UNIVERSITY OF VIRGINIA BOARD OF VISITORS MEETING OF THE BUILDINGS AND GROUNDS COMMITTEE NOVEMBER 15, 2010 BUILDINGS AND GROUNDS COMMITTEE Monday, November 15, 2010 2:15 – 3:15 p.m.. Board Room, The Rotunda Committee Members: The Hon. Lewis F. Payne, Chair Stewart H. Ackerly Hunter E. Craig The Hon. Alan A. Diamonstein Susan Y. Dorsey Helen E. Dragas W. Heywood Fralin Robert D. Hardie Mark J. Kington John O. Wynne, Ex-officio Bradley H. Gunter, Consulting Member AGENDA PAGE I. II. CONSENT AGENDA (Ms. Sheehy) A. Easements 1. Appalachian Electric Power, Easement Request - Fan Mountain 2. City of Charlottesville, Easement Request– Traffic Control Devices 11th and West Main Street B. Architect/Engineer Selection 1. East Chiller Plant 2. Helicopter Pad Relocation 3. Upgrade Track Facilities, Phase I C. University Representative to the Art and Architectural Review Board ACTION ITEMS (Ms. Sheehy) A. Update of the Major Capital Projects Program, Programmatic Approval of New Infrastructure Projects (Ms. Sheehy to introduce Ms. Cheryl Gomez, Ms. Gomez to report) B. Additions to the Major Capital Projects Program 1. Blandy Farm/State Arboretum Research Laboratory 2. Expand North Grounds Recreation Center 3. Upgrade Track Facilities, Phase I 4. Lee Street Realignment 5. Helicopter Pad Relocation 1 2 3 3 4 4 6 9 PAGE C. D. E. Project Budget and Scope Review 1. Jordan Hall HVAC 2. Lee Street Connective Elements Schematic Design Approval, Thrust Theatre and Arts Commons Landscape Master Plan (Ms. Sheehy to introduce Mr. David J. Neuman; Mr. Neuman to report) Concept, Site, and Design Guidelines 1. East Chiller Plant & Lee Street Realignment 2. Blandy Farm/State Arboretum Research Laboratory 11 13 19 28 III. REPORT BY THE VICE PRESIDENT FOR MANAGEMENT AND BUDGET (Ms. Sheehy) • Vice President’s Remarks 36 IV. REPORT BY THE ARCHITECT FOR THE UNIVERSITY (Mr. Neuman) 2010 Sustainability Assessment Historic Preservation Discussion 37 V. MISCELLANEOUS BUILDINGS AND GROUNDS REPORTS (Written Reports) A. Major Projects Status Report, Future Design 39 Actions and Planning Studies B. Architect/Engineer Selection Report for Projects 44 Less Than $5 Million C. Professional Services Contracts 45 D. Pavilion Occupancy Status 46 BOARD OF VISITORS CONSENT AGENDA A.1. EASEMENT, ELECTRICAL SERVICE, APPROVAL TO CONVEY AN EASEMENT TO APPALACHIAN POWER COMPANY The owner of property adjacent to Fan Mountain desires to have electrical service provided to their property. Electrical service can be provided with an easement across property owned by The Rector and Visitors of the University of Virginia. The easement will provide for underground installation on property owned by the University. Other considerations may include requiring the line to be installed underground all the way to the meter, as well as requiring the property owner to conform to certain night lighting restrictions. ACTION REQUIRED: Approval by the Buildings and Grounds Committee and by the Board of Visitors APPROVAL OF EASEMENT FROM THE UNIVERSITY OF VIRGINIA TO APPALACHIAN POWER COMPANY RESOLVED, the grant of a permanent easement on property owned by The Rector and Visitors of the University of Virginia to Appalachian Power Company, in the approximate location shown on that certain plan entitled “Proposed Right Of Way on The Property of The Rector and Visitors of The University of Virginia” dated July 16, 2010, and prepared by Appalachian Power Company (the “Plan”), to facilitate the installation of underground electrical facilities, is approved; and RESOLVED FURTHER, the Executive Vice President and Chief Operating Officer is authorized, on behalf of the University, to approve and execute a deed of easement and related documents, to approve revisions to the Plan (including, without limitation, revisions to change the location of the permanent easement), to incur reasonable and customary expenses, and to take such other actions as deemed necessary and appropriate to grant such permanent easement; and RESOLVED FURTHER, all prior acts performed by the Executive Vice President and Chief Operating Officer, and other officers and agents of the University, in connection with the grant of such permanent easement, are in all respects approved, ratified and confirmed. 1 A.2. EASEMENT, TRAFFIC CONTROL DEVICES, APPROVAL TO CONVEY AN EASEMENT TO THE CITY OF CHARLOTTESVILLE The City of Charlottesville desires to upgrade the traffic control facilities at the intersection of 11th Street and West Main Street. The installation of new control devices requires an easement of approximately 72 square feet. ACTION REQUIRED: Approval by the Buildings and Grounds Committee and by the Board of Visitors APPROVAL OF EASEMENT FROM THE UNIVERSITY OF VIRGINIA TO THE CITY OF CHARLOTTESVILLE TO FACILITATE THE INSTALLATION OF TRAFFIC CONTROL FACILITIES RESOLVED, the grant of a permanent easement on property owned by The Rector and Visitors of the University of Virginia to the City of Charlottesville, in the approximate location shown on that certain plat entitled “Permanent Easement for Traffic Control Facilities To Be Acquired By The City of Charlottesville, VA. from The Rector & Visitors of The University of Virginia” dated August 25, 2010, and prepared by Neighborhood Development Services, Engineering Division (the “Plat”), to facilitate the installation of traffic control facilities, is approved; and RESOLVED FURTHER, the Executive Vice President and Chief Operating Officer is authorized, on behalf of the University, to approve and execute a deed of easement and related documents, to approve revisions to the Plat (including, without limitation, revisions to change the location of the permanent easement), to incur reasonable and customary expenses, and to take such other actions as deemed necessary and appropriate to grant such permanent easement; and RESOLVED FURTHER, all prior acts performed by the Executive Vice President and Chief Operating Officer, and other officers and agents of the University, in connection with the grant of such permanent easement, are in all respects approved, ratified and confirmed. 2 B.1. ARCHITECT/ENGINEER SELECTION, EAST CHILLER PLANT: of architect/engineer selection Approval This $25.8 to $29.0 million project was approved at the June 2010 Board of Visitors meeting. Its scope includes construction of a new 12,000 ton East Chiller Plant with an initial 6,000 tons of chiller capacity. We recommend the selection of Affiliated Engineers, Inc., of Chapel Hill, North Carolina, for the contract. This firm is currently engaged successfully on the South Chiller Plant Addition and has been active in the planning and design of chilled water plant facilities at the University. They are currently completing the Aquatics and Fitness Center Chiller Plant upgrade and have completed the Central Grounds Chiller Plant upgrades. ACTION REQUIRED: Approval by the Buildings and Grounds Committee APPROVAL OF ARCHITECT/ENGINEER SELECTION, EAST CHILLER PLANT RESOLVED, Affiliated Engineers, Inc. of Chapel Hill, North Carolina is approved for performance of architectural and engineering services for the East Chiller Plant at the University of Virginia. B.2. ARCHITECT/ENGINEER SELECTION, HELICOPTER PAD RELOCATION: Approval of architect/engineer selection This $ 6.0 to $6.7 million project