LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
It pays in the long run to inform the customer regarding
expected delays in the deliveries.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large
number of parts
Your Answer
product is very heavy involving assembly of large number of
parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded
as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due to
less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due to less or no
restriction for building and construction
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process
planning
Correct Answer
Order Quantity , Process capability of machine ,
Page 1
POM1
Delivery Dates
Your Answer
Order Quantity , Delivery Dates , Plant layout
True/False
Question
Availability of training schools, colleges and management
institutes reduces the company's internal training needs.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Lime stone
Match The Following
Question Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Craft
Facilities Planning
Wage Payment
Production Scheduling
Work Sampling
Machine utilization
Sampling Inspection
Gantt Chart
Production Scheduling
Charting technique
Match The Following
Question Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Stock on hand
Symptom of ill planned purchasing
Over ordering
Over ordering
Factor influencing material planning
Lead time
Lead time
Net requirement of material under MRP
Stock on hand
Price of material
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in
a small network?
Correct Answer
Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. , Enumerate
all paths in the network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
Page 2
POM1
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Tool breakage has got nearly zero chances in case of eventual
breakdown.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the three types of float?
Correct Answer
Total float , Independent float , Free float
Your Answer
Total float , Dependent float , Free float
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work
centre , Performance standards
Your Answer
Effective Capacity per work centre , Ratio of skilled to
unskilled labour , Performance standards
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a process
average.
Correct Answer
Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Overhauling
Page 3
POM1
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.
Correct Answer
One
Your Answer
One
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / (
Normal time - Crash time )
Your Answer
Activity cost slope = ( Normal cost - Crash cost ) / ( Normal
time - Crash time )
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good
quality of design?
Correct Answer
Resonable cost , Resonable procurement time ,
Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable
manufacturing time
True/False
Question
In case of control chart, large smaples such as n=15 or 20
are used if the process standard deviation is small.
Correct Answer
False
Your Answer
True
Select The Blank
Question
Production control work is ________ in case of floor
inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
labourious
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps
the operating personnel?
Correct Answer
Identify the presence of an assignable cause before it
develops
Your Answer
Reduces chances of rejections
Page 4
POM1
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Reduced salvage value of machine
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of
product which forms the vital part of engineering function?
Correct Answer
Material specifications
Your Answer
Performance specifications
Multiple Choice Single Answer
Question
Which of the following is a cause of plant breakdown?
Correct Answer
Overloading of machines
Your Answer
Overloading of machines
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using
flow process chart?
Correct Answer
Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen or
materials , Avoiding the waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials ,
Reducing rejections drastically , Avoiding the waiting time and thereby reduce
production losses
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
True/False
Question
Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for
method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
True/False
Question
In case of centralised inspection, inspection rooms generally
Page 5
POM1
become bottleneck and cause delay in taking action regarding rejection or
rework.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection to
unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
The problems of congestion, bottlenecks and backtracking can
not be visualized by using templates and models.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Quality
True/False
Question
Delay in completion of projects result in unwelcome additions
to the fixed manufacturing expenses.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The term ________ emplies the foregone profit due to
inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Idle wages
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for
location decision as taxes/duties substantially influence
Correct Answer
Product cost
Your Answer
Order procurement
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer
To forecast the defect , To identify causes of major
repetative failures , To quantify the frequency of preventive inspection
Page 6
POM1
Your Answer
To forecast the defect , To identify causes of major repetative
failures , To quantify the frequency of preventive inspection
True/False
Question
Shop order is one of the subsidiary order
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for
Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
The component produced on completely automatic machines
may be subjected to sampling inspection while parts produced on
semi-automatic and completely manual operated machines require cent percent
inspection.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department
if
Correct Answer
Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not very
large
Your Answer
Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following
selecting or rejecting a particular site
view?
Correct Answer
Labour laws ,
of licences
Your Answer
Labour laws , Policies
of labour
factors play important role while
from legislation and taxation point of
Building codes , Policies regarding issue
regarding issue of licences , Productivity
Page 7
POM1
Page 8
POM2
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Cent percent inspection is required on WIP prior to the key,
critical or costly operation.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality
of purchased items?
Correct Answer
Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand the
requirements
Your Answer
Vendor performance evaluation , Making sure that suppliers
understand the requirements , Defining right quality for the job
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the
achievement of quality?
Correct Answer
Quality of conformance , Purpose of product , Quality
of design
Your Answer
Quality of conformance , Quality of design
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of
alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of
supervision
Page 1
Your Answer
POM2
Flow of Material , Equipment utilization , Ease of supervision
Match The Following
Question Correct Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout Burnout
Ear
Impact
Your Answer
Impact
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning
activity times?
Correct Answer
Activity time should be obtained from the person
responsible for the completion of an activity , Activity time must be
independent of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal quantity of
resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible
for the completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. , Activity
time may assume that just the normal quantity of resources required to carry
out the activity are available.
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the
method study?
Correct Answer
Monitoring and control , Performance appraisal ,
Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on
savings
Multiple Choice Multiple Answer
Question
Which of the following are characteristics of an operating
characteristics curve?
Correct Answer
Producer risk , Consumer Risk , Acceptable Quality
Level
Your Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergency
actions.
Page 2
POM2
Correct Answer
Your Answer
Partial
Unexpected
Multiple Choice Single Answer
Question
Why stores issue order should not be issued as soon as it is
prepared?
Correct Answer
Material may or may not be available at the time of
preparation
Your Answer
Inventory investment will increase
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Multiple Answer
Question
Plant layout facilitates processing of products in most effective
manner through the following
Correct Answer
Shortest possible distance , Shortest processing time ,
Minimum movement
Your Answer
Shortest possible distance , Shortest processing time ,
Minimum movement
True/False
Question
After goods have been manufactured, route sheets and
operation layouts should not be collected back.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Process planning is the process of
Correct Answer
establishing shortest and most economic path of
production
Your Answer
establishing shortest and most economic path of production
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Page 3
POM2
Your Answer
Operation
Select The Blank
Question
The ________ is specified to indicate the maximum
permissible variability in the dimensions product or parts.
Correct Answer
Tolerance
Your Answer
Tolerance
Select The Blank
Question
Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance
True/False
Question
A load chart specifies the work to be carried out by each
person of company during shift hours.
Correct Answer
False
Your Answer
True
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
True/False
Question
Under MRP system for common items order for procurement
is placed based on requirement for each product
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
What do you understand by the extent the products
manufactured conforms to the laid down design?
Correct Answer
Quality of conformance
Your Answer
Quality of conformance
Page 4
POM2
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment
which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Job card
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality
standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
True/False
Question
In case of forward pass computation, the earliest event time
of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first
off inspection?
Correct Answer
Due to mistakes in reading blue prints , Due to
errors in tooling , Due to wrong machine set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in
tooling , Due to wrong machine set up , Due to purposely done mistakes by
unsatisfied worker
True/False
Question
A sampling plan which perfectly discriminates will have
vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing
order set as a primary function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores
issue orders
Your Answer
Operational layouts , Rejection reports , Move orders ,
Pre-filled stores issue orders
Select The Blank
Question
An ________ history card is the record of all repairs,
replacements and engineering changes carried out in the equipment during it's
period of service.
Page 5
POM2
Correct Answer
Equipment history card
Your Answer
Equipment history card
True/False
Question
Specifications is the basic tool of inspection.
Correct Answer
True
Your Answer
True
Match The Following
Question Correct Answer
Your Answer
Forcasting requirement for indirect material
technique
Economic order quantity
Past consumption analysis
Inventory control by classification ABC Analysis
ABC Analysis
Structure of the product BOM
BOM
Material Planning for dependent demand
MRP
MRP
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different
functions to take action as per instruction is called
Correct Answer
Work Order
Your Answer
Job Instructions
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer
Shop Supervisor
Your Answer
Shop Supervisor
True/False
Question
A lot declared rejected in sampling inspection should not be
inspected 100% in any case.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable
Quality Level (AQL )?
Correct Answer
Very high
Your Answer
Average
Multiple Choice Multiple Answer
Page 6
POM2
Question
Which are the different methods of recording actual progress
of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating
True/False
Question
The dispatching function is of very importance in flow and
mass production units.
Correct Answer
False
Your Answer
True
True/False
Question
Proper care and storage is not an essential part of a well
planned lubrication system.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for
Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
Production Planning is a centralised activity which includes
functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule
Page 7
POM3
ASSIGNMENT
Q.1) What is “Operations Management”? What are the objectives of Operations
Management? Enlist key elements of Operations Management.
Answer.1)
An operation may be defined “as the process of changing inputs into outputs
thereby adding value to some entity”.Right quality, right quantity, right time
and right price are the four basic requirements of
the customers and as
such they determine the extent of customer satisfaction. And if these can be
provided at a minimum cost, then the value of goods produced or services
rendered increases. Thus the objectives of production management are “to
produce goods and services of the right quality, in the right quantities,
according to the time schedule and a minimum cost”.
Objectives of production management may be amplified as under:
•
Producing the right kind of goods and services that satisfy customers’
needs (effectiveness objective).
•
Maximizing output of goods and services with minimum resource inputs
(efficiency objective).
•
Ensuring that goods and services produced conform to pre-set quality
specifications (quality objective).
•
Minimizing throughput-time- the time that elapses in the conversion
process- by reducing delays, waiting time and idle time (lead time objective).
•
Maximizing utilization of manpower, machines, etc. (Capacity utilization
objective).
•
Minimizing cost of producing goods or rendering a service (Cost
objective).
Key elements of Operations Management
1.
Product selection and design
The right kind of products and good designs of the products are crucial for
the success of an organizing. A wrong selection of the product and/or poor
design of the products can render the company’s operation ineffective and
non-competitive. Products/services, therefore, must be chosen after detailed
evaluation of the product/services alternatives in conformity with the
organization’s objectives. Techniques like value engineering may be employed in
creating alternate designs, which are free from unnecessary features and meet
the intended functions at the lowest cost.
2.
Process selection and planning
Page 1
POM3
Selection of the optimal “conversion system” is as important as choice of
products/services and their design. Process selection decisions include
decisions concerning choice of technology, Equipment, machines, material
handling systems, mechanization and automation. Process planning involves
detailing of processes if resource conversion required and their sequence.
3
Facilities (Plant) location
Plant location decisions are strategic decisions and once plant is set up at a
location, it is comparatively immobile and can be shifted later only at a
considerable cost and interruption of production. Although problem of location
choice does not fall within preview the production function and it occurs
infrequently, yet it is of crucial importance because of its major effect on the
performance of every department including production. Therefore, it is
important to choose the right location, which will minimize total “delivered
customer” cost (Production and distribution cost). Locational decisions involve
evaluation of locational alternatives against multiplicity of relevant factors
considering their relative importance to the organization and selecting those,
which are operationally advantageous to the organization.
4. Facilities (Plant) layout and materials handling
Plant layout is concerned with relative location of one department (Work
centre) with another in order to facilitate material flow and processing of a
product in the most efficient manner through the shortest possible time. A
good layout reduces material handling cost, eliminates delays and congestion,
improves co-ordination, provide good housekeeping etc. while a poor layout
results in congestion, waste, frustration, inefficiency and loss of profit.
5.
