Public Utility Commission of Texas Comparison of Utilities' Generic T&D Rates Updated: March 1, 2014 Schedule Commission-1 Generic Transmission and Distribution Rates Class Residential Secondary ≤ 10 kW (or kVA) (TNMP 5 kW) Secondary > 10 kW (or kVA) (TNMP 5 kW) CenterPoint - Docket 38339/41072 Charges Customer Charge (per customer) $1.62 Oncor - Docket 38929 Charges Customer Charge (per customer) AEP Charges $0.78 Customer Charge (per customer) TCC D-33309 $3.19 Metering Charge (per customer) $3.85 Metering Charge (per customer) $2.28 Metering Charge (per customer) $3.55 $5.24 Metering Charge (per customer) Transmission Charge (per kWh) Distribution Charge (per kWh) $0.008439 $0.016489 Transmission Charge (per kWh) Distribution Charge (per kWh) $0.000000 Transmission Charge (per kWh) $0.018583 Distribution Charge (per kWh) $0.005190 $0.013915 $0.005803 Transmission Charge (per kWh) $0.019007 Distribution Charge (per kWh) Customer Charge (per customer) Metering Charge (per customer) $1.61 $4.41 Customer Charge (per customer) Metering Charge (per customer) $1.71 Customer Charge (per customer) $5.19 Metering Charge (per customer) $3.20 $3.68 $4.25 Customer Charge (per customer) $7.50 Metering Charge (per customer) Transmission Charge (per kWh) Distribution Charge (per kWh) $0.004437 $0.012218 Transmission Charge (per kWh) Distribution Charge (per kWh) $0.000000 Transmission Charge (per kWh) $0.020109 Distribution Charge (per kWh) $0.002512 $0.015489 $0.003148 Transmission Charge (per kWh) $0.031948 Distribution Charge (per kWh) Customer Charge (per customer) Non-IDR customers IDR Customers Customer Charge (per customer) $2.26 $65.83 $6.80 Customer Charge (per customer) Non-IDR customers $22.14 IDR Customers $3.26 $26.52 $4.25 Customer Charge (per customer) $26.00 Metering Charge (per customer) Metering Charge (per customer) Non-IDR customers IDR Customers Transmission Charge Non-IDR Customers (per NCP kVA) IDR Customers (per 4CP kVA) Primary Distribution Charge (per kVA) Customer Charge (per customer) Non-IDR customers IDR Customers Metering Charge (per customer) Non-IDR customers IDR customers Metering Charge (per customer) Transmission Charge (per kW) $18.82 $63.07 $1.4318 $2.2387 $3.059429 Primary $3.58 ≤ 10 kW $76.73 Primary $181.35 > 10 kW $138.40 Distrib. Distribution Charge (per kW) NCP ≤ 20 kW NCP > 20 kW, Load Factor 0 - 10% NCP > 20 kW, Load Factor 11 - 15% NCP > 20 kW, Load Factor 16 - 20% NCP > 20 kW, Load Factor 21 - 25% NCP > 20 kW, Load Factor ≥ 26% Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per kWh) Distribution Charge (per kWh) Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per kW) Transmission Charge Non-IDR Customers (per NCP kVA) IDR Customers (per 4CP kVA) Transmission Distribution Charge (per kVA) $1.7033 $2.1546 Primary > 10 kW $2.002820 Substat. Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per 4CP kVA) Distribution Charge (per 4CP kVA) $154.44 $1,449.82 $2.1188 $0.463296 Distribution Charge (per kW) Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per kW) Distribution Charge (per kW) Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per 4CP kW) Distribution Charge (per kW) $0.00 Metering Charge (per customer) Non-IDR Customers IDR Customers $4.38 $6.10 Transmission Charge $5.47 Non-IDR Customers (per NCP kW) $5.16 IDR Customers (per 4CP kW) $5.01 $4.38 Distribution Charge (per NCP kW) $4.00 Customer Charge (per customer) $12.62 Non-IDR customers $0.000000 IDR