will be presented for approval at the November 2010 Board of Visitors meeting. Its scope includes construction of a new heliport facility on the roof of University Hospital. The project scope involves construction of up to two new aluminum helipads on the east and west towers on University Hospital with a connecting walkway. It includes structural steel modifications to support the helipads, enclosed elevator and stair extensions, elevator equipment upgrades, and the addition of lighting and fire suppression systems. We recommend the selection of the Smith Group Inc. of Washington, D.C. for the contract. They have been active in the planning and design of healthcare facilities at the University, and are currently providing these services for the Hospital Bed Expansion. They are familiar with the existing and renovated 3 structural conditions, the associated elevators, the eighth floor operations, and the related building infrastructure. ACTION REQUIRED: Approval by the Buildings and Grounds Committee APPROVAL OF ARCHITECT/ENGINEER SELECTION, HELICOPTER PAD RELOCATION RESOLVED, the Smith Group Inc. of Washington, D.C. is approved for performance of architectural and engineering services for the Helicopter Pad Relocation at the University of Virginia. B.3. ARCHITECT/ENGINEER SELECTION, UPGRADE TRACK FACILITIES, PHASE I: Approval of architect/engineer selection The project will be presented for approval as an addition to the Major Capital Projects Program at the November 2010 Board of Visitors meeting. The University is hosting the ACC championship meet in 2012. This project will improve the track, field events areas, and general site, as required by this event. Additional area planning will ensure that the track and field upgrades reflect the context of the University Grounds and the aspirations of the other Athletic programs in the precinct. We recommend the selection of VMDO, of Charlottesville, for the contract. They have extensive experience with this precinct having previously completed both Klockner Stadium and Davenport Field, two well-regarded sports venues. ACTION REQUIRED: Approval by the Buildings and Grounds Committee APPROVAL OF ARCHITECT/ENGINEER SELECTION, UPGRADE TRACK FACILITIES, PHASE I RESOLVED, VMDO of Charlottesville, Virginia is approved for performance of architectural and engineering services for the Upgrade Track Facilities, Phase I. C. UNIVERSITY REPRESENTATIVE TO THE ART AND ARCHITECTURAL REVIEW BOARD: Approval of appointment nominees The Art and Architectural Review Board reviews and approves designs for all state capital projects. Ms. Constance Warnock, Assistant University Architect at the University of Virginia, 4 has served admirably as a member of the Board for the past four years, and is eligible for reappointment to one additional four year term. In June 2010, the Board of Visitors recommended her reappointment. Staff in the Secretary of Commonwealth’s Office has subsequently asked for an additional nominee so that the Governor has an option in making his appointment. In response, the Administration wishes to add Mr. Luis Carrazana, Senior Biomedical Facilities Planner at the University of Virginia, for consideration. The appointment procedure calls for the Board of Visitors to make formal recommendations and for the Rector to communicate the recommendations to the Secretary of the Commonwealth. The Administration recommends that the Board nominate Ms. Constance Warnock and Mr. Luis Carrazana for consideration by the Governor for appointment as the University’s citizen member of the Art and Architectural Review Board. ACTION REQUIRED: Approval by the Buildings and Grounds Committee and by the Board of Visitors NOMINATION OF UNIVERSITY REPRESENTATIVE TO THE ART AND ARCHITECTURAL REVIEW BOARD WHEREAS, pursuant to Section 2.2-2400 of The Code of Virginia, the Governor appoints five citizen members to the Art and Architectural Review Board of the Commonwealth of Virginia; and WHEREAS, the Code provides that one member be appointed from a list of two or more persons nominated by the governing board of the University of Virginia; RESOLVED, the Board of Visitors recommends to the Governor that Constance Warnock and Luis Carrazana be considered for appointment to the citizen member position on the Art and Architectural Review Board as the University of Virginia representative. 5 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: II.A. Update of the Major Capital Projects Program: Programmatic Approval of New Infrastructure Projects BACKGROUND: In October 2004, the Board of Visitors revised the policy outlining the involvement of the Board and its committees in the capital planning process. As a part of the upcoming update to the University’s Major Capital Project Program, certain committees will review the programmatic concepts of certain projects. The Buildings and Grounds Committee was assigned responsibility for reviewing the programmatic components of infrastructure projects, historic renovations, and other projects which do not clearly fall under other committees’ purview and were not reviewed with the last update in April 2009. DISCUSSION: The draft update to the Major Capital Projects Program, which will be brought to the Buildings and Grounds Committee in February 2011, includes the following new infrastructure projects. Near Term (through 2014) Infrastructure Expansion/Replacement – This project will (1) upgrade the Cavalier Substation to provide redundant power and ensure that existing equipment is not overloaded as new facilities are connected; (2) repairs or replaces 1,300 feet of steam tunnels on Central Grounds, Emmet Street and the Dell; and (3) replaces approximately 1,300 feet of steam and condensate pipe to accommodate growth in the Health System. Far Term (through 2022) Add Main Heat Plant Biomass – This project would add the ability to co-fire wood at the plant. Specific components include adding a new fuel storage silo, modifying existing fuel unloading and conveying system, and making minor modifications to the existing solid fuel-fired boilers. Benefits include increasing fuel diversity and reliability, hedging price volatility of fossil fuels, reducing emissions including greenhouse gas (carbon), and contributing to sustainability goals. 