production planning control all

P P C 3rd SEMESTER OPERATIONS (PGDBA)
True/False
Question:
XYZ when combined with FSN analysis helps to
classify non-moving items into XN , YN and ZN.
Correct Answer:
True
Your Answer True
Multiple Choice Single Answers
Question:
Forecast is based on:Correct Answer:
Past data
Your Answer Competitor's market share
Select the Blank
Question:
Network ________ is defined as any adjustment
to the arrow diagram which becomes necessary owing to departure
from the project schedule laid down earlier.
Correct Answer:
Updating
Your Answer Design
Multiple Choice Single Answers
Question:
For goods manufactured to stock, following
department is expected to periodically undertake replenishment
action as stocks are depleted:Correct Answer:
Production Planning Control
Your Answer Production Planning Control
True/False
Question:
CPM marks critical activities.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
A shop order may combine more than one
________ requiring identical items.
Correct Answer:
Work order
Your Answer Sales order
Multiple Choice Single Answer
Question:
What are the customer's expectation from the
supplier?
Correct Answer:
Consistent good quality of products
Your Answer Consistent good quality of products
Select The Blank
Question:
________ inventories help to balance company's
supply with market demand.
Correct Answer:
Finished goods
Your Answer WIP
Select The Blank
Question:
Short term forecasts are for ________.
Correct Answer:
Material Planning
Your Answer Cash flow management
Multiple Choice Single Answer
Question:
For process planning following is one of the basic
document used :Correct Answer:
Operation Layout
Your Answer Process Layout
Multiple Choice Single Answer
Question:
Scheduled start of an operation is authorized by
issuing a document called :Correct Answer:
Job card
Your Answer Route card
Multiple Choice Multiple Answer
Question:
SOS Analysis involves following type of items :Correct Answer:
Seasonal items available only for a
limited period. , Seasonal items available throughout the year. ,
Non-seasonal items whose quantity is decided on different
considerations.
Your Answer Seasonal items available throughout the year. ,
Non-seasonal items whose quantity is decided on different
considerations. , Machine spare parts
Multiple Choice Multiple Answer
Question:
The basic procedure of assignment technique is
designed to solve problems wherein :Correct Answer:
Number of tasks equal to number of
facilities. , The objective function is minimization. , There are no
restrictions in allocation
Your Answer Number of tasks equal to number of facilities. ,
There are no restrictions in allocation , Cost of machine should be
taken into consideration.
True/False
Question:
There are five manufacturing systems. However,
many manufacturers combines two or more systems to produce a
final product.
Correct Answer:
True
Your Answer True
True/False
Question:
In LOB, the regular progress checks the future
effect of any current delays and indicates degree of urgency for
corrective action.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
5 jobs are to be processed on machines M1 and
M2 , first on M1 and then on M2. The processing times in hours are
PAGE NO: 1 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
as follows. Find the sequence for 5 jobs that will minimize total
elapsed time .also find idle time & total elapsed time. Job
Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9
7 6 3 8 5 10 4
Correct Answer:
2-4-3-5-1 , Minimum time 28 hours ,
Idle time = 1 & 2 Hours for M1 & M2 respectively.
Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours
for M1 & M2 respectively.
True/False
Question:
When shop floor scheduling problem larger than
3 machines arise the analytical solution procedures leading to
optimality are complex and difficult.
Correct Answer:
True
Your Answer True
Question:
The data regarding maximum run out between
centers pertains to :Correct Answer:
Process planning
Your Answer Raw material data
True/False
Question:
Lead time information is required for
determination of safety stock.
Correct Answer:
False
Your Answer True
Select The Blank
Question:
Americans like to use the word 'inventory'
whereas for same context British use the term________.
Correct Answer:
Stock
Your Answer Stock
Match The Following
Question:
Correct Answer:Your Answer
End piece allowance
Material insufficient to produce one
piece Material insufficient to produce one piece
Stock allowance Quantity to meet requirement of spares
Extra material requirement
Machining allowance
in handling
Extra material requirementMaterial loss
Spoilage allowance
requirement of spares
Process rejection Quantity to meet
Select The Blank
Question:
________ is required for machine set ups as well
as regular production.
Correct Answer:
Performance standard
Your Answer Machine design data
Multiple Choice Single Answer
Question:
If a product is required within 20 days and the
product can be made available in 10 days, the Critical ratio would
be :Correct Answer:
2
Your Answer 0.5
Multiple Choice Single Answer
Question:
A subcontractor is :Correct Answer:
Another form acting as a supplier
Your Answer Manufacturer of specialized products on whom
the buyer is dependent for 100% of requirement of main assembly
Multiple Choice Multiple Answer
Question:
SDE analysis is employed by the purchase
department for :Correct Answer:
Contract buying for some of 'easy' items.
, Forward buying of some of 'scarce' items. , Scheduled buying for
some of 'easy' items.
Your Answer Forward buying of some of 'scarce' items. ,
Scheduled buying for some of 'easy' items. , Contract buying for
some of 'easy' items.
True/False
Question:
Labour efficiency factor is applied after capacity
requirement of equipment is calculated.
Correct Answer:
False
Your Answer True
Multiple Choice Multiple Answer
Question:
PERT terminology uses words like :Correct Answer:
Network diagram , Events , Slack
Your Answer Network diagram , Events
True/False
Question:
The LOB technique is most appropriate for
assembly operations involving number of distinct components.
Correct Answer:
True
Your Answer True
True/False
Question:
Transit time for manufactured items should be
considered only when it is insignificant.
Correct Answer:
False
Your Answer True
Multiple Choice Single Answer
Select The Blank
PAGE NO: 2 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
A progress card normally contains ________
squares.
Correct Answer:
Less than 25
Your Answer More than 50
Multiple Choice Multiple Answer
Question:
Due to the following emergent events, the queue
time has to compensate for the time for which the job has to
undergo an extra time :Correct Answer:
Tool breakage , Job split up , Change in
priorities
Your Answer Tool breakage , Job split up , Store inventory
Multiple Choice Single Answer
Question:
One of the following is not an task of progressing
:Correct Answer:
Ensuring supply of material and issue of
documents to manufacturing shops
Your Answer Expediting to rush up remaining operations of the
delays jobs
Multiple Choice Single Answer
Question:
Production output in night shift is :Correct Answer:
Less than I shift production
Your Answer More than I shift production
Multiple Choice Multiple Answer
Question:
The minimum requirements for application
software for line balancing are as follows :Correct Answer:
1 Ghz processor , 1 Gb hard Disk free
memory , Windows or equivalent operating system.
Your Answer 1 Gb hard Disk free memory , Windows or
equivalent operating system.
Multiple Choice Single Answer
Question:
The work measurement and time study belong to
the following school of management :Correct Answer:
Scientific School of management
Your Answer Functional School of management
Multiple Choice Multiple Answer
Question:
Before planning subcontracting points to be
considered are :Correct Answer:
Whether overtime can be given , One
more shift can be started
Your Answer Whether overtime can be given , One more shift
can be started , Set up time can be reduced
Multiple Choice Multiple Answer
Question:
The main requirements of re-order level system
are as follows :-
Correct Answer:
Incoming materials and materials
returned from shop must be deposited in appropriate bins and their
stock cards must be posted for "goods receipt report" and "material
return note" for the quantities received physically . , Items should
be issued in correct quantities. , The balance on the stock cards
should be periodically tallied with physical stock.
Your Answer Incoming materials and materials returned from
shop must be deposited in appropriate bins and their stock cards
must be posted for "goods receipt report" and "material return note"
for the quantities received physically . , Items should be issued in
correct quantities. , The balance on the stock cards should be
periodically tallied with physical stock.
Multiple Choice Multiple Answer
Question:
The following are salient features of the fixed
order quantity system :Correct Answer:
Reorder quantity is always the same
which is usually economic order quantity , The time interval
between deliveries varies. , Replenishment action is initiated when
the stock on hand is just sufficient to meet demand during the lead
time.
Your Answer Reorder quantity is always the same which is
usually economic order quantity , The time interval between
deliveries varies. , Percent cumulative cost of item is taken into
consideration.
Select The Blank
Question:
ABC company manufactures MS bolts. Given
fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs
3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost
of buying is Rs 8 per piece. The firm uses 100000 MS bolts every
year. Under these circumstances, the firm would take a decision to
________.
Correct Answer:
Make at home
Your Answer Buy from outside
Multiple Choice Multiple Answer
Question:
Following difficulties are faced by SDE analysis
:Correct Answer:
More delivery period , Geographical
location of supplier , Reliability of suppliers
Your Answer More delivery period , Reliability of suppliers ,
Excise duty
Select The Blank
Question:
For replenishment action for stock items which
are reserved by PPC, the stores work out ________ stock which
equals the stock on hand less stock reserved.
Correct Answer:
Free
Your Answer Net
True/False
Question:
Route sheets for custom built job is prepared for
each new order received.
PAGE NO: 3 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
Correct Answer:
Your Answer True
True
P P C 3rd SEMESTER OPERATIONS (PGDBA)
memory or wastes computer stationary while preparing stores
ledger.
Correct Answer:
MNG Analysis
Your Answer SOS Analysis
Match The Following
Question:
Correct Answer:Your Answer
Order quantity Factor influencing process planningCompare
alternative processes
Machine capacity chart Dimensional accuracy
purpose machines with special toolings
Multiple Choice Single Answer
Question:
Why customer is called the king?
Correct Answer:
Customer's orders gives us work
Your Answer Gives satisfaction to workers
General
Mass production Special purpose machines Break even analysis
Standard elemental time data
Compare alternative processes
Factor influencing process planning
Multiple Choice Multiple Answer
Question:
Following are some of the common standard
cutting tools :Correct Answer:
Cutting saw , Inserts , Reamers
Your Answer Form tool , Inserts , Reamers
Multiple Choice Single Answer
Question:
The Carrying cost is stated in terms of :Correct Answer:
Per item per year
Your Answer Per order
Select The Blank
Question:
The definitive statement of policy stating when to
procure and how much to procure usually to ensure that the sum of
all costs associated with ________ are minimised is called
Inventory policy.
Correct Answer:
Inventory
Your Answer Buying
Select The Blank
Question:
Buying for C quantities should be made in
________ quantities .
Correct Answer:
Large
Your Answer Medium
Select The Blank
Question:
In the assignment model, the________ is formed
between jobs and machines.
Correct Answer:
Matrix
Your Answer Matrix
Select The Blank
Question:
________ analysis mainly helps to identify nonexisting items for which store keeps bin cards, wastes computer
Multiple Choice Single Answer
Question:
Negative value of critical ratio :Correct Answer:
Is meaningless
Your Answer Indicates excess of scheduled delivery period
Multiple Choice Multiple Answer
Question:
The main characteristics of batch production are
:Correct Answer:
Short runs , Skilled labours in specific
trade , Supervisor to posses knowledge of specific process
Your Answer Short runs , Skilled labours in specific trade ,
Supervisor to posses knowledge of specific process
True/False
Question:
If lead time available is 11days and lead time
required is 10 days, the critical ratio would be 1.10.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
What are the factor affecting decision about
centralized planning system?
Correct Answer:
Product variety is large , Jobbing and
batch production methods of manufacturing , Work is less repetitive
Your Answer Product variety is large , Jobbing and batch
production methods of manufacturing , Work is less repetitive
True/False
Question:
In continuous or process production , only one
product is manufactured.
Correct Answer:
True
Your Answer True
True/False
Question:
The make-or-buy decision becomes necessary
when the current source of supply is not able to supply the material
in accordance with buyer's quality requirements.
Correct Answer:
True
Your Answer True
True/False
PAGE NO: 4 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
Work measurement function is attached to line
management.
Correct Answer:
False
Your Answer True
Multiple Choice Single Answer
Question:
Placement of purchase orders in case of 'A' type
of items is usually :Correct Answer:
Frequent
Your Answer Frequent
Match The Following
Question:
Correct Answer:Your Answer
Economic order quantity Quantity at which there is neither
overstocking nor under stocking. Quantity at which there is
neither overstocking nor under stocking.
Carrying cost
Cost of 'holding' the material in store
of transportation [carrying] of material
Cost
Procurement cost Administrative cost for procurement
of procurement of material
Cost
Inventory cost Sum of carrying and inventory cost Sum of
carrying and inventory cost
True/False
Question:
To solve "n jobs - 3 machines" sequencing
problem, the largest of time of any job on the second machine must
be smaller than or equal to the smallest time of any job on first
machine or third machine.
Correct Answer:
True
Your Answer False
True/False
Question:
Systematic procedures must be set in the
operating functions prior to installation of PPC in the firm.
Correct Answer:
True
Your Answer True
Multiple Choice Single Answer
Question:
Which factor influence plan for meeting seasonal
or occasional increase in demand?
Correct Answer:
Subcontracting
Your Answer Subcontracting
Multiple Choice Single Answer
Question:
Which of the following is the function of
Production Planning?
Correct Answer:
Process planning and scheduling
Your Answer Progressing
Select The Blank
Question:
Because of uncertainty of activity timings, PERT
acquired a shape of ________ model.
Correct Answer:
Probabilistic
Your Answer Statistical
True/False
Question:
Scientific inventory control system requires to be
followed for machine aid, work aid and inspection aid :Correct Answer:
False
Your Answer True
True/False
Question:
Job schedule is a chart showing work ahead of
each machine with respect to time.
Correct Answer:
False
Your Answer True
Match The Following
Question:
Correct Answer:Your Answer
Tooling cost
Jigs and Fixtures Jigs and Fixtures
Opportunity costsMonitory value sacrificed in rejection
of giving opportunity to do a business
Cost
Incremental cost Vary with decision to make or buy Vary with
decision to make or buy
Select The Blank
Question:
Time waste is the earliest of all wastes and yet
the________ to correct because it does not litter the floor.
Correct Answer:
Hazards
Your Answer Big hazard
Multiple Choice Single Answer
Question:
If the annual usage of a material is 1200 units and
the reorder point is at 120 Units, find the lead time.
Correct Answer:
4 months
Your Answer 1.2 Months
Labour cost
benefits
Wages and other benefits Wages and other
Multiple Choice Single Answer
Question:
The goods are manufactured as per customer's
definite order in case of :Correct Answer:
Job production
Your Answer Batch production
PAGE NO: 5 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Multiple Answer
Question:
The commonly used network techniques other
than PERT and CPM are as follows :Correct Answer:
MOSS [ Multi Operation Scheduling
System ] , PCS [ Project Control System ] , GERT [ Graphical
Evaluation Review Techniques ]
Your Answer MIS [ Management Information Systems ]
Multiple Choice Multiple Answer
Question:
To minimize total throughout time we are
required to minimize :Correct Answer:
Queuing , Idle time , Inventory
Your Answer Queuing , Idle time
Multiple Choice Multiple Answer
Question:
Following conditions are required to be fulfilled
for processing n jobs through 2 machines :Correct Answer:
The jobs are ready to be processed
before the period under consideration begins . , Transient time to
move a job from one machine to the another is negligible. , In
process inventory is allowed.
Your Answer The jobs are ready to be processed before the
period under consideration begins . , In process inventory is
allowed.
Select The Blank
Question:
An inventory control technique based on selective
approach to stock items is called ________ analysis.
Correct Answer:
Pareto's
Your Answer Pareto's
Multiple Choice Multiple Answer
Question:
While communicating to customer on delays in
delivery following information should be given :Correct Answer:
Information on identification of job ,
Reasons for delays , Revised date of delivery
Your Answer Reasons for delays , Revised date of delivery
Select The Blank
Question:
CPM is ________ oriented system.
Correct Answer:
Activity
Your Answer Activity
Multiple Choice Single Answer
Question:
One of the following is not consumable tool :Correct Answer:
Arbors
Your Answer Arbors
True/False
Question:
LOB is a manual planning and scheduling
technique similar in nature to MRP [Material Resource Planning].
Correct Answer:
Your Answer False
True
Select The Blank
Question:
________ is required when expediting fails to
bring deviated plan to its actual path.
Correct Answer:
Replanning
Your Answer Replanning
Multiple Choice Multiple Answer
Question:
The process of contraction or compression
involves extra cost because extra money is required to be spent on
factors such as :Correct Answer:
Overtime engagement of workforce ,
Purchase of additional machinery , Use of better materials
Your Answer Overtime engagement of workforce , Purchase of
additional machinery , Purchase of stationary of good quality
Multiple Choice Single Answer
Question:
In job production one single product is
manufactured while a batch of group of products is turned out at a
time under a system of :Correct Answer:
Batch production
Your Answer Process production
Multiple Choice Multiple Answer
Question:
The 'F' group of GOLF analysis involves
following requirements :Correct Answer:
Search for foreign suppliers , Opening of
letter of credit , Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers
Multiple Choice Single Answer
Question:
The production system characterized by complex
set of activities that must be performed in a particular order within a
given period and within an estimated expenditure is known as :Correct Answer:
Project production
Your Answer Project production
Multiple Choice Single Answer
Question:
Proper Production Planning and Control can
reduce cost in :Correct Answer:
Overtime cost
Your Answer Overtime cost
Select The Blank
Question:
________ is the specific instant of time that
marks start and end of activity.
Correct Answer:
Event
Your Answer Event
PAGE NO: 6 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Select The Blank
Question:
Overlapping of operations help to ________
manufacturing time.
Correct Answer:
Reduce
Your Answer Reduce
Multiple Choice Multiple Answer
Question:
"Difficult" items have following attributes :Correct Answer:
Available indigenously but are not easy
to procure , Items which come from longer distance , Items which
are difficult to manufacture
Your Answer Available indigenously but are not easy to
procure , Items which come from longer distance , Items having
complex specifications
Multiple Choice Multiple Answer
Question:
They are type of analytical estimate :Correct Answer:
Moving average , Exponential
smothering , Curve fitting
Your Answer Moving average , Curve fitting
Select The Blank
Question:
The performance standard is required by
________ to determine individual machine capacity for the purpose
of machine loading and assigning machine hours and man hours .
Correct Answer:
Scheduler
Your Answer Production engineer
Multiple Choice Multiple Answer
Question:
The network analysis involves following works :Correct Answer:
Obtaining a work breakdown structure to
a set of individual jobs which are arranged in a logical network. ,
Estimation of job duration , Scheduling to discover which jobs
control completion of project and reallocation of resources.
Your Answer Obtaining a work breakdown structure to a set of
individual jobs which are arranged in a logical network. ,
Estimation of job duration , Scheduling to discover which jobs
control completion of project and reallocation of resources.
Multiple Choice Single Answer
Question:
The assembly work content [ Wi ] of the i'th
station having n work stations is given by :Correct Answer:
å Wi from i=1 to n
Your Answer å Wi from i=1 to n
Multiple Choice Multiple Answer
Question:
Essentials of good forecasts are :Correct Answer:
Stability , Fairly accurate , Economical
to generate
Your Answer Stability , Fairly accurate , Economical to
generate
True/False
Question:
The 'G' group of GOLF analysis involves
moderate delivery time and availability of credit usually in the
range of 30 to 60 days.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
ABC company manufactures MS bolts. Given
fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs
3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost
would be Rs ________.
Correct Answer:
6 Lacs
Your Answer 6 Lacs
LIST OF ATTEMPTED QUESTION:S AND ANSWERS
Multiple Choice Multiple Answer
Question: If actual demand far exceeds forecast, it will result
into :Correct Answer: Better utilization of equipment , Project
margin , Higher material purchase
Your Answer Higher material purchase , Increase in labour
productivity , Better utilization of equipment , Project margin
Select The Blank
Question: To know the accumulated ________ for a given
machine at a given time Load charts are necessary.
Correct Answer: Load
Your Answer Load
Multiple Choice Single Answer
Question: LOB technique was developed by US navy in the year
:Correct Answer: 1958
Your Answer 1958
True/False
Question: In continuous or process production , only one product
is manufactured.
Correct Answer: True
Your Answer True
Select The Blank
Question: ________reflects impact of money tied up in
inventory.
Correct Answer: Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question: Methods for recording actual progress of work for
shop orders are :Correct Answer: Progress card , Display board , Network
updating
Your Answer Progress card , Display board , Network updating ,
Job card
PAGE NO: 7 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Select The Blank
Question: A progress card is the most ________ method of
recording of progress of work.
Correct Answer: Convenient
Your Answer Convenient
Multiple Choice Multiple Answer
Question: Following are some of the common standard cutting
tools :Correct Answer: Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question: Tooling cost comprises the cost of :Correct Answer: Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question: The light engineering company has one special
purpose facing & centering machine And one copying lathe. The
foreman has five work orders for processing . The operation
Sequence is fixed [ each job is first faced and centered and then
copy turned ] . The standard Hours required for each machine to
process each work order are shown in the following Table :- Work
Order Processing Time [Hours ] Facing & centering machine
Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find
sequence to minimize requirements of machine hours.
Correct Answer: IV-I-II-V-III
Your Answer I-II-III-IV-V
Select The Blank
Question: ________ represents the time that elapses between the
receipt of requirement of job until the job is adopted in the
production control department.
Correct Answer: Order preparation time
Your Answer Queue time
True/False
Question: PERT basically does not demarcate between critical
and non-critical activities.
Correct Answer: True
Your Answer True
Multiple Choice Single Answer
Question: The assignment method is also called as :Correct Answer: Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question: Outside operations cost involves expenses such as :Correct Answer: Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough
blanking
Select The Blank
Question: The correct fitting of orders with capacity
considerably lessens ________ burden of control.
Correct Answer: Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question: The 'F' group of GOLF analysis involves following
requirements :Correct Answer: Search for foreign suppliers , Opening of letter
of credit , Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of
credit , Arrangements for shipping and port clearance , Account in
foreign bank
Match The Following
Question: Correct Answer: Your Answer
Order quantity Factor influencing process planning Break even
analysis
Machine capacity chart Dimensional accuracy Dimensional
accuracy
Mass production Special purpose machines Special purpose
machines
Standard elemental time data Compare alternative processes Factor
influencing process planning
Multiple Choice Multiple Answer
Question: The tooling data is prepared in respect of following
measuring instruments :Correct Answer: Vernier caliper , Micrometer screw gauge ,
Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain
gauge , Drill bits
Multiple Choice Multiple Answer
Question: In replenishment system, the fixed order quantity
system is also called by following names :Correct Answer: Fixed order system , Min-max system , Reorder point system
Your Answer Fixed order system , Min-max system , Re-order
point system , Lead time system
Multiple Choice Multiple Answer
Question: How you will Judge the failure of production planning
and control department?
Correct Answer: Frequent broken delivery promises ,
Underutilization of men, machines , Excessive overtime
Your Answer Frequent broken delivery promises ,
Underutilization of men, machines , Excessive overtime , Better
coordination with other section
Multiple Choice Single Answer
Question: In Cost Vs Quantity plot, the total inventory Cost
curve is :Correct Answer: Parabolic
Your Answer Inverse
True/False
PAGE NO: 8 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question: Given stock in hand = 1320 units, safety stock=840
units and average daily consumption = 60 units, the lead time
available would be 10 hours.
Correct Answer: False
Your Answer True
Multiple Choice Single Answer
Question: If the annual usage of a material is 1200 units and the
reorder point is at 120 Units, find the lead time.
Correct Answer: 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question: The assignment algorithm was developed by a
Hungarian mathematician named :Correct Answer: D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question: So far as possible, number of activities should be :Correct Answer: Limited
Your Answer Limited
True/False
Question: Production Planning and Control makes the supervisor
ineffective.
Correct Answer: True
Your Answer False
Multiple Choice Single Answer
Question: Unit of loading and scheduling depends on following
factor :Correct Answer: Operating cycle
Your Answer Unit of capacity
True/False
Question: The 'G' group of GOLF analysis involves moderate
delivery time and availability of credit usually in the range of 30 to
60 days.
Correct Answer: True
Your Answer True
Multiple Choice Multiple Answer
Question: Load charts are used for following :Correct Answer: To know the accumulated load on a given
machine at a given time , Identify periods available for allocation in
future to orders , Matching orders and loads
Your Answer Improving supply of material , To know the
accumulated load on a given machine at a given time , Identify
periods available for allocation in future to orders , Matching orders
and loads
Select The Blank
Question: ABC company manufactures MS bolts. Given fixed
cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3
Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would
be Rs ________.
Correct Answer: 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question: An inventory control system in which stock of item is
physically or conceptually divided into ________ bins is calledTwo
bin system.
Correct Answer: Two
Your Answer Pair
Multiple Choice Multiple Answer
Question: They are type of analytical estimate :Correct Answer: Moving average , Exponential smothering ,
Curve fitting
Your Answer Moving average , Exponential smothering , Curve
fitting , Opinion surveys
Multiple Choice Single Answer
Question: For goods manufactured to stock, following
department is expected to periodically undertake replenishment
action as stocks are depleted :Correct Answer: Production Planning Control
Your Answer Production
True/False
Question: Random fluctuation is addition of cyclical fluctuation
and seasonal fluctuation.
Correct Answer: False
Your Answer True
True/False
Question: Scientific inventory control system requires to be
followed for machine aid, work aid and inspection aid :Correct Answer: False
Your Answer True
Multiple Choice Single Answer
Question: Value Analysis conducted in 'C' type of material is
usually :Correct Answer: Minimum
Your Answer Minimum
True/False
Question: Purchase department must keep PPC informed
regarding lead time of different items specially where lead times are
extended.
Correct Answer: True
Your Answer True
True/False
Question: In assignment matrix, it is a must to determine
Jacobean of the determinant.
Correct Answer: False
Your Answer True
Select The Blank
Question: For replenishment action for stock items which are
reserved by PPC, the stores work out ________ stock which equals
the stock on hand less stock reserved.
Correct Answer: Free
Your Answer Net
PAGE NO: 9 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Single Answer
Question: What are the customer's expectation from the
supplier?
Correct Answer: Consistent good quality of products
Your Answer Consistent good quality of products
Your Answer Tools and plants are available , Technical know
how is available , Competent persons are present , Cost data of raw
material is available.
LIST OF ATTEMPTED QUESTION:S AND ANSWERS
Match The Following
Question: Correct Answer: Your Answer
End piece allowance Material insufficient to produce one piece
Material insufficient to produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to
meet requirement of spares
Multiple Choice Multiple Answer
Question:
Following are the factors which influence tool life
:Correct Answer:
Operators efficiency , Type of tool ,
Material it is required to operate upon
Your Answer Operators efficiency , Type of tool , Material it is
required to operate upon
Machining allowance Extra material requirement Extra material
requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question: Why customer is called the king?
Correct Answer: Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question: PPC is expected to have good inter-departmental
relationships to achieve the production targets. Which is the most
important factor that shall affect production targets?
Correct Answer: Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question: Generally for ________ flow system, Heuristic
method is preferred.
Correct Answer: Intermittent
Your Answer Continuous
Select The Blank
Question: In control board________ compartment contains copy
of work orders/shop orders of the item to be processed next on the
machine.
Correct Answer: Middle
Your Answer Bottom
True/False
Question: Work measurement function is attached to line
management.
Correct Answer: False
Your Answer True
Multiple Choice Multiple Answer
Question: The technical feasibility of sales enquiry is carried out
on the following grounds :Correct Answer: Tools and plants are available , Technical
know how is available , Competent persons are present
Multiple Choice Single Answer
Question:
The document which incorporates details of
process planning for a job is called :Correct Answer:
Route Sheet
Your Answer Route Sheet
Multiple Choice Multiple Answer
Question:
CPM terminology uses words like
Correct Answer:
Arrow diagram , Nodes , Float
Your Answer Arrow diagram , Nodes
Select The Blank
Question:
Forecasting is function of ________.
Correct Answer:
Marketing department
Your Answer Planning in charge
Select The Blank
Question:
Johnsons method of scheduling can be used when
operation sequence involve ________ machines.
Correct Answer:
Two
Your Answer Two
Select The Blank
Question:
Good quality and ________are the two main
requirements to secure maximum business from a customer.
Correct Answer:
Competitive rates
Your Answer Competitive rates
Select The Blank
Question:
Sum of queue, transit, order preparation and
manufacturing times is known as ________
Correct Answer:
Total Lead Time
Your Answer Total Lead Time
True/False
PAGE NO: 10 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
To conduct FSN analysis we require, last date of
receipt or last date of issue whichever is later and period.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Overtime can be avoided in many ways and they
are :Correct Answer:
Unrealistic delivery date , Acceptance of
too many rush order , Excessive machine breakdown
Your Answer Unrealistic delivery date , Acceptance of too
many rush order , Excessive machine breakdown
Multiple Choice Single Answer
Question:
Effective Production Planning and Control,
reduce investment in inventories effectively :Correct Answer:
By proper coordination between shop
floor, stores and buying department
Your Answer By proper coordination between shop floor, stores
and buying department
True/False
Question:
Fluctuation due to changes in season are called
cyclical fluctuation.
Correct Answer:
False
Your Answer False
Multiple Choice Multiple Answer
Question:
Material control function embraces a following
techniques :Correct Answer:
Make -or -buy decision , Pareto's
analysis , Replenishment system
Your Answer Make -or -buy decision , Pareto's analysis ,
Replenishment system
True/False
Question:
Flexibility and product variety are not interrelated with each other.
Correct Answer:
False
Your Answer True
True/False
Question:
Work measurement is not useful for choosing
between two alternate methods of production.
Correct Answer:
False
Your Answer False
True/False
Question:
Overlapping of operations help to reduce
manufacturing time.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Process Sheet contains following information :Correct Answer:
Material Specification , Sequence of
operation , Skill of Labour
Your Answer Material Specification , Sequence of operation ,
Skill of Labour
Select The Blank
Question:
The LOB technique is made more accurate and
fast by using ________.
Correct Answer:
Computers
Your Answer Reduction techniques
True/False
Question:
More than one subcontractor should be developed
for each subcontracted operation/Job.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
Classification of items on basis of their capital
lock up is called ________ analysis.
Correct Answer:
XYZ
Your Answer XYZ
Select The Blank
Question:
Purchase section must keep ________posted on
the progress of purchase orders and expected delays.
Correct Answer:
P.P.C.
Your Answer P.P.C.
True/False
Question:
Overtime is undesirable since it increases
manufacturing cost of the product.
Correct Answer:
True
Your Answer False
Multiple Choice Multiple Answer
Question:
The essential features of batch production are :Correct Answer:
General purpose machines and process
type layout , Manual materials handling , Flexibility of production
schedule
Your Answer General purpose machines and process type
layout , Manual materials handling , Flexibility of production
schedule
Multiple Choice Single Answer
Question:
The sourcing of vendors in case of 'B' type of
items is :Correct Answer:
Medium
PAGE NO: 11 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
Your Answer
Few
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Your Answer
Multiple Choice Single Answer
Question:
Dispatcher withdraws required quantity of
material from stores using following document :Correct Answer:
Stores issue order
Your Answer Bill of material
Multiple Choice Multiple Answer
Question:
In a mass production assembly shop following
work measurement techniques are used :Correct Answer:
Time study , Work sampling ,
Production study
Your Answer Time study , Work sampling , Production study ,
Analytical estimating
Multiple Choice Multiple Answer
Question:
SDE analysis is based on problems of
procurement namely :Correct Answer:
Non-availability , Scarcity , Longer lead
time
Your Answer Non-availability , Scarcity , Longer lead time
True/False
Question:
Line balancing is a simulation technique.
Correct Answer:
False
Your Answer False
Multiple Choice Multiple Answer
Question:
The line of balance is a device for planning and
monitoring progress of :Correct Answer:
Purchase order execution , Project
execution , Targeted programs
Your Answer Purchase order execution , Project execution ,
Targeted programs
Select The Blank
Question:
Sales persons decides ________.
Correct Answer:
Synthetic forecast
Your Answer Current sales
True/False
Question:
Material control Card is a document for record of
issues of material and receipt of unused material by production
shop.
Correct Answer:
False
Your Answer False
Multiple Choice Single Answer
Question:
Work measurement is limited to measuring :Correct Answer:
Productive & non productive time
Only product related activities
Match The Following
Question:
Correct Answer:Your Answer
Move order
Transport material from and to required work
centers Transport material from and to required work centers
Materials Order Allocation of material required in connection with
shop order
Allocation of material required in connection with
shop order
Work Order
Bird's eye view of production programme
Bird's eye view of production programme
Production Order Reserve material required in connection with
sales order
Reserve material required in connection with
sales order
Multiple Choice Multiple Answer
Question:
The software for line balancing should have
following features :Correct Answer:
Easy to operate , Easy to install , Easy to
upgrade
Your Answer Easy to operate , Easy to install , Unmanaged
code should be available
Multiple Choice Single Answer
Question:
Man hours is commonly used unit of
measurement for scheduling purposes in following industry :Correct Answer:
Engineering
Your Answer Engineering
Multiple Choice Multiple Answer
Question:
Customer plays very important role due to the
following reasons :Correct Answer:
Gives us work , Dividends to share
holders , Gets business from new customers
Your Answer Gives us work , Dividends to share holders , Gets
business from new customers
Multiple Choice Single Answer
Question:
The 4X4 assignment problem involve following
job-machine operations :Correct Answer:
24
Your Answer 24
Multiple Choice Single Answer
Question:
The best of scientific tools available for
scheduling is :Correct Answer:
CPA [ critical path analysis ]
Your Answer Gantt Chart
PAGE NO: 12 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Multiple Answer
Question:
Work measurement is responsibility of :Correct Answer:
PPC , Industrial Engineering ,
Production department
Your Answer PPC , Industrial Engineering
Match The Following
Question:
Correct Answer:Your Answer
Long production run
Flow production
Mass and Flow production Mass and
Complex activities to be performed in a particular order within a
give time & estimate.
Project production
Project
production
One or few units manufactured as per customers requirement
Jobbing Production
Jobbing Production
Short production run
Multiple Choice Multiple Answer
Question:
Smoothing performs following activities:Correct Answer:
Reallocation of resources , Improving
utilization of resources , Conducting Heuristic approach
Your Answer Reallocation of resources , Improving utilization
of resources , Conducting Heuristic approach
True/False
Question:
As per a study on materials management
practices, a typical firm spends almost half of its rupee sales on
goods purchased from vendors.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
Value analysis of ________ class items is usually
inadvisable.
Correct Answer:
C
Your Answer C
Batch Production Batch Production
Multiple Choice Single Answer
Question:
Value Analysis conducted in 'C' type of material
is usually :Correct Answer:
Minimum
Your Answer Minimum
True/False
Question:
PPC system in the organisation is to be tailor
made.
Correct Answer:
True
Your Answer True
LIST OF ATTEMPTED QUESTION:S AND ANSWERS
Multiple Choice Multiple Answer
Question:
Some of significant features of HML analysis are
:Correct Answer:
To evolve buying policies to control
purchases , To delegate authorities to different buyers to make petty
cash purchases , Not to take consumption into account
Your Answer To evolve buying policies to control purchases ,
To delegate authorities to different buyers to make petty cash
purchases
Multiple Choice Single Answer
Question:
What is the reasons for poor labour efficiency
attributed by inefficient P.P.C.?
Correct Answer:
Failure to provide proper tools and
control on work in progress on shop floor
Your Answer Failure to provide proper tools and control on
work in progress on shop floor
Multiple Choice Single Answer
Question:
The administrative expenses towards the
procurement of materials is called :Correct Answer:
Procurement cost
Your Answer Administrative cost
True/False
Question:
Performance benchmarking does not involves
comparison of financial ratios at the aggregate level.
Correct Answer:
False
Your Answer False
Multiple Choice Single Answer
Question:
Setup time includes :Correct Answer:
Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single Answer
Question:
Participants of the groups for quality circles
should be decided by :Correct Answer:
Employees coming together by their own
enthusiasm
Your Answer Employees coming together by their own
enthusiasm
Multiple Choice Single Answer
PAGE NO: 13 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
Check sheet are also used as :Correct Answer:
Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single Answer
Question:
SMED means :Correct Answer:
Single minute exchange of dies
Your Answer Single minute exchange of dies
Parato analysis underlines & operates on
Philosophy of "vital
few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their
frequency of occurrence Arranging data according to the
descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order Magnitude of defects
Match The Following
Question:
Correct Answer:Your Answer
Productivity performance measurement
Cost of quality
Turnover employee
Financial performance measurement
Sales of the months
Sales of the months
Customer satisfaction measurement Customer complaints per period
Customer complaints per period
Staff attitude measurementEmployee satisfaction index
Employee satisfaction index
Select The Blank
Question:
________ is an effect due to the muda of defect.
Correct Answer:
Wear & tear of parts while
disassembling
Your Answer Poor production planning & control
Select The Blank
Question:
If some defective parts are discovered by the
subsequent process they should be returned to the ________ to
prevent reoccurrence.
Correct Answer:
Preceding process
Your Answer Return to stores
Multiple Choice Multiple Answer
Question:
The results oriented efforts of the quality circle
should also include :Correct Answer:
Efforts to avoid the problem
permanently , Ultimate aim of the customers satisfaction , Attacking
the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently ,
Publication or advertisement of your contribution , Attacking the
real root causes & all possibilities
Match The Following
Question:
Correct Answer:Your Answer
Multiple Choice Multiple Answer
Question:
Few steps in construction in Radar chart are :Correct Answer:
Brainstorming to enlist characteristics
which require to be evaluated & draw the circle & divide it into
'slices' equal to number of characteristics , The first slice begins at
12 noon. Then draw vertical line & calibrate it equal to the number
of levels required , Draw concentric circles from each gradiation
using 'o' point as centre
Your Answer Brainstorming to enlist characteristics which
require to be evaluated & draw the circle & divide it into 'slices'
equal to number of characteristics , The first slice begins at 12
noon. Then draw vertical line & calibrate it equal to the number of
levels required , Draw concentric circles from each gradiation using
'o' point as centre
Select The Blank
Question:
5 S audit result is discussed in ________ meeting.
Correct Answer:
Monthly
Your Answer Monthly
True/False
Question:
Fishbone analysis is used both in analysis &
planning.
Correct Answer:
True
Your Answer False
Multiple Choice Single Answer
Question:
One Green Belt may head a team of :Correct Answer:
20 employees
Your Answer 20 employees
Multiple Choice Multiple Answer
Question:
Role of champions are :Correct Answer:
Approve six sigma projects , Remove
road block in the path of six sigma implementation , Monitor
progress of six sigma projects
Your Answer Monitor progress of six sigma projects , Approve
six sigma projects , Remove road block in the path of six sigma
implementation
Parato diagram always indicates Magnitude of defects
Philosophy of 20% of the activity causes 80% of the effect
PAGE NO: 14 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Multiple Answer
Question:
To draw control charts, sample must be
representative of homogeneous segment of production for which :Correct Answer:
The items of the sample should be from
the same machine setting , The items should be of the same batch ,
Items should be made from the same raw material batch
Your Answer The items of the sample should be from the same
machine setting , The items should be of the same batch , Items
should be made from the same raw material batch
Multiple Choice Single Answer
Question:
Failure mode and effect analysis (FMEA)
establish
Correct Answer:
Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple Answer
Question:
What are the steps in deciding the benchmarking
partner?
Correct Answer:
Decide level of benchmarking , List
down a few prospective candidates of partnership , Collect
information of short listed partners
Your Answer Decide level of benchmarking , List down a few
prospective candidates of partnership , Collect information of short
listed partners
Multiple Choice Single Answer
Question:
One Master Black Belt may head a team of :Correct Answer:
15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single Answer
Question:
Competitive benchmarking involves identifying
key competitive product, services or processes & comparing with
those of :Correct Answer:
Main competitor
Your Answer Main competitor
Multiple Choice Single Answer
Question:
Implication of Quality problem is:Correct Answer:
Gap in performance
Your Answer Gap in performance
Select The Blank
Question:
Number of defects in an individual component,
like gear, shaft, wheel etc can be monitored through ________ type
of control chart.
Correct Answer:
c-chart
Your Answer c-chart
True/False
Question:
Non-availability of files /document in time is a
problem to be addressed by office TPM.
Correct Answer:
True
Your Answer True
Multiple Choice Single Answer
Question:
Check sheet is easy to use because it is :Correct Answer:
Simplest tool
Your Answer Simplest tool
Multiple Choice Single Answer
Question:
Benchmarking helps to identify the gap between
the current performance of the organization and the :Correct Answer:
Performance of the best organization
Your Answer Performance of the best organization
True/False
Question:
Flow chart is pictorial representation of the steps
in production control.
Correct Answer:
False
Your Answer True
Multiple Choice Multiple Answer
Question:
Breakdown problem may be stratified by :Correct Answer:
Sections , Machines , Type of
breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g
mech. Or electrical)
Select The Blank
Question:
A control chart to exhibit counted data on number
of defect is called ________.
Correct Answer:
c-chart
Your Answer c-chart
Select The Blank
Question:
Procedure for implementation of TPM consists of
________ numbers of steps.
Correct Answer:
12
Your Answer 8
Select The Blank
Question:
Capability index Cp = ________
Correct Answer:
Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single Answer
Question:
Pareto's analysis underlines & operates
philosophy of :Correct Answer:
Vital few = trivial many
Your Answer Vital few = trivial many
PAGE NO: 15 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
True/False
Question:
Kanban signals are required when assembly work,
subassembly work and manufacturing at parts is carried out at
different locations.
