cable accessories (1)
(shackles, swivels and other attachment pieces)
W
W
B4
Anchor chain cables (1)
B3
W
W
2 - Rudder blade / nozzle shell
Anchors (1)
W
Item
Material
certification
1 - Rudder stock, shaft, pintles, coupling
Rudders / nozzles (1)
B2
B1
N°
DA
DA
DA
DA
DA
DA
DA
TA
TA
TA
DA
DA
Design
assessment
index
X
X
X
X
X
X
X
X
Xh (1)
X
Xs
Xh (1)
Xhose
Xhose (1)
X (2)
X (2)
Xs (2)
Xs (2)
Xs
Xh (2)
X
During
After
fabrica- completion
tion
X
X
Running
tests
Examinations and tests
Product certification
HULL OUTFITTING - ITEM B - µ
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
26
All vessels/units (carriage of dangerous goods excepted)
Table 9: Hull outfitting - item B - µ
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 3
(1)
(2)
As per NR217, Pt B, Ch 6, Sec 6
Structural test is to be carried out for independent tanks
not used as cargo tanks
(1)
(1)
As per NR217, Pt B, Ch 6, Sec 6
Structural test is to be carried out for watertight doors
below freeboard or bulkhead deck either before or after
the door is fitted on board
(1)
(1)
As per NR217, Pt B, Ch 6, Sec 5
(1)
Hose test as per NR217, Pt B, Ch 8, Sec 3
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 1
(1)
(2)
(1)
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 1
As per NR217, Pt B, Ch 7, Sec 4
Additional approval for manufacturing process is required for rolled bars of grade K2 and K3 (or Q2 and Q3)
(1)
(2)
(1)
(2)
As per NR217, Pt B, Ch 7, Sec 4
As per NR217, Pt B, Ch 7, Sec 1
Leak test is to be carried out for double plate rudder as
per NR217, Pt B, Ch 8, Sec 3
(1)
(1)
(2)
Remarks
NR 544, Sec 3
April 2015
Bureau Veritas
W
4 - Water spray nozzles
W
5 - Water spray nozzles
W
3 - Discharge nozzles
Portable fire extinguishers (1)
Detection and alarm system (1)
C7
4 - Extinguishing agents
W
2 - Pressure tank
1 - Piping system
W
W
Fixed gas fire extinguishing system (1)
W
4 - Pressure water tank
TA
TA
TA
TA
DA
TA
XS
Xh
Xh
Xh
Xh
X
2 - Pump prime movers
3 - Water spray piping system
Xh
DA
TA
1 - Pressure pumps
Automatic pressure water spraying system (1)
W
3 - Hoses
X
Xh
Xh
Xh
TA
TA
TA
During
After
fabrica- completion
tion
X
X
X
X
X
Running
tests
Examinations and tests
2 - Pump prime movers
W
W
Material
certification
1 - Fire pumps
C6
C5
C4
C3
Fire dampers (1)
C2
Water supply system (1)
Fire bulkheading, fire doors (1)
Item
C1
N°
Design
assessment
index
Product certification
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
April 2015
(1)
(1)
(1)
(1)
(1)
(1)
(1)
FIRE PROTECTION, DETECTION AND EXTINGUISHING - ITEM C - µ
All vessels/units (carriage of dangerous goods excepted)
Table 10: Fire protection, detection and extinguishing - item C - µ
As per NR217, Pt C, Ch 3, Sec 3
As per NR217, Pt C, Ch 3, Sec 4, [2]
As per NR217, Pt C, Ch 3, Sec 4, [4]
As per NR217, Pt C, Ch 3, Sec 4, [3]
As per NR217, Pt C, Ch 3, Sec 4, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
Remarks
NR 544, Sec 3
27
Bureau Veritas

E1
N°
W (4)
5 - Pistons rods
W
(5) (9)
9 - Steel cylinder covers
W (4)
16 - Steer gear wheels for camshaft drives
18 - Cylinder cover, cooling space
17 - Cylinder liner, over the whole length of cooling space
W (9)
15 - Bolts and studs for cylinder covers, crossheads, main
bearings and connecting rod bearings; nuts for tie rods
W
13 - Tie rods
W (12)
W
12 - Entablatures of welded construction
14 - Shaft and rotors, including blades for turbochargers
W
11 - Frames and crankcases of welded construction
10 - Bedplates of welded construction; plates and transverse
W
bearing girders made of forged or cast steel
(5) (10)
W (9)
W (4)
8 - Cylinder liners
7 - Crossheads
W
W
(4) (5)
4 - Steel piston crowns
6 - Connecting rods, together with connecting rod bearing caps
W (4)
3 - Coupling bolts for crankshaft
DA
W
W (4)
1 - Crankshaft
2 - Crankshaft coupling flange (non-integral) for main power
transmissions
TA
Material
certification
Main diesel engines with diameter of cylinder bore, D > 300 mm
(1)
Item
Design
assessment
index
Xs (11)
Xs (11)
Xs (11)
Xs
Xs (6)
Xs (8)
Xs (7)
Xs (6)
Xs (3)
X
Xh (13)
Xh
X
X
X
Xh
X
X
X
Xh
Xh
X
Xh
Xh
X
X
X
During
After
fabrica- completion
tion
X (2)
Running
tests
Examinations and tests
Product certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - µ
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
28
All vessels/units (carriage of dangerous goods excepted)
(15)
(16)
(14)
(13)
(12)
(11)
(9)
(10)
(8)
(7)
(6)
(3)
(4)
(5)
(1)
(2)
Table 11: Main diesel engines & their auxiliaries - item E - µ
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be in accordance with stage A, B and C as
per NR217, in the presence of the Surveyor
NDT of magnetic particle and ultrasonic
Material test is required if bore > 400 mm
Material tests are also required for parts made of material other than steel
NDT of magnetic particle or liquid penetrant (if
bore > 400 mm) and ultrasonic (all)
NDT of magnetic particle or liquid penetrant and ultrasonic are required if bore > 400 mm
NDT of magnetic particle or liquid penetrant (all) and
ultrasonic (if bore > 400 mm)
Material test is required if bore > 300 mm
Material tests are required even these parts are not
welded and for any material except grey cast iron
NDT of magnetic particle or liquid penetrant if
bore > 400 mm
Material certification and test as per NR217, Pt C, Ch 1,
Sec 14
For forged steel, test methods other than hydrostatic
testing may be accepted e.g. suitable NDT and documented dimensional test
Where the cooling space is sealed by the piston rod, or
by the piston ron and the shell, the pressure test is to be
carried out after the assembly
See item Turbochargers
Turbocharger air cooler are tested on the water side
only
Remarks
NR 544, Sec 3
April 2015
Bureau Veritas
DA
TA
Control and safety devices (1)
Mass produced diesel engines with diameter of cylinder bore,
D < 300 mm (1)
E5
E6
W
TA
Scavenging and supercharging compressors or blowers (1)
E4
W (2)
Turning gears of main diesel engines (1)
E3
X
Xs (2)
X (2)
X (2)
Xh
X
X h, s
Xh
29 - Engine driven pumps (oil, water, fuel, bilge)
TA
Xh
28 - Engine driven air compressor if any (cylinders, covers, intercoolers and aftercoolers); air side, water side
Heat exchangers (1)
Xh
Xh
Xh
Xh (16)
27 - Scavenge pump cylinder
26 - Hydraulic system (piping pumps, actuators, etc for hydraulic drive of valves)
25 - Fuel injection system (injection pump body pressure side,
injection valve, injection pipes)
24 - Coolers, each side
W
Xh
22 - Turbocharger, cooling space
Xh
Xh
(13) (14)
21 - Piston crown, cooling space
23 - Exhaust pipe, cooling space
Xh
20 - Exhaust valve, cooling space
(15)
Xh
During
After
fabrica- completion
tion
X (2)
X
Xbt (3)
X
X
Running
tests
Examinations and tests
19 - Cylinder jacket, cooling space
Item
E2
E1

N°
Material
certification
April 2015
Design
assessment
index
Product certification
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - µ
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 2
Shaft and rotor where D > 300 mm
Test to be carried out during bench trials of the engine
of which these equipment are mounted
As per NR217, Pt C, Ch 1, Sec 2
During load test
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be performed in accordance with NR217,
Pt C, Ch 1, Sec 2, [4.3]
(1)
(2)
(3)
(1)
(2)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 3
(1)
(1)
Remarks
NR 544, Sec 3
29
E8
E7
N°
Starting air receiver (1)
2 - Turbochargers not included as above
1 - Turbochargers having a power of 1000 kW and above and
fitted on diesel engines as listed below:
• main propulsion engines
• engines driving electric generators, including emergency
generators
• engines driving other auxiliaries essential for safety and
navigation and cargo pumps in tankers
Turbochargers (1)
Item
Material
certification
W
W (2)
DA or TA
(3)
TA
Design
assessment
index
30
Xh
Xh, s
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
W
W
W
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - µ
(1)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 14
Material test are required for shafts and rotors, including blades
Turbochargers are to be designed and constructed according to sound marine practice and delivered with
certificate relevant to the bench running test and the
hydrostatic test as per Rules
Remarks
NR 544, Sec 3
Bureau Veritas
April 2015
Bureau Veritas

G3
G2
G1
N°
with transmitted power P < 220 kW
with transmitted power P ≥ 220 kW
W
5 - Cardan shafts
W
W
4 - Thrust shafts
7 - Sterntubes bushes and other shaft bearings
W
3 - Intermediate shafts
W
W
2 - Propeller shafts
6 - Sterntubes
W
1 - Coupling
W
(2)
with transmitted power P < 110 kW
•
W
W
W
Main propulsion shafting (1)
with transmitted power P ≥ 110 kW
•
2 - Other reduction and step-up gears:
•
•
1 - Reduction and/or reverse gears intended for propulsion:
DA
DA
DA
DA
DA
DA
DA
DA
DA
Gears and couplings (1)
(2)
TA
Auxiliary diesel engines (1)
Item
Material
certification
Xs (5)
Xs (5)
Xs (3)
X
Xh
Xh (4)
Xh
X
X
Xh
X
Xh (3)
Xh, s (6)
Xh, s (6)
X (4)
X
During
After
fabrica- completion
tion
X
X
X
X
X
X
Xbt
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Design
assessment
index
April 2015
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
All vessels/units (carriage of dangerous goods excepted)
Table 12: Auxiliary machinery - item G - µ
(4)
(1)
(2)
(3)
(6)
(5)
(4)
As per NR217, Pt C, Ch 1, Sec 7
Material tests are required for all shaft components
Parts of hydraulic couplings, clutches of hydraulic reverse gears and control units, hubs and hydraulic cylinders of controllable pitch propellers, including piping
systems and associated fittings, are to be hydrostatically
tested to 1,5 times the maximum working pressure
Sterntubes, when machine-finished, and propeller shaft
liners, when machine-finished on the inside and with
an overthickness not exceeding 3 mm on the outside,
are to be hydrostatically tested to 0,2 N/mm2
As per NR217, Pt C, Ch 1, Sec 6
Material tests as per NR216, Ch 2, Sec 3 for the following items:
• pinions and wheel bodies
• rims
• plates and other elements intended for propulsion
gear casings of welded construction
Mechanical test and NDT are to be carried out for
pinions and wheel forgings in accordance with NR216,
Ch 2, Sec 3
Survey of shafts and their connections (flange couplings,
hubs, bolt pins) as per item G3 Main propulsion shafting
Static balancing test of rotating components in particular gear wheel and pinion shaft assemblies with the
coupling part attached. Where n2⋅d ≥ 1,5⋅109, gear
wheel and pinion shaft assemblies are also to undergo
a dynamic balancing test
Verification of cutting accuracy, meshing test and hydrostatic tests as per NR217
(1)
(2)
(3)
As per NR217, Pt C, Ch 1, Sec 2
(1)
Remarks
NR 544, Sec 3
31
Bureau Veritas
G5
G4
W
4 - Pipes, valves and fittings (4)
X
Xh, ht
Xh, ht
W
Xs
W
3 - Load transmitting components
X
X
Xh, ht (5)
Xh
Xs (4)
2 - Pressure components
Xs
Xs (3)
X
X
X
X
Xh
X
Xh (4)
Xh
DA
DA
DA
DA
DA
DA or TA
(3)
DA
DA
DA
DA
During
After
fabrica- completion
tion
X
Xbt
Xbt
X (6)
X
X
Running
tests
Examinations and tests
Product certification
1 - Power unit
power < 50 kW
•
(2)
Steering gears (1)
power ≥ 50 kW
W
2 - Built-up and controllable pitch propeller (CPP)
•
W
(2)
Propellers (1)
1 - Solid propeller
C
W
G3
11 - Thrust sliding-blocks
W
9 - Coupling bolt or studs
10 - Flexible couplings
W
8 - Propeller shaft liners
Item

