Matakuliah Tahun Versi : A0194/Pengendalian Rekayasa Ulang Informasi : 2005 : 1/5 Pertemuan 25 Making It Happen 1 Learning Outcomes Pada akhir pertemuan ini, diharapkan mahasiswa akan mampu : • Menunjukkan hubungan antara kebutuhan kontrol dengan current architecture 2 Outline Materi • Step Three: Chart The Course • Isolating and Decoupling Legacy System through Data Hubs 3 Step Three: Chart The Course Establishing the course may seem to be a simple thing to do. 4 Step Three: Chart The Course A straight line in laying out the tactical plan to replace the legacy of architecture with the future state. 5 Step Three: Chart The Course The Steps to Chart: • Isolating and Decoupling Legacy System through Data Hubs. • Warehouse and Decision Support System as interim integrators 6 Isolating and Decoupling Legacy System through Data Hubs The first time you create a hub, you actually make the job a little harder, which makes it difficult to gain support for this approach. 7 Isolating and Decoupling Legacy System through Data Hubs Direct Connection Replace direct link between house #1 and #3 Replace direct link between house #2 and #5 All directs link removed. 8 Isolating and Decoupling Legacy System through Data Hubs Since we have to rewrite the links anyway, we just write ht links to the hub instead of to each other. 9 Isolating and Decoupling Legacy System through Data Hubs Legacy system change into directly connected architecture by eliminating, simplifying and replacing. 10 The End 11
© Copyright 2026 Paperzz