6 Replace Aging Chillers - Four separate projects through 2022 will address aging chillers in the Health System, in Bryan Hall, in the Chemistry Building, and in Hereford College. The projects will increase reliability and address potential additional capacity needs related to the expansion of the University Hospital’s Emergency Department; construction of an Intramural and Rehabilitation facility in the Health System; and other possible new growth. Expand Ductbank – The project will install 7,000 feet of ductbank along with two feeders from the North Grounds Substation to Old Ivy Road. Roughly half of the project will provide for growth in the Massie Road/North Grounds area and enable the future retirement of the Copeley Substation. The remaining half will serve existing and new facilities in the area of Old Ivy Road that currently receive service directly from Dominion Virginia Power, thereby improving service reliability (dual, underground feeds) and reduce cost through aggregating demand in the North Grounds/Old Ivy Road sector. Expand Science/Engineering Plant – This project will expand capacity by installing a new 1,500 ton chiller in the science and engineering precinct, including a new cooling tower. This project is needed only if growth occurs in the precinct, possibly two new classroom/science buildings and possibly new or larger residence halls in the Alderman Road area. Repair Steam Tunnels – This project will repair 600 feet of existing steam tunnels from Maury Hall to Halsey Hall and from Davis Wing to Rupple Drive. Expand Cavalier Substation – This project will expand capacity at the existing Cavalier Substation in the eastern sector of the UVA Grounds, which encompasses the Health System to the Emmet Street area. Alternatively, a new substation may need to be built in this sector to avoid having to install new transmission lines from Dominion Virginia Power to Grounds. The need and timing for this project will be driven by the rate of growth in new facilities and corresponding electrical demand. Retire Copeley Substation – This project installs a new ductbank and replaces building transformers and switchgear 7 so that the Copeley Substation can be retired. The load will be picked up by the North Grounds Substation. This 4160 volt substation dates to 1963 and has components that are becoming obsolete. The existing North Grounds Substation, built in 1994, currently provides service to the Copeley Substation. As such, no new capacity would be required of the North Grounds Substation. In addition to the above projects, the update to the Major Capital Projects Program will include a state general fund request for Maintenance Reserve funding in each biennium. ACTION REQUIRED: Committee Approval by the Buildings and Grounds APPROVAL OF PROGRAM OF INFRASTRUCTURE PROJECTS FOR THE 2011 UPDATE OF THE MAJOR CAPITAL PROJECTS PROGRAM RESOLVED, the infrastructure projects proposed for the 2011 Update of the Major Capital Projects Program are appropriate for inclusion in the plan. 8 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: II.B. Additions to the Major Capital Projects Program BACKGROUND: Normally, the Board of Visitors approves capital projects every two years with a comprehensive update to the Major Capital Projects Program. When the University identifies a new capital project outside the biennial update, the project requires approval by the Buildings and Grounds Committee, the Finance Committee, and by the Board of Visitors. DISCUSSION: At this time, the University has five new capital projects to add to the Major Capital Projects Program: Blandy Farm/State Arboretum Research Laboratory Private: $0.80M Federal Grants: $0.35M Cash Reserves: $0.30M $1.45M The proposed project will construct a 3,900 gross square foot (gsf) frame structure that will support the flow of research activity at the Commonwealth’s State Arboretum at Blandy Farm. Labs will accommodate microscopy, fume hoods, and other instrumentation. The facility will also provide shared equipment and environmental rooms; write up, meeting, and support space. Expand North Grounds Recreation Center Debt: $15.2M - $17.2M The proposed 30,000 gsf addition to the North Grounds Recreation Center includes an eight lane 25-meter pool (with variable depth), sauna, whirlpool and outdoor patio and two exterior tennis courts. Renovations will be made to existing squash and racquetball courts and add a mind/body multi-purpose room for programs such as yoga, pilates, tai chi, martial arts, and dance. Upgrade Track Facilities Phase I Gifts: $5.0M - $7.0M The University is hosting the ACC championship meet in 2012. This phase will provide track improvements to include reconfiguring and resurfacing. Additionally, field events will be reconfigured inside the new track geometry, with an additional jogging track outside the perimeter of the 9 competition surface. Site improvements include adding lighting and electrical capacity, installing storm water management, addressing perimeter fencing, and improving the facility's entry point and ticketing area. Verbal commitments sufficient to fund this project have been reported – the project will proceed only to the extent that amounts obligated are backed by signed gift agreements. Lee Street Realignment Cash Reserves: $2.4M - $2.7M This realignment will help to provide better access to the Medical Center, create a more advantageous site for the East Chiller Plant, and will be required to manage traffic with the completion of the Battle Building and the future Emergency Department expansion. Helicopter Pad Relocation Debt: $6.0M - $6.7M The East Chiller Plant construction (short-term) and the Emergency Department Expansion (long-term) will require the relocation of the helicopter pad from its current site to the top of the University Hospital. ACTION REQUIRED: Approval by the Buildings and Grounds Committee, the Finance Committee, and by the Board of Visitors APPROVAL OF ADDITIONS TO THE MAJOR CAPITAL PROJECTS PROGRAM WHEREAS, the University proposes five new capital projects: a $1.45 million Research Lab at the State Arboretum at Blandy Farm; a $15.2-$17.2 million expansion of the North Grounds Recreation Center; a $5.0-$7.0 million upgrade to the Track Facilities; a $2.4-$2.7 million realignment of Lee Street; and a $6.0–$6.7 million relocation of the University Hospital’s helicopter pad; RESOLVED, the Buildings and Grounds Committee approves the addition of these projects to the University’s Major Capital Projects Program. 10 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: II.C. Project Budget and Scope Reviews BACKGROUND: In accordance with the policy adopted by the Board of Visitors in October 2004, all capital project budget increases in excess of ten percent require the approval of the Finance and Buildings and Grounds Committees. DISCUSSION: The University administration has budget and scope increases related to two capital projects for review at this meeting. The Upgrade of the Jordan Hall HVAC System was approved in February 2007 at a project budget of $28,884,500 to demolish and replace the existing HVAC and electrical systems in the University’s largest research facility. The School of Medicine would like to expand the scope to increase emergency power and complete asbestos abatement in the lecture hall, at an additional cost of $4,115,500 bringing the total budget to $33,000,000. The additional amount will be financed with debt, to be repaid from School of Medicine funds. The Lee Street Connective Elements project was approved in January 2006 at a project budget of $24,190,000. A budget increase of $3,370,000 to fund an expanded scope (from 32,166 gross square feet to 39,700 gross square feet) to include the renovation of the University Hospital entryway and lobby is requested. In addition, we propose a $1,656,500 transfer in authority and budget from the Battle Building and the Couric Cancer Center that will better align work originally included in the scope of the two building projects with the Connective Elements project. This brings the total budget to $29,216,500. The project will be funded from debt ($27,260,000), gifts ($1,500,000 – from Battle Building authority), and hospital operating funds ($456,500 – for Grounds Improvement Fund and from Couric Center authority). The debt will be repaid from hospital operating revenues. ACTION REQUIRED: Approval by the Buildings and Grounds Committee, the Finance Committee, and by the Board of Visitors 11 APPROVAL OF PROJECT BUDGET AND SCOPE REVIEW, JORDAN HALL HVAC UPGRADE AND LEE STREET CONNECTIVE ELEMENTS RESOLVED, a $4,115,500 increase to the Jordan Hall HVAC Upgrade to $33,000,000 and a $5,026,500 increase in the Lee Street Connective Elements project to $29,216,500, is approved. 