Correct Answer:
True
Your Answer True
Correct Answer:
Prevention type Poka-Yoke , Detection
type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type
Poka-Yoke
Multiple Choice Single Answer
Question:
Quality problem solving tool is used to :Correct Answer:
Improve quality
Your Answer Save time
Multiple Choice Multiple Answer
Question:
To reduce clamping & declamping time,
following actions are desirable :Correct Answer:
Standardize clamping bolts / screws ,
Cut off unnecessary threads , Use quick clamping device
Your Answer Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping device
True/False
Question:
Along with problem solving tools experience and
judgment is also used.
Correct Answer:
True
Your Answer False
Select The Blank
Question:
Benchmarking allows exchange of ________
between the benchmarking partners.
Correct Answer:
Information
Your Answer Information
Select The Blank
Question:
JIT advocates the philosophy at elimination of
waste from system which occurs due to ________.
Correct Answer:
Over Production
Your Answer Over Production
Multiple Choice Multiple Answer
Question:
TQM can never flourish if the staff are:Correct Answer:
Worried about losing jobs , Afraid of
being reprimanded if there are mistakes , Scared of their bosses
Your Answer Worried about losing jobs , Afraid of being
reprimanded if there are mistakes , Scared of their bosses
True/False
Question:
Without measuring initial performance, target
can't be set.
Correct Answer:
True
Your Answer False
True/False
Question:
In bar graph each bar is of same height.
Correct Answer:
False
Your Answer False
Multiple Choice Multiple Answer
Question:
During SMED implementation, primary study
consists of :Correct Answer:
Equipment analysis , Setup change
analysis , Preparation items (storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis ,
Preparation items (storage place , method) analysis
True/False
Question:
Daily work management can also be extended to
non manufacturing areas like procurement, QA, HRD etc.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Types of Poka-Yoke are :-
Multiple Choice Multiple Answer
Question:
An erratic patterns falling above & below the
control limits indicates :Correct Answer:
Defect in materials , Frequent adjustment
of machines , Poorly trained operators
Your Answer Defect in materials , Frequent adjustment of
machines , Poorly trained operators
True/False
Question:
Sample size for the construction of p-chart are
larger than X bar-R chart.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Histogram is an important diagnostic tool.
Analysis of the histogram gives :Correct Answer:
It shows cause which affects the process
, An idea of what is happening to the process , Whether the process
is capable of meeting process or not i.e. around correct average &
within specific limits
Your Answer An idea of what is happening to the process ,
Whether the process is capable of meeting process or not i.e. around
PAGE NO: 16 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
correct average & within specific limits , A bird's eye view of the
variation
Multiple Choice Single Answer
Question:
Productivity improves by :Correct Answer:
Voluntary participants of everyone
Your Answer Voluntary participants of everyone
PAGE NO: 17 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
Production Planning & Control_8
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
XYZ when combined with FSN analysis helps to classify
non-moving items into XN , YN and ZN.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Forecast is based on :Correct Answer
Past data
Your Answer
Competitor's market share
Select The Blank
Question
Network ________ is defined as any adjustment to the
arrow diagram which becomes necessary owing to departure from the
project schedule laid down earlier.
Correct Answer
Updating
Your Answer
Design
Multiple Choice Single Answer
Question
For goods manufactured to stock, following department
is expected to periodically undertake replenishment action as stocks are
depleted :Correct Answer
Production Planning Control
Your Answer
Production Planning Control
True/False
Question
Correct Answer
Your Answer
CPM marks critical activities.
True
True
Select The Blank
Question
A shop order may combine more than one ________
requiring identical items.
Page 1
Correct Answer
Your Answer
Production Planning & Control_8
Work order
Sales order
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer
Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
________ inventories help to balance company's
supply with market demand.
Correct Answer
Finished goods
Your Answer
WIP
Select The Blank
Question
Correct Answer
Your Answer
Short term forecasts are for ________.
Material Planning
Cash flow management
Multiple Choice Single Answer
Question
For process planning following is one of the basic
document used :Correct Answer
Operation Layout
Your Answer
Process Layout
Multiple Choice Single Answer
Question
Scheduled start of an operation is authorized by issuing
a document called :Correct Answer
Job card
Your Answer
Route card
Multiple Choice Multiple Answer
Question
SOS Analysis involves following type of items :Correct Answer
Seasonal items available only for a limited period. ,
Seasonal items available throughout the year. , Non-seasonal items whose
quantity is decided on different considerations.
Page 2
Production Planning & Control_8
Your Answer
Seasonal items available throughout the year. ,
Non-seasonal items whose quantity is decided on different considerations. ,
Machine spare parts
Multiple Choice Multiple Answer
Question
The basic procedure of assignment technique is designed
to solve problems wherein :Correct Answer
Number of tasks equal to number of facilities. , The
objective function is minimization. , There are no restrictions in allocation
Your Answer
Number of tasks equal to number of facilities. , There are
no restrictions in allocation , Cost of machine should be taken into
consideration.
True/False
Question
There are five manufacturing systems. However, many
manufacturers combines two or more systems to produce a final product.
Correct Answer
True
Your Answer
True
True/False
Question
In LOB, the regular progress checks the future effect of
any current delays and indicates degree of urgency for corrective action.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
5 jobs are to be processed on machines M1 and M2 , first
on M1 and then on M2. The processing times in hours are as follows.Find the
sequence for 5 jobs that will minimize total elapsed time .also find idle time &
total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 5
2 2 1 6 8 9 7 6 3 8 5 10 4
Correct Answer
2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2
Hours for M1 & M2 respectively.
Your Answer
Minimum time 28 hours , Idle time = 1 & 2 Hours for M1
& M2 respectively.
True/False
Page 3
Production Planning & Control_8
Question
When shop floor scheduling problem larger than 3
machines arise the analytical solution procedures leading to optimality are
complex and difficult.
Correct Answer
True
Your Answer
True
Match The Following
Question Correct Answer
Your Answer
End piece allowance Material insufficient to produce one piece Material
insufficient to produce one piece
Stock allowance
Quantity to meet requirement of spares
material requirement
Extra
Machining allowance
in handling
Material loss
Extra material requirement
Spoilage allowance Process rejection
spares
Quantity to meet requirement of
Select The Blank
Question
________ is required for machine set ups as well as
regular production.
Correct Answer
Performance standard
Your Answer
Machine design data
Multiple Choice Single Answer
Question
If a product is required within 20 days and the product
can be made available in 10 days, the Critical ratio would be :Correct Answer
2
Your Answer
0.5
Multiple Choice Single Answer
Question
A subcontractor is :Correct Answer
Another form acting as a supplier
Your Answer
Manufacturer of specialized products on whom the
Page 4
Production Planning & Control_8
buyer is dependent for 100% of requirement of main assembly
Multiple Choice Single Answer
Question
The data regarding maximum run out between centers
pertains to :Correct Answer
Process planning
Your Answer
Raw material data
True/False
Question
safety stock.
Correct Answer
Your Answer
Lead time information is required for determination of
False
True
Select The Blank
Question
Americans like to use the word 'inventory' whereas for
same context British use the term________.
Correct Answer
Stock
Your Answer
Stock
Multiple Choice Multiple Answer
Question
SDE analysis is employed by the purchase department
for :Correct Answer
Contract buying for some of 'easy' items. , Forward
buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items.
Your Answer
Forward buying of some of 'scarce' items. , Scheduled
buying for some of 'easy' items. , Contract buying for some of 'easy' items.
True/False
Question
Labour efficiency factor is applied after capacity
requirement of equipment is calculated.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
PERT terminology uses words like :Page 5
Correct Answer
Your Answer
Production Planning & Control_8
Network diagram , Events , Slack
Network diagram , Events
True/False
Question
The LOB technique is most appropriate for assembly
operations involving number of distinct components.
Correct Answer
True
Your Answer
True
True/False
Question
Transit time for manufactured items should be
considered only when it is insignificant.
Correct Answer
False
Your Answer
True
Select The Blank
Question
Correct Answer
Your Answer
A progress card normally contains ________ squares.
Less than 25
More than 50
Multiple Choice Multiple Answer
Question
Due to the following emergent events, the queue time has
to compensate for the time for which the job has to undergo an extra time :Correct Answer
Tool breakage , Job split up , Change in priorities
Your Answer
Tool breakage , Job split up , Store inventory
Multiple Choice Single Answer
Question
One of the following is not an task of progressing :Correct Answer
Ensuring supply of material and issue of documents to
manufacturing shops
Your Answer
Expediting to rush up remaining operations of the
delays jobs
Multiple Choice Single Answer
Question
Production output in night shift is :Correct Answer
Less than I shift production
Page 6
Your Answer
Production Planning & Control_8
More than I shift production
Multiple Choice Multiple Answer
Question
The minimum requirements for application software for
line balancing are as follows :Correct Answer
1 Ghz processor , 1 Gb hard Disk free memory , Windows
or equivalent operating system.
Your Answer
1 Gb hard Disk free memory , Windows or equivalent
operating system.
Multiple Choice Single Answer
Question
The work measurement and time study belong to the
following school of management :Correct Answer
Scientific School of management
Your Answer
Functional School of management
Multiple Choice Multiple Answer
Question
Before planning subcontracting points to be considered
are :Correct Answer
Whether overtime can be given , One more shift can be
started
Your Answer
Whether overtime can be given , One more shift can be
started , Set up time can be reduced
Multiple Choice Multiple Answer
Question
The main requirements of re-order level system are as
follows :Correct Answer
Incoming materials and materials returned from shop
must be deposited in appropriate bins and their stock cards must be posted
for "goods receipt report" and "material return note" for the quantities
received physically . , Items should be issued in correct quantities. , The
balance on the stock cards should be periodically tallied with physical stock.
Your Answer
Incoming materials and materials returned from shop
must be deposited in appropriate bins and their stock cards must be posted
for "goods receipt report" and "material return note" for the quantities
received physically . , Items should be issued in correct quantities. , The
balance on the stock cards should be periodically tallied with physical stock.
Page 7
Production Planning & Control_8
Multiple Choice Multiple Answer
Question
The following are salient features of the fixed order
quantity system :Correct Answer
Reorder quantity is always the same which is usually
economic order quantity , The time interval between deliveries varies. ,
Replenishment action is initiated when the stock on hand is just sufficient to
meet demand during the lead time.
Your Answer
Reorder quantity is always the same which is usually
economic order quantity , The time interval between deliveries varies. ,
Percent cumulative cost of item is taken into consideration.
Select The Blank
Question
ABC company manufactures MS bolts. Given fixed cost
Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost
Rs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. The
firm uses 100000 MS bolts every year. Under these circumstances, the firm
would take a decision to ________.
Correct Answer
Make at home
Your Answer
Buy from outside
Multiple Choice Multiple Answer
Question
Following difficulties are faced by SDE analysis :Correct Answer
More delivery period , Geographical location of supplier
, Reliability of suppliers
Your Answer
More delivery period , Reliability of suppliers , Excise
duty
Select The Blank
Question
For replenishment action for stock items which are
reserved by PPC, the stores work out ________ stock which equals the stock
on hand less stock reserved.
Correct Answer
Free
Your Answer
Net
True/False
Question
Route sheets for custom built job is prepared for each
new order received.
Page 8
Correct Answer
Your Answer
Production Planning & Control_8
True
True
Match The Following
Question Correct Answer
Your Answer
Order quantity
Factor influencing process planning
alternative processes
Compare
Machine capacity chart
Dimensional accuracy
purpose machines with special toolings
General
Mass production
Special purpose machines
Break even analysis
Standard elemental time data Compare alternative processes Factor
influencing process planning
Multiple Choice Multiple Answer
Question
Following are some of the common standard cutting
tools :Correct Answer
Cutting saw , Inserts , Reamers
Your Answer
Form tool , Inserts , Reamers
Multiple Choice Single Answer
Question
The Carrying cost is stated in terms of :Correct Answer
Per item per year
Your Answer
Per order
Select The Blank
Question
The definitive statement of policy stating when to
procure and how much to procure usually to ensure that the sum of all costs
associated with ________ are minimised is called Inventory policy.
Correct Answer
Inventory
Your Answer
Buying
Select The Blank
Page 9
Question
quantities .
Correct Answer
Your Answer
Production Planning & Control_8
Buying for C quantities should be made in ________
Large
Medium
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
In the assignment model, the________ is formed
between jobs and machines.
Correct Answer
Matrix
Your Answer
Matrix
Select The Blank
Question
________ analysis mainly helps to identify
non-existing items for which store keeps bin cards, wastes computer memory
or wastes computer stationary while preparing stores ledger.
Correct Answer
MNG Analysis
Your Answer
SOS Analysis
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer
Customer's orders gives us work
Your Answer
Gives satisfaction to workers
Multiple Choice Single Answer
Question
Negative value of critical ratio :Correct Answer
Is meaningless
Your Answer
Indicates excess of scheduled delivery period
Multiple Choice Multiple Answer
Question
The main characteristics of batch production are :Correct Answer
Short runs , Skilled labours in specific trade , Supervisor
to posses knowledge of specific process
Your Answer
Short runs , Skilled labours in specific trade , Supervisor
to posses knowledge of specific process
Page 10
Production Planning & Control_8
True/False
Question
If lead time available is 11days and lead time required is
10 days, the critical ratio would be 1.10.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
What are the factor affecting decision about centralized
planning system?
Correct Answer
Product variety is large , Jobbing and batch production
methods of manufacturing , Work is less repetitive
Your Answer
Product variety is large , Jobbing and batch production
methods of manufacturing , Work is less repetitive
True/False
Question
manufactured.
Correct Answer
Your Answer
In continuous or process production , only one product is
True
True
True/False
Question
The make-or-buy decision becomes necessary when the
current source of supply is not able to supply the material in accordance with
buyer's quality requirements.
Correct Answer
True
Your Answer
True
True/False
Question
management.
Correct Answer
Your Answer
Work measurement function is attached to line
False
True
Multiple Choice Single Answer
Question
Placement of purchase orders in case of 'A' type of items
Page 11
Production Planning & Control_8
is usually :Correct Answer
Your Answer
Frequent
Frequent
Match The Following
Question Correct Answer
Your Answer
Economic order quantity
Quantity at which there is neither
overstocking nor under stocking.
Quantity at which there is neither
overstocking nor under stocking.
Carrying cost
Cost of 'holding' the material in store
transportation [carrying] of material
Cost of
Procurement cost
Administrative cost for procurement
procurement of material
Cost of
Inventory cost
Sum of carrying and inventory cost
carrying and inventory cost
Sum of
True/False
Question
To solve "n jobs - 3 machines" sequencing problem, the
largest of time of any job on the second machine must be smaller than or
equal to the smallest time of any job on first machine or third machine.
Correct Answer
True
Your Answer
False
True/False
Question
Systematic procedures must be set in the operating
functions prior to installation of PPC in the firm.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Time waste is the earliest of all wastes and yet
the________ to correct because it does not litter the floor.
Correct Answer
Hazards
Page 12
Your Answer
Production Planning & Control_8
Big hazard
Multiple Choice Single Answer
Question
If the annual usage of a material is 1200 units and the
reorder point is at 120 Units, find the lead time.
Correct Answer
4 months
Your Answer
1.2 Months
Multiple Choice Single Answer
Question
Which factor influence plan for meeting seasonal or
occasional increase in demand?
Correct Answer
Subcontracting
Your Answer
Subcontracting
Multiple Choice Single Answer
Question
Which of the following is the function of Production
Planning?
Correct Answer
Process planning and scheduling
Your Answer
Progressing
Select The Blank
Question
Because of uncertainty of activity timings, PERT
acquired a shape of ________ model.
Correct Answer
Probabilistic
Your Answer
Statistical
True/False
Question
Scientific inventory control system requires to be
followed for machine aid, work aid and inspection aid :Correct Answer
False
Your Answer
True
True/False
Question
Job schedule is a chart showing work ahead of each
machine with respect to time.
Correct Answer
False
Page 13
Your Answer
Production Planning & Control_8
True
Match The Following
Question Correct Answer
Tooling cost
Your Answer
Jigs and Fixtures
Jigs and Fixtures
Opportunity costs Monitory value sacrificed in rejection
opportunity to do a business
Cost of giving
Incremental cost
Vary with decision to make or buy
decision to make or buy
Vary with
Labour cost
benefits
Wages and other benefits
Wages and other
Multiple Choice Single Answer
Question
The goods are manufactured as per customer's definite
order in case of :Correct Answer
Job production
Your Answer
Batch production
Multiple Choice Multiple Answer
Question
The commonly used network techniques other than
PERT and CPM are as follows :Correct Answer
MOSS [ Multi Operation Scheduling System ] , PCS [
Project Control System ] , GERT [ Graphical Evaluation Review Techniques ]
Your Answer
MIS [ Management Information Systems ]
Multiple Choice Multiple Answer
Question
To minimize total throughout time we are required to
minimize :Correct Answer
Queuing , Idle time , Inventory
Your Answer
Queuing , Idle time
Multiple Choice Multiple Answer
Page 14
Production Planning & Control_8
Question
Following conditions are required to be fulfilled for
processing n jobs through 2 machines :Correct Answer
The jobs are ready to be processed before the period
under consideration begins . , Transient time to move a job from one machine
to the another is negligible. , In process inventory is allowed.
Your Answer
The jobs are ready to be processed before the period
under consideration begins . , In process inventory is allowed.
Select The Blank
Question
An inventory control technique based on selective
approach to stock items is called ________ analysis.
Correct Answer
Pareto's
Your Answer
Pareto's
Multiple Choice Multiple Answer
Question
While communicating to customer on delays in delivery
following information should be given :Correct Answer
Information on identification of job , Reasons for delays
, Revised date of delivery
Your Answer
Reasons for delays , Revised date of delivery
Select The Blank
Question
Correct Answer
Your Answer
CPM is ________ oriented system.
Activity
Activity
Multiple Choice Single Answer
Question
One of the following is not consumable tool :Correct Answer
Arbors
Your Answer
Arbors
True/False
Question
LOB is a manual planning and scheduling technique
similar in nature to MRP [Material Resource Planning].
Correct Answer
True
Your Answer
False
Page 15
Production Planning & Control_8
Select The Blank
Question
________ is required when expediting fails to bring
deviated plan to its actual path.
Correct Answer
Replanning
Your Answer
Replanning
Multiple Choice Multiple Answer
Question
The process of contraction or compression involves extra
cost because extra money is required to be spent on factors such as :Correct Answer
Overtime engagement of workforce , Purchase of
additional machinery , Use of better materials
Your Answer
Overtime engagement of workforce , Purchase of
additional machinery , Purchase of stationary of good quality
Multiple Choice Single Answer
Question
In job production one single product is manufactured
while a batch of group of products is turned out at a time under a system of :Correct Answer
Batch production
Your Answer
Process production
Multiple Choice Multiple Answer
Question
The 'F' group of GOLF analysis involves following
requirements :Correct Answer
Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance
Your Answer
Search for foreign suppliers
Multiple Choice Single Answer
Question
The production system characterized by complex set of
activities that must be performed in a particular order within a given period
and within an estimated expenditure is known as :Correct Answer
Project production
Your Answer
Project production
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost
Page 16
Production Planning & Control_8
in :Correct Answer
Your Answer
Overtime cost
Overtime cost
Select The Blank
Question
________ is the specific instant of time that marks
start and end of activity.
Correct Answer
Event
Your Answer
Event
Select The Blank
Question
Overlapping of operations help to ________
manufacturing time.
Correct Answer
Reduce
Your Answer
Reduce
Multiple Choice Multiple Answer
Question
"Difficult" items have following attributes :Correct Answer
Available indigenously but are not easy to procure ,
Items which come from longer distance , Items which are difficult to
manufacture
Your Answer
Available indigenously but are not easy to procure ,
Items which come from longer distance , Items having complex specifications
Multiple Choice Multiple Answer
Question
They are type of analytical estimate :Correct Answer
Moving average , Exponential smothering , Curve fitting
Your Answer
Moving average , Curve fitting
Select The Blank
Question
The performance standard is required by ________ to
determine individual machine capacity for the purpose of machine loading
and assigning machine hours and man hours .
Correct Answer
Scheduler
Your Answer
Production engineer
Page 17
Production Planning & Control_8
Multiple Choice Multiple Answer
Question
The network analysis involves following works :Correct Answer
Obtaining a work breakdown structure to a set of
individual jobs which are arranged in a logical network. , Estimation of job
duration , Scheduling to discover which jobs control completion of project and
reallocation of resources.
Your Answer
Obtaining a work breakdown structure to a set of
individual jobs which are arranged in a logical network. , Estimation of job
duration , Scheduling to discover which jobs control completion of project and
reallocation of resources.
Multiple Choice Single Answer
Question
The assembly work content [ Wi ] of the i'th station
having n work stations is given by :Correct Answer
å Wi from i=1 to n
Your Answer
å Wi from i=1 to n
Multiple Choice Multiple Answer
Question
Essentials of good forecasts are :Correct Answer
Stability , Fairly accurate , Economical to generate
Your Answer
Stability , Fairly accurate , Economical to generate
True/False
Question
The 'G' group of GOLF analysis involves moderate
delivery time and availability of credit usually in the range of 30 to 60 days.
Correct Answer
True
Your Answer
True
Select The Blank
Question
ABC company manufactures MS bolts. Given fixed cost
Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost
Rs 0.5 Lacs, the total manufacturing cost would be Rs ________.
Correct Answer
6 Lacs
Your Answer
6 Lacs
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Page 18
Production Planning & Control_8
Multiple Choice Multiple Answer
Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher
material purchase
Your Answer Higher material purchase , Increase in labour productivity ,
Better utilization of equipment , Project margin
Select The Blank
Question To know the accumulated ________ for a given machine at a
given time Load charts are necessary.
Correct Answer Load
Your Answer Load
Multiple Choice Single Answer
Question LOB technique was developed by US navy in the year :Correct Answer 1958
Your Answer 1958
True/False
Question In continuous or process production , only one product is
manufactured.
Correct Answer True
Your Answer True
Select The Blank
Question ________reflects impact of money tied up in inventory.
Correct Answer Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question Methods for recording actual progress of work for shop orders
are :Correct Answer Progress card , Display board , Network updating
Your Answer Progress card , Display board , Network updating , Job card
Select The Blank
Question A progress card is the most ________ method of recording of
progress of work.
Correct Answer Convenient
Your Answer Convenient
Page 19
Production Planning & Control_8
Multiple Choice Multiple Answer
Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question The light engineering company has one special purpose facing &
centering machine And one copying lathe. The foreman has five work orders
for processing . The operation Sequence is fixed [ each job is first faced and
centered and then copy turned ] . The standard Hours required for each
machine to process each work order are shown in the following Table :- Work
Order Processing Time [Hours ] Facing & centering machine Copying Lathe I
16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize
requirements of machine hours.
Correct Answer IV-I-II-V-III
Your Answer I-II-III-IV-V
Select The Blank
Question ________ represents the time that elapses between the receipt of
requirement of job until the job is adopted in the production control
department.
Correct Answer Order preparation time
Your Answer Queue time
True/False
Question PERT basically does not demarcate between critical and
non-critical activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The assignment method is also called as :Correct Answer Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question Outside operations cost involves expenses such as :Page 20
Production Planning & Control_8
Correct Answer Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough blanking
Select The Blank
Question The correct fitting of orders with capacity considerably lessens
________ burden of control.
Correct Answer Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance , Account in foreign bank
Match The Following
Question Correct Answer Your Answer
Order quantity Factor influencing process planning Break even analysis
Machine capacity chart Dimensional accuracy Dimensional accuracy
Mass production Special purpose machines Special purpose machines
Standard elemental time data Compare alternative processes Factor
influencing process planning
Multiple Choice Multiple Answer
Question The tooling data is prepared in respect of following measuring
instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge ,
Drill bits
Multiple Choice Multiple Answer
Question In replenishment system, the fixed order quantity system is also
called by following names :Correct Answer Fixed order system , Min-max system , Re-order point
system
Page 21
Production Planning & Control_8
Your Answer Fixed order system , Min-max system , Re-order point system
, Lead time system
Multiple Choice Multiple Answer
Question How you will Judge the failure of production planning and
control department?
Correct Answer Frequent broken delivery promises , Underutilization of
men, machines , Excessive overtime
Your Answer Frequent broken delivery promises , Underutilization of men,
machines , Excessive overtime , Better coordination with other section
Multiple Choice Single Answer
Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic
Your Answer Inverse
True/False
Question Given stock in hand = 1320 units, safety stock=840 units and
average daily consumption = 60 units, the lead time available would be 10
hours.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question If the annual usage of a material is 1200 units and the reorder
point is at 120 Units, find the lead time.
Correct Answer 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question The assignment algorithm was developed by a Hungarian
mathematician named :Correct Answer D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question So far as possible, number of activities should be :Correct Answer Limited
Your Answer Limited
True/False
Question Production Planning and Control makes the supervisor ineffective.
Page 22
Production Planning & Control_8
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle
Your Answer Unit of capacity
True/False
Question The 'G' group of GOLF analysis involves moderate delivery time
and availability of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a
given time , Identify periods available for allocation in future to orders ,
Matching orders and loads
Your Answer Improving supply of material , To know the accumulated load
on a given machine at a given time , Identify periods available for allocation
in future to orders , Matching orders and loads
Select The Blank
Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac,
Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5
Lacs, the total manufacturing cost would be Rs ________.
Correct Answer 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question An inventory control system in which stock of item is physically or
conceptually divided into ________ bins is calledTwo bin system.
Correct Answer Two
Your Answer Pair
Multiple Choice Multiple Answer
Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer Moving average , Exponential smothering , Curve fitting ,
Opinion surveys
Page 23
Production Planning & Control_8
Multiple Choice Single Answer
Question For goods manufactured to stock, following department is
expected to periodically undertake replenishment action as stocks are
depleted :Correct Answer Production Planning Control
Your Answer Production
True/False
Question Random fluctuation is addition of cyclical fluctuation and
seasonal fluctuation.
Correct Answer False
Your Answer True
True/False
Question Scientific inventory control system requires to be followed for
machine aid, work aid and inspection aid :Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum
Your Answer Minimum
True/False
Question Purchase department must keep PPC informed regarding lead
time of different items specially where lead times are extended.
Correct Answer True
Your Answer True
True/False
Question In assignment matrix, it is a must to determine Jacobean of the
determinant.
Correct Answer False
Your Answer True
Select The Blank
Question For replenishment action for stock items which are reserved by
PPC, the stores work out ________ stock which equals the stock on hand less
stock reserved.
Correct Answer Free
Page 24
Production Planning & Control_8
Your Answer Net
Multiple Choice Single Answer
Question What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer Consistent good quality of products
Match The Following
Question Correct Answer Your Answer
End piece allowance Material insufficient to produce one piece Material
insufficient to produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to meet
requirement of spares
Machining allowance Extra material requirement Extra material
requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question PPC is expected to have good inter-departmental relationships to
achieve the production targets. Which is the most important factor that shall
affect production targets?
Correct Answer Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question Generally for ________ flow system, Heuristic method is
preferred.
Correct Answer Intermittent
Your Answer Continuous
Select The Blank
Question In control board________ compartment contains copy of work
Page 25
Production Planning & Control_8
orders/shop orders of the item to be processed next on the machine.
Correct Answer Middle
Your Answer Bottom
True/False
Question Work measurement function is attached to line management.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question The technical feasibility of sales enquiry is carried out on the
following grounds :Correct Answer Tools and plants are available , Technical know how is
available , Competent persons are present
Your Answer Tools and plants are available , Technical know how is
available , Competent persons are present , Cost data of raw material is
available.
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
Following are the factors which influence tool life :Correct Answer
Operators efficiency , Type of tool , Material it is
required to operate upon
Your Answer
Operators efficiency , Type of tool , Material it is
required to operate upon
Multiple Choice Single Answer
Question
The document which incorporates details of process
planning for a job is called :Correct Answer
Route Sheet
Your Answer
Route Sheet
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct Answer
Arrow diagram , Nodes , Float
Your Answer
Arrow diagram , Nodes
Page 26
Production Planning & Control_8
Select The Blank
Question
Correct Answer
Your Answer
Forecasting is function of ________.
Marketing department
Planning in charge
Select The Blank
Question
Johnsons method of scheduling can be used when
operation sequence involve ________ machines.
Correct Answer
Two
Your Answer
Two
Select The Blank
Question
Good quality and ________are the two main
requirements to secure maximum business from a customer.
Correct Answer
Competitive rates
Your Answer
Competitive rates
Select The Blank
Question
Sum of queue, transit, order preparation and
manufacturing times is known as ________
Correct Answer
Total Lead Time
Your Answer
Total Lead Time
True/False
Question
To conduct FSN analysis we require, last date of receipt
or last date of issue whichever is later and period.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Overtime can be avoided in many ways and they are :Correct Answer
Unrealistic delivery date , Acceptance of too many rush
order , Excessive machine breakdown
Your Answer
Unrealistic delivery date , Acceptance of too many rush
order , Excessive machine breakdown
Page 27
Production Planning & Control_8
Multiple Choice Multiple Answer
Question
Material control function embraces a following
techniques :Correct Answer
Make -or -buy decision , Pareto's analysis ,
Replenishment system
Your Answer
Make -or -buy decision , Pareto's analysis ,
Replenishment system
True/False
Question
Work measurement is not useful for choosing between
two alternate methods of production.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Process Sheet contains following information :Correct Answer
Material Specification , Sequence of operation , Skill of
Labour
Your Answer
Material Specification , Sequence of operation , Skill of
Labour
True/False
Question
More than one subcontractor should be developed for
each subcontracted operation/Job.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Classification of items on basis of their capital lock up is
called ________ analysis.
Correct Answer
XYZ
Your Answer
XYZ
Select The Blank
Question
Purchase section must keep ________posted on the
progress of purchase orders and expected delays.
Page 28
Correct Answer
Your Answer
Production Planning & Control_8
P.P.C.
P.P.C.
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce
investment in inventories effectively :Correct Answer
By proper coordination between shop floor, stores and
buying department
Your Answer
By proper coordination between shop floor, stores and
buying department
True/False
Question
fluctuation.
Correct Answer
Your Answer
True/False
Question
each other.
Correct Answer
Your Answer
True/False
Question
time.
Correct Answer
Your Answer
Select The Blank
Question
using ________.
Correct Answer
Your Answer
Fluctuation due to changes in season are called cyclical
False
False
Flexibility and product variety are not inter-related with
False
True
Overlapping of operations help to reduce manufacturing
True
True
The LOB technique is made more accurate and fast by
Computers
Reduction techniques
True/False
Page 29
Production Planning & Control_8
Question
Overtime is undesirable since it increases
manufacturing cost of the product.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
The essential features of batch production are :Correct Answer
General purpose machines and process type layout ,
Manual materials handling , Flexibility of production schedule
Your Answer
General purpose machines and process type layout ,
Manual materials handling , Flexibility of production schedule
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct Answer
Medium
Your Answer
Few
Multiple Choice Single Answer
Question
Dispatcher withdraws required quantity of material
from stores using following document :Correct Answer
Stores issue order
Your Answer
Bill of material
Multiple Choice Multiple Answer
Question
In a mass production assembly shop following work
measurement techniques are used :Correct Answer
Time study , Work sampling , Production study
Your Answer
Time study , Work sampling , Production study ,
Analytical estimating
Multiple Choice Multiple Answer
Question
SDE analysis is based on problems of procurement
namely :Correct Answer
Non-availability , Scarcity , Longer lead time
Your Answer
Non-availability , Scarcity , Longer lead time
Page 30
Production Planning & Control_8
True/False
Question
Correct Answer
Your Answer
Line balancing is a simulation technique.
False
False
Multiple Choice Multiple Answer
Question
The line of balance is a device for planning and
monitoring progress of :Correct Answer
Purchase order execution , Project execution , Targeted
programs
Your Answer
Purchase order execution , Project execution , Targeted
programs
Select The Blank
Question
Correct Answer
Your Answer
Sales persons decides ________.
Synthetic forecast
Current sales
True/False
Question
Material control Card is a document for record of issues
of material and receipt of unused material by production shop.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Work measurement is limited to measuring :Correct Answer
Productive & non productive time
Your Answer
Only product related activities
Match The Following
Question Correct Answer
Your Answer
Move order
Transport material from and to required work centers
Transport material from and to required work centers
Materials Order
Allocation of material required in connection with shop
order
Allocation of material required in connection with shop order
Page 31
Production Planning & Control_8
Work Order
Bird's eye view of production programme Bird's eye
view of production programme
Production Order
Reserve material required in connection with sales order
Reserve material required in connection with sales order
Multiple Choice Multiple Answer
Question
The software for line balancing should have following
features :Correct Answer
Easy to operate , Easy to install , Easy to upgrade
Your Answer
Easy to operate , Easy to install , Unmanaged code
should be available
Multiple Choice Single Answer
Question
Man hours is commonly used unit of measurement for
scheduling purposes in following industry :Correct Answer
Engineering
Your Answer
Engineering
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following
reasons :Correct Answer
Gives us work , Dividends to share holders , Gets
business from new customers
Your Answer
Gives us work , Dividends to share holders , Gets
business from new customers
Multiple Choice Single Answer
Question
The 4X4 assignment problem involve following
job-machine operations :Correct Answer
24
Your Answer
24
Multiple Choice Single Answer
Question
The best of scientific tools available for scheduling is :Page 32
Correct Answer
Your Answer
Production Planning & Control_8
CPA [ critical path analysis ]
Gantt Chart
Multiple Choice Multiple Answer
Question
Work measurement is responsibility of :Correct Answer
PPC , Industrial Engineering , Production department
Your Answer
PPC , Industrial Engineering
Match The Following
Question Correct Answer
Your Answer
Long production run Mass and Flow production
production
Mass and Flow
Complex activities to be performed in a particular order within a give time &
estimate. Project production Project production
One or few units manufactured as per customers requirement Jobbing
Production
Jobbing Production
Short production run
Batch Production
Batch Production
Multiple Choice Single Answer
Question
Value Analysis conducted in 'C' type of material is
usually :Correct Answer
Minimum
Your Answer
Minimum
Multiple Choice Multiple Answer
Question
Some of significant features of HML analysis are :Correct Answer
To evolve buying policies to control purchases , To
delegate authorities to different buyers to make petty cash purchases , Not to
take consumption into account
Your Answer
To evolve buying policies to control purchases , To
delegate authorities to different buyers to make petty cash purchases
Page 33
Production Planning & Control_8
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed
by inefficient P.P.C.?
Correct Answer
Failure to provide proper tools and control on work in
progress on shop floor
Your Answer
Failure to provide proper tools and control on work in
progress on shop floor
Multiple Choice Single Answer
Question
The administrative expenses towards the procurement
of materials is called :Correct Answer
Procurement cost
Your Answer
Administrative cost
Multiple Choice Multiple Answer
Question
Smoothing performs following activities:Correct Answer
Reallocation of resources , Improving utilization of
resources , Conducting Heuristic approach
Your Answer
Reallocation of resources , Improving utilization of
resources , Conducting Heuristic approach
True/False
Question
As per a study on materials management practices, a
typical firm spends almost half of its rupee sales on goods purchased from
vendors.
Correct Answer
True
Your Answer
True
Select The Blank
Question
inadvisable.
Correct Answer
Your Answer
True/False
Question
Correct Answer
Value analysis of ________ class items is usually
C
C
PPC system in the organisation is to be tailor made.
True
Page 34
Your Answer
Production Planning & Control_8
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Performance benchmarking does not involves
comparison of financial ratios at the aggregate level.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Setup time includes :Correct Answer
Internal setup time & External setup time
Your Answer
Internal setup time & External setup time
Multiple Choice Single Answer
Question
Participants of the groups for quality circles should be
decided by :Correct Answer
Employees coming together by their own enthusiasm
Your Answer
Employees coming together by their own enthusiasm
Multiple Choice Single Answer
Question
Check sheet are also used as :Correct Answer
Data gathering & interpretation tool
Your Answer
Data gathering & interpretation tool
Multiple Choice Single Answer
Question
SMED means :Correct Answer
Single minute exchange of dies
Your Answer
Single minute exchange of dies
Match The Following
Question Correct Answer
Your Answer
Page 35
Production Planning & Control_8
Productivity performance measurement Turnover employee Cost of
quality
Financial performance measurement
months
Sales of the months Sales of the
Customer satisfaction measurement
Customer complaints per period
Customer complaints per period
Staff attitude measurement
satisfaction index
Select The Blank
Question
Correct Answer
Your Answer
Employee satisfaction index
Employee
________ is an effect due to the muda of defect.
Wear & tear of parts while disassembling
Poor production planning & control
Select The Blank
Question
If some defective parts are discovered by the subsequent
process they should be returned to the ________ to prevent reoccurrence.
Correct Answer
Preceding process
Your Answer
Return to stores
Multiple Choice Multiple Answer
Question
The results oriented efforts of the quality circle should
also include :Correct Answer
Efforts to avoid the problem permanently , Ultimate aim
of the customers satisfaction , Attacking the real root causes & all possibilities
Your Answer
Efforts to avoid the problem permanently , Publication
or advertisement of your contribution , Attacking the real root causes & all
possibilities
Match The Following
Question Correct Answer
Your Answer
Parato diagram always indicates
Magnitude of defects Philosophy of
20% of the activity causes 80% of the effect
Page 36
Production Planning & Control_8
Parato analysis underlines & operates on Philosophy of "vital few:trivial
many"
Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging
data according to the descending order of their frequency of occurrence
Arranging data according to the descending order of their frequency of
occurrence
Parato diagram is a Bar graph with height or value drawn by Arranging
data in descending order
Magnitude of defects
Multiple Choice Multiple Answer
Question
Few steps in construction in Radar chart are :Correct Answer
Brainstorming to enlist characteristics which require to
be evaluated & draw the circle & divide it into 'slices' equal to number of
characteristics , The first slice begins at 12 noon. Then draw vertical line &
calibrate it equal to the number of levels required , Draw concentric circles
from each gradiation using 'o' point as centre
Your Answer
Brainstorming to enlist characteristics which require to
be evaluated & draw the circle & divide it into 'slices' equal to number of
characteristics , The first slice begins at 12 noon. Then draw vertical line &
calibrate it equal to the number of levels required , Draw concentric circles
from each gradiation using 'o' point as centre
Select The Blank
Question
Correct Answer
Your Answer
5 S audit result is discussed in ________ meeting.
Monthly
Monthly
True/False
Question
Correct Answer
Your Answer
Fishbone analysis is used both in analysis & planning.
True
False
Multiple Choice Single Answer
Question
One Green Belt may head a team of :Page 37
Correct Answer
Your Answer
Production Planning & Control_8
20 employees
20 employees
Multiple Choice Multiple Answer
Question
Role of champions are :Correct Answer
Approve six sigma projects , Remove road block in the
path of six sigma implementation , Monitor progress of six sigma projects
Your Answer
Monitor progress of six sigma projects , Approve six
sigma projects , Remove road block in the path of six sigma implementation
Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative
of homogeneous segment of production for which :Correct Answer
The items of the sample should be from the same
machine setting , The items should be of the same batch , Items should be
made from the same raw material batch
Your Answer
The items of the sample should be from the same
machine setting , The items should be of the same batch , Items should be
made from the same raw material batch
Multiple Choice Single Answer
Question
Failure mode and effect analysis (FMEA) establish
Correct Answer
Process failure and minimize frequency
Your Answer
Process failure and minimize frequency
Multiple Choice Multiple Answer
Question
What are the steps in deciding the benchmarking
partner?
Correct Answer
Decide level of benchmarking , List down a few
prospective candidates of partnership , Collect information of short listed
partners
Your Answer
Decide level of benchmarking , List down a few
prospective candidates of partnership , Collect information of short listed
partners
Multiple Choice Single Answer
Question
One Master Black Belt may head a team of :Page 38
Correct Answer
Your Answer
Production Planning & Control_8
15-20 Black Belts
15-20 Black Belts
Multiple Choice Single Answer
Question
Competitive benchmarking involves identifying key
competitive product, services or processes & comparing with those of :Correct Answer
Main competitor
Your Answer
Main competitor
Multiple Choice Single Answer
Question
Implication of Quality problem is:Correct Answer
Gap in performance
Your Answer
Gap in performance
Select The Blank
Question
Number of defects in an individual component, like gear,
shaft, wheel etc can be monitored through ________ type of control chart.
Correct Answer
c-chart
Your Answer
c-chart
True/False
Question
Non-availability of files /document in time is a problem
to be addressed by office TPM.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :Correct Answer
Simplest tool
Your Answer
Simplest tool
Multiple Choice Single Answer
Question
Benchmarking helps to identify the gap between the
current performance of the organization and the :Correct Answer
Performance of the best organization
Your Answer
Performance of the best organization
Page 39
Production Planning & Control_8
True/False
Question
Flow chart is pictorial representation of the steps in
production control.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Breakdown problem may be stratified by :Correct Answer
Sections , Machines , Type of breakdown (e.g mech. Or
electrical)
Your Answer
Sections , Machines , Type of breakdown (e.g mech. Or
electrical)
Select The Blank
Question
A control chart to exhibit counted data on number of
defect is called ________.