Capacity Planning
Capacity planning concerns determination and acquisition of productive
resource to ensure that their availability matches the demand. Capacity
decisions have a direct
Influence on performance of production system in respect of both resource
productivity and customer service (i.e. delivery performance). Excess capacity
results in low resource productivity while inadequate capacity leads to poor
customer service. Capacity planning decisions can be short-term decisions.
Long-term capacity planning decisions concern expansion/contraction of major
facilities required in the conversion process, economics of multiple shift
operation, development of vendors for major components etc. Short term
capacity planning decisions concern issues like overtime working,
sub-contracting, shift adjustments etc. Break even analysis is a valuable tool
for capacity planning.
6.
Production Planning and Control (PPC)
Production planning is the system for specifying the production procedure to
obtain the desired output in a given time at optimum cost in conformance with
specified standard of quality, and control is essential to ensure that
Page 2
POM3
manufacturing takes place in the manner stated in the plan.
7.
Inventory control
Inventory control deals with determination of optimal inventory levels of raw
materials, components, parts, tools; finished goods, spares and supplies to
ensure their availability with minimum capital lock up. Material requirement
planning (MRP) and just-in-Time (JIT) are the latest techniques that can help
the firm to reduce inventory.
8.
Quality assurance and control
Quality is an important aspect of production system and it must ensure that
services and products produced by the company conform to the declared
quality standards at the minimum cost A total quality assurance system
includes such aspects as setting standards of quality, inspection of purchased
and sub-contracted parts, control of quality during manufacture and inspection
of finished product including performance testing etc.
9.
Work study and job design
Work-study, also called time and motion study, is concerned with improvement
of productivity in the existing jobs and the maximization of productivity in the
design of new jobs. Two principal component of work-study are:
(i)
(ii)
Method study
Work measurement
Method study has been defined (BS 3138) as the systematic recording and
critical
examination of the existing and proposed ways of doing work, as a
means of developing and applying easier and more effective methods and
reducing costs. Method study when applied to production methods yields one or
more of the following benefits:
•
•
•
•
•
•
•
•
Improved work environment
Improved facility layout
Better utilization of facilities
Greater safety
Lesser materials handling
Smooth production flow
Lower work-in-process
Higher earnings for the workmen
10.
Maintenance and replacement
Maintenance and replacement involve selection of optimal maintenance
Preventive and/or breakdown) policy to ensure higher equipment availability at
minimum maintenance and repair cost. Preventive maintenance, which includes
Page 3
POM3
preventive inspection, planned lubrication, periodic cleaning and upkeep, planned
replacement of parts, condition monitoring of the equipment and machines, etc.
is most appropriate for critical machines.
11.
Cost reduction and cost control
Effective production management must ensure minimum cost of production and
in this context cost reduction and cost control acquires significant importance.
There are large number of tools and techniques available that can help to
make a heavy dent on the production cost.
Q.2) What is batch Production? What are its key characteristics? Compare these
characteristics with those of project production.
Answer.2)
Batch production is characterized by the manufacture of a limited
number of a product (but many such quantities of different products)
produced at periodic intervals
and stocked in warehouses as finished goods
(or finished parts) awaiting sales (or withdrawal for assembly). Typical
examples of batch production are: process industries such as pharmaceuticals,
paints, chemicals; medium and heavy engineering industry engaged in the
manufacture of electric motors, switch gears, heavy motor vehicles, internal
combustion engines; manufacture of ready made garments; manufacture of
assembly shops such as machine tools; sub contractors which take on machining
of batches of components to the drawings of a large manufacture etc.
Characteristics of batch production
(a)
Short runs:
Short production runs and frequent changes of set also characterize
batch production up. The equipment and the assembly set up is used for a
limited
number of parts or assemblies and is then changed to make a different
product. The production is generally made to stock.
(b) Skilled labour in specific trades:
The labour force is expected to posses skill in one specific
manufacturing process, Turning, milling, drilling, welding, grinding, hobbing,
fitting etc.
The operator may perform simpler machine set-ups but the separate machine
tool setter performs those involving complex operations.
(c)
Supervision to possess knowledge of a specific process
The supervision has considerable knowledge of a specific process.
Supervisor in the grinding section for example, may not expert in turning and
drilling work but s expected to possess a find of knowledge of different types of
grinding operations.
Page 4
POM3
Similarly a supervisor in the gear shop is expected to have sound knowledge in
working of different types of gear cutting machines.
(d) Limited span of control:
The amount of supervision required in batch production is lower than
that of jobbing production. The ration of direct workmen to supervisors is
more or less a function of batch size. The smaller the batches, the lower are
the ratio of direct workers to supervisors, and vice versa. This is because
smaller lots require each supervisor to spend a great deal of his time in
allocating new work, giving instructions, follow up on the shop floor for proper
movement of materials from and to the machines, identifying delays and
interruptions, and arranging, in consultation with planning, work load in his
section to keep his men busy.
(e) General purpose machines and process type of layout
Plant and equipment is procured and arranged to
obtain maximum flexibility. General purpose machines and handling equipment
capable of performing variety of operations with minimum set –up times are
installed in lieu of variety of products. The machines are arranged to give
process layout-layout by function. Similar machines capable of doing similar
types of operations are grouped together and kept at one place. Presses for
example, are put together and kept at one place milling machines are placed
together at another place, drilling machines are kept at the third place, gear
cutting machines are located at the fourth place and so on. Each Group of
machines is usually designated as a work centre or a section or a shop.
(f) Manual materials handling:
Materials handling in batch production as compared to jobbing production are
small. Individual components and parts are placed in trolleys and trays and
are transported as unit loads. Materials handling may be mechanized by
deploying power driven trucks.
(g)
Manufacturing cycle time affected due to queues:
The manufacture cycle time is comparatively smaller than jobbing production
but is much more than mass and flow production. The batches of work tend
to queue up at different machines due to differing cycles times, batch sizes and
sequence of operations.
(h)
Large work-in-progress:
Work in progress is comparatively large due to varying work content of
different components, imbalance in manufacturing times, formation of queues
between the machines.
(i)
Flexibility of production schedules:
Disruptions due to machine breakdown or absenteeism do not seriously affect
production as job can be shifted to another machine or another operator from
another machine can be shifted.
(j) Need to have production planning and control:
Functions of production planning and control in a batch production unit are
more complex than those in jobbing production or mass and flow production:
Page 5
POM3
•
Materials control and tools control functions are important.
kind of replenishment system needs to be used to ensure routine
replenishment
Some
•
Detailed operational layout and route sheets are prepared for each
part of the product.
•
Loading and scheduling needs to be more detailed and more
sophisticated since every machine requires to be individually scheduled.
•
Progressing function is very important to collect information on
progress of work. A separate progress card needs to be maintained to record
progress of each component.
•
Expediting is generally necessary since quite often jobs, due to
imbalances in work content, tend to lag behind
Q.3) (a) Why are locational decisions important? What factors should be taken
into account while deciding location of a unit to manufacture washing
machines?
Answer.3a)
Locational decisions generally arise when:
•
A new manufacturing (or servicing) unit is to be set up.
•
Existing plant operations are difficult to expand due to poor selection
of site earlier.
•
The growth of the business makes it advisable to establish additional
facilities in new territories.
•
There is emergence of new social (chronic labour problems) political
(political instability or economic conditions that suggest a change in the
location of the existing plant.
•
The product development has over weighted the advantages of the
existing plant.
•
The changes in the industrial Policy of the Government, favoring
decentralizing and dispersal of industries to achieve overall development of the
country, do not permit expansion of the existing plant
FACTORS GOVERNING PLANT LOCATION
Plant location studies are conducted in three phases:
(i)
(ii)
(iii)
General territory selection
Community selection, and
Site selection
1.
Proximity to market:
Page 6
POM3
Every company is in business to market and it can survive only if their
product reaches the consumers on time and at the competitive price. The
ratio of selling costs to sales generally increases with distance. Therefore, in
the choice of location o the plant, the factor of “proximity to the market” is
given the highest priority. Locating a plant nearer to the market is preferred
if:
•
The
•
The
•
The
•
The
significantly
product is fragile.
product is susceptible to spoilage.
promptness of service is required.
product is relatively inexpensive and transportation costs add
to the cost.
Bread, soap factories, etc. require the market to be nearby. If factory cannot
be started in Bombay, it may be started in Thane, Kalyan or Poona. If the
product is exported, location near ports is desirable. This is particularly
important for producers who sell bulky commodities, which incur high
transportation costs
Nearness to market not only lowers transportation costs but also gives many
other benefits namely:
•
A good many administrative problems, which cause perpetual headaches
and add to costs, are avoided.
•
Liaison with dealers or whole sellers can be maintained economically
and easily
•
Other costs such as commission to middlemen, which at times run as
high as 20 to 50 percent can be reduced significantly.
•
Customer’s accounts do not remain outstanding for settlement. This
recovery is easy and less time saving which itself reduces selling costs.
2.
Proximity to source of raw materials:
Since raw materials usually constitute 50 to 60 percent of the total product
cost, it is important that the firm gets its requirements of raw materials at
the right time and at the reasonable price for which the plant must be located
in the neighborhood of some source which can meet the raw materials
requirement of the unit “Proximity to supply of raw materials” factor assumes
still greater importance if raw materials are of perishable nature or if they
are expensive to transport, or if their weight is substantially reduced by
processing.
Proximity to sources of raw materials is equally important for small units.
This is because usually small units are not considered important customers.
Page 7
POM3
They get least priority and in the event of scarcity are the one to be struck
off first from the list. The availability of materials to small units to a large
extent thus depends on their follow up and personal visits to the supplier’s
plant which is possible only if the buyer’s plant is close by.
3.
Infrastructural facilities:
Infrastructural facilities consider availability of utilities like power water,
disposal of waste etc. These form the life-blood of many types of industries
without which there facilities may come to a stand still. Underestimating the
need of any one of the utilities can be extremely costly and inconvenient.
Certain industries, for example, aluminium, steel, etc are power intensive and
must be located close to the sites of power generation failing which the
shortage of, or increase in cost of generating power may spell problems for
their survival.
Similarly, chemical process industries like paper and pulp, cement, steel, sugar
laundries, metal plating, food preparation etc. requires perennial source of
water. Mineral content of water may also be an important factor. Treatment
of water is an expense to be considered while comparing economics of different
locations.
Drainage facilities are important for process industries otherwise disposal of
process waster can create lot of difficulties.
4.
Transport facilities:
Transportation cost to the value added is a key determinant of the plant
location. The structure of the transportation cost depends on (i)
Characteristics of the commodity (ii) average distance of shipment (iii) medium
of shipment: rail, road, and air sea.
The need for transport arises because raw materials and fuel are to be moved
to factory site and finished goods are to be transported from factory to
markets. Other things being equal since transport cost has a major effect on
product cost, the regions well served by transport facilities are most suitable
for industrial locations.
5.
Labour and wages:
Plant location should be such that required labour is easily available in the
neighbourhood. Importing labour from outside is usually costly and it causes
lot of administrative problems. Availability of required labour locally is better
since problem of arranging accommodation and other related problems do not
arise. Since normally workers with specific skills are required, some sort of
training facility should also be available in the neighborhood. Skilled employees
are easily available if ITI’s, or Engineering colleges are there in the
neighbourhood.
6.
Legislation and taxation:
Page 8
POM3
The policies of the state Government and Local Bodies relating to issue of
licenses, building codes, labour laws, etc. are the factors in selecting/rejecting
a particular community/site.
