OFFICE OF THE VICE PRESIDENT FOR MANAGEMENT AND BUDGET December 4, 2014 MEMORANDUM To: Mr. John D. Simon Dr. Richard P. Shannon Ms. Nancy Rivers Mr. Patrick D. Hogan Mr. Simeon E. Ewing From: Colette Sheehy Re: 2016-22 Six Year Capital Program – Due January 31, 2015 The state requires each institution of higher education to submit a revised six-year capital outlay plan in the spring of odd numbered years. The information in this plan informs the Governor as he prepares his biennial budget submission in December. We are proposing three major changes to our usual process to better align with multi-year planning. We will align the capital process with the annual operating budget process to allow deans and unit heads to discuss critical capital projects with their respective senior leadership at the same time they are reviewing their annual operating budget and multi-year plans. The objective is to better connect the need for new construction or renovation with the strategic operating plans of the school/unit. The capital process will transition from a major effort every other year to a continuous process that allows the multi-year capital program to be updated annually (if needed) and approved by the Board of Visitors at its spring meeting when the operating budget is approved. The focus should be on anticipating needed capital projects for the next fiscal year so that a single action can be taken to the Board that encompasses all changes to the current capital program. In January we will constitute a new space governance and management process. I have previously shared with you the document that outlines the new process and the responsibilities of two committees (Space Leadership Committee and Space Working Group) dedicated to overseeing a strategic space planning and assessment process. The Space Leadership Committee will assume the duties of the former Executive Capital Review Committee as it relates to development of the capital program. The governance document and membership of each committee can be found at www.space.virginia.edu. In conversations with state officials it is unlikely that there will be funding available for new projects. Even if the state approves a major capital bond issue in 2016, the current list of projects is quite long. The University’s highest priority projects to be supported with state funds are the renovation Madison Hall ∙ Post Office Box 400227 ∙ Charlottesville, Virginia 22904‐4227 434‐924‐3349 ∙ Fax: 434‐924‐4778 [email protected] * www.virginia.edu/vpmb of Gilmer/Chemistry and the renovation of Alderman Library. Together those projects approach $300M. Consequently we are anticipating a very limited list of state supported requests for 2016-18. This letter is accompanied by the following attachments: A calendar that outlines the review and approval process timeline facilitating the needed board and state approvals A listing of inactive projects currently in the capital plan that should be considered for resubmission or elimination a summary of planning studies the latest Major Projects Status Report as of October 2014 (showing all projects whether active or inactive) All projects, whether a resubmission or a newly proposed project, require a Project Initiation Form (PIF). Instructions for the Capital Project Approval Process can be found at http://www.virginia.edu/budget/Cap.html. Previously submitted projects can be obtained from the Project Initiation Form on-line system, copying in the base project data to a new PIF, thereby bringing in the updated metrics and providing the project sponsor a starting point to update the proposed project. The Project Initiation Form and instructions are available from the help menu in the PIF system. Once proposals are received, the Space Leadership Committee will review programmatic justification and financial feasibility provided on the Project Initiation Form before advancing a project for inclusion in the updated 2016-2022 