12 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: II.D. Schematic Design Approval, Thrust Theatre and Arts Commons Landscape Master Plan $13.5 – $15.0 million Gifts BACKGROUND: The Thrust Theatre will be a 20,500 gross square foot addition to the Drama Building. Its scope includes 1) a 300 seat theatre; 2) an expanded Drama Building lobby; 3) expansion of the Drama Building’s existing lobby restrooms; 4) dressing rooms and back-of-house support spaces; and 5) a roof terrace. The planning effort includes an entrance plaza/ patron drop-off area serving the Thrust Theatre and the existing Culbreth and Helms Theatres. If funding is available, this feature will be included in the project scope. The Theatre will be a flexible space for plays, dance, films, contemporary music, and lectures, and will support Drama Department programs and those of other University Schools and Departments. The Arts Commons Landscape Master Plan was initiated in the fall of 2009 and completed this past summer. It is a refinement of the 2000 Conceptual Plan for the Arts Grounds. The Master Plan, developed by the consultant landscape architect, Olin, focuses on the space framed by Campbell Hall, Ruffin Hall, the Drama Building, the Band Rehearsal Hall, and the Culbreth Road Garage. Its development was coordinated with the design of the Thrust Theatre. The Plan’s primary focus is to physically link the arts buildings and to create a shared outdoor space for students, staff, faculty, and visitors. The design will 1) provide flexible event spaces of various sizes; 2) improve circulation and access to the surrounding buildings, including the Thrust Theatre; and 3) preserve and enhance the views to the Lambeth Colonnade. The Architect Selection and the Concept, Site, and Design Guidelines for the Thrust Theatre were approved at the April 2010 meeting. Design review was completed at the October 29, 2010 meeting with no suggestions for changes. 13 DISCUSSION: The design architect, William Rawn Associates, and the design landscape architect, Olin, in conjunction with the Architect for the University and representatives from the Office of the Executive Vice President and Provost, the College and Graduate School of Arts & Sciences, and Facilities Management, have developed a schematic design which Mr. Neuman will review with the Committee. ACTION REQUIRED: Committee Approval by the Buildings and Grounds SCHEMATIC DESIGN APPROVAL, THRUST THEATRE, AND DESIGN APPROVAL, 2010 ARTS COMMONS LANDSCAPE MASTER PLAN RESOLVED, the schematic design for the Thrust Theatre, dated November 15, 2010, and prepared by William Rawn Associates, and the Arts Commons Landscape Master Plan, dated October 29, 2010, and prepared by Olin in conjunction with the Architect for the University and others, is approved for further development and construction. 14 SITE Arts Commons with the Proposed Site of the Thrust Theatre View of Existing Drama Building and Current Main Lobby 15 Computer Simulation of Arts Commons and Thrust Theatre from the North East Section Through the Thrust Theatre 16 View of Thrust Theatre from Culbreth Road View of Lobby and Terrace 17 Arts Commons Master Landscape Plan Arts Commons Master Landscape Plan Aerial Perspective 18 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: II.E.1. Concept, Site, and Design Guidelines, East Chiller Plant and Lee Street Realignment $25.8 - $29.0 million – East Chiller Plant $ 2.4 - $ 2.7 million – Lee Street Realignment BACKGROUND: A study of the Health System chiller plant system completed in January 2010, reviewed chilled water demand and system capacity for the next 20 years. The study provided recommendations for existing chiller replacements as well as capacity increases. This project is proposed in concert with the realignment of Lee Street to Roosevelt Brown Boulevard in order to best accommodate the new chiller plant site, and significantly improve traffic flow to the Health System facilities including the Battle Buildings and related parking structures, particularly the 11th Street Garage. CONCEPT: Currently, there is a need to replace five 1,200 ton chillers (6,000 total tons) in the North Chiller Plant that are at the end of their useful life. An additional 6,000 tons will be needed to meet Health System projected loads over the next ten years. The optimum solution to address short term equipment replacement and long term system capacity requirements is to build a new 12,000 ton East Chiller Plant with an initial 6,000 tons of chiller capacity. The Lee Street realignment project was identified as part of the 11th Street Garage and Battle Building Traffic Study conducted in 2004, and updated in 2006. The resulting site to the south of the realigned Lee Street creates an advantageous site for the development of the East Chiller Plant, thus providing the impetus for executing the road work on a more accelerated schedule. Additionally, the proposed road realignment of Lee Street responds to increased traffic volumes generated by the new developments and the need to improve access and wayfinding to and within the Health System. DISCUSSION: The Office of the Architect has prepared the concept, site, and design guidelines which Mr. Neuman will review with the Committee. 19 ACTION REQUIRED: Committee Approval by the Buildings and Grounds APPROVAL OF CONCEPT, SITE, AND DESIGN GUIDELINES FOR THE EAST CHILLER PLANT AND LEE STREET REALIGNMENT RESOLVED, the concept, site, and design guidelines, dated November 15, 2010, prepared by the Architect for the University for the East Chiller Plant and Lee Street Realignment, are approved; and RESOLVED FURTHER, the project will be presented for further review at the schematic design level of development. 20 East Chiller Plant Concept, Site, and Design Guidelines A) Proposed Project Concept In anticipation of facility growth within the University’s Health System district, projections indicate a shortfall of chilled water capacity for planned facility expansion. This shortfall will ultimately effect the ability of the University to supply and, therefore, develop new and/or major renovation projects in the near future. At full capacity, the East Chiller Plant will provide 12,000 tons of chilled water capacity to the Health System chilled water system. The increased supply will provide adequate capacity for the foreseeable future and redundancy for the existing chilled water system. The proposed project site for the East Chiller Plant is on the .55 acre site resulting from the Lee Street realignment project. The proposed site will be south of Lee Street and north of the railroad tracks. The proposed site extends to Roosevelt Brown Boulevard to the east and to Crispell Drive to the west. This location works well in concert with both the North and South Chiller Plants from an engineering perspective. To accommodate