In order to disperse industries and ensure balanced economic growth, both
Central and State government offer a package of incentives for setting up
industries in particular locations. Exemption from excise duty, sales tax and
octroi, soft loans from financial institutions, subsidy in electricity charges, etc.
are some of the incentives offered.
Since taxes and duties levied by the State Government and Local bodies
substantially influence product cost, the incidence of such taxes/levies must be
taken into account while selecting a community/site.
7.
Climatic conditions:
Climatic factors may not have a major influence these days because of modern
air conditioning facilities available today. However, it may be important factor
for certain industries like textile mills, which require high humidity.
8.
Industrial and labour attitudes:
Community attitudes towards supporting hostile trade union activities are an
important factor. Locating facilities in a certain region/community may not be
desirable as frequent labour problems and interruptions are harmful to the
plant in the long run. Political situation in the state and attitude of the
government towards labour activities also influences selection of the site for
the plant.
9.
Safety requirement:
Safety factor may be important for certain industries such as:
Nuclear power plants
Explosive factories
Location of such industries close to border areas is undesirable.
10.
Community facilities (or social infrastructure):
Community facilities imply accommodation, educational, entertainment and
transport facilities.
Accommodation is needed unless the employees are local residents.
Accommodation should be easily available, comparatively cheap and near some
public transport stop.
The locational area should be fully developed, be accessible by road and should
have a convenient and efficient public transport system operating between the
area and the township to enable employees, officials, customers and suppliers to
make easy trips for their work
Page 9
POM3
11.
Community attitudes:
Community attitudes towards work (i.e. whether the people in the location are
hard working or otherwise) as well as their attitudes towards the incoming
entrepreneurs (helpful and cooperative or otherwise) can make or mar an
industry. Locational decisions, therefore, must take such factors also into
account particularly while setting up labour intensive units.
12.
Supporting industries and services:
Locational factors should also include proximity of services needed by the firm.
A firm desirous of getting some or all parts made from outside or some of
the operations done from outside must see that such sub-contractors are
located in the neighbourhood. Getting a job done from units located at far off
places will mean not only additional transportation cost but also time
consuming and costly. Also if units are too far off, the control on quality of
work done by them cannot be exercised.
13.
Suitability of the land:
Site selection should also take into account topography and soil structure of
the land. The soil structure must be capable of bearing loads of foundations.
Though modern building techniques can overcome the limitations of the soil,
but if considerable improvement is required then selection of a low cost and
may ultimately turn out to be expensive.
14.
Availability and cost of the land:
Site size (Plot size) must be large enough to accommodate the present
production facilities, parking and access facilities but also leave sufficient room
for future expansion. As a general rule, a site five times the actual plant size
is considered minimum for all these things including future expansion.
ECONOMY SURVEY OF THE SITE SELECTION:
An ideal location is one where the cost of obtaining materials and processing
them into finished product plus the cost of distributing the finished product to
customers is minimum.
Page 10
POM3
One of the most commonly used approaches consists of following steps:
Step 1:
Prepare a list of all relevant factors.
Step 2: Estimate expenses on materials, transport, wages, power etc for each
location on each of the above factors.
Step 3: Collect data on intangible factors like community facilities, community
attitudes etc.
Step 4: Analyse the tangible data for each location and calculate rate of
return on investment.
Step 5:
Select provisionally a locational based on financial data.
Step 6: Compare the intangible data for the different locations and select the
optimal location considering
intangible data.
Q.3) (b) What are objectives of a good layout? Discuss any six principles of a
good layout?
Answer.3)(b)
OBJECTIVE OF A GOOD PLANT LAYOUT
Only through an efficient layout, the organization can attain the following
objectives:
(i)
Economy in handling of materials, work-in-process and finished goods.
(ii)
Minimization of product delays.
(iii)
Lesser work-in-progress and minimum manufacturing cycle time.
(iv)
Efficient utilization of available space.
(v)
Easy supervision and better production control.
(vi)
Greater flexibility for changes in product design and for future
expansion.
(vii)
Better working conditions by eliminating causes of excessive noise,
objectionable odor smoke etc.
PRINCIPLES OF A GOOD LAYOUT
(i)
Overall integration of factors:
A good layout is one that integrates men, materials, machines and supporting
activities and others in a way that the best compromise is obtained
No layout can satisfy each and every principle of a good layout.
Page 11
Some
POM3
criterion may conflict with some other criterion and as a result no layout can
be ideal it has to integrate all factors into the best possible compromise.
(ii)
Minimum movement:
A good layout is one that permits the minimum movement between the
operations.
The plant and machinery in case of product layout and departments
in
case of process layout should be arranged as per sequence of operations of
most of the products.
?
Since straight line is the shortest distance between any two points,
men and materials as far as possible should be made to move along the
straight path
A door may be made in a wall or a hole may be drilled in a ceiling if that
eliminates or reduces material handling in place of stairs or a distant door.
(iii)
Uni-direction flow:
A good layout is one that makes the materials move only in the forward
direction, towards stage of completion, with any backtracking.
?
Since straight line is the shortest distance between any two, points,
materials as far as possible should be made to move on the principle of
straight line flow. And when straight line flow is not possible, other flows like
U-shaped flow, circular flow or zig zag flow may be adopted, but the layout
may ensure that materials move in the forward direction (Fig 4.1)
?
To ensure forward flow, equipment if necessary may be duplicated.
(iv)
Effective use of available space:
A good layout is one that makes effective use of available space both horizontal
and vertical
•
Backtracking and duplicated movements consume more time, involve
un-necessary materials handling, add to cost and lead to inefficiency.
•
Raw materials, work-in-progress and finished goods should be piled
vertically one above another rather than being strewn on the floor.
•
Pallets or equivalents should be made use of to pile up several layers
one above another
•
Area below the work tables or in the cupboards built into the wall are
welcome since they reduce requirement of space
(v)
Maximum visibility:
A good layout is one that makes men, machines and materials ready observable
Page 12
POM3
at all
times.
•
All departments should be smoothly integrated, convenient to service
and easy to supervise
•
Every piece of positioning or screening or partitioning should be
scrutinized and carefully planned.
•
Special cupboards, enclosures, offices, partitions etc. should be avoided
except when their utility is established beyond doubt.
(vi)
Maximum accessibility:
A good layout is one that makes all servicing and maintenance point readily
accessible.
•
Machines should be kept sufficiently apart and with reasonable
clearance from
The wall so that lubrication, adjustment and replacement of belts, removal of
parts at the time of repairs etc can be done conveniently by the maintenance
staff.
Area in front of electrical panels and fire extinguishers should be kept free
from obstructions.
Q.4) How does production planning differ from production control? What are
the key functions of production planning and control?
Answer.4)
Production planning versus production control.
Planning (Planning the work)
Control (Working the Plan)
Planning involves collection and maintenance of data regarding time standards,
materials and their specifications, machines and their quantities, tools and
their process capabilities, drawings and operational layouts etc.
Planning is seeing that requirements tool, machines, men, instructions,
authorization and the like-will be available at the right time and in the right
quantities and are of proper quality.
Planning involves preparations of load charts and fitting various work orders
into uncommitted time available on the company’s facilities (men or machines).
Planning involves preparation of all necessary forms and paper work.
Planning involves designing suitable feed back as to what may happen.
Planning involves forwarding thinking regarding the remedial action to be taken
if the job falls behind schedule.
Planning therefore is a centralized
Page 13
POM3
Activity (in the office) and includes such functions as materials control, tools
control, process planning and scheduling. Control involves dissemination of data
preparation of reports regarding output, machine and labour efficiency,
percent defectives etc.
Control is seeing the requirements are actually made available at the right
place and in the right quantities.
Control involves actual seeing that the jobs are started and completed as per
schedule prepared by the scheduling cell of the PPC.
Control involves actual issue of forms and paper work.
Control involves keeping track of what is happening and collecting information
as to what has happened.
Control involves suggesting remedial action when the job is falling behind
schedule.
Control is thus a diffused activity (in the shops) and includes functions such as
dispatching, progressing and expediting.
FUNCTIONS OF PRODUCTION PLANNING AND CONTROL:
Production planning and control is normally assigned two sets of functions:
(I)Regular functions and
(ii) Optional functions.
(i)
Regular functions are those, which are generally assigned to PPC in
most of the organizations through the importance of the function, may vary
from industry to industry.
(ii)
Optional functions are those, which may be assigned to PPC depending
upon policy of the management of the firm.
Page 14
POM3
Common (or Regular Functions)
Optional Functions
Order Preparation includes activities like making of work orders, converting
work orders to shop orders, preparing auxiliary orders and releasing such
orders to those concerned to authorize their activities
Materials control concerns preparations of materials estimates, indenting
non-stock materials, ascertaining availability of materials purchased to stock,
continual follow-up with purchase and stores for timely receipt of materials,
and advising stores to allocate required quantities or available materials
(alternatively on their receipt) against specific shop orders.
Process planning or Routing concerns fixation of method of manufacture:
operations and their sequence, machine tool for each operation, jigs and
fixtures, measuring instruments and gauges etc. to enable shops to produce
goods of the right quality at the lowest cost.
Tools control concerns preparations of estimates of cutting tools (Standards as
week As non-standards tools), gauges and measuring instruments, jigs and
fixtures etc indenting non-stick tooling: follow up with tool room for timely
manufacture of jigs and fixtures; periodical replenishment of
worn-out-non-consumable tooling (e.g. work arbors, collets, copying masters,
Allen keys, spanners, etc.
Scheduling concerns preparation of machine loads, fixation of calendar dates of
various operations to be performed on a job, coordination with sales to
confirm delivery dates of new items and periodical preparation of dispatch
schedules of regular items.
Dispatching concerns preparation and distribution of shop orders and
manufacturing instructions to the concerned department as their authority to
perform the work according to the predetermined schedule.
Progressing concerns collection of data from manufacturing shops, recording of
progress of work, and comparing progress against the plan.
Expediting concerns intensive progress chasing to identify delays and
interruptions which may hold up production, devising cures from time to time
to keep rate of production in line with the schedule, communicating possible
failure in delivery commitments to Sales Department.
Cost Estimation concerns preparations of
Preproduction cost estimates to be used by sales department for quotation
purposes (Alternatively this may be assigned to Costing Department Or
Industrial Engineering Department)
Page 15
POM3
Work measurement concern fixation of time to be allowed to a qualified
workman to carry out a specific task, under specified conditions and at the
defined level of performance. Work measurement employs scientific, well-known
techniques like time study, work sampling standard data, production study,
analytical estimating etc. (Alternatively, work measurement function may be
assigned to Industrial Engineering department.
Sub-Contract concerns offloading of certain work on outside vendors for
economic reasons or to augment the existing manufacturing facilities
(Sub-contract work alternatively) be handled by Materials/purchase Department)
Capacity planning concerns estimation of requirements of men and machines as
the basis of decision making to meet the firm’s increased volume of business
(Some companies prefer to assign this function to Engineering department.
Demand forecasting concerns making projection of company’s product market.
Though, long term forecasts are given by Sales Department but short term
forecasts required for materials planning, machine loading, sub contracting etc
may be prepared by PPC department
Q.12 (a) What is critical path? What does it signify? How is it identified?
Answer.2)(a)
Critical path analysis, an important aid to planning, scheduling and
coordinating the activities if large scale projects. Is a synthesis of two
independent techniques: Programme Evaluation and Review Technique (PERT)
and Critical Path Method (CPM).