N°
Material
certification
32
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
C
W
W
(4)
(3)
(1)
(2)
(6)
(5)
(4)
(1)
(2)
(3)
As per NR217, Pt C, Ch 1, Sec 11
Material tests, including examinations for internal defects, to be performed to components subject to pressure or transmitting mechanical forces as per NR216
NDT are to be carried out for mechanical components
subjected to pressure or transmitting mechanical forces
Tests for pipes, valves and fittings are to comply with
NR217, Pt C, Ch 1, Sec 10, [20]
As per NR217, Pt C, Ch 1, Sec 8
Material tests to be in accordance with NR216
Mass produced propellers may be accepted within the
framework of the type approval program of the Society
Static balancing is required for all finished propellers in
accordance with the specified ISO 484 tolerance class.
Dynamic balance is required for propellers running
above 500 rpm
Required static balancing of complete built-up and CPP
propellers may be replaced by an individual check of
blade weight and gravity centre position
Complete hydraulic system for the control of CPP
mechanism is to be hydrotested at a pressure equal to
1,5 times the design pressure. The proper operation of
the safety valve is to be tested in the presence of the
Surveyor
Remarks
NR 544, Sec 3
April 2015
G7
G6
N°
Bureau Veritas
W (5)
W
2 - Thrusters intended for propulsion and steering
W (2)
1 - Transverse thrusters intended for manoeuvring
Thrusters and their prime movers (1) (2) (3)
3 - Systems
2 - Power unit
1 - Power transmitting components
Windlasses (1)
Item
Material
certification
April 2015
DA or TA
(4)
TA
Design
assessment
index
X
X
X
Xh, ht
Xh, ht
X
Xh, ht
X
X
X (3) (4)
During
After
fabrica- completion
tion
X
X
X (5) (6)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
As per NR217, Pt C, Ch 1, Sec 12
Thrusters developing power less than 110 kW are to be
built in accordance with sound marine practice and
tested as required to the satisfaction of the Surveyor
Prime movers are to be tested in accordance with the
requirements applicable to the type of mover used
Mass produced thrusters may be accepted with the
frame work of type approval program of the Society
Material testing for parts of athwartship thrusters does
not need to be witnessed by a Surveyor, provided full
test reports are made available to him
(1)
(2)
(5)
(4)
(3)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 5
The material of component which are stressed by the
pull of the chain when the cable lifter is disengaged
(main shaft, cable lifter, brake bands, brake spindles,
brake bolts, tension strap) must possess mechanical
characteristics in conformity with NR216
Pressure test to be done to pressure components at
1,5 p, p being the working pressure. For working pressure over 200 bar, test pressure need not exceed
p + 100
Tightness tests are to be performed on components to
which this is appropriate
Operational test at twice the nominal pull. Where manufacturing works do not have adequate facilities, the
tests including the adjustment of the overload protection may be carried out on board the vessel. In these
cases, functional testing in the manufacturer’s works is
to be performed under load conditions
Working test to be carried out in the presence of the
Surveyor
(1)
(2)
Remarks
NR 544, Sec 3
33
Bureau Veritas

G8
N°
W
Class 2: if not in class 1
W
W
Class 2: V > 1 and p⋅V > 100 and not in class 1
Class 3: all pressure vessels which are not class 1 or class 2
W
Class 3: all pressure vessels and heat exchangers which
are not class 1 or class 2
W (4)
W (4)
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 150
Class 1: p > 1,6 or T > 300
W
W
Class 2: (V ≤ 10 and p > 100) or (1 < p ≤ 50 and p⋅V>1000)
6 - Pressure vessels for thermal oil
W
Class 1: V > 10 and p⋅V > 1000 and p > 50
5 - Pressure vessels for liquid substances
W
Class 1: p > 100 or p⋅V > 300
4 - Pressure vessels for gaseous substances
W
W
Class 1: p > 20 or p⋅V > 20 or T > 350
3 - Pressure vessels for corrosive substances
Class 1: all in class 1
C
W (6)
Class 3: p⋅V ≤ 5 or V ≤ 2
2 - Pressure vessels for toxic substances
W (6)
W
(3) (4)
Class 2: if not class 1 or class 3
Class 1: (p > 3,2 and V > 2) or (p⋅V > 20 and V > 2)
1 - Steam generators or boilers
Pressure equipment (1) (2)
Item
Material
certification
34
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
Design
assessment
index
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
(5)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
(4)
(7)
(8)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 5
Definitions:
p : Design pressure, in MPa
V : Volume, in litres
T : Design temperature, in °C
tA : Actual thickness of the vessel, in mm
In addition to the general requirement, material test for
the construction of pressure parts of boilers, other steam
generators, oil fired thermal oil heaters and exhaust gas
thermal oil heaters to be witnessed by the Surveyor
Material test to be witnessed by the Surveyor for class 1
pressure vessels and heat exchangers. This may be
waived for mass produced small pressure vessels e.g.
accumulators for valve controls, gas bottles, etc.
Hydrostatic test of all class 1, class 2 and class 3 pressure vessels are to be witnessed by the Surveyor with
the exception of mass produced pressure vessels which
are built under the conditions stated in (6)
Product certificate W may be accepted for mass produced small pressure vessels of class 1, class 2 and
class 3 which are type approved by the Society
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Remarks
NR 544, Sec 3
April 2015
G9
G8