the greatest amount of chilled water capacity in the proposed location, the building will likely need to be configured with chillers on the ground floor, ancillary equipment on the basement level, and cooling towers on the roof. The realigned Lee Street and Roosevelt Brown Boulevard intersection is planned as an important gateway to the UVa Health System, requiring careful study and coordination of the building massing and associated landscape design. Project design has been divided into two specific phases: preliminary design and final design of the East Chiller Plant and Lee Street realignment, and the construction phase. The preliminary design will establish and further refine the building envelope to be contained within the site and its compliance with all fire-safety requirements and regulations. It will also finalize how the project site will accommodate a facility that will provide the needed chilled water capacity and allow for resolution of appropriate Health System context design concerns. Additionally, the design phase will include traffic engineering for the Lee Street realignment and coordination with City officials. An engineering firm will lead the project in association with a consulting design architect. 21 Aerial of the Health System with the proposed East Chiller site highlighted SITE Map of Health System Planned Chiller Plant Loop 22 B) Siting Criteria The University of Virginia general siting criteria for all new facilities includes the following components. Those highlighted are the most pertinent in determining the siting recommendation for the new East Chiller Plant. • Conforms with the 2008 Grounds Plan and precinct/area plans, including the 2010 Health System Area Plan. • Reinforces functional relationships with other components of the same department or program, and is compatible with other neighboring uses. • Satisfies access requirements - vehicular and service. • Maximizes infill opportunities to utilize land resources and existing infrastructure. • Minimizes site development costs, including extension of utilities, access, loss of parking, mass grading, etc. • Minimizes opportunity cost; (i.e., value of this use and size versus other alternatives). • Provides a size that is adequate, but not excessive, for initial program, future expansion, and ancillary uses. • Allows for incorporating sustainability principles in terms of solar orientation, reuse of historic structures, storm water management, etc. • Avoids unnecessary environmental impacts, including significant tree removal or filling of existing stream valleys. • Allows site visibility and aesthetic character, as appropriate for the intended use and for the neighborhood. • Minimizes time for implementation of project. 23 Site Context South Chiller Plant completed in 2008 24 View of the Proposed East Chiller site from the 11th Street Garage Site from Ground Level Lee Street Connective Elements Perspective with Site in Background 25 SITE View of Roosevelt Brown Boulevard Health System entrance: site on the left side of the image View from Health System Area Plan of Roosevelt Brown Entry with Lee Street realigned 26 C) Design Guidelines Site Planning - Project will comply with 2010 Health System Area Plan in overall design intent. - Building setback is a minimum of 60-70' on Roosevelt Brown Boulevard, 20' on realigned Lee Street, 15' on Crispell Avenue and 10' along the railroad right of way. - Fire safety code considerations and coordination will be crucial in the final siting of the new building. Fire vehicle access through realigned Lee Street must be maintained. - Building siting must accommodate the operation of adjacent uses including the realigned Lee Street and the railroad right of way. - Existing underground utilities / piping must be addressed in the building foundation and infrastructure. - The new building placement will allow access to, and maintenance of, all chillers and related equipment. - Realigned Lee Street will be designed to connect with the existing Lee Street/Roosevelt Brown Boulevard signalized intersection. - The Lee Street, 11th Street, Crispell Avenue intersection will be carefully designed to create safe, expedient, and aesthetic conditions for pedestrian, bicycles, vehicles and transit. Architecture - Building will consist of one level below grade and two levels above with rooftop cooling towers (85’ maximum on the west end of the site (Crispell Drive). - Final massing and architectural details will provide a visual relationship to adjacent structures and planned development, by continuing the material pallet and design aesthetics established in the Emily Couric Clinical Cancer Center, the Hospital Bed Expansion, and the Lee Street Connective Elements projects. - Materials and colors consistent with palette indicated in the 2010 Health System Area Plan will be utilized. Landscape - Project will comply with UVa Landscape Master Plan in overall design intent. - Appropriate and safe levels of pedestrian lighting in accordance with UVa standards will be provided. - Project will provide appropriately-scaled landscape screening for both the building and the above-grade utilities from adjacent Health System buildings and public thoroughfares. - Graphics will comply with University sign standards. Review and Compliance The Office of the Architect for the University is responsible for the review and approval of project compliance with these design guidelines. 27 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: II.E.2. Concept, Site, and Design Guidelines, Blandy Farm/State Arboretum Research Laboratory $1,450,000 BACKGROUND: Blandy Experimental Farm has been operated as a biological and environmental sciences field station since 1927. Its mission is to increase understanding of the natural world through research and education. Its 700 acres of fields, forest, and wetlands in rural Clarke County support the research of undergraduates, graduate students, and faculty from the University of Virginia and other institutions. Blandy also hosts the State Arboretum of Virginia, a 170-acre collection of nearly 8000 trees and shrubs that serves as the flagship of a robust environmental education outreach program. Since its inception, the State Arboretum and Blandy Experimental Farm have shared grounds, facilities, and other resources. The two institutions share a common goal of educating and furthering appreciation of natural resources. In order to enhance this relationship, an overall analysis was commissioned in 2000 to produce a campus plan for the University to guide the development of Blandy’s expansion. This plan focused on bringing the Field Lab’s scientific research to the forefront of the Arboretum visitor’s experience. Based on this earlier plan, the 2010 updated plan was developed to identify specific sites for the expansion of Blandy Farm’s research mission. The proposed field laboratory building will mark the beginning of a phased improvement of Blandy Farm’s research facilities. The new building will provide approximately 3,900 gross square feet of modern laboratory and laboratory support space to accommodate up to six student/faculty research teams and enhance Blandy Farm’s research capabilities. This plan, along with the new flexible lab facility, will create a conducive environment to attract the highest caliber faculty and students to maintaining Blandy Farm’s prominence as a research station. 