Though the two techniques were developed independently, they are only
superficially different. The two method have many features in common and
are now combined into a technique called Critical Path Analysis (CPA) or
Network Analysis.
There are three basic different between a PERT network and CPM network:
•
PERT is event oriented while CPM is activity oriented (i.e. PERT
prepares network from events while CPM builds if from activities)
•
PERT provides for an allowance for uncertainty while CPM does not (i.e.
PERT makes three time estimates for each activity while CPM makes one time
estimate)
Page 16
POM3
•
Activity time in CPM technique are related to costs while it is not so
in PERT since it is event oriented
Significance of critical path
Critical path analysis offers several advantages.
It
(i)
Forces through pre-planning. Each and every activity compromising
the project is identified and recorded. Nothing is left to memory or chance
which prevents crises in scheduling
(ii)
Increases coordination of tasks as technological relationship between
the activities suggests which activities can run simultaneously and which should
succeed others.
(iii)
Helps computations of different project duration’s for different level of
resources and thereby select a plan that minimizes total project cost.
(iv)
Indicates optimal start and finish times of each activity of the project.
(v)
Defines areas of responsibility of different departmental heads for
timely execution of the project.
(vi)
Facilitates progress reporting and limits unnecessary discussion at the
progress meetings.
(vii)
Identifies troubles spot often in advance and apply remedial measures.
(viii)
Enables the plan to be revised in accordance with changes/changing
circumstances.
(ix)
Helps to exercise “control by exception” and prevents cost overruns.
A Project comprises a series of activities and the identification of the individual
activities requires knowledge and experience of the men responsible for the
planning of the project. Even the preliminaries-mere listing of the
activities-make the operating personnel:
•
Think of details about the project well in advance.
•
Observe critically the way in which the various activities interact or
compete for scarce resources
•
Improve upon the original plans even before network is formally
drawn and analyzed.
A project, therefore, must be torn into a set of identifiable activities.
are no set rules but general guidelines are as under:
There
•
An activity should represent the smallest unit of the operation or set
of operations over which management desires control.
•
An activity should represent an operation or set of operations, which
can be performed
using a particular kind of equipment or a special
skill. For example in construction project, plumbing is considered as one
activity while wiring can be considered as another activity since the first
activity requires plumbers and the second activity needs electricians.
Page 17
POM3
Q.12) (b)
Activity
1-2
1-3
1-4
2-5
3-5
4-5
4-6
5-6
Optimistic
02
03
02
04
02
06
01
01
04
05
02
03
02
05
03
05
Most Likely
10
06
10
01
12
04
08
13
Pessimistic
Answer:
Page 18
POM3
(a) Expected time of an activity can be obtained from the three time estimates
using the formula:
te = a + 4m +b
6
where
a
m
b
=
=
=
Optimistic time
most likely time
pessimistic time
a
m
b
=
=
=
2
3
10
For activity (1-2)
te
=
2 + 4 x 3 + 10
6
te
=
24
6
=
4
Expected times of all activities of the network, calculated on above lines, are
tabulated below.
Activity
1-2
1-3
1-4
2-5
3-5
4-5
4-6
5-6
Three time estimates
02-03-10
4
02-04-06
4
02-06-10
6
01-01-01
1
04-05-12
6
02-03-04
3
02-05-08
5
03-05-13
6
Expected time
5
6
6
3
4
6
4
1
Page 19
POM3
Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks
(4+6+6)
Variance is
Vi
=
(b –a) X (b – a)
6
6
V1-3
=
4
9
V3-5
=
16
9
V5-6
=
25
9
V
=
V1-3 + V3-5 + V5-6
V
=
5
Standard deviation Z
?
=
=
T - Tcp
19 -16
?5
=
3
2.236
=
1.34
The approximate probability value when Z = 1.34 is 0.9099
?The probability of completion of critical path by the schedule time of 19 weeks
= 91%
Q.5) What is preventive maintenance? Why it is better than Breakdown
Maintenance? What are the key activities of Preventive Maintenance?
Answer.5)
Preventive maintenance anticipates failures and adopts necessary actions to
check failures before they occur. It includes activities like inspection,
lubrication cleaning and unkeeps, minor adjustments and replacements found
necessary at the time of inspection etc. Preventive maintenance can be either:
running maintenance or “shut down maintenance”. Running maintenance
includes maintenance activities (e.g. minor adjustments
In machines
revealed through inspections, lubrication, cleaning and unkeep etc.) Which are
carried out when the machine is still running. Shutdown maintenance includes
preventive maintenance activities such as minor component replacement whose
needs are identified through inspections, which require stoppage of Machines.
Page 20
POM3
Preventive inspection is one of the key activities of preventive maintenance
which
is usually performed by making use of human senses – watch) eye),
listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) – but the
trend is Changing towards use of condition monitoring instruments. Such
maintenance. Practice is known as predictive maintenance or condition based
maintenance.
Q.10) (a) What are X-R Charts? How are they made and used in controlling a
process?
Answer.10)
X-R chart is a pair of chart consisting of a average (called X chart) and a
range
Chart (called R chart) placed one below another on a piece of graph paper.
The X chart is used to control the mean value of the characteristic an
R-chart is used to restrict the range of variations in the values. X-R charts
are drawn when the characteristics are measurable. Each chart consists of
three values: a central line, upper control limit and lower control limit. The
central line represents the arithmetic average of the sample means which
equals the mean of the population, u. The upper and lower control limits are
located at three standard deviation on either side of the central line.
Samples of fixed size are drawn at regular intervals and measurements are
taken.
The samples wise values of the mean and range are plotted
in their respective X
and R charts.
The spread of sample points in the charts is studied to decide the remedial
action (if any) to be taken. The X chart analyses whether or not the mean of
the quality Characteristics is within control while R-chart analyses whether or
not the variability is within control.
STEPS TO PREPARE X-R CHART
A pre-requisite to the preparation of the chart is the decision on the following
aspects:
•
Quality Characteristics refer to the property of the product, which is
to be assessed. The quality characteristics must be capable of being measured.
In case of more than quality characteristics, separate chart is made for each
quality characteristic.
•
Sample size refers to number of pieces comprising each sample.
Sample size is an important decision. It is a common practice to use sample
of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or
20 are used if the process standard deviation is large.
•
Sample Population refers to the number of samples to be collected to
construct a control chart. The number of samples must be sufficient.
Usually, 20 samples each of size 4 or 5 are enough to have good estimates of
the process average (X) and dispersion (R).
•
Time Interval measures the time gap between consecutive samples.
Time interval, as a genera rule, should be proportional to the average
frequency of out-of-control conditions. It is a fairly complex decision since a
number of factors such as cost economy, susceptibility of the process to
Page 21
POM3
disturbances; convenience of the inspector etc. requires to be considered.
The making of X-R Charts involves the following Steps:
Step 1:
Collect Data
(a)
Collect sufficient samples spread over a reasonable period. Each
sample must be of equal size.
(b)
Measure each component comprising the sample for the given quality
characteristic
(c)
Record individual measurements on a work data sheet.
Step 2:
Calculate mean (X) and Range (R) of each sample
A
The mean which is written as X (X bar) is average of each
sample and is
Obtained by totaling the individual measurements of the units comprising the
sample and dividing the total by the sample size (number of units in each
sample)
B
The range, which is written as R, is obtained as the difference between
the highest and the lowest measurement of a sample.
C
The values of X and R are recorded sample wise either on the extreme
right of the individual measurements on the data sheet or in a separate table.
Step 3: Calculate grand Average (X) and mean Range (R)
A
The grand average, which is written as, X (X double bar) is the
average of the sample averages and is obtained by dividing the total of the
averages of all the samples by the total number of samples.
B
The mean range, which is written as, R (R bar) is the average of the
ranges and is obtained by dividing the total of the ranges of the samples by
the total number of samples.
Step 4:
Set up Control chart for the average
A
Set up a control chart with the central line drawn at X (X double
bar), upper control limit located X + A2R (R bar) and the lower control limit
set up at X-A2R.
B
Plot the averages to see whether the process was under control when
samples were drawn.
C
If all points fall within the control limits, the process is said to be
under control
D
If process is not under control (indicated by some points falling
outside the control limits), eliminate points outside the control limits and
compute new trial control limits for the remaining points.
E
Repeat step 4 (d) until all points fall within the control limits
F
Control limits in a particular situation should be revised from time to
time as additional data is accumulated.
Step 5: Calculate control limits of the range chart
Page 22
POM3
A
The control chart for range chart is set up with central line as R,
upper control limit (UCLR) located at D4R above the central line and lower
control limit (LCL) at D3R below the central line
B
Plot the value of the range of each sample.
C
If all points fall within the control limits no modification is necessary
unless it is desired to reduce the process dispersion
D
if range chart exhibits lack of control indicated by some points falling
outside the control limits, eliminate those points out of control and compute
new trial control limits
E
Repeat step 5 (d) until all points fall within the control limits.
F
Control limits in a practical situation should be revised time to time
as additional data
is accumulated.
Step 6: Use control chart
A
Collect samples of fixed size at specified intervals of time.
B
Measure each unit of the sample for the quality characteristics,
calculate mean and the range of each sample.
C
charts
D
action
Plot the values of X and R of each sample in their respective
Study the trend of the points to interpret and suggest
remedial
Q10 (b) ABC company produces a solvent, which must contain 3 percent of
alcohol. It tries to maintain the actual percentage at 3 + 0.3 percent. It tests
hourly in samples of five. The following table shows the results of last five
samples. Set up a control chart for mean and examine whether the process is
under control.
A) Solution:
(i)
Collect data
(ii)
Calculate mean (X bar) and range(R bar)
Page 23
Sample No.
POM3
Arithmetic Mean (X bar) Range(R)
1
2
3
4
5
2.92
2.98
3.06
3
3
0.3
0.1
0.1
0
0.2
(iii)
Calculate grand average and the mean range
X(X bar)
=
2.92 + 2.98 + 3.06 + 3 + 3
5
=
R
=
0.3 + 0.1 + 0.1 + 0 + 0.2
5
=
(iv)
2.992
0.14
Set Up control chart for the average
Central Line = CLx = X(X bar)
=
2.992
Upper Control Limit
=
UCLx = X (X bar) + A2.R(R bar)
=
UCLx = X (X bar) - A2.R(R bar)
=
R(R bar)
=
2.992 + 0.5768 x 0.14
=
3.476
Lower Control Limit
=
2.992 - 0.5768 x 0.14
=
2.507
(v)
Set up a range chart
Central line CLR
Lower control limit
bar)
=
LCLR
=
0 x 0.14
Page 24
=
0.14
=
D3.R (R
POM3
Lower control limit
bar)
=
0
=
UCLR
=
2.114 x 0.14
=
0.29596
=
D4.R (R
Q.6) What is method study? Describe the procedural steps to develop easier and
effective methods.
Answer.6)
Method study is the systematic recording and critical examination of existing
and proposed ways of doing work, as a means of developing and applying easier
and more effective methods and reducing costs.
Method study is an organized approach and its investigation rests on the
following six basic steps outlined in the block diagram
•
Select
the work to be analyzed.
•
Record
all facts relating to the existing method.
•
Examine the recorded facts critically but impartially.
•
Develop the most economical method commensurate with plant
Requirements
•
Install
the new method as standard practice.
•
Maintain the new method.