Six Year Plan. All proposed projects should submit Project Initiation Forms, with your review and approval by no later than January 30, 2015. Enclosures cc: Mr. Robert Sweeney Ms. Mary Hughes Mr. Richard Minturn Mr. Tom Harkins Ms. Annette Cyphers Ms. Anda Webb Mr. Don Sundgren Mr. Richard Rice Ms. Melissa Clarke Mr. Larry Fitzgerald Schedule for 2016-2022 Six-Year Capital Outlay Plan University Process December 4, 2014 Call letter to President, Executive Vice Presidents and College at Wise for Annual Capital Plan Update January 2015 President’s Office, EVP/Provost, EVP Health Affairs, EVP/COO, and College at Wise review and approve Project Initiation Forms, Part I as submitted to their offices by project sponsors and authorize the initiation of the Part II review. EVP designees will forward Part I to Part II review. Designee will send email notification of the Part I submission to [email protected] by January 30, 2015. February 2015 Space Working Group completes Part II of Project Initiation Forms by February 27, 2015. March 2015 Space Leadership Committee approves Project Initiation Forms, Part II. Chair of Space Leadership Committee communicates approved capital program to senior leadership. April 2015 Board of Visitors approves the revised capital program. May/June 2015 Budget Office submits Board approved six-year plan to the state Department of Planning and Budget for the University, Medical Center and College at Wise. December 2015 Governor submits 2016-2018 Budget Bill to 2016 General Assembly January 2016 University submits any necessary 2016 Legislative Budget Amendments July 1, 2016 2016 General Assembly Approved 2016-2018 Project Authorizations become effective UNIVERSITY OF VIRGINIA 2016-2022 Six Year Capital Planning Current Capital Plan - As of Oct-2014 Projects Not Started : Consider for Resubmission Board of Visitors Authorized Budget (High End of Range) : April 2013 State General (orange = No State approval; only BOV approval) Project Project Start Comments/Update on Progress Debt Gift/Grants Auxiliary Other Project Formulation Status (Active, Planned, N/A, Not Yet, TBD, Complete) EVP Total University of Virginia, 207 - Academic Division Other Board Authorized Academic Division Projects, Near Term (through June 30, 2016) Alderman Library Renewal 2014-16 119,500,000 - 500,000 - - 120,000,000 EVPP JAG School Addition 2013-14 - 34,570,000 - 430,000 - Main Heat Plant Biomass 2014-16 1,650,000 - - 950,000 - 2,600,000 EVPCOO Jeffersonian Grounds Initiative 2014-16 - - 125,000,000 - - 125,000,000 EVPCOO 35,000,000 To US Congress for funding EVPP Other Authorized Academic Division Projects, Long Term (July 1, 2016 - June 30, 2020) Bayly Building Addition Renovation 2016-18 Miller Center Phase III 2016-18 34,820,000 University Conservation Center 2016-18 8,100,000 Slaughter Recreation Center Renovation / Addition 2016-18 - 2016-18 - Anheuser-Busch Coastal Research Center - Phase II Science/Engineering Plant Expansion: AFC Chiller #6 - - 20,000,000 - 28,000,000 6,080,000 2016-18 6,318,000 - - Health System Chiller Replacement/Expansion 2016-18 10,750,000 - - North Grounds to Old Ivy Ductbank 2016-18 5,239,000 - - Science and Engineering Teaching and Research Facility 2016-18 66,450,000 - Fiske Kimball Fine Arts Library 2018-20 New Music Building 2018-20 Drama Building: Phase II South Addition 2018-20 Physics Building Renewal 2018-20 Upperclass Housing 2018-20 Expand Cavalier Substation 2018-20 80,840,000 - 250,000 332,000 361,000 - - 2,560,000 28,000,000 On Hold for fundraising On Hold for fundraising for numerous years; 34,820,000 consider whether necessary to carryforward again at this On Hold for time fundraising for numerous years; 8,100,000 consider whether necessary to carryforward again at this time 22,810,000 Planning complete; on hold Complete EVPP Complete PRES Complete EVPP EVPCOO - 6,080,000 On Hold for fundraising N/A EVPP - 6,650,000 N/A EVPP 21,500,000 N/A EVPCOO 