Correct Answer
c-chart
Your Answer
c-chart
Select The Blank
Question
Procedure for implementation of TPM consists of
________ numbers of steps.
Correct Answer
12
Your Answer
8
Select The Blank
Question
Correct Answer
Your Answer
Capability index Cp = ________
Specification width/process width
Specification width/process width
Multiple Choice Single Answer
Question
Pareto's analysis underlines & operates philosophy of :Correct Answer
Vital few = trivial many
Your Answer
Vital few = trivial many
Page 40
Production Planning & Control_8
True/False
Question
Kanban signals are required when assembly work,
subassembly work and manufacturing at parts is carried out at different
locations.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
To reduce clamping & declamping time, following
actions are desirable :Correct Answer
Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping device
Your Answer
Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping device
Select The Blank
Question
Benchmarking allows exchange of ________ between
the benchmarking partners.
Correct Answer
Information
Your Answer
Information
Multiple Choice Multiple Answer
Question
TQM can never flourish if the staff are:Correct Answer
Worried about losing jobs , Afraid of being reprimanded
if there are mistakes , Scared of their bosses
Your Answer
Worried about losing jobs , Afraid of being reprimanded
if there are mistakes , Scared of their bosses
True/False
Question
Correct Answer
Your Answer
In bar graph each bar is of same height.
False
False
Multiple Choice Multiple Answer
Question
During SMED implementation, primary study consists
of :Page 41
Production Planning & Control_8
Correct Answer
Equipment analysis , Setup change analysis ,
Preparation items (storage place , method) analysis
Your Answer
Equipment analysis , Setup change analysis ,
Preparation items (storage place , method) analysis
True/False
Question
Daily work management can also be extended to non
manufacturing areas like procurement, QA, HRD etc.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :Correct Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :Correct Answer
Improve quality
Your Answer
Save time
True/False
Question
Along with problem solving tools experience and
judgment is also used.
Correct Answer
True
Your Answer
False
Select The Blank
Question
JIT advocates the philosophy at elimination of waste
from system which occurs due to ________.
Correct Answer
Over Production
Your Answer
Over Production
True/False
Question
set.
Without measuring initial performance, target can't be
Page 42
Correct Answer
Your Answer
Production Planning & Control_8
True
False
Multiple Choice Multiple Answer
Question
An erratic patterns falling above & below the control
limits indicates :Correct Answer
Defect in materials , Frequent adjustment of machines ,
Poorly trained operators
Your Answer
Defect in materials , Frequent adjustment of machines ,
Poorly trained operators
True/False
Question
Sample size for the construction of p-chart are larger
than X bar-R chart.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Histogram is an important diagnostic tool. Analysis of
the histogram gives :Correct Answer
It shows cause which affects the process , An idea of
what is happening to the process , Whether the process is capable of meeting
process or not i.e. around correct average & within specific limits
Your Answer
An idea of what is happening to the process , Whether
the process is capable of meeting process or not i.e. around correct average &
within specific limits , A bird's eye view of the variation
Multiple Choice Single Answer
Question
Productivity improves by :Correct Answer
Voluntary participants of everyone
Your Answer
Voluntary participants of everyone
N
Page 43
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
The activities such as preparation of estimates of tools, gauges, measuring instruments,
follow up with tool room, periodic replenishment are grouped under :Correct Answer Tool controls
Your Answer
Tool controls
Multiple Choice Single Answer
Question
Break light is essential for an automobile from safety point of view. However, the vehicle
can be driven even in absence of break light. Thus break light can be categorized as :Correct Answer Essential
Your Answer
Essential
Multiple Choice Single Answer
Question
Given a decision for designing a line layout, major problem is subdividing a work so that
smooth flow can result. The subdivision process is called :Correct Answer Line balancing
Your Answer
Line of balance
True/False
Question
As per a study on materials management practices, a typical firm spends almost half of its
rupee sales on goods purchased from vendors.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
Labour efficiency depends upon ________
Correct Answer Training and experience
Your Answer
Training and experience
Match The Following
Question
Correct Answer
Your Answer
Work element
Smallest portion of work identified Smallest portion of work identified
during the breakdown analysis of during the breakdown analysis of
the job.
the job.
Production line
Arrangement of workstations
where each workman performs a
Arrangement of workstations where
each workman performs a pre-
3rd Sem Operations – Production Planning and Control
1
pre-determined task on an
incomplete unit which passes
down the line of subsequent unit
until it is finished.
determined task on an incomplete
unit which passes down the line of
subsequent unit until it is finished.
Work Station
Assigned location, zone, place or
stage in assembly where
designated work is performed on
part component of product.
Assigned location, zone, place or
stage in assembly where
designated work is performed on
part component of product.
Station work content
Time required to perform the
designated amount of work at a
given work station and is obtained
by adding up time of work
elements allotted to the work
station.
Time required to perform the
designated amount of work at a
given work station and is obtained
by adding up time of work elements
allotted to the work station.
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying department
Your Answer
By proper coordination between shop floor, stores and buying department
Select The Blank
Question
In the assignment model, the________ is formed between jobs and machines.
Correct Answer Matrix
Your Answer
Matrix
True/False
Question
To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of
operations. Each job must be processed first on machine A and then on machine B in a
fixed sequence AB.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Let us suppose that activity P & Q can not start until activity R& S are completed.
Activities P &Q are therefore :Correct Answer Succeeding
Your Answer
Preceding
Multiple Choice Multiple Answer
Question
What is meant by production control?
Correct Answer Control is seeing that the requirements are made available at the right place and right
quantities , Reporting back the progress to the production planning , Control involves
suggesting action when the jobs is falling behind schedule
Your Answer
Control is seeing that the requirements are made available at the right place and right
quantities , Reporting back the progress to the production planning , Control involves
suggesting action when the jobs is falling behind schedule
3rd Sem Operations – Production Planning and Control
2
Multiple Choice Multiple Answer
Question
The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database
Your Answer
Algorithms , Program code , Database
Multiple Choice Single Answer
Question
The assignment method is also called as :Correct Answer Hungarian Method
Your Answer
Hungarian Method
True/False
Question
A buyer has little or no control over a lead time.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Customer's orders gives us work
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed by inefficient P.P.C.?
Correct Answer Failure to provide proper tools and control on work in progress on shop floor
Your Answer
Failure to provide proper tools and control on work in progress on shop floor
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'C' type of items is :Correct Answer Few
Your Answer
Few
Multiple Choice Multiple Answer
Question
The features of program plan are as follows :Correct Answer Each row of activities is associated with one component of final assembly. , Final
completion date is zero , Time scale runs from right to left
Your Answer
Time scale runs from right to left , Program plan is prepared in form of mathematical
model. , Final completion date is zero
Multiple Choice Multiple Answer
Question
Failure to identify accumulated load on a given machine at a given time and identify
periods available for allocation of future orders leads to
3rd Sem Operations – Production Planning and Control
3
Correct Answer Delays in delivery , High overtime payment , Broken promises
Your Answer
Delays in delivery , High overtime payment , Higher rejections/rework
True/False
Question
A manufacturing firm in the present days have virtually no control on their profits
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers
Your Answer
Gives us work , Dividends to share holders , Gets business from new customers , Set the
wheel of our production rolling
True/False
Question
If customers orders often get completed ahead of the schedule, it is a sign of good
scheduling.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost
Your Answer
Overtime cost
Multiple Choice Multiple Answer
Question
Subcontracting department works under :Correct Answer Planning , Purchase , Production
Your Answer
Planning , Purchase , Production
Select The Blank
Question
Given total work content as 370 and maximum allowable cycle time to be 90 seconds, the
theoretical number of work stations would be ________.
Correct Answer 4.11
Your Answer
4.11
Select The Blank
Question
Orders with ________ slack time remaining per operation are run first.
Correct Answer Shortest
Your Answer
Shortest
3rd Sem Operations – Production Planning and Control
4
Multiple Choice Single Answer
Question
If total lead time of certain item is 30 days and lead time of operations completed is 6
days, the lead time required [ LTR ] would be :Correct Answer 24
Your Answer
24
Select The Blank
Question
The performance standard is required by ________ to determine individual machine
capacity for the purpose of machine loading and assigning machine hours and man hours
.
Correct Answer Scheduler
Your Answer
Industrial engineer
Select The Blank
Question
At each ________, work is performed on a product either by adding parts or by
completing assembly operations.
Correct Answer Work station
Your Answer
Work station
Multiple Choice Single Answer
Question
Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box
Your Answer
Placed in a tray/box
True/False
Question
PERT finds applications where resources [ men, materials and money ] are always made
available as and when required.
Correct Answer True
Your Answer
True
Select The Blank
Question
Rational figure on utilization index can be obtained by carrying out ________ study.
Correct Answer Work- sampling
Your Answer
Work- sampling
True/False
Question
EOQ is that quantity at which price paid by buyer is minimum.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
3rd Sem Operations – Production Planning and Control
5
Question
Keeping available time per day constant, if the desired production rate per day is to be
doubled ,cycle time will be reduced by :Correct Answer 0.5
Your Answer
0.5
Multiple Choice Multiple Answer
Question
To prepare load chart following job related information should be collected :Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand
Your Answer
Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand
Select The Blank
Question
Job production requires ________ capital investment.
Correct Answer Lowest
Your Answer
Largest
Multiple Choice Multiple Answer
Question
The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision
Your Answer
Continuous flow of material , Low skilled labour , Easy supervision
Select The Blank
Question
________ represents productive time of the job.
Correct Answer Manufacturing time
Your Answer
Manufacturing time
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct Answer Arrow diagram , Nodes , Float
Your Answer
Arrow diagram , Nodes , Float
Multiple Choice Single Answer
Question
The Follow up required for early delivery in case of 'B' types of items is usually :Correct Answer Periodic
Your Answer
Periodic
Match The Following
Question
Correct Answer
Your Answer
3rd Sem Operations – Production Planning and Control
6
Job splitting
Dividing job in more than one lot
Dividing job in more than one lot
Change in priority
Shift equipment/workmen to
delayed jobs
Shift equipment/workmen to
delayed jobs
Alternate routing
Processing on costlier machine
Running jobs on one machine
sequentially
Overlapping
Running jobs simultaneously on
more than one machine
Running jobs simultaneously on
more than one machine
Multiple Choice Single Answer
Question
The event is graphically represented by :Correct Answer Circle
Your Answer
Circle
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium
Your Answer
Medium
Select The Blank
Question
________ analysis is based on consumption figures of an item.
Correct Answer FSN
Your Answer
ABC
True/False
Question
Purchase department must keep PPC informed regarding lead time of different items
specially where lead times are extended.
Correct Answer True
Your Answer
True
True/False
Question
More than one subcontractor should be developed for each subcontracted operation/Job.
Correct Answer True
Your Answer
True
2nd Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material
purchase
3rd Sem Operations – Production Planning and Control
7
Your Answer Higher material purchase , Increase in labour productivity , Better
utilization of equipment , Project margin
Select The Blank
Question To know the accumulated ________ for a given machine at a given time
Load charts are necessary.
Correct Answer Load
Your Answer Load
Multiple Choice Single Answer
Question LOB technique was developed by US navy in the year :Correct Answer 1958
Your Answer 1958
True/False
Question In continuous or process production , only one product is manufactured.
Correct Answer True
Your Answer True
Select The Blank
Question ________reflects impact of money tied up in inventory.
Correct Answer Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating
Your Answer Progress card , Display board , Network updating , Job card
Select The Blank
Question A progress card is the most ________ method of recording of progress
of work.
Correct Answer Convenient
Your Answer Convenient
Multiple Choice Multiple Answer
Question Following are some of the common standard cutting tools : Correct Answer Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question The light engineering company has one special purpose facing &
centering machine And one copying lathe. The foreman has five work orders for
processing . The operation Sequence is fixed [ each job is first faced and centered
and then copy turned ] . The standard Hours required for each machine to process
each work order are shown in the following Table :- Work Order Processing Time
[Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15
16 V 25 12 find sequence to minimize requirements of machine hours.
Correct Answer IV-I-II-V-III
Your Answer I-II-III-IV-V
Select The Blank
Question ________ represents the time that elapses between the receipt of
requirement of job until the job is adopted in the production control department.
3rd Sem Operations – Production Planning and Control
8
Correct Answer Order preparation time
Your Answer Queue time
True/False
Question PERT basically does not demarcate between critical and non-critical
activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The assignment method is also called as :Correct Answer Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough blanking
Select The Blank
Question The correct fitting of orders with capacity considerably lessens ________
burden of control.
Correct Answer Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance , Account in foreign bank
Match The Following
Question Correct Answer Your Answer
Order quantity Factor influencing process planning Break even analysis
Machine capacity chart Dimensional accuracy Dimensional accuracy
Mass production Special purpose machines Special purpose machines
Standard elemental time data Compare alternative processes Factor influencing
process planning
Multiple Choice Multiple Answer
Question The tooling data is prepared in respect of following measuring
instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits
Multiple Choice Multiple Answer
Question In replenishment system, the fixed order quantity system is also called
by following names :Correct Answer Fixed order system , Min-max system , Re-order point system
Your Answer Fixed order system , Min-max system , Re-order point system , Lead
time system
Multiple Choice Multiple Answer
3rd Sem Operations – Production Planning and Control
9
Question How you will Judge the failure of production planning and control
department?
Correct Answer Frequent broken delivery promises , Underutilization of men,
machines , Excessive overtime
Your Answer Frequent broken delivery promises , Underutilization of men,
machines , Excessive overtime , Better coordination with other section
Multiple Choice Single Answer
Question In Cost Vs Quantity plot, the total inventory Cost curve is : Correct Answer Parabolic
Your Answer Inverse
True/False
Question Given stock in hand = 1320 units, safety stock=840 units and average
daily consumption = 60 units, the lead time available would be 10 hours.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question If the annual usage of a material is 1200 units and the reorder point is
at 120 Units, find the lead time.
Correct Answer 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question The assignment algorithm was developed by a Hungarian mathematician
named :Correct Answer D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question So far as possible, number of activities should be :Correct Answer Limited
Your Answer Limited
True/False
Question Production Planning and Control makes the supervisor ineffective.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle
Your Answer Unit of capacity
True/False
Question The 'G' group of GOLF analysis involves moderate delivery time and
availability of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time
, Identify periods available for allocation in future to orders , Matching orders and
loads
Your Answer Improving supply of material , To know the accumulated load on a
given machine at a given time , Identify periods available for allocation in future to
orders , Matching orders and loads
3rd Sem Operations – Production Planning and Control
10
Select The Blank
Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac,
Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the
total manufacturing cost would be Rs ________.
Correct Answer 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question An inventory control system in which stock of item is physically or
conceptually divided into ________ bins is calledTwo bin system.
Correct Answer Two
Your Answer Pair
Multiple Choice Multiple Answer
Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer Moving average , Exponential smothering , Curve fitting , Opinion
surveys
Multiple Choice Single Answer
Question For goods manufactured to stock, following department is expected to
periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control
Your Answer Production
True/False
Question Random fluctuation is addition of cyclical fluctuation and seasonal
fluctuation.
Correct Answer False
Your Answer True
True/False
Question Scientific inventory control system requires to be followed for machine
aid, work aid and inspection aid :Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum
Your Answer Minimum
True/False
Question Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer True
Your Answer True
True/False
Question In assignment matrix, it is a must to determine Jacobean of the
determinant.
Correct Answer False
Your Answer True
Select The Blank
Question For replenishment action for stock items which are reserved by PPC, the
stores work out ________ stock which equals the stock on hand less stock reserved.
Correct Answer Free
3rd Sem Operations – Production Planning and Control
11
Your Answer
Net
Multiple Choice Single Answer
Question What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer Consistent good quality of products
Match The Following
Question Correct Answer Your Answer
End piece allowance Material insufficient to produce one piece Material insufficient to
produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to meet
requirement of spares
Machining allowance Extra material requirement Extra material requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question PPC is expected to have good inter-departmental relationships to achieve
the production targets. Which is the most important factor that shall affect
production targets?
Correct Answer Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question Generally for ________ flow system, Heuristic method is preferred.
Correct Answer Intermittent
Your Answer Continuous
Select The Blank
Question In control board________ compartment contains copy of work
orders/shop orders of the item to be processed next on the machine.
Correct Answer Middle
Your Answer Bottom
True/False
Question Work measurement function is attached to line management.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question The technical feasibility of sales enquiry is carried out on the following
grounds :Correct Answer Tools and plants are available , Technical know how is available ,
Competent persons are present
Your Answer Tools and plants are available , Technical know how is available ,
Competent persons are present , Cost data of raw material is available.
3rd Copy
3rd Sem Operations – Production Planning and Control
12
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
Which is the most appropriate type of alliance which the new companies often
overestimate?
Correct Answer Joint-venture
Your Answer
Joint-venture
True/False
Question
The financial structure is not one of the five channels of corporate governance.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
The different types of motivators would be
Correct Answer Positive , External , Financial
Your Answer
Positive , Financial
Multiple Choice Multiple Answer
Question
The different components of EQ would be
Correct Answer Self-awareness , Emotional management , empathy
Your Answer
Self-awareness , Emotional management , empathy
Multiple Choice Multiple Answer
Question
Most Indian business houses go for restructuring exercise, through,
Correct Answer Demerger , Merger , Takeover
Your Answer
Competitor , Merger , Takeover
Multiple Choice Single Answer
Question
What is that the consultant must be able to recognise about the client's future needs ?
Correct Answer Vision
Your Answer
Vision
Multiple Choice Single Answer
Question
Which among the following is a component of planning ?
Correct Answer Rules
Your Answer
Rules
Multiple Choice Multiple Answer
3rd Sem Operations – Production Planning and Control
13
Question
The external environmental factors that influence management are
Correct Answer Economic , Political , Technological
Your Answer
Economic , Political
Multiple Choice Single Answer
Question
Who said, “Management is the creation and maintenance of internal environment in an
enterprise, where individuals working in groups can perform efficiently and effectively
towards the attainment of gr
Correct Answer Koontz & O ‘Donell
Your Answer
Koontz & O ‘Donell
Select The Blank
Question
The service sector has expanded because of the virtual stagnation of the________sector.
Correct Answer agricultural
Your Answer
agricultural
True/False
Question
Professional management signifies separation of ownership and management.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
The functions of the board of directors are
Correct Answer succession planning , establishing performance standards , determination of board policies
Your Answer
succession planning , establishing performance standards , determination of board policies
Select The Blank
Question
A rule governing Indian companies states that policy holder's funds must be________only
in India.
Correct Answer invested
Your Answer
invested
Multiple Choice Multiple Answer
Question
Any morale improvement programme of management must embrace the following rules.
Correct Answer Respect individual , Be fair and just , Encourage initiative
Your Answer
Respect individual , Be fair and just , Encourage initiative
True/False
Question
W.Edward Deming introduced quality control in Japan.
3rd Sem Operations – Production Planning and Control
14
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
EQ is born largely in the neurotransmitters if the brains limbic system that governs
Correct Answer drives , impulses , feelings
Your Answer
impulses , feelings , drives
Multiple Choice Single Answer
Question
There are six methods of giving orders, like mutual effort, open order, volunteers the other
three are
Correct Answer Command, power, suggestion
Your Answer
Command, request, suggestion
Select The Blank
Question
Services need efficient________, transport roads and power just as much as industry and
agriculture.
Correct Answer telecom
Your Answer
system
True/False
Question
Management consultants do not assist implementation.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Features of direction would be
Correct Answer Pervasive function , Communication , Continuous process
Your Answer
Pervasive function , Communication , Continuous process
Select The Blank
Question
________ says you are the product of your past and you are bound by past activities.
Correct Answer Law of destiny
Your Answer
Law of destiny
True/False
Question
Morale is the sum total of various physical qualities.
Correct Answer False
Your Answer
False
3rd Sem Operations – Production Planning and Control
15
Multiple Choice Single Answer
Question
The philosophy of Vedanta is compared to which animal in the dream of the person, who
wakes the dreamer and makes you realise your self discovered reality.
Correct Answer Lion
Your Answer
Lion
Multiple Choice Single Answer
Question
Who said, “Management is a multiple organ that manages a business, manages a manager
and manages workers and work”?
Correct Answer Peter Drucker
Your Answer
Peter Drucker
Multiple Choice Single Answer
Question
One of the internal environment factors that influences management is
Correct Answer Place
Your Answer
Place
Select The Blank
Question
Latest approach signifies organization has a part of ________ system.
Correct Answer Social
Your Answer
Social
Multiple Choice Single Answer
Question
Which among the following is a general management challenge in the insurance sector?
Correct Answer Training
Your Answer
Training
True/False
Question
Learning organizations should imitate a task force.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
If SBU's are formed, managers tend to be closer to
Correct Answer customers
Your Answer
customers
Match The Following
3rd Sem Operations – Production Planning and Control
16
Question
Correct Answer
Organization as a structure of
authority
This is created out of responsibility This is created out of responsibility
and accountability structure
and accountability structure
Organization as an establishment
This is regarded as the physical
aspect of an enterprise
Organization as a corporate citizen This is regarded as the social
aspect of an organization
Organization as a relationship
Your Answer
This is regarded as the physical
aspect of an enterprise
This is regarded as the social
aspect of an organization
This is more related with the formal This is more related with the formal
and informal relationships
and informal relationships
Select The Blank
Question
The statement "We sell for Less" is deliberately ambiguous, it raises the question; 'Less
than what', this is called as, ________ to communication.
Correct Answer Semantic barrier
Your Answer
Semantic barrier
Select The Blank
Question
Events are occurrences designed for ________ interests.
Correct Answer marketing
Your Answer
marketing
Select The Blank
Question
One of the earlier users of this strategic business unit was ________.
Correct Answer General Electrical Co.
Your Answer
General Electrical Co.
True/False
Question
Vision without mission is incomplete and mission without vision is meaningless.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Who said, “Management is management of Men, Money, Machinery Materials and
Information?”
Correct Answer Anonymous
Your Answer
Anonymous
Multiple Choice Multiple Answer
Question
Organizing is defined in different ways, viz.
Correct Answer Process , Relationship , Corporate citizen
Your Answer
Process , Relationship , Corporate citizen
3rd Sem Operations – Production Planning and Control
17
Match The Following
Question
Correct Answer
W.Edward Deming
Introduced quality control in Japan Introduced quality control in Japan
Henry Fayol
Referred to as 'The father of
modern management theory'
Referred to as 'The father of modern
management theory'
Federick W.Taylor
Referred to as 'The father of
scientific management'
Referred to as 'The father of
scientific management'
Vilfredo Pareto
Referred to as 'The father of the
social systems approach' to
organization and management
Referred to as 'The father of the
social systems approach' to
organization and management
Your Answer
True/False
Question
Focus on savings and high bargaining interests of the consumer is an obstacle in retail
development in India.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Limitation of control are
Correct Answer external factors , fixing of responsibility , variation and its causes
Your Answer
external factors , fixing of responsibility , variation and its causes
Multiple Choice Single Answer
Question
How many forces of competition are there according to Michael E. Porter?
Correct Answer Five
Your Answer
Five
Multiple Choice Multiple Answer
Question
Multiple Choice Multiple Response
Correct Answer Loyalty , Devotion
Your Answer
Loyalty , Devotion
Multiple Choice Single Answer
Question
What is essential for the management to get things done in the organization?
Correct Answer Delegation
Your Answer
True/False
Question
Delegation
The larger the organisation, the more easier is the control process with respect to overall
results.
3rd Sem Operations – Production Planning and Control
18
Correct Answer False
Your Answer
False
True/False
Question
Ethics of statute tries to explore the traits which help the person to lead a life that is
satisfying from an ethical point of view.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
What articulates the long-term goals of an enterprise ?
Correct Answer Vission Statement
Your Answer
Vission Statement
Select The Blank
Question
Control, like other elements of management process has to be ________ and not an
emergency operation
Correct Answer continuous
Your Answer
corrective
Multiple Choice Single Answer
Question
Which is the technique where the completion of all tasks is checked in the order planned in
the time scheduled is known as
Correct Answer Critical path method
Your Answer
Critical path method
4th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Gita has nothing to do with leadership in management
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Future of Insurance sector would be
Correct Answer new players
nationalized
Your Answer
new players
nationalized
taking over the market , improved customer service , strong hold of
players
taking over the market , improved customer service , strong hold of
players
Multiple Choice Multiple Answer
Question
Key ethical principles include the following:
3rd Sem Operations – Production Planning and Control
19
Correct Answer Caring and compassion , Being fair and open minded , Fulfilling commitments
Your Answer
Caring and compassion , Being fair and open minded , Fulfilling commitments
Multiple Choice Single Answer
Question
What is that which poses a major problem to the organizers of events?
Correct Answer Taxes
Your Answer
Taxes
Multiple Choice Single Answer
Question
One of the internal environmental factors that influences management is
Correct Answer place
Your Answer
place
Match The Following
Question
Correct Answer
Your Answer
Company's checklist before
making a call to the consultant
Never give up control and look
up to consultants as God
Never give up control and look up
to consultants as God
Need of consultants
Consultants are responsible for
providing information to those
individuals who fail to respond to
changes in outside environment
Consultants are responsible for
providing information to those
individuals who fail to respond to
changes in outside environment
Role of consultants
Conduct diagnosis to redefine
problem
Conduct diagnosis to redefine
problem
Rule for becoming successful
consultant
Evolve abundant negotiating
skills, be adaptable and flexible
Evolve abundant negotiating
skills, be adaptable and flexible
Select The Blank
Question
Management as a discipline is the function of________.
Correct Answer creativity
Your Answer
creativity
Multiple Choice Single Answer
Question
Name the type of the supervisor who takes care of the number being produced
today.
Correct Answer Speed Boss
Your Answer
True/False
Question
Speed Boss
Posture' and Observance' are not included under the 'yogic' exercises
Correct Answer False
Your Answer
False
3rd Sem Operations – Production Planning and Control
20
Multiple Choice Multiple Answer
Question
Under principle of effective communication what should be fully understood by all
concerned.
Correct Answer tasks , policies , responsibilities
Your Answer
tasks , policies , responsibilities
Multiple Choice Multiple Answer
Question
Under McKinsey's 7 S model, the soft S's are:
Correct Answer Style , Staff , Skills
Your Answer
True/False
Question
Style , Staff , Skills
Communication in industry is a phase both of organisation and moral building.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
The person who does not limit the interactions and decisions just to logical
approach, but continuously encourages his team members to think non -logically is
Correct Answer Leader
Your Answer
True/False
Question
Mediator
Before 1990, Global players were allowed to enter and operate in Indian Market.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
One of the external environment factors that influences Management is
Correct Answer Legal
Your Answer
Legal
Multiple Choice Single Answer
Question
A business unit must meet specific criteria, if it wants to be called an SBU. These are
Correct Answer Definable group of competitors
Your Answer
True/False
Question
Definable group of competitors
Programme should not be closely integrated with objectives but to be developed
3rd Sem Operations – Production Planning and Control
21
from year to year.
Correct Answer False
Your Answer
False
Match The Following
Question
Correct Answer
Philosophy of scientific
management
Development of each man to his Development of each man to his
capacity and ability
capacity and ability
Six industrial activities
Technical, commercial, financial, Technical, commercial, financial,
accounting, security
accounting, security management
management
Five management functions
Planning, organizing,
commanding, co-ordination,
control
Planning, organizing,
commanding, co-ordination,
control
Four supervisors at
implementation department
Gang boss, speed boss, repair
boss, inspector
Gang boss, speed boss, repair
boss, inspector
Your Answer
Select The Blank
Question
Direction is a ________ function performed by all the managers at all levels of the
organisation.
Correct Answer managerial
Your Answer
managerial
Multiple Choice Multiple Answer
Question
Ethical concepts include:
Correct Answer Ethical subjectivism , Consequentialism , Ethics of Virtue
Your Answer
Ethical subjectivism , Consequentialism , Ethics of Virtue
Select The Blank
Question
The process of control is complete only when the organisation take ________ action.
Correct Answer corrective
Your Answer
corrective
Multiple Choice Single Answer
Question
What is the reason that Indian Business houses were not able to take courageous
decisions.
Correct Answer stagger or stumbling self-confidence
Your Answer
stagger or stumbling self-confidence
Multiple Choice Single Answer
Question
Management is
Correct Answer Creative
3rd Sem Operations – Production Planning and Control
22
Your Answer
Creative
Multiple Choice Single Answer
Question
In which type of equilibrium, the man is compared to a cone resting on its base
Correct Answer Perfect equilibrium
Your Answer
True/False
Question
Perfect equilibrium
A strategy is a ploy or a past course of action.
Correct Answer False
Your Answer
False
Select The Blank
Question
Brands are associated with lifestyles and people's________.
Correct Answer aspirations
Your Answer
aspirations
Multiple Choice Multiple Answer
Question
The factors measuring the morale of the workers and ascertain whether it is
increasing or diminishing can be listed as
Correct Answer Grievances , Absenteeism , No. of accidents
Your Answer
Absenteeism , Grievances
True/False
Question
An organization consists of individuals in which their formal roles and structural
positions bring them closer.
Correct Answer True
Your Answer
True
Select The Blank
Question
Planning, organizing and controlling demand effective ________ at all stages if they
are to be successful.
Correct Answer decision making
Your Answer
decision making
Multiple Choice Single Answer
Question
Name the industrial activity where 'Buying, selling and exchanging takes place'.
Correct Answer Commercial
Your Answer
Commercial
3rd Sem Operations – Production Planning and Control
23
Multiple Choice Multiple Answer
Question
The general management challenges faced by the service sector are
Correct Answer Communicating the concept , Differentiating factors , Revenue model
Your Answer
Communicating the concept , Differentiating factors , Revenue model
True/False
Question
Every manager in an organisation gives direction to his subordinates a s a superior
and receives direction as subordinate from his superior.
Correct Answer True
Your Answer
True
Select The Blank
Question
A superior should always establish a ________ control so that his subordinates
report to him periodically.
Correct Answer Feedback
Your Answer
Feedback
Select The Blank
Question
Span of control is also referred to as the span of ________.
Correct Answer Supervision
Your Answer
Supervision
Select The Blank
Question
Actuary is one who specializes in the________of insurance.
Correct Answer mathematics
Your Answer
mathematics
Select The Blank
Question
________ is the reason for the rising importance of empathy for business leaders.
Correct Answer Globalisation
Your Answer
Globalisation
Select The Blank
Question
Different rates are levied by different states for ________ tax.
Correct Answer entertainment
Your Answer
entertainment
Multiple Choice Multiple Answer
Question
Functional authority works only when,
3rd Sem Operations – Production Planning and Control
24
Correct Answer Assignment is clarified , The subordinates are allowed to participate , Feedback
control is established
Your Answer
Assignment is clarified , The subordinates are allowed to participate , Feedback
control is established
Select The Blank
Question
________ provide all types of help required to make the busin ess more efficient and
profitable.
Correct Answer Consultants
Your Answer
True/False
Question
Consultants
Business families have started spending more on research and development.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
State the barriers to delegation of authority?
Correct Answer Over-confidence
Your Answer
Over-confidence
Multiple Choice Single Answer
Question
"The structure of consumer demand in India is like an iceberg". What is the rationale
behind this statement?
Correct Answer we see only parts of ready potential on the surface
Your Answer
we see only parts of consumers on the surface
True/False
Question
Direction initiates at the bottom level in the organisation and follows to top through
the hierarchy.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
The potential external opportunities faced by an organization are
Correct Answer additional customer groups , faster market groups , falling trade barriers
Your Answer
additional customer groups , faster market groups , falling trade barriers
Multiple Choice Multiple Answer
Question
Advantages of delegation of authority would be:
Correct Answer Prompt decision making , Opportunity to subordinates to grow and develop ,
Satisfaction to subordinates in terms of recognition
3rd Sem Operations – Production Planning and Control
25
Your Answer
Prompt decision making , Opportunity to subordinates to grow and develop ,
Satisfaction to subordinates in terms of recognition
Multiple Choice Multiple Answer
Question
Certain important motivational techniques are
Correct Answer Monetary incentives , Job-based techniques , MBO techniques
Your Answer
Security technique , Monetary incentives , Job-based techniques
Multiple Choice Multiple Answer
Question
What type of skills does management require?
Correct Answer conceptual , human relations , technical
Your Answer
th
5
conceptual , human relations , technical
Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN
and ZN.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Forecast is based on :Correct Answer Past data
Your Answer
Competitor's market share
Select The Blank
Question
Network ________ is defined as any adjustment to the arrow diagram which becomes
necessary owing to departure from the project schedule laid down earlier.
Correct Answer Updating
Your Answer
Design
Multiple Choice Single Answer
Question
For goods manufactured to stock, following department is expected to periodically
undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control
Your Answer
Production Planning Control
True/False
Question
CPM marks critical activities.
3rd Sem Operations – Production Planning and Control
26
Correct Answer True
Your Answer
True
Select The Blank
Question
A shop order may combine more than one ________ requiring identical items.
Correct Answer Work order
Your Answer
Sales order
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
________ inventories help to balance company's supply with market demand.
Correct Answer Finished goods
Your Answer
WIP
Select The Blank
Question
Short term forecasts are for ________.
Correct Answer Material Planning
Your Answer
Cash flow management
Multiple Choice Single Answer
Question
For process planning following is one of the basic document used :Correct Answer Operation Layout
Your Answer
Process Layout
Multiple Choice Single Answer
Question
Scheduled start of an operation is authorized by issuing a document called :Correct Answer Job card
Your Answer
Route card
Multiple Choice Multiple Answer
Question
SOS Analysis involves following type of items :Correct Answer Seasonal items available only for a limited period. , Seasonal items available throughout
the year. , Non-seasonal items whose quantity is decided on different considerations.
Your Answer
Seasonal items available throughout the year. , Non-seasonal items whose quantity is
decided on different considerations. , Machine spare parts
3rd Sem Operations – Production Planning and Control
27
Multiple Choice Multiple Answer
Question
The basic procedure of assignment technique is designed to solve problems wherein :Correct Answer Number of tasks equal to number of facilities. , The objective function is minimization. ,
There are no restrictions in allocation
Your Answer
Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost
of machine should be taken into consideration.
True/False
Question
There are five manufacturing systems. However, many manufacturers combines two or
more systems to produce a final product.
Correct Answer True
Your Answer
True
True/False
Question
In LOB, the regular progress checks the future effect of any current delays and indicates
degree of urgency for corrective action.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The
processing times in hours are as follows.Find the sequence for 5 jobs that will minimize
total elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ]
Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4
Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.
Your Answer
Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.
True/False
Question
When shop floor scheduling problem larger than 3 machines arise the analytical solution
procedures leading to optimality are complex and difficult.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
End piece allowance
Material insufficient to produce one Material insufficient to produce one
piece
piece
Stock allowance
Quantity to meet requirement of
spares
Extra material requirement
Machining allowance
Extra material requirement
Material loss in handling
Spoilage allowance
Process rejection
Quantity to meet requirement of
spares
Select The Blank
3rd Sem Operations – Production Planning and Control
28
Question
________ is required for machine set ups as well as regular production.
Correct Answer Performance standard
Your Answer
Machine design data
Multiple Choice Single Answer
Question
If a product is required within 20 days and the product can be made available in 10 days,
the Critical ratio would be :Correct Answer 2
Your Answer
0.5
Multiple Choice Single Answer
Question
A subcontractor is :Correct Answer Another form acting as a supplier
Your Answer
Manufacturer of specialized products on whom the buyer is dependent for 100% of
requirement of main assembly
Multiple Choice Single Answer
Question
The data regarding maximum run out between centers pertains to :Correct Answer Process planning
Your Answer
Raw material data
True/False
Question
Lead time information is required for determination of safety stock.
Correct Answer False
Your Answer
True
Select The Blank
Question
Americans like to use the word 'inventory' whereas for same context British use the
term________.
Correct Answer Stock
Your Answer
Stock
Multiple Choice Multiple Answer
Question
SDE analysis is employed by the purchase department for :Correct Answer Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. ,
Scheduled buying for some of 'easy' items.
Your Answer
Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. ,
Contract buying for some of 'easy' items.
True/False
Question
Labour efficiency factor is applied after capacity requirement of equipment is calculated.
Correct Answer False
3rd Sem Operations – Production Planning and Control
29
Your Answer
True
Multiple Choice Multiple Answer
Question
PERT terminology uses words like :Correct Answer Network diagram , Events , Slack
Your Answer
Network diagram , Events
True/False
Question
The LOB technique is most appropriate for assembly operations involving number of
distinct components.
Correct Answer True
Your Answer
True
True/False
Question
Transit time for manufactured items should be considered only when it is insignificant.
Correct Answer False
Your Answer
True
Select The Blank
Question
A progress card normally contains ________ squares.
Correct Answer Less than 25
Your Answer
More than 50
Multiple Choice Multiple Answer
Question
Due to the following emergent events, the queue time has to compensate for the time for
which the job has to undergo an extra time :Correct Answer Tool breakage , Job split up , Change in priorities
Your Answer
Tool breakage , Job split up , Store inventory
Multiple Choice Single Answer
Question
One of the following is not an task of progressing :Correct Answer Ensuring supply of material and issue of documents to manufacturing shops
Your Answer
Expediting to rush up remaining operations of the delays jobs
Multiple Choice Single Answer
Question
Production output in night shift is :Correct Answer Less than I shift production
Your Answer
More than I shift production
Multiple Choice Multiple Answer
3rd Sem Operations – Production Planning and Control
30
Question
The minimum requirements for application software for line balancing are as follows :-
Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system.
Your Answer
1 Gb hard Disk free memory , Windows or equivalent operating system.
Multiple Choice Single Answer
Question
The work measurement and time study belong to the following school of management :Correct Answer Scientific School of management
Your Answer
Functional School of management
Multiple Choice Multiple Answer
Question
Before planning subcontracting points to be considered are :Correct Answer Whether overtime can be given , One more shift can be started
Your Answer
Whether overtime can be given , One more shift can be started , Set up time can be
reduced
Multiple Choice Multiple Answer
Question
The main requirements of re-order level system are as follows :Correct Answer Incoming materials and materials returned from shop must be deposited in appropriate bins
and their stock cards must be posted for "goods receipt report" and "material return note"
for the quantities received physically . , Items should be issued in correct quantities. , The
balance on the stock cards should be periodically tallied with physical stock.
Your Answer
Incoming materials and materials returned from shop must be deposited in appropriate bins
and their stock cards must be posted for "goods receipt report" and "material return note"
for the quantities received physically . , Items should be issued in correct quantities. , The
balance on the stock cards should be periodically tallied with physical stock.
Multiple Choice Multiple Answer
Question
The following are salient features of the fixed order quantity system :Correct Answer Reorder quantity is always the same which is usually economic order quantity , The time
interval between deliveries varies. , Replenishment action is initiated when the stock on
hand is just sufficient to meet demand during the lead time.
Your Answer
Reorder quantity is always the same which is usually economic order quantity , The time
interval between deliveries varies. , Percent cumulative cost of item is taken into
consideration.
Select The Blank
Question
ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs,
Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost of
buying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under these
circumstances, the firm would take a decision to ________.
Correct Answer Make at home
Your Answer
Buy from outside
Multiple Choice Multiple Answer
Question
Following difficulties are faced by SDE analysis :-
3rd Sem Operations – Production Planning and Control
31
Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers
Your Answer
More delivery period , Reliability of suppliers , Excise duty
Select The Blank
Question
For replenishment action for stock items which are reserved by PPC, the stores work out
________ stock which equals the stock on hand less stock reserved.
Correct Answer Free
Your Answer
Net
True/False
Question
Route sheets for custom built job is prepared for each new order received.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Order quantity
Factor influencing process
planning
Compare alternative processes
Machine capacity chart
Dimensional accuracy
General purpose machines with
special toolings
Mass production
Special purpose machines
Break even analysis
Standard elemental time data
Compare alternative processes
Factor influencing process planning
Multiple Choice Multiple Answer
Question
Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers
Your Answer
Form tool , Inserts , Reamers
Multiple Choice Single Answer
Question
The Carrying cost is stated in terms of :Correct Answer Per item per year
Your Answer
Per order
Select The Blank
Question
The definitive statement of policy stating when to procure and how much to procure usually
to ensure that the sum of all costs associated with ________ are minimised is called
Inventory policy.
Correct Answer Inventory
Your Answer
Buying
3rd Sem Operations – Production Planning and Control
32
Select The Blank
Question
Buying for C quantities should be made in ________ quantities .
Correct Answer Large
Your Answer
th
6
Medium
Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
In the assignment model, the________ is formed between jobs and machines.
Correct Answer Matrix
Your Answer
Matrix
Select The Blank
Question
________ analysis mainly helps to identify non-existing items for which store keeps bin
cards, wastes computer memory or wastes computer stationary while preparing stores
ledger.