Selection of the job
Selections of the jobs to be studied for methods improvement by the method
study practioner is a managerial responsibility and it (selection) may be based
on economic technical or human consideration. Economic consideration
justifies selection based on the economic worth (i.e. money saving potential) of
the job.
Technical consideration identifies jobs, which require studies to overcome
manufacturing difficulties (excessive rejection, relaxation in prefixed
performance standards, inability if the shops to stick to specified machining
parameters such as speeds, feeds, depth of cut etc., inconsistent quality etc.)
Human consideration in job selection is usually given weightage while
introducing method study practices for the first time.
Recording of facts
Systematic recording is the most crucial step in method improvement. Since
recording by long hand (or by descriptive method) has its limitations, it is not
recommended for use in method study. Instead, five symbols and eight
charting conventions are used to record facts relating to the job under study.
Page 25
POM3
Five typical symbols are O, ||, ?, D and V and eight charting conventions
concern composition of the chart, reject, rework, repletion, change of state,
introducing of new material, combined events and numbering of events. The
document on which details of the process are recorded by the above referred
symbols and conventions is called chart. There are four basic types of chart:
(i) operation process chart (ii) Flow process chart (iii) multiple activity charts
and (iv) two handed process chart.
Besides charts, two types of diagrams-flow diagram and string diagram are
drawn when recording details of an existing layout. Travel chart is another
typical chart, which is used to record frequency of movements (weight x
distance) between work centres/departments.
Repetitive short cycle operation which involves quick hand/feel motions (i.e.
microscopic motions) may be studied with micro motion study. Glibreth,
founder father of micro motion study, also developed photographic techniques
called cyclograph and chronocylegraph to record path of the motions of the
members of the body.
Critical examination
Critical examination aims to analyze the facts critically and thereby give rise
to alternatives, which form the basis of selection and development of easier,
and effective methods.
Critical examination is conducted through a systematic and methodical
questioning process. Each activity recorded on the chart, whether it relates to
processing or inspection, or material handling, or to any other aspect, is
picked up one at a time and is examined minutely. The questioning process is
considered under five major heads, namely the purpose, the place, the
sequence, the person and the means. These five aspects in critical examination
are referred to as five governing considerations.
Development and selection:
Development and selection stage concerns short listing of ideas generated at the
critical examination stage, testing each short listed idea for its technical and
economic feasibility, and making selection among the alternatives wherever
choice exists. To develop ideas and to ascertain their technical and economical
feasibility, the method study practioner needs to solicit the cooperation of
personnel from different departments of the company. Various techniques
available for the development and selection purpose are: cost benefit analysis,
break even analysis, investment analysis and critical path analysis.
Installation
‘Installation’ (or implementation) of the proposed method involves preparation
of project report on recommendations making oral presentation to the top
Page 26
POM3
management, securing approval of the decision maker, assisting line
management during implementation, arranging training of workmen, and getting
jobs (operations) retime after implementation, arranging training of workmen,
and getting jobs (operations) retimed after implementation.
Maintenance
“ Maintenance” phase is the follow up phase after implementation, which serves
as a monitoring and control mechanism. It helps to ensure that the revised
methods are set into concrete and workmen do not revert back to old
methods. It also provides an opportunity to the practitioner to assess the
effectiveness of the approach followed by him and makes changes in the
methodology (if required).
Q.9) (a) What desirable conditions need to be present to be present to
guarantee success of an incentive scheme?
Answer.9)
A good wage incentive plan should have the following characteristics.
•
Administrative simplicity:
The incentive system should be simple and must be easily understood by the
workers and their representatives. An incentives scheme, which can be
understood, only by engineers and mathematicians or a scheme which involves
the use of complex formulate or references and cross-references is sure to
fail. The incentive scheme should be such that workmen can calculate their
own earnings easily and quickly.
•
Minimum clerical work:
The system should fit into existing system of production and cost control.
should not involve any significant addition to the clerical work.
It
•
Maximum coverage:
The system should cover as many workmen as possible. A scheme if applied to
a few workmen creates a demoralizing effect on the morale of those not
covered by the scheme.
•
Direct
Incentive payments should increase at least in direct proportion to the increase
in output by the operator. There are two reasons:
Firstly because it is more difficult to producer extra units and secondly
because saving in the overheads are far greater at higher levels of production.
•
Period of Payment
The period of payment should be as short as possible
•
Adequate guaranteed minimum hourly rate
The scheme must ensure adequate guaranteed minimum hourly rate to all
Page 27
POM3
incentive workers regardless of their output. Such an hourly guaranteed rate
is normally referred to as the guaranteed base rate.
The guaranteed base rate must be realistic and should be at least equal to the
hourly rate payable to a non-incentive worker doing similar job in the
industry. Incentive earnings of the workers should never be regarded as a
substitute for poor wages.
•
Accurate and yet attainable performance standards
Performance standards should be set through systematic work measurement
studies. The experts to that there is no dispute or malpractice and yet the
standards are attainable so that a worker working at normal pace can attain
them should base the standards of measurement on the assessment.
Further the incentive plan should be such that it provides an opportunity to
all average workers to earn reasonable earnings.
•
Consistency of the standards
Standards once fixed should not be changed unless there is a permanent
change in methods, or change in equipment, or change in material and plan
should provide for the provisions to modify the performance standards.
•
Inbuilt check on process rejections
A good incentive scheme should exercise a check on the operator against
achieving higher bonus by poor workmanship. Payment should be made only
for pieces declared acceptable by the inspection department and a workman
constantly producing substandard pieces should be liable for disciplinary action.
•
Payment of partially completed jobs
The problem of payment for the incomplete work arises only in case of long
cycle jobs. Situations do arise when the jobs are of very long cycle duration
and cannot be finished within the bonus period. Similarly, a semi-finished job
may require to be handed over by one operator to another at the end of shift,
or prior to having a holiday. The scheme should clearly spell out as how
assessment of work done by the workmen on the same job will be carried out
and how disputes arising out of such assessment would be resolved.
•
Payment of Idle Time
Adequate safeguards must be provided to compensate the operator for the time
lost due to reasons beyond his control. A good incentive scheme should ensure
that an operator does not suffer financial loss for reasons attributable to the
managerial weakness, e.g.: lack of material due to bad buying, breakdowns of
the machines due to poor maintenance practices, non-availability of work etc.
Thus an operator rendered idle because of factors attributable to the
management should be given a lieu bonus.
Page 28
POM3
•
Safeguards
The scheme should be fair not only to the employees but also to the employer.
Safeguarding clauses as under should be incorporated to protect.
a.
Management’s right to change a standard when there are changes in
methods. Materials and machines
b.
Management’s right to withdraw or discontinue temporarily a scheme
during bad period.
c.
Management’s right to initiate disciplinary action against operators who
continually produce sub-standard articles.
d.
Management’s right to initiate disciplinary action against employees
who, time and again, do not achieve minimum standard of production even in
the presence of fair and accurate standards.
e.
Management’s right to initiate disciplinary action against employees
who, time and again are found using speeds and feeds higher than those
recommended in the process sheet (or operational layouts)
•
Maximum ceiling on the earnings
The system should have built-in-control against higher earnings beyond a
certain limit. Firstly, the system should discourage workers to work beyond a
certain limit otherwise too attractive an incentive scheme may induce the
worker to work more and more and thereby adversely affect his health.
Secondly, the system should ensure that in case of loose standards the company
does not lose financially.
•
Consistency of Plan
The plan should be consistent over a period of time. Frequent changes in the
plan make it’s functioning difficult. Faith in plan is lost if there are frequent
revisions.
•
Acceptance of Labour Body
The scheme should finally have acceptance of the labour body. The body of
workers’ representatives to prevent any misunderstanding and ill-feeling later
on must accept the basic incentive plan and its provisions.
•
Continuous Use
The scheme should be in continuous use. The temporary use of the scheme in
good times and its discontinuation in bad times makes it’s functioning difficult.
•
Define End Results
The plan must result in reduction in per unit labor cost.
Page 29
POM3
Q 13)
Answer 13)
i) Average Cycle time
=
0.22 + 0.24 + 0.28 + 0.26 + 0.25
5
=
Normal Time
=
0.25
Observed time x Rating
100
=
0.25 x 80
100
=
0.2
Similarly, average cycle time and normal time for all the elements are
calculated and tabulated as below
Element
A
B
C
D
E
Avg. cycle time
0.25
80
0.15
100
0.35
120
0.102
90
0.12
100
Total Normal time
Rating
0.2
0.15
0.42
0.0918
0.12
Normal time
=
Page 30
0.2 + 0.15 + 0.42 + 0.0918 +
POM3
0.12
Total Normal time
ii)
Relaxation Allowance
=
=
0.9818
15
100
x
=
0.1473
x
Contingency Allowance
=
5
100
?Standard time
=
0.0491
0.9818
0.9818
Normal time + Relaxation Allowance + Contingency Allowance
=
?Standard time
0.9818 + 0.1473 + 0.0491
=
1.1782
Page 31
POM4
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality
of purchased items?
Correct Answer
Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand the
requirements
Your Answer
Defining right quality for the job , Vendor performance
evaluation , Making sure that suppliers understand the requirements
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergency
actions.
Correct Answer
Unexpected
Your Answer
Unexpected
True/False
Question
After goods have been manufactured, route sheets and
operation layouts should not be collected back.
Correct Answer
False
Your Answer
False
True/False
Question
In case of centralised inspection, inspection rooms generally
become bottleneck and cause delay in taking action regarding rejection or
rework.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of
following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Page 1
POM4
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage
defectives in the zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL
but less than LPTD
Your Answer
Lots having the percentage defective more than AQL but less
than LPTD
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during
recording for method study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Rectangular
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing
the production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor
, Excessive absenteeism
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic
consideration while selecting a job for method study?
Correct Answer
Unorderly movement of men and materials , Excessive
process defectives , Too many suggestions received for improvement from a
department or section
Your Answer
Unorderly movement of men and materials , Excessive process
defectives , Inconsistent quality
Page 2
POM4
True/False
Question
During set up of X bar-R control chart, control limts should
be practically revised from time to time as additional data is accumulated.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality
standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
Match The Following
Question Correct Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout Burnout
Ear
Impact
Your Answer
Roughness
Select The Blank
Question
The ________ is the defect level for which lots are regarded
as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
True/False
Question
Floor inspection delays the identification of faults which can
not be rectified immediately before large lots are spoiled.
Correct Answer
False
Your Answer
False
True/False
Question
Cent percent inspection is required on WIP prior to the key,
critical or costly operation.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
The document which incorporates details of process planning
Page 3
POM4
for a job is called
Correct Answer
Route Sheet
Your Answer
Route Sheet
True/False
Question
Repetitive movements between work stations which are difficult
to be traced on string diagrams can be conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for
Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Breakdown
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length
of an arrow?
Correct Answer
No relation
Your Answer
No relation
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Page 4
POM4
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning
activity times?
Correct Answer
Activity time should be obtained from the person
responsible for the completion of an activity , Activity time must be
independent of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal quantity of
resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible
for the completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. , Activity
time may assume that just the normal quantity of resources required to carry
out the activity are available.
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial
engineering department to obtain the utilisation index?
Correct Answer
Work Sampling Studies
Your Answer
Break Even Analysis
Multiple Choice Multiple Answer
Question
Which of the following
selecting or rejecting a particular site
view?