28 DISCUSSION: The Office of the Architect has prepared the concept, site, and design guidelines. Mr. Neuman will review the site and guidelines with the Committee. ACTION REQUIRED: Committee Approval by the Buildings and Grounds APPROVAL OF CONCEPT, SITE, AND DESIGN GUIDELINES FOR THE BLANDY FARM/STATE ARBORETUM RESEARCH LABORATORY RESOLVED, the concept, site, and design guidelines, dated November 15, 2010, prepared by the Architect for the University for the Blandy Farm/State Arboretum Research Laboratory, are approved; and RESOLVED FURTHER, the project will be presented for further review at the schematic design level of development. 29 Blandy Farm Research Laboratory Concept, Site, and Design Guidelines A) Concept The latest planning effort builds on the 2000 Landscape Master Plan to provide a new campus framework, improving the visual connection of the existing structures and their relationships with the landscape. The development of the research precinct is intended to extend existing pedestrian paths to the north of the Quarters Building, creating a dialogue between the site’s rich history and Blandy’s research mission. The placement of the proposed structures is also envisioned to preserve the viewshed to the north of the Historic precinct, by siting new structures to the east of the iconic centerline of the Quarters building. The project’s proposed site has been carefully selected and coordinated with the recent planning effort to insure maximum flexibility for future development. The laboratory building design will relate in scale and material palate to existing buildings on site and to traditional farm vernacular architecture. Blandy Farm’s Research Laboratory project is proposed as approximately 3,900 GSF of laboratory and laboratory support space that includes: 6 laboratory modules, an environmental room, write-up, meeting room, and a equipment room. The new laboratory will allow for the expansion of Blandy’s facilities to accommodate up to 6 visiting Principle Investigators, 20 graduate students, 20 undergraduate students and 6 technicians, in addition to the current 3 permanent UVa Principle Investigators. The project goals were centered on providing a safe, clean, and flexible facility for Blandy’s field level research, that is compatible with and complimentary to its historic surroundings. 30 B) Siting Criteria The University of Virginia general siting criteria for all new facilities include the following components. Those highlighted are the most pertinent in determining the siting recommendation for the new Blandy Farm Research Laboratory. • Conforms with overall land use plan, historic site designation and district/area plans. • Reinforces functional relationships with adjacent and future research facilities, and is compatible with other neighboring uses. • Satisfies access requirements- vehicular and service. • Maximizes infill opportunities to utilize land resources and existing infrastructure. • Minimizes site development costs, including extension of utilities, access, loss of parking, mass grading, etc. • Minimizes opportunity cost; (i.e.,) value of this use and size versus other alternatives. • Provides a size that is adequate, but not excessive, for initial program, future expansion, and ancillary uses. • Allows for incorporating sustainability principles in terms of solar orientation, reuse of historic structures, storm water management, etc. • Avoids unnecessary environmental impacts, including significant tree removal or filling of existing stream valleys. • Allows site visibility and aesthetic character as appropriate for the intended use and for the neighborhood. • Minimizes time for implementation of project. 31 Aerial of Blandy Farm Site Main Entry Historic Quarters Building Aerial of Blandy Farm with the Proposed Laboratory Site Highlighted 32 View #1 Site View #2 Master Site Plan Showing Location of Laboratory Building Site Historic Quarters Building 33 C) Proposed Site Site View #1 of the Proposed Site from Blandy Entry Road (looking southeast) Site View #2 of the Proposed Site from Classrooms (looking north) 34 D) Design Guidelines: Site Planning Building siting to conform to the Blandy Experimental Farm Master Plan Update (2010). This lab building is the first of a series of anticipated buildings, including additional laboratories and greenhouses. The lab building’s northwest façade should align with entrance face of the education building, or “Apple Shed”; it is to be located in the position of the northernmost structure of this alignment, as identified in the revised Landscape Master Plan. The Quarters Building should remain the most prominent building in the visual experience of visitors arriving to the site. The dominant view from the Quarters building entrance should be focused on the arboretum landscape not the laboratory complex. Service access and parking to be from existing maintenance area entrance and work yard. At-grade exterior mechanical equipment to be located on the building’s northeast side and be screened. As funds allow, establish pedestrian walk connection between lab building and Quarters area on the site’s northwest edge as indicated in the 2010 Master Plan Update. Architecture Building will consist of a one floor on grade structure with pitched roof. Final massing and architectural details will provide a visual relationship to adjacent structures and planned development, by continuing the material pallet and aesthetics of the existing structures on Blandy Farm. Materials and colors consistent with the Blandy Farm’s palette will be utilized. The building will contain basic interior functions in an aesthetically acceptable fashion. Landscape Future planting locations should reflect the geometry established in the revised Landscape Master Plan and support the objectives of the Arboretum’s collections. As funds allow, establish tree and shrub plantings to screen the view of the proposed facilities from the entrance drive. In the near-term, utilize existing box plantings for screening or landscape enhancement. Screen any outdoor mechanical equipment from public view. Review and Compliance The Office of the Architect for the University is responsible for the review and approval of project compliance with these guidelines. 35 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: III. Report by the Vice President for Management and Budget ACTION REQUIRED: None DISCUSSION: The Vice President for Management and Budget will report on recent developments of interest to the Committee since the last meeting. 36 UNIVERSITY OF VIRGINIA BOARD OF VISITORS AGENDA ITEM SUMMARY BOARD MEETING: November 15, 2010 COMMITTEE: Buildings and Grounds AGENDA ITEM: IV. Report by the Architect for the University ACTION REQUIRED: None DISCUSSION: The Architect for the University will report on the results of the 2010 Sustainability Assessment completed in the summer 2010, and review the process for continuing the historic preservation discussions begun at the October 29, 2010 Committee meeting. 