Customers $0.005551 $14.95 Metering Charge (per customer) $24.69 Non-IDR Customers IDR Customers $0.00 Transmission Charge $3.37 Non-IDR Customers (per NCP kW) $76.61 IDR Customers (per 4CP kW) $221.32 $0.00 Distribution Charge (per NCP kW) $0.93 $114.51 Customer Charge (per customer) $239.29 Metering Charge (per customer) $0.00 Transmission Charge (per 4CP kW) $0.58 Distribution Charge (per NCP kW) $15.81 $15.81 $1.286 $1.793 $3.314 $3.80 $28.41 $154.62 $154.62 $1.628 $1.925 $2.945 $38.84 $1,869.15 $1.718 $0.199 Summary-TD Non-Bypassable Rates TNC TNMP - Docket 38480 D-33310 Charges $2.94 Customer Charge (per customer) $18.68 $35.00 Transmission Charge (per kW) Non-IDR customers IDR Customers $1.245 $1.953 Distribution Charge (per NCP kW) Non-IDR Customers $3.21 IDR Customers Customer Charge (per customer) $4.25 $26.00 Metering Charge (per customer) $151.75 $168.65 Transmission Charge (per kW) Non-IDR customers IDR Customers $1.189 $1.963 Distribution Charge (per NCP kW) Non-IDR Customers $1.88 IDR Customers $24.80 $850.00 $1.356 $0.0182 Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per 4CP kVA) Distribution Charge (per 4CP kVA) Sharyland - Docket 40332 Charges $4.00 Customer Charge (per customer) $3.19 $1.25 Metering Charge (per customer) $3.55 $0.000000 Transmission Charge (per 4CP kW) $0.017347 Distribution Charge (per kW) $1.88 $7.66 $2.50 Optional Residential $2.20 Customer Charge (per customer) Metering Charge (per customer) $0.000000 Energy (per kWh) $0.033323 $3.19 $3.55 $0.035988 Customer Charge (per customer) $26.52 Metering Charge (per customer) $15.81 $2.56 $10.74 $0.0000 Transmission Charge (per 4CP kW) $0.0000 Distribution Charge (per kW) $1.79 $6.95 $6.0981 $5.2808 $34.50 Customer Charge (per customer) $28.41 $204.98 Metering Charge (per customer) $154.62 Transmission Charge (per 4CP kW) $1.925 Distribution Charge (per kW) $5.082 $0.0000 $0.0000 $4.7102 $5.1286 $214.51 $1,751.67 $0.0000 $0.0000 Customer Charge (per customer) Metering Charge (per customer) Transmission Charge (per 4CP kW) Distribution Charge (per NCP kW) $38.84 $1,869.15 $1.718 $3.153 Page 1 Public Utility Commission of Texas Comparison of Utilities' TCRF Charges Updated: March 1, 2014 Schedule Commission-2 Transmission Cost Recovery Factor (TCRF) Class Residential CenterPoint - Docket 42053 Charges per kWh Oncor - Docket 42059 Class Charges $0.004247 Residential per kWh $0.010953 Residential Secondary Secondary ≤ 10 kW Secondary > 10 kW NonIDR Secondary > 10 kW IDR per kWh per NCP kW per 4CP kW $0.007165 $3.079186 $3.516757 Secondary Secondary ≤ 10 kW Secondary > 10 kW IDR Secondary > 10 kW NonIDR per kWh per Avg 4CP kW per kW $0.002861 $1.441635 $1.473722 Primary Primary ≤ 10 kW per kWh $0.005666 Primary Primary IDR Primary NonIDR per Avg 4CP kW per kW $2.693335 $3.297596 Transmission per Avg 4CP kW $2.008500 Secondary Secondary ≤ 10 kVA Secondary > 10 kVA IDR Secondary > 10 kVA NonIDR per kWh per 4CP kVA per NCP kVA $0.003661 $1.365836 $0.807775 Primary Primary IDR Primary NonIDR per 4CP kVA per NCP kVA $1.280981 $1.007032 Transmission per 4CP kVA $1.433360 Primary > 10 kW Distribution Primary > 10 kW NonIDR Primary > 10 kW IDR per NCP kW per 4CP kW $2.521523 $3.325860 Lighting Street Lighting Service Miscellaneous Lighting Service per kWh per kWh $0.000000 $0.000000 Primary > 10 kW Substation Transmission IDR per 4CP kW per 4CP kW $3.350609 $3.605516 Residential Texas Central (TCC) - Docket 42054 Class Charges per kWh Texas