Correct Answer
Labour laws ,
of licences
Your Answer
Labour laws , Building
licences
factors play important role while
from legislation and taxation point of
Building codes , Policies regarding issue
codes , Policies regarding issue of
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation in
method study recording?
Correct Answer
Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Your Answer
Change in physical characteristic , Consumption of physical
effort , Movement of material
True/False
Question
An activity can share the same tail event and same head event
with any other activity.
Correct Answer
False
Your Answer
True
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer
Quality of design
Page 5
POM4
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Woolen
Select The Blank
Question
The ________ are the definitions of the measurable as well
as nonmeasurable characteristics of the product.
Correct Answer
Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer
Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following defects can be observed during
preventive inspection by using human senses?
Correct Answer
Deviation from normal sound , Excessive Vibration ,
Leakage of a gas
Your Answer
Deviation from normal sound , Excessive Vibration , Leakage of
a gas
Select The Blank
Question
The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Working Maintenance
True/False
Question
Independent float either affects the float of preceding activities
or that of succeeding activities.
Correct Answer
False
Your Answer
False
Page 6
POM4
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
True/False
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer
False
Your Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Match The Following
Question Correct Answer
Your Answer
Factor Analysis
Method to evaluate layouts
analysis of layouts
Technique for evolving and
Minimization of production delays Objective of good layout
layout
Maximum visibility
Scale model
Objective of good
Principles of good layout Principles of good layout
Layout analysis
Method to evaluate layouts
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning
for high value material
Correct Answer
MRP
Your Answer
MRP
Multiple Choice Single Answer
Question
What do you understand by totality of features and
characteristics of a product or service that bears on it's ability to satisfy the
customer?
Correct Answer
Quality
Your Answer
Quality
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Page 7
POM4
Your Answer
Worker
Page 8
POM5
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
One of the sophisticated operations research techniques used
in material planning is
Correct Answer
Dynamic programming
Your Answer
Dynamic programming
True/False
Question
Job life is one of the factors that influence Process Planning
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management advocated
by F W Taylor
Correct Answer
Selection of best worker for each particular task ,
Division of work between worker and management , Training and development
of the workmen
Your Answer
Selection of best worker for each particular task , Division of
work between worker and management , Training and development of the
workmen
Multiple Choice Single Answer
Question
Product layout is employed for manufacturing following
products
Correct Answer
refrigirators
Your Answer
ships
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Job
Multiple Choice Multiple Answer
Question
Which of the following situations demand the technical
consideration while selecting a job for method study?
Correct Answer
Jobs having inconsistent quality , Operations inviting
frequent requests from supervisors for relaxation in allowed time because of
variations in materials and tool performance , Jobs in which too many
man-hours are spend in checking and rechecking work
Your Answer
Jobs having inconsistent quality , Operations inviting frequent
requests from supervisors for relaxation in allowed time because of variations
in materials and tool performance , Jobs in which too many man-hours are
spend in checking and rechecking work
Page 1
POM5
True/False
Question
Quality control determines what, when, and how much to
inspect while inspection actually conducts examination of goods.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a process
average.
Correct Answer
Acceptable quality level
Your Answer
Producer's risk
Select The Blank
Question
The term ________ emplies the foregone profit due to
inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Opportunity cost
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
True/False
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following may be the objectives of project
crashing?
Correct Answer
To achieve uniformity in requirement of resources ,
To complete the project in the least possible time , To reduce project cost
below it's normal cost
Your Answer
To complete the project in the least possible time , To achieve
uniformity in requirement of resources , To improve the labour efficiency
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without
actual measurements , Improper selection of samples
Page 2
POM5
Your Answer
Recording done without actual measurements , Improper
selection of samples
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning
for high value material
Correct Answer
MRP
Your Answer
MRP
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of
material / personnel. In a good layout the flow should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
True/False
Question
The event numbers as far as possible reflect the logical
relationships of the activities.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following
situations
Correct Answer
Long Lead time for procurement , Several levels of
assemblies in product , Long manufacturing cycle
Your Answer
Long Lead time for procurement , Several levels of assemblies
in product , Long manufacturing cycle
True/False
Question
Cent percent inspection is often more practical and economical
than sampling inspection.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer
Quality of design
Page 3
Your Answer
POM5
Quality of conformance
True/False
Question
Both, preventive and breakdown maintenance work must be
assigned to the same team.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Following is one of the tasks of Production Control
Correct Answer
Actual issue of forms and documents
Your Answer
Actual issue of forms and documents
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing
tooling for most economic production run when
Correct Answer
Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using
mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
What is the specific name for the Gantt chart when it shows
at a glance the scheduling of various operations involved in a job?
Page 4
POM5
Correct Answer
Job Schedule
Your Answer
Load Chart
Select The Blank
Question
A set of activities to keep an equipment in the specified
condition is called as ________.
Correct Answer
Maintenance
Your Answer
Maintenance
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Crash cost
Multiple Choice Multiple Answer
Question
Which of the following factors decide the choice between the
cent percent and sampling inspection?
Correct Answer
Nature of inspection , Natural tolerance versus design
tolerance , Vendor's quality rating
Your Answer
Nature of inspection , Natural tolerance versus design
tolerance , Vendor's quality rating
Select The Blank
Question
The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage
defectives in the zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL
but less than LPTD
Your Answer
Lots having the percentage defective more than AQL but less
than LPTD
Multiple Choice Single Answer
Question
In mass/batch production organizations where goods are
produced for stocking, Work Order is raised on the basis of
Page 5
POM5
Correct Answer
Sales Programme
Your Answer
Sales Order
Match The Following
Question Correct Answer
Your Answer
Fixed Position Layout
Project Layout
Functional Layout
Product Layout
Line Layout
Process Layout
Functional Layout job layout
Combined Layout Mixed Layout
Project Layout
Mixed Layout
Multiple Choice Single Answer
Question
What do you understand by the measurement of work to
establish allowed time for a job for the defined method?
Correct Answer
Work measurement
Your Answer
Work measurement
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the distinct functions of scientific quality control?
Correct Answer
Acceptance function , Preventive function , Assurance
function
Your Answer
Acceptance function , Feedback function , Preventive function
Match The Following
Question Correct Answer
Your Answer
Interruption for machine utilisation
maintenance
Input for scheduling
Preventive maintenance
Overlapping of operations Strings
Page 6
Preventive
Technique of scheduling
POM5
Critical Path Analysis
Scheduling Device Strings
Blackboard
Critical Path Analysis
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Rectangular
True/False
Question
Breakdown of machines, absenteeism of worker does not
dislocate the manufacturing activity in process layout
Correct Answer
True
Your Answer
True
True/False
Question
Since value of c can never be negativee, hence" if LCLp works
out to be negative, it is taken as zero."
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer
Shop Supervisor
Your Answer
Worker
True/False
Question
The dispatching function is of very importance in flow and
mass production units.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
It helps to identify the set of activities and events
which are critical and as such must be carefully controlled and monitored , It
identifies activities to be given preference in allocation of resources. , It helps
to exercise "control by exception".
Your Answer
It helps to identify the set of activities and events which are
critical and as such must be carefully controlled and monitored , It helps to
exercise "control by exception".
Page 7
POM6
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Open purchase order
True/False
Question
An ideal OC curve is never possible only with cent percent
inspection.
Correct Answer
False
Your Answer
True
Match The Following
Question Correct Answer
Your Answer
Table lubrication Weekly
Six monthly
Draining and refilling of oil reserviors of plunger pump
Parts lubricated with oil nipple
Tools and slideways
Daily
Yearly
Yearly
Weekly
two to three times a day Daily
True/False
Question
The operator should not stop production if first piece is not
approved by the inspector.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing
the production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor
, Excessive absenteeism
True/False
Question
For p-chart, the central line of fraction defectives is
determined by average percentage defectives.
Correct Answer
True
Your Answer
True
Page 1
POM6
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to
sales department , Devising cures to keep rate of production in line with
schedule
Your Answer
Recording progress of work , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of
production in line with schedule
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the
perforated route sheet?
Correct Answer
After completion of operation
Your Answer
After completion of operation
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment
which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Move order
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement of replacement
spares
Your Answer
Eliminates problems and frequent breakdowns , Increases life
of an equipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question
Which of the following processes or activities are denoted by
using symbols while recording in method study?
Correct Answer
Transport , Delay , Storage
Your Answer
Transport , Rejection , Storage
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a
general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
True/False
Question
A properly designed sampling plan can control sampling
Page 2
POM6
errors and completely eliminate them.
Correct Answer
False
Your Answer
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
True/False
Question
Grouping of machines gives a lot of flexibility in loading and
scheduling
Correct Answer
True
Your Answer
True
True/False
Question
A lot declared rejected in sampling inspection should not be
inspected 100% in any case.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality
standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
True/False
Question
The plotting of activities - critical, non-critical and dummy
activities- is strictly according to their precedence relationship.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are activities of corrective maintenance?
Correct Answer
Modifications and improvements , Overhauling ,
Emergency repairs
Your Answer
Modifications and improvements , Overhauling , Lubrication as
Page 3
POM6
per schedule
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer
Product Planning
Your Answer
Order Processing
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the
qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By
experience
Your Answer
By vendor plant surveys , By the perofrmance of first lot , By
experience
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of end
product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Match The Following
Question Correct Answer
Your Answer
Pessimistic time b
p
Expected time
Te
Te
Optimistic time
a
o
Most likely time
m
m
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress
of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Progress cards
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of
material / personnel. In a good layout the flow should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
Page 4
POM6
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without
actual measurements , Improper selection of samples
Your Answer
Biases in measurements , Recording done without actual
measurements , Improper selection of samples
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the
project which is composed as series of connected arrows and circles to
describe the interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Flow chart
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the
occurances of defectives?
Correct Answer
On manufacturing process
Your Answer
On manufacturing process
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of
motions of the members of the body during method study?
Correct Answer
Cyclograph
Your Answer
Pictograph
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Bell
True/False
Question
In Gantt Chart, the horizontal lines devide vertical lines into
sections which represents either operations or work centres.
Correct Answer
True
Your Answer
True
Page 5
POM6
Select The Blank
Question
Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
Capacity decisions have a direct influence on performance of
production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Quality
True/False
Question
Floor inspection promotes tendency of machines to drift out of
limits and produce defectives.
Correct Answer
False
Your Answer
False
True/False
Question
A sampling plan which perfectly discriminates will have
vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the
existing method during method study?
Correct Answer
Charts , Diagrams , Templates or models
Your Answer
Control plans , Charts , Templates or models
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergency
actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Page 6
POM6
Correct Answer
Both forecast and pending orders
Your Answer
Past sales
Select The Blank
Question
The ________ is the probability that a bad lot will be
accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Acceptable quality level
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Total cost
Multiple Choice Single Answer
Question
What do you understand by the extent the products
manufactured conforms to the laid down design?
Correct Answer
Quality of conformance
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first
off inspection?
Correct Answer
Due to mistakes in reading blue prints , Due to
errors in tooling , Due to wrong machine set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in
tooling , Due to wrong machine set up
Page 7
POM7
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Open purchase order
True/False
Question
An ideal OC curve is never possible only with cent percent
inspection.