5,600,000 N/A EVPCOO Not Yet EVPP TBD EVPP 10,750,000 - 147,290,000 Long Range proposal - 210,000 - - Long Range proposal. Evaluate status when 18,710,000 Alderman SSP is complete. - - 59,510,000 - - 59,510,000 On Hold for fundraising Not Yet EVPP - - 25,470,000 - - 25,470,000 On Hold for fundraising Not Yet EVPP - 430,000 - - 35,000,000 Planned EVPP - 31,000,000 TBD EVPCOO 9,420,000 N/A EVPCOO 18,500,000 34,570,000 5,652,000 23,000,000 - - 8,000,000 - 3,768,000 V:\2016 Session 2014-15 Capital Plan Update for 2016-18\2016-2022 Six Year Capital Plan\Existing 2016-20 Capital Outlay Plan_for distribution.xlsx\Current Plan-not active Resubmit? Yes/No Board of Visitors Authorized Budget (High End of Range) : April 2013 State General (orange = No State approval; only BOV approval) Project Project Start Comments/Update on Progress Debt Gift/Grants Auxiliary Other Project Formulation Status (Active, Planned, N/A, Not Yet, TBD, Complete) EVP Total Replace Hereford College Chillers 2018-20 - - - 2,820,000 - 2,820,000 N/A EVPCOO Retire Copeley Substation 2018-20 - - - 5,960,000 - 5,960,000 N/A EVPCOO Memorial Gymnasium Renovation 2018-20 - - 260,000 - 21,260,000 Combine w/ Kinesiology Request? TBD PRES New South Lawn Academic Building - Phase II 2018-20 - Thornton Hall D-Wing and B-Wing renovation 2018-20 Central Grounds: Replace Bryan Hall Chiller #1 21,000,000 - 31,330,000 - - 31,330,000 Not Yet EVPCOO 26,980,000 - 360,000 - - 27,340,000 N/A EVPP 2020-22 6,150,000 - - - 6,150,000 EVPCOO Old Cabell Hall Renewal 2020-22 64,500,000 - - - 65,000,000 EVPP Science/Engineering Plant: Replace Chemistry Chillers 2020-22 19,969,000 - - 23,060,000 EVPP 500,000 - 3,091,000 University of Virginia, 209 - Medical Center Other Authorized Medical Center Projects, Near Term (through June 30, 2016) --None-- EVPHA Other Authorized Medical Center Projects, Long Term (July 1, 2016 - June 30, 2020) --None-- EVPHA Other Authorized College at Wise Projects, Near Term (through June 30, 2016) Wyllie Library Conversion 2014-16 8,600,000 - - - 100,000 8,700,000 WISE Other Authorized College At Wise Projects, Long Term (July 1, 2016 - June 30, 2020) Football Building 2016-18 Proscenium Theatre 2016-18 Residence Hall IV 2018-18 34,840,000 - 14,810,000 2,700,000 - - 2,700,000 WISE - - - 34,840,000 WISE - - 15,000,000 WISE 190,000 V:\2016 Session 2014-15 Capital Plan Update for 2016-18\2016-2022 Six Year Capital Plan\Existing 2016-20 Capital Outlay Plan_for distribution.xlsx\Current Plan-not active Resubmit? Yes/No UNIVERSITY OF VIRGINIA 2016-2022 Six Year Capital Planning Planning Studies Project Start State General Debt Gift/Grants Auxiliary Other Total Comments/Update on Program Project Formulation Status (Active, Planned, N/A, Not Yet, TBD, Complete) Project Strategic Space Plans, Formulation Studies, Programming and Schematic Design Gilmer Hall and Chemistry Building Renovations - Programming and Schematic Design Contemplative Sciences Center Facility Schematic Design Programming complete July-14 Schematic Active. Pre-State funding approval activity Design in prog. Due Oct-14 continuing on UVA funds. On Hold 6/5/14 BOV B&G approval of Dell site and Concept, Site & Design Guidelines Alderman Library Renewal Stategic Plan Fall 2014 - Winter 2015 Active. Provost funding. Darden School Strategic Space Plan Complete November 2014 Active SSP. To Darden Board October 14 w/4 options McIntire School Strategic Space Plan Fall 2014 - Winter 2015 Active SSP. Part I, Space Need, complete by Jan 2015. Batten School Strategic Space Plan Fall 2014 - School of Medicine Strategic Space Plan Winter 2015 - Requested SSP. Increased program, enrollment, and faculty census have been identified. Exploring a SSP. Space Needs Investigations and Major Space Requests Curry School - Kinesiology Dept Fall 2015 V:\2016 Session 2014-15 Capital Plan Update for 2016-18\2016-2022 Six Year Capital Plan\Existing 2016-20 Capital Outlay Plan_for distribution.xlsx\Planning