N°
W
W
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 60
Class II piping system
Bureau Veritas
4 - Gas-consuming appliances
3 - Receptacle fittings subjected to pressure
2 - Other pipes
1 - Medium-pressure pipes
Domestic gas installations (1)
Class III piping system if design pressure exceeds 3,5 bar
W
W (8)
W
Class 2: 15 ≤ tA ≤ 40
9 - Oil firing equipment (7)
W
Class 1: tA > 40
8 - Whatever type of equipment
W
Class 1: p > 1,6 or T > 150
7 - Pressure vessels for fuel oil, lubricating oil or flammable
hydraulic oil
Item
Material
certification
April 2015
DA
DA
DA
DA
DA
Design
assessment
index
Xht (7)
Xht (4) (5)
Xh, ht (2)
(3)
X (6)
Xh
Xh
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
During
After
fabrica- completion
tion
X (8)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
(8)
(7)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 13
Pressure test is carried out with air, an inert gas or liquid
at a pressure of 20 bar above atmospheric pressure
Gastightness test is carried out with air or an inert gas
at a pressure of 3,5 bar above atmospheric pressure
Tightness test, for concerning pipes, is to be carried out
with air or an inert gas at a pressure of 1 bar above atmospheric pressure
Leak test, for concerning pipes, is to be carried out at a
pressure of 0,15 bar above atmospheric pressure
Gastightness, tightness and leak tests for the pipes are
deemed gastight if, after sufficient time to allow for normal balancing, no fall in the test pressure is observed
during the following 10 minutes
Tightness test is carried out with a foaming substance at
the operating pressure
All gas-consuming appliances shall be brought into service and tested at the nominal pressure to ensure that
combustion is satisfactory with the regulating knobs in
the different positions. Flame failure devices shall be
checked to ensure that they operate satisfactorily
Remarks
NR 544, Sec 3
35
2 - Class III piping system if design pressure exceeds 3,5 bar (4)
1 - Class II piping system
Pumps and compressors (1)
Item
Bureau Veritas
W
6 - Forced circulation pumps for main boilers
G12
Xh
Xht
3 - Systems
Xh
Xh
Xh
2 - Power unit
DA
X (5) (6)
Xh
W
DA or TA
DA
DA
Xh
Xh
Xh
Xh (3)
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Pressure casings and oil lines
Hydraulic system (1)
W
W
5 - Feed pumps for main boilers
G11 Starting air receiver (1)
W
W
W (2)
(7)
4 - Bilge and fire pumps
G10 3 - Class III piping system other than above
N°
Material
certification
36
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
(7)
(1)
(1)
(6)
(7)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 10, [20]
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Cylinders, covers and casings of pumps and compressors are to be subjected to an hydrostatic test. Tightness
tests are to be performed on components to which this
is appropriate
Pumps within this category:
• boiler feed water or forced circulating
• fuel oil or other flammable oil
• compressed air
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
For main parts before assembling
For product certificate C, alternative type of certificate
may be accepted depending on the Survey Scheme.
See NR217, Part A
Remarks
NR 544, Sec 3
April 2015
1 - Class II
Pipes, Piping (1)
Bureau Veritas
diameter > 100 mm
•
4 - Remote controlled valves
3 - For plastic pipes
diameter ≤ 100 mm
G14 •
2 - Valves for pipe Class III
1 - Valves for pipe Class II
Pipe fittings (1)
W
W
W
W
W
4 - Plastic piping
W
W (2)
W
Item
3 - Hose assemblies and compensators
G13 2 - Class III
N°
Material
certification
April 2015
DA
DA
DA
TA (6)
Design
assessment
index
X (2)
X (2)
X
X (3)
X (3)
X
Xh (3)
Xh (3)
Xh (3)
Xh
Xh (7)
Xh (4)
Xh (4) (5)
During
After
fabrica- completion
tion
X
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
W
As per NR217, Pt C, Ch 1, Sec 10, [20]
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
The following valves are to be subjected in the manufacture’s work to an hydraulic pressure test in the presence of the Surveyor and are also subjected to undergo
a tightness test at 1,0 times the nominal pressure:
• valves of pipe Class II to 1,5 PR
• valves mounted on the vessel’s side not less than
5 bar
(1)
(2)
(3)
(7)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials is to be in the form
of an inspection certificate according to EN 10.204. 3.1
or equivalent
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
All pipe systems are to be tested for leakage under operational conditions. If necessary, special techniques
other than hydraulic pressure tests are to be applied:
• heating coils in tanks and fuel lines must be tested
to not less than 1,5 PB but in no case less than 4 bar
• liquefied gas process piping systems are to be leak
tested (by air, halides, etc.) to a pressure depending
on the leak detection method applied
All Class II pipes (and other concerning items) having a
design pressure PR greater than 3,5 bar shall be subjected to an hydraulic pressure test in the presence of
the Surveyor
Relevant tests are to be carried out on each type and each
size as per NR467, Pt C, Ch 1, Sec 10, [2.1.3]
Hydrostatic tests under supervision of the Society
(1)
(2)
Remarks
NR 544, Sec 3
37
Bureau Veritas
K3
K2
K1
N°
power < 50 kW/kVA
power ≥ 50 kW/kVA
power < 50 kW/kVA
•
•
•
power < 50 kW/kVA
power ≥ 50 kW/kVA
Transformers (1)
power ≥ 50 kW/kVA
•
Electrical machines (1)
•
•
Generators (1)
Item
Material
certification
W
W
W
W
TA
TA
TA
Design
assessment
index
X (2)
X (2)
X (2) (3)
X (2) (3)
X (2) (3)
X (2) (3)
During
After
fabrica- completion
tion
X
X
X (4)
X (4)
X (4)
X (4)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - µ
W
W
W
W
W
W
Certification
38
All vessels/units (carriage of dangerous goods excepted)
Table 13: Electrical installations - item K - µ
(1)
(2)
(4)
(3)
As per NR217, Pt C, Ch 2, Sec 4
Power transformers are to be tested according to IEC
60076
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
Test on board subjected to the most severe operating
conditions
(1)
(2)
(4)
(3)
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
Test on board of the generator sets shall be conducted
under normal operating conditions
(1)
(2)
Remarks
NR 544, Sec 3
April 2015
Bureau Veritas
power < 2 kW/kVA
•
Cables and insulated wires (1)
Control, monitoring, alarm and safety systems (1)
K8
K9
power < 100 kW/kVA
•
Switchgears (1)
power ≥ 100 kW/kVA (2)
•
Switchboards (1)
power ≥ 2 kW/kVA
•
Storage battery chargers (1)
Storage batteries (1)
Item
K7
K6
K5
K4
N°
Material
certification
April 2015
TA
TA (2)
TA (2)
DA or TA
DA or TA
TA
TA
Design
assessment
index
X
X
X
X (3)
X
X
During
After
fabrica- completion
tion
X (2)
X (3)
X
X
X
X
X (2)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - µ
Certification
W
W
W
W
W
W
W
W
As per NR217, Pt C, Ch 2, Sec 7
As a general principle, switchgear shall be type approved, designed and constructed in accordance with
standard IEC, EN or other standards recognized by the
Society
Test on board
As per NR217, Pt C, Ch 2, Sec 12
As a general principle, the use of the types of cables
and wired according to IEC 60092 is permitted
As per NR217, Pt C, Ch 2, Sec 13
Operational test to be performed
(1)
(2)
(1)
(2)
(1)
(2)
(3)
As per NR217, Pt C, Ch 2, Sec 7
Including switchboards for emergency generator sets
Tests to be performed:
• operational test
• high voltage test
• insulation resistance measurement
As per NR217, Pt C, Ch 2, Sec 5
As per NR217, Pt C, Ch 2, Sec 5
The following shall be tested:
• installation of storage batteries
• ventilation of battery rooms, cupboards/containers;
and cross-section of ventilation ducts
• storage battery charging equipment
• required caution labels and information plates
(1)
(2)
(3)
(1)
(1)
(2)
Remarks
NR 544, Sec 3
39
power < 50 kW/kVA
•
Item
Bureau Veritas
power < 50 kW/kVA
•
2 - Class 3, class 4 and class 5
K12 1 - Class 1 and class 2
Computer systems (1)
power ≥ 50 kW/kVA
K11 •
Electrical propulsion plants (1)
power ≥ 50 kW/kVA
Power electronics (1)
K10 •
N°
DA or TA
TA
TA
W (2) DA or TA
(3)
C (2)
(3)
Material
certification
40
Design
assessment
index
X (4)
X (4)
X (2)
X (2)
X (5)
X (5)
X (2)
X (2)
During
After
fabrica- completion
tion
X
X
X (6) (7)
X (6) (7)
X (3)
X (3)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - µ
Certification
W
W
W
C
W
W
As per NR217, Pt C, Ch 2, Sec 15
Material certificate for shafts. Shafts are to be made of
material complying with NR216, Ch 2, Sec 3 or, where
rolled products are allowed in place of forgings, with
NR216, Ch 2, Sec 1
Shaft material for electric propulsion motors and for
main engine driven generators where the shaft is part of
the propulsion shafting is to be certified by the Society
If appropriate, where welded parts are foreseen on
shafts and rotors, the provisions of NR216, Chapter 5
apply
Type test are to be carried out on a prototype machine
or on the first of a batch of machines, and routine tests
are to be carried out on the subsequent machines
Functioning of the propulsion plant shall be proved by
dock trial before river trials
Testing during trial voyages as per NR217, Pt C, Ch 2,
Sec 17
As per NR217, Pt C, Ch 2, Sec 16
Following test shall be carried out in the manufacturer’s
works:
• function test
• operating conditions simulation
• fault simulation
• simulation of the application environment
(1)
(2)
(1)
(2)
(7)
(6)
(5)
(4)
(3)
(3)
As per NR217, Pt C, Ch 2, Sec 14
Routine tests to be performed:
• voltage test
• insulation resistance test
Operational test to be performed on the subsequent
machines
(1)
(2)
Remarks
NR 544, Sec 3
April 2015
Anti-fouling system (1)
Advanced water treatment plants (1)
Grey water treatment plants (1)
Onboard NOx monitoring systems (1)
Oily water separator (OWS) systems (1)
Exhaust gas cleaning (EGC) systems (1)
S4
S5
S6
S7
S8
Incinerator (1)
S2
Material
certification
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Remarks
Bureau Veritas
TA
TA
TA
TA
TA
TA (2)
TA
TA
X
Xh
X
X
X
X
X
Xh
X
X
X
X
X
X
X
D
D
D
D
D
W
D
D
In accordance with International Convention on the
control of Harmful and Anti-fouling systems, 2001, Annex 4, Appendices 1 and 2
Anti-fouling paint are to be a type approved by the Society, on the basis of the following criteria:
• TBT-free
• small quantities of organotin compounds acting as
a chemical catalyst are allowed provided their concentration does not exceed 2500 mg total tin per kg
of dry paint
(1)
In accordance with IMO Resolution MEPC. 107 (49)
In accordance with IMO Resolution MEPC.184 (59):
2009 Guidelines for exhaust gas cleaning systems.
(1)
Where NOx reduction methods (such as water injection, fuel oil emulsification, charge air humidification,
exhaust gas after-treatment) are used, they are to be approved by the Society and taken into account in type
approval certification of the engine.
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
In accordance with IMO Resolution MEPC. 76 (40) as
amended by Resolution MAPC.93 (45) and Annex VI of
MARPOL 73/78, Appendix IV
(1)
(2)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
Pollution prevention installation covered by additional class notation Cleanvessel as per NR 217, Pt D, Ch 2, Sec 11
Item
S3
Sewage treatment plant (1)
S1
S
N°
Design
assessment
index
Product certification
Certification
April 2015
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - µ
All vessels/units (carriage of dangerous goods excepted)
Table 14: Pollution prevention installation covered by additional class notation Cleanvessel - item S - µ
NR 544, Sec 3
41
Oil content meter
Oil sealing glands
Leak detector for refrigeration systems
S10
S11
Item
S9
N°
TA
TA
TA
Design
assessment
index
Material
certification
42
X
X
X
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
D
D
D
Certification
Remarks
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - µ
NR 544, Sec 3
Bureau Veritas
April 2015
NR 544, Sec 4
SECTION 4
1
1.1
VESSELS INTENDED FOR THE CARRIAGE OF
DANGEROUS GOODS WITH ASSIGNMENT OF
CHARACTER OF CONSTRUCTION {
Summary
Vessels with assignment of character of construction {
1.1.1 Provisions related to survey at works for assignment of character of construction {, for vessels intended to carry dangerous goods, are summarized in the Table below.
VESSELS INTENDED FOR THE CARRIAGE OF DANGEROUS GOODS with assignment of character of construction {
Item
Title
Reference
Item A
Raw materials for hull
Tab 15
Item B
Hull outfitting
Tab 16
Item C
Fire protection, detection and extinguishing
Tab 17
Item E
Main diesel engine engines & their auxiliaries
Tab 18
Item G
Auxiliary machinery
Tab 19
Item H
Cargo handling and containment systems for liquefied gases
Tab 20
Item I
Cargo handling and containment systems for liquids
Tab 21
Item K
Electrical installations
Tab 22
Item S
Pollution prevention installation covered by additional class notation Cleanvessel
Tab 23
April 2015
Bureau Veritas
43
Bureau Veritas
A9
A8
W
TA
TA
W
4 - Adhesives
C
W
3 - Core material for sandwiches
Cast steel shaft brackets (1)
W
2 - Reinforcement fibers
DA
DA (1)
TA (3)
TA (3)
TA (3)
Welding consumables (1)
A7
C
DA (1)
Transition joints steel / aluminium alloy (1)
A6
C
1 - Resin systems
Aluminium alloy plates, profiles, bars and tubes (1)
A5
C
C
Composite materials
Iron castings (1)
A4
Steel castings (1)
A3
C
C
2 - Tubes (2)
Steel forgings (1)
C
Item
1 - Plates, sections & bars (1)
Steel plates and profiles
A2
A1
N°
Material
certification
X (2)
Xs (2)
X (2)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
RAW MATERIALS FOR HULL - ITEM A - {
Design
assessment
index
44
C
Certification
C
W
W
W
W
C
W
Vessels intended for the carriage of dangerous goods
Table 15: Raw materials for hull - item A - {
(1)
(2)
(3)
(1)
(2)
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
As per NR217, Pt B, Ch 7, Sec 3
Vibration analysis is recommended for single arm propeller shaft
DA for structure assembly
Representative sample of the structural assembly is to
be carried out by a testing laboratory accepted by the
Society
TA as per NR546, Sec 8
As per NR216, Ch 5, Sec 2
As per NR216, Ch 3, Sec 2
As per NR216, Ch 3, Sec 2
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 3
As per NR216, Ch 2, Sec 1
As per NR216, Ch 2 Sec 2
Remarks
NR 544, Sec 4
April 2015
Bureau Veritas
C
C
C
C
W
Ropes (steel wire ropes and fibre ropes) (1)
Sidescuttles and windows (1)
Shell doors
Hatchcovers (1)
Watertight doors
B5
B6
B7
B8
B9
B10 External ramp (1)
B11 Movable deck and inner ramp (1)
B12 Independent tanks
B13 Elastic bedding
C
C
C
C
Anchor chain cable accessories (1)
(shackles, swivels and other attachment pieces)
C
C
B4
Anchor chain cables (1)
B3
C
C
2 - Rudder blade / nozzle shell
Anchors (1)
C
Item
Material
certification
1 - Rudder stock, shaft, pintles, coupling
Rudders / nozzles (1)
B2
B1
N°
DA
DA
DA
DA
DA
DA
DA
TA
TA
TA
DA
DA
Design
assessment
index
April 2015
X
X
X
X
X
X
X
X
Xh (1)
X
Xs
Xh (1)
Xhose
Xhose (1)
X (2)
X (2)
Xs (2)
Xs (2)
Xs
Xh (2)
X
During
After
fabrica- completion
tion
X
X
Running
tests
Examinations and tests
Product certification
HULL OUTFITTING - ITEM B - {
C
C
C
C
C
C
C
C
C
C
C
Certification
W
Vessels intended for the carriage of dangerous goods
Table 16: Hull outfitting - item B - {
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 3
(1)
(2)
As per NR217, Pt B, Ch 6, Sec 6
Structural test is to be carried out for independent tanks
not used as cargo tanks
(1)
(1)
As per NR217, Pt B, Ch 6, Sec 6
Structural test is to be carried out for watertight doors
below freeboard or bulkhead deck either before or after
the door is fitted on board
(1)
(1)
As per NR217, Pt B, Ch 6, Sec 5
(1)
Hose test as per NR217, Pt B, Ch 8, Sec 3
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 1
(1)
(2)
(1)
As per NR217, Pt B, Ch 7, Sec 4
Tests as per NR216, Ch 4, Sec 1
As per NR217, Pt B, Ch 7, Sec 4
Additional approval for manufacturing process is required
for rolled bars of grade K1 and K2 (or Q2 and Q3)
(1)
(2)
(1)
(2)
As per NR217, Pt B, Ch 7, Sec 4
As per NR217, Pt B, Ch 7, Sec 1
Leak test is to be carried out for double plate rudder as
per NR217, Pt B, Ch 8, Sec 3
(1)
(1)
(2)
Remarks
NR 544, Sec 4
45
Bureau Veritas
W
4 - Water spray nozzles
W
5 - Water spray nozzles
W
3 - Discharge nozzles
Portable fire extinguishers (1)
Detection and alarm system (1)
C7
4 - Extinguishing agents
W
2 - Pressure tank
1 - Piping system
W
W
4 - Pressure water tank
Fixed gas fire extinguishing system (1)
W
3 - Water spray piping system
TA
TA
TA
TA
DA
TA
XS
Xh
Xh
Xh
Xh
X
2 - Pump prime movers
X
Xh
Xh
Xh
Xh
DA
TA
TA
TA
TA
During
After
fabrica- completion
tion
X
X
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Pressure pumps
Automatic pressure water spraying system (1)
W
W
W
Material
certification
3 - Hoses
2 - Pump prime movers
1 - Fire pumps
C6
C5
C4
C3
Fire dampers (1)
C2
Water supply system (1)
Fire bulkheading, fire doors (1)
Item
C1
N°
Design
assessment
index
C
W
W
W
W
W
W
W
W
C
C
W
W
C
C
C
C
(1)
(1)
(1)
(1)
(1)
(1)
(1)
FIRE PROTECTION, DETECTION AND EXTINGUISHING - ITEM C - {
Certification
46
Vessels intended for the carriage of dangerous goods
Table 17: Fire protection, detection and extinguishing - item C - {
As per NR217, Pt C, Ch 3, Sec 3
As per NR217, Pt C, Ch 3, Sec 4, [2]
As per NR217, Pt C, Ch 3, Sec 4, [4]
As per NR217, Pt C, Ch 3, Sec 4, [3]
As per NR217, Pt C, Ch 3, Sec 4, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
Remarks
NR 544, Sec 4
April 2015
Bureau Veritas

E1
N°
C (4)
5 - Pistons rods
C (9)
C
(5) (9)
8 - Cylinder liners
9 - Steel cylinder covers
C (4)
16 - Steer gear wheels for camshaft drives
Xh (13)
Xh
Xh
X
X
X
Xh
X
X
X
Xh
Xh
X
Xh
Xh
X
X
X
19 - Cylinder jacket, cooling space
Xs (11)
Xs (11)
Xs (11)
Xs
Xs (6)
Xs (8)
Xs (7)
Xs (6)
Xs (3)
X
During
After
fabrica- completion
tion
X (2)
Running
tests
Examinations and tests
18 - Cylinder cover, cooling space
17 - Cylinder liner, over the whole length of cooling space
C (9)
15 - Bolts and studs for cylinder covers, crossheads, main
bearings and connecting rod bearings; nuts for tie rods
C
13 - Tie rods
C (12)
C
12 - Entablatures of welded construction
14 - Shaft and rotors, including blades for turbochargers
C
11 - Frames and crankcases of welded construction
10 - Bedplates of welded construction; plates and transverse
C
bearing girders made of forged or cast steel
(5) (10)
C (4)
7 - Crossheads
C
C
(4) (5)
4 - Steel piston crowns
6 - Connecting rods, together with connecting rod bearing caps
C (4)
3 - Coupling bolts for crankshaft
DA
C
C (4)
1 - Crankshaft
2 - Crankshaft coupling flange (non-integral) for main power
transmissions
TA
Material
certification
Main diesel engines with diameter of cylinder bore, D > 300 mm
(1)
Item
Design
assessment
index
Product certification
C
C
C
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C
C
Certification
April 2015
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - {
Vessels intended for the carriage of dangerous goods
(15)
(16)
(14)
(13)
(12)
(11)
(9)
(10)
(8)
(7)
(6)
(3)
(4)
(5)
(1)
(2)
Table 18: Main diesel engines & their auxiliaries - item E - {
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be in accordance with stage A, B and C as
per NR217, in the presence of the Surveyor
NDT of magnetic particle and ultrasonic
Material test is required if bore > 400 mm
Material tests are also required for parts made of material other than steel
NDT of magnetic particle or liquid penetrant (if
bore > 400 mm) and ultrasonic (all)
NDT of magnetic particle or liquid penetrant and ultrasonic are required if bore > 400 mm
NDT of magnetic particle or liquid penetrant (all) and
ultrasonic (if bore > 400 mm)
Material test is required if bore > 300 mm
Material tests are required even these parts are not
welded and for any material except grey cast iron
NDT of magnetic particle or liquid penetrant if
bore > 400 mm
Material certification and test as per NR217, Pt C, Ch 1,
Sec 14
For forged steel, test methods other than hydrostatic
testing may be accepted e.g. suitable NDT and documented dimensional test
Where the cooling space is sealed by the piston rod or
by the piston rod and the shell, the pressure test is to be
carried out after the assembly
See item Turbochargers
Turbocharger air cooler are tested on the water side
only
Remarks
NR 544, Sec 4
47
Bureau Veritas
TA
DA
TA
Control and safety devices (1)
Mass produced diesel engines with diameter of cylinder bore
D < 300 mm (1)
E5
E6
C
TA
Scavenging and supercharging compressors or blowers (1)
E4
C (2)
Turning gears of main diesel engines (1)
E3
X
Xs (2)
X (2)
X (2)
Xh
X
X h, s
Xh
29 - Engine driven pumps (oil, water, fuel, bilge)
C
Xh
28 - Engine driven air compressor if any (cylinders, covers, intercoolers and aftercoolers); air side, water side
Heat exchangers (1)
Xh
Xh
Xh
Xh (16)
27 - Scavenge pump cylinder
26 - Hydraulic system (piping pumps, actuators, etc for hydraulic drive of valves)
E2
E1
25 - Fuel injection system (injection pump body pressure side,
injection valve, injection pipes)
24 - Coolers, each side
Xh
Xh
22 - Turbocharger, cooling space
23 - Exhaust pipe, cooling space
Xh
(13) (14)
21 - Piston crown, cooling space
(15)
Xh
20 - Exhaust valve, cooling space