37 MISCELLANEOUS REPORTS Buildings and Grounds Committee University of Virginia November 15, 2010 38 UNIVERSITY OF VIRGINIA MAJOR PROJECTS STATUS REPORT, FUTURE DESIGN ACTIONS AND PLANNING STUDIES OCTOBER 29, 2010 Authorized April 3, 2009 Last updated: Oct-10 Project Total Project Working Budget Approval Scope Concept/ Architect/ Site/Design Engineer Guidelines Selection Architect/ Address Schematic Design Future budget, scope, and design approval actions by the Board of Visitors are highlighted in blue Contractor/ Address/ Contract Date Construction Start Complete Comments/Update on Progress (TBD until contract awarded) University of Virginia, 207 - Academic Division Authorized Academic Division Projects Under Construction Alderman Rd Res Halls-Phase II, Bldg 1 + Bldg 2 + Commons Bldg Alderman Road - Phase III, Utilities $ 69,431,000 $ 45,577,340 8,500,000 Arts and Sciences Research Building 88,900,000 Chemistry Teaching Labs Renovation 3,100,000 Apr-09 241 bed, 70k gsf Oct-08 residence hall; 221 bed, 65k gsf residence hall; 8k Apr-09 10,000lf new water n/a, ren. pipes; 1,000lf new with no ext. electrical lines impact Oct-07 100,000 gsf Dec-07 Oct-08 Feb-10 Apr-09 Replace exhaust fans Jul-08 Jul-08 Feb-08 Ayers Saint review: Dec- WM Jordan; Jun-09 Gross; 08 Richmond; Baltimore, MD approval: 7/15/09 Clarke Nexsen Feb-09 Dewberry & n/a, ren. Daniel & Co.; May-10 Davis; Glen with no ext. Richmond Allen, VA impact Bohlin Cywinski Oct-08 WM Jordan; Nov-08 Jackson; Richmond; Pittsburgh 4/24/08 Affiliated Aug-08 Nielsen Builders, May-10 Engineerss Charlottesville, Raleigh, NC 4/2/10 Aug-11 Nov-10 Bldg 1 is 69% complete. Bldg 2 is 54% complete. Commons is 18% complete. Construction is 96% complete. Aug-11 Construction is 62% complete. Jan-11 40% compelte; change order to re-roof penthouse. 39 Garrett Hall Renovation 14,000,000 12,239,208 Feb-08 25,200 gsf ren Apr-08 Jun-08 Architectural Resources Group, Inc; San Francisco n/a, ren. Christman with no ext. Company; impact Alexandria; June 2009 Oct-09 Jul-11 Construction is 25% complete. ITC Data Center Building 14,800,000 13,426,400 Feb-07 12,500 gsf Oct-07 Jun-08 Hypertect, Inc; Roseville, Minnesota Feb-10 Jun-11 Construction is 65% complete. Jordan Hall HVAC 28,900,000 33,000,000 yes replace HVAC system n/a, ren. with no ext. impact Oct-07 review: Jun-09 approval: Jun-09 n/a, ren. with no ext. impact Aug-10 Jun-13 Construction is 4% complete. McLeod Hall Ren. 14,810,000 Feb-07 50,000 gsf n/a, ren. with no ext. impact Jul-08 Aug-09 Apr-12 Construction is 45% complete. Newcomb Hall Repair and Renovation 15,200,000 Apr-09 55,420 gsf ren n/a, ren. with no ext. impact Sep-09 Cole & Denny; Alexandria May-10 Nov-10 Rehearsal Hall 12,700,000 Apr-09 17,898 gsf Feb-09 Feb-09 William Rawn Associates; Boston DRP, Inc; Falls Church; 3/27/09 Dec-09 Aug-11 Construction Documents completion for Phase 2: Nov10; Phase 3: Jul-11. Phase I construction is 30% complete. Construction is 32% complete. Rice Hall/Information Technology Engineering Building Feb-07; 100,000 gsf Revised Oct-07 Dec-07 Feb-08 Bohlin Cywinski Jackson; Pittsburgh WM Jordan; Richmond; 4/24/08 Nov-08 Aug-11 74,050,000 Construction is 46% complete. Univ. Bookstore 10,631,000 Feb-09 Feb-09 Bowie Gridley review: Architects; Sep-09 Washington, DC approval: Nov-09 WM Jordan; Richmond; 9/23/09 May-10 Oct-11 Construction is 30% complete. Subtotal Authorized Projects Under Construction 2,250,000 76,300,000 $ 357,272,000 70,800,000 Jan-07 17,000 gsf new RMF Engineering, Inc.; Charlottesville Bowie Gridley n/a, ren. Architects; with no ext. Washington, DC impact Holder Construction; Herndon; 1/22/10 DPR Construction; Falls Church; 3/27/08 UVa Special Projects; 10/23/08 n/a, ren. RE Lee & Sons; with no ext. Charlottesville; impact 12/2/2009 review: Jun-09 approval: Sep-09 Oct-08 MAJOR PROJECTS STATUS REPORT, FUTURE DESIGN ACTIONS AND PLANNING STUDIES OCTOBER 29, 2010 (CONTINUED) Authorized Academic Division Projects in Planning 2010-12 Maintenance Reserve $ 4,831,197 Alderman Road - Phase III, Bldgs 3 & 4 (less utilities) 12,525,455 Alderman Road - Phase IV, Bldg 5 36,525,000 Blandy Farm Research Building - Apr-09 46,500,000 1,450,000 n/a, maintenance reserve Ayers Saint review: Gross; Baltimore Jun-09 Apr-09 2 residence halls, 378 beds Oct-08 Jun-09 Apr-09 Nov-09 Nov-09 Ayers Saint Gross; Baltimore Feb-10 Nov-10 3,900 gsf new Nov-10 n/a, < $5M TBD Bldg 5 only Drama Building Additions: New Thrust Theater Addition 13,500,000 Apr-09 25,200 gsf Apr-10 Apr-10 William Rawn Associates; Boston East Chiller Plant 29,000,000 Jun-10 12,000 ton plant, w/ 6,000 tons Nov-10 Nov-10 TBD 4,882,000 Apr-09 Ivy Stacks I Retrofit 40 Lannigan Field Track Replacement, Phase I - New Cabell Hall Renovation 7,600,000 72,400,000 80,000,000 18,000,000 Newcomb Hall Dining Expansion North Grounds Rec Ctr Exp/Ren - Ruffner Hall Renovation 250,000 500,000 23,217,000 23,967,000 4,200,000 SEAS Student Projects Facility/Fac Mgt Shop Building South Chiller Plant Addition Subtotal Authorized Projects in Planning 7,000,000 35,200,000 $ 262,630,652 replace high bay shelving, infrastructure upgrades, fire pump Nov-10 track and field improvements Feb-07 Feb-10 17,200,000 159,000 gsf ren, incl. replacing the south entrance 16,000 gsf new 32,000 gsf ren Nov-10 30,000 gsf new n/a, ren. n/a, < $5M Hurd & with no ext. Obenchain, impact Richmond & Roanoke Feb-11 Feb-11 TBD Jun-08 Jul-08 Goody Clancy; Boston Feb-10 Feb-10 Cole & Denny; Alexandria Feb-11 Feb-11 TBD Feb-07 86,455 gsf ren n/a, ren. with no ext. impact Sep-09 McKinney & Co; Ashland, VA Feb-07 revised Jun-10 20,000 gsf new Jun-10 <$5M TBD Phase I: Yes Phase II: Apr-10 Phase I: 4k tons of capacity Phase II: 2k add'l tons Nov-05 Nov-05 Affiliated Engineers; Chapel Hill WM Jordan Richmond 8/18/10 TBD May-11 Aug-13 review: Feb-11 approval: Apr-11 review: Oct-10 approval: Nov-10 review: Feb-11 approval: Jun-11 TBD TBD TBD TBD TBD TBD TBD TBD TBD n/a, ren. with no ext. impact TBD Jan-11 Jun-11 review: Feb-11 approval: Apr-11 Oct-08 TBD TBD TBD TBD TBD TBD review: Jun-10 approval: Sep-10 review: Apr-11 approval: Jun-11 n/a, ren. with no ext. impact TBD TBD TBD TBD TBD TBD TBD TBD TBD review: Sep-10 approval: Sep-10 Jul-06 TBD TBD TBD TBD Phase I: Feb-07 Phase II: TBD Phase I: Nov-08 Phase II: TBD Reflects FY11 state authorization. Design completion February 2011. Design completion spring 2011. Fund source amended in 2010-11 Budget Summary. Design complete. Construction is on hold pending state debt issuance. Design completion by March 2011. Schematic design complete. On hold pending state debt issuance. Design Build Contractor procurement on-going. MAJOR PROJECTS STATUS REPORT, FUTURE DESIGN ACTIONS AND PLANNING STUDIES OCTOBER 29, 2010 (CONTINUED) University of Virginia, 209 - Medical Center Authorized Medical Center Projects Under Construction Emily Couric Clinical Cancer Center $ Hosp 1st Flr Radiology 74,000,000 Yes 150,000 gsf new Oct-04 Oct-04 Zimmer-GunsalFrasca; Washington DC Jul-06 21,212,000 yes improve and upgrade dept n/a, ren. with no ext. impact Jul-08 Perkins Eastman; Charlotte n/a, ren. with no ext. impact 20,500 gsf ren n/a, ren. with no ext. impact Jul-08 HKS; Richmond n/a, ren. with no ext. impact 41 Hosp 2nd Flr Heart Ctr 15,583,000 Yes Hosp 2nd Flr ORs/MRI 14,294,000 Feb-08 2 Ors w/ interoperative MRI + equipment n/a, ren. with no ext. impact Jul-08 HKS; Richmond n/a, ren. with no ext. impact Hosp 2nd Flr Surgical Path Lab 6,581,250 