Correct Answer MNG Analysis
Your Answer
SOS Analysis
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Gives satisfaction to workers
Multiple Choice Single Answer
Question
Negative value of critical ratio :Correct Answer Is meaningless
Your Answer
Indicates excess of scheduled delivery period
Multiple Choice Multiple Answer
Question
The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific
process
Your Answer
Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specific
process
True/False
Question
If lead time available is 11days and lead time required is 10 days, the critical ratio would be
1.10.
Correct Answer True
3rd Sem Operations – Production Planning and Control
33
Your Answer
True
Multiple Choice Multiple Answer
Question
What are the factor affecting decision about centralized planning system?
Correct Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work is
less repetitive
Your Answer
Product variety is large , Jobbing and batch production methods of manufacturing , Work is
less repetitive
True/False
Question
In continuous or process production , only one product is manufactured.
Correct Answer True
Your Answer
True
True/False
Question
The make-or-buy decision becomes necessary when the current source of supply is not able
to supply the material in accordance with buyer's quality requirements.
Correct Answer True
Your Answer
True
True/False
Question
Work measurement function is attached to line management.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Placement of purchase orders in case of 'A' type of items is usually :Correct Answer Frequent
Your Answer
Frequent
Match The Following
Question
Correct Answer
Your Answer
Economic order quantity
Quantity at which there is neither
overstocking nor under stocking.
Quantity at which there is neither
overstocking nor under stocking.
Carrying cost
Cost of 'holding' the material in
store
Cost of transportation [carrying] of
material
Procurement cost
Administrative cost for procurement Cost of procurement of material
Inventory cost
Sum of carrying and inventory cost Sum of carrying and inventory cost
True/False
Question
To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the
second machine must be smaller than or equal to the smallest time of any job on first
3rd Sem Operations – Production Planning and Control
34
machine or third machine.
Correct Answer True
Your Answer
False
True/False
Question
Systematic procedures must be set in the operating functions prior to installation of PPC in
the firm.
Correct Answer True
Your Answer
True
Select The Blank
Question
Time waste is the earliest of all wastes and yet the________ to correct because it does not
litter the floor.
Correct Answer Hazards
Your Answer
Big hazard
Multiple Choice Single Answer
Question
If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the
lead time.
Correct Answer 4 months
Your Answer
1.2 Months
Multiple Choice Single Answer
Question
Which factor influence plan for meeting seasonal or occasional increase in demand?
Correct Answer Subcontracting
Your Answer
Subcontracting
Multiple Choice Single Answer
Question
Which of the following is the function of Production Planning?
Correct Answer Process planning and scheduling
Your Answer
Progressing
Select The Blank
Question
Because of uncertainty of activity timings, PERT acquired a shape of ________ model.
Correct Answer Probabilistic
Your Answer
Statistical
True/False
Question
Scientific inventory control system requires to be followed for machine aid, work aid and
inspection aid :Correct Answer False
3rd Sem Operations – Production Planning and Control
35
Your Answer
True
True/False
Question
Job schedule is a chart showing work ahead of each machine with respect to time.
Correct Answer False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Tooling cost
Jigs and Fixtures
Jigs and Fixtures
Opportunity costs
Monitory value sacrificed in
rejection
Cost of giving opportunity to do a
business
Incremental cost
Vary with decision to make or buy
Vary with decision to make or buy
Labour cost
Wages and other benefits
Wages and other benefits
Multiple Choice Single Answer
Question
The goods are manufactured as per customer's definite order in case of :Correct Answer Job production
Your Answer
Batch production
Multiple Choice Multiple Answer
Question
The commonly used network techniques other than PERT and CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [
Graphical Evaluation Review Techniques ]
Your Answer
MIS [ Management Information Systems ]
Multiple Choice Multiple Answer
Question
To minimize total throughout time we are required to minimize :Correct Answer Queuing , Idle time , Inventory
Your Answer
Queuing , Idle time
Multiple Choice Multiple Answer
Question
Following conditions are required to be fulfilled for processing n jobs through 2 machines :Correct Answer The jobs are ready to be processed before the period under consideration begins . ,
Transient time to move a job from one machine to the another is negligible. , In process
inventory is allowed.
Your Answer
The jobs are ready to be processed before the period under consideration begins . , In
process inventory is allowed.
Select The Blank
3rd Sem Operations – Production Planning and Control
36
Question
An inventory control technique based on selective approach to stock items is called
________ analysis.
Correct Answer Pareto's
Your Answer
Pareto's
Multiple Choice Multiple Answer
Question
While communicating to customer on delays in delivery following information should be given
:Correct Answer Information on identification of job , Reasons for delays , Revised date of delivery
Your Answer
Reasons for delays , Revised date of delivery
Select The Blank
Question
CPM is ________ oriented system.
Correct Answer Activity
Your Answer
Activity
Multiple Choice Single Answer
Question
One of the following is not consumable tool :Correct Answer Arbors
Your Answer
Arbors
True/False
Question
LOB is a manual planning and scheduling technique similar in nature to MRP [Material
Resource Planning].
Correct Answer True
Your Answer
False
Select The Blank
Question
________ is required when expediting fails to bring deviated plan to its actual path.
Correct Answer Replanning
Your Answer
Replanning
Multiple Choice Multiple Answer
Question
The process of contraction or compression involves extra cost because extra money is
required to be spent on factors such as :Correct Answer Overtime engagement of workforce , Purchase of additional machinery , Use of better
materials
Your Answer
Overtime engagement of workforce , Purchase of additional machinery , Purchase of
stationary of good quality
Multiple Choice Single Answer
Question
In job production one single product is manufactured while a batch of group of products is
turned out at a time under a system of :-
3rd Sem Operations – Production Planning and Control
37
Correct Answer Batch production
Your Answer
Process production
Multiple Choice Multiple Answer
Question
The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and port
clearance
Your Answer
Search for foreign suppliers
Multiple Choice Single Answer
Question
The production system characterized by complex set of activities that must be performed in a
particular order within a given period and within an estimated expenditure is known as :Correct Answer Project production
Your Answer
Project production
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost
Your Answer
Overtime cost
Select The Blank
Question
________ is the specific instant of time that marks start and end of activity.
Correct Answer Event
Your Answer
Event
Select The Blank
Question
Overlapping of operations help to ________ manufacturing time.
Correct Answer Reduce
Your Answer
Reduce
Multiple Choice Multiple Answer
Question
"Difficult" items have following attributes :Correct Answer Available indigenously but are not easy to procure , Items which come from longer distance ,
Items which are difficult to manufacture
Your Answer
Available indigenously but are not easy to procure , Items which come from longer distance ,
Items having complex specifications
Multiple Choice Multiple Answer
Question
They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer
Moving average , Curve fitting
3rd Sem Operations – Production Planning and Control
38
Select The Blank
Question
The performance standard is required by ________ to determine individual machine capacity
for the purpose of machine loading and assigning machine hours and man hours .
Correct Answer Scheduler
Your Answer
Production engineer
Multiple Choice Multiple Answer
Question
The network analysis involves following works :Correct Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in a
logical network. , Estimation of job duration , Scheduling to discover which jobs control
completion of project and reallocation of resources.
Your Answer
Obtaining a work breakdown structure to a set of individual jobs which are arranged in a
logical network. , Estimation of job duration , Scheduling to discover which jobs control
completion of project and reallocation of resources.
Multiple Choice Single Answer
Question
The assembly work content [ Wi ] of the i'th station having n work stations is given by :Correct Answer å Wi from i=1 to n
Your Answer
å Wi from i=1 to n
Multiple Choice Multiple Answer
Question
Essentials of good forecasts are :Correct Answer Stability , Fairly accurate , Economical to generate
Your Answer
Stability , Fairly accurate , Economical to generate
True/False
Question
The 'G' group of GOLF analysis involves moderate delivery time and availability of credit
usually in the range of 30 to 60 days.
Correct Answer True
Your Answer
True
Select The Blank
Question
ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs,
Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would
be Rs ________.
Correct Answer 6 Lacs
Your Answer
6 Lacs
7th Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
3rd Sem Operations – Production Planning and Control
39
Question
Following are the factors which influence tool life :-
Correct Answer Operators efficiency , Type of tool , Material it is required to operate upon
Your Answer
Operators efficiency , Type of tool , Material it is required to operate upon
Multiple Choice Single Answer
Question
The document which incorporates details of process planning for a job is called :Correct Answer Route Sheet
Your Answer
Route Sheet
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct Answer Arrow diagram , Nodes , Float
Your Answer
Arrow diagram , Nodes
Select The Blank
Question
Forecasting is function of ________.
Correct Answer Marketing department
Your Answer
Planning in charge
Select The Blank
Question
Johnsons method of scheduling can be used when operation sequence involve
________ machines.
Correct Answer Two
Your Answer
Two
Select The Blank
Question
Good quality and ________are the two main requirements to secure maximum
business from a customer.
Correct Answer Competitive rates
Your Answer
Competitive rates
Select The Blank
Question
Sum of queue, transit, order preparation and manufacturing times is known as
________
Correct Answer Total Lead Time
Your Answer
Total Lead Time
True/False
Question
To conduct FSN analysis we require, last date of receipt or last date of issue
whichever is later and period.
Correct Answer True
3rd Sem Operations – Production Planning and Control
40
Your Answer
True
Multiple Choice Multiple Answer
Question
Overtime can be avoided in many ways and they are :Correct Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machine
breakdown
Your Answer
Unrealistic delivery date , Acceptance of too many rush order , Excessive machine
breakdown
Multiple Choice Multiple Answer
Question
Material control function embraces a following techniques :Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system
Your Answer
Make -or -buy decision , Pareto's analysis , Replenishment system
True/False
Question
Work measurement is not useful for choosing between two alternate methods of
production.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Process Sheet contains following information :Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
More than one subcontractor should be developed for each subcontracted
operation/Job.
Correct Answer True
Your Answer
True
Select The Blank
Question
Classification of items on basis of their capital lock up is called ________ analysis.
Correct Answer XYZ
Your Answer
XYZ
Select The Blank
Question
Purchase section must keep ________posted on the progress of purchase orders
and expected delays.
Correct Answer P.P.C.
Your Answer
P.P.C.
3rd Sem Operations – Production Planning and Control
41
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in inventories
effectively :Correct Answer By proper coordination between shop floor, stores and buying department
Your Answer
By proper coordination between shop floor, stores and buying department
True/False
Question
Fluctuation due to changes in season are called cyclical fluctuation.
Correct Answer False
Your Answer
False
True/False
Question
Flexibility and product variety are not inter-related with each other.
Correct Answer False
Your Answer
True
True/False
Question
Overlapping of operations help to reduce manufacturing time.
Correct Answer True
Your Answer
True
Select The Blank
Question
The LOB technique is made more accurate and fast by using ________.
Correct Answer Computers
Your Answer
Reduction techniques
True/False
Question
Overtime is undesirable since it increases manufacturing cost of the product.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
The essential features of batch production are :Correct Answer General purpose machines and process type layout , Manual materials handling ,
Flexibility of production schedule
Your Answer
General purpose machines and process type layout , Manual materials handling ,
Flexibility of production schedule
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :-
3rd Sem Operations – Production Planning and Control
42
Correct Answer Medium
Your Answer
Few
Multiple Choice Single Answer
Question
Dispatcher withdraws required quantity of material from stores using following
document :Correct Answer Stores issue order
Your Answer
Bill of material
Multiple Choice Multiple Answer
Question
In a mass production assembly shop following work measurement techniques are
used :Correct Answer Time study , Work sampling , Production study
Your Answer
Time study , Work sampling , Production study , Analytical estimating
Multiple Choice Multiple Answer
Question
SDE analysis is based on problems of procurement namely :Correct Answer Non-availability , Scarcity , Longer lead time
Your Answer
Non-availability , Scarcity , Longer lead time
True/False
Question
Line balancing is a simulation technique.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
The line of balance is a device for planning and monitoring progress of :Correct Answer Purchase order execution , Project execution , Targeted programs
Your Answer
Purchase order execution , Project execution , Targeted programs
Select The Blank
Question
Sales persons decides ________.
Correct Answer Synthetic forecast
Your Answer
Current sales
True/False
Question
Material control Card is a document for record of issues of material and receipt of
unused material by production shop.
Correct Answer False
Your Answer
False
3rd Sem Operations – Production Planning and Control
43
Multiple Choice Single Answer
Question
Work measurement is limited to measuring :Correct Answer Productive & non productive time
Your Answer
Only product related activities
Match The Following
Question
Correct Answer
Your Answer
Move order
Transport material from and to
required work centers
Transport material from and to
required work centers
Materials Order
Allocation of material required in Allocation of material required in
connection with shop order
connection with shop order
Work Order
Bird's eye view of production
programme
Bird's eye view of production
programme
Production Order
Reserve material required in
connection with sales order
Reserve material required in
connection with sales order
Multiple Choice Multiple Answer
Question
The software for line balancing should have following features :Correct Answer Easy to operate , Easy to install , Easy to upgrade
Your Answer
Easy to operate , Easy to install , Unmanaged code should be available
Multiple Choice Single Answer
Question
Man hours is commonly used unit of measurement for scheduling purposes in
following industry :Correct Answer Engineering
Your Answer
Engineering
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new customers
Your Answer
Gives us work , Dividends to share holders , Gets business from new customers
Multiple Choice Single Answer
Question
The 4X4 assignment problem involve following job-machine operations :Correct Answer 24
Your Answer
24
Multiple Choice Single Answer
Question
The best of scientific tools available for scheduling is :Correct Answer CPA [ critical path analysis ]
3rd Sem Operations – Production Planning and Control
44
Your Answer
Gantt Chart
Multiple Choice Multiple Answer
Question
Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department
Your Answer
PPC , Industrial Engineering
Match The Following
Question
Correct Answer
Your Answer
Long production run
Mass and Flow production
Mass and Flow production
Complex activities to be
performed in a particular order
within a give time & estimate.
Project production
Project production
One or few units manufactured
as per customers requirement
Jobbing Production
Jobbing Production
Short production run
Batch Production
Batch Production
Multiple Choice Single Answer
Question
Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum
Your Answer
Minimum
Multiple Choice Multiple Answer
Question
Some of significant features of HML analysis are :Correct Answer To evolve buying policies to control purchases , To delegate authorities to different
buyers to make petty cash purchases , Not to take consumption into account
Your Answer
To evolve buying policies to control purchases , To delegate authorities to different
buyers to make petty cash purchases
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed by inefficient P.P.C.?
Correct Answer Failure to provide proper tools and control on work in progress on shop floor
Your Answer
Failure to provide proper tools and control on work in progress on shop floor
Multiple Choice Single Answer
Question
The administrative expenses towards the procurement of materials is called :Correct Answer Procurement cost
Your Answer
Administrative cost
Multiple Choice Multiple Answer
3rd Sem Operations – Production Planning and Control
45
Question
Smoothing performs following activities:-
Correct Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristic
approach
Your Answer
Reallocation of resources , Improving utilization of resources , Conducting Heuristic
approach
True/False
Question
As per a study on materials management practices, a typical firm spends almost half
of its rupee sales on goods purchased from vendors.
Correct Answer True
Your Answer
True
Select The Blank
Question
Value analysis of ________ class items is usually inadvisable.
Correct Answer C
Your Answer
C
True/False
Question
PPC system in the organisation is to be tailor made.
Correct Answer True
Your Answer
True
3rd Sem Operations – Production Planning and Control
46
9) a) Draw a flow chart to explain the procedure to schedule ‘n’ jobs on two
machines:
Ans: The following are the ten steps involved to schedule ‘n’ jobs on two machines:
Step 1) Prepare list of the jobs to be processed on the two machines.
Step 2) Estimate processing time for each job on each machine.
Step 3) Construct a job array, called sequencing matrix. To construct the matrix the jobs
to be processed are recorded row head wise, the machines to be employed to process the
jobs are recorded column head wise and the processing time of each job is recorded
against the under the respective machine.
Step 4) Scan the job array and identify the smallest processing time.
Step 5) If the smallest time appears:
i.
On the first machine, A, assign the corresponding jobs as close to the
beginning of the job sequence as possible.
ii. On the second machine, schedule the corresponding job as close to the end
of the job sequence as possible.
iii. If there is a tie of minima for both machines i.e., if the smallest element
occurs on both machines, (one minimal element on each machine), select
among the tied up jobs the one with the smallest time on the first machine
and schedule it as early in the job sequence as possible.
iv. If the tie of the minima occurs among the elements of the first machine,
select among the tied up jobs the one with the smallest time on the second
machine and schedule it as early in the job sequence as possible.
v. If the tie for the minima occurs among the elements in the second
machine, select among the tied up jobs the one with the smallest time on
the first machine and schedule it as late in the sequence as possible.
Step 6) Delete from the array the jobs scheduled and its corresponding processing times.
Step 7) Repeat steps 4, 5, 6 and 7 for remaining processing times, placing the jobs next to
first or next to last until all jobs are scheduled.
Step 8) Calculate the total elapsed time to process all jobs through the two machines.
Step 9) Calculate the idle time for machines A and B.
Fig: Flow chart for”n jobs: 2 machines” sequencing model
START
Construct a sequencing matrix with
n jobs and two machines (A & B)
Scrutinize processing time of all
jobs on both machines and select the
smallest time
Does the
smallest time
occur on first
machine?
No
Yes
Schedule the job corresponding to the
smallest time as close to the beginning of
the job sequence as possible.
Delete the job scheduled and its
corresponding processing times
No
Have all
jobs been
scheduled?
Yes
Calculate start and finish time of
each job on machine A
Calculate start and finish time of
each job on machine B
Determine total elapsed time to
process all jobs though two machines
Calculate idle time of each machine
STOP
Schedule the job
corresponding to the
smallest time as close
to the end of the job
sequence as possible
b) Five jobs A, B, C, D and E are required to be processed on two machines M1 and
M2. Each job has to be processed on machine M1 and then on machine M2. The
order of the completion of jobs has no significance. The processing time hours for
five jobs on the two machines is as under:
Job
Machine
A
B
C
D
E
Machine #1
4
17
14
9
11
Machine #2
5
7
12
2
6
Ans: The smallest time in the job array is 2 hours and it appears for the first stage. The
corresponding job D therefore is scheduled last and its entry is made in the last cell of the
sequencing bar.
D
Delete the corresponding job schedule leaves us 4 jobs in the array.
The next smallest time is 4 hrs and it occurs on the job A which is present in the sequence
of Machine #1. Therefore the entry is made in the first cell of the sequencing bar.
A
D
Deleting the job schedule leaves us with 3 more entries in the array.
The next smallest time is 6 and is present in the job E, which is present in the sequence of
Machine #2. Therefore the entry is made in the last but one cell of the bar.
A
E
D
Deleting the job schedule leaves us with 2 more entries in the array.
The next smallest time is 7 and is present in the job B, which is present in the sequence of
Machine #2. Therefore the entry is made in the 3rd cell of the bar.
A
B
E
D
Since the last job is left unscheduled, it is therefore placed in the empty cell:
Therefore the optimum sequence, therefore is A, C, B, E & D
A
C
B
E
D
2. What is Production Planning and Control? What are its key functions? How does
PPC contribute to the two basic objectives namely “long term growth of business”
and “Profit of the company”?
Ans: Introduction: Production Planning is a centralized activity (normally conducted in
the office) and includes such functions as order preparation, material control, process
planning, tools control and scheduling. Production control, on the contrary, a diffused
activity (usually conducted in the shops) and includes such functions as dispatching,
progressing and expediting.
Functions of Production Planning & Control:
Control Functions
1) Order Preparation includes activities like
making of work orders, converting work
orders into shop orders, preparing auxiliary
orders, and releasing such orders to shops to
authorize manufacturing activity.
2) Materials control concerns preparation of
materials estimates indenting non-stick
materials, ascertaining availability of
materials purchased to stock, continual
follow-up with purchase and store for timely
receipt of materials, advising store to allocate
required quantities of available materials
(alternatively on their receipt) against
specific shop orders.
3) Processing Planning or Routing concerns
fixation of method of manufacture operations
and their sequence, machine tools for each
operation, jigs and fixtures, measuring
instruments and gauges etc to enable shops to
produce goods of the right quality at the
lowest cost.
4) Tools Controls concerns preparation of
estimates of cutting tools (Standard as well
as non-standard tools), gauges and measuring
instruments including jigs & fixtures,
indenting non-stock tooling, follow-up with
tool room for timely manufacture of jigs &
fixtures, periodical replenishment of wornout-non-consumable tooling (e.g. work
aborts, collets, copying masters, Allen keys,
spanners. etc.)
Optional Functions
1. Cost Estimation concerns preparation of
pre-production cost estimates to be used by
sales department for quotation purposes.
(Alternatively this function may be
assigned to costing department or industrial
engineering dept)
2. Work Measurement concerns fixation of
time to be allowed to a qualified workman
to carryout a specified task, under specified
conditions and at the defined level of
performance. Work measurement employs
scientific, well-known techniques like time
study,
analytical
estimating
etc
(Alternatively, work measurement work
may be assigned to industrial engineering
dept.)
3. Sub Contract concerns off-loading of
work on outside vendors for economic
reasons
or
to
augment
existing
manufacturing facilities. Sub-contract work
alternatively may be handled by
Materials/Purchase Dept.
4. Capacity Planning concerns estimation of
requirements of men and machines as the
basics of decision making to meet the
firm’s increased volume of business (Some
companies prefer to assign this function to
engineering dept)
5) Scheduling concerns preparation of machine
loads, fixation of calendar dates of various
operations to be performed on a job,
coordination with sales to confirm delivery
dates of new items and periodical preparation
of dispatch schedules or regular items.
5) Demand Forecasting concerns making
projection of company’s product market,
though, long term forecasts are given by
sales department but short term forecasts
required for materials planning, machines
loading, subcontracting etc, may be prepared
by PPC departments.
6) Dispatching concerns preparation and
distribution of shop orders and manufacturing
instructions to be concerned department as
their authority to perform the work according
to the predetermined schedule.
7) Progressing concerns collection of data from
manufacturing shops, recording of progress of
work, and comparing progress against the plan.
8) Expediting concerns intensive progress
chasing to identify delays and interruptions
which may hold up production, devising cures
from time to time to keep rate of production in
line with the schedule communicating possible
failure in delivery commitments to sales
department.
b) Long term Growth of business and Profit of the Company:
Long term growth of business and profitability are the two basic objectives of an
organization. For long term growth, the company must have enough orders and for
enough orders it must have large number of satisfied customers.
Five essentials to achieve customers’ satisfaction are:
1)
2)
3)
4)
5)
Timely delivery
Advance communication in case of expected late shipments
Short lead time in emergency
Consistent and good quality of products
Competitive price.
Good production planning and control is necessary to meet these essentials of customers’
satisfaction. Good PPC system is also necessary to minimize waiting time costs, overtime
costs, inventory costs and other manufacturing overheads. Goods PPC system helps to
improve utilization or resources morale of the employees.
3) (a) How does Production Planning differ from Production Control?
Ans:
Production Planning: It is the determination, acquisition and arrangement of all
facilities necessary for future production of items. In other words, production planning is
essentially a pre-production activity, associated with the design of the production system.
Production Control: It is the corollary to short term production planning or scheduling
and is quite simply concerned with the implementation of production schedules.
Production Planning Versus Production Control
PLANNING (Planning the Work)
1) Planning
involves
collection
and
maintenance of data regarding time
standards, materials and their specifications,
machines and their process capabilities,
drawing and operational layouts etc.
2) Planning is seeing that requirements-tools,
machines, men, instructions, authorizations
and the like-well be available at the right
time and in the right quantities and are of
proper quality.
3) Planning involves preparation of load charts
and fitting various work orders into
uncommitted time available on the
company’s facilities (men or machines).
4) Planning involves preparation of all
necessary forms and paper work
5) Planning involves designing suitable
feedback as to what may happen.
6) Planning involves forward thinking as to the
remedial action to be taken if the job fails
behind schedule.
Planning therefore, is a centralized activity
(in the office) and includes such function as
materials control, tools control, preprocess
planning and scheduling.
CONTROL (Working the plan)
1) Control involves dissemination of data,
preparation of reports regarding output,
machine and labour utilization, labour
efficiency, percentage defectives etc.
2) Control is seeing that the requirements are
actually made available at the right place in
the right quantities.
3) Control involves actual seeing that the jobs
are started and completed as per schedule
prepared by scheduling cell of the PPC.
4) Control involves actual issue of forms and
paper work.
5) Control involves keeping track of what is
happening and collecting information as to
what has happened.
6) Control involves suggesting remedial action
when the job is falling behind schedule.
Control is thus a diffused activity (in the
shops) and includes functions such as
dispatching, progressing and expediting.
(b) What type of information is necessary for efficient functioning of PPC
department? Which department in the organization originates this information?
Ans: Introduction: The efficiency of Production Planning and Control department
depends upon the information it gets from other departments and the accuracy of such
information. To prepare load and schedule chat, it must know the preventive maintenance
schedule. To give realistic delivery date, it must know the work content of each job.
Production Planning and Control department generally requires the following
information:
Information
Concerning
Details
1. Production
programme.
1. Quantity to be manufactured.
2. Delivery date.
2. Production
materials
1. Kind and quality of material.
2. Quantity of material required
3.Stock on hand and reservations
4. Lead time required for
procurement.
1. Standard and special tooling
3. Tooling
4. Quality
Standards
5. Operation
Methods.
1.
2.
3.
4.
Dimensional requirements.
Finish requirements
Tolerance requirements
Hardness desired.
1. Operations and their sequence.
2. Machine tool for each
indicated operation
3. Jigs and fixtures needed
4. Speeds & Feeds.
Source
Department
originating indicated
Information
Sales order or Order
Acceptance
Sales
Drawings/Bill of
Material
Stock Cards
Drawing Office
Stores Purchase
Tool Card
P.P.C
Drawings
Customer’s feedback
Process sheets
Capacity charts
Drawing office
Sales Department
PPC
PPC
Experience
Route sheets
PPC
6. Path of
Materials.
1 List of Operations and their
Sequence
2.Alternatives possible
7. Operation
time.
1. Setup time and standard time
for each operation
Work Measurement
data
8. Scheduling
1. Starting and finishing dates.
Machine Load &
Scheduled charts
P.P.C
9. Progress of
Work.
1. Work Completed as on date.
Daily production
reports/Time
ticket/Perforated
slips
Production
Plan layout
Industrial
Engineering
4) How do the following management decisions influence design of the PPC system?
(i) Plan for meeting occasional increase in demand.
(ii) Status of the PPC department in the organization
(iii)Degree of centralization
(iv)Internal structure of PPC department.
Ans: PLANNING MEETING SEASONAL OR OCCASIONAL INCREASE IN
DEMAND:
This influences greatly the production planning and control system which the company
should have. Alternatives available to the company and associated activities are as under:
i)
Having factors of production for the peak demand and utilizing extra capacity
to manufacture products of non-seasonal nature or taking up subcontract work
etc.
Having factors of production for the least demand and meeting requirements
of extra capacity by overtime or by holiday working or by hiring capacity or
by sub-contracting etc. Production planning and control and the purchasing
function under such a situation assumes very important role in the company.
ii)
STATUS OF THE PPC DEPARTMENT IN THE COMPANY:
The status of PPC department in the company depends upon the company’s
manufacturing processes.
If the work is highly repetitive and the number of workmen is not very large, the work of
planning may be performed directly by the line staff, there being thus no formal PPC
department in the company. And in manufacturing units where plant and machinery is
laid out as per sequence of operations and there is little difference in machine capacity for
different products, the PPC may be sub-division of the manufacturing department.
In firms, where either the product variety is very large or where machine capacities are
different for different products, or where plant and machinery is laid out as per function
in different departments not related to each other, PPC should be set up as an independent
department with the head of the department responsible to the managing director, General
manager, or works manager, depending upon the magnitude and complexity of the
planning functions and the size of the firm.
DEGREE OF CENTRALISATION:
Degree of centralization implies extent to which planning activities are performed by
PPC. Two systems in general are available:
i)
ii)
Centralized Planning where the functions of production planning is
controlled centrally by staff specialist (s).
Decentralized Planning where planning is carried out by line executiveforemen-who direct normal work in their respective departments.
Both types of planning, centralized as well as decentralized planning, have their relative
advantages and disadvantages, the centralized planning takes away the burden of
planning from the line staff thus leaving free to handle men and machines more
effectively.
Decentralized planning gives line staff sense of participation and opportunity to use their
experience but it takes away lot of their valuable time in performing planning functions
The trend today is towards the blend of “Centralized” and “Decentralized” system, called
semi-centralized planning. It combines the merits of both the systems and it especially
gives better results in a large industrial complex.
Under semi-centralized planning, the scheduling of operations within the pre-fixed period
and allotment of work to men and machines is done by line staff while overall coordination of materials ordering, sub-contract work planning, progressing and follow-up,
capacity planning man power planning, maintenance planning etc, is done centrally by
the staff specialists.
THE INTERNAL STRUCTURE OF THE PPC DEPARTMENT
Internal structure implies the functions to be assigned to PPC which depends on the
nature of industry the size of the company and the management policies. Different
companies assign different functions to the PPC department. It is common practice to
assign following functions to PPC department:
i)
ii)
iii)
iv)
Order Preparation.
Materials Control
Tools Control
Process planning
v)
vi)
vii)
viii)
Scheduling
Dispatching
Progressing
Expediting.
Few companies assign following four areas to PPC department:
i)
Cost Estimation
iii)
Sub-Contracting
ii)
Work Measurement
iv)
Capacity planning
The functions actually to be assigned depend on the size of the company.
This aspect also considers assigning of various functions of production control to
different cells which again depends on the size of the company. In a medium or large
sized industry there may be following important cells in PPC department:
i)
ii)
iii)
iv)
v)
Materials Control Cell
Tools Control Cell
Process Planning Cell
Scheduling Cell
Dispatching Cell
vi)
vii)
viii)
ix)
Progressing Cell
Cost Estimation Cell
Sub-Contract Cell
Work Measurement Cell
Each cell may be headed by a senior engineer and supported by planning assistant(s) and
clerk(s).
A representative production planning and control department of a medium size firm is
illustrative in the following figure.
General
Manager
Development
Department
Order
Preparation
Factory Production
Material
Control
Process
Planning
Production Planning
& Control
Tools
Control
Inspection &
Quality Control
Scheduling
Plant
Maintenance
Dispatching
6) (a) “Data given on the process sheet can be put to lot many uses in the organization”
Discuss.
Ans: Introduction: Process planning is the process of establishing the shortest and most
economical path that each part is to follow from the point it is received as raw materials until it
leaves as furnished part or a finished product. Process planning indicates operations to be
performed and their sequence; specified the machine tool for each indicated operation; shows the
necessary tooling (jigs and fixtures, cutting tools, cams and templates, measuring instruments,
and gauges) for each indicated operation; gives manufacturing data such as speeds and feeds;
sometimes the specifications of the skill for each operation. The document which incorporates
this vital information is called process sheet or route sheet.
Text: The information contained in the process sheet can be put to a variety of uses:
(i) Scheduling: The scheduling cell of PPC can obtain for each operation the set-up
and the processing time. This information helps them to prepare load and
schedule charts
(ii) Materials Movement: The Shop supervisor and the dispatch clerk can know
where the jobs require to be sent for the next operation.
Progressing
(iii) Cost Reduction and Cost Control: A process sheet gives an idea of the tooling
(standard tools, jigs and fixtures, templates, gauges and measuring instruments)
which could be arranged prior to the starting of the operation. This cuts down setup time and reduces labour cost and overheads.
(iv)Costing: Costing group can use the information to determine pre and post
production cost of each component.
(v) Method of Working: Method study engineer without going on the shop floor can
know as to how presently the part is being manufactured.
(vi)Requirement of manpower and machines: Set up times and processing times
given in different route sheets may be consolidated machine wise into total manhours or machine-hours required to enable the management to take decisions
concerning requirements of manpower and machines.
(vii) Shop efficiency: Operation wise time data given in the process sheet is also
helpful to the shop personnel to know whether the shop performance is in line
with the expected performance.
(b) A Small pump shaft is to be manufactured from a round bar on four machines
in a workshop. It is first cut to length on a power hack-saw which can produce 12
pieces per hour. The cut pieces are then “faced to length” and “centered” on a
special facing and centering machine. Once this machine is set-up (taking 30
minutes), the operator can complete 30 pieces per hour. Faced and centered pieces
are next moved to the copying lathe. It takes 45 minutes to set up the copying lathe
and 3 minutes to turn each piece. The final operation is cutting of the keyways on a
special purpose key-way milling machine. It takes 8.50 minutes to cut hey-way on
each piece. 8.0 minutes are required to set-up the hack-saw and 10 minutes to set-up
the key-way milling machines. After cutting the key-ways the parts are debarred
and inspected.
Draw up a process sheet for the manufacture of this part. Though tooling and
gauges do not require to be indicated yet their relative position on the process sheet
should be shown.
Sol:
PTO
Part Name: Pump Shaft
Part No. : P0401125
PROCESS SHEET
Set Up Time
Op. No.
Operation Description
Machine
Tooling Set up Std min
1
Cutting it to Length
Power Hack Saw
12
80
60
2
Faced to length & Center
Spiral Machine
30
30
60
3
Copying Lathe
Lathe Machine
45
3
4
Cutting Keyways
Key way milling
Machine
10
8.50
REVISION
Prepared by
(Signature & Date)
Checked by
(Signature & Date)
DATE:
KALLURI ENGINEERS
HYDERABAD - 500070.
7 (a) Why is it necessary to record the progress of work? What different methods
are available to collect information?
Ans: Introduction: Progressing is the process of checking actual performance against
the production plan and reporting exceptional deviations to the concerned authorities for
the corrective action. Progressing function consists in keeping a watch on flow of
materials, recognition of delays and interruptions, taking steps to rush up the remaining
operations and communicating possible delays to the customer (wherever necessary)
It is sometimes argued that progressing is only a substitute for poor planning. Should a
driver take his hands off the steering wheel because the road is straight? Should a pilot
divert his attention from the control board because the weather is fine? No! They can’t do
this, similarly, progressing is required even if the material control and process planning
functions are discharged satisfactorily, scheduling is done properly, manufacturing orders
are released. There are usually a number of factors which tend to push the schedules off
the mark. Some of the notable ones are as under:






Delay in receipt of material from vendor(s)
Excessive absenteeism (more than the normal)
Machines breakdowns
Excessive spoilage
Errors in drawings
Strikes and acts of Gods.
The need for progressing is also created when the customers do the follow up on their
own to know the status of their orders.
Methods to collect information:
(i) Physical Count
(ii) Daily production report
(iii) Job Card
(iv) Perforated route sheet
(v) Detachable sheet
(b) Explain with a diagram any two methods to collect data on progress of work.
Ans: Daily Production Report: It is prepared by the supervisor, this is another method
of obtaining feedback. A daily production report contains fixed space to record:







Operator’s Name and Token number
Machine on which he worked
Time spend
Quantity produced
Quantity checked by the patrolling inspector
Results of the inspection
Idle time and its reasons.
This report may be prepared either by the shop supervisor or the patrolling inspector
and is collected at the end of the shift or the next day by the progress clerk of the PPC
department. This method is best suited for large workshop having a process type of
layout producing number of non-standard parts.
DAILY PRODUCTION REPORT
Machi
ne
Operator’s
Name Code
Part Name &
No.
507
A.R. Yande
Double Gear:
29 teeth
Cam Shaft Gear
(Op. No. 80)
Idler Gear
508
-do-
509
Manjit
208/1
R. B. Kale
208/2
-do-
SECTION
DATE
SHIFT
Hours Worked
:
:
:
Gear Shop
12.11.04
First Shift
First Inspection
Tole
Qty. OK OK Rej Code
From To
7AM 3.30 PM
Qty.
produc
ed
78
20
20
-
-
7AM
3.30 PM
42
18
17
1
E
7AM
3.30 PM
60
15
15
-
G
½ Hr
Axle Shaft
(Op. No. 90)
7AM
3.30PM
20
20
-
-
-
Agro Control
Shaft (Op. 120)
7AM
3.30PM
6
2
2
G
1 Hr
34
6
Idle
Hours
_
½ Hr
Perforated route sheet:
It is a useful method of production feed back/collecting data on progress of work. The
route sheet for each job carries part number, product or assembly number it is in, list of
operations to be performed, and the necessary information. The route sheet is handed
over to the supervisor or is tied to the product. As soon as each operation is completed,
the operator or the supervisor signs the lower portion of the route sheet, detaches it, and
returns to the progress section for their analysis.
This method is suitable for tool rooms, jobbing shops or workshops producing one or few
numbers of a component.
SHOP ORDER OP. NO.
NO.
2002
130
2002
120
2002
110
2002
100
2002
90
2002
80
2002
70
2002
60
2002
50
2002
40
2002
30
2002
20
2002
10
OPERATION
DESCRIPTION
Inspect
Grind Chamfer
Thread Grind
Grind OD
Grind total length
Grind bore and face
Heat treat
Inspect
Cut keyway
Finish blank
Rough blank
Drill 50 hole
Saw off
DATE
OF SIGN
COMPLETIION
Fig: Perforated route sheet for manufacture of a thread roll
10 (a) What are the steps involved in solving an assignment problem.
Ans: Introduction:
Hungarian method is the most efficient method for solving an assignment problem
involving minimum objective. Though its standard procedure is for balanced problems,
minimization problem, free from restrictive, but it can be applied to even special
situations by adopting additional steps.
Basic Principles:
The Hungarian method is based on the following properties:
(i) If a constant element is added or subtracted from every element of any row or
column in the given cost matrix, an assignment that minimizes the total cost in
the original matrix also minimizes the total cost in the revised matrix.
(ii) In an assignment matrix, solution having zero total cost is the optimal solution.
Assumptions:
(i) Each facility is capable of performing each task
(ii) Tasks differ in their work contents and facility in their capabilities
(iii)Only one task can be assigned to each facility
(iv)As only one task can be assigned to each facility, the assignment matrix must be
of n x n size. (In case the matrix is not square, dummy rows or columns, equal to
the difference, are added).
Procedural steps to solve standard assignment problems:
A standard assignment problem is a balanced assignment problem (i.e., number of
tasks equal number of facilities), incorporates no restriction in allocation and involved
minimization objective, Hungarian method to solve such problem requires following
steps:
Step 1: Express the problem into n x n assignment matrix
Step 2: Select the smallest element in each row and subtract it from every element of
that row.
Step 3: Select the smallest element in each column of the reduced matrix obtained
from step 2 and subtract it from every element of that column.
Step 4: Cover all zero elements by minimum number of straight lines (horizontal and
vertical lines only). If the number of lines drawn is equal to n(number of
rows/columns), the solution is optimal and proceed to Step 7. if the number of lines
drawn is smaller than n, go to step 5.
Step 5: Select the smallest uncovered element (i.e., smallest element not covered by
the lines), subtract it from all uncovered elements including itself, and add it to the
elements covered twice (i.e. elements located at the intersection of any two lines), and
reproduce other elements (i.e. elements through which only one line passes) as they
are.
Step 6: Repeat steps 4 and 5 until an optimal solution is obtained.
Step 7: Given the optimal solution make the job assignments as follows:
(a) Examine the rows one by one starting with the first row until a row with
an exclusive zero (i.e. row with exactly one zero) is found. Mark the zero
by enclosing it in a square indicating assignment of the task to the facility.
Cross out all zeroes (if any) in the column as they cannot be used to make
other assignments.
(b) Examine next the columns for any mutual exclusive zero and mark each as
above, crossing out the remaining zeroes in that row.
(c) Repeat steps (a) and (b) successfully until either of the following
conditions occur:
i. All zeros have been marked / crossed and each row contains one
marked zero. This means that the optimal solution has reached.
ii. All zeros have not been marked / crossed. The remaining
unmarked zeros lie at least two in each row and column. This
means that more than one optimal solution exists.
(b) A drawing office incharge has four tasks and equal number of draught men. His
estimate of time for each job – draught men combination is given (in hours) in the
following matrix:
Draughtmen
Processing time (Hours)
Jobs
D1
D2
D3
D4
J1
25
25
20
15
J2
35
20
15
20
J3
25
15
20
18
J4
30
10
25
20
Find out the optimal assignment.
Sol:
Step1: “Express the problem into n x n assignment matrix”. This step has already done in
the case problem.
Step2. “Subtract the smallest element in each row from every element in its row so as to
obtain atleast one zero in each row.”
st
nd
rd
th
15, 15, 15 & 10 are the smallest in 1 , 2 , 3 and 4 rows respectively. Subtraction of
the smallest element in the row from every element in its row gives rise to an assignment
matrix shown in the following table.
Draughtmen
Processing time (Hours)
Jobs
D1
D2
D3
D4
J1
10
10
5
0
J2
20
5
0
5
J3
10
0
5
3
J4
20
0
15
10
Step 3. Subtract the smallest element in each column of assignment matrix obtained in
step 2 from every element in its column. This step gives rise to yet another assignment
matrix…
Draughtmen
Processing time (Hours)
D1
D2
D3
D4
J1
0
10
5
0
J2
10
5
0
5
J3
0
0
5
3
J4
10
0
15
10
Jobs
Connect all zeros in the assignment matrix obtained in step 3 by minimum number of
straight lines. Min 4 straight lines are required to connect all zeros.