During
After
fabrica- completion
tion
X (2)
X
Xbt (3)
X
X
Running
tests
Examinations and tests
Product certification
Item
Material
certification
N°
Design
assessment
index
48
C
C
C
C
C
C
C
C
C
C
C
C
C
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - {
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 2
Shaft and rotor where D > 300 mm
Test to be carried out during bench trials of the engine
of which these equipment are mounted
As per NR217, Pt C, Ch 1, Sec 2
During load test
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be performed in accordance with NR217,
Pt C, Ch 1, Sec 2, [4.3]
(1)
(2)
(3)
(1)
(2)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 3
(1)
(1)
Remarks
NR 544, Sec 4
April 2015
E8
E7
N°
Starting air receiver (1)
2 - Turbochargers not included as above
1 - Turbochargers having a power of 1000 kW and above and
fitted on diesel engines as listed below:
• main propulsion engines
• engines driving electric generators, including emergency
generators
• engines driving other auxiliaries essential for safety and
navigation and cargo pumps in tankers
Turbochargers (1)
Item
C
C (2)
Material
certification
April 2015
DA or TA
(3)
TA
Design
assessment
index
Xh
Xh, s
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
C
C
C
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - {
(1)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 14
Material test are required for shafts and rotors, including blades
Turbochargers are to be designed and constructed according to sound marine practice and delivered with
certificate relevant to the bench running test and the
hydrostatic test as per Rules
Remarks
NR 544, Sec 4
Bureau Veritas
49
Bureau Veritas

G3
G2
G1
N°
with transmitted power P < 220 kW
with transmitted power P ≥ 220 kW
C
W
C
4 - Thrust shafts
6 - Sterntubes
C
3 - Intermediate shafts
5 - Cardan shafts
C
2 - Propeller shafts
C
1 - Coupling
W
(2)
with transmitted power P < 110 kW
•
C
W
C
Main propulsion shafting (1)
with transmitted power P ≥ 110 kW
•
2 - Other reduction and step-up gears:
•
•
1 - Reduction and/or reverse gears intended for propulsion:
DA
DA
DA
DA
DA
DA
DA
DA
Gears and couplings (1)
(2)
TA
Auxiliary diesel engines (1)
Item
Material
certification
Xs (5)
Xs (5)
Xs (3)
X
Xh (4)
Xh
X
X
Xh
X
Xh (3)
Xh, s (6)
Xh, s (6)
X (4)
X
During
After
fabrica- completion
tion
X
X (7)
X (7)
X (7)
X (7)
Xbt
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Design
assessment
index
50
C
C
Certification
W
C
C
C
C
C
C
W
C
W
Vessels intended for the carriage of dangerous goods
Table 19: Auxiliary machinery - item G - {
(1)
(2)
(3)
(7)
(6)
(5)
(4)
As per NR217, Pt C, Ch 1, Sec 7
Material tests are required for all shaft components
Parts of hydraulic couplings, clutches of hydraulic reverse gears and control units, hubs and hydraulic cylinders of controllable pitch propellers, including piping
systems and associated fittings, are to be hydrostatically
tested to 1,5 times the maximum working pressure.
As per NR217, Pt C, Ch 1, Sec 6
Material tests as per NR216, Ch 2, Sec 3 for the following items:
• pinions and wheel bodies
• rims
• plates and other elements intended for propulsion
gear casings of welded construction
Mechanical test and NDT are to be carried out for
pinions and wheel forgings in accordance with NR216,
Ch 2, Sec 3
Survey of shafts and their connections (flange couplings,
hubs, bolt pins) as per item G3 Main propulsion shafting
Static balancing test of rotating components in particular gear wheel and pinion shaft assemblies with the
coupling part attached. Where n2⋅d ≥ 1,5⋅109, gear
wheel and pinion shaft assemblies are also to undergo
a dynamic balancing test
Verification of cutting accuracy, meshing test and hydrostatic tests as per NR217
Tests on board as per NR217, Pt C, Ch 1, Sec 15
(1)
(2)
(3)
As per NR217, Pt C, Ch 1, Sec 2
(1)
Remarks
NR 544, Sec 4
April 2015
Bureau Veritas
G5
G4
G3

N°
C
4 - Pipes, valves and fittings (4)
X
Xh, ht
C
3 - Load transmitting components
Xs
Xh, ht
C
X
X
Xh, ht (6)
Xh
Xs (4)
2 - Pressure components
Xs
Xs (3)
X
X
X
X
Xh
X
Xh (4)
Xh
Xh
DA
DA
DA
DA
DA
DA or TA
(3)
DA
DA
DA
DA
DA
During
After
fabrica- completion
tion
X
Xbt
Xbt
X (7)
X (5)
X
X
Running
tests
Examinations and tests
Product certification
1 - Power unit
power < 50 kW
•
(2)
Steering gears (1)
power ≥ 50 kW
C
2 - Built-up and controllable pitch propeller (CPP)
•
C
(2)
Propellers (1)
1 - Solid propeller
W
11 - Thrust sliding-blocks
W
9 - Coupling bolt or studs
C
W
8 - Propeller shaft liners
10 - Flexible couplings
W
7 - Sterntubes bushes and other shaft bearings
Item
Material
certification
April 2015
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - {
Certification
W
C
C
C
C
W
C
W
W
W
As per NR217, Pt C, Ch 1, Sec 11
Material tests, including examinations for internal defects, to be performed to components subject to pressure or transmitting mechanical forces as per NR216.
Works’ certificate may be accepted for low stressed
parts, provided all characteristics for which verification
is required are guaranteed
NDT are to be carried out for mechanical components
subjected to pressure or transmitting mechanical forces
Tests for pipes, valves and fittings are to comply with
NR217, Pt C, Ch 1, Sec 10, [20]
(1)
(2)
(4)
(3)
(7)
(5)
(6)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 8
Material tests to be in accordance with NR216 in the
presence of the Surveyor
Mass produced propellers may be accepted within the
framework of the type approval program of the Society
Static balancing is required for all finished propellers in
accordance with the specified ISO 484 tolerance class.
Dynamic balance is required for propellers running
above 500 rpm
Test on board as per NR217, Pt C, Ch 1, Sec 15
Required static balancing of complete built-up and CPP
propellers may be replaced by an individual check of
blade weight and gravity centre position
Complete hydraulic system for the control of CPP
mechanism is to be hydrotested at a pressure equal to
1,5 times the design pressure. The proper operation of
the safety valve is to be tested in the presence of the
Surveyor
Sterntubes, when machine-finished, and propeller shaft
liners, when machine-finished on the inside and with
an overthickness not exceeding 3 mm on the outside,
are to be hydrostatically tested to 0,2 N/mm2
(1)
(2)
(4)
Remarks
NR 544, Sec 4
51
G7
G6
N°
Bureau Veritas
W (5)
C
2 - Thrusters intended for propulsion and steering
C (2)
1 - Transverse thrusters intended for manoeuvring
Thrusters and their prime movers (1) (2) (3)
3 - Systems
2 - Power unit
1 - Power transmitting components
Windlasses (1)
Item
Material
certification
52
DA or TA
(4)
Design
assessment
index
X
X
X
Xh, ht
Xh, ht
X
Xh, ht
X
X
X (3) (4)
During
After
fabrica- completion
tion
X
X
X (5) (6)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
C
As per NR217, Pt C, Ch 1, Sec 12
Thrusters developing power less than 110 kW are to be
built in accordance with sound marine practice and
tested as required to the satisfaction of the Surveyor
Prime movers are to be tested in accordance with the
requirements applicable to the type of mover used
Mass produced thrusters may be accepted with the
frame work of type approval program of the Society
Material testing for parts of athwartship thrusters does
not need to be witnessed by a Surveyor, provided full
test reports are made available to him
(1)
(2)
(5)
(4)
(3)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 5
The material of component which are stressed by the
pull of the chain when the cable lifter is disengaged
(main shaft, cable lifter, brake bands, brake spindles,
brake bolts, tension strap) must possess mechanical
characteristics in conformity with NR216
Pressure test to be done to pressure components at
1,5 p, p being the working pressure. For working pressure over 200 bar, test pressure need not exceed
p + 100
Tightness tests are to be performed on components to
which this is appropriate
Operational test at twice the nominal pull. Where manufacturing works do not have adequate facilities, the
tests including the adjustment of the overload protection may be carried out on board the vessel. In these
cases, functional testing in the manufacturer’s works is
to be performed under load conditions
Working test to be carried out in the presence of the
Surveyor
(1)
(2)
Remarks
NR 544, Sec 4
April 2015
Bureau Veritas

G8
N°
Class 1: all in class 1
W
Class 3: all pressure vessels which are not class 1 or class 2
W
Class 3: all pressure vessels and heat exchangers which
are not class 1 or class 2
W (4)
W (4)
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 150
Class 1: p > 1,6 or T > 300
C
W
Class 2: (V ≤ 10 and p > 100) or (1 < p ≤ 50 and p⋅V>1000)
6 - Pressure vessels for thermal oil
C
Class 1: V > 10 and p⋅V > 1000 and p > 50
5 - Pressure vessels for liquid substances
W
Class 2: V > 1 and p⋅V > 100 and not in class 1
Class 1: p > 100 or p⋅V > 300
C
W
Class 2: if not in class 1
4 - Pressure vessels for gaseous substances
C
Class 1: p > 20 or p⋅V > 20 or T > 350
3 - Pressure vessels for corrosive substances
C
W (6)
Class 3: p⋅V ≤ 5 or V ≤ 2
2 - Pressure vessels for toxic substances
W (6)
C
(3) (4)
Class 2: if not class 1 or class 3
Class 1: (p > 3,2 and V > 2) or (p⋅V > 20 and V > 2)
1 - Steam generators or boilers
Pressure equipment (1) (2)
Item
Material
certification
April 2015
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
Design
assessment
index
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
(5)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
(4)
(7)
(8)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 5
Definitions:
p : Design pressure, in MPa
V : Volume, in litres
T : Design temperature, in °C
tA : Actual thickness of the vessel, in mm
In addition to the general requirement, material test for
the construction of pressure parts of boilers, other steam
generators, oil fired thermal oil heaters and exhaust gas
thermal oil heaters to be witnessed by the Surveyor
Material test to be witnessed by the Surveyor for class 1
pressure vessels and heat exchangers. This may be
waived for mass produced small pressure vessels e.g.
accumulators for valve controls, gas bottles, etc.
Hydrostatic test of all class 1, class 2 and class 3 pressure vessels are to be witnessed by the Surveyor with
the exception of mass produced pressure vessels which
are built under the conditions stated in (6)
Product certificate W may be accepted for mass produced small pressure vessels of class 1, class 2 and
class 3 which are type approved by the Society
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Remarks
NR 544, Sec 4
53
G9
G8