North (TNC) - Docket 42055 Class Charges per kWh $0.006128 Texas-New Mexico Power (TNMP) - Docket 42048 Class Charges Residential per kWh $0.011394 Secondary Secondary ≤ 10 kW Secondary > 10 kW IDR Secondary > 10 kW NonIDR per kWh per Avg 4CP kW per kW $0.003954 $1.964374 $1.429454 Secondary Secondary ≤ 5 kW Secondary >5 kW NonIDR Secondary > 5kW IDR per kWh per NCP kW per 4CP kW $0.014384 $2.859274 $4.436968 Primary Primary IDR Primary NonIDR per Avg 4CP kW per kW $1.523843 $1.560458 Primary Primary NonIDR Primary IDR per NCP kW per 4CP kW $1.289155 $4.482955 Transmission per Avg 4CP kW $2.844678 Transmission per 4CP kVA $2.898749 Summary-TCRF $0.005311 Sharyland - Docket 42056 Class Charges Residential per 4CP kW $0.192547 Optional Residential Energy Rate per kWh $0.000770 Secondary per 4CP kW $2.947756 Page 2 of 6 Public Utility Commission of Texas Comparison of Utilities' Metering Credits Updated: March 1, 2014 Schedule Commission-3 Metering Credit Charges (per customer) Class CenterPoint Secondary ≤ 10 kW (or kVA) n/a Secondary > 10 kW (TNMP 5 kW) IDR customers $1.32 Primary ≤ 10 kW IDR customers $2.14 Oncor > 10 kW Dist. Line Subst. Transmission Lighting $21.80 n/a $1.01 $1.82 AEP TCC $1.21 $2.17 $1.86 $23.00 $13.00 $2.55 $3.75 $3.75 $1.48 $140.00 n/a $30.00 n/a Summary-Metering Credit AEP TNC TNMP $1.21 ≤ (5 kW) $0.40 $2.17 > (5 kW) $2.00 Sharyland $2.17 $2.17 $3.20 n/a $100.00 n/a n/a n/a Page 3 of 6 Public Utility Commission of Texas Comparison of Utilities' Transition Charges Updated: March 1, 2014 Schedule Commission-4 Transition Charges (TCs) and System Restoration Charges (SRCs) Oncor (Fmr. TXU) Class Residential TC1 Docket 41764 Charges per kWh $0.000576 Secondary Secondary ≤ 10 kW Secondary > 10 kW per kWh per kW $0.000580 $0.176 $0.000899 $0.276 Primary Primary ≤ 10 kW Primary > 10 kW per kWh per kW $0.000378 $0.154 $0.000464 $0.248 High Voltage Lighting Service Instantaneous Interruptible Noticed Interruptible per kW per kWh per kW per kW $0.118 $0.000805 $0.093 $0.196 $0.135 $0.001383 $0.127 $0.285 Residential per kWh TC1 Docket 41982 Charges $0.003581 TC2 Docket 41533 Charges $0.007976 TC3 Docket 42241 Charges $0.003238 Commercial & Small Industrial - Energy per kWh $0.008550 $0.015567 $0.008207 $0.953569 $2.320791 $0.863688 Texas Central (TCC) (Fmr.CPL) Class Commercial & Small Industrial - Demand per kW or kVA TC2 Docket 41492 Charges $0.000902 CenterPoint (Fmr. Reliant) Class Residential TC Docket 41610 Charges per kWh $0.000000 TC2 Docket 41983 Charges $0.003030 MGS per kVA per kW per kWh $0.000000 $0.000000 $0.000000 (MGS-T) (MGS-D) n/a $0.339549 $0.002501 n/a $0.225872 $0.001061 n/a $1.162521 $0.002684 LGS per kVA per kW $0.000000 $0.000000 (LGS-D) (LGS-T) $1.088172 $1.683095 $0.465071 $0.790228 $1.225715 $1.254980 LOS-A LOS-B per kW per kW $0.000000 $0.000000 $0.813869 $1.382368 $0.322556 $0.784610 $0.796332 $1.287411 Lighting SES-D ISS-D IS-30 IS-10 IS-I ISS-T SES-T SBI SCP per kWh per kW per kW per kW per kW per kW per kW per kW per kW per kW $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.003515 $0.394669 $2.769828 $0.828381 $0.417866 $0.917574 $1.010050 $0.402955 $0.123629 $1.428872 $0.000555 $0.074416 ($0.231048) ($0.011103) $0.025296 ($0.022908) $0.278755 $0.226716 $0.006396 $0.500463 $0.004139 $0.341347 $2.107266 $0.628065 $0.321958 $0.838173 $1.087116 $0.403948 $0.087149 $1.333880 Large Industrial - Firm per kW or kVA $1.081807 $1.258871 $0.484692 Large Industrial - Non-Firm per kW or kVA $0.734184 $1.986337 $0.545946 Residential per kWh Standby - Firm per kW or kVA or Daily $0.084009 $0.172197 $0.073856 Standby - Non-Firm per kW or kVA or Daily $0.123023 $0.233650 $0.079763 Secondary Secondary ≤ 10 kVA Secondary > 10 kVA per kWh per kVA $0.002777 $0.205180 ($0.000669) ($0.037606) Municipal and Cotton Gin per kWh $0.005312 $0.010448 $0.004741 Primary Lighting Service per kVA per kWh $0.151267 $0.014415 ($0.029872) ($0.002617) CenterPoint Class SRC Docket 41954 Charges $0.002234 Summary-TC and SRC TC3 Docket 42121 Charges $0.000406 TC5 Docket 42017 Charges $0.003211 ADFITC Docket 41834 Charges ($0.000420) Page 4 of 6 Public Utility Commission of Texas Comparison of Utilities' Rate Case Expense Charges Updated: March 1, 2014 Schedule Commission-5 Rate Case Expenses (Rider RCE) CenterPoint Class Residential Secondary ≤ 10 kVA Secondary > 10 kVA Primary Transmission Street Lighting Miscellaneous Lighting RCE - Docket 39127 Charges per kWh $0.000055 per kWh $0.000049 per kVA $0.008670 per kVA $0.006469 per kVA $0.002705 per kWh $0.000382 per kWh $0.000126 Texas New-Mexico Power (TNMP) Class Residential Secondary ≤ 5 kW Secondary >5 kW NonIDR Secondary >5 kW IDR Primary NonIDR Primary IDR Transmission Lighting RCE-3 - Docket 38880 Charges per kWh $0.000146 per kWh $0.000263 per kWh $0.043799 per kWh $0.046158 per kWh $0.047120 per kWh $0.052076 per 4CP kVA $0.013630 per kWh $0.000467 Oncor Class Residential Secondary ≤ 10 kW Secondary > 10 kW Primary ≤ 10 kW Primary > 10 kW Distribution Primary > 10 kW Substation Transmission Lighting RCE-2 - Docket 39239 Charges per kWh per kWh per kW per kWh per kW per kW per kW per kWh $0.000033 $0.000044 $0.007521 $0.000027 $0.006166 $0.003325 $0.002190 $0.000141 RCE-M - Docket 40348 Charges (per ESI ID) $0.090000 $0.090000 $0.090000 $0.090000 $0.090000 $0.090000 Summary-Rate Case Expenses Page 5 of 6 Public Utility Commission of Texas Comparison of Utilities' Other Non-Bypassable Charges Updated: March 1, 2014 Schedule Commission-6 Other Non-Bypassable Charges Competition Transition Charges Advanced Metering Charges (per customer) Texas New-Mexico Power (TNMP) - Docket 40941 Class Charges Residential per kWh General Service per kWh Large General Service per kW Economy LGS per kW Industrial Power per kW Standby Power per kW Economy IPS per kW Interruptible IPS per kW Municipal Power per kWh Street Lighting per kWh Outdoor Lighting per kWh $0.00248 $0.00309 $0.45194 $0.91234 $0.11271 $0.25930 $0.22526 $0.45160 $0.00282 $0.00217 $0.00438 Energy Efficiency Cost Recovery Factor (EECRF) CenterPoint - Docket 41540 Class Residential Secondary ≤ 10 kVA per kWH per kWH Secondary > 10 kVA Primary per kWH per kWH Transmission - Industrial Lighting per customer per lamp System Benefit Funds Fees per kWh CenterPoint - Docket 35639 Class Charges Residential Secondary ≤ 10 kVA Secondary > 10 kVA Primary $3.05 $3.14 $3.16 $3.16 $0.000862 ($0.000097) $0.000601 $0.000992 CenterPoint $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 Oncor $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 TCC TNC $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 TNMP $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 Sharyland $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 $0.000000 Oncor - Docket 35717 Class Residential Secondary ≤ 10 kW Secondary > 10 kW Primary ≤ 10 kW Nuclear Decommissioning Charges Charges $2.19 $2.39 $3.98 $3.95 Primary > 10 kW $5.15 Lighting (metered facilities) $3.25 Texas Central (TCC) - Docket 36928 Class Charges Charges Class Residential Secondary ≤ 10 kW Secondary > 10 kW Primary Transmission Lighting Residential Secondary ≤ 10 kW Secondary > 10 kW Non-IDR Primary Non-IDR $2.89 $4.17 $2.05 ($7.07) Hurricane Cost Recovery CenterPoint - Docket 41941 Texas-New Mexico Power (TNMP) - Docket 41988 Charges Class Residential per kWh Charges Class $0.000010 Secondary ≤ 10 kVA per kWh $0.000007 Secondary > 10 kVA per kVA $0.001828 Primary per kVA $0.001818 Transmission per 4CP kVA $0.003161 Lighting per kWh $0.000004 Residential per kWh Secondary ≤ 5kW per kWh Secondary > 5kW Non IDR Secondary > 5kW IDR Primary Non IDR Primary IDR Transmission Lighting per NCP kW per NCP kW per NCP kW per NCP kW per 4CP kVA per kWh $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 $0.00000 Municipal Franchise Fees NA NA Texas North (TNC) - Docket 36928 Class Charges Oncor - Docket 41544 Charges Class Residential per kWh Secondary ≤ 10 kW per kWh Secondary > 10 kW Primary ≤ 10 kW per kWh per kWh Primary > 10 kW Distrib. Primary > 10 kW Subst. per kWh per kWh Transmission Non-Profit Transmission For Profit Lighting per kWh per kWh per kWh $0.001014 $0.000437 $0.000525 ($0.000004) $0.000649 $0.000680 $0.000525 ($0.000002) $0.000000 Texas Central (TCC) - Docket 41538 Charges Class Residential Secondary ≤ 10 kW per kWh per kWh Secondary > 10 kW per kWh Primary Transmission Service per kWh per kWh $0.000670 $0.000511 $0.000398 $0.000317 ($0.000126) Texas North (TNC) - Docket 41539 Class Charges Residential Secondary ≤ 10 kW Secondary > 10 kW Primary Transmission Service $0.000319 $0.000284 $0.000405 ($0.000107) ($0.000142) per kWh per kWh per kWh per kWh per kWh Residential Secondary ≤ 10 kW Secondary > 10 kW Non-IDR Primary Non-IDR $2.77 $4.40 $1.46 $0.22 Oncor - Docket 38929 Charges per kWh Class Residential $0.000169 Texas New-Mexico Power (TNMP) Class Charges Transmission per kWh $0.001175 Inside City Other Customers' Municipal Franchise Fees are recovered through the base distribution charges. Texas New-Mexico Power (TNMP) - Docket 38306 Class Charges Residential Secondary ≤ 5 kW Secondary > 5 kW Primary Lighting (metered facilities) $3.40 $8.20 $13.63 $17.32 $7.22 Secondary ≤ 10 kW per kWh $0.000146 Secondary > 10 kW per kW Primary ≤ 10 kW per kWh Primary > 10 kW per kW $0.045 Transmission per kW $0.046 Lighting per kWh $0.044 $0.000096 $0.000147 Municipal Account Franchise Credit CenterPoint - Docket 38339/41072 Class Charges Residential per kWh Secondary ≤ 10 kVA per kWh ($0.001839) ($0.002161) Secondary > 10 kVA Primary Transmission Street Lighting per kVA per kVA per kWh per kWh ($0.690362) ($0.699012) ($0.000725) ($0.002168) Miscellaneous Lighting per kWh ($0.002343) TCC - Docket 41970 Charges Class Residential per kWh $0.000018 Secondary ≤ 10 kW per kWh $0.000017 Secondary > 10 kW per kW $0.003884 Primary per kW $0.006326 Transmission per kW $0.002614 Lighting per kWh $0.000017 Texas-New Mexico Power (TNMP) - Docket 41496 Class Charges Residential per kWh Secondary ≤ 5 kW Secondary > 5 kW Primary Lighting per kWh per kWh per kWh per kWh $0.001259 $0.008816 $0.000619 $0.000113 $0.000330 Note: Other utilities' NDCs are included in the distribution charges. Sharyland - Docket 41445 Class Residential Optional Residential Service Primary Charges per kWh per kWh per kWh $0.001214 $0.001214 $0.000516 Summary-Other NBC Page 6 of 6
© Copyright 2026 Paperzz