Step 4.
(a) “Examine the rows one by one, starting with the first row until with an exclusive
zero (i.e. row with exactly one zero) is found. Mark the zero by enclosing it in a
square indicating assignment of the task to the facility. Cross out all zeros in the
same column as they cannot be used to make other assignments.
(b) Examine next the columns for any mutual exclusive zero and mark each as above,
crossing the remaining zeros in that row.
Here…
1) Row J1 has two exclusive zeros which occur at Junction J1 D1 and J1 D4 hence
the allocation of task J1 is postponed for the time being.
2) Row J2 has 1 exclusive zero which occurs at junction J2 D3 hence Job J2 is
assigned to D3.
3) Row J3 has two exclusive zeros which occur at Junction J3 D1 and J3 D2 hence
the allocation of task J1 is postponed for the time being.
4) Row J4 has 1 exclusive zero which occurs at junction J4 D2 hence Job J2 is
assigned to D2.
5) With the allocation of J2 and J4 we have 2 jobs left out unassigned. Looking at
the matrix again, we see that the Under J3 there are 2 zeros out of which the
position D2 is already assigned to J4 and cannot be reassigned to J1 as this is a
mutual exclusive zero assignment matrix. So the only position left out is J3D1.
Hence the job J3 is assigned to D1.
6) With the allocation of Job J3 to D1 we are left out with J1. Considering the
exclusive assignment matrix. The Job J1 can only be assigned to D4. Hence
J1D4.
So the Optimal assignment matrix is the following
Jobs
Draught Men Processing Time
J1
D4
15
J2
D3
15
J3
D1
25
J4
D2
10
Total Processing Time:
65 Hours
11 (a) what is critical ratio scheduling? What advantages does this technique have
over other technique?
Ans:
Introduction: Critical ratio scheduling is a technique for establishing and maintaining
priorities among the jobs-be it in a production control department for the purpose of
scheduling or expending in a purchase department for the purpose of “Purchase order
follow up” or in any other department of the company. The technique utilities concept of
ratios called Critical ratios which provide time relationship between when a
product/part/material is required and when it can be made available/supplied.
Definition: A Critical ratio in its simplest form, may be stated as the ration of “time when
a product is required“to the “time when the product can be supplied”.
I.e. Critical Ratio =
Time when a product is required
Time when the product can be supplied
For E.g.,
Critical Ratio =
The Product is required in 20 days.
The product can be made available in 10 days
=
2.
A critical ratio of 2 implies that the time available to deliver the product is twice the time
required to manufacture the product, similarly, a critical ratio of ½ will mean that the
time available to deliver the product is half of the time required to manufacture the
product. This also suggests that the processing time must be reduced to half of the normal
expected time otherwise the product will not be delivered on time.
Interpretation of critical ratios: Critical ratios have the following significance:
A critical ratio of
(i)
Greater than one means that there is sufficient time and job can be completed
ahead of the schedule.
(ii)
Equal to one implies that job is just on schedule and requires to be closely
watched.
(iii)
Less than one suggests that the job is critical and needs to be expedited to
complete it on schedule.
In general, the smaller the critical ratio, the more critical the job is from delivery point of
view.
Advantages: This technique of critical ratio scheduling helps to:
 Determine the relative job priorities for scheduling.
 Make automatic adjustment in the shop schedule when there are changes in
demand and job progress.
 Reduce dependence on expeditors since a properly designed critical ratio system,
coupled with necessary progress reporting, identifies critical jobs.
 Compare both stock and made to order jobs on a common basis.
 Prevent crises in scheduling of production
 Exercise control by exception.
Critical ratio scheduling, when applied to activities of production control department
helps in establishing and maintaining priorities among the jobs and when applied to
purchase follow up on pending orders.
The technique helps to identify components/parts/ materials which require expediting of
their pending quantities from their suppliers.
The technique utilizes the concept of ratios called critical ratios which provide a time
relationship between a product / part /material is required and when it can be made
available / supplied.
(b) Write few typical critical ratios and explain what they signify?
Ans:
1) A total of 20 work orders completed over last one quarter were analyzed and
following data on ineffective timer per operation (days) was obtained:
2.0
0.8
3.2
4.9
2.5
1.20
5.80
2.06
6.0
3.5
3.4
1.6
3.0
2.7
4.9
0.6
2.8
1.8
2.3
0.9
Calculate
(i)
(ii)
The average time per operation the component stayed on the
shop floor due to waiting queuing, hunting, job splitting, change
in priorities, power failure, machine break down etc.
What total lead time should be considered for component with
the following details?
Batch quantity
=
Total set up time
=
Total processing time
=
No. of operations
=
Average labour efficiency =
against performance standards
300 no.s
12 hrs
18 min
5
80 %
N.B: The Company works two shifts per day, each shift of 8 hrs duration.
Sol:
(a) Expected ineffective time per operation is
EIT
=
N
∑
1
X i,
P(Xi)
The computational process is given in the table below:
Range of
ineffective
time per
operation
(days)
Mid
value
Frequency
Tally Total
Relative
frequency
Probability
P(Xi) that
ineffective
time per
operation
shall be Xi
Xi
Marks
Upto 1
.5
///
3
0.15
0.15
0.075
1 –2
1.5
////
4
0.20
0.20
0.300
2 –3
2.5
////// 7
0.35
0.35
0.875
3 –4
3.5
//
2
0.10
0.10
0.350
4 –5
4.5
//
2
0.10
0.10
0.450
5-6
5.5
//
2
0.10
0.10
0.550
20
Xi .P (Xi)
Total: 2.600
Therefore, expected value of ineffective time per operation = 2.60 days
(b) Total Lead time is given by the formula
TLT
+
N
∑
1
(W + T)
+
N
∑
1
=
P
S+QR
HXE
=
=
Order preparation time = 7 days (assumed)
Expected value of ineffective time per operation x No. of
Operations
2.60 x 5
13 days
Transit time between operations x No. of operations
0 (Transit time assumed to be insufficient)
Where,
P
W
T
=
=
=
=
And
N
∑
1
S+QR
HXE
=
12 +
18 / 60 X
16 X 0.80
=
7.97 days
13
+
300
Therefore,
TKT
=
7
+
=
28 days.
7.97
2) National Engineering Company utilizes critical-ratio-scheduling technique
for the purpose of scheduling and expediting. The status of few made-tostock items is given in the table below.
S.No
Stock-on
hand
Safety
stock
Average daily
consumption
Average lead time
remaining (to
complete remaining
operations) (days)
1
2
3
4
1320
480
520
785
840
120
80
235
60
30
40
50
4
15
10
30
Calculate critical ratio for each of the items and decide on the action to be taken.
Sol:
Critical Ratio =
Lead time available (LTA)
Lead time required (LTR)
For made to stock items
LTA
=
LTR
=
(Stock on hand) – (Safety stock)
Average daily consumption
Lead time required to the complete remaining operations
=
This has been given in the problem
Critical ratios for above items have been calculated in the table below:
S.No
Lead time
available (LTA
Lead Time
required
Critical ratio
1
1320 - 840 / 60
= 8
4
8 / 4 = 2.00
2
480 - 120 / 30
= 12
15
12 / 15 = 0.80
3
520 - 80 / 40
= 11
10
11 / 10 = 1.10
4
785 - 235 / 50
= 11
30
11 / 30 = 0.37
From the above critical ratios, we can conclude that progress of item
(i)
(ii)
(iii)
(iv)
At serial 1 is more than satisfactory. The item is likely to get completed on
time and not much of attention is required to be paid to it.
At serial 2 is unsatisfactory. The item has become critical either because its
consumption has risen above its average or the job has been delayed. In any
case, its progress must be accelerated to avoid potential stock out.
At serial 3 is just satisfactory. The item needs to be closely monitored
At serial 4 is extremely critical. Every possible avenue should be explored to
expedite the remaining operations.
12 (a) What are make or buy decisions? What costs are considered while finding the
cost to make and cost to buy?
Ans: Introduction: Make or buy decisions generally concern items required to the
company’s own design. No firm can manufacture each and every item of its product. It is
neither possible nor desirable. Items which do not form the company’s product line are
always purchased from outside. An automobile firm for example requires to purchase raw
materials, forgings, castings, tyres, tubes, bulbs, wires, bearings, automotive wheels, etc,
from others. Similarly, an engineering firm needs to buy grinding wheels, oils and
greases; tools etc., since the manufacture of these items require totally a different
manufacturing process.
Items which require specialized technical knowledge or procurement of special
equipment are generally sub-contracted. A small firm for example normally gets its items
heat-treated, surface coated (zinc plating, or galvanizing, or phosphating) from outside to
get benefit of low price.
The exclusion of the above categories of items leaves the firm with items which require
to be manufactured to its design either at the home plant or to be purchased from outside
suppliers. The decision whether to make the item at the home plant or buy it from outside
vendors is referred to as “make-or-buy” decision.
Costs to be considered while making a make or buy decision:
Cost analysis refers to the determination of cost to make the item and cost to buy it. A
complete and correct assessment of the various elements of the cost is essential to make
sound economic decisions.
The following data needs to be collected and analysed.
Particulars
Raw materials
Landed cost of the item
being cub-contracted
Weight of raw materials/
Casting/forgings
Weight of finished component
Present utilization of company’s facilities
Methods of manufacture (Route sheet)
Set up times and operational times
Machine hour cost and labour hour cost
Departments originating the information
Purchase
Purchase or sub-contracting
Purchase/Production Planning & Control
Production Planning & Control
Production Planning & Control
Production Planning & Control
Industrial Engineering
Costing/Industrial Engineering /
Sales/Finance
The analysis is based on annual requirements of components against the following
elements:
(a) Raw Material: The raw material cost consists of cost of raw materials less value
recovered during to the sale of scrap like turnings, borings, end pieces etc. The
raw material cost is considered towards the cost to make. However, if the raw
material is supplied to the vendor free of cost, the cost of such materials also
required to be considered towards cost to purchase.
(b) Labour cost: Labour cost implies the wages and costs of other benefits
(Provident fund, E.S.I., bonus, gratuity etc.) payable to the workmen engaged on
the job. This cost however, requires to be considered only when additional labour
force needs to be employed while production capacity is available.
(c) Tooling cost: Jigs and fixtures generally require to be made if the item is to be
machined at the home plant. The jigs and fixtures once made maintain their
accuracy only for certain quantity, say “n” pieces, after which again a new set of
jigs and fixtures require to be made. The cost of tooling thus requires to be
amortized over “n” pieces and the annual cost of such tooling requires to be added
to “cost to make”.
At times, when an item is purchased from outside vendors, certain special cutting
tools (broaches, hobs, shaping cutters etc.) and jigs and fixtures require to be
supplied to the vendor free of cost. The cost of such tooling, therefore, requires to
be considered separately as tooling cost towards “cost-to-buy”
(d) Overhead cost: the bulk of cost associated with a make or buy decision is the
cost of production capacity. This is the area where most often mistakes are made.
These costly errors can be avoided by keeping a single fact in mind that the costs
which influence make or buy decisions are just the incremental costs the costs
which will be incurred if the part currently made is purchased or vice versa.
(e) Recoupment cost: Recoupment cost implies the setup costs (if the item is to be
manufactured at the home plant) or the procurement cost (if the item is to be
purchased). Set-up cost is the “preparation cost” of the machines and it varies
depending upon the number of production runs in a year. The procurement cost is
the cost of raising a purchase order and processing the deliveries from the
vendor(s) and it varies depending upon the frequency of receipts of the item from
the vendor(s).
(f) Outside operations cost: The item manufactured at the home plant may require
sub-contracting of certain operations such as rough blanking, heat treatment,
plating etc. The cost of such operations requires to be considered separately
towards “cost to make”
(g) Purchase cost: Purchase cost includes the price given to the vendor, packing and
forwarding, excise, sales tax, transport cost, control etc.
(h) Capacity cost: Capacity cost implies the cost of capacity rendered idle if the item
currently being manufactured is purchased. Such a cost requires to be added to
“cost to buy”.
1. “Production Planning and Control department is called the nerve center of a
production unit” Discuss.
Ans: Introduction: Good production planning and control system is a must for a firm to
enable it to make reliable promises and then to stick to them. It is also essential to devise
methods which will ensure selection of right equipment, right tooling and enable the shop
to make the job in the simplest but in the fool proof way. The following costs can be
controlled / avoided through better production, planning and control, which make it the
nerve center of a production unit.
(a)Waiting time: “Time waste is the easiest of all wastes and yet the hardest to correct
because it does not litter the floor” remarked Henry Ford once. This statement is as
true as death. Excessive waiting time is really a big hazard – a big expense.
A closer look around the department can enable us to spot some of these time leaks.
We will find some of our workmen waiting at that tool crib. Some may be waiting for
raw materials. Other may be waiting for the tools to be sharpened. Yet there may be
some waiting for prints and instructions for the next job. These little time leaks, if
considered in isolation, do no mean much but too many of these can certainly add to a
large amount, may be larger than few big ones. To reduce waiting time, each
supervisor must know as to when the job in hand must be completed and when next
job should get started so that necessary tools. Gauges, prints, materials, etc. for the
next job can be kept ready.
(b) Hunting Time: “An Operative in an engineering concern spends more than 2% of his
time in wandering or looking for the things he needs to do the jobs” we will find them
sharing their tools with other operators. Lot of operative’s time is wasted in searching for
straps, clamps, bolts, nuts and washers.” We can reduce this ineffective time by fixing
right place for everything and providing our men a set of everything they need well in
advance of starting of the job. Good production planning and control can convert some of
these time leaks into useful production hours.
(c) Stalling: “Workers usually try to coincide the end of their jobs with the end of the day by
stretching the jobs in hand”. A worker usually tends to delay the completion of job so that
he does not need to start a fresh job towards the end of the day. “why start now, I wont be
able to finish it in my shift” is the commonest attitude among our workmen. We can
somewhat avoid this by setting the system where by each workman knows when he is
expected to complete the job-in-hand and what is his next work assignment. Scientific
scheduling can do this!
(d) Interrupted workloads: “Unplanned over lapping of operations lead to idle machines
and job split-ups”. Interrupted work from the previous operation not only results in partial
utilization of the next machine but also seriously undermine morale of the shop. Careful
production planning can prevent such unnecessary losses of time.
(e) Costly overtime: “Poor planning is the common cause of overtime.” Prolonged overtime
is not merely the extra strain on the finance of the company but means much more.
Excessive overtime and hence extra time earnings make the workers accustomed to a new
standard of living and any action on the part of the management to reduce or discontinue
overtime is disliked by the workers. It is just not palatable to them. The mere knowledge
that the company intends to do away with the overtime make the workers slow down
their pace and thus the company is forced to overtime working. It then becomes a vicious
circle and once caught in it the company cannot come out of it. The result is of anybody’s
guess. The workers go on getting overtime day after day and month after month and thus
worsening the already worsened situation. The overall effect is thus the lowering of
efficiency – firstly because of accumulation of fatigue and secondly because of slackering
of pace to get overtime.
The need for overtime arises due to:
 Unrealistic delivery dates without there being any leeway for unforeseeable.
 Acceptance of too many rush orders.
 Frequent delays in receipt of materials
 Excessive machine breakdowns
 Lack of qualified workers
 Insufficient manpower or machines.
The majority of the causes cited above can be avoided by proper planning
(f) Unproductive time of the machines: “Productivity of factors of production to a large
extent depends on the quality of supervision”. The prime responsibility of the
supervisory staff is to ensure that the company’s machines work for maximum time
and the loss of time due to different reasons is kept at minimum. The production time
of the machines is lost due to weaknesses in one or more of the following supervisory
functions:
 Operators’ unauthorized absenteeism and the failure of the supervisor to make
substitute arrangement
 Enforced idle time of the machine for want of smooth movement of materials on
the shop floor
 Lack of effective supervision which cause idle time of the machines since
operators merely shop around, visit unnecessarily places of personal needs, steal
longer tea breaks, resume work 5-10 min late in the beginning of the shift and
after lunch break and close work 10-15 min prior to lunch break and the end of
the shift.
 Idle time of the machines due to delayed action by the supervisor to trace defects
to the source and stoppage of the machines by the workmen until then.
 Wastage in factors of production enumerated above occurs not only because of
poor quality of supervision but also when the supervisory staff gets burdened with
routine functions namely materials planning, tools planning, movement of
materials on the shop floor, machine loading, expediting etc. PPC relieves
supervisory staff from clerical functions and thereby enable them to spend more
time for training of workmen, proper allocation of work to workmen, trouble
shooting and maintaining shop discipline.
(g) Higher overhead costs: Since production planning anc control relieves supervisory
staff from a number of clerical responsibilities, they get more time for training of
workmen, troubleshooting, maintaining shop discipline and improvising methods of
work. At the same time they can handle more workmen and more machines, which
reduce supervisory overheads.
(h) Poor labour efficiency: “Workmen who get accustomed to working intermittently
never work continuously”. This is no exaggeration. It is a fact based on human
physiology and it holds good not only for workmen but also for supervisory
personnel. Many a times in large companies, jobs get delayed due to irregular
deliveries of materials, interruptions from the supervisors, improper loading and
scheduling, lack of sufficient volume of work etc. and as a result workmen are either
rendered idle or are utilized for part of the time. And if such delays are frequent,
workmen get accustomed to partial working and thus the efficiency of the shop floor
suffer a set back. They even do not work continuously when sufficient work is
available.
PPC can prevent such a situation by exercising better control on availability of tools
and materials monitoring a close control on work-in-progress on the shop floor, reallocating jobs from other machines by shifting idle operators to other machines,
changing the route, ensuring smooth movement of materials from and into the
different shops, and reporting cases of idle time of men and machines to enable the
scheduler to release new jobs.
(i) Investment in inventories: Good production planning and control can help the firm
to ensure continuity in production with minimum inventory investment. Stock outs
and higher inventory investment result if the requirements of materials are not
indented on time and also if materials on receipt are not allowed properly to the work
orders as per job priorities. Shop personnel can neither do forward planning of
materials nor can they keep track of receipts and issues of materials. Only a
centralized agency such as PPC can co-ordinate the activities of shops, stores
department and the buying department.
Timely
deliveries
Quick
feedback on
job status
Lower
capital
investment
Better
availability
Better co-ordination
between production,
sales & stores.
PRODUCTION
PLANNING &
CONTROL
Effective
supervision
Better job
satisfaction
Cost reduction
& cost control
Effective utilization of
factors of production
Good return on
investment
Fig: Effect of production planning and control on the firm’s operations
(j) Lowered morale: A department plagues by rush orders, broken deliveries,
uneven work loads, frequent revisions in process, costly overtime, excessive
machine breakdowns and the like can hardly be expected to have good morale. An
integrated approach to production, planning and control can go a long way to
eliminate or atleast minimize the occurrences of the above mentioned losses.
Certainly production, planning and control is the nerve center of a production unit.
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
The commonly used network techniques other than PERT and
CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project
Control System ] , GERT [ Graphical Evaluation Review
Techniques ]
Your Answer
MOSS [ Multi Operation Scheduling System ] , PCS [ Project
Control System ] , GERT [ Graphical Evaluation Review
Techniques ]
Multiple Choice Single Answer
Question
In an unbalanced assignment, the tasks can be balanced by
adding :Correct Answer Dummy tasks
Your Answer
Dummy tasks
Multiple Choice Single Answer
Question
One of the causes of inability to meet delivery date originally
promised :Correct Answer Lack of availability of material in time
Your Answer
Lack of availability of material in time
Multiple Choice Multiple Answer
Question
The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy
supervision
Your Answer
Continuous flow of material , Low skilled labour , Easy
supervision
Multiple Choice Multiple Answer
Question
In a mass production assembly shop following work
measurement techniques are used :Correct Answer Time study , Work sampling , Production study
Your Answer
Time study , Work sampling , Production study
Multiple Choice Single Answer
Question
As the quantity increases, the procurement cost :Correct Answer Reduces
Your Answer
Reduces
True/False
Question
Fluctuation due to changes in season are called cyclical
fluctuation.
Correct Answer False
Your Answer
True
True/False
Question
A type items are always vital under VED analysis.
Correct Answer False
Your Answer
False
Select The Blank
Question
Random fluctuation is considered for deciding ________.
Correct Answer Analytical estimate
Your Answer
Seasonal fluctuation
True/False
Question
In assignment matrix, it is a must to determine Jacobean of the
determinant.
Correct Answer False
Your Answer
False
Select The Blank
Question
If Kwh consumption per 100 pieces is 8.01 and cost/kwh is Rs
0.80 the cost of power over the year for 40000 pieces with 2000
numbers rejection would be Rs ________.
Correct Answer 2692
Your Answer
2692
Select The Blank
Question
At each ________, work is performed on a product either by
adding parts or by completing assembly operations.
Correct Answer Work station
Your Answer
Work station
Multiple Choice Multiple Answer
Question
To operate fixed order quantity system, following parameters are
required to be fixed:-
Correct Answer Standard reorder quantity , Minimum stock , Re-order point
Your Answer
Minimum stock , Re-order point , Standard reorder quantity
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Customer's orders gives us work
Select The Blank
Question
A progress card normally contains ________ squares.
Correct Answer Less than 25
Your Answer
Less than 25
Select The Blank
Question
________ models of OR serve as an ideal aid for determining
optimal sequence of jobs.
Correct Answer Sequencing
Your Answer
Sequencing
Multiple Choice Single Answer
Question
Ordering of raw material is based on :Correct Answer Sales forecast
Your Answer
Sales forecast
Select The Blank
Question
Heuristics approach gave very good results when Wester and
Kilbridge applied it to ________ assembly line.
Correct Answer TV
Your Answer
Car
Multiple Choice Single Answer
Question
What can be the consequence of inefficient working of
department like sales?
Correct Answer Failure on delivery date to customer
Your Answer
True/False
Failure on delivery date to customer
Question
In PERT, use of dummy activities is not much essential.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department
Your Answer
PPC , Industrial Engineering , Production department
Select The Blank
Question
The batch production requires ________ capital investment as
compared to job production.
Correct Answer High
Your Answer
High
Select The Blank
Question
Time waste is the earliest of all wastes and yet the________ to
correct because it does not litter the floor.
Correct Answer Hazards
Your Answer
Hazards
True/False
Question
To solve "n jobs - 2 machines" sequencing problem, it is
assumed that each machine can perform only one type of
operation and can undertake only one job at a time.
Correct Answer True
Your Answer
True
True/False
Question
PERT is suitable in defense projects and R&D where activity
times can not be really predicted.
Correct Answer True
Your Answer
True/False
Question
True
In precedence diagram the length of arrow has very high degree
of significance.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Earliest possible occurrence time [ I.e. stray time ] of activity [ies
] emanating from the event is represented by :Correct Answer Earliest event time
Your Answer
Earliest event time
Multiple Choice Multiple Answer
Question
They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer
Moving average , Exponential smothering , Curve fitting
Multiple Choice Single Answer
Question
The production system characterized by complex set of activities
that must be performed in a particular order within a given period
and within an estimated expenditure is known as :Correct Answer Project production
Your Answer
Project production
Match The Following
Question
Correct Answer
Your Answer
Time taken by each job at Processing time
each machine
Processing time
Time between starting of Elapsed time
first job and completion of
last job
Elapsed time
Number of stages the job Number of machines
has to pass
Number of machines
Time during which the
machine is standstill
Idle time
Idle time
Select The Blank
Question
In the assignment model, the measure of effectiveness of each
job for each machine can be represented by means of
________.
Correct Answer Matrix
Your Answer
Matrix
Multiple Choice Single Answer
Question
The ROI of the company can be increased by :-
Correct Answer Increasing profit & decreasing inventory
Your Answer
Increasing investment/sales ratio
Multiple Choice Multiple Answer
Question
The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database
Your Answer
Algorithms , Program code , Database
Multiple Choice Multiple Answer
Question
Some of significant characteristics of fixed order quantity system
under replenishment systems are as follows :Correct Answer Safety stock is kept to take care of increase in demand during
lead time as well as to meet demand when lead time is
extended. , Re-order level equals safety stock plus average
consumption during lead time , Average inventory equals safety
stock plus half of reorder quantity.
Your Answer
Safety stock is kept to take care of increase in demand during
lead time as well as to meet demand when lead time is
extended. , Re-order level equals safety stock plus average
consumption during lead time , Average inventory equals safety
stock plus half of reorder quantity.
Multiple Choice Multiple Answer
Question
Important considerations in scheduling are :Correct Answer Degree of centralization , Relative job priority , Load chart
Your Answer
Degree of centralization , Relative job priority , Load chart
Multiple Choice Multiple Answer
Question
Methods for recording actual progress of work for shop orders
are :Correct Answer Progress card , Display board , Network updating
Your Answer
Progress card , Display board , Network updating
Select The Blank
Question
The unit cost of manufacturing is largest in case of ________.
Correct Answer Job production
Your Answer
Job production
Match The Following
Question
Correct Answer
Your Answer
HML Analysis
Price orientation
Price orientation
SDE Analysis
Procurement difficulties
Procurement difficulties
ABC analysis
Usage value
Usage value
VED Analysis
Criticality
Criticality
True/False
Question
The non-mathematical rationale of the assignment method is
one of minimizing opportunity costs.
Correct Answer True
Your Answer
False
True/False
Question
Moving average method lags behind the latest trend.
Correct Answer True
Your Answer
True
True/False
Question
The 'G' group of GOLF analysis involves moderate delivery time
and availability of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier ,
Reliability of suppliers
Your Answer
More delivery period , Geographical location of supplier ,
Reliability of suppliers
Multiple Choice Single Answer
Question
The work measurement and time study belong to the school of
management which was pioneered by :Correct Answer Fedric Winslow Taylor
Your Answer
Fedric Winslow Taylor
Multiple Choice Single Answer
Question
Stock of finished goods are based on :Correct Answer Sales forecast
Your Answer
Sales forecast
Multiple Choice Single Answer
Question
The data in respect of spindle nose pertains to :Correct Answer Tooling
Your Answer
Raw material data
Multiple Choice Multiple Answer
Question
In linear programming method of line balancing, there are three
types of constraints namely :Correct Answer Cycle time constraint , Step or task constraint , Precedence
constraints
Your Answer
Cycle time constraint , Step or task constraint , Precedence
constraints
Select The Blank
Question
Buying for C quantities should be made in ________ quantities .
Correct Answer Large
Your Answer
Large
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium
Your Answer
Minimum
Select The Blank
Question
In the assignment model, the________ is formed between jobs
and machines.
Correct Answer Matrix
Your Answer
Matrix
Select The Blank
Question
Production Planning and Control department acts as a link
between company's sales and ________ department.
Correct Answer Manufacturing
Your Answer
Manufacturing
Select The Blank
Question
________ is used for planning capacity.
Correct Answer Standard Time
Your Answer
Standard Time
Select The Blank
Question
Being capable to adjust their production facilities shortly just after
change in demand for products and without incurring heavy
expenses, greater flexibility in production is provided by
________.
Correct Answer Job & batch production
Your Answer
Continuous production
True/False
Question
PERT uses linear programming and probability concepts for
planning and controlling activities.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost
Your Answer
Overtime cost
Multiple Choice Single Answer
Question
Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box
Your Answer
Placed in a tray/box
Select The Blank
Question
The effectiveness of sequencing model technique ________ if
the company has backlog of orders.
Correct Answer Increases
Your Answer
Decreases
Multiple Choice Multiple Answer
Question
Computerisation of line balancing involve following requirements
:Correct Answer System software , Application software , User friendly interface
Your Answer
System software , Application software , User friendly interface
True/False
Question
Curve fitting method of statistical forecasting uses curve line
approach.
Correct Answer False
Your Answer
False
True/False
Question
If set up time for four operations involved is 2 ,1.5, 2 , 2.5 hours
respectively, total set up time would be 10 hours.
Correct Answer False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Bought out materials
Maintenance, repair,
Maintenance, repair,
required for production
process but do not
become part of finished
product.
operating [MRO]
inventories
operating [MRO]
inventories
Finished goods, ready for Finished goods inventory
sale to customer
Finished goods inventory
Idle resource of any kind
having economic value
Inventory
Inventory
Raw materials, parts,
Production inventory
components required to
produced finished product
Production inventory
Select The Blank
Question
Rational figure on utilization index can be obtained by carrying
out ________ study.
Correct Answer Work- sampling
Your Answer
Work- sampling
Multiple Choice Single Answer
Question
The assignment algorithm was developed by a Hungarian
mathematician named :Correct Answer D. Konig
Your Answer
D. Konig
Multiple Choice Multiple Answer
Question
The minimum requirements for application software for line
balancing are as follows :Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or
equivalent operating system.
Your Answer
1 Ghz processor , 1 Gb hard Disk free memory , Windows or
equivalent operating system.
Multiple Choice Multiple Answer
Question
A firm has 6 jobs to be processed on three machines A,B and C
in the order ABC. The processing time of each job is given in the
table below:- Find the idle time on different machines . Job
Processing time [ hours ] Machine A Machine B Machine C J1
25 16 20 J2 26 20 19 J3 24 17 18 J4 22 20 21 J5 24 21 17 J6 28
18 13
Correct Answer 74 , 31 , 58
Your Answer
31 , 58 , 60
Multiple Choice Multiple Answer
Question
PERT terminology uses words like :-
Correct Answer Network diagram , Events , Slack
Your Answer
Network diagram , Events , Slack
Multiple Choice Single Answer
Question
The most common assembly line is a moving conveyor that
passes a series of workstations in a uniform time interval called
:Correct Answer Cycle time
Your Answer
Cycle time
True/False
Question
The make-or-buy decision is not related with profit of the factory.
Correct Answer False
Your Answer
True
Select The Blank
Question
Generally for ________ flow system, Heuristic method is
preferred.
Correct Answer Intermittent
Your Answer
Intermittent
Multiple Choice Single Answer
Question
Document raised by sales department to authorise activities of
PPC department for items manufactured to customers order is
called :Correct Answer Order Acceptance
Your Answer
Order Acceptance
Multiple Choice Multiple Answer
Question
What factors affect the status of PPC department in the
company for achieving informal status?
Correct Answer Manufacturing Process , Work is highly repetitive , Number of
workmen is not very large
Your Answer
Manufacturing Process , Work is highly repetitive , Number of
workmen is not very large
True/False
Question
Increase in inventory carrying cost increases EOQ.
Correct Answer False
Your Answer
False
True/False
Question
Progressing is only a substitute for poor planning.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Detachable Card contain following information :Correct Answer Quantity produced , Operation , Date of completion
Your Answer
Quantity produced , Operation , Date of completion
Multiple Choice Multiple Answer
Question
Weaknesses of PPC department can be studied on following
grounds :Correct Answer Failures in delivery commitment , Cancellation of orders ,
Complaints from customers
Your Answer
Failures in delivery commitment , Cancellation of orders ,
Complaints from customers
Multiple Choice Single Answer
Question
Activity R can not start unless activities P & Q are completed .
And activity S can not start unless activity Q is over [ I.e. activity
P may not be even over ]. Activity R is therefore succedding to
activity P & Q while activity S is succeeding to activity :Correct Answer Q
Your Answer
Q
Multiple Choice Single Answer
Question
If the annual usage of a material is 1200 units and the reorder
point is at 120 Units, find the lead time.
Correct Answer 4 months
Your Answer
4 months
Multiple Choice Multiple Answer
Question
Due to the following emergent events, the queue time has to
compensate for the time for which the job has to undergo an
extra time :Correct Answer Tool breakage , Job split up , Change in priorities
Your Answer
Tool breakage , Job split up , Change in priorities
True/False
Question
Stores issue order for an item is prepared as soon as the route
sheet is ready.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Time study is useful method of measurement for :Correct Answer Short cycle time operations
Your Answer
Long cycle time operations
Match The Following
Question
Correct Answer
Your Answer
Index method
Loading and allocation of
different jobs on different
machines
Loading and allocation of
different jobs on different
machines
Critical Path Analysis
Schedule of activities of
project
Schedule of activities of
project
Jonsons method
Optimal job sequence for
2 machines n jobs
Schedule using priority
numbers
Critical Ratio Scheduling
Establishing priorities
among jobs
Establishing priorities
among jobs
Select The Blank
Question
In check list approach, ________ rating indicates that existing
PPC system requires some major improvements in indicated
areas.
Correct Answer Fair
Your Answer
Fair
Multiple Choice Multiple Answer
Question
Because of following reasons there are limitations in forwarding
quotation against sales enquiry :Correct Answer The lot is not as per EOQ , Tools / plants required to execute
order are not available. , The item is not within the manufacturing
range of a company
Your Answer
The lot is not as per EOQ , Tools / plants required to execute
order are not available. , The item is not within the manufacturing
range of a company
Multiple Choice Multiple Answer
Question
Following are the factors which influence tool life :-
Correct Answer Type of tool , Material it is required to operate upon , Operators
efficiency
Your Answer
Type of tool , Material it is required to operate upon , Operators
efficiency
True/False
Question
C type items would never be vital under VED analysis.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
The Hungarian method is based on following assumptions :Correct Answer Tasks differ in their work contents and facility differ in their
capabilities. , Only one task can be assigned to each facility. , As
only one task can be assigned to each facility, the matrix must
be of nXn order.
Your Answer
Tasks differ in their work contents and facility differ in their
capabilities. , Only one task can be assigned to each facility. , As
only one task can be assigned to each facility, the matrix must
be of nXn order.
Multiple Choice Single Answer
Question
The ratio between "time when a product is required" and " time
when the product is supplied " is known as :Correct Answer Critical ratio
Your Answer
Critical ratio
Select The Blank
Question
________ inventories help to balance company's supply with
market demand.
Correct Answer Finished goods
Your Answer
Finished goods
True/False
Question
In order to complete a project on time, each critical activity need
not be completed in time.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Production output in night shift is :-
Correct Answer Less than I shift production
Your Answer
Less than I shift production
Select The Blank
Question
________reflects impact of money tied up in inventory.
Correct Answer Inventory turnover
Your Answer
Inventory turnover
Multiple Choice Multiple Answer
Question
The line of balance is a device for planning and monitoring
progress of :Correct Answer Purchase order execution , Project execution , Targeted
programs
Your Answer
Purchase order execution , Project execution , Targeted
programs
Select The Blank
Question
Forecasting is function of ________.
Correct Answer Marketing department
Your Answer
Chief Executive officer
True/False
Question
The Heuristics approach has a base of binary number theory.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
What shall be the consequence of acceptance of frequent rush
orders by sales department?
Correct Answer Delivery failure
Your Answer
Disturbed scheduling
PRODUCTION PLANNING AND CONTROL
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
Find EOQ in Rs from the following data :-Annual consumption = 20, 000
units, Ordering and receiving cost of material = Rs 20 per order, Annual
carrying cost or storage cost = 10% of unit cost of material, Cost of
material = Rs 50.
Correct Answer 20000
Your Answer
20000
Multiple Choice Single Answer
Question
Tools control is :Correct Answer Set of techniques for providing required tooling
Your Answer
Set of techniques for providing required tooling
Multiple Choice Multiple Answer
Question
The line of balance is a device for planning and monitoring progress of
:Correct Answer Purchase order execution , Project execution , Targeted programs
Your Answer
Purchase order execution , Project execution , Targeted programs
Select The Blank
Question
________ analysis mainly helps to identify non-existing items for which
store keeps bin cards, wastes computer memory or wastes computer
stationary while preparing stores ledger.
Correct Answer MNG Analysis
Your Answer
MNG Analysis
Select The Blank
Question
Network ________ is defined as any adjustment to the arrow diagram
which becomes necessary owing to departure from the project schedule
laid down earlier.
Correct Answer Updating
Your Answer
Updating
Select The Blank
Question
If number of work stations is 8 and work content of all stations is 32 ,
the cycle time would be ________.
Correct Answer 4
Your Answer
4
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Customer's orders gives us work
Multiple Choice Multiple Answer
Question
The check list approach comprises of following parameters :Correct Answer Each department head concerned with efficiency of PPC function is
given a set of questions to be answered. , The department head has to
answer in "Yes/no" format only , Each "Yes" answer gives one negative
score
Your Answer
Each department head concerned with efficiency of PPC function is
given a set of questions to be answered. , The department head has to
answer in "Yes/no" format only , In remark column details are to be
furnished .
Match The Following
Question
Correct Answer
Your Answer
Time taken by each job at
each machine
Processing time
Processing time
Time between starting of
first job and completion of
last job
Elapsed time
Elapsed time
Number of stages the job
has to pass
Number of machines
Number of machines
Time during which the
machine is standstill
Idle time
Idle time
True/False
Question
To solve "n jobs - 2 machines" sequencing problem, it is assumed that
each machine can perform only one type of operation and can
undertake only one job at a time.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
If Assignment model is to be applied to 5 jobs, number of machines
required would be :-
Correct Answer 5
Your Answer
5
Select The Blank
Question
Given the following data :- procurement cost per order = Rs 30 ;
frequency of ordering per year =4 ; number of suppliers = 3 . Form the
above data, total procurement cost would be Rs ________.
Correct Answer 360
Your Answer
360
Multiple Choice Multiple Answer
Question
If actual demand is much lower than forecasted sale :Correct Answer Inventory will increase , Machine utilization will drop , Absolute project
will reduce
Your Answer
Inventory will increase , Machine utilization will drop , Absolute project
will reduce
Multiple Choice Multiple Answer
Question
The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses
knowledge of specific process
Your Answer
Short runs , Skilled labours in specific trade , Supervisor to posses
knowledge of specific process
Match The Following
Question
Correct Answer
Your Answer
Economic order quantity
Quantity at which there is
neither overstocking nor
under stocking.
Quantity at which there is
neither overstocking nor
under stocking.
Carrying cost
Cost of 'holding' the material Cost of 'holding' the material
in store
in store
Procurement cost
Administrative cost for
procurement
Cost of procurement of
material
Inventory cost
Sum of carrying and
inventory cost
Sum of carrying and
inventory cost
Multiple Choice Multiple Answer
Question
The Hungarian method is based on following assumptions :Correct Answer Tasks differ in their work contents and facility differ in their capabilities. ,
Only one task can be assigned to each facility. , As only one task can
be assigned to each facility, the matrix must be of nXn order.
Your Answer
Tasks differ in their work contents and facility differ in their capabilities. ,
Only one task can be assigned to each facility. , As only one task can
be assigned to each facility, the matrix must be of nXn order.
Multiple Choice Multiple Answer
Question
The essential features of batch production are :Correct Answer General purpose machines and process type layout , Manual materials
handling , Flexibility of production schedule
Your Answer
General purpose machines and process type layout , Flexibility of
production schedule
Multiple Choice Single Answer
Question
The works such as preparation of machine loads, fixation of calendar
dates of various operations, coordination with sales to confirm delivery
dates of new items and periodical preparation of dispatch schedule are
categorized under :Correct Answer Scheduling
Your Answer
Process planning
Multiple Choice Multiple Answer
Question
In case of overloading actions to be considered include following :Correct Answer Subcontracting , Hiring capacity , Overtime working
Your Answer
Subcontracting , Hiring capacity , Overtime working
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
In an unbalanced assignment matrix, the columns can be balanced by
adding ________.
Correct Answer Dummy columns
Your Answer
Dummy rows
True/False
Question
Random fluctuation is addition of cyclical fluctuation and seasonal
fluctuation.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in
inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying
department
Your Answer
By proper coordination between shop floor, stores and buying
department
True/False
Question
Exponential smoothening is weighted average method.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
The labour cost comprises of :Correct Answer Provident Fund , ESI , Bonus
Your Answer
Provident Fund , ESI , Bonus
Multiple Choice Single Answer
Question
The ratio between "time when a product is required" and " time when
the product is supplied " is known as :Correct Answer Critical ratio
Your Answer
Critical ratio
True/False
Question
LOB is a manual planning and scheduling technique similar in nature to
MRP [Material Resource Planning].
Correct Answer True
Your Answer
True
True/False
Question
Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier , Reliability of
suppliers
Your Answer
More delivery period , Geographical location of supplier , Reliability of
suppliers
Select The Blank
Question
Complexity of dispatcher's work varies with the type of ________.
Correct Answer Manufacture
Your Answer
Manufacture
Select The Blank
Question
The ________ makes scheduling process simpler but does not provide
economy in manufacture.
Correct Answer First-come-first scheduled
Your Answer
Johnson's rule
Multiple Choice Single Answer
Question
Installed capacity means :Correct Answer Cumulative capacity of all locations
Your Answer
Capacity at one location
Multiple Choice Single Answer
Question
Forecast is :Correct Answer Short termed and Long termed
Your Answer
Short termed and Long termed
Multiple Choice Multiple Answer
Question
Steps involved in process planning include the following :Correct Answer Enlist feature influencing selection of manufacturing process , Prepare
sequence of basic operation , Write down route sheet
Your Answer
Enlist feature influencing selection of manufacturing process , Prepare
sequence of basic operation , Write down route sheet
Multiple Choice Multiple Answer
Question
Due to the following emergent events, the queue time has to
compensate for the time for which the job has to undergo an extra time
:Correct Answer Tool breakage , Job split up , Change in priorities
Your Answer
True/False
Tool breakage , Job split up , Change in priorities
Question
In assignment matrix, it is a must to determine adjoint of the matrix.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Such spares which are required for a system but the system can
continue to work in absence of such spares are categorized as :Correct Answer Essential
Your Answer
Desirable
True/False
Question
Mere communication to customer expressing inability to meet delivery
commitment and reasons for delays is not enough.