N°
W
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 60
Bureau Veritas
4 - Gas-consuming appliances
3 - Receptacle fittings subjected to pressure
2 - Other pipes
1 - Medium-pressure pipes
Domestic gas installations (1)
Class III piping system if design pressure exceeds 3,5 bar
Class II piping system
W
W (8)
W
Class 2: 15 ≤ tA ≤ 40
9 - Oil firing equipment (7)
C
Class 1: tA > 40
8 - Whatever type of equipment
C
W
Class 1: p > 1,6 or T > 150
7 - Pressure vessels for fuel oil, lubricating oil or flammable
hydraulic oil
Item
Material
certification
54
DA
DA
DA
DA
DA
Design
assessment
index
Xht (7)
Xht (4) (5)
Xh, ht (2)
(3)
X (6)
Xh
Xh
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
During
After
fabrica- completion
tion
X (8)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
W
W
W
C
C
C
C
C
(8)
(7)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 13
Pressure test is carried out with air, an inert gas or liquid
at a pressure of 20 bar above atmospheric pressure
Gastightness test is carried out with air or an inert gas
at a pressure of 3,5 bar above atmospheric pressure
Tightness test, for concerning pipes, is to be carried out
with air or an inert gas at a pressure of 1 bar above atmospheric pressure
Leak test, for concerning pipes, is to be carried out at a
pressure of 0,15 bar above atmospheric pressure
Gastightness, tightness and leak tests for the pipes are
deemed gastight if, after sufficient time to allow for normal balancing, no fall in the test pressure is observed
during the following 10 minutes
Tightness test is carried out with a foaming substance at
the operating pressure
All gas-consuming appliances shall be brought into service and tested at the nominal pressure to ensure that
combustion is satisfactory with the regulating knobs in
the different positions. Flame failure devices shall be
checked to ensure that they operate satisfactorily
Remarks
NR 544, Sec 4
April 2015
2 - Class III piping system if design pressure exceeds 3,5 bar (4)
1 - Class II piping system
Pumps and compressors (1)
Item
Bureau Veritas
C
6 - Forced circulation pumps for main boilers
G12
Xh
Xht
3 - Systems
Xh
Xh
Xh
Xh
DA
X (5) (6)
2 - Power unit
W
DA or TA
DA
DA
Xh
Xh
Xh
Xh (3)
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Pressure casings and oil lines
Hydraulic system (1)
C
C
5 - Feed pumps for main boilers
G11 Starting air receiver (1)
W
W
W (2)
(7)
4 - Bilge and fire pumps
G10 3 - Class III piping system other than above
N°
Material
certification
April 2015
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
C
C
W
C
C
(7)
(1)
(1)
(6)
(7)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 10, [20]
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Cylinders, covers and casings of pumps and compressors are to be subjected to an hydrostatic test. Tightness
tests are to be performed on components to which this
is appropriate
Pumps within this category:
• boiler feed water or forced circulating
• fuel oil or other flammable oil
• compressed air
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
For main parts before assembling
For product certificate C, alternative type of certificate
may be accepted depending on the Survey Scheme.
See NR217, Part A
Remarks
NR 544, Sec 4
55
1 - Class II
Pipes, Piping (1)
Bureau Veritas
diameter > 100 mm
•
4 - Remote controlled valves
3 - For plastic pipes
diameter ≤ 100 mm
G14 •
2 - Valves for pipe Class III
1 - Valves for pipe Class II
Pipe fittings (1)
C
C
W
C
C
4 - Plastic piping
W
C (2)
C
Item
3 - Hose assemblies and compensators
G13 2 - Class III
N°
Material
certification
56
DA
DA
DA
TA (6)
Design
assessment
index
X (2)
X (2)
X
X (3)
X (3)
X
Xh (3)
Xh (3)
Xh (3)
Xh
Xh (7)
Xh (4)
Xh (4) (5)
During
After
fabrica- completion
tion
X
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - {
Certification
C
C
C
W
C
C
C
W
C
As per NR217, Pt C, Ch 1, Sec 10, [20]
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
The following valves are to be subjected in the manufacture’s work to an hydraulic pressure test in the presence of a Surveyor and are also subjected to undergo a
tightness test at 1,0 times the nominal pressure:
• valves of pipe Class II to 1,5 PR
• valves mounted on the vessel’s side not less than
5 bar
(1)
(2)
(3)
(7)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials is to be in the form
of an inspection certificate according to EN 10.204. 3.1
or equivalent
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
All pipe systems are to be tested for leakage under operational conditions. If necessary, special techniques
other than hydraulic pressure tests are to be applied:
• heating coils in tanks and fuel lines must be tested to
not less than 1,5 PB but in no case less than 4 bar
• liquefied gas process piping systems are to be leak
tested (by air, halides, etc.) to a pressure depending
on the leak detection method applied
All Class II pipes (and other concerning items) having a
design pressure PR greater than 3,5 bar shall be subjected to an hydraulic pressure test in the presence of
the Surveyor
Relevant type approval tests are to be carried out on each
type and each size as per NR467, Pt C, Ch 1, Sec 10
Hydrostatic tests under supervision of the Society
(1)
(2)
Remarks
NR 544, Sec 4
April 2015
Bureau Veritas
Gas-tight penetration glands (1)
H6
W (2)
W
ND ≤ 100 mm
•
Expansion joints and cargo hoses (1)
C
ND > 100 mm
(2)
C/W
(2)
C/W
(2)
C
Material
certification
•
Item
H5
H4
Pipes, valves and fittings (1)
Cargo pumps (1)
Compressors (1)
H2
H3
Independent cargo tanks (1)
H1
N°
TA
TA
TA
TA
DA
DA
DA
Design
assessment
index
X
X (4)
X (3)
X (3)
X
Xh, ht
Xh (3)
Xh
Xh
(3)
Xh
X
Xh
During
After
fabrica- completion
tion
(4)
Running
tests
Examinations and tests
Product certification
C
C
C
C
C
C
C
Certification
April 2015
As per NR217, Pt D, Ch 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
As per NR217, Pt D, Ch 3
If metallic
Tests may be carried out in the workshops or on board
(1)
(2)
(3)
(1)
(5)
(4)
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
Tests subjected as per NR217, Pt C, Ch 1, Sec 10, [20]
The setting pressure of the pressure/vacuum valves is to
be checked with regard to the applicable Society’s
Rules
Cargo piping system is to be checked for leakage under
operational conditions after installation on board
Welded joints are to be subjected to examinations
specified in NR217, Pt C, Ch 1, Sec 10, [20] for Class II
pipes
(1)
(2)
(3)
(3)
As per NR217, Pt D, Ch 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
(3)
As per NR217, Pt D, Ch 3
Remarks
(1)
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUEFIED GASES - ITEM H - {
Vessels intended for the carriage of dangerous goods
Table 20: Cargo handling and containment systems for liquefied gases - item H - {
NR 544, Sec 4
57
TA
H11 Insulation materials of pressure vessels (1)
H12 Safety relief valves (1)
TA
H10 Fans for enclosed spaces (1)
C
TA
Instrumentation (1)
H9
TA
TA
Gas detection system (1)
TA
H8
W
Cargo tank P/V and high velocity valves (1)
Item
Material
certification
H7
N°
Design
assessment
index
58
X
X
X
X
X
X
Xht (2)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
C
C
W
C
C
C
Certification
(1)
(1)
(1)
(1)
(1)
(1)
(2)
Remarks
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
Tests may be carried out in the workshops or on board
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUEFIED GASES - ITEM H - {
NR 544, Sec 4
Bureau Veritas
April 2015
Bureau Veritas
Gas-tight penetration glands (1)
I6
ND ≤ 100 mm
•
Expansion joints and cargo hoses (1)
ND > 100 mm
•
Item
I5
I4
Pipes, valves and fittings (1)
Cargo pumps (1)
Compressors (1)
I2
I3
Independent cargo tanks (1)
I1
N°
Material
certification
W (2)
W
C
(2)
C/W
(2)
C/W
(2)
C
TA
TA
TA
TA
DA
DA
DA
Design
assessment
index
X
X (5)
X (3)
X (3)
X
Xh, ht
Xh (3)
Xh
Xh
(3)
Xh
X
Xh
During
After
fabrica- completion
tion
(4)
Running
tests
Examinations and tests
Product certification
C
C
C
C
W
C
C
Certification
April 2015
(1)
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
If metallic
Tests may be carried out in the workshops or on board
(1)
(2)
(3)
(5)
(4)
As per NR217, Pt D, Ch 3
Tests subjected as per NR217, Pt C, Ch 1, Sec 10, [20]
The setting pressure of the pressure/vacuum valves is to
be checked with regard to the applicable Society’s
Rules
Cargo piping system is to be checked for leakage under
operational conditions after installation on board
Welded joints are to be subjected to examinations
specified in NR217, Pt C, Ch 1, Sec 10, [20] for Class II
pipes
(1)
(2)
(3)
(3)
(1)
(2)
As per NR217, Pt D, Ch 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
As per NR217, Pt D, Ch 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
(3)
As per NR217, Pt D, Ch 3
Remarks
(1)
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUIDS - ITEM I - {
Vessels intended for the carriage of dangerous goods
Table 21: Cargo handling and containment systems for liquids - item I - {
NR 544, Sec 4
59
Fans for enclosed spaces (1)
I11
Safety relief valves (1)
Instrumentation (1)
I10
I13
Gas detection system (1)
I9
Insulation materials (1)
Flame arresters (1)
I8
I12
Cargo tank P/V and high velocity valves (1)
Item
I7
N°
Material
certification
W
TA
TA
TA
TA
TA
TA
TA
Design
assessment
index
60
X
X
X
X
X
X
X
Xht (2)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
C
C
W
C
C
C
C
Certification
(1)
(1)
(1)
(1)
(1)
(1)
(1)
(2)
Remarks
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
As per NR217, Pt D, Ch 3
Tests may be carried out in the workshops or on board
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUIDS - ITEM I - {
NR 544, Sec 4
Bureau Veritas
April 2015
Bureau Veritas
K3
K2
K1
N°
power < 50 kW/kVA
power ≥ 50 kW/kVA
power < 50 kW/kVA
•
power ≥ 50 kW/kVA
power < 50 kW/kVA
•
•
Transformers (1)
power ≥ 50 kW/kVA
•
Electrical machines (1)
•
•
Generators (1)
Item
Material
certification
W
C
W
C
TA
TA
TA
Design
assessment
index
April 2015
X (2)
X (2)
X (2) (3)
X (2) (3)
X (2) (3)
X (2) (3)
During
After
fabrica- completion
tion
X
X
X
X
X (4)
X (4)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - {
C
Certification
W
C
W
C
W
Vessels intended for the carriage of dangerous goods
Table 22: Electrical installations - item K - {
(1)
(2)
(3)
As per NR217, Pt C, Ch 2, Sec 4
Power transformers are to be tested according to IEC
60076
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
(1)
(2)
(4)
(3)
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
Test on board of the generator sets shall be conducted
under normal operating conditions
(1)
(2)
Remarks
NR 544, Sec 4
61
Bureau Veritas
power < 2 kW/kVA
•
Cables and insulated wires (1)
Control, monitoring, alarm and safety systems (1)
K8
K9
power < 100 kW/kVA
•
Switchgear (1)
power ≥ 100 kW/kVA (2)
•
Switchboards (1)
power ≥ 2 kW/kVA
•
Storage battery chargers (1)
Storage batteries (1)
Item
K7
K6
K5
K4
N°
Material
certification
62
TA
TA (2)
TA (2)
DA or TA
DA or TA
TA
TA
Design
assessment
index
X
X
X
X (3)
X
X
During
After
fabrica- completion
tion
X (2)
X (3)
X
X
X
X
X (2)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - {
Certification
C
W
W
W
C
W
C
W
As per NR217, Pt C, Ch 2, Sec 7
As a general principle, switchgear shall be type approved, designed and constructed in accordance with
standard IEC, EN or other standards recognized by the
Society
Test on board
As per NR217, Pt C, Ch 2, Sec 12
As a general principle, the use of the types of cables
and wired according to IEC 60092 is permitted
As per NR217, Pt C, Ch 2, Sec 13
Operational test to be performed
(1)
(2)
(1)
(2)
(1)
(2)
(3)
As per NR217, Pt C, Ch 2, Sec 7
Including switchboards for emergency generator sets
Tests to be performed:
• operational test
• high voltage test
• insulation resistance measurement
As per NR217, Pt C, Ch 2, Sec 5
As per NR217, Pt C, Ch 2, Sec 5
The following shall be tested:
• installation of storage batteries
• ventilation of battery rooms, cupboards/containers;
and cross-section of ventilation ducts
• storage battery charging equipment
• required caution labels and information plates
(1)
(2)
(3)
(1)
(1)
(2)
Remarks
NR 544, Sec 4
April 2015
power < 50 kW/kVA
•
Item
Bureau Veritas
power < 50 kW/kVA
•
2 - Class 3, class 4 and class 5
K12 1 - Class 1 and class 2
Computer systems (1)
power ≥ 50 kW/kVA
K11 •
Electrical propulsion plants (1)
power ≥ 50 kW/kVA
Power electronics (1)
K10 •
N°
DA or TA
TA
TA
W (2) DA or TA
(3)
C (2)
(3)
Material
certification
April 2015
Design
assessment
index
X (4)
X (4)
X (2)
X (2)
X (5)
X (5)
X (2)
X (2)
During
After
fabrica- completion
tion
X
X
X (6) (7)
X (6) (7)
X (3)
X (3)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - {
Certification
C
W
W
C
W
C
As per NR217, Pt C, Ch 2, Sec 15
Material certificate for shafts. Shafts are to be made of
material complying with NR216, Ch 2, Sec 3 or, where
rolled products are allowed in place of forgings, with
NR216, Ch 2, Sec 1
Shaft material for electric propulsion motors and for
main engine driven generators where the shaft is part of
the propulsion shafting is to be certified by the Society
If appropriate, where welded parts are foreseen on shafts
and rotors, the provisions of NR216, Chapter 5 apply
Type test are to be carried out on a prototype machine
or on the first of a batch of machines, and routine tests
are to be carried out on the subsequent machines
Functioning of the propulsion plant shall be proved by
dock trial before river trials
Testing during trial voyages as per NR217, Pt C, Ch 2,
Sec 17
As per NR217, Pt C, Ch 2, Sec 16
The following test shall be carried out in the manufacturer’s works:
• function test
• operating conditions simulation
• fault simulation
• simulation of the application environment
(1)
(2)
(1)
(2)
(7)
(6)
(5)
(4)
(3)
(3)
As per NR217, Pt C, Ch 2, Sec 14
Extent of routine tests to be performed:
• voltage test
• insulation resistance test
Operational test to be performed on the subsequent
machines
(1)
(2)
Remarks
NR 544, Sec 4
63
Bureau Veritas
Grey water treatment plants (1)
Onboard NOx monitoring systems (1)
Oily water separator (OWS) systems (1)
S5
S6
S7
Exhaust gas cleaning (EGC) systems (1)
Advanced water treatment plants (1)
S4
S8
Anti-fouling system (1)
Incinerator (1)
S2
Material
certification
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
Remarks
TA
TA
TA
TA
TA
TA (2)
TA
TA
X
Xh
X
X
X
X
X
Xh
X
X
X
X
X
X
X
C/D
C/D
C/D
C/D
C/D
C
C/D
C/D
In accordance with International Convention on the
control of Harmful and Anti-fouling systems, 2001, Annex 4, Appendices 1 and 2
Anti-fouling paint are to be a type approved by the Society, on the basis of the following criteria:
• TBT-free
• small quantities of organotin compounds acting as
a chemical catalyst are allowed provided their concentration does not exceed 2500 mg total tin per kg
of dry paint
(1)
(1)
In accordance with IMO Resolution MEPC.184 (59):
2009 Guidelines for exhaust gas cleaning systems
In accordance with IMO Resolution MEPC. 107 (49)
Where NOx reduction methods (such as water injection, fuel oil emulsification, charge air humidification,
exhaust gas after-treatment) are used, they are to be approved by the Society and taken into account in type
approval certification of the engine
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
In accordance with IMO Resolution MEPC. 76 (40) as
amended by Resolution MAPC.93 (45) and Annex VI of
MARPOL 73/78, Appendix IV
(1)
(2)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
Pollution prevention installation covered by additional class notation Cleanvessel as per NR217, Pt D, Ch 2, Sec 11
Item
S3
Sewage treatment plant (1)
S1
S
N°
Design
assessment
index
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - {
Certification
64
All vessels (carriage of dangerous goods excepted)
Table 23: Pollution prevention installation covered by additional class notation Cleanvessel - item S - {
NR 544, Sec 4
April 2015
Oil content meter
Oil sealing glands
Leak detector for refrigeration systems
S10
S11
Item
S9
N°
Material
certification
April 2015
TA
TA
TA
Design
assessment
index
X
X
X
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
C/D
C/D
C/D
Certification
Remarks
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - {
NR 544, Sec 4
Bureau Veritas
65
NR 544, Sec 5
SECTION 5
1
1.1
VESSELS INTENDED FOR THE CARRIAGE OF
DANGEROUS GOODS WITH ASSIGNMENT OF
CHARACTER OF CONSTRUCTION µ
Summary
Vessels with assignment of character of construction µ
1.1.1 Provisions related to survey at works for assignment of character of construction µ, for vessels intended to carry dangerous
goods, are summarized in the Table below.
VESSELS INTENDED FOR THE CARRIAGE OF DANGEROUS GOODS with assignment of character of construction µ
Item
66
Title
Reference
Item A
Raw materials for hull
NA
Item B
Hull outfitting
NA
Item C
Fire protection, detection and extinguishing
Tab 24
Item E
Main diesel engine engines & their auxiliaries
Tab 25
Item G
Auxiliary machinery
Tab 26
Item H
Cargo handling and containment systems for liquefied gases
Tab 27
Item I
Cargo handling and containment systems for liquids
Tab 28
Item K
Electrical installations
Tab 29
Item S
Pollution prevention installation covered by additional class notation Cleanvessel
Tab 30
Bureau Veritas
April 2015
Bureau Veritas
W
4 - Water spray nozzles
W
5 - Water spray nozzles
W
3 - Discharge nozzles
Portable fire extinguishers (1)
Detection and alarm system (1)
C7
4 - Extinguishing agents
W
2 - Pressure tank
1 - Piping system
W
W
Fixed gas fire extinguishing system (1)
W
4 - Pressure water tank
TA
TA
TA
TA
DA
TA
XS
Xh
Xh
Xh
Xh
X
2 - Pump prime movers
3 - Water spray piping system
Xh
DA
TA
1 - Pressure pumps
Automatic pressure water spraying system (1)
W
3 - Hoses
X
Xh
Xh
Xh
TA
TA
TA
During
After
fabrica- completion
tion
X
X
X
X
X
Running
tests
Examinations and tests
2 - Pump prime movers
W
W
Material
certification
1 - Fire pumps
C6
C5
C4
C3
Fire dampers (1)
C2
Water supply system (1)
Fire bulkheading, fire doors (1)
Item
C1
N°
Design
assessment
index
Product certification
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
April 2015
(1)
(1)
(1)
(1)
(1)
(1)
(1)
FIRE PROTECTION, DETECTION AND EXTINGUISHING - ITEM C - µ
Vessels intended for the carriage of dangerous goods
Table 24: Fire protection, detection and extinguishing - item C - µ
As per NR217, Pt C, Ch 3, Sec 3
As per NR217, Pt C, Ch 3, Sec 4, [2]
As per NR217, Pt C, Ch 3, Sec 4, [4]
As per NR217, Pt C, Ch 3, Sec 4, [3]
As per NR217, Pt C, Ch 3, Sec 4, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
As per NR217, Pt C, Ch 3, Sec 1, [1]
Remarks
NR 544, Sec 5
67
Bureau Veritas