Studies Investigation of program growth and space need. May lead to project formulation. UNIVERSITY OF VIRGINIA MAJOR PROJECTS STATUS REPORT, FUTURE DESIGN ACTIONS AND PLANNING STUDIES October 2014 Authorized April 18, 2013 Last Update October 2014 Project Total Concept/ Architect/ Scope Project Site/Design Engineer Schematic Working Budget Approval Guidelines Selection Architect/ Address Design Future budget, scope, and design approval actions by the Board of Visitors highlighted in blue Construction Contractor/ Address/ Contract Start Complete Date (TBD until contract awarded) Comments/Update on Progress University of Virginia, 207 - Academic Division Authorized Academic Division Projects Under Construction Alderman Road-Phase IV, Bldg 6 East Chiller Plant & Lee Street Realignment $ 38,000,000 Apr-11 74,898 May-12 Sep-12 EYP Washington, DC review: Nov-12 approval: Nov-12 review: Jun-11 approval: Jun-11 Donley's Richmond, VA October, 2012 May-13 Jun-15 Construction is 55% complete. Gilbane; Richmond VA 02/18/11 Sep-11 Sep-13 Construction is 99% complete. 36,500,000 Jun-10 Nov-10 10,000 ton plant, w/ 6,000 tons Nov-10 Nov-10 Affiliated Engineers Chapel Hill 5,000,000 Nov-14 Renovate 9,400 SF teaching space in Jordan Hall for reaccreditation. N/A Nov-13 UVA FP&CEngineering & Design Division, Charlottesville, VA N/A Uva Project Services, Charlottesville, VA Feb-14 Phase 1 Aug -14; Phase II Aug - 14; Phase III Dec - 14 Phase I construction is 100% complete. Phase II construction is 100% complete.Phase III construction is 60% complete. New Cabell Hall Renovation 7,600,000 56,919,878 64,519,878 Feb-07 Jun-08 Jul-08 Goody Clancy; Boston Oct-08 Barton Malow Charlottesville VA Oct-08 Sep-11 Sep-14 Construction is 99% complete. North Grounds Mechanical Plant 14,419,770 14,419,770 Apr-13 159,000 gsf ren, incl. replacing entrance connecting to South Lawn crossing Renovate existing and add 2,400SF with additional capacity. Nov-12 Aug-12 Hamel, Green, Abrahamson Minneapolis, MN review: Feb-13 approval: Feb-13 Martin Horn Oct-13 Feb-15 Construction 80% complete. Rugby Road Office Building 10,000,000 Sep-13 TBD Oct-13 Glave & Holmes Richmond, VA Previously completed UVA Project Services Dec-13 Apr-15 Construction is 49% complete. Design and Construction Changes have been approved and included in the documents. These changes include office reconfiguration and lower level separation capabilities. These changes resulted in revisions to all MEPFP and structural systems which in turn increased the construction schedule. Ruffner Hall Renovation 250,000 18,565,492 467,600 19,283,092 n/a, ren. with no ext. impact Sep-09 McKinney & Co; Ashland, VA review June-10 approval Aug-10 Donley's Richmond, VA Dec-12 Jan-13 Jul-14 Construction is 100% complete. Additional $300,000 of MR work/funding. CUO issed on 613-14 Gross Anatomy Lab Renovation $467,600 to be provided by State for equipment toward the end. Feb-07 25,000 gsf renovation. New central stair & elevator. All new MEP systems 86,455 gsf ren Last Update October 2014 Concept/ Architect/ Project Site/Design Engineer Schematic Total Working Budget Approval Guidelines Selection Architect/ Address Design Future budget, scope, and design approval actions by the Board of Visitors highlighted in blue 41,194,814 The Roof work for Apr-13 Remaining Sep-12 Oct-12 John Waite report: $7,190,000 was renovations after Associates, Sep-11 completed as phase roof. Albany NY I of work. Scope Project Renovations to the Rotunda, Phases I/II (Less the Roof) $ Wilson Hall Renewal 4,650,000 $ Subtotal Authorized Projects Under Construction Authorized Academic Division Projects in Planning 2012-14 Maintenance Reserve Newcomb Road Chiller Plant $ Facilities Management Shop Support / Office Building Acquire and Renovate 560 Ray C. Hunt McCormick Rd Residence Hall Subtotal Authorized Projects in Planning $ Feb-14 Interior renewal of 29,000 GSF TBD TBD Train & Partners Charlottesville, VA