FIGURE 2 Conventional Footings on Ground Improvement B-1 B-2 APPROXIMATE LIMITS OF PROPOSED BUILDING OPTION 1 B-8 B-7 B-3 B-4 B-5 APPROXIMATE LIMITS OF EXISTING SCHOOL BUILDING Conventional Footings on Natural Bearing Soil. B-6 FILE NAME: H:\Acad\JOBS\5883\5883-F02.dwg GRAPHIC SCALE Possible Pile Support or Conventional Footings on Ground Improvement 0 100 100 DOVER 200 NEW HAMPSHIRE SUBSURFACE EXPLORATION PLAN - OPTION 1 FOR LEGEND APPROXIMATE LOCATION OF BORING PERFORMED BY NEW ENGLAND BORING ON MAY 4 AND 5, 2015 FOR McPHAIL ASSOCIATES, LLC HMFH ARCHITECTS, INC. REFERENCE: THIS PLAN WAS PREPARED FROM A 40-SCALE DRAWING ENTITLED "BOUNDARY SURVEY" DATED FEBRUARY 23, 2015 BY SEBAGO TECHNICS BY McPHAIL ASSOCIATES, LLC MAY 2015 F.G.P. 5883 J.S.H. 1" = 100' FIGURE 3 B-1 B-2 Conventional Footings on Ground Improvement APPROXIMATE LIMITS OF PROPOSED BUILDING OPTION 2 B-8 B-7 B-3 B-4 B-5 APPROXIMATE LIMITS OF EXISTING SCHOOL BUILDING Conventional Footings on Natural Bearing Stratum. B-6 GRAPHIC SCALE 0 FILE NAME: H:\Acad\JOBS\5883\5883-F03.dwg 100 Pile Supported Foundations 100 DOVER 200 NEW HAMPSHIRE SUBSURFACE EXPLORATION PLAN - OPTION 2 FOR LEGEND APPROXIMATE LOCATION OF BORING PERFORMED BY NEW ENGLAND BORING ON MAY 4 AND 5, 2015 FOR McPHAIL ASSOCIATES, LLC HMFH ARCHITECTS, INC. REFERENCE: THIS PLAN WAS PREPARED FROM A 40-SCALE DRAWING ENTITLED "BOUNDARY SURVEY" DATED FEBRUARY 23, 2015 BY SEBAGO TECHNICS BY McPHAIL ASSOCIATES, LLC MAY 2015 F.G.P. 5883 J.S.H. 1" = 100'
© Copyright 2026 Paperzz