E1
N°
W (9)
W
(5) (9)
8 - Cylinder liners
9 - Steel cylinder covers
Xh (13)
Xh
19 - Cylinder jacket, cooling space
Xh
18 - Cylinder cover, cooling space
17 - Cylinder liner, over the whole length of cooling space
X
Xs (11)
16 - Steer gear wheels for camshaft drives
W (4)
X
Xs (11)
Xh
15 - Bolts and studs for cylinder covers, crossheads, main W (9)
bearings and connecting rod bearings; nuts for tie rods
Xs (11)
X
X
X
Xh
Xh
X
Xh
X
W
13 - Tie rods
Xs
Xs (6)
Xs (8)
Xh
W (12)
W
12 - Entablatures of welded construction
14 - Shaft and rotors, including blades for turbochargers
W
11 - Frames and crankcases of welded construction
10 - Bedplates of welded construction; plates and transverse
W
bearing girders made of forged or cast steel
(5) (10)
W (4)
W
7 - Crossheads
6 - Connecting rods, together with connecting rod bearing caps
Xs (7)
W (4)
5 - Pistons rods
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
X
W
(4) (5)
Xs (6)
W (4)
W
W
4 - Steel piston crowns
X
X (2)
3 - Coupling bolts for crankshaft
Xs (3)
X
Running
tests
W
DA
W
1 - Crankshaft
X
During
After
fabrica- completion
tion
Examinations and tests
Product certification
2 - Crankshaft coupling flange (non-integral) for main power W (4)
transmissions
TA
Material
certification
Main diesel engines with diameter of cylinder bore, D > 300 mm
(1)
Item
Design
assessment
index
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - µ
Certification
68
Vessels intended for the carriage of dangerous goods
(15)
(16)
(14)
(13)
(12)
(11)
(9)
(10)
(8)
(7)
(6)
(3)
(4)
(5)
(1)
(2)
Table 25: Main diesel engines & their auxiliaries - item E - µ
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be in accordance with stage A, B and C as
per NR217, in the presence of the Surveyor
NDT of magnetic particle and ultrasonic
Material test is required if bore > 400 mm
Material tests are also required for parts made of material other than steel
NDT of magnetic particle or liquid penetrant (if
bore > 400 mm) and ultrasonic (all)
NDT of magnetic particle or liquid penetrant and ultrasonic are required if bore > 400 mm
NDT of magnetic particle or liquid penetrant (all) and
ultrasonic (if bore > 400 mm)
Material test is required if bore > 300 mm
Material tests are required even these parts are not
welded and for any material except grey cast iron
NDT of magnetic particle or liquid penetrant if
bore > 400 mm
Material certification and test as per NR217, Pt C, Ch 1,
Sec 14
For forged steel, test methods other than hydrostatic
testing may be accepted e.g. suitable NDT and documented dimensional test
Where the cooling space is sealed by the piston rod, or
by the piston ron and the shell, the pressure test is to be
carried out after the assembly
See item Turbochargers
Turbocharger air cooler are tested on the water side
only
Remarks
NR 544, Sec 5
April 2015
Bureau Veritas
TA
DA
TA
Control and safety devices (1)
Mass produced diesel engines with diameter of cylinder bore
D < 300 mm (1)
E5
E6
W
TA
Scavenging and supercharging compressors or blowers (1)
E4
W (2)
Turning gears of main diesel engines (1)
E3
X
Xs (2)
X (2)
X (2)
Xh
X
X h, s
Xh
29 - Engine driven pumps (oil, water, fuel, bilge)
W
Xh
28 - Engine driven air compressor if any (cylinders, covers, intercoolers and aftercoolers); air side, water side
Heat exchangers (1)
Xh
Xh
Xh
Xh (16)
27 - Scavenge pump cylinder
26 - Hydraulic system (piping pumps, actuators, etc for hydraulic drive of valves)
E2
E1
25 - Fuel injection system (injection pump body pressure side,
injection valve, injection pipes)
24 - Coolers, each side
Xh
Xh
22 - Turbocharger, cooling space
23 - Exhaust pipe, cooling space
Xh
(13) (14)
21 - Piston crown, cooling space
(15)
Xh
20 - Exhaust valve, cooling space

During
After
fabrica- completion
tion
X (2)
X
Xbt (3)
X
X
Running
tests
Examinations and tests
Item
N°
Material
certification
April 2015
Design
assessment
index
Product certification
W
W
W
W
W
W
W
W
W
W
W
W
W
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - µ
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 2
Shaft and rotor where D > 300 mm
Test to be carried out during bench trials of the engine
of which these equipment are mounted
As per NR217, Pt C, Ch 1, Sec 2
During load test
As per NR217, Pt C, Ch 1, Sec 2
Type tests to be performed in accordance with NR217,
Pt C, Ch 1, Sec 2, [4.3]
(1)
(2)
(3)
(1)
(2)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 3
(1)
(1)
Remarks
NR 544, Sec 5
69
E8
E7
N°
Material
certification
Starting air receiver (1)
2 - Turbochargers not included as above
W
1 - Turbochargers having a power of 1000 kW and above and W (2)
fitted on diesel engines as listed below:
• main propulsion engines
• engines driving electric generators, including emergency
generators
• engines driving other auxiliaries essential for safety and
navigation and cargo pumps in tankers
Turbochargers (1)
Item
DA or TA
(3)
TA
Design
assessment
index
70
Xh
Xh, s
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
W
W
W
Certification
MAIN DIESEL ENGINES & THEIR AUXILIARIES - ITEM E - µ
(1)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 14
Material test are required for shafts and rotors, including blades
Turbochargers are to be designed and constructed according to sound marine practice and delivered with
certificate relevant to the bench running test and the
hydrostatic test as per Rules
Remarks
NR 544, Sec 5
Bureau Veritas
April 2015
Bureau Veritas

G3
G2
G1
N°
with transmitted power P < 220 kW
with transmitted power P ≥ 220 kW
W
W
W
4 - Thrust shafts
6 - Sterntubes
W
3 - Intermediate shafts
5 - Cardan shafts
W
2 - Propeller shafts
W
1 - Coupling
W
(2)
with transmitted power P < 110 kW
•
W
W
Main propulsion shafting (1)
with transmitted power P ≥ 110 kW
•
2 - Other reduction and step-up gears:
•
•
W
DA
DA
DA
DA
DA
DA
DA
DA
Gears and couplings (1)
1 - Reduction and/or reverse gears intended for propulsion:
TA
(2)
Material
certification
Auxiliary diesel engines (1)
Item
Design
assessment
index
April 2015
Xs (5)
Xs (5)
Xs (3)
X
Xh (4)
Xh
X
X
Xh
X
Xh (3)
Xh, s (6)
Xh, s (6)
X (4)
X
During
After
fabrica- completion
tion
X
X (7)
X (7)
X (7)
X (7)
Xbt
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
W
W
W
W
Vessels intended for the carriage of dangerous goods
Table 26: Auxiliary machinery - item G - µ
(1)
(2)
(3)
(7)
(6)
(5)
(4)
As per NR217, Pt C, Ch 1, Sec 7
Material tests are required for all shaft components
Parts of hydraulic couplings, clutches of hydraulic reverse gears and control units, hubs and hydraulic cylinders of controllable pitch propellers, including piping
systems and associated fittings, are to be hydrostatically
tested to 1,5 times the maximum working pressure
As per NR217, Pt C, Ch 1, Sec 6
Material tests as per NR216, Ch 2, Sec 3 for the following items:
• pinions and wheel bodies
• rims
• plates and other elements intended for propulsion
gear casings of welded construction
Mechanical test and NDT are to be carried out for pinions and wheel forgings in accordance with NR216,
Ch 2, Sec 3
Survey of shafts and their connections (flange couplings,
hubs, bolt pins) as per item G3 Main propulsion shafting
Static balancing test of rotating components in particular gear wheel and pinion shaft assemblies with the
coupling part attached. Where n2⋅d ≥ 1,5⋅109, gear
wheel and pinion shaft assemblies are also to undergo
a dynamic balancing test
Verification of cutting accuracy, meshing test and hydrostatic tests as per NR217
Tests on board as per NR217, Pt C, Ch 1, Sec 15
(1)
(2)
(3)
As per NR217, Pt C, Ch 1, Sec 2
(1)
Remarks
NR 544, Sec 5
71
Bureau Veritas
G5
G4
G3