Nov-12 Nov-12 Sep-13 Sep-13 Bowie-Gridley Washington DC TBD Construction Contractor/ Address/ Contract Comments/Update on Progress Start Complete Date (TBD until contract awarded) Whiting-Turner May-14 Jul-16 Final CD's issued 8/19/14. Early Contracting Co., trade package (marble capitals Richmond, VA fabrication), package 1 (site setup, shoring & underpinning), and package 2 (sitework, utilities, MEP) issued. Package 3 (various trades) being processed. Two packages remaining. Full building permit received. Underpinning 65% complete. Utilities in progress. Shoring of south portico in progress. Capitals being carved in Carrara, Italy (5 completed, 3 in progress). FM Project Services Charlottesville, VA Jul-14 Aug-15 Sauer TBD TBD Construction is approximately 12% complete. 233,567,554 10,053,062 11,640,000 Apr-11 Apr-11 6,000,000 May-13 14,300 gsf n/a, maintenance reserve Affiliated review: Engineers, Inc Nov-13 Chapell Hill, NC approved: Nov-13 26,230,000 Apr-14 Renovate floors 1-3 plus major maintenance of systems N/A TBD TBD 104,700,000 Jun-14 Renovate 10 buildings ; 304,000 GSF Jun-14 Jun-14 Clark Nexsen, Norfolk VA 158,623,062 FY13 & 14 Appropriations Working through budget resolution. review: Nov-13 approved: Nov-13 N/A TBD Oct-14 Sep-15 TBD TBD TBD Acquisition complete Mar-2014. TBD TBD TBD TBD Feasibility Study complete. Proj. approved by BOV. A/E contract in process. Site Utilities constr. to begin Summer 2015. Construction Documents in review. Last Update October 2014 Concept/ Architect/ Project Site/Design Engineer Schematic Working Budget Approval Guidelines Selection Architect/ Address Design Future budget, scope, and design approval actions by the Board of Visitors highlighted in blue Scope Project Total Construction Contractor/ Address/ Contract Start Complete Date (TBD until contract awarded) Comments/Update on Progress Other Authorized Academic Division Projects, Near Term (through June 30, 2016) 2014-16 Maintenance Reserve Gilmer Hall and Chemistry Building Renovations Programming and Concept Design n/a maintenance reserve Perkins + Will, TBD Washington DC 17,300,000 1,800,000 Apr-13 Apr-13 134,000,000 Apr-13 Contemplative Sciences Center Facility 13,680,000 Apr-13 Gooch Dillard Residence Hall Renovation 32,000,000 Sep-14 120,000,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD 35,000,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD Gilmer Hall and Chemistry Building Renovation Alderman Library Renewal JAG School Addition Main Heat Plant Biomass Jeffersonian Grounds Initiative Subtotal Other Authorized Projects, Near Term $ Gilmer Hall 232,000 GSF ; Chemistry Bldg 273,000 GSF 120,000 gsf Jun-14 Jun-14 Jun-14 Jun-14 Perkins + Will, Washington DC Jun-14 TBD TBD review: Nov-14 TBD TBD TBD review: Feb-15 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD 2,600,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD 125,000,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD n/a, maintenance reserve n/a, maintenance reserve n/a, maintenance reserve n/a, maintenance reserve TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Pre-planning complete Jan-14; Detail planning draft report complete June 5 BOV B&G approval of Dell site and Concept, Site & Design Guidelines To US Congress for funding 481,380,000 Other Authorized Academic Division Projects, Long Term (July 1, 2016 - June 30, 2024) 2016-18 Maintenance Reserve 2018-20 Maintenance Reserve 2020-22 Maintenance Reserve 2022-24 Maintenance Reserve Bayly Building Addition Renovation Miller Center Phase III University Conservation Center Slaughter Recreation Center Renovation / Addition 18,400,000 19,500,000 20,700,000 21,900,000 28,000,000 34,820,000 8,100,000 22,810,000 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 TBD TBD TBD TBD TBD TBD TBD TBD 6,080,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD 6,650,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD 21,500,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD 5,600,000 147,290,000 Apr-13 Apr-13 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Fiske Kimball Fine Arts Library New Music Building 18,710,000 59,510,000 Apr-13 Apr-13 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Drama Building: Phase II South Addition Physics Building Renewal Upperclass Housing Expand Cavalier Substation Replace Hereford College Chillers 25,470,000 35,000,000 31,000,000 9,420,000 2,820,000 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD 5,960,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD Anheuser-Busch Coastal Research Center - Phase II Science/Engineering Plant Expansion: AFC Chiller #6 Health System Chiller Replacement/Expansion North Grounds to Old Ivy Ductbank Science and Engineering Teaching and Research Facility Retire Copeley Substation $ Planning complete; on hold Last Update October 2014 Concept/ Architect/ Project Site/Design Engineer Schematic Working Budget Approval Guidelines Selection Architect/ Address Design Future budget, scope, and design approval actions by the Board of Visitors highlighted in blue Apr-13 TBD TBD TBD TBD Scope Project Total Construction Contractor/ Address/ Contract Start Complete Date (TBD until contract awarded) TBD TBD TBD Comments/Update on Progress Memorial Gymnasium Renovation 21,260,000 New South Lawn Academic Building - Phase II 31,330,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD Thornton Hall D-Wing and B-Wing renovation 27,340,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD Central Grounds: Replace Bryan Hall Chiller #1 6,150,000 Apr-13 TBD TBD TBD TBD TBD TBD TBD 65,000,000 23,060,000 Apr-13 Apr-13 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD Odell/Stanley Beaman Sears; Richmond n/a, UVa Foundation Kjellstrom & Lee; Richmond; 12/22/05 (Amended April 2011) Apr-11 Jun-14 Final inspections complete. Building sold to UVA in May 2014. TCUO obtained in June 2014. Working on phased occupancy & post-TCO related items. Old Cabell Hall Renewal Science/Engineering Plant: Replace Chemistry Chillers Subtotal Other Authorized Projects, Long Term Acad Div Major Capital Projects program $ 723,380,000 $ 1,596,950,616 University of Virginia, 209 - Medical Center Authorized Medical Center Projects Under Construction Battle Building at the UVA Children's Hospital UVA Foundation Project $ Lee Street Entry and Connective Elements 141,620,000 Apr-09 200,000 gsf new n/a, UVa Foundation 30,305,500 Jan-06 Hospital plaza and colonnade May-07 May-07 Zimmer-GunsalFrasca; Washington DC Jun-08 Gilbane w/ HJ Russell; Richmond; 3/9/09 May-10 Feb-14 Project is 99% complete. N/A May-12 Leach Wallace Elkridge MD N/A Replacement with no ext. impact Donley's/ McCarthy. Richmond, VA 10/26/12 Pkg 1 Apr13 Pkg II Jul-14 Pkg I Mar-14 Pkg II Jul-15 Package 1 construction is 100% complete. Package 11B (AHUs and RAFs) is 20%. n/a replacement May-13 Roofmeadow, Philadelphia, PA Deferred Maintenance Umbrella: Hospital HVAC Phase II 28,000,000 Apr-09 Deferred Maintenance Umbrella: Hospital Vegetated Roof Replacement 2,400,000 Apr-09 Subtotal Authorized Projects Under Construction $ 199,925,500 21,000 gsf roof replacement. n/a Tecta America replacement East, LLC; Jessup, MD Jul-14 Sep-14 Project is 90% complete. Last Update October 2014 Concept/ Architect/ Project Site/Design Engineer Schematic Working Budget Approval Guidelines Selection Architect/ Address Design Future budget, scope, and design approval actions by the Board of Visitors highlighted in blue Scope Project Total Construction Contractor/ Address/ Contract Start Complete Date (TBD until contract awarded) Comments/Update on Progress Authorized Medical Center Projects in Planning Deferred Maintenance 10 Year Plan Master -Less Hospital Roof, HVAC II, Emer Power, Vegetated Roof 82,300,000 Deferred Maintenance Umbrella: Hospital Emergency Power Phase III Apr-09 5,000,000 Apr-09 University Hospital Renovations / Levels 7 & 8 (Umbrella Authorization) 