Poster

Hardware-in-the-loop Simulation of
Hydrostatic Hybrid Transmission
Installation of Accumulators
Introduction
Background
Increasing fuel prices and stricter regulations for
emissions have raised the demand for more efficient
transmissions in heavy machinery. With a hydromechanical transmission there is a possibility to make a
hybrid transmission that can recuperate brake energy.
The development and evaluation of new concepts is
often a time consuming and costly procedure. By using
computer aided tools and hardware-in-the-loop
simulations, this process can be made considerably
shorter.
Problem description
The hardware of the test rig had to be
modified with hydraulic accumulators
for energy storage.
The aim of this project was to prepare the test rig in
FluMeS laboratory for hardware-in-the-loop-simulations
of a short loading cycle for a wheel loader with a hybrid
hydrostatic transmission.
Modeling
Control
Simulation models made in Hopsan
Block diagram - calculations of control signals
Results - Successful Hardware-in-the-loop Simulation
Load side result for the loading cycle
Transmission result for the loding cycle
Christian Borg Bagge
[email protected]
Emil Johansson
[email protected]
Controlers are made in Simulink
Christoffer Zeipel-Stjerna
[email protected]
Oskar Nilsson
[email protected]
David Karlsson
[email protected]
Mattias Forsell
[email protected]