N°
W
4 - Pipes, valves and fittings (4)
X
Xh, ht
W
3 - Load transmitting components
Xs
Xh, ht
W
X
X
Xh, ht (5)
Xh
Xs (4)
2 - Pressure components
Xs
Xs (3)
X
X
X
X
Xh
X
Xh (4)
Xh
Xh
DA
DA
DA
DA
DA
DA or TA
(3)
DA
DA
DA
DA
DA
During
After
fabrica- completion
tion
X
Xbt
Xbt
X (6)
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Power unit
power < 50 kW
•
(2)
Steering gears (1)
power ≥ 50 kW
W
2 - Built-up and controllable pitch propeller (CPP)
•
W
(2)
Propellers (1)
1 - Solid propeller
W
11 - Thrust sliding-blocks
W
9 - Coupling bolt or studs
C
W
8 - Propeller shaft liners
10 - Flexible couplings
W
7 - Sterntubes bushes and other shaft bearings
Item
Material
certification
72
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
C
W
W
W
(4)
(3)
(1)
(2)
(6)
(5)
(4)
(1)
(2)
(3)
(4)
As per NR217, Pt C, Ch 1, Sec 11
Material tests, including examinations for internal defects, to be performed to components subject to pressure or transmitting mechanical forces as per NR216
NDT are to be carried out for mechanical components
subjected to pressure or transmitting mechanical forces
Tests for pipes, valves and fittings are to comply with
NR217, Pt C, Ch 1, Sec 10, [20]
As per NR217, Pt C, Ch 1, Sec 8
Material tests to be in accordance with NR216
Mass produced propellers may be accepted within the
framework of the type approval program of the Society
Static balancing is required for all finished propellers in
accordance with the specified ISO 484 tolerance class.
Dynamic balance is required for propellers running
above 500 rpm
Required static balancing of complete built-up and CPP
propellers may be replaced by an individual check of
blade weight and gravity centre position
Complete hydraulic system for the control of CPP
mechanism is to be hydrotested at a pressure equal to
1,5 times the design pressure. The proper operation of
the safety valve is to be tested in the presence of the
Surveyor
Sterntubes, when machine-finished, and propeller shaft
liners, when machine-finished on the inside and with
an overthickness not exceeding 3 mm on the outside,
are to be hydrostatically tested to 0,2 N/mm2
Remarks
NR 544, Sec 5
April 2015
G7
G6
N°
Bureau Veritas
W (5)
W
2 - Thrusters intended for propulsion and steering
W (2)
1 - Transverse thrusters intended for manoeuvring
Thrusters and their prime movers (1) (2) (3)
3 - Systems
2 - Power unit
1 - Power transmitting components
Windlasses (1)
Item
Material
certification
April 2015
DA or TA
(4)
Design
assessment
index
X
X
X
Xh, ht
Xh, ht
X
Xh, ht
X
X
X (3) (4)
During
After
fabrica- completion
tion
X
X
X (5) (6)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
As per NR217, Pt C, Ch 1, Sec 12
Thrusters developing power less than 110 kW are to be
built in accordance with sound marine practice and
tested as required to the satisfaction of the Surveyor
Prime movers are to be tested in accordance with the
requirements applicable to the type of mover used
Mass produced thrusters may be accepted with the
frame work of type approval program of the Society
Material testing for parts of athwartship thrusters does
not need to be witnessed by a Surveyor, provided full
test reports are made available to him
(1)
(2)
(5)
(4)
(3)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 5
The material of component which are stressed by the
pull of the chain when the cable lifter is disengaged
(main shaft, cable lifter, brake bands, brake spindles,
brake bolts, tension strap) must possess mechanical
characteristics in conformity with NR216
Pressure test to be done to pressure components at
1,5 p, p being the working pressure. For working pressure over 200 bar, test pressure need not exceed
p + 100
Tightness tests are to be performed on components to
which this is appropriate
Operational test at twice the nominal pull. Where manufacturing works do not have adequate facilities, the
tests including the adjustment of the overload protection may be carried out on board the vessel. In these
cases, functional testing in the manufacturer’s works is
to be performed under load conditions
Working test to be carried out in the presence of the
Surveyor
(1)
(2)
Remarks
NR 544, Sec 5
73
Bureau Veritas

G8
N°
W
Class 3: all pressure vessels which are not class 1 or class 2
W
Class 3: all pressure vessels and heat exchangers which
are not class 1 or class 2
W (4)
W (4)
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 150
Class 1: p > 1,6 or T > 300
W
W
Class 2: (V ≤ 10 and p > 100) or (1 < p ≤ 50 and p⋅V>1000)
6 - Pressure vessels for thermal oil
W
Class 1: V > 10 and p⋅V > 1000 and p > 50
5 - Pressure vessels for liquid substances
W
Class 2: V > 1 and p⋅V > 100 and not in class 1
Class 1: p > 100 or p⋅V > 300
W
W
Class 2: if not in class 1
4 - Pressure vessels for gaseous substances
W
Class 1: p > 20 or p⋅V > 20 or T > 350
3 - Pressure vessels for corrosive substances
Class 1: all in class 1
W
W (6)
Class 3: p⋅V ≤ 5 or V ≤ 2
2 - Pressure vessels for toxic substances
W (6)
W
(3) (4)
Class 2: if not class 1 or class 3
Class 1: (p > 3,2 and V > 2) or (p⋅V > 20 and V > 2)
1 - Steam generators or boilers
Pressure equipment (1) (2)
Item
Material
certification
74
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
DA
Design
assessment
index
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
(5)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
(4)
(7)
(8)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 5
Definitions:
p : Design pressure, in MPa
V : Volume, in litres
T : Design temperature, in °C
tA : Actual thickness of the vessel, in mm
In addition to the general requirement, material test for
the construction of pressure parts of boilers, other
steam generators, oil fired thermal oil heaters and exhaust gas thermal oil heaters to be witnessed by the Surveyor
Material test to be witnessed by the Surveyor for class 1
pressure vessels and heat exchangers. This may be
waived for mass produced small pressure vessels e.g.
accumulators for valve controls, gas bottles, etc.
Hydrostatic test of all class 1, class 2 and class 3 pressure vessels are to be witnessed by the Surveyor with
the exception of mass produced pressure vessels which
are built under the conditions stated in (6)
Product certificate W may be accepted for mass produced small pressure vessels of class 1, class 2 and
class 3 which are type approved by the Society
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Remarks
NR 544, Sec 5
April 2015
G9
G8