20,000,000 Apr-13 Education Resource Center 29,860,000 Apr-13 revised : Nov-13 University Hospital Expansion 26,624,000 Apr-13 Umbrella n/a no exterior Jun-12 impact 45,900 gsf MRI relocation, ED expansion, Add'l beds 100-150 (TBD) Subtotal Authorized Projects in Planning $ Umbrella Umbrella Umbrella Umbrella Leach Wallace Elkridge MD n/a no exterior TBD impact Umbrella TBD Umbrella TBD N/A Sep-13 HKS, Richmond, VA n/a no exterior impact TBD TBD TBD Feb-13 Feb-13 CO Architects, Los Angeles, CA review: Sep13 approval: Nov-13 Donley's /McCarthy, Collinsville, IL 09/15/13 TBD TBD Project has acquired its building permit. ED Jun-14 MRI Sep-14 ED Nov-13 Perkins + Will, Washington DC review: ED Feb-15 Skanska USA Building, Inc. Durham, NC 07/17/14 TBD TBD $15.064M : MRI Relocation ; $11.56M: ED Expansion Schematic TBD TBD TBD TBD TBD TBD TBD TBD review: Nov-14 TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD 163,784,000 Other Authorized Medical Center Projects, Near Term (through June 30, 2016) Ambulatory Practice Space Renovations (Umbrella Authorization) Outpatient Surgery Center Renovation $ 7,000,000 Apr-13 $ 13,000,000 Sep-14 8,000,000 Apr-13 Emergency Department and Operating Rooms Utility Infrastructure Subtotal Other Authorized Projects, Near Term Med Ctr Major Capital Projects Program $ 28,000,000 $ 391,709,500 33,000 gsf Umbrella Project. Subs: 1) Roof 2) HVAC Phase II 3) Emerg Power Ph II 4) Vegetated Roof Last Update October 2014 Concept/ Architect/ Project Site/Design Engineer Schematic Working Budget Approval Guidelines Selection Architect/ Address Design Future budget, scope, and design approval actions by the Board of Visitors highlighted in blue Scope Project Total Construction Contractor/ Address/ Contract Start Complete Date (TBD until contract awarded) Comments/Update on Progress University of Virginia, 246 - College at Wise Authorized College at Wise Projects Under Construction New Library 250,000 2,010,000 34,909,250 37,169,250 Health & Wellness Center and Greear Gym Renovation 15,000,000 Subtotal Authorized Projects Under Construction $ 8,300,000 Apr-09 67,000 gsf Sep-09 June-11 Cannon Design Arlington VA Review Feb-12 approval Feb-12 Quesenberry Big Stone Gap VA Jun-13 Jun-16 Structural steel is largely complete. SODs and SOG are in progress. Project is 31% complete. Apr-11 11,000 gsf H&W 6,000 gsf Greear Jun-11 Sep-11 Train; Charlottesville, VA review: Feb-12 approval: Feb-12 BurWil Construction Bristol, TN Aug-12 Jun-14 Greear construction complete. Health & Wellness substantial completion August 2014. N/A Nov-11 TBD TBD TBD TBD TBD TBD TBD n/a, maintenance reserve n/a, maintenance reserve n/a, maintenance reserve n/a, maintenance reserve TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD TBD 52,169,250 Authorized College At Wise Projects in Planning 2012-14 Maintenance Reserve Dam Improvements Subtotal Authorized Projects in Planning $ $ 210,698 2,519,144 Apr-11 Apr-11 Apr09 n/a, maintenance reserve Thompson & Jun-13 Litton, Wise, VA 2,729,842 Other Authorized College at Wise Projects, Near Term (through June 30, 2016) 2014-16 Maintenance Reserve Wyllie Library Conversion Subtotal Other Authorized Projects, Near Term $ 1,100,000 Apr-13 8,700,000 Apr-13 n/a maintenance reserve TBD TBD TBD 9,800,000 Other Authorized College At Wise Projects, Long Term (July 1, 2016 - June 30, 2024) 2016-18 Maintenance Reserve 2018-20 Maintenance Reserve 2020-22 Maintenance Reserve 2022-24 Maintenance Reserve Football Building Proscenium Theatre Residence Hall IV 1,200,000 1,300,000 1,500,000 1,700,000 2,700,000 34,840,000 15,000,000 $ 58,240,000 Wise Major Capital Projects Program $ 122,939,092 UVa Major Capital Projects Program $ 2,111,599,208 Subtotal Other Authorized Projects, Long Term Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 Apr-13 TBD TBD TBD TBD TBD TBD FY 13 & 14 Appropriations Preliminary Design submitted to BCOM October 2013.
© Copyright 2026 Paperzz