Feb-08 8,800 gsf ren n/a, ren. with no ext. impact Jul-08 HKS; Richmond n/a, ren. with no ext. impact Hosp Elevators 7,594,000 Feb-08 bank of 2 elevators n/a, ren. with no ext. impact Jun-08 SmithGroup n/a, ren. MidAtlantic; with no ext. Washington DC impact Hosp HVAC Upgrade-Phase I 4,406,600 Apr-09 Hospital Bed Expansion 80,200,000 Yes Hospital Bed Remodeling, inc. PCC Annex 25,730,000 Lee Street Entry and Connective Elements $ 24,190,000 Subtotal Authorized Projects Under Construction $ 273,790,850 40,000 gsf new 60,000 gsf ren n/a, ren. n/a, < $5M AKF Engineers n/a, ren. with no ext. with no ext. impact impact Sep-05 Dec-05 SmithGroup May-07 MidAtlantic; Washington DC PCCanne multiple projects PCCannex x Apr-09 Apr-09 Other:Fe Remainder is b-08 int. ren. 29,216,500 Jan-06 Hospital plaza and May-07 colonnade n/a, multiple under $5M May-07 multiple Zimmer-GunsalFrasca; Washington DC PCCannex Jun-09 Remainder is int. ren. Jun-08 Gilbane w/ HJ Russell; Richmond; 12/22/05 DPR Apr-08 Apr-11 Project is 76% complete. Oct-09 Mar-13 Project is 33% complete. Oct-09 Mar-12 Project is 68% complete. Apr-10 Mar-12 Project is 58% complete. Feb-10 Mar-12 Project is 39% complete. Apr-10 Jan-12 Project is 49% complete. Oct-09 11-Mar Project is 81% complete. Gilbane w/ HJ Russell; Richmond; 12/6/06 multiple Jan-09 Dec-11 Project is 62% complete. Jul-07 Jan-12 Project is 99% complete. Gilbane w/ HJ Russell; Richmond; 3/9/09 May-10 Construction; Falls Church; 3/9/09 DPR Construction; Falls Church; 3/2/09 DPR Construction; Falls Church; 3/2/09 DPR Construction; Falls Church; 6/5/09 Gilbane w/ HJ Russell; Richmond; 2/14/08 DPR Construction May-12 Project is 10% complete. Authorized Medical Center Projects in Planning Battle Building (Children's MOB) UVA Foundation Project Helicopter Pad Relocation $ Lee Street Re-alignment Moser Radiation Therapy Subtotal Authorized Projects in Planning $ 141,620,000 - 6,700,000 Nov-10 Nov-10 Nov-10 Odell/Stanley Beaman Sears; Richmond TBD - 2,700,000 Nov-10 Nov-10 Nov-10 TBD 3,007,000 144,627,000 Apr-09 150,000 gsf new Apr-09 n/a, UVa Foundation TBD n/a, UVa Kjellstrom & Foundation Lee; Richmond; 12/22/05 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Schematic design development drawings are complete. Underground project deferred MAJOR PROJECTS STATUS REPORT, FUTURE DESIGN ACTIONS AND PLANNING STUDIES OCTOBER 29, 2010 (CONTINUED) University of Virginia, 246 - College at Wise Authorized College at Wise Projects Under Construction Multi-purpose Center $ Smiddy Hall Renovation Subtotal Authorized Projects Under Construction $ 30,000,000 Feb-08 13,546,000 Yes 79,000 gsf Jun-08 Oct-08 21,524 gsf ren. 2,187 gsf add 6,000 gsf new Jan-07 Apr-07 Sep-09 TBD TBD VMDO Architects; Charlottesville Train & Partners; Charlottesville Feb-09 Feb-08 Quesenberry's; Big Stone Gap, VA Rentenbach Contractors; Knoxville, TN Jun-09 Sep-11 Construction is 45% complete. Nov-08 May-11 Construction is 68% complete. TBD TBD TBD TBD TBD TBD TBD TBD TBD 43,546,000 Authorized College At Wise Projects in Planning 2010-12 Maintenance Reserve Accessibility Projects New Library $ Stormwater/Access Rd Subtotal Authorized Projects in Planning $ 255,605 600,000 250,000 3,250,000 46,500,000 50,000,000 2,000,000 52,855,605 Apr-09 Apr-09 Apr-09 Apr-09 79,000 new gsf TBD n/a, maintenance reserve n/a, < $5M TBD TBD TBD n/a, < $5M TBD Reflects FY11 state Design on hold, pending issuance of state debt. can't build without 100% GF 42 University of Virginia Current Project Formulation Studies October 29, 2010 BOV Project Approval Project Academic Division / Agency 207 Bayly (UVa Museum) Addition Drama Building Addition Housing Services Building Indoor Practice Air Supported Structure Ivy Translational Research Building JAG School Expansion Klockner Stadium Expansion, Phase II Miller Center, Phase III Scott Stadium Garage Expansion Intramural and Recreational Sports Centers, Phases I-III McCormick Road Bridge Replacement Student Residence: "Sustainability House" Expansion to Aquatics Facility Center BOV Concept, Site, and Design Guidelines X X X X X X X Medical Center / Agency 209 Emergency Department Expansion Patient Education Building Health System Rehab & Recreation Building - 11th Street X University of Virginia / College at Wise / Agency 246 College at Wise New Library College at Wise Proscenium Theatre X X 43 X UNIVERSITY OF VIRGINIA ARCHITECT/ENGINEER SELECTION FOR CAPITAL PROJECTS $5 MILLION OR LESS PERIOD ENDED OCTOBER 31, 2010 Project Selection Date A/E Selected Description Blandy Farm Research Laboratory March 30, 2010 Train & Partners Charlottesville, VA Term Agreement Lee Street Realignment October 21, 2010 Affiliated Engineers, Inc. Chapel Hill, NC Term Agreement 44 PROFESSIONAL AND CONSTRUCTION-RELATED NON-PROFESSIONALSERVICES CONTRACTS University of Virginia Quarter Ended September 30, 2010 CONTRACTS Virginia Architects Virginia Engineers Virginia Non-Professional Total Virginia Contracts 69 26 56 8 10 9.091% 11.364% 13 7 1 1.136% 136 135 89 19 21.591% 122 347 384 345 88 100% 2005-2006 $3,830,387 $2,938,803 2006-2007 $6,298,801 $1,537,366 2007-2008 $5,380,810 $2,881,163 $5,535,005 $6,769,190 $7,836,167 $8,261,973 2008-2009 $7,229,197 $3,006,222 $156,045 $10,391,464 2009-2010 $5,620,392 $4,487,183 $421,726 $10,529,301 7/1/10 9/30/10 $636,385 $1,141,614 $211,542 $1,989,541 % for each category 23.892% 42.861% 7.942% 74.695% $5,256,775 $842,261 $23,898,844 $1,694,436 $7,876,867 $1,132,659 $14,076,542 $4,867,814 $26,452,922 $3,393,392 $4,999,799 $2,778,728 $418,506 $250,874 15.712% 9.419% $6,099,036 $25,593,280 $9,009,526 $18,944,356 $382,730 $30,229,044 $373,143 $8,151,670 $4,632 $674,012 0.174% 25.305% $11,634,041 $32,362,470 $16,845,693 $27,206,329 $40,620,508 $18,680,971 $2,663,553 100% 2006-2007 38 40 2007-2008 80 131 211 2008-2009 95 147 7 249 2009-2010 60 178 18 256 78 85 78 Out-of-State Architects Out-of-State Engineers Out-of-State NonProfessional Total Out-of-State Contracts 11 2 42 14 31 13 93 43 79 43 13 56 44 Total All Firms 91 141 2004-2005 $4,062,035 $1,472,970 45 2005-2006 30 55 FEES Virginia Architects Virginia Engineers Virginia Non-Professional Total Virginia Fees Out-of State Architects Out-of-State Engineers Out-of-State NonProfessional Total Out-of-State Fees Total All Firms 7/1/10 9/30/10 10 47 12 % for each category 11.364% 53.409% 13.636% 78.409% 2004-2005 35 43 UNIVERSITY OF VIRGINIA PAVILION OCCUPANCY STATUS AS OF SEPTEMBER 30, 2010 Pavilion Occupants I Robert Pianta II Meredith Woo III Harry Harding IV Larry J. Sabato V & Annex Patricia Lampkin and Wayne Cozart VI Robert D. Sweeney VII Colonnade Club VIII Upper Apartment VIII Terrace Apartment Assigned Available Comments Winter Spring Occupied Pavilion III from Spring 2010 2013 2008 until Winter 2010 September September 2009 2014 Spring Spring 2010 2015 October Spring 2002 2013 Spring Summer Occupied Pavilion III from Summer 2008 2015 2005 until Spring 2008 Fall Fall 2007 2012 VACANT Pamela Pecchio IX VACANT X Carl P. Zeithaml Montebello James H. Aylor Sunnyside Dorrie K. Fontaine Available for assignment 1/2011 Summer 2009 Summer 2014 April 2011 March 2001 April 2007 Weedon House VACANT 46 July 2012 April 2012 April 2011 Summer 2010 Off-line for a year to complete utility upgrade and interior renovations
© Copyright 2026 Paperzz