N°
W
W
Class 2: if not class 1 or class 3
Class 3: p ≤ 0,7 and T ≤ 60
Bureau Veritas
4 - Gas-consuming appliances
3 - Receptacle fittings subjected to pressure
2 - Other pipes
1 - Medium-pressure pipes
Domestic gas installations (1)
Class III piping system if design pressure exceeds 3,5 bar
Class II piping system
W
W (8)
W
Class 2: 15 ≤ tA ≤ 40
9 - Oil firing equipment (7)
W
Class 1: tA > 40
8 - Whatever type of equipment
W
Class 1: p > 1,6 or T > 150
7 - Pressure vessels for fuel oil, lubricating oil or flammable
hydraulic oil
Item
Material
certification
April 2015
DA
DA
DA
DA
DA
Design
assessment
index
Xht (7)
Xht (4) (5)
Xh, ht (2)
(3)
X (6)
Xh
Xh
Xh, s
Xh, s
Xh, s
Xh, s
Xh, s
During
After
fabrica- completion
tion
X (8)
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
(8)
(7)
(6)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 13
Pressure test is carried out with air, an inert gas or liquid
at a pressure of 20 bar above atmospheric pressure
Gastightness test is carried out with air or an inert gas
at a pressure of 3,5 bar above atmospheric pressure
Tightness test, for concerning pipes, is to be carried out
with air or an inert gas at a pressure of 1 bar above atmospheric pressure
Leak test, for concerning pipes, is to be carried out at a
pressure of 0,15 bar above atmospheric pressure
Gastightness, tightness and leak tests for the pipes are
deemed gastight if, after sufficient time to allow for normal balancing, no fall in the test pressure is observed
during the following 10 minutes
Tightness test is carried out with a foaming substance at
the operating pressure
All gas-consuming appliances shall be brought into service and tested at the nominal pressure to ensure that
combustion is satisfactory with the regulating knobs in
the different positions. Flame failure devices shall be
checked to ensure that they operate satisfactorily
Remarks
NR 544, Sec 5
75
2 - Class III piping system if design pressure exceeds 3,5 bar (4)
1 - Class II piping system
Pumps and compressors (1)
Item
Bureau Veritas
W
6 - Forced circulation pumps for main boilers
G12
Xh
Xht
3 - Systems
Xh
Xh
Xh
2 - Power unit
DA
X (5) (6)
Xh
W
DA or TA
DA
DA
Xh
Xh
Xh
Xh (3)
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
1 - Pressure casings and oil lines
Hydraulic system (1)
W
W
5 - Feed pumps for main boilers
G11 Starting air receiver (1)
W
W
W (2)
(7)
4 - Bilge and fire pumps
G10 3 - Class III piping system other than above
N°
Material
certification
76
Design
assessment
index
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
(7)
(1)
(1)
(6)
(7)
(5)
(4)
(3)
(1)
(2)
As per NR217, Pt C, Ch 1, Sec 10, [20]
As per NR217, Pt C, Ch 1, Sec 2
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials for pipe Class II is
to be in the form of an inspection certificate according
to EN 10.204. 3.1 or equivalent
Cylinders, covers and casings of pumps and compressors are to be subjected to an hydrostatic test. Tightness
tests are to be performed on components to which this
is appropriate
Pumps within this category:
• boiler feed water or forced circulating
• fuel oil or other flammable oil
• compressed air
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
For main parts before assembling
For product certificate C, alternative type of certificate
may be accepted depending on the Survey Scheme.
See NR217, Part A
Remarks
NR 544, Sec 5
April 2015
1 - Class II
Pipes, Piping (1)
Bureau Veritas
diameter > 100 mm
•
4 - Remote controlled valves
3 - For plastic pipes
diameter ≤ 100 mm
G14 •
2 - Valves for pipe Class III
1 - Valves for pipe Class II
Pipe fittings (1)
W
W
W
W
W
4 - Plastic piping
W
W (2)
W
Item
3 - Hose assemblies and compensators
G13 2 - Class III
N°
Material
certification
April 2015
DA
DA
DA
TA (6)
Design
assessment
index
X (2)
X (2)
X
X (3)
X (3)
X
Xh (3)
Xh (3)
Xh (3)
Xh
Xh (7)
Xh (4)
Xh (4) (5)
During
After
fabrica- completion
tion
X
Running
tests
Examinations and tests
Product certification
AUXILIARY MACHINERY - ITEM G - µ
Certification
W
W
W
W
W
W
W
W
W
As per NR217, Pt C, Ch 1, Sec 10, [20]
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
The following valves are to be subjected in the manufacture’s work to an hydraulic pressure test in the presence of a Surveyor and are also subjected to undergo a
tightness test at 1,0 times the nominal pressure:
• valves of pipe Class II to 1,5 PR
• valves mounted on the vessel’s side not less than
5 bar
(1)
(2)
(3)
(7)
(6)
(5)
(4)
(3)
As per NR217, Pt C, Ch 1, Sec 10, [20]
The proof of the quality of materials is to be in the form
of an inspection certificate according to EN 10.204. 3.1
or equivalent
If of welded construction, welding steel pipes are to
comply with the applicable requirements of NR467,
Pt C, Ch 1, Sec 10. Welded joints in pipelines of
Class II are to be tested in accordance with NR216
All pipe systems are to be tested for leakage under operational conditions. If necessary, special techniques
other than hydraulic pressure tests are to be applied:
• heating coils in tanks and fuel lines must be tested to
not less than 1,5 PB but in no case less than 4 bar
• liquefied gas process piping systems are to be leak
tested (by air, halides, etc.) to a pressure depending
on the leak detection method applied
All Class II pipes (and other concerning items) having a
design pressure PR greater than 3,5 bar shall be subjected to an hydraulic pressure test in the presence of
the Surveyor
Relevant type approval tests are to be carried out on each
type and each size as per NR467, Pt C, Ch 1, Sec 10
Hydrostatic tests under supervision of the Society
(1)
(2)
Remarks
NR 544, Sec 5
77
Bureau Veritas
Gas-tight penetration glands (1)
H6
ND ≤ 100 mm
•
Expansion joints and cargo hoses (1)
ND > 100 mm
•
Item
H5
H4
Pipes, valves and fittings (1)
Cargo pumps (1)
Compressors (1)
H2
H3
Independent cargo tanks (1)
H1
N°
Material
certification
W (2)
W
C
(2)
C/W
(2)
C/W
(2)
C
TA
TA
TA
TA
DA
DA
DA
Design
assessment
index
X
X (5)
X (3)
X (3)
X
Xh,
ht
Xh (3)
Xh
Xh
(3)
Xh
X
Xh
During
After
fabrica- completion
tion
(4)
Running
tests
Examinations and tests
Product certification
C
C
W
W
C
C
C
As per NR217, Part D, Chapter 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
As per NR217, Part D, Chapter 3
If metallic
Tests may be carried out in the workshops or on board
(1)
(2)
(3)
(1)
(5)
(4)
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
Tests subjected as per NR217, Pt C, Ch 1, Sec 10, [20]
The setting pressure of the pressure/vacuum valves is to
be checked with regard to the applicable Society’s
Rules
Cargo piping system is to be checked for leakage under
operational conditions after installation on board
Welded joints are to be subjected to examinations
specified in NR217, Pt C, Ch 1, Sec 10, [20] for Class II
pipes
(1)
(2)
(3)
(3)
As per NR217, Part D, Chapter 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
(3)
As per NR217, Part D, Chapter 3
Remarks
(1)
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUEFIED GASES - ITEM H - µ
Certification
78
Vessels intended for the carriage of dangerous goods
Table 27: Cargo handling and containment systems for liquefied gases - item H - µ
NR 544, Sec 5
April 2015
TA
H11 Insulation materials of pressure vessels (1)
H12 Safety relief valves (1)
TA
H10 Fans for enclosed spaces (1)
C
TA
Instrumentation (1)
H9
TA
TA
Gas detection system (1)
TA
H8
W
Cargo tank P/V and high velocity valves (1)
Item
H7
N°
Material
certification
April 2015
Design
assessment
index
X
X
X
X
X
X
Xht (2)
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
C
C
W
W
W
C
Certification
(1)
(1)
(1)
(1)
(1)
(1)
(2)
Remarks
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
Tests may be carried out in the workshops or on board
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUEFIED GASES - ITEM H - µ
NR 544, Sec 5
Bureau Veritas
79
Bureau Veritas
I7
Cargo tank P/V and high velocity valves (1)
Gas-tight penetration glands (1)
I6
ND ≤ 100 mm
•
Expansion joints and cargo hoses (1)
ND > 100 mm
•
Item
I5
I4
Pipes, valves and fittings (1)
Cargo pumps (1)
Compressors (1)
I2
I3
Independent cargo tanks (1)
I1
N°
Material
certification
W
W (2)
W
C
(2)
C/W
(2)
C/W
(2)
C
TA
TA
TA
TA
TA
DA
DA
DA
Design
assessment
index
X
X
X (5)
X (3)
X (3)
X
Xht (2)
Xh, ht
Xh (3)
Xh
Xh
(3)
Xh
X
Xh
During
After
fabrica- completion
tion
(4)
Running
tests
Examinations and tests
Product certification
C
C
C
W
W
W
C
C
As per NR217, Part D, Chapter 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
As per NR217, Part D, Chapter 3
If metallic
Tests may be carried out in the workshops or on board
(1)
(2)
(3)
(1)
(2)
(1)
(5)
(4)
As per NR217, Part D, Chapter 3
Tests may be carried out in the workshops or on board
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
Tests subjected as per NR217, Pt C, Ch 1, Sec 10, [20]
The setting pressure of the pressure/vacuum valves is to
be checked with regard to the applicable Society’s
Rules
Cargo piping system is to be checked for leakage under
operational conditions after installation on board
Welded joints are to be subjected to examinations specified in NR217, Pt C, Ch 1, Sec 10, [20] for Class II pipes
(1)
(2)
(3)
(3)
As per NR217, Part D, Chapter 3
Material certificate:
• C for cast body
• W for welded construction
Inspection to be carried out according to a program approved by the Society
(1)
(2)
(3)
As per NR217, Part D, Chapter 3
Remarks
(1)
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUIDS - ITEM I - µ
Certification
80
Vessels intended for the carriage of dangerous goods
Table 28: Cargo handling and containment systems for liquids - item I - µ
NR 544, Sec 5
April 2015
Flame arresters (1)
Gas detection system (1)
Instrumentation (1)
Fans for enclosed spaces (1)
Insulation materials (1)
Safety relief valves (1)
I8
I9
I10
I11
I12
I13
N°
Item
Material
certification
April 2015
TA
TA
TA
TA
TA
TA
Design
assessment
index
X
X
X
X
X
X
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Product certification
C
C
W
W
W
W
Certification
(1)
(1)
(1)
(1)
(1)
(1)
Remarks
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
As per NR217, Part D, Chapter 3
CARGO HANDLING AND CONTAINMENT SYSTEMS FOR LIQUIDS - ITEM I - µ
NR 544, Sec 5
Bureau Veritas
81
Bureau Veritas
K3
K2
K1
N°
power < 50 kW/kVA
power ≥ 50 kW/kVA
power < 50 kW/kVA
•
power ≥ 50 kW/kVA
power < 50 kW/kVA
•
•
Transformers (1)
power ≥ 50 kW/kVA
•
Electrical machines (1)
•
•
Generators (1)
Item
W
W
W
W
Material
certification
TA
TA
TA
X (2)
X (2)
X (2) (3)
X (2) (3)
X (2) (3)
X (2) (3)
During
After
fabrica- completion
tion
X
X
X
X
X
X
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - µ
Design
assessment
index
82
Certification
W
W
W
W
W
W
Vessels intended for the carriage of dangerous goods
Table 29: Electrical installations - item K - µ
(1)
(2)
(3)
(1)
(2)
(3)
(1)
(2)
As per NR217, Pt C, Ch 2, Sec 4
Power transformers are to be tested according to IEC
60076
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
As per NR217, Pt C, Ch 2, Sec 3
Tests to be performed:
• temperature rise test
• overload test
• short-circuit test
• high voltage test
• overspeed test
• measurement of insulation resistance
All electrical machines are to be tested at manufacturer’s work. When the test is not specified, the requirements of IEC 60034 apply
Remarks
NR 544, Sec 5
April 2015
Bureau Veritas
power < 2 kW/kVA
•
Cables and insulated wires (1)
Control, monitoring, alarm and safety systems (1)
K8
K9
power < 100 kW/kVA
•
Switchgear (1)
power ≥ 100 kW/kVA (2)
•
Switchboards (1)
power ≥ 2 kW/kVA
•
Storage battery chargers (1)
Storage batteries (1)
Item
K7
K6
K5
K4
N°
Material
certification
April 2015
TA
TA (2)
TA (2)
DA or TA
DA or TA
TA
TA
Design
assessment
index
X
X
X
X (3)
X
X
During
After
fabrica- completion
tion
X (2)
X (3)
X
X
X
X
X (2)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - µ
Certification
W
W
W
W
W
W
W
W
As per NR217, Pt C, Ch 2, Sec 7
As a general principle, switchgear shall be type approved, designed and constructed in accordance with
standard IEC, EN or other standards recognized by the
Society
Test on board
As per NR217, Pt C, Ch 2, Sec 12
As a general principle, the use of the types of cables
and wired according to IEC 60092 is permitted
As per NR217, Pt C, Ch 2, Sec 13
Operational test to be performed
(1)
(2)
(1)
(2)
(1)
(2)
(3)
As per NR217, Pt C, Ch 2, Sec 7
Including switchboards for emergency generator sets
Tests to be performed:
• operational test
• high voltage test
• insulation resistance measurement
As per NR217, Pt C, Ch 2, Sec 5
As per NR217, Pt C, Ch 2, Sec 5
The following shall be tested:
• installation of storage batteries
• ventilation of battery rooms, cupboards/containers;
and cross-section of ventilation ducts
• storage battery charging equipment
• required caution labels and information plates
(1)
(2)
(3)
(1)
(1)
(2)
Remarks
NR 544, Sec 5
83
power < 50 kW/kVA
•
Item
Bureau Veritas
power < 50 kW/kVA
•
2 - Class 3, class 4 and class 5
K12 1 - Class 1 and class 2
Computer systems (1)
power ≥ 50 kW/kVA
K11 •
Electrical propulsion plants (1)
power ≥ 50 kW/kVA
Power electronics (1)
K10 •
N°
DA or TA
TA
TA
W (2) DA or TA
(3)
C (2)
(3)
Material
certification
84
Design
assessment
index
X (4)
X (4)
X (2)
X (2)
X (5)
X (5)
X (2)
X (2)
During
After
fabrica- completion
tion
X
X
X (6) (7)
X (6) (7)
X (3)
X (3)
Running
tests
Examinations and tests
Product certification
ELECTRICAL INSTALLATIONS - ITEM K - µ
Certification
W
W
W
C
W
W
As per NR217, Pt C, Ch 2, Sec 15
Material certificate for shafts. Shafts are to be made of
material complying with NR216, Ch 2, Sec 3 or, where
rolled products are allowed in place of forgings, with
NR216, Ch 2, Sec 1
Shaft material for electric propulsion motors and for
main engine driven generators where the shaft is part of
the propulsion shafting is to be certified by the Society
If appropriate, where welded parts are foreseen on
shafts and rotors, the provisions of NR216, Chapter 5
apply
Type test are to be carried out on a prototype machine
or on the first of a batch of machines, and routine tests
carried out on the subsequent machines
Functioning of the propulsion plant shall be proved by
dock trial before river trials
Testing during trial voyages as per NR217, Pt C, Ch 2,
Sec 17
As per NR217, Pt C, Ch 2, Sec 16
The following test shall be carried out in the manufacturer’s works:
• function test
• operating conditions simulation
• fault simulation
• simulation of the application environment
(1)
(2)
(1)
(2)
(7)
(6)
(5)
(4)
(3)
(3)
As per NR217, Pt C, Ch 2, Sec 14
Routine tests to be performed:
• voltage test
• insulation resistance test
Operational test to be performed on the subsequent
machines
(1)
(2)
Remarks
NR 544, Sec 5
April 2015
Bureau Veritas
Anti-fouling system (1)
Advanced water treatment plants (1)
Grey water treatment plants (1)
Onboard NOx monitoring systems (1)
Oily water separator (OWS) systems (1)
Exhaust gas cleaning (EGC) systems (1)
S4
S5
S6
S7
S8
Incinerator (1)
S2
Material
certification
During
After
fabrica- completion
tion
Running
tests
Examinations and tests
Remarks
TA
TA
TA
TA
TA
TA (2)
TA
TA
X
Xh
X
X
X
X
X
Xh
X
X
X
X
X
X
X
D
D
D
D
D
W
D
D
In accordance with International Convention on the
control of Harmful and Anti-fouling systems, 2001, Annex 4, Appendices 1 and 2
Anti-fouling paint are to be a type approved by the Society, on the basis of the following criteria:
• TBT-free
• small quantities of organotin compounds acting as
a chemical catalyst are allowed provided their concentration does not exceed 2500 mg total tin per kg
of dry paint
(1)
In accordance with IMO Resolution MEPC. 107 (49)
In accordance with IMO Resolution MEPC.184 (59):
2009 Guidelines for exhaust gas cleaning systems
(1)
Where NOx reduction methods (such as water injection, fuel oil emulsification, charge air humidification,
exhaust gas after-treatment) are used, they are to be approved by the Society and taken into account in type
approval certification of the engine
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
(1)
In accordance with IMO Resolution MEPC. 159 (55)
In accordance with IMO Resolution MEPC. 76 (40) as
amended by Resolution MAPC.93 (45) and Annex VI of
MARPOL 73/78, Appendix IV
(1)
(2)
In accordance with IMO Resolution MEPC. 159 (55)
(1)
Pollution prevention installation covered by additional class notation Cleanvessel as per NR 217, Pt D, Ch 2, Sec 11
Item
S3
Sewage treatment plant (1)
S1
S
N°
Design
assessment
index
Product certification
Certification
April 2015
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - µ
Vessels intended for the carriage of dangerous goods
Table 30: Pollution prevention installation covered by additional class notation Cleanvessel - item S - µ
NR 544, Sec 5
85
Oil content meter
Oil sealing glands
Leak detector for refrigeration systems
S10
S11
Item
S9
N°
TA
TA
TA
Design
assessment
index
Material
certification
86
X
X
X
During
After
fabrica- completion
tion
X
X
X
Running
tests
Examinations and tests
Product certification
D
D
D
Certification
Remarks
POLLUTION PREVENTION INSTALLATION COVERED BY ADDITIONAL CLASS NOTATION CLEANVESSEL - ITEM S - µ
NR 544, Sec 5
Bureau Veritas
April 2015
NR 544, App 1
APPENDIX 1
1
GENERAL INDEX
Key-words and labels (from A to Z)
1.1
Index
1.1.1
Table 1 : General index
Key-words and labels (from A to Z)
A
C
D
E
Advance water treatment plants
S4
Aluminium alloy plates, profiles, bars and tubes
A5
Anchor chain cable accesories
B4
Anchor chain cables
B3
Anchors
B2
Anti-fouling system
S3
Automatic pressure water spraying system
C4
Auxiliary diesel engines
G1
Cables and insulated wires
K8
Cargo pumps (for liquefied gases)
H3
Cargo pumps (for liquids)
I3
Cargo tank P/V and high velocity valves (for liquefied gases)
H7
Cargo tank P/V and high velocity valves (for liquids)
I7
Cast steel shaft brackets
A9
Composite materials
A9
Compressors (for liquefied gases)
A8
Compressors (for liquids)
H2
Computer systems
K12
Control and safety devices
E5
Control, monitoring, alarm and safety system
K9
Detection and alarm system
C7
Domestic gas installations
G9
Electrical machines
K2
Electrical propulsion plants
K11
Exhaust gas cleaning (EGC) systems
F
April 2015
Item reference No.
S8
Expansion joints and cargo hoses (for liquids)
I5
Expansion joints and cargo hoses (for liquefied gases)
H5
External ramp
B10
Fans for enclosed spaces (for liquefied gases)
H10
Fans for enclosed spaces (for liquids)
I11
Fire bulkheading, fire doors
C1
Fire dampers
C2
Fixed gas fire extinguishing system
C5
Flame arresters (for liquids)
I8
Bureau Veritas
87
NR 544, App 1
Key-words and labels (from A to Z)
G
H
I
Gas detection system (for liquefied gases)
H8
Gas detection system (for liquids)
I9
Gas-tight penetration glands (for liquefied gases)
H6
Gas-tight penetration glands (for liquids)
I6
Gears and couplings
G2
Generators
K1
Grey water treatment plants
S5
Hatch covers
B8
Heat exchangers
E2
Hydraulic system
G12
Incinerator
S2
Independent cargo tanks (for liquefied gases)
H1
Independent cargo tanks (for liquids)
I1
Independent tanks
B12
Instrumentation (for liquefied gases)
H9
Instrumentation (for liquids)
I10
Insulation materials (for liquefied gases)
H11
Insulation materials (for liquids)
I12
Iron castings
A4
L
Leak detector for refrigeration systems
S11
M
Main diesel engines with diameter of cylinder bore > 300 mm
E1
Main propulsion shafting
G3
Mass produced diesel engines diameter of cylinder bore D ≤ 300 mm
E6
Movable deck and inner ramp
O
P
R
88
Item reference No.
B11
Oil content meter
S9
Oil sealing glands
S10
Oily separator (OWS) systems
S7
Onboard NOx monitoring systems
S6
Pipe fittings
G14
Pipes, piping
G13
Pipes, valves and fittings (for liquefied gases)
H4
Pipes, valves and fittings (for liquids)
I4
Portable fire extinguishers
C6
Power electronics
K10
Pressure vessels
G8
Pump and compressors
G4
Propellers
G10
Ropes (Steel wire ropes and fibre ropes)
B5
Rudders / nozzles
B1
Bureau Veritas
April 2015
NR 544, App 1
Key-words and labels (from A to Z)
S
T
W
April 2015
Item reference No.
Safety relief valves (for liquefied gases)
H12
Safety relief valves (for liquids)
I13
Scavenging and supercharging compressors or blowers
E4
Sewage treatment plant
S1
Shell doors
B7
Sidescuttles and windows
B6
Starting air receiver (for main diesel engines)
E8
Starting air receiver (for auxiliary machinery)
G11
Steel castings
A3
Steel forgings
A2
Steel plates and profiles
A1
Steering gears
G5
Storage batteries
K4
Storage battery chargers
K5
Switchboards
K6
Switchgears
K7
Thrusters and their prime movers
G7
Transformers
K3
Transition joints steel / Aluminium alloy
A6
Turbochargers
E7
Turning gears of main diesel engines
E3
Water supply system
C3
Watertight doors
B9
Welding consumables
A7
Windlasses
G6
Bureau Veritas
89
NR 544, App 1
90
Bureau Veritas
April 2015