Correct Answer
False
Your Answer
True
Match The Following
Question Correct Answer
Your Answer
Table lubrication Weekly
Six monthly
Draining and refilling of oil reserviors of plunger pump
Parts lubricated with oil nipple
Tools and slideways
Daily
Yearly
Yearly
Weekly
two to three times a day Daily
True/False
Question
The operator should not stop production if first piece is not
approved by the inspector.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing
the production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material
from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor
, Excessive absenteeism
True/False
Question
For p-chart, the central line of fraction defectives is
determined by average percentage defectives.
Correct Answer
True
Your Answer
True
Page 1
POM7
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to
sales department , Devising cures to keep rate of production in line with
schedule
Your Answer
Recording progress of work , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of
production in line with schedule
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the
perforated route sheet?
Correct Answer
After completion of operation
Your Answer
After completion of operation
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment
which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Move order
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement of replacement
spares
Your Answer
Eliminates problems and frequent breakdowns , Increases life
of an equipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question
Which of the following processes or activities are denoted by
using symbols while recording in method study?
Correct Answer
Transport , Delay , Storage
Your Answer
Transport , Rejection , Storage
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a
general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
True/False
Question
A properly designed sampling plan can control sampling
Page 2
POM7
errors and completely eliminate them.
Correct Answer
False
Your Answer
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
True/False
Question
Grouping of machines gives a lot of flexibility in loading and
scheduling
Correct Answer
True
Your Answer
True
True/False
Question
A lot declared rejected in sampling inspection should not be
inspected 100% in any case.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality
standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
True/False
Question
The plotting of activities - critical, non-critical and dummy
activities- is strictly according to their precedence relationship.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are activities of corrective maintenance?
Correct Answer
Modifications and improvements , Overhauling ,
Emergency repairs
Your Answer
Modifications and improvements , Overhauling , Lubrication as
Page 3
POM7
per schedule
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer
Product Planning
Your Answer
Order Processing
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the
qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By
experience
Your Answer
By vendor plant surveys , By the perofrmance of first lot , By
experience
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of end
product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Match The Following
Question Correct Answer
Your Answer
Pessimistic time b
p
Expected time
Te
Te
Optimistic time
a
o
Most likely time
m
m
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress
of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Progress cards
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of
material / personnel. In a good layout the flow should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
Page 4
POM7
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without
actual measurements , Improper selection of samples
Your Answer
Biases in measurements , Recording done without actual
measurements , Improper selection of samples
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the
project which is composed as series of connected arrows and circles to
describe the interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Flow chart
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the
occurances of defectives?
Correct Answer
On manufacturing process
Your Answer
On manufacturing process
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of
motions of the members of the body during method study?
Correct Answer
Cyclograph
Your Answer
Pictograph
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Bell
True/False
Question
In Gantt Chart, the horizontal lines devide vertical lines into
sections which represents either operations or work centres.
Correct Answer
True
Your Answer
True
Page 5
POM7
Select The Blank
Question
Goods after final inspection should accompany ________to
enable dispatch department to identify and draw correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
Capacity decisions have a direct influence on performance of
production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Quality
True/False
Question
Floor inspection promotes tendency of machines to drift out of
limits and produce defectives.
Correct Answer
False
Your Answer
False
True/False
Question
A sampling plan which perfectly discriminates will have
vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the
existing method during method study?
Correct Answer
Charts , Diagrams , Templates or models
Your Answer
Control plans , Charts , Templates or models
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergency
actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Page 6
POM7
Correct Answer
Both forecast and pending orders
Your Answer
Past sales
Select The Blank
Question
The ________ is the probability that a bad lot will be
accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Acceptable quality level
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Total cost
Multiple Choice Single Answer
Question
What do you understand by the extent the products
manufactured conforms to the laid down design?
Correct Answer
Quality of conformance
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first
off inspection?
Correct Answer
Due to mistakes in reading blue prints , Due to
errors in tooling , Due to wrong machine set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in
tooling , Due to wrong machine set up
Page 7
POM8
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Floor inspection delays the identification of faults which can
not be rectified immediately before large lots are spoiled.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Management often fails to realize the importance of efficient
layout due to following reason
Correct Answer
losses resulting from poor layout are not directly
shown in the financial statements
Your Answer
losses resulting from poor layout are not directly shown in
the financial statements
Select The Blank
Question
The ________ is the defect level for which lots are regarded
as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
Which method of critical path determination begins with the
end event and moves backward to the start event of the project network?
Correct Answer
Backward pass computation
Your Answer
Backward pass computation
True/False
Question
Complexity and difficulty of Planning is influenced by types of
layout
Correct Answer
True
Your Answer
False
True/False
Question
For p-chart, p bar is the ratio of total number of units
inspected to the total number of units defectives.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
Page 1
POM8
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct Answer
Master production schedule , Product structure , Lead
time for procurement/manufacturing
Your Answer
Master production schedule , Lead time for
procurement/manufacturing , list of machines
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity
in a network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to emergency
actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
True/False
Question
Systematic maintenance system can completely eliminate the
wear and tear of machines.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Page 2
POM8
Multiple Choice Single Answer
Question
Providing flexibility in plant layout means
Correct Answer
Layout can be changed without much cost if required
Your Answer
Layout can be changed without much cost if required
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality
of purchased items?
Correct Answer
Defining right quality for the job , Vendor
performance evaluation , Making sure that suppliers understand the
requirements
Your Answer
Defining right quality for the job , Vendor performance
evaluation , Making sure that suppliers understand the requirements
Multiple Choice Multiple Answer
Question
Which of the following are scheduling techniques?
Correct Answer
Critical Path Analysis , Index Method , Johnson's two
machine algorithm
Your Answer
Critical Path Analysis , Index Method , Johnson's two machine
algorithm
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection to
unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
A network should be progression of activities always moving
forward.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department
if
Correct Answer
Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not very
large
Your Answer
Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment
Page 3
POM8
which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order
requires following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Shop order
Multiple Choice Single Answer
Question
What do you understand by the selection of the job for the
method study on the basis of money saving potential of the job?
Correct Answer
Economic consideration
Your Answer
Economic consideration
Select The Blank
Question
Production Planning is a centralised activity which includes
functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single Answer
Question
Which is the ideal place to inspect jigs and fixtures in a mass
manufacturing unit?
Correct Answer
Separate inspection room
Your Answer
Separate inspection room
Multiple Choice Single Answer
Question
How to reveal the capability of the sampling plan to
discriminate between good lots and bad lots?
Correct Answer
Operating characteristics curve ( OC )
Your Answer
Operating characteristics curve ( OC )
True/False
Question
It would not affect the project completion time if non-critical
activities take little loner time than planned.
Correct Answer
True
Page 4
POM8
Your Answer
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Match The Following
Question Correct Answer
Your Answer
Forcasting requirement for indirect material
Past consumption analysis
technique
Past consumption analysis technique
Inventory control by classification ABC Analysis
Structure of the product BOM
ABC Analysis
BOM
Material Planning for dependent demand
MRP
MRP
True/False
Question
The dispatching function is of very importance in flow and
mass production units.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of
materials while defining the qualitative requirement?
Correct Answer
Material composition , Dimensions , Any heat
treatment if required
Your Answer
Material composition , Dimensions , Cost of material
Select The Blank
Question
The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Operation
Page 5
POM8
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for
Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
True/False
Question
An activity should represent an operation or set of operations
which can be performed using a particular kind of equipment or a special
skill.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple
sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling
plan
True/False
Question
In case of forward pass computation, the earliest event time
of a plain event equals the earliest event time of the preceding event plus
duration of activity emanating from the preceding event.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are ideal situations for the preventive
inspection?
Correct Answer
Weekly off and holidays , Non-production hours ,
Stand-up equipment
Your Answer
Weekly off and holidays , Non-production hours , Stand-up
equipment
Page 6
POM8
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities
and entry points of materials are recorded to have graphic view of operations
and inspections involved in the process?
Correct Answer
Operation process chart
Your Answer
Flow Process chart
Match The Following
Question Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Reorder level
Symptom of ill planned purchasing
Over ordering
Over ordering
Factor influencing material planning
Lead time
Lead time
Net requirement of material under MRP
Stock on hand
Stock on hand
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for
location decision as taxes/duties substantially influence
Correct Answer
Product cost
Your Answer
Product cost
Multiple Choice Single Answer
Question
Which kind of gauge consists of electrical contacts operating a
series of colloured signal lamps which indicate whether the dimension is
correct, oversize or undersize?
Correct Answer
Multiple gauging
Your Answer
Multiple gauging
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good
quality of design?
Correct Answer
Resonable cost , Resonable procurement time ,
Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable
manufacturing time
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.
Correct Answer
One
Your Answer
One
Page 7
POM8
Page 8
POM9
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of
following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
As a general rule, the number of tail event of an activity is
more than that of it's head event.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning
activity times?
Correct Answer
Activity time should be obtained from the person
responsible for the completion of an activity , Activity time must be
independent of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal quantity of
resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible
for the completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. , Activity
time may assume that just the normal quantity of resources required to carry
out the activity are available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Page 1
POM9
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of
alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of
supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear ,
Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors
in setting
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
In case of X bar, if the process is not under control indicated
by some points falling outside the control limits, such points outside the
control limits are eliminated and new trial control limits for the remaining
points are computed.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer
Level of uncertainty
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a process
average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level
Page 2
POM9
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by diverting work to other
machine.
Correct Answer
Control board
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of end
product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Match The Following
Question Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Craft
Facilities Planning
Wage Payment
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Page 3
POM9
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department
if
Correct Answer
Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not very
large
Your Answer
Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer
Operators awaiting instructions from supervisor ,
Worker waiting for his turn at tools stores , Jobs awaiting at the machines for
their turn
Your Answer
Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for their
turn
True/False
Question
Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order
requires following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Reduce lead time
True/False
Question
Cent percent inspection is often more practical and economical
than sampling inspection.
Correct Answer
False
Your Answer
False
Page 4
POM9
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to
J.M.Juran?
Correct Answer
Quality of design
Your Answer
Quality of design
Match The Following
Question Correct Answer
Your Answer
Crash cost of an activity Cc
Cc
Normal time of an activity
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Tn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Study different plant layouts and select the most
optimum one , Study the extent of traffic over the different routes of the
plant , Identify the extent of backtracking, cross traffic and obstacles
encountered during the movement of material.
Your Answer
Study different plant layouts and select the most optimum one
, Study the extent of traffic over the different routes of the plant , Identify
the extent of backtracking, cross traffic and obstacles encountered during the
movement of material.
True/False
Question
A load chart specifies the work to be carried out by each
person of company during shift hours.
Correct Answer
False
Page 5
POM9
Your Answer
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill
of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due to
less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due to less or no
restriction for building and construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to
sales department , Devising cures to keep rate of production in line with
schedule
Your Answer
Recording progress of work , Progress chasing to identify
delays which may hold up production , Communicating possible delays in
delivery date commitment to sales department
Select The Blank
Page 6
POM9
Question
Production control work is ________ in case of floor
inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time
of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
True/False
Question
As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future expansion.
Correct Answer
True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities
or that of succeeding activities.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different
functions to take action as per instruction is called
Correct Answer
Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Page 7
POM9
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Page 8
POM10
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Site selection should also take into account topography and
soil structure of the land.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which manufacturing method is ideal for the use of air gauges
as inspection device?
Correct Answer
Mass
Your Answer
Batch
True/False
Question
Kanban system is essentially a computer based system for
production scheduling and control
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are three different bases to establish an activity time?