Correct Answer True
Your Answer
True
Select The Blank
Question
Process plan is the process of establishing the ________ and most
economical path that each part is to follow from raw material stage to
finished product stage.
Correct Answer Shortest
Your Answer
Shortest
Multiple Choice Multiple Answer
Question
In SDE analysis, the responsibility of buyers is fixed as follows :Correct Answer Senior buyers may be given the responsibility of 'S' and 'D' , Items in 'E'
are handled by junior buyers , Items in 'E' are handled directly by the
storekeeper
Your Answer
Senior buyers may be given the responsibility of 'S' and 'D' , Items in 'E'
are handled directly by the storekeeper
True/False
Question
PERT does not help in decision making.
Correct Answer False
Your Answer
False
True/False
Question
Curve fitting method of statistical forecasting uses curve line approach.
Correct Answer False
Your Answer
True
Select The Blank
Question
Heuristics approach gave very good results when Wester and Kilbridge
applied it to ________ assembly line.
Correct Answer TV
Your Answer
TV
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost
Your Answer
Overtime cost
Multiple Choice Single Answer
Question
The term Stock allowance in context of Lot Size refers to the quantity
that may be required to meet the requirement of spares for the following
period :Correct Answer Specified period
Your Answer
One month
True/False
Question
Work measurement function is attached to line management.
Correct Answer False
Your Answer
True
Select The Blank
Question
________ is the sum of set up time and run time.
Correct Answer Manufacturing time
Your Answer
Manufacturing time
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
The activities such as preparation of estimates of tools, gauges,
measuring instruments, follow up with tool room, periodic replenishment
are grouped under :Correct Answer Tool controls
Your Answer
Tool controls
Multiple Choice Single Answer
Question
Break light is essential for an automobile from safety point of view.
However, the vehicle can be driven even in absence of break light.
Thus break light can be categorized as :Correct Answer Essential
Your Answer
Essential
Multiple Choice Single Answer
Question
Given a decision for designing a line layout, major problem is
subdividing a work so that smooth flow can result. The subdivision
process is called :Correct Answer Line balancing
Your Answer
Line of balance
True/False
Question
As per a study on materials management practices, a typical firm
spends almost half of its rupee sales on goods purchased from
vendors.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
Labour efficiency depends upon ________
Correct Answer Training and experience
Your Answer
Training and experience
Match The Following
Question
Correct Answer
Your Answer
Work element
Smallest portion of work
identified during the
breakdown analysis of the
job.
Smallest portion of work
identified during the
breakdown analysis of the
job.
Production line
Arrangement of workstations
where each workman
performs a pre-determined
task on an incomplete unit
which passes down the line
of subsequent unit until it is
finished.
Arrangement of workstations
where each workman
performs a pre-determined
task on an incomplete unit
which passes down the line
of subsequent unit until it is
finished.
Work Station
Assigned location, zone,
place or stage in assembly
where designated work is
performed on part
component of product.
Assigned location, zone,
place or stage in assembly
where designated work is
performed on part component
of product.
Station work content
Time required to perform the
designated amount of work
at a given work station and
is obtained by adding up
time of work elements
allotted to the work station.
Time required to perform the
designated amount of work at
a given work station and is
obtained by adding up time of
work elements allotted to the
work station.
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in
inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying
department
Your Answer
By proper coordination between shop floor, stores and buying
department
Select The Blank
Question
In the assignment model, the________ is formed between jobs and
machines.
Correct Answer Matrix
Your Answer
Matrix
True/False
Question
To solve "n jobs - 2 machines " sequencing problem, all jobs require
same sequence of operations. Each job must be processed first on
machine A and then on machine B in a fixed sequence AB.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Let us suppose that activity P & Q can not start until activity R& S are
completed. Activities P &Q are therefore :-
Correct Answer Succeeding
Your Answer
Preceding
Multiple Choice Multiple Answer
Question
What is meant by production control?
Correct Answer Control is seeing that the requirements are made available at the right
place and right quantities , Reporting back the progress to the
production planning , Control involves suggesting action when the jobs
is falling behind schedule
Your Answer
Control is seeing that the requirements are made available at the right
place and right quantities , Reporting back the progress to the
production planning , Control involves suggesting action when the jobs
is falling behind schedule
Multiple Choice Multiple Answer
Question
The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database
Your Answer
Algorithms , Program code , Database
Multiple Choice Single Answer
Question
The assignment method is also called as :Correct Answer Hungarian Method
Your Answer
Hungarian Method
True/False
Question
A buyer has little or no control over a lead time.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Customer's orders gives us work
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed by inefficient
P.P.C.?
Correct Answer Failure to provide proper tools and control on work in progress on shop
floor
Your Answer
Failure to provide proper tools and control on work in progress on shop
floor
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'C' type of items is :Correct Answer Few
Your Answer
Few
Multiple Choice Multiple Answer
Question
The features of program plan are as follows :Correct Answer Each row of activities is associated with one component of final
assembly. , Final completion date is zero , Time scale runs from right to
left
Your Answer
Time scale runs from right to left , Program plan is prepared in form of
mathematical model. , Final completion date is zero
Multiple Choice Multiple Answer
Question
Failure to identify accumulated load on a given machine at a given time
and identify periods available for allocation of future orders leads to
Correct Answer Delays in delivery , High overtime payment , Broken promises
Your Answer
Delays in delivery , High overtime payment , Higher rejections/rework
True/False
Question
A manufacturing firm in the present days have virtually no control on
their profits
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new
customers
Your Answer
Gives us work , Dividends to share holders , Gets business from new
customers , Set the wheel of our production rolling
True/False
Question
If customers orders often get completed ahead of the schedule, it is a
sign of good scheduling.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost
Your Answer
Overtime cost
Multiple Choice Multiple Answer
Question
Subcontracting department works under :Correct Answer Planning , Purchase , Production
Your Answer
Planning , Purchase , Production
Select The Blank
Question
Given total work content as 370 and maximum allowable cycle time to
be 90 seconds, the theoretical number of work stations would be
________.
Correct Answer 4.11
Your Answer
4.11
Select The Blank
Question
Orders with ________ slack time remaining per operation are run first.
Correct Answer Shortest
Your Answer
Shortest
Multiple Choice Single Answer
Question
If total lead time of certain item is 30 days and lead time of operations
completed is 6 days, the lead time required [ LTR ] would be :Correct Answer 24
Your Answer
24
Select The Blank
Question
The performance standard is required by ________ to determine
individual machine capacity for the purpose of machine loading and
assigning machine hours and man hours .
Correct Answer Scheduler
Your Answer
Industrial engineer
Select The Blank
Question
At each ________, work is performed on a product either by adding
parts or by completing assembly operations.
Correct Answer Work station
Your Answer
Work station
Multiple Choice Single Answer
Question
Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box
Your Answer
Placed in a tray/box
True/False
Question
PERT finds applications where resources [ men, materials and money ]
are always made available as and when required.
Correct Answer True
Your Answer
True
Select The Blank
Question
Rational figure on utilization index can be obtained by carrying out
________ study.
Correct Answer Work- sampling
Your Answer
Work- sampling
True/False
Question
EOQ is that quantity at which price paid by buyer is minimum.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Keeping available time per day constant, if the desired production rate
per day is to be doubled ,cycle time will be reduced by :Correct Answer 0.5
Your Answer
0.5
Multiple Choice Multiple Answer
Question
To prepare load chart following job related information should be
collected :Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on
hand
Your Answer
Jobs on the machine , Jobs on hand , Delivery commitments of jobs on
hand
Select The Blank
Question
Job production requires ________ capital investment.
Correct Answer Lowest
Your Answer
Largest
Multiple Choice Multiple Answer
Question
The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision
Your Answer
Continuous flow of material , Low skilled labour , Easy supervision
Select The Blank
Question
________ represents productive time of the job.
Correct Answer Manufacturing time
Your Answer
Manufacturing time
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct Answer Arrow diagram , Nodes , Float
Your Answer
Arrow diagram , Nodes , Float
Multiple Choice Single Answer
Question
The Follow up required for early delivery in case of 'B' types of items is
usually :Correct Answer Periodic
Your Answer
Periodic
Match The Following
Question
Correct Answer
Your Answer
Job splitting
Dividing job in more than
one lot
Dividing job in more than one
lot
Change in priority
Shift equipment/workmen to Shift equipment/workmen to
delayed jobs
delayed jobs
Alternate routing
Processing on costlier
machine
Running jobs on one
machine sequentially
Overlapping
Running jobs simultaneously Running jobs simultaneously
on more than one machine on more than one machine
Multiple Choice Single Answer
Question
The event is graphically represented by :Correct Answer Circle
Your Answer
Circle
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium
Your Answer
Medium
Select The Blank
Question
________ analysis is based on consumption figures of an item.
Correct Answer FSN
Your Answer
ABC
True/False
Question
Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer True
Your Answer
True
True/False
Question
More than one subcontractor should be developed for each
subcontracted operation/Job.
Correct Answer True
Your Answer
True
2nd Copy
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material
purchase
Your Answer Higher material purchase , Increase in labour productivity , Better utilization
of equipment , Project margin
Select The Blank
Question To know the accumulated ________ for a given machine at a given time Load
charts are necessary.
Correct Answer Load
Your Answer Load
Multiple Choice Single Answer
Question LOB technique was developed by US navy in the year :Correct Answer 1958
Your Answer 1958
True/False
Question In continuous or process production , only one product is manufactured.
Correct Answer True
Your Answer True
Select The Blank
Question ________reflects impact of money tied up in inventory.
Correct Answer Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating
Your Answer Progress card , Display board , Network updating , Job card
Select The Blank
Question A progress card is the most ________ method of recording of progress of work.
Correct Answer Convenient
Your Answer Convenient
Multiple Choice Multiple Answer
Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question The light engineering company has one special purpose facing & centering
machine And one copying lathe. The foreman has five work orders for processing . The
operation Sequence is fixed [ each job is first faced and centered and then copy turned ] .
The standard Hours required for each machine to process each work order are shown in the
following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying
Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of
machine hours.
Correct Answer IV-I-II-V-III
Your Answer
I-II-III-IV-V
Select The Blank
Question ________ represents the time that elapses between the receipt of requirement
of job until the job is adopted in the production control department.
Correct Answer Order preparation time
Your Answer Queue time
True/False
Question PERT basically does not demarcate between critical and non-critical activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The assignment method is also called as :Correct Answer Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough blanking
Select The Blank
Question The correct fitting of orders with capacity considerably lessens ________
burden of control.
Correct Answer Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements
for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for
shipping and port clearance , Account in foreign bank
Match The Following
Question Correct Answer Your Answer
Order quantity Factor influencing process planning Break even analysis
Machine capacity chart Dimensional accuracy Dimensional accuracy
Mass production Special purpose machines Special purpose machines
Standard elemental time data Compare alternative processes Factor influencing process
planning
Multiple Choice Multiple Answer
Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits
Multiple Choice Multiple Answer
Question In replenishment system, the fixed order quantity system is also called by
following names :Correct Answer Fixed order system , Min-max system , Re-order point system
Your Answer Fixed order system , Min-max system , Re-order point system , Lead time
system
Multiple Choice Multiple Answer
Question How you will Judge the failure of production planning and control department?
Correct Answer Frequent broken delivery promises , Underutilization of men, machines ,
Excessive overtime
Your Answer Frequent broken delivery promises , Underutilization of men, machines ,
Excessive overtime , Better coordination with other section
Multiple Choice Single Answer
Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic
Your Answer Inverse
True/False
Question Given stock in hand = 1320 units, safety stock=840 units and average daily
consumption = 60 units, the lead time available would be 10 hours.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question If the annual usage of a material is 1200 units and the reorder point is at 120
Units, find the lead time.
Correct Answer 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question The assignment algorithm was developed by a Hungarian mathematician named
:Correct Answer D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question So far as possible, number of activities should be :Correct Answer Limited
Your Answer Limited
True/False
Question Production Planning and Control makes the supervisor ineffective.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle
Your Answer Unit of capacity
True/False
Question The 'G' group of GOLF analysis involves moderate delivery time and availability
of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time ,
Identify periods available for allocation in future to orders , Matching orders and loads
Your Answer Improving supply of material , To know the accumulated load on a given
machine at a given time , Identify periods available for allocation in future to orders ,
Matching orders and loads
Select The Blank
Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost
Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing
cost would be Rs ________.
Correct Answer 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question An inventory control system in which stock of item is physically or conceptually
divided into ________ bins is calledTwo bin system.
Correct Answer Two
Your Answer Pair
Multiple Choice Multiple Answer
Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys
Multiple Choice Single Answer
Question For goods manufactured to stock, following department is expected to
periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control
Your Answer Production
True/False
Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.
Correct Answer False
Your Answer True
True/False
Question Scientific inventory control system requires to be followed for machine aid, work
aid and inspection aid :Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum
Your Answer Minimum
True/False
Question Purchase department must keep PPC informed regarding lead time of different
items specially where lead times are extended.
Correct Answer True
Your Answer True
True/False
Question In assignment matrix, it is a must to determine Jacobean of the determinant.
Correct Answer False
Your Answer True
Select The Blank
Question For replenishment action for stock items which are reserved by PPC, the stores
work out ________ stock which equals the stock on hand less stock reserved.
Correct Answer Free
Your Answer Net
Multiple Choice Single Answer
Question What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer Consistent good quality of products
Match The Following
Question Correct Answer Your Answer
End piece allowance Material insufficient to produce one piece Material insufficient to
produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of
spares
Machining allowance Extra material requirement Extra material requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question PPC is expected to have good inter-departmental relationships to achieve the
production targets. Which is the most important factor that shall affect production targets?
Correct Answer Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question Generally for ________ flow system, Heuristic method is preferred.
Correct Answer Intermittent
Your Answer Continuous
Select The Blank
Question In control board________ compartment contains copy of work orders/shop
orders of the item to be processed next on the machine.
Correct Answer Middle
Your Answer Bottom
True/False
Question Work measurement function is attached to line management.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question The technical feasibility of sales enquiry is carried out on the following grounds
:Correct Answer Tools and plants are available , Technical know how is available ,
Competent persons are present
Your Answer Tools and plants are available , Technical know how is available , Competent
persons are present , Cost data of raw material is available.
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
The activities such as preparation of estimates of tools, gauges,
measuring instruments, follow up with tool room, periodic replenishment
are grouped under :Correct Answer Tool controls
Your Answer
Tool controls
Multiple Choice Single Answer
Question
Break light is essential for an automobile from safety point of view.
However, the vehicle can be driven even in absence of break light.
Thus break light can be categorized as :Correct Answer Essential
Your Answer
Essential
Multiple Choice Single Answer
Question
Given a decision for designing a line layout, major problem is
subdividing a work so that smooth flow can result. The subdivision
process is called :Correct Answer Line balancing
Your Answer
True/False
Line of balance
Question
As per a study on materials management practices, a typical firm
spends almost half of its rupee sales on goods purchased from
vendors.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
Labour efficiency depends upon ________
Correct Answer Training and experience
Your Answer
Training and experience
Match The Following
Question
Correct Answer
Your Answer
Work element
Smallest portion of work
identified during the
breakdown analysis of the
job.
Smallest portion of work
identified during the
breakdown analysis of the
job.
Production line
Arrangement of workstations
where each workman
performs a pre-determined
task on an incomplete unit
which passes down the line
of subsequent unit until it is
finished.
Arrangement of workstations
where each workman
performs a pre-determined
task on an incomplete unit
which passes down the line
of subsequent unit until it is
finished.
Work Station
Assigned location, zone,
place or stage in assembly
where designated work is
performed on part
component of product.
Assigned location, zone,
place or stage in assembly
where designated work is
performed on part component
of product.
Station work content
Time required to perform the
designated amount of work
at a given work station and
is obtained by adding up
time of work elements
allotted to the work station.
Time required to perform the
designated amount of work at
a given work station and is
obtained by adding up time of
work elements allotted to the
work station.
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in
inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying
department
Your Answer
By proper coordination between shop floor, stores and buying
department
Select The Blank
Question
In the assignment model, the________ is formed between jobs and
machines.
Correct Answer Matrix
Your Answer
Matrix
True/False
Question
To solve "n jobs - 2 machines " sequencing problem, all jobs require
same sequence of operations. Each job must be processed first on
machine A and then on machine B in a fixed sequence AB.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Let us suppose that activity P & Q can not start until activity R& S are
completed. Activities P &Q are therefore :Correct Answer Succeeding
Your Answer
Preceding
Multiple Choice Multiple Answer
Question
What is meant by production control?
Correct Answer Control is seeing that the requirements are made available at the right
place and right quantities , Reporting back the progress to the
production planning , Control involves suggesting action when the jobs
is falling behind schedule
Your Answer
Control is seeing that the requirements are made available at the right
place and right quantities , Reporting back the progress to the
production planning , Control involves suggesting action when the jobs
is falling behind schedule
Multiple Choice Multiple Answer
Question
The software for CPA would require the following parameters:Correct Answer Algorithms , Program code , Database
Your Answer
Algorithms , Program code , Database
Multiple Choice Single Answer
Question
The assignment method is also called as :-
Correct Answer Hungarian Method
Your Answer
Hungarian Method
True/False
Question
A buyer has little or no control over a lead time.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Customer's orders gives us work
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed by inefficient
P.P.C.?
Correct Answer Failure to provide proper tools and control on work in progress on shop
floor
Your Answer
Failure to provide proper tools and control on work in progress on shop
floor
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'C' type of items is :Correct Answer Few
Your Answer
Few
Multiple Choice Multiple Answer
Question
The features of program plan are as follows :Correct Answer Each row of activities is associated with one component of final
assembly. , Final completion date is zero , Time scale runs from right to
left
Your Answer
Time scale runs from right to left , Program plan is prepared in form of
mathematical model. , Final completion date is zero
Multiple Choice Multiple Answer
Question
Failure to identify accumulated load on a given machine at a given time
and identify periods available for allocation of future orders leads to
Correct Answer Delays in delivery , High overtime payment , Broken promises
Your Answer
Delays in delivery , High overtime payment , Higher rejections/rework
True/False
Question
A manufacturing firm in the present days have virtually no control on
their profits
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from new
customers
Your Answer
Gives us work , Dividends to share holders , Gets business from new
customers , Set the wheel of our production rolling
True/False
Question
If customers orders often get completed ahead of the schedule, it is a
sign of good scheduling.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct Answer Overtime cost
Your Answer
Overtime cost
Multiple Choice Multiple Answer
Question
Subcontracting department works under :Correct Answer Planning , Purchase , Production
Your Answer
Planning , Purchase , Production
Select The Blank
Question
Given total work content as 370 and maximum allowable cycle time to
be 90 seconds, the theoretical number of work stations would be
________.
Correct Answer 4.11
Your Answer
4.11
Select The Blank
Question
Orders with ________ slack time remaining per operation are run first.
Correct Answer Shortest
Your Answer
Shortest
Multiple Choice Single Answer
Question
If total lead time of certain item is 30 days and lead time of operations
completed is 6 days, the lead time required [ LTR ] would be :Correct Answer 24
Your Answer
24
Select The Blank
Question
The performance standard is required by ________ to determine
individual machine capacity for the purpose of machine loading and
assigning machine hours and man hours .
Correct Answer Scheduler
Your Answer
Industrial engineer
Select The Blank
Question
At each ________, work is performed on a product either by adding
parts or by completing assembly operations.
Correct Answer Work station
Your Answer
Work station
Multiple Choice Single Answer
Question
Detachable ticket, after filling in required information is :Correct Answer Placed in a tray/box
Your Answer
Placed in a tray/box
True/False
Question
PERT finds applications where resources [ men, materials and money ]
are always made available as and when required.
Correct Answer True
Your Answer
True
Select The Blank
Question
Rational figure on utilization index can be obtained by carrying out
________ study.
Correct Answer Work- sampling
Your Answer
Work- sampling
True/False
Question
EOQ is that quantity at which price paid by buyer is minimum.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Keeping available time per day constant, if the desired production rate
per day is to be doubled ,cycle time will be reduced by :Correct Answer 0.5
Your Answer
0.5
Multiple Choice Multiple Answer
Question
To prepare load chart following job related information should be
collected :Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on
hand
Your Answer
Jobs on the machine , Jobs on hand , Delivery commitments of jobs on
hand
Select The Blank
Question
Job production requires ________ capital investment.
Correct Answer Lowest
Your Answer
Largest
Multiple Choice Multiple Answer
Question
The main characteristics of mass and flow production are :Correct Answer Continuous flow of material , Low skilled labour , Easy supervision
Your Answer
Continuous flow of material , Low skilled labour , Easy supervision
Select The Blank
Question
________ represents productive time of the job.
Correct Answer Manufacturing time
Your Answer
Manufacturing time
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct Answer Arrow diagram , Nodes , Float
Your Answer
Arrow diagram , Nodes , Float
Multiple Choice Single Answer
Question
The Follow up required for early delivery in case of 'B' types of items is
usually :Correct Answer Periodic
Your Answer
Periodic
Match The Following
Question
Correct Answer
Your Answer
Job splitting
Dividing job in more than
one lot
Dividing job in more than one
lot
Change in priority
Shift equipment/workmen to Shift equipment/workmen to
delayed jobs
delayed jobs
Alternate routing
Processing on costlier
machine
Overlapping
Running jobs simultaneously Running jobs simultaneously
on more than one machine on more than one machine
Running jobs on one
machine sequentially
Multiple Choice Single Answer
Question
The event is graphically represented by :Correct Answer Circle
Your Answer
Circle
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium
Your Answer
Medium
Select The Blank
Question
________ analysis is based on consumption figures of an item.
Correct Answer FSN
Your Answer
True/False
ABC
Question
Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer True
Your Answer
True
True/False
Question
More than one subcontractor should be developed for each
subcontracted operation/Job.
Correct Answer True
Your Answer
True
Production Planning & Control assgn :03: Abhra
Multiple Choice Single Answer
Question
The activities such as preparation of estimates of tools, gauges, measuring instruments,
follow up with tool room, periodic replenishment are grouped under :Correct
Tool controls
Answer
Your Answer
Tool controls
Multiple Choice Single Answer
Question
Break light is essential for an automobile from safety point of view. However, the vehicle
can be driven even in absence of break light. Thus break light can be categorized as :Correct
Essential
Answer
Your Answer
Essential
Multiple Choice Single Answer
Question
Given a decision for designing a line layout, major problem is subdividing a work so that
smooth flow can result. The subdivision process is called :Correct
Line balancing
Answer
Your Answer
Line of balance
True/False
Question
Correct
Answer
Your Answer
As per a study on materials management practices, a typical firm spends almost half of
its rupee sales on goods purchased from vendors.
True
True
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct
Answer
Your Answer
Consistent good quality of products
Consistent good quality of products
Select The Blank
Question
Labour efficiency depends upon ________
Correct
Answer
Your Answer
Training and experience
Training and experience
Match The Following
Question
Correct Answer
Your Answer
Work element
Smallest portion of work identified Smallest portion of work identified
during the breakdown analysis of during the breakdown analysis of
the job.
the job.
Production line
Arrangement of workstations
where each workman performs a
pre-determined task on an
incomplete unit which passes
down the line of subsequent unit
until it is finished.
Arrangement of workstations
where each workman performs a
pre-determined task on an
incomplete unit which passes down
the line of subsequent unit until it
is finished.
Work Station
Assigned location, zone, place or
stage in assembly where
designated work is performed on
part component of product.
Assigned location, zone, place or
stage in assembly where
designated work is performed on
part component of product.
Station work content
Time required to perform the
designated amount of work at a
given work station and is obtained
by adding up time of work
elements allotted to the work
station.
Time required to perform the
designated amount of work at a
given work station and is obtained
by adding up time of work
elements allotted to the work
station.
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in inventories effectively :Correct
Answer
Your Answer
By proper coordination between shop floor, stores and buying department
By proper coordination between shop floor, stores and buying department
Select The Blank
Question
In the assignment model, the________ is formed between jobs and machines.
Correct
Answer
Your Answer
Matrix
Matrix
True/False
Question
Correct
Answer
Your Answer
To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of
operations. Each job must be processed first on machine A and then on machine B in a
fixed sequence AB.
True
True
Multiple Choice Single Answer
Question
Let us suppose that activity P & Q can not start until activity R& S are completed.
Activities P &Q are therefore :Correct
Succeeding
Answer
Your Answer
Preceding
Multiple Choice Multiple Answer
Question
What is meant by production control?
Correct
Answer
Your Answer
Control is seeing that the requirements are made available at the right place and right
quantities , Reporting back the progress to the production planning , Control involves
suggesting action when the jobs is falling behind schedule
Control is seeing that the requirements are made available at the right place and right
quantities , Reporting back the progress to the production planning , Control involves
suggesting action when the jobs is falling behind schedule
Multiple Choice Multiple Answer
Question
The software for CPA would require the following parameters:Correct
Answer
Your Answer
Algorithms , Program code , Database
Algorithms , Program code , Database
Multiple Choice Single Answer
Question
The assignment method is also called as :Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Hungarian Method
Hungarian Method
A buyer has little or no control over a lead time.
False
True
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct
Answer
Your Answer
Customer's orders gives us work
Customer's orders gives us work
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed by inefficient P.P.C.?
Correct
Answer
Your Answer
Failure to provide proper tools and control on work in progress on shop floor
Failure to provide proper tools and control on work in progress on shop floor
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'C' type of items is :Correct
Answer
Your Answer
Few
Few
Multiple Choice Multiple Answer
Question
The features of program plan are as follows :Correct
Answer
Your Answer
Each row of activities is associated with one component of final assembly. , Final
completion date is zero , Time scale runs from right to left
Time scale runs from right to left , Program plan is prepared in form of mathematical
model. , Final completion date is zero
Multiple Choice Multiple Answer
Question
Failure to identify accumulated load on a given machine at a given time and identify
periods available for allocation of future orders leads to
Correct
Delays in delivery , High overtime payment , Broken promises
Answer
Your Answer
Delays in delivery , High overtime payment , Higher rejections/rework
True/False
Question
Correct
Answer
Your Answer
A manufacturing firm in the present days have virtually no control on their profits
False
True
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following reasons :Correct
Answer
Gives us work , Dividends to share holders , Gets business from new customers
Your Answer
True/False
Question
Correct
Answer
Your Answer
Gives us work , Dividends to share holders , Gets business from new customers , Set the
wheel of our production rolling
If customers orders often get completed ahead of the schedule, it is a sign of good
scheduling.
False
True
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :Correct
Answer
Your Answer
Overtime cost
Overtime cost
Multiple Choice Multiple Answer
Question
Subcontracting department works under :Correct
Answer
Your Answer
Planning , Purchase , Production
Planning , Purchase , Production
Select The Blank
Question
Given total work content as 370 and maximum allowable cycle time to be 90 seconds,
the theoretical number of work stations would be ________.
Correct
4.11
Answer
Your Answer
4.11
Select The Blank
Question
Orders with ________ slack time remaining per operation are run first.
Correct
Answer
Your Answer
Shortest
Shortest
Multiple Choice Single Answer
Question
If total lead time of certain item is 30 days and lead time of operations completed is 6
days, the lead time required [ LTR ] would be :Correct
24
Answer
Your Answer
24
Select The Blank
Question
Correct
Answer
Your Answer
The performance standard is required by ________ to determine individual machine
capacity for the purpose of machine loading and assigning machine hours and man hours
.
Scheduler
Industrial engineer
Select The Blank
Question
At each ________, work is performed on a product either by adding parts or by
completing assembly operations.
Correct
Work station
Answer
Your Answer
Work station
Multiple Choice Single Answer
Question
Detachable ticket, after filling in required information is :Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Placed in a tray/box
Placed in a tray/box
PERT finds applications where resources [ men, materials and money ] are always made
available as and when required.
True
True
Select The Blank
Question
Rational figure on utilization index can be obtained by carrying out ________ study.
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Work- sampling
Work- sampling
EOQ is that quantity at which price paid by buyer is minimum.
False
True
Multiple Choice Single Answer
Question
Keeping available time per day constant, if the desired production rate per day is to be
doubled ,cycle time will be reduced by :Correct
0.5
Answer
Your Answer
0.5
Multiple Choice Multiple Answer
Question
To prepare load chart following job related information should be collected :Correct
Answer
Your Answer
Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand
Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand
Select The Blank
Question
Job production requires ________ capital investment.
Correct
Answer
Your Answer
Lowest
Largest
Multiple Choice Multiple Answer
Question
The main characteristics of mass and flow production are :Correct
Answer
Your Answer
Continuous flow of material , Low skilled labour , Easy supervision
Continuous flow of material , Low skilled labour , Easy supervision
Select The Blank
Question
________ represents productive time of the job.
Correct
Answer
Your Answer
Manufacturing time
Manufacturing time
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct
Answer
Your Answer
Arrow diagram , Nodes , Float
Arrow diagram , Nodes , Float
Multiple Choice Single Answer
Question
The Follow up required for early delivery in case of 'B' types of items is usually :Correct
Answer
Your Answer
Periodic
Periodic
Match The Following
Question
Correct Answer
Your Answer
Job splitting
Dividing job in more than one lot
Dividing job in more than one lot
Change in priority
Shift equipment/workmen to
delayed jobs
Shift equipment/workmen to
delayed jobs
Alternate routing
Processing on costlier machine
Running jobs on one machine
sequentially
Overlapping
Running jobs simultaneously on
more than one machine
Running jobs simultaneously on
more than one machine
Multiple Choice Single Answer
Question
The event is graphically represented by :Correct
Answer
Your Answer
Circle
Circle
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct
Answer
Your Answer
Medium
Medium
Select The Blank
Question
________ analysis is based on consumption figures of an item.
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
FSN
ABC
Purchase department must keep PPC informed regarding lead time of different items
specially where lead times are extended.
True
True
More than one subcontractor should be developed for each subcontracted operation/Job.
True
True
Production Planning & Control assgn:04: Sameer
Multiple Choice Multiple Answer
Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material
purchase
Your Answer Higher material purchase , Increase in labour productivity , Better utilization
of equipment , Project margin
Select The Blank
Question To know the accumulated ________ for a given machine at a given time Load
charts are necessary.
Correct Answer Load
Your Answer Load
Multiple Choice Single Answer
Question LOB technique was developed by US navy in the year :Correct Answer 1958
Your Answer 1958
True/False
Question In continuous or process production , only one product is manufactured.
Correct Answer True
Your Answer True
Select The Blank
Question ________reflects impact of money tied up in inventory.
Correct Answer Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating
Your Answer Progress card , Display board , Network updating , Job card
Select The Blank
Question A progress card is the most ________ method of recording of progress of work.
Correct Answer Convenient
Your Answer Convenient
Multiple Choice Multiple Answer
Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question The light engineering company has one special purpose facing & centering
machine And one copying lathe. The foreman has five work orders for processing . The
operation Sequence is fixed [ each job is first faced and centered and then copy turned ] .
The standard Hours required for each machine to process each work order are shown in the
following Table :- Work Order Processing Time [Hours ] Facing & centering machine Copying
Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements of
machine hours.
Correct Answer IV-I-II-V-III
Your Answer I-II-III-IV-V
Select The Blank
Question ________ represents the time that elapses between the receipt of requirement
of job until the job is adopted in the production control department.
Correct Answer Order preparation time
Your Answer Queue time
True/False
Question PERT basically does not demarcate between critical and non-critical activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The assignment method is also called as :Correct Answer Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough blanking
Select The Blank
Question The correct fitting of orders with capacity considerably lessens ________
burden of control.
Correct Answer Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question The 'F' group of GOLF analysis involves following requirements :Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements
for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for
shipping and port clearance , Account in foreign bank
Match The Following
Question Correct Answer Your Answer
Order quantity Factor influencing process planning Break even analysis
Machine capacity chart Dimensional accuracy Dimensional accuracy
Mass production Special purpose machines Special purpose machines
Standard elemental time data Compare alternative processes Factor influencing process
planning
Multiple Choice Multiple Answer
Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits
Multiple Choice Multiple Answer
Question In replenishment system, the fixed order quantity system is also called by
following names :Correct Answer Fixed order system , Min-max system , Re-order point system
Your Answer Fixed order system , Min-max system , Re-order point system , Lead time
system
Multiple Choice Multiple Answer
Question How you will Judge the failure of production planning and control department?
Correct Answer Frequent broken delivery promises , Underutilization of men, machines ,
Excessive overtime
Your Answer Frequent broken delivery promises , Underutilization of men, machines ,
Excessive overtime , Better coordination with other section
Multiple Choice Single Answer
Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic
Your Answer Inverse
True/False
Question Given stock in hand = 1320 units, safety stock=840 units and average daily
consumption = 60 units, the lead time available would be 10 hours.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question If the annual usage of a material is 1200 units and the reorder point is at 120
Units, find the lead time.
Correct Answer 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question The assignment algorithm was developed by a Hungarian mathematician named
:Correct Answer D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question So far as possible, number of activities should be :Correct Answer Limited
Your Answer Limited
True/False
Question Production Planning and Control makes the supervisor ineffective.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle
Your Answer Unit of capacity
True/False
Question The 'G' group of GOLF analysis involves moderate delivery time and availability
of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time ,
Identify periods available for allocation in future to orders , Matching orders and loads
Your Answer Improving supply of material , To know the accumulated load on a given
machine at a given time , Identify periods available for allocation in future to orders ,
Matching orders and loads
Select The Blank
Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost
Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing
cost would be Rs ________.
Correct Answer 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question An inventory control system in which stock of item is physically or conceptually
divided into ________ bins is calledTwo bin system.
Correct Answer Two
Your Answer Pair
Multiple Choice Multiple Answer
Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys
Multiple Choice Single Answer
Question For goods manufactured to stock, following department is expected to
periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control
Your Answer Production
True/False
Question Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.
Correct Answer False
Your Answer True
True/False
Question Scientific inventory control system requires to be followed for machine aid, work
aid and inspection aid :Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question Value Analysis conducted in 'C' type of material is usually : Correct Answer Minimum
Your Answer Minimum
True/False
Question Purchase department must keep PPC informed regarding lead time of different
items specially where lead times are extended.
Correct Answer True
Your Answer True
True/False
Question In assignment matrix, it is a must to determine Jacobean of the determinant.
Correct Answer False
Your Answer True
Select The Blank
Question For replenishment action for stock items which are reserved by PPC, the stores
work out ________ stock which equals the stock on hand less stock reserved.
Correct Answer Free
Your Answer Net
Multiple Choice Single Answer
Question What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer Consistent good quality of products
Match The Following
Question Correct Answer Your Answer
End piece allowance Material insufficient to produce one piece Material insufficient to
produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of
spares
Machining allowance Extra material requirement Extra material requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question PPC is expected to have good inter-departmental relationships to achieve the
production targets. Which is the most important factor that shall affect production targets?
Correct Answer Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question Generally for ________ flow system, Heuristic method is preferred.
Correct Answer Intermittent
Your Answer Continuous
Select The Blank
Question In control board________ compartment contains copy of work orders/shop
orders of the item to be processed next on the machine.
Correct Answer Middle
Your Answer Bottom
True/False
Question Work measurement function is attached to line management.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question The technical feasibility of sales enquiry is carried out on the following grounds
:Correct Answer Tools and plants are available , Technical know how is available ,
Competent persons are present
Your Answer Tools and plants are available , Technical know how is available , Competent
persons are present , Cost data of raw material is available.
P P C 3rd SEMESTER OPERATIONS (PGDBA)
True/False
Question:
XYZ when combined with FSN analysis helps to
classify non-moving items into XN , YN and ZN.
Correct Answer:
True
Your Answer True
Multiple Choice Single Answers
Question:
Forecast is based on:Correct Answer:
Past data
Your Answer Competitor's market share
Select the Blank
Question:
Network ________ is defined as any adjustment
to the arrow diagram which becomes necessary owing to departure
from the project schedule laid down earlier.
Correct Answer:
Updating
Your Answer Design
Multiple Choice Single Answers
Question:
For goods manufactured to stock, following
department is expected to periodically undertake replenishment
action as stocks are depleted:Correct Answer:
Production Planning Control
Your Answer Production Planning Control
True/False
Question:
CPM marks critical activities.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
A shop order may combine more than one
________ requiring identical items.
Correct Answer:
Work order
Your Answer Sales order
Multiple Choice Single Answer
Question:
What are the customer's expectation from the
supplier?
Correct Answer:
Consistent good quality of products
Your Answer Consistent good quality of products
Select The Blank
Question:
________ inventories help to balance company's
supply with market demand.
Correct Answer:
Finished goods
Your Answer WIP
Select The Blank
Question:
Short term forecasts are for ________.
Correct Answer:
Material Planning
Your Answer Cash flow management
Multiple Choice Single Answer
Question:
For process planning following is one of the basic
document used :Correct Answer:
Operation Layout
Your Answer Process Layout
Multiple Choice Single Answer
Question:
Scheduled start of an operation is authorized by
issuing a document called :Correct Answer:
Job card
Your Answer Route card
Multiple Choice Multiple Answer
Question:
SOS Analysis involves following type of items :Correct Answer:
Seasonal items available only for a
limited period. , Seasonal items available throughout the year. ,
Non-seasonal items whose quantity is decided on different
considerations.
Your Answer Seasonal items available throughout the year. ,
Non-seasonal items whose quantity is decided on different
considerations. , Machine spare parts
Multiple Choice Multiple Answer
Question:
The basic procedure of assignment technique is
designed to solve problems wherein :Correct Answer:
Number of tasks equal to number of
facilities. , The objective function is minimization. , There are no
restrictions in allocation
Your Answer Number of tasks equal to number of facilities. ,
There are no restrictions in allocation , Cost of machine should be
taken into consideration.
True/False
Question:
There are five manufacturing systems. However,
many manufacturers combines two or more systems to produce a
final product.
Correct Answer:
True
Your Answer True
True/False
Question:
In LOB, the regular progress checks the future
effect of any current delays and indicates degree of urgency for
corrective action.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
5 jobs are to be processed on machines M1 and
M2 , first on M1 and then on M2. The processing times in hours are
PAGE NO: 1 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
as follows. Find the sequence for 5 jobs that will minimize total
elapsed time .also find idle time & total elapsed time. Job
Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 9
7 6 3 8 5 10 4
Correct Answer:
2-4-3-5-1 , Minimum time 28 hours ,
Idle time = 1 & 2 Hours for M1 & M2 respectively.
Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours
for M1 & M2 respectively.
True/False
Question:
When shop floor scheduling problem larger than
3 machines arise the analytical solution procedures leading to
optimality are complex and difficult.
Correct Answer:
True
Your Answer True
Question:
The data regarding maximum run out between
centers pertains to :Correct Answer:
Process planning
Your Answer Raw material data
True/False
Question:
Lead time information is required for
determination of safety stock.
Correct Answer:
False
Your Answer True
Select The Blank
Question:
Americans like to use the word 'inventory'
whereas for same context British use the term________.
Correct Answer:
Stock
Your Answer Stock
Match The Following
Question:
Correct Answer:Your Answer
End piece allowance
Material insufficient to produce one
piece Material insufficient to produce one piece
Stock allowance Quantity to meet requirement of spares
Extra material requirement
Machining allowance
in handling
Extra material requirementMaterial loss
Spoilage allowance
requirement of spares
Process rejection Quantity to meet
Select The Blank
Question:
________ is required for machine set ups as well
as regular production.
Correct Answer:
Performance standard
Your Answer Machine design data
Multiple Choice Single Answer
Question:
If a product is required within 20 days and the
product can be made available in 10 days, the Critical ratio would
be :Correct Answer:
2
Your Answer 0.5
Multiple Choice Single Answer
Question:
A subcontractor is :Correct Answer:
Another form acting as a supplier
Your Answer Manufacturer of specialized products on whom
the buyer is dependent for 100% of requirement of main assembly
Multiple Choice Multiple Answer
Question:
SDE analysis is employed by the purchase
department for :Correct Answer:
Contract buying for some of 'easy' items.
, Forward buying of some of 'scarce' items. , Scheduled buying for
some of 'easy' items.
Your Answer Forward buying of some of 'scarce' items. ,
Scheduled buying for some of 'easy' items. , Contract buying for
some of 'easy' items.
True/False
Question:
Labour efficiency factor is applied after capacity
requirement of equipment is calculated.
Correct Answer:
False
Your Answer True
Multiple Choice Multiple Answer
Question:
PERT terminology uses words like :Correct Answer:
Network diagram , Events , Slack
Your Answer Network diagram , Events
True/False
Question:
The LOB technique is most appropriate for
assembly operations involving number of distinct components.
Correct Answer:
True
Your Answer True
True/False
Question:
Transit time for manufactured items should be
considered only when it is insignificant.
Correct Answer:
False
Your Answer True
Multiple Choice Single Answer
Select The Blank
PAGE NO: 2 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
A progress card normally contains ________
squares.
Correct Answer:
Less than 25
Your Answer More than 50
Multiple Choice Multiple Answer
Question:
Due to the following emergent events, the queue
time has to compensate for the time for which the job has to
undergo an extra time :Correct Answer:
Tool breakage , Job split up , Change in
priorities
Your Answer Tool breakage , Job split up , Store inventory
Multiple Choice Single Answer
Question:
One of the following is not an task of progressing
:Correct Answer:
Ensuring supply of material and issue of
documents to manufacturing shops
Your Answer Expediting to rush up remaining operations of the
delays jobs
Multiple Choice Single Answer
Question:
Production output in night shift is :Correct Answer:
Less than I shift production
Your Answer More than I shift production
Multiple Choice Multiple Answer
Question:
The minimum requirements for application
software for line balancing are as follows :Correct Answer:
1 Ghz processor , 1 Gb hard Disk free
memory , Windows or equivalent operating system.
Your Answer 1 Gb hard Disk free memory , Windows or
equivalent operating system.
Multiple Choice Single Answer
Question:
The work measurement and time study belong to
the following school of management :Correct Answer:
Scientific School of management
Your Answer Functional School of management
Multiple Choice Multiple Answer
Question:
Before planning subcontracting points to be
considered are :Correct Answer:
Whether overtime can be given , One
more shift can be started
Your Answer Whether overtime can be given , One more shift
can be started , Set up time can be reduced
Multiple Choice Multiple Answer
Question:
The main requirements of re-order level system
are as follows :-
Correct Answer:
Incoming materials and materials
returned from shop must be deposited in appropriate bins and their
stock cards must be posted for "goods receipt report" and "material
return note" for the quantities received physically . , Items should
be issued in correct quantities. , The balance on the stock cards
should be periodically tallied with physical stock.
Your Answer Incoming materials and materials returned from
shop must be deposited in appropriate bins and their stock cards
must be posted for "goods receipt report" and "material return note"
for the quantities received physically . , Items should be issued in
correct quantities. , The balance on the stock cards should be
periodically tallied with physical stock.
Multiple Choice Multiple Answer
Question:
The following are salient features of the fixed
order quantity system :Correct Answer:
Reorder quantity is always the same
which is usually economic order quantity , The time interval
between deliveries varies. , Replenishment action is initiated when
the stock on hand is just sufficient to meet demand during the lead
time.
Your Answer Reorder quantity is always the same which is
usually economic order quantity , The time interval between
deliveries varies. , Percent cumulative cost of item is taken into
consideration.
Select The Blank
Question:
ABC company manufactures MS bolts. Given
fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs
3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost
of buying is Rs 8 per piece. The firm uses 100000 MS bolts every
year. Under these circumstances, the firm would take a decision to
________.
Correct Answer:
Make at home
Your Answer Buy from outside
Multiple Choice Multiple Answer
Question:
Following difficulties are faced by SDE analysis
:Correct Answer:
More delivery period , Geographical
location of supplier , Reliability of suppliers
Your Answer More delivery period , Reliability of suppliers ,
Excise duty
Select The Blank
Question:
For replenishment action for stock items which
are reserved by PPC, the stores work out ________ stock which
equals the stock on hand less stock reserved.
Correct Answer:
Free
Your Answer Net
True/False
Question:
Route sheets for custom built job is prepared for
each new order received.
PAGE NO: 3 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
Correct Answer:
Your Answer True
True
P P C 3rd SEMESTER OPERATIONS (PGDBA)
memory or wastes computer stationary while preparing stores
ledger.
Correct Answer:
MNG Analysis
Your Answer SOS Analysis
Match The Following
Question:
Correct Answer:Your Answer
Order quantity Factor influencing process planningCompare
alternative processes
Machine capacity chart Dimensional accuracy
purpose machines with special toolings
Multiple Choice Single Answer
Question:
Why customer is called the king?
Correct Answer:
Customer's orders gives us work
Your Answer Gives satisfaction to workers
General
Mass production Special purpose machines Break even analysis
Standard elemental time data
Compare alternative processes
Factor influencing process planning
Multiple Choice Multiple Answer
Question:
Following are some of the common standard
cutting tools :Correct Answer:
Cutting saw , Inserts , Reamers
Your Answer Form tool , Inserts , Reamers
Multiple Choice Single Answer
Question:
The Carrying cost is stated in terms of :Correct Answer:
Per item per year
Your Answer Per order
Select The Blank
Question:
The definitive statement of policy stating when to
procure and how much to procure usually to ensure that the sum of
all costs associated with ________ are minimised is called
Inventory policy.
Correct Answer:
Inventory
Your Answer Buying
Select The Blank
Question:
Buying for C quantities should be made in
________ quantities .
Correct Answer:
Large
Your Answer Medium
Select The Blank
Question:
In the assignment model, the________ is formed
between jobs and machines.
Correct Answer:
Matrix
Your Answer Matrix
Select The Blank
Question:
________ analysis mainly helps to identify nonexisting items for which store keeps bin cards, wastes computer
Multiple Choice Single Answer
Question:
Negative value of critical ratio :Correct Answer:
Is meaningless
Your Answer Indicates excess of scheduled delivery period
Multiple Choice Multiple Answer
Question:
The main characteristics of batch production are
:Correct Answer:
Short runs , Skilled labours in specific
trade , Supervisor to posses knowledge of specific process
Your Answer Short runs , Skilled labours in specific trade ,
Supervisor to posses knowledge of specific process
True/False
Question:
If lead time available is 11days and lead time
required is 10 days, the critical ratio would be 1.10.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
What are the factor affecting decision about
centralized planning system?
Correct Answer:
Product variety is large , Jobbing and
batch production methods of manufacturing , Work is less repetitive
Your Answer Product variety is large , Jobbing and batch
production methods of manufacturing , Work is less repetitive
True/False
Question:
In continuous or process production , only one
product is manufactured.
Correct Answer:
True
Your Answer True
True/False
Question:
The make-or-buy decision becomes necessary
when the current source of supply is not able to supply the material
in accordance with buyer's quality requirements.
Correct Answer:
True
Your Answer True
True/False
PAGE NO: 4 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
Work measurement function is attached to line
management.
Correct Answer:
False
Your Answer True
Multiple Choice Single Answer
Question:
Placement of purchase orders in case of 'A' type
of items is usually :Correct Answer:
Frequent
Your Answer Frequent
Match The Following
Question:
Correct Answer:Your Answer
Economic order quantity Quantity at which there is neither
overstocking nor under stocking. Quantity at which there is
neither overstocking nor under stocking.
Carrying cost
Cost of 'holding' the material in store
of transportation [carrying] of material
Cost
Procurement cost Administrative cost for procurement
of procurement of material
Cost
Inventory cost Sum of carrying and inventory cost Sum of
carrying and inventory cost
True/False
Question:
To solve "n jobs - 3 machines" sequencing
problem, the largest of time of any job on the second machine must
be smaller than or equal to the smallest time of any job on first
machine or third machine.
Correct Answer:
True
Your Answer False
True/False
Question:
Systematic procedures must be set in the
operating functions prior to installation of PPC in the firm.
Correct Answer:
True
Your Answer True
Multiple Choice Single Answer
Question:
Which factor influence plan for meeting seasonal
or occasional increase in demand?
Correct Answer:
Subcontracting
Your Answer Subcontracting
Multiple Choice Single Answer
Question:
Which of the following is the function of
Production Planning?
Correct Answer:
Process planning and scheduling
Your Answer Progressing
Select The Blank
Question:
Because of uncertainty of activity timings, PERT
acquired a shape of ________ model.
Correct Answer:
Probabilistic
Your Answer Statistical
True/False
Question:
Scientific inventory control system requires to be
followed for machine aid, work aid and inspection aid :Correct Answer:
False
Your Answer True
True/False
Question:
Job schedule is a chart showing work ahead of
each machine with respect to time.
Correct Answer:
False
Your Answer True
Match The Following
Question:
Correct Answer:Your Answer
Tooling cost
Jigs and Fixtures Jigs and Fixtures
Opportunity costsMonitory value sacrificed in rejection
of giving opportunity to do a business
Cost
Incremental cost Vary with decision to make or buy Vary with
decision to make or buy
Select The Blank
Question:
Time waste is the earliest of all wastes and yet
the________ to correct because it does not litter the floor.
Correct Answer:
Hazards
Your Answer Big hazard
Multiple Choice Single Answer
Question:
If the annual usage of a material is 1200 units and
the reorder point is at 120 Units, find the lead time.
Correct Answer:
4 months
Your Answer 1.2 Months
Labour cost
benefits
Wages and other benefits Wages and other
Multiple Choice Single Answer
Question:
The goods are manufactured as per customer's
definite order in case of :Correct Answer:
Job production
Your Answer Batch production
PAGE NO: 5 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Multiple Answer
Question:
The commonly used network techniques other
than PERT and CPM are as follows :Correct Answer:
MOSS [ Multi Operation Scheduling
System ] , PCS [ Project Control System ] , GERT [ Graphical
Evaluation Review Techniques ]
Your Answer MIS [ Management Information Systems ]
Multiple Choice Multiple Answer
Question:
To minimize total throughout time we are
required to minimize :Correct Answer:
Queuing , Idle time , Inventory
Your Answer Queuing , Idle time
Multiple Choice Multiple Answer
Question:
Following conditions are required to be fulfilled
for processing n jobs through 2 machines :Correct Answer:
The jobs are ready to be processed
before the period under consideration begins . , Transient time to
move a job from one machine to the another is negligible. , In
process inventory is allowed.
Your Answer The jobs are ready to be processed before the
period under consideration begins . , In process inventory is
allowed.
Select The Blank
Question:
An inventory control technique based on selective
approach to stock items is called ________ analysis.
Correct Answer:
Pareto's
Your Answer Pareto's
Multiple Choice Multiple Answer
Question:
While communicating to customer on delays in
delivery following information should be given :Correct Answer:
Information on identification of job ,
Reasons for delays , Revised date of delivery
Your Answer Reasons for delays , Revised date of delivery
Select The Blank
Question:
CPM is ________ oriented system.
Correct Answer:
Activity
Your Answer Activity
Multiple Choice Single Answer
Question:
One of the following is not consumable tool :Correct Answer:
Arbors
Your Answer Arbors
True/False
Question:
LOB is a manual planning and scheduling
technique similar in nature to MRP [Material Resource Planning].
Correct Answer:
Your Answer False
True
Select The Blank
Question:
________ is required when expediting fails to
bring deviated plan to its actual path.
Correct Answer:
Replanning
Your Answer Replanning
Multiple Choice Multiple Answer
Question:
The process of contraction or compression
involves extra cost because extra money is required to be spent on
factors such as :Correct Answer:
Overtime engagement of workforce ,
Purchase of additional machinery , Use of better materials
Your Answer Overtime engagement of workforce , Purchase of
additional machinery , Purchase of stationary of good quality
Multiple Choice Single Answer
Question:
In job production one single product is
manufactured while a batch of group of products is turned out at a
time under a system of :Correct Answer:
Batch production
Your Answer Process production
Multiple Choice Multiple Answer
Question:
The 'F' group of GOLF analysis involves
following requirements :Correct Answer:
Search for foreign suppliers , Opening of
letter of credit , Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers
Multiple Choice Single Answer
Question:
The production system characterized by complex
set of activities that must be performed in a particular order within a
given period and within an estimated expenditure is known as :Correct Answer:
Project production
Your Answer Project production
Multiple Choice Single Answer
Question:
Proper Production Planning and Control can
reduce cost in :Correct Answer:
Overtime cost
Your Answer Overtime cost
Select The Blank
Question:
________ is the specific instant of time that
marks start and end of activity.
Correct Answer:
Event
Your Answer Event
PAGE NO: 6 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Select The Blank
Question:
Overlapping of operations help to ________
manufacturing time.
Correct Answer:
Reduce
Your Answer Reduce
Multiple Choice Multiple Answer
Question:
"Difficult" items have following attributes :Correct Answer:
Available indigenously but are not easy
to procure , Items which come from longer distance , Items which
are difficult to manufacture
Your Answer Available indigenously but are not easy to
procure , Items which come from longer distance , Items having
complex specifications
Multiple Choice Multiple Answer
Question:
They are type of analytical estimate :Correct Answer:
Moving average , Exponential
smothering , Curve fitting
Your Answer Moving average , Curve fitting
Select The Blank
Question:
The performance standard is required by
________ to determine individual machine capacity for the purpose
of machine loading and assigning machine hours and man hours .
Correct Answer:
Scheduler
Your Answer Production engineer
Multiple Choice Multiple Answer
Question:
The network analysis involves following works :Correct Answer:
Obtaining a work breakdown structure to
a set of individual jobs which are arranged in a logical network. ,
Estimation of job duration , Scheduling to discover which jobs
control completion of project and reallocation of resources.
Your Answer Obtaining a work breakdown structure to a set of
individual jobs which are arranged in a logical network. ,
Estimation of job duration , Scheduling to discover which jobs
control completion of project and reallocation of resources.
Multiple Choice Single Answer
Question:
The assembly work content [ Wi ] of the i'th
station having n work stations is given by :Correct Answer:
å Wi from i=1 to n
Your Answer å Wi from i=1 to n
Multiple Choice Multiple Answer
Question:
Essentials of good forecasts are :Correct Answer:
Stability , Fairly accurate , Economical
to generate
Your Answer Stability , Fairly accurate , Economical to
generate
True/False
Question:
The 'G' group of GOLF analysis involves
moderate delivery time and availability of credit usually in the
range of 30 to 60 days.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
ABC company manufactures MS bolts. Given
fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs
3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost
would be Rs ________.
Correct Answer:
6 Lacs
Your Answer 6 Lacs
LIST OF ATTEMPTED QUESTION:S AND ANSWERS
Multiple Choice Multiple Answer
Question: If actual demand far exceeds forecast, it will result
into :Correct Answer: Better utilization of equipment , Project
margin , Higher material purchase
Your Answer Higher material purchase , Increase in labour
productivity , Better utilization of equipment , Project margin
Select The Blank
Question: To know the accumulated ________ for a given
machine at a given time Load charts are necessary.
Correct Answer: Load
Your Answer Load
Multiple Choice Single Answer
Question: LOB technique was developed by US navy in the year
:Correct Answer: 1958
Your Answer 1958
True/False
Question: In continuous or process production , only one product
is manufactured.
Correct Answer: True
Your Answer True
Select The Blank
Question: ________reflects impact of money tied up in
inventory.
Correct Answer: Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question: Methods for recording actual progress of work for
shop orders are :Correct Answer: Progress card , Display board , Network
updating
Your Answer Progress card , Display board , Network updating ,
Job card
PAGE NO: 7 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Select The Blank
Question: A progress card is the most ________ method of
recording of progress of work.
Correct Answer: Convenient
Your Answer Convenient
Multiple Choice Multiple Answer
Question: Following are some of the common standard cutting
tools :Correct Answer: Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question: Tooling cost comprises the cost of :Correct Answer: Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question: The light engineering company has one special
purpose facing & centering machine And one copying lathe. The
foreman has five work orders for processing . The operation
Sequence is fixed [ each job is first faced and centered and then
copy turned ] . The standard Hours required for each machine to
process each work order are shown in the following Table :- Work
Order Processing Time [Hours ] Facing & centering machine
Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find
sequence to minimize requirements of machine hours.
Correct Answer: IV-I-II-V-III
Your Answer I-II-III-IV-V
Select The Blank
Question: ________ represents the time that elapses between the
receipt of requirement of job until the job is adopted in the
production control department.
Correct Answer: Order preparation time
Your Answer Queue time
True/False
Question: PERT basically does not demarcate between critical
and non-critical activities.
Correct Answer: True
Your Answer True
Multiple Choice Single Answer
Question: The assignment method is also called as :Correct Answer: Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question: Outside operations cost involves expenses such as :Correct Answer: Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough
blanking
Select The Blank
Question: The correct fitting of orders with capacity
considerably lessens ________ burden of control.
Correct Answer: Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question: The 'F' group of GOLF analysis involves following
requirements :Correct Answer: Search for foreign suppliers , Opening of letter
of credit , Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of
credit , Arrangements for shipping and port clearance , Account in
foreign bank
Match The Following
Question: Correct Answer: Your Answer
Order quantity Factor influencing process planning Break even
analysis
Machine capacity chart Dimensional accuracy Dimensional
accuracy
Mass production Special purpose machines Special purpose
machines
Standard elemental time data Compare alternative processes Factor
influencing process planning
Multiple Choice Multiple Answer
Question: The tooling data is prepared in respect of following
measuring instruments :Correct Answer: Vernier caliper , Micrometer screw gauge ,
Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain
gauge , Drill bits
Multiple Choice Multiple Answer
Question: In replenishment system, the fixed order quantity
system is also called by following names :Correct Answer: Fixed order system , Min-max system , Reorder point system
Your Answer Fixed order system , Min-max system , Re-order
point system , Lead time system
Multiple Choice Multiple Answer
Question: How you will Judge the failure of production planning
and control department?
Correct Answer: Frequent broken delivery promises ,
Underutilization of men, machines , Excessive overtime
Your Answer Frequent broken delivery promises ,
Underutilization of men, machines , Excessive overtime , Better
coordination with other section
Multiple Choice Single Answer
Question: In Cost Vs Quantity plot, the total inventory Cost
curve is :Correct Answer: Parabolic
Your Answer Inverse
True/False
PAGE NO: 8 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question: Given stock in hand = 1320 units, safety stock=840
units and average daily consumption = 60 units, the lead time
available would be 10 hours.
Correct Answer: False
Your Answer True
Multiple Choice Single Answer
Question: If the annual usage of a material is 1200 units and the
reorder point is at 120 Units, find the lead time.
Correct Answer: 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question: The assignment algorithm was developed by a
Hungarian mathematician named :Correct Answer: D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question: So far as possible, number of activities should be :Correct Answer: Limited
Your Answer Limited
True/False
Question: Production Planning and Control makes the supervisor
ineffective.
Correct Answer: True
Your Answer False
Multiple Choice Single Answer
Question: Unit of loading and scheduling depends on following
factor :Correct Answer: Operating cycle
Your Answer Unit of capacity
True/False
Question: The 'G' group of GOLF analysis involves moderate
delivery time and availability of credit usually in the range of 30 to
60 days.
Correct Answer: True
Your Answer True
Multiple Choice Multiple Answer
Question: Load charts are used for following :Correct Answer: To know the accumulated load on a given
machine at a given time , Identify periods available for allocation in
future to orders , Matching orders and loads
Your Answer Improving supply of material , To know the
accumulated load on a given machine at a given time , Identify
periods available for allocation in future to orders , Matching orders
and loads
Select The Blank
Question: ABC company manufactures MS bolts. Given fixed
cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3
Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost would
be Rs ________.
Correct Answer: 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question: An inventory control system in which stock of item is
physically or conceptually divided into ________ bins is calledTwo
bin system.
Correct Answer: Two
Your Answer Pair
Multiple Choice Multiple Answer
Question: They are type of analytical estimate :Correct Answer: Moving average , Exponential smothering ,
Curve fitting
Your Answer Moving average , Exponential smothering , Curve
fitting , Opinion surveys
Multiple Choice Single Answer
Question: For goods manufactured to stock, following
department is expected to periodically undertake replenishment
action as stocks are depleted :Correct Answer: Production Planning Control
Your Answer Production
True/False
Question: Random fluctuation is addition of cyclical fluctuation
and seasonal fluctuation.
Correct Answer: False
Your Answer True
True/False
Question: Scientific inventory control system requires to be
followed for machine aid, work aid and inspection aid :Correct Answer: False
Your Answer True
Multiple Choice Single Answer
Question: Value Analysis conducted in 'C' type of material is
usually :Correct Answer: Minimum
Your Answer Minimum
True/False
Question: Purchase department must keep PPC informed
regarding lead time of different items specially where lead times are
extended.
Correct Answer: True
Your Answer True
True/False
Question: In assignment matrix, it is a must to determine
Jacobean of the determinant.
Correct Answer: False
Your Answer True
Select The Blank
Question: For replenishment action for stock items which are
reserved by PPC, the stores work out ________ stock which equals
the stock on hand less stock reserved.
Correct Answer: Free
Your Answer Net
PAGE NO: 9 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Single Answer
Question: What are the customer's expectation from the
supplier?
Correct Answer: Consistent good quality of products
Your Answer Consistent good quality of products
Your Answer Tools and plants are available , Technical know
how is available , Competent persons are present , Cost data of raw
material is available.
LIST OF ATTEMPTED QUESTION:S AND ANSWERS
Match The Following
Question: Correct Answer: Your Answer
End piece allowance Material insufficient to produce one piece
Material insufficient to produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to
meet requirement of spares
Multiple Choice Multiple Answer
Question:
Following are the factors which influence tool life
:Correct Answer:
Operators efficiency , Type of tool ,
Material it is required to operate upon
Your Answer Operators efficiency , Type of tool , Material it is
required to operate upon
Machining allowance Extra material requirement Extra material
requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question: Why customer is called the king?
Correct Answer: Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question: PPC is expected to have good inter-departmental
relationships to achieve the production targets. Which is the most
important factor that shall affect production targets?
Correct Answer: Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question: Generally for ________ flow system, Heuristic
method is preferred.
Correct Answer: Intermittent
Your Answer Continuous
Select The Blank
Question: In control board________ compartment contains copy
of work orders/shop orders of the item to be processed next on the
machine.
Correct Answer: Middle
Your Answer Bottom
True/False
Question: Work measurement function is attached to line
management.
Correct Answer: False
Your Answer True
Multiple Choice Multiple Answer
Question: The technical feasibility of sales enquiry is carried out
on the following grounds :Correct Answer: Tools and plants are available , Technical
know how is available , Competent persons are present
Multiple Choice Single Answer
Question:
The document which incorporates details of
process planning for a job is called :Correct Answer:
Route Sheet
Your Answer Route Sheet
Multiple Choice Multiple Answer
Question:
CPM terminology uses words like
Correct Answer:
Arrow diagram , Nodes , Float
Your Answer Arrow diagram , Nodes
Select The Blank
Question:
Forecasting is function of ________.
Correct Answer:
Marketing department
Your Answer Planning in charge
Select The Blank
Question:
Johnsons method of scheduling can be used when
operation sequence involve ________ machines.
Correct Answer:
Two
Your Answer Two
Select The Blank
Question:
Good quality and ________are the two main
requirements to secure maximum business from a customer.
Correct Answer:
Competitive rates
Your Answer Competitive rates
Select The Blank
Question:
Sum of queue, transit, order preparation and
manufacturing times is known as ________
Correct Answer:
Total Lead Time
Your Answer Total Lead Time
True/False
PAGE NO: 10 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
To conduct FSN analysis we require, last date of
receipt or last date of issue whichever is later and period.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Overtime can be avoided in many ways and they
are :Correct Answer:
Unrealistic delivery date , Acceptance of
too many rush order , Excessive machine breakdown
Your Answer Unrealistic delivery date , Acceptance of too
many rush order , Excessive machine breakdown
Multiple Choice Single Answer
Question:
Effective Production Planning and Control,
reduce investment in inventories effectively :Correct Answer:
By proper coordination between shop
floor, stores and buying department
Your Answer By proper coordination between shop floor, stores
and buying department
True/False
Question:
Fluctuation due to changes in season are called
cyclical fluctuation.
Correct Answer:
False
Your Answer False
Multiple Choice Multiple Answer
Question:
Material control function embraces a following
techniques :Correct Answer:
Make -or -buy decision , Pareto's
analysis , Replenishment system
Your Answer Make -or -buy decision , Pareto's analysis ,
Replenishment system
True/False
Question:
Flexibility and product variety are not interrelated with each other.
Correct Answer:
False
Your Answer True
True/False
Question:
Work measurement is not useful for choosing
between two alternate methods of production.
Correct Answer:
False
Your Answer False
True/False
Question:
Overlapping of operations help to reduce
manufacturing time.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Process Sheet contains following information :Correct Answer:
Material Specification , Sequence of
operation , Skill of Labour
Your Answer Material Specification , Sequence of operation ,
Skill of Labour
Select The Blank
Question:
The LOB technique is made more accurate and
fast by using ________.
Correct Answer:
Computers
Your Answer Reduction techniques
True/False
Question:
More than one subcontractor should be developed
for each subcontracted operation/Job.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
Classification of items on basis of their capital
lock up is called ________ analysis.
Correct Answer:
XYZ
Your Answer XYZ
Select The Blank
Question:
Purchase section must keep ________posted on
the progress of purchase orders and expected delays.
Correct Answer:
P.P.C.
Your Answer P.P.C.
True/False
Question:
Overtime is undesirable since it increases
manufacturing cost of the product.
Correct Answer:
True
Your Answer False
Multiple Choice Multiple Answer
Question:
The essential features of batch production are :Correct Answer:
General purpose machines and process
type layout , Manual materials handling , Flexibility of production
schedule
Your Answer General purpose machines and process type
layout , Manual materials handling , Flexibility of production
schedule
Multiple Choice Single Answer
Question:
The sourcing of vendors in case of 'B' type of
items is :Correct Answer:
Medium
PAGE NO: 11 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
Your Answer
Few
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Your Answer
Multiple Choice Single Answer
Question:
Dispatcher withdraws required quantity of
material from stores using following document :Correct Answer:
Stores issue order
Your Answer Bill of material
Multiple Choice Multiple Answer
Question:
In a mass production assembly shop following
work measurement techniques are used :Correct Answer:
Time study , Work sampling ,
Production study
Your Answer Time study , Work sampling , Production study ,
Analytical estimating
Multiple Choice Multiple Answer
Question:
SDE analysis is based on problems of
procurement namely :Correct Answer:
Non-availability , Scarcity , Longer lead
time
Your Answer Non-availability , Scarcity , Longer lead time
True/False
Question:
Line balancing is a simulation technique.
Correct Answer:
False
Your Answer False
Multiple Choice Multiple Answer
Question:
The line of balance is a device for planning and
monitoring progress of :Correct Answer:
Purchase order execution , Project
execution , Targeted programs
Your Answer Purchase order execution , Project execution ,
Targeted programs
Select The Blank
Question:
Sales persons decides ________.
Correct Answer:
Synthetic forecast
Your Answer Current sales
True/False
Question:
Material control Card is a document for record of
issues of material and receipt of unused material by production
shop.
Correct Answer:
False
Your Answer False
Multiple Choice Single Answer
Question:
Work measurement is limited to measuring :Correct Answer:
Productive & non productive time
Only product related activities
Match The Following
Question:
Correct Answer:Your Answer
Move order
Transport material from and to required work
centers Transport material from and to required work centers
Materials Order Allocation of material required in connection with
shop order
Allocation of material required in connection with
shop order
Work Order
Bird's eye view of production programme
Bird's eye view of production programme
Production Order Reserve material required in connection with
sales order
Reserve material required in connection with
sales order
Multiple Choice Multiple Answer
Question:
The software for line balancing should have
following features :Correct Answer:
Easy to operate , Easy to install , Easy to
upgrade
Your Answer Easy to operate , Easy to install , Unmanaged
code should be available
Multiple Choice Single Answer
Question:
Man hours is commonly used unit of
measurement for scheduling purposes in following industry :Correct Answer:
Engineering
Your Answer Engineering
Multiple Choice Multiple Answer
Question:
Customer plays very important role due to the
following reasons :Correct Answer:
Gives us work , Dividends to share
holders , Gets business from new customers
Your Answer Gives us work , Dividends to share holders , Gets
business from new customers
Multiple Choice Single Answer
Question:
The 4X4 assignment problem involve following
job-machine operations :Correct Answer:
24
Your Answer 24
Multiple Choice Single Answer
Question:
The best of scientific tools available for
scheduling is :Correct Answer:
CPA [ critical path analysis ]
Your Answer Gantt Chart
PAGE NO: 12 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Multiple Answer
Question:
Work measurement is responsibility of :Correct Answer:
PPC , Industrial Engineering ,
Production department
Your Answer PPC , Industrial Engineering
Match The Following
Question:
Correct Answer:Your Answer
Long production run
Flow production
Mass and Flow production Mass and
Complex activities to be performed in a particular order within a
give time & estimate.
Project production
Project
production
One or few units manufactured as per customers requirement
Jobbing Production
Jobbing Production
Short production run
Multiple Choice Multiple Answer
Question:
Smoothing performs following activities:Correct Answer:
Reallocation of resources , Improving
utilization of resources , Conducting Heuristic approach
Your Answer Reallocation of resources , Improving utilization
of resources , Conducting Heuristic approach
True/False
Question:
As per a study on materials management
practices, a typical firm spends almost half of its rupee sales on
goods purchased from vendors.
Correct Answer:
True
Your Answer True
Select The Blank
Question:
Value analysis of ________ class items is usually
inadvisable.
Correct Answer:
C
Your Answer C
Batch Production Batch Production
Multiple Choice Single Answer
Question:
Value Analysis conducted in 'C' type of material
is usually :Correct Answer:
Minimum
Your Answer Minimum
True/False
Question:
PPC system in the organisation is to be tailor
made.
Correct Answer:
True
Your Answer True
LIST OF ATTEMPTED QUESTION:S AND ANSWERS
Multiple Choice Multiple Answer
Question:
Some of significant features of HML analysis are
:Correct Answer:
To evolve buying policies to control
purchases , To delegate authorities to different buyers to make petty
cash purchases , Not to take consumption into account
Your Answer To evolve buying policies to control purchases ,
To delegate authorities to different buyers to make petty cash
purchases
Multiple Choice Single Answer
Question:
What is the reasons for poor labour efficiency
attributed by inefficient P.P.C.?
Correct Answer:
Failure to provide proper tools and
control on work in progress on shop floor
Your Answer Failure to provide proper tools and control on
work in progress on shop floor
Multiple Choice Single Answer
Question:
The administrative expenses towards the
procurement of materials is called :Correct Answer:
Procurement cost
Your Answer Administrative cost
True/False
Question:
Performance benchmarking does not involves
comparison of financial ratios at the aggregate level.
Correct Answer:
False
Your Answer False
Multiple Choice Single Answer
Question:
Setup time includes :Correct Answer:
Internal setup time & External setup time
Your Answer Internal setup time & External setup time
Multiple Choice Single Answer
Question:
Participants of the groups for quality circles
should be decided by :Correct Answer:
Employees coming together by their own
enthusiasm
Your Answer Employees coming together by their own
enthusiasm
Multiple Choice Single Answer
PAGE NO: 13 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Question:
Check sheet are also used as :Correct Answer:
Data gathering & interpretation tool
Your Answer Data gathering & interpretation tool
Multiple Choice Single Answer
Question:
SMED means :Correct Answer:
Single minute exchange of dies
Your Answer Single minute exchange of dies
Parato analysis underlines & operates on
Philosophy of "vital
few:trivial many" Philosophy of "vital few:trivial many"
Parato analysis is technique of identifying vital causes by
Arranging data according to the descending order of their
frequency of occurrence Arranging data according to the
descending order of their frequency of occurrence
Parato diagram is a Bar graph with height or value drawn by
Arranging data in descending order Magnitude of defects
Match The Following
Question:
Correct Answer:Your Answer
Productivity performance measurement
Cost of quality
Turnover employee
Financial performance measurement
Sales of the months
Sales of the months
Customer satisfaction measurement Customer complaints per period
Customer complaints per period
Staff attitude measurementEmployee satisfaction index
Employee satisfaction index
Select The Blank
Question:
________ is an effect due to the muda of defect.
Correct Answer:
Wear & tear of parts while
disassembling
Your Answer Poor production planning & control
Select The Blank
Question:
If some defective parts are discovered by the
subsequent process they should be returned to the ________ to
prevent reoccurrence.
Correct Answer:
Preceding process
Your Answer Return to stores
Multiple Choice Multiple Answer
Question:
The results oriented efforts of the quality circle
should also include :Correct Answer:
Efforts to avoid the problem
permanently , Ultimate aim of the customers satisfaction , Attacking
the real root causes & all possibilities
Your Answer Efforts to avoid the problem permanently ,
Publication or advertisement of your contribution , Attacking the
real root causes & all possibilities
Match The Following
Question:
Correct Answer:Your Answer
Multiple Choice Multiple Answer
Question:
Few steps in construction in Radar chart are :Correct Answer:
Brainstorming to enlist characteristics
which require to be evaluated & draw the circle & divide it into
'slices' equal to number of characteristics , The first slice begins at
12 noon. Then draw vertical line & calibrate it equal to the number
of levels required , Draw concentric circles from each gradiation
using 'o' point as centre
Your Answer Brainstorming to enlist characteristics which
require to be evaluated & draw the circle & divide it into 'slices'
equal to number of characteristics , The first slice begins at 12
noon. Then draw vertical line & calibrate it equal to the number of
levels required , Draw concentric circles from each gradiation using
'o' point as centre
Select The Blank
Question:
5 S audit result is discussed in ________ meeting.
Correct Answer:
Monthly
Your Answer Monthly
True/False
Question:
Fishbone analysis is used both in analysis &
planning.
Correct Answer:
True
Your Answer False
Multiple Choice Single Answer
Question:
One Green Belt may head a team of :Correct Answer:
20 employees
Your Answer 20 employees
Multiple Choice Multiple Answer
Question:
Role of champions are :Correct Answer:
Approve six sigma projects , Remove
road block in the path of six sigma implementation , Monitor
progress of six sigma projects
Your Answer Monitor progress of six sigma projects , Approve
six sigma projects , Remove road block in the path of six sigma
implementation
Parato diagram always indicates Magnitude of defects
Philosophy of 20% of the activity causes 80% of the effect
PAGE NO: 14 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
Multiple Choice Multiple Answer
Question:
To draw control charts, sample must be
representative of homogeneous segment of production for which :Correct Answer:
The items of the sample should be from
the same machine setting , The items should be of the same batch ,
Items should be made from the same raw material batch
Your Answer The items of the sample should be from the same
machine setting , The items should be of the same batch , Items
should be made from the same raw material batch
Multiple Choice Single Answer
Question:
Failure mode and effect analysis (FMEA)
establish
Correct Answer:
Process failure and minimize frequency
Your Answer Process failure and minimize frequency
Multiple Choice Multiple Answer
Question:
What are the steps in deciding the benchmarking
partner?
Correct Answer:
Decide level of benchmarking , List
down a few prospective candidates of partnership , Collect
information of short listed partners
Your Answer Decide level of benchmarking , List down a few
prospective candidates of partnership , Collect information of short
listed partners
Multiple Choice Single Answer
Question:
One Master Black Belt may head a team of :Correct Answer:
15-20 Black Belts
Your Answer 15-20 Black Belts
Multiple Choice Single Answer
Question:
Competitive benchmarking involves identifying
key competitive product, services or processes & comparing with
those of :Correct Answer:
Main competitor
Your Answer Main competitor
Multiple Choice Single Answer
Question:
Implication of Quality problem is:Correct Answer:
Gap in performance
Your Answer Gap in performance
Select The Blank
Question:
Number of defects in an individual component,
like gear, shaft, wheel etc can be monitored through ________ type
of control chart.
Correct Answer:
c-chart
Your Answer c-chart
True/False
Question:
Non-availability of files /document in time is a
problem to be addressed by office TPM.
Correct Answer:
True
Your Answer True
Multiple Choice Single Answer
Question:
Check sheet is easy to use because it is :Correct Answer:
Simplest tool
Your Answer Simplest tool
Multiple Choice Single Answer
Question:
Benchmarking helps to identify the gap between
the current performance of the organization and the :Correct Answer:
Performance of the best organization
Your Answer Performance of the best organization
True/False
Question:
Flow chart is pictorial representation of the steps
in production control.
Correct Answer:
False
Your Answer True
Multiple Choice Multiple Answer
Question:
Breakdown problem may be stratified by :Correct Answer:
Sections , Machines , Type of
breakdown (e.g mech. Or electrical)
Your Answer Sections , Machines , Type of breakdown (e.g
mech. Or electrical)
Select The Blank
Question:
A control chart to exhibit counted data on number
of defect is called ________.
Correct Answer:
c-chart
Your Answer c-chart
Select The Blank
Question:
Procedure for implementation of TPM consists of
________ numbers of steps.
Correct Answer:
12
Your Answer 8
Select The Blank
Question:
Capability index Cp = ________
Correct Answer:
Specification width/process width
Your Answer Specification width/process width
Multiple Choice Single Answer
Question:
Pareto's analysis underlines & operates
philosophy of :Correct Answer:
Vital few = trivial many
Your Answer Vital few = trivial many
PAGE NO: 15 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
True/False
Question:
Kanban signals are required when assembly work,
subassembly work and manufacturing at parts is carried out at
different locations.
Correct Answer:
True
Your Answer True
Correct Answer:
Prevention type Poka-Yoke , Detection
type Poka-Yoke
Your Answer Prevention type Poka-Yoke , Detection type
Poka-Yoke
Multiple Choice Single Answer
Question:
Quality problem solving tool is used to :Correct Answer:
Improve quality
Your Answer Save time
Multiple Choice Multiple Answer
Question:
To reduce clamping & declamping time,
following actions are desirable :Correct Answer:
Standardize clamping bolts / screws ,
Cut off unnecessary threads , Use quick clamping device
Your Answer Standardize clamping bolts / screws , Cut off
unnecessary threads , Use quick clamping device
True/False
Question:
Along with problem solving tools experience and
judgment is also used.
Correct Answer:
True
Your Answer False
Select The Blank
Question:
Benchmarking allows exchange of ________
between the benchmarking partners.
Correct Answer:
Information
Your Answer Information
Select The Blank
Question:
JIT advocates the philosophy at elimination of
waste from system which occurs due to ________.
Correct Answer:
Over Production
Your Answer Over Production
Multiple Choice Multiple Answer
Question:
TQM can never flourish if the staff are:Correct Answer:
Worried about losing jobs , Afraid of
being reprimanded if there are mistakes , Scared of their bosses
Your Answer Worried about losing jobs , Afraid of being
reprimanded if there are mistakes , Scared of their bosses
True/False
Question:
Without measuring initial performance, target
can't be set.
Correct Answer:
True
Your Answer False
True/False
Question:
In bar graph each bar is of same height.
Correct Answer:
False
Your Answer False
Multiple Choice Multiple Answer
Question:
During SMED implementation, primary study
consists of :Correct Answer:
Equipment analysis , Setup change
analysis , Preparation items (storage place , method) analysis
Your Answer Equipment analysis , Setup change analysis ,
Preparation items (storage place , method) analysis
True/False
Question:
Daily work management can also be extended to
non manufacturing areas like procurement, QA, HRD etc.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Types of Poka-Yoke are :-
Multiple Choice Multiple Answer
Question:
An erratic patterns falling above & below the
control limits indicates :Correct Answer:
Defect in materials , Frequent adjustment
of machines , Poorly trained operators
Your Answer Defect in materials , Frequent adjustment of
machines , Poorly trained operators
True/False
Question:
Sample size for the construction of p-chart are
larger than X bar-R chart.
Correct Answer:
True
Your Answer True
Multiple Choice Multiple Answer
Question:
Histogram is an important diagnostic tool.
Analysis of the histogram gives :Correct Answer:
It shows cause which affects the process
, An idea of what is happening to the process , Whether the process
is capable of meeting process or not i.e. around correct average &
within specific limits
Your Answer An idea of what is happening to the process ,
Whether the process is capable of meeting process or not i.e. around
PAGE NO: 16 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
P P C 3rd SEMESTER OPERATIONS (PGDBA)
correct average & within specific limits , A bird's eye view of the
variation
Multiple Choice Single Answer
Question:
Productivity improves by :Correct Answer:
Voluntary participants of everyone
Your Answer Voluntary participants of everyone
PAGE NO: 17 OF 17
<Join symbiosispgdba2005 in yahoo groups for More>
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
XYZ when combined with FSN analysis helps to classify nonmoving items into XN , YN and ZN.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Forecast is based on :Correct Answer Past data
Your Answer
Competitor's market share
Select The Blank
Question
Network ________ is defined as any adjustment to the arrow
diagram which becomes necessary owing to departure from the
project schedule laid down earlier.
Correct Answer Updating
Your Answer
Design
Multiple Choice Single Answer
Question
For goods manufactured to stock, following department is
expected to periodically undertake replenishment action as
stocks are depleted :Correct Answer Production Planning Control
Your Answer
Production Planning Control
True/False
Question
CPM marks critical activities.
Correct Answer True
Your Answer
True
Select The Blank
Question
A shop order may combine more than one ________ requiring
identical items.
Correct Answer Work order
Your Answer
Sales order
Multiple Choice Single Answer
Question
What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer
Consistent good quality of products
Select The Blank
Question
________ inventories help to balance company's supply with
market demand.
Correct Answer Finished goods
Your Answer
WIP
Select The Blank
Question
Short term forecasts are for ________.
Correct Answer Material Planning
Your Answer
Cash flow management
Multiple Choice Single Answer
Question
For process planning following is one of the basic document
used :Correct Answer Operation Layout
Your Answer
Process Layout
Multiple Choice Single Answer
Question
Scheduled start of an operation is authorized by issuing a
document called :Correct Answer Job card
Your Answer
Route card
Multiple Choice Multiple Answer
Question
SOS Analysis involves following type of items :Correct Answer Seasonal items available only for a limited period. , Seasonal
items available throughout the year. , Non-seasonal items whose
quantity is decided on different considerations.
Your Answer
Seasonal items available throughout the year. , Non-seasonal
items whose quantity is decided on different considerations. ,
Machine spare parts
Multiple Choice Multiple Answer
Question
The basic procedure of assignment technique is designed to
solve problems wherein :-
Correct Answer Number of tasks equal to number of facilities. , The objective
function is minimization. , There are no restrictions in allocation
Your Answer
Number of tasks equal to number of facilities. , There are no
restrictions in allocation , Cost of machine should be taken into
consideration.
True/False
Question
There are five manufacturing systems. However, many
manufacturers combines two or more systems to produce a final
product.
Correct Answer True
Your Answer
True
True/False
Question
In LOB, the regular progress checks the future effect of any
current delays and indicates degree of urgency for corrective
action.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
5 jobs are to be processed on machines M1 and M2 , first on M1
and then on M2. The processing times in hours are as
follows.Find the sequence for 5 jobs that will minimize total
elapsed time .also find idle time & total elapsed time. Job
Processing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8
9 7 6 3 8 5 10 4
Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for
M1 & M2 respectively.
Your Answer
Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2
respectively.
True/False
Question
When shop floor scheduling problem larger than 3 machines
arise the analytical solution procedures leading to optimality are
complex and difficult.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
End piece allowance
Material insufficient to
produce one piece
Material insufficient to
produce one piece
Stock allowance
Quantity to meet
requirement of spares
Extra material requirement
Machining allowance
Extra material requirement Material loss in handling
Spoilage allowance
Process rejection
Quantity to meet
requirement of spares
Select The Blank
Question
________ is required for machine set ups as well as regular
production.
Correct Answer Performance standard
Your Answer
Machine design data
Multiple Choice Single Answer
Question
If a product is required within 20 days and the product can be
made available in 10 days, the Critical ratio would be :Correct Answer 2
Your Answer
0.5
Multiple Choice Single Answer
Question
A subcontractor is :Correct Answer Another form acting as a supplier
Your Answer
Manufacturer of specialized products on whom the buyer is
dependent for 100% of requirement of main assembly
Multiple Choice Single Answer
Question
The data regarding maximum run out between centers pertains
to :Correct Answer Process planning
Your Answer
Raw material data
True/False
Question
Lead time information is required for determination of safety
stock.
Correct Answer False
Your Answer
True
Select The Blank
Question
Americans like to use the word 'inventory' whereas for same
context British use the term________.
Correct Answer Stock
Your Answer
Stock
Multiple Choice Multiple Answer
Question
SDE analysis is employed by the purchase department for :Correct Answer Contract buying for some of 'easy' items. , Forward buying of
some of 'scarce' items. , Scheduled buying for some of 'easy'
items.
Your Answer
Forward buying of some of 'scarce' items. , Scheduled buying for
some of 'easy' items. , Contract buying for some of 'easy' items.
True/False
Question
Labour efficiency factor is applied after capacity requirement of
equipment is calculated.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
PERT terminology uses words like :Correct Answer Network diagram , Events , Slack
Your Answer
Network diagram , Events
True/False
Question
The LOB technique is most appropriate for assembly operations
involving number of distinct components.
Correct Answer True
Your Answer
True
True/False
Question
Transit time for manufactured items should be considered only
when it is insignificant.
Correct Answer False
Your Answer
True
Select The Blank
Question
A progress card normally contains ________ squares.
Correct Answer Less than 25
Your Answer
More than 50
Multiple Choice Multiple Answer
Question
Due to the following emergent events, the queue time has to
compensate for the time for which the job has to undergo an
extra time :Correct Answer Tool breakage , Job split up , Change in priorities
Your Answer
Tool breakage , Job split up , Store inventory
Multiple Choice Single Answer
Question
One of the following is not an task of progressing :Correct Answer Ensuring supply of material and issue of documents to
manufacturing shops
Your Answer
Expediting to rush up remaining operations of the delays jobs
Multiple Choice Single Answer
Question
Production output in night shift is :Correct Answer Less than I shift production
Your Answer
More than I shift production
Multiple Choice Multiple Answer
Question
The minimum requirements for application software for line
balancing are as follows :Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or
equivalent operating system.
Your Answer
1 Gb hard Disk free memory , Windows or equivalent operating
system.
Multiple Choice Single Answer
Question
The work measurement and time study belong to the following
school of management :Correct Answer Scientific School of management
Your Answer
Functional School of management
Multiple Choice Multiple Answer
Question
Before planning subcontracting points to be considered are :Correct Answer Whether overtime can be given , One more shift can be started
Your Answer
Whether overtime can be given , One more shift can be started ,
Set up time can be reduced
Multiple Choice Multiple Answer
Question
The main requirements of re-order level system are as follows :Correct Answer Incoming materials and materials returned from shop must be
deposited in appropriate bins and their stock cards must be
posted for "goods receipt report" and "material return note" for
Your Answer
the quantities received physically . , Items should be issued in
correct quantities. , The balance on the stock cards should be
periodically tallied with physical stock.
Incoming materials and materials returned from shop must be
deposited in appropriate bins and their stock cards must be
posted for "goods receipt report" and "material return note" for
the quantities received physically . , Items should be issued in
correct quantities. , The balance on the stock cards should be
periodically tallied with physical stock.
Multiple Choice Multiple Answer
Question
The following are salient features of the fixed order quantity
system :Correct Answer Reorder quantity is always the same which is usually economic
order quantity , The time interval between deliveries varies. ,
Replenishment action is initiated when the stock on hand is just
sufficient to meet demand during the lead time.
Your Answer
Reorder quantity is always the same which is usually economic
order quantity , The time interval between deliveries varies. ,
Percent cumulative cost of item is taken into consideration.
Select The Blank
Question
ABC company manufactures MS bolts. Given fixed cost Rs 0.5
Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs,
overhead cost Rs 0.5 Lacs. If bough from outside, the cost of
buying is Rs 8 per piece. The firm uses 100000 MS bolts every
year. Under these circumstances, the firm would take a decision
to ________.
Correct Answer Make at home
Your Answer
Buy from outside
Multiple Choice Multiple Answer
Question
Following difficulties are faced by SDE analysis :Correct Answer More delivery period , Geographical location of supplier ,
Reliability of suppliers
Your Answer
More delivery period , Reliability of suppliers , Excise duty
Select The Blank
Question
For replenishment action for stock items which are reserved by
PPC, the stores work out ________ stock which equals the stock
on hand less stock reserved.
Correct Answer Free
Your Answer
True/False
Question
Net
Route sheets for custom built job is prepared for each new order
received.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Order quantity
Factor influencing process Compare alternative
planning
processes
Machine capacity chart
Dimensional accuracy
Mass production
Special purpose machines Break even analysis
Standard elemental time
data
Compare alternative
processes
General purpose machines
with special toolings
Factor influencing process
planning
Multiple Choice Multiple Answer
Question
Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers
Your Answer
Form tool , Inserts , Reamers
Multiple Choice Single Answer
Question
The Carrying cost is stated in terms of :Correct Answer Per item per year
Your Answer
Per order
Select The Blank
Question
The definitive statement of policy stating when to procure and
how much to procure usually to ensure that the sum of all costs
associated with ________ are minimised is called Inventory
policy.
Correct Answer Inventory
Your Answer
Buying
Select The Blank
Question
Buying for C quantities should be made in ________ quantities .
Correct Answer Large
Your Answer
Medium
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
In the assignment model, the________ is formed between jobs
and machines.
Correct Answer Matrix
Your Answer
Matrix
Select The Blank
Question
________ analysis mainly helps to identify non-existing items for
which store keeps bin cards, wastes computer memory or
wastes computer stationary while preparing stores ledger.
Correct Answer MNG Analysis
Your Answer
SOS Analysis
Multiple Choice Single Answer
Question
Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer
Gives satisfaction to workers
Multiple Choice Single Answer
Question
Negative value of critical ratio :Correct Answer Is meaningless
Your Answer
Indicates excess of scheduled delivery period
Multiple Choice Multiple Answer
Question
The main characteristics of batch production are :Correct Answer Short runs , Skilled labours in specific trade , Supervisor to
posses knowledge of specific process
Your Answer
Short runs , Skilled labours in specific trade , Supervisor to
posses knowledge of specific process
True/False
Question
If lead time available is 11days and lead time required is 10
days, the critical ratio would be 1.10.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
What are the factor affecting decision about centralized planning
system?
Correct Answer Product variety is large , Jobbing and batch production methods
of manufacturing , Work is less repetitive
Your Answer
Product variety is large , Jobbing and batch production methods
of manufacturing , Work is less repetitive
True/False
Question
In continuous or process production , only one product is
manufactured.
Correct Answer True
Your Answer
True
True/False
Question
The make-or-buy decision becomes necessary when the current
source of supply is not able to supply the material in accordance
with buyer's quality requirements.
Correct Answer True
Your Answer
True
True/False
Question
Work measurement function is attached to line management.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Placement of purchase orders in case of 'A' type of items is
usually :Correct Answer Frequent
Your Answer
Frequent
Match The Following
Question
Correct Answer
Your Answer
Economic order quantity
Quantity at which there is Quantity at which there is
neither overstocking nor neither overstocking nor
under stocking.
under stocking.
Carrying cost
Cost of 'holding' the
material in store
Cost of transportation
[carrying] of material
Procurement cost
Administrative cost for
procurement
Cost of procurement of
material
Inventory cost
Sum of carrying and
inventory cost
Sum of carrying and
inventory cost
True/False
Question
To solve "n jobs - 3 machines" sequencing problem, the largest
of time of any job on the second machine must be smaller than
or equal to the smallest time of any job on first machine or third
machine.
Correct Answer True
Your Answer
False
True/False
Question
Systematic procedures must be set in the operating functions
prior to installation of PPC in the firm.
Correct Answer True
Your Answer
True
Select The Blank
Question
Time waste is the earliest of all wastes and yet the________ to
correct because it does not litter the floor.
Correct Answer Hazards
Your Answer
Big hazard
Multiple Choice Single Answer
Question
If the annual usage of a material is 1200 units and the reorder
point is at 120 Units, find the lead time.
Correct Answer 4 months
Your Answer
1.2 Months
Multiple Choice Single Answer
Question
Which factor influence plan for meeting seasonal or occasional
increase in demand?
Correct Answer Subcontracting
Your Answer
Subcontracting
Multiple Choice Single Answer
Question
Which of the following is the function of Production Planning?
Correct Answer Process planning and scheduling
Your Answer
Progressing
Select The Blank
Question
Because of uncertainty of activity timings, PERT acquired a
shape of ________ model.
Correct Answer Probabilistic
Your Answer
Statistical
True/False
Question
Scientific inventory control system requires to be followed for
machine aid, work aid and inspection aid :Correct Answer False
Your Answer
True
True/False
Question
Job schedule is a chart showing work ahead of each machine
with respect to time.
Correct Answer False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Tooling cost
Jigs and Fixtures
Jigs and Fixtures
Opportunity costs
Monitory value sacrificed
in rejection
Cost of giving opportunity
to do a business
Incremental cost
Vary with decision to
make or buy
Vary with decision to make
or buy
Labour cost
Wages and other benefits Wages and other benefits
Multiple Choice Single Answer
Question
The goods are manufactured as per customer's definite order in
case of :Correct Answer Job production
Your Answer
Batch production
Multiple Choice Multiple Answer
Question
The commonly used network techniques other than PERT and
CPM are as follows :Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project
Control System ] , GERT [ Graphical Evaluation Review
Techniques ]
Your Answer
MIS [ Management Information Systems ]
Multiple Choice Multiple Answer
Question
To minimize total throughout time we are required to minimize :Correct Answer Queuing , Idle time , Inventory
Your Answer
Queuing , Idle time
Multiple Choice Multiple Answer
Question
Following conditions are required to be fulfilled for processing n
jobs through 2 machines :Correct Answer The jobs are ready to be processed before the period under
consideration begins . , Transient time to move a job from one
machine to the another is negligible. , In process inventory is
allowed.
Your Answer
The jobs are ready to be processed before the period under
consideration begins . , In process inventory is allowed.
Select The Blank
Question
An inventory control technique based on selective approach to
stock items is called ________ analysis.
Correct Answer Pareto's
Your Answer
Pareto's
Multiple Choice Multiple Answer
Question
While communicating to customer on delays in delivery following
information should be given :Correct Answer Information on identification of job , Reasons for delays ,
Revised date of delivery
Your Answer
Reasons for delays , Revised date of delivery
Select The Blank
Question
CPM is ________ oriented system.
Correct Answer Activity
Your Answer
Activity
Multiple Choice Single Answer
Question
One of the following is not consumable tool :Correct Answer Arbors
Your Answer
Arbors
True/False
Question
LOB is a manual planning and scheduling technique similar in
nature to MRP [Material Resource Planning].
Correct Answer True
Your Answer
False
Select The Blank
Question
________ is required when expediting fails to bring deviated
plan to its actual path.
Correct Answer Replanning
Your Answer
Replanning
Multiple Choice Multiple Answer
Question
The process of contraction or compression involves extra cost
because extra money is required to be spent on factors such as
:Correct Answer Overtime engagement of workforce , Purchase of additional
machinery , Use of better materials
Your Answer
Overtime engagement of workforce , Purchase of additional
machinery , Purchase of stationary of good quality
Multiple Choice Single Answer
Question
In job production one single product is manufactured while a
batch of group of products is turned out at a time under a system
of :Correct Answer Batch production
Your Answer
Process production
Multiple Choice Multiple Answer
Question
The 'F' group of GOLF analysis involves following requirements
:Correct Answer Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance
Your Answer
Search for foreign suppliers
Multiple Choice Single Answer
Question
The production system characterized by complex set of activities
that must be performed in a particular order within a given period
and within an estimated expenditure is known as :Correct Answer Project production
Your Answer
Project production
Multiple Choice Single Answer
Question
Proper Production Planning and Control can reduce cost in :-
Correct Answer Overtime cost
Your Answer
Overtime cost
Select The Blank
Question
________ is the specific instant of time that marks start and end
of activity.
Correct Answer Event
Your Answer
Event
Select The Blank
Question
Overlapping of operations help to ________ manufacturing time.
Correct Answer Reduce
Your Answer
Reduce
Multiple Choice Multiple Answer
Question
"Difficult" items have following attributes :Correct Answer Available indigenously but are not easy to procure , Items which
come from longer distance , Items which are difficult to
manufacture
Your Answer
Available indigenously but are not easy to procure , Items which
come from longer distance , Items having complex specifications
Multiple Choice Multiple Answer
Question
They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer
Moving average , Curve fitting
Select The Blank
Question
The performance standard is required by ________ to determine
individual machine capacity for the purpose of machine loading
and assigning machine hours and man hours .
Correct Answer Scheduler
Your Answer
Production engineer
Multiple Choice Multiple Answer
Question
The network analysis involves following works :Correct Answer Obtaining a work breakdown structure to a set of individual jobs
Your Answer
which are arranged in a logical network. , Estimation of job
duration , Scheduling to discover which jobs control completion
of project and reallocation of resources.
Obtaining a work breakdown structure to a set of individual jobs
which are arranged in a logical network. , Estimation of job
duration , Scheduling to discover which jobs control completion
of project and reallocation of resources.
Multiple Choice Single Answer
Question
The assembly work content [ Wi ] of the i'th station having n work
stations is given by :Correct Answer å Wi from i=1 to n
Your Answer
å Wi from i=1 to n
Multiple Choice Multiple Answer
Question
Essentials of good forecasts are :Correct Answer Stability , Fairly accurate , Economical to generate
Your Answer
Stability , Fairly accurate , Economical to generate
True/False
Question
The 'G' group of GOLF analysis involves moderate delivery time
and availability of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer
True
Select The Blank
Question
ABC company manufactures MS bolts. Given fixed cost Rs 0.5
Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs,
overhead cost Rs 0.5 Lacs, the total manufacturing cost would
be Rs ________.
Correct Answer 6 Lacs
Your Answer
6 Lacs
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question If actual demand far exceeds forecast, it will result into :Correct Answer Better utilization of equipment , Project margin , Higher material
purchase
Your Answer Higher material purchase , Increase in labour productivity , Better
utilization of equipment , Project margin
Select The Blank
Question To know the accumulated ________ for a given machine at a given time
Load charts are necessary.
Correct Answer Load
Your Answer Load
Multiple Choice Single Answer
Question LOB technique was developed by US navy in the year :Correct Answer 1958
Your Answer 1958
True/False
Question In continuous or process production , only one product is manufactured.
Correct Answer True
Your Answer True
Select The Blank
Question ________reflects impact of money tied up in inventory.
Correct Answer Inventory turnover
Your Answer Inventory turnover
Multiple Choice Multiple Answer
Question Methods for recording actual progress of work for shop orders are :Correct Answer Progress card , Display board , Network updating
Your Answer Progress card , Display board , Network updating , Job card
Select The Blank
Question A progress card is the most ________ method of recording of progress of
work.
Correct Answer Convenient
Your Answer Convenient
Multiple Choice Multiple Answer
Question Following are some of the common standard cutting tools :Correct Answer Cutting saw , Inserts , Reamers
Your Answer Form tool , Cutting saw , Inserts , Reamers
Multiple Choice Multiple Answer
Question Tooling cost comprises the cost of :Correct Answer Gigs , Fixtures , Drill bits
Your Answer Gigs , Fixtures , Drill bits , Stationary
Multiple Choice Single Answer
Question The light engineering company has one special purpose facing & centering
machine And one copying lathe. The foreman has five work orders for processing . The
operation Sequence is fixed [ each job is first faced and centered and then copy turned ] .
The standard Hours required for each machine to process each work order are shown in
the following Table :- Work Order Processing Time [Hours ] Facing & centering
machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to
minimize requirements of machine hours.
Correct Answer IV-I-II-V-III
Your Answer I-II-III-IV-V
Select The Blank
Question ________ represents the time that elapses between the receipt of requirement
of job until the job is adopted in the production control department.
Correct Answer Order preparation time
Your Answer Queue time
True/False
Question PERT basically does not demarcate between critical and non-critical
activities.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The assignment method is also called as :Correct Answer Hungarian Method
Your Answer Analytical Method
Multiple Choice Multiple Answer
Question Outside operations cost involves expenses such as :Correct Answer Rough blanking , Heat treatment , Plating
Your Answer Heat treatment , Plating , Inventory control , Rough blanking
Select The Blank
Question The correct fitting of orders with capacity considerably lessens ________
burden of control.
Correct Answer Foreman's
Your Answer Foreman's
Multiple Choice Multiple Answer
Question The 'F' group of GOLF analysis involves following requirements :-
Correct Answer Search for foreign suppliers , Opening of letter of credit ,
Arrangements for shipping and port clearance
Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangements
for shipping and port clearance , Account in foreign bank
Match The Following
Question Correct Answer Your Answer
Order quantity Factor influencing process planning Break even analysis
Machine capacity chart Dimensional accuracy Dimensional accuracy
Mass production Special purpose machines Special purpose machines
Standard elemental time data Compare alternative processes Factor influencing process
planning
Multiple Choice Multiple Answer
Question The tooling data is prepared in respect of following measuring instruments :Correct Answer Vernier caliper , Micrometer screw gauge , Strain gauge
Your Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits
Multiple Choice Multiple Answer
Question In replenishment system, the fixed order quantity system is also called by
following names :Correct Answer Fixed order system , Min-max system , Re-order point system
Your Answer Fixed order system , Min-max system , Re-order point system , Lead
time system
Multiple Choice Multiple Answer
Question How you will Judge the failure of production planning and control
department?
Correct Answer Frequent broken delivery promises , Underutilization of men,
machines , Excessive overtime
Your Answer Frequent broken delivery promises , Underutilization of men, machines ,
Excessive overtime , Better coordination with other section
Multiple Choice Single Answer
Question In Cost Vs Quantity plot, the total inventory Cost curve is :Correct Answer Parabolic
Your Answer Inverse
True/False
Question Given stock in hand = 1320 units, safety stock=840 units and average daily
consumption = 60 units, the lead time available would be 10 hours.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question If the annual usage of a material is 1200 units and the reorder point is at 120
Units, find the lead time.
Correct Answer 4 months
Your Answer 4 months
Multiple Choice Single Answer
Question The assignment algorithm was developed by a Hungarian mathematician
named :Correct Answer D. Konig
Your Answer Charles simony
Multiple Choice Single Answer
Question So far as possible, number of activities should be :Correct Answer Limited
Your Answer Limited
True/False
Question Production Planning and Control makes the supervisor ineffective.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question Unit of loading and scheduling depends on following factor :Correct Answer Operating cycle
Your Answer Unit of capacity
True/False
Question The 'G' group of GOLF analysis involves moderate delivery time and
availability of credit usually in the range of 30 to 60 days.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Load charts are used for following :Correct Answer To know the accumulated load on a given machine at a given time ,
Identify periods available for allocation in future to orders , Matching orders and loads
Your Answer Improving supply of material , To know the accumulated load on a given
machine at a given time , Identify periods available for allocation in future to orders ,
Matching orders and loads
Select The Blank
Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour
cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total
manufacturing cost would be Rs ________.
Correct Answer 6 Lacs
Your Answer 6 Lacs
Select The Blank
Question An inventory control system in which stock of item is physically or
conceptually divided into ________ bins is calledTwo bin system.
Correct Answer Two
Your Answer Pair
Multiple Choice Multiple Answer
Question They are type of analytical estimate :Correct Answer Moving average , Exponential smothering , Curve fitting
Your Answer Moving average , Exponential smothering , Curve fitting , Opinion
surveys
Multiple Choice Single Answer
Question For goods manufactured to stock, following department is expected to
periodically undertake replenishment action as stocks are depleted :Correct Answer Production Planning Control
Your Answer Production
True/False
Question Random fluctuation is addition of cyclical fluctuation and seasonal
fluctuation.
Correct Answer False
Your Answer True
True/False
Question Scientific inventory control system requires to be followed for machine aid,
work aid and inspection aid :Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum
Your Answer Minimum
True/False
Question Purchase department must keep PPC informed regarding lead time of
different items specially where lead times are extended.
Correct Answer True
Your Answer True
True/False
Question In assignment matrix, it is a must to determine Jacobean of the determinant.
Correct Answer False
Your Answer True
Select The Blank
Question For replenishment action for stock items which are reserved by PPC, the
stores work out ________ stock which equals the stock on hand less stock reserved.
Correct Answer Free
Your Answer Net
Multiple Choice Single Answer
Question What are the customer's expectation from the supplier?
Correct Answer Consistent good quality of products
Your Answer Consistent good quality of products
Match The Following
Question Correct Answer Your Answer
End piece allowance Material insufficient to produce one piece Material insufficient to
produce one piece
Stock allowance Quantity to meet requirement of spares Quantity to meet requirement of
spares
Machining allowance Extra material requirement Extra material requirement
Spoilage allowance Process rejection Process rejection
Multiple Choice Single Answer
Question Why customer is called the king?
Correct Answer Customer's orders gives us work
Your Answer Customer's orders gives us work
Multiple Choice Single Answer
Question PPC is expected to have good inter-departmental relationships to achieve the
production targets. Which is the most important factor that shall affect production
targets?
Correct Answer Timely availability of material, manpower
Your Answer Timely availability of material, manpower
Select The Blank
Question Generally for ________ flow system, Heuristic method is preferred.
Correct Answer Intermittent
Your Answer Continuous
Select The Blank
Question In control board________ compartment contains copy of work orders/shop
orders of the item to be processed next on the machine.
Correct Answer Middle
Your Answer Bottom
True/False
Question Work measurement function is attached to line management.
Correct Answer False
Your Answer True
Multiple Choice Multiple Answer
Question The technical feasibility of sales enquiry is carried out on the following
grounds :Correct Answer Tools and plants are available , Technical know how is available ,
Competent persons are present
Your Answer Tools and plants are available , Technical know how is available ,
Competent persons are present , Cost data of raw material is available.
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
Following are the factors which influence tool life :Correct Answer Operators efficiency , Type of tool , Material it is required to operate
upon
Your Answer
Operators efficiency , Type of tool , Material it is required to operate
upon
Multiple Choice Single Answer
Question
The document which incorporates details of process planning for a
job is called :Correct Answer Route Sheet
Your Answer
Route Sheet
Multiple Choice Multiple Answer
Question
CPM terminology uses words like
Correct Answer Arrow diagram , Nodes , Float
Your Answer
Arrow diagram , Nodes
Select The Blank
Question
Forecasting is function of ________.
Correct Answer Marketing department
Your Answer
Planning in charge
Select The Blank
Question
Johnsons method of scheduling can be used when operation
sequence involve ________ machines.
Correct Answer Two
Your Answer
Two
Select The Blank
Question
Good quality and ________are the two main requirements to secure
maximum business from a customer.
Correct Answer Competitive rates
Your Answer
Competitive rates
Select The Blank
Question
Sum of queue, transit, order preparation and manufacturing times is
known as ________
Correct Answer Total Lead Time
Your Answer
Total Lead Time
True/False
Question
To conduct FSN analysis we require, last date of receipt or last date
of issue whichever is later and period.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Overtime can be avoided in many ways and they are :Correct Answer Unrealistic delivery date , Acceptance of too many rush order ,
Excessive machine breakdown
Your Answer
Unrealistic delivery date , Acceptance of too many rush order ,
Excessive machine breakdown
Multiple Choice Multiple Answer
Question
Material control function embraces a following techniques :Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system
Your Answer
Make -or -buy decision , Pareto's analysis , Replenishment system
True/False
Question
Work measurement is not useful for choosing between two alternate
methods of production.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Process Sheet contains following information :Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
More than one subcontractor should be developed for each
subcontracted operation/Job.
Correct Answer True
Your Answer
True
Select The Blank
Question
Classification of items on basis of their capital lock up is called
________ analysis.
Correct Answer XYZ
Your Answer
XYZ
Select The Blank
Question
Purchase section must keep ________posted on the progress of
purchase orders and expected delays.
Correct Answer P.P.C.
Your Answer
P.P.C.
Multiple Choice Single Answer
Question
Effective Production Planning and Control, reduce investment in
inventories effectively :Correct Answer By proper coordination between shop floor, stores and buying
department
Your Answer
By proper coordination between shop floor, stores and buying
department
True/False
Question
Fluctuation due to changes in season are called cyclical fluctuation.
Correct Answer False
Your Answer
False
True/False
Question
Flexibility and product variety are not inter-related with each other.
Correct Answer False
Your Answer
True
True/False
Question
Overlapping of operations help to reduce manufacturing time.
Correct Answer True
Your Answer
True
Select The Blank
Question
The LOB technique is made more accurate and fast by using
________.
Correct Answer Computers
Your Answer
Reduction techniques
True/False
Question
Overtime is undesirable since it increases manufacturing cost of the
product.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
The essential features of batch production are :-
Correct Answer General purpose machines and process type layout , Manual
materials handling , Flexibility of production schedule
Your Answer
General purpose machines and process type layout , Manual
materials handling , Flexibility of production schedule
Multiple Choice Single Answer
Question
The sourcing of vendors in case of 'B' type of items is :Correct Answer Medium
Your Answer
Few
Multiple Choice Single Answer
Question
Dispatcher withdraws required quantity of material from stores using
following document :Correct Answer Stores issue order
Your Answer
Bill of material
Multiple Choice Multiple Answer
Question
In a mass production assembly shop following work measurement
techniques are used :Correct Answer Time study , Work sampling , Production study
Your Answer
Time study , Work sampling , Production study , Analytical
estimating
Multiple Choice Multiple Answer
Question
SDE analysis is based on problems of procurement namely :Correct Answer Non-availability , Scarcity , Longer lead time
Your Answer
Non-availability , Scarcity , Longer lead time
True/False
Question
Line balancing is a simulation technique.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
The line of balance is a device for planning and monitoring progress
of :Correct Answer Purchase order execution , Project execution , Targeted programs
Your Answer
Purchase order execution , Project execution , Targeted programs
Select The Blank
Question
Sales persons decides ________.
Correct Answer Synthetic forecast
Your Answer
Current sales
True/False
Question
Material control Card is a document for record of issues of material
and receipt of unused material by production shop.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Work measurement is limited to measuring :Correct Answer Productive & non productive time
Your Answer
Only product related activities
Match The Following
Question
Correct Answer
Your Answer
Move order
Transport material from and Transport material from and
to required work centers
to required work centers
Materials Order
Allocation of material
Allocation of material
required in connection with required in connection with
shop order
shop order
Work Order
Bird's eye view of
production programme
Bird's eye view of production
programme
Production Order
Reserve material required
in connection with sales
order
Reserve material required in
connection with sales order
Multiple Choice Multiple Answer
Question
The software for line balancing should have following features :Correct Answer Easy to operate , Easy to install , Easy to upgrade
Your Answer
Easy to operate , Easy to install , Unmanaged code should be
available
Multiple Choice Single Answer
Question
Man hours is commonly used unit of measurement for scheduling
purposes in following industry :Correct Answer Engineering
Your Answer
Engineering
Multiple Choice Multiple Answer
Question
Customer plays very important role due to the following reasons :Correct Answer Gives us work , Dividends to share holders , Gets business from
new customers
Your Answer
Gives us work , Dividends to share holders , Gets business from
new customers
Multiple Choice Single Answer
Question
The 4X4 assignment problem involve following job-machine
operations :Correct Answer 24
Your Answer
24
Multiple Choice Single Answer
Question
The best of scientific tools available for scheduling is :Correct Answer CPA [ critical path analysis ]
Your Answer
Gantt Chart
Multiple Choice Multiple Answer
Question
Work measurement is responsibility of :Correct Answer PPC , Industrial Engineering , Production department
Your Answer
PPC , Industrial Engineering
Match The Following
Question
Correct Answer
Long production run
Mass and Flow production Mass and Flow production
Complex activities to be
performed in a particular
order within a give time &
estimate.
Project production
Project production
One or few units
manufactured as per
customers requirement
Jobbing Production
Jobbing Production
Short production run
Batch Production
Batch Production
Your Answer
Multiple Choice Single Answer
Question
Value Analysis conducted in 'C' type of material is usually :Correct Answer Minimum
Your Answer
Minimum
Multiple Choice Multiple Answer
Question
Some of significant features of HML analysis are :-
Correct Answer To evolve buying policies to control purchases , To delegate
authorities to different buyers to make petty cash purchases , Not to
take consumption into account
Your Answer
To evolve buying policies to control purchases , To delegate
authorities to different buyers to make petty cash purchases
Multiple Choice Single Answer
Question
What is the reasons for poor labour efficiency attributed by inefficient
P.P.C.?
Correct Answer Failure to provide proper tools and control on work in progress on
shop floor
Your Answer
Failure to provide proper tools and control on work in progress on
shop floor
Multiple Choice Single Answer
Question
The administrative expenses towards the procurement of materials
is called :Correct Answer Procurement cost
Your Answer
Administrative cost
Multiple Choice Multiple Answer
Question
Smoothing performs following activities:Correct Answer Reallocation of resources , Improving utilization of resources ,
Conducting Heuristic approach
Your Answer
Reallocation of resources , Improving utilization of resources ,
Conducting Heuristic approach
True/False
Question
As per a study on materials management practices, a typical firm
spends almost half of its rupee sales on goods purchased from
vendors.
Correct Answer True
Your Answer
True
Select The Blank
Question
Value analysis of ________ class items is usually inadvisable.
Correct Answer C
Your Answer
C
True/False
Question
PPC system in the organisation is to be tailor made.
Correct Answer True
Your Answer
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Performance benchmarking does not involves comparison of
financial ratios at the aggregate level.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Setup time includes :Correct Answer Internal setup time & External setup time
Your Answer
Internal setup time & External setup time
Multiple Choice Single Answer
Question
Participants of the groups for quality circles should be decided
by :Correct Answer Employees coming together by their own enthusiasm
Your Answer
Employees coming together by their own enthusiasm
Multiple Choice Single Answer
Question
Check sheet are also used as :Correct Answer Data gathering & interpretation tool
Your Answer
Data gathering & interpretation tool
Multiple Choice Single Answer
Question
SMED means :Correct Answer Single minute exchange of dies
Your Answer
Single minute exchange of dies
Match The Following
Question
Correct Answer
Your Answer
Productivity performance Turnover employee
measurement
Cost of quality
Financial performance
measurement
Sales of the months
Sales of the months
Customer satisfaction
measurement
Customer complaints per
period
Customer complaints per
period
Sem – 3rd
Techniques for Operations Efficiency
1
Staff attitude
measurement
Employee satisfaction
index
Employee satisfaction
index
Select The Blank
Question
________ is an effect due to the muda of defect.
Correct Answer Wear & tear of parts while disassembling
Your Answer
Poor production planning & control
Select The Blank
Question
If some defective parts are discovered by the subsequent
process they should be returned to the ________ to prevent
reoccurrence.
Correct Answer Preceding process
Your Answer
Return to stores
Multiple Choice Multiple Answer
Question
The results oriented efforts of the quality circle should also
include :Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the
customers satisfaction , Attacking the real root causes & all
possibilities
Your Answer
Efforts to avoid the problem permanently , Publication or
advertisement of your contribution , Attacking the real root
causes & all possibilities
Match The Following
Question
Parato diagram always
indicates
Correct Answer
Your Answer
Magnitude of defects
Philosophy of 20% of the
activity causes 80% of the
effect
Parato analysis underlines Philosophy of "vital
& operates on
few:trivial many"
Philosophy of "vital
few:trivial many"
Parato analysis is
technique of identifying
vital causes by
Arranging data according
to the descending order of
their frequency of
occurrence
Arranging data according
to the descending order of
their frequency of
occurrence
Parato diagram is a Bar
Arranging data in
graph with height or value descending order
drawn by
Magnitude of defects
Multiple Choice Multiple Answer
Question
Few steps in construction in Radar chart are :Correct Answer Brainstorming to enlist characteristics which require to be
evaluated & draw the circle & divide it into 'slices' equal to
number of characteristics , The first slice begins at 12 noon.
Then draw vertical line & calibrate it equal to the number of
Sem – 3rd
Techniques for Operations Efficiency
2
Your Answer
levels required , Draw concentric circles from each gradiation
using 'o' point as centre
Brainstorming to enlist characteristics which require to be
evaluated & draw the circle & divide it into 'slices' equal to
number of characteristics , The first slice begins at 12 noon.
Then draw vertical line & calibrate it equal to the number of
levels required , Draw concentric circles from each gradiation
using 'o' point as centre
Select The Blank
Question
5 S audit result is discussed in ________ meeting.
Correct Answer Monthly
Your Answer
Monthly
True/False
Question
Fishbone analysis is used both in analysis & planning.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
One Green Belt may head a team of :Correct Answer 20 employees
Your Answer
20 employees
Multiple Choice Multiple Answer
Question
Role of champions are :Correct Answer Approve six sigma projects , Remove road block in the path of
six sigma implementation , Monitor progress of six sigma
projects
Your Answer
Monitor progress of six sigma projects , Approve six sigma
projects , Remove road block in the path of six sigma
implementation
Multiple Choice Multiple Answer
Question
To draw control charts, sample must be representative of
homogeneous segment of production for which :Correct Answer The items of the sample should be from the same machine
setting , The items should be of the same batch , Items should
be made from the same raw material batch
Your Answer
The items of the sample should be from the same machine
setting , The items should be of the same batch , Items should
be made from the same raw material batch
Multiple Choice Single Answer
Sem – 3rd
Techniques for Operations Efficiency
3
Question
Failure mode and effect analysis (FMEA) establish
Correct Answer Process failure and minimize frequency
Your Answer
Process failure and minimize frequency
Multiple Choice Multiple Answer
Question
What are the steps in deciding the benchmarking partner?
Correct Answer Decide level of benchmarking , List down a few prospective
candidates of partnership , Collect information of short listed
partners
Your Answer
Decide level of benchmarking , List down a few prospective
candidates of partnership , Collect information of short listed
partners
Multiple Choice Single Answer
Question
One Master Black Belt may head a team of :Correct Answer 15-20 Black Belts
Your Answer
15-20 Black Belts
Multiple Choice Single Answer
Question
Competitive benchmarking involves identifying key competitive
product, services or processes & comparing with those of :Correct Answer Main competitor
Your Answer
Main competitor
Multiple Choice Single Answer
Question
Implication of Quality problem is:Correct Answer Gap in performance
Your Answer
Gap in performance
Select The Blank
Question
Number of defects in an individual component, like gear, shaft,
wheel etc can be monitored through ________ type of control
chart.
Correct Answer c-chart
Your Answer
c-chart
True/False
Question
Non-availability of files /document in time is a problem to be
addressed by office TPM.
Correct Answer True
Sem – 3rd
Techniques for Operations Efficiency
4
Your Answer
True
Multiple Choice Single Answer
Question
Check sheet is easy to use because it is :Correct Answer Simplest tool
Your Answer
Simplest tool
Multiple Choice Single Answer
Question
Benchmarking helps to identify the gap between the current
performance of the organization and the :Correct Answer Performance of the best organization
Your Answer
Performance of the best organization
True/False
Question
Flow chart is pictorial representation of the steps in production
control.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Breakdown problem may be stratified by :Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or
electrical)
Your Answer
Sections , Machines , Type of breakdown (e.g mech. Or
electrical)
Select The Blank
Question
A control chart to exhibit counted data on number of defect is
called ________.
Correct Answer c-chart
Your Answer
c-chart
Select The Blank
Question
Procedure for implementation of TPM consists of ________
numbers of steps.
Correct Answer 12
Your Answer
8
Select The Blank
Question
Capability index Cp = ________
Correct Answer Specification width/process width
Sem – 3rd
Techniques for Operations Efficiency
5
Your Answer
Specification width/process width
Multiple Choice Single Answer
Question
Pareto's analysis underlines & operates philosophy of :Correct Answer Vital few = trivial many
Your Answer
Vital few = trivial many
True/False
Question
Kanban signals are required when assembly work, subassembly
work and manufacturing at parts is carried out at different
locations.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
To reduce clamping & declamping time, following actions are
desirable :Correct Answer Standardize clamping bolts / screws , Cut off unnecessary
threads , Use quick clamping device
Your Answer
Standardize clamping bolts / screws , Cut off unnecessary
threads , Use quick clamping device
Select The Blank
Question
Benchmarking allows exchange of ________ between the
benchmarking partners.
Correct Answer Information
Your Answer
Information
Multiple Choice Multiple Answer
Question
TQM can never flourish if the staff are:Correct Answer Worried about losing jobs , Afraid of being reprimanded if there
are mistakes , Scared of their bosses
Your Answer
Worried about losing jobs , Afraid of being reprimanded if there
are mistakes , Scared of their bosses
True/False
Question
In bar graph each bar is of same height.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
During SMED implementation, primary study consists of :-
Sem – 3rd
Techniques for Operations Efficiency
6
Correct Answer Equipment analysis , Setup change analysis , Preparation items
(storage place , method) analysis
Your Answer
Equipment analysis , Setup change analysis , Preparation items
(storage place , method) analysis
True/False
Question
Daily work management can also be extended to non
manufacturing areas like procurement, QA, HRD etc.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Types of Poka-Yoke are :Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke
Your Answer
Prevention type Poka-Yoke , Detection type Poka-Yoke
Multiple Choice Single Answer
Question
Quality problem solving tool is used to :Correct Answer Improve quality
Your Answer
Save time
True/False
Question
Along with problem solving tools experience and judgment is
also used.
Correct Answer True
Your Answer
False
Select The Blank
Question
JIT advocates the philosophy at elimination of waste from
system which occurs due to ________.
Correct Answer Over Production
Your Answer
Over Production
True/False
Question
Without measuring initial performance, target can't be set.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
An erratic patterns falling above & below the control limits
indicates :Sem – 3rd
Techniques for Operations Efficiency
7
Correct Answer Defect in materials , Frequent adjustment of machines , Poorly
trained operators
Your Answer
Defect in materials , Frequent adjustment of machines , Poorly
trained operators
True/False
Question
Sample size for the construction of p-chart are larger than X barR chart.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Histogram is an important diagnostic tool. Analysis of the
histogram gives :Correct Answer It shows cause which affects the process , An idea of what is
happening to the process , Whether the process is capable of
meeting process or not i.e. around correct average & within
specific limits
Your Answer
An idea of what is happening to the process , Whether the
process is capable of meeting process or not i.e. around correct
average & within specific limits , A bird's eye view of the variation
Multiple Choice Single Answer
Question
Productivity improves by :Correct Answer Voluntary participants of everyone
Your Answer
Sem – 3rd
Voluntary participants of everyone
Techniques for Operations Efficiency
8