Correct Answer
Past experience , Judgement , Historical data
Your Answer
Past experience , Judgement , Historical data
True/False
Question
Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low
product variety and large volumes?
Correct Answer
Low Skilled Labour & Special Purpose Machines
Your Answer
Semiskilled Labour & General Purpose Machines
Select The Blank
Question
Capacity decisions have a direct influence on performance of
production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Delivery performance
Page 1
POM10
True/False
Question
In case of X bar, if the process is not under control indicated
by some points falling outside the control limits, such points outside the
control limits are eliminated and new trial control limits for the remaining
points are computed.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special equipment
which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Job card
Match The Following
Question Correct Answer
Your Answer
Crash cost of an activity Cc
Cc
Normal time of an activity
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Tn
True/False
Question
Lubrication survey should never be done for a new machine.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Single Answer
Question
Out of two basic criteria for the selection of a manufacturing
method, one is, it must be able to meet the specifications of final product and
Page 2
POM10
the other is, it must be
Correct Answer
Cost effective method
Your Answer
Cost effective method
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing
order set as a primary function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores
issue orders
Your Answer
Operational layouts , Move orders , Pre-filled stores issue
orders
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
Which are the major types of defects?
Correct Answer
Minor , Major , Critical
Your Answer
Minor , Critical , General
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing
Production?
Correct Answer
Highly Skilled
Your Answer
Highly Skilled
Multiple Choice Multiple Answer
Question
Which are the sources of information to update the progress
card daily?
Correct Answer
Detachable ticket , Daily production report , Job Card
Your Answer
Detachable ticket , Daily production report , Job Card
True/False
Question
In case of forward pass computation, the earliest event time
of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the distinct functions of scientific quality control?
Correct Answer
Acceptance function , Preventive function , Assurance
function
Page 3
Your Answer
POM10
Acceptance function , Preventive function , Assurance function
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing
instructions , Bill of material
Your Answer
Production schedule , Commercial standards , Bill of material
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory
is called
Correct Answer
MRP
Your Answer
MRP
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
Semiskilled
Multiple Choice Multiple Answer
Question
Major contributors in the development of Control Charts,
Sampling plan are
Correct Answer
F H Dodge , H G Roming , Walter Schewhart
Your Answer
F H Dodge , H G Roming , Walter Schewhart
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Event
True/False
Question
Feasibility of time schedule requires that an activity be
scheduled before any of it's predecessors are scheduled.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Which method of critical path determination begins with the
end event and moves backward to the start event of the project network?
Correct Answer
Backward pass computation
Your Answer
Backward pass computation
True/False
Question
Operation process charts though indicates the sequence of
Page 4
POM10
events but do not show movements.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which
can be carried out simultaneously and both activities require definite time to
finish?
Correct Answer
Concurrent activities
Your Answer
Concurrent activities
True/False
Question
One major difference between CPM and PERT is the former's
adaptability for the projects where high degree of uncertainty prevails and
activity times during performance are expected to vary considerably for
certain activities.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management advocated
by F W Taylor
Correct Answer
Selection of best worker for each particular task ,
Division of work between worker and management , Training and development
of the workmen
Your Answer
Selection of best worker for each particular task , Division of
work between worker and management , Training and development of the
workmen
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Poor Machine Utilization
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?
Correct Answer
Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep schedule ,
Lubrication schedule
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart
evaluates that the process is in a state of statistical control?
Correct Answer
Random variability
Page 5
POM10
Your Answer
Random variability
True/False
Question
Even in a small set up wherein maintenance of a machine is
looked after by a mechanic cum worker, he should report directly to the
person responsible for the manufacturing operations.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities
and entry points of materials are recorded to have graphic view of operations
and inspections involved in the process?
Correct Answer
Operation process chart
Your Answer
Operation process chart
Multiple Choice Single Answer
Question
Plant Layout decisions are considered to be
Correct Answer
Strategic
Your Answer
Strategic
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the
manufacturer of a machine?
Correct Answer
It gives instructions regarding installation and
operation of the equipment , It contains note on common troubles with causes
and remedies for troubleshooting , It enlists points, frequency and type of
lubrication
Your Answer
It gives instructions regarding installation and operation of
the equipment , It contains note on common troubles with causes and remedies
for troubleshooting , It enlists points, frequency and type of lubrication
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the
perforated route sheet?
Correct Answer
After completion of operation
Your Answer
After completion of operation
Multiple Choice Multiple Answer
Question
Which of the following situations demand that the human
consideration should be given preference over other considerations?
Correct Answer
Inconsistent earnings where the earnings are tied to
output , Poor morale evidenced by petty or trivial complaints , Repeated cases
of accidents and health hazards
Your Answer
Excessive rejections , Poor morale evidenced by petty or
trivial complaints , Repeated cases of accidents and health hazards
Page 6
POM10
True/False
Question
A network can have more than one starting event but
completion event must be only one.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity
in a network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of
materials while defining the qualitative requirement?
Correct Answer
Material composition , Dimensions , Any heat
treatment if required
Your Answer
Material composition , Dimensions , Any heat treatment if
required
Match The Following
Question Correct Answer
Your Answer
When to inspect
Stages of inspection
What to inspect
Specification
How to inspect
Inspection devices
How much to inspect
cent percent inspection
Stages of inspection
Specification
Inspection devices
Sampling or cent percent inspection
Sampling or
Multiple Choice Multiple Answer
Question
How the concept of float is helpful to planners?
Correct Answer
To decide priorities in allocation of resources , To
minimize the requirement of resources , To prevent peaks and valleys in
requirement of resources
Your Answer
To decide priorities in allocation of resources , To minimize
the requirement of resources , To prevent peaks and valleys in requirement of
resources
Page 7
POM11
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
It pays in the long run to inform the customer regarding
expected delays in the deliveries.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large
number of parts
Your Answer
product is very heavy involving assembly of large number of
parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded
as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both
skilled and unskilled labour can be available , Plant expansion is easier due to
less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due to less or no
restriction for building and construction
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process
planning
Correct Answer
Order Quantity , Process capability of machine ,
Page 1
POM11
Delivery Dates
Your Answer
Order Quantity , Delivery Dates , Plant layout
True/False
Question
Availability of training schools, colleges and management
institutes reduces the company's internal training needs.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Lime stone
Match The Following
Question Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Craft
Facilities Planning
Wage Payment
Production Scheduling
Work Sampling
Machine utilization
Sampling Inspection
Gantt Chart
Production Scheduling
Charting technique
Match The Following
Question Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Stock on hand
Symptom of ill planned purchasing
Over ordering
Over ordering
Factor influencing material planning
Lead time
Lead time
Net requirement of material under MRP
Stock on hand
Price of material
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in
a small network?
Correct Answer
Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. , Enumerate
all paths in the network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
Page 2
POM11
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality
lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Tool breakage has got nearly zero chances in case of eventual
breakdown.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the three types of float?
Correct Answer
Total float , Independent float , Free float
Your Answer
Total float , Dependent float , Free float
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work
centre , Performance standards
Your Answer
Effective Capacity per work centre , Ratio of skilled to
unskilled labour , Performance standards
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the maximum percentage defective that for
the purpose of sampling inspection can be considered satisfactory as a process
average.
Correct Answer
Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
The ________ is the maintenance work initiated on a result
of knowledge of the condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Overhauling
Page 3
POM11
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.
Correct Answer
One
Your Answer
One
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / (
Normal time - Crash time )
Your Answer
Activity cost slope = ( Normal cost - Crash cost ) / ( Normal
time - Crash time )
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good
quality of design?
Correct Answer
Resonable cost , Resonable procurement time ,
Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable
manufacturing time
True/False
Question
In case of control chart, large smaples such as n=15 or 20
are used if the process standard deviation is small.
Correct Answer
False
Your Answer
True
Select The Blank
Question
Production control work is ________ in case of floor
inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
labourious
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps
the operating personnel?
Correct Answer
Identify the presence of an assignable cause before it
develops
Your Answer
Reduces chances of rejections
Page 4
POM11
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Reduced salvage value of machine
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of
product which forms the vital part of engineering function?
Correct Answer
Material specifications
Your Answer
Performance specifications
Multiple Choice Single Answer
Question
Which of the following is a cause of plant breakdown?
Correct Answer
Overloading of machines
Your Answer
Overloading of machines
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using
flow process chart?
Correct Answer
Eliminating the operations or combining the
operations with another , Reducing the distance traveled by the workmen or
materials , Avoiding the waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials ,
Reducing rejections drastically , Avoiding the waiting time and thereby reduce
production losses
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
True/False
Question
Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for
method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
True/False
Question
In case of centralised inspection, inspection rooms generally
Page 5
POM11
become bottleneck and cause delay in taking action regarding rejection or
rework.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic inspection to
unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
The problems of congestion, bottlenecks and backtracking can
not be visualized by using templates and models.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Quality
True/False
Question
Delay in completion of projects result in unwelcome additions
to the fixed manufacturing expenses.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The term ________ emplies the foregone profit due to
inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Idle wages
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for
location decision as taxes/duties substantially influence
Correct Answer
Product cost
Your Answer
Order procurement
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer
To forecast the defect , To identify causes of major
repetative failures , To quantify the frequency of preventive inspection
Page 6
POM11
Your Answer
To forecast the defect , To identify causes of major repetative
failures , To quantify the frequency of preventive inspection
True/False
Question
Shop order is one of the subsidiary order
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for
Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
The component produced on completely automatic machines
may be subjected to sampling inspection while parts produced on
semi-automatic and completely manual operated machines require cent percent
inspection.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department
if
Correct Answer
Work is highly repetitive in nature , Planning
activities are performed by the line staff , Number of workmen is not very
large
Your Answer
Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following
selecting or rejecting a particular site
view?
Correct Answer
Labour laws ,
of licences
Your Answer
Labour laws , Policies
of labour
factors play important role while
from legislation and taxation point of
Building codes , Policies regarding issue
regarding issue of licences , Productivity
Page 7
POM11
Page 8
pom 12
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Kanban system is essentially a computer based system for
production scheduling and control
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is one of the best known statistical relationship
regarding process control.
Correct Answer
Normal distribution
Your Answer
Normal distribution
True/False
Question
Floor inspection promotes tendency of machines to drift out of
limits and produce defectives.
Correct Answer
False
Your Answer
False
True/False
Question
In case of two handed process chart, inspection symbol is used
when check by touch or feel is involved.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are reason due to which the progress of work is rarely in
line with it's plan?
Correct Answer
Absenteeism , Machine breakdowns , Substandard
performance against prefixed production standards
Your Answer
Absenteeism , Change in operation sequence , Machine
breakdowns
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Page 1
pom 12
Question
What does the points falling outside the control limits indicate?
Correct Answer
Presence of assignable causes
Your Answer
Presence of assignable causes
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer
Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for their
turn
Your Answer
Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for their
turn
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following
situations
Correct Answer
Long Lead time for procurement , Several levels of
assemblies in product , Long manufacturing cycle
Your Answer
Long Lead time for procurement , Several levels of assemblies
in product , Long manufacturing cycle
Select The Blank
Question
Principle underlying the Moving Average mrthod is that future
demand shall be ________ past demand.
Correct Answer
Average of
Your Answer
Higher than
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly
known as
Correct Answer
Productivity
Your Answer
Productivity
True/False
Question
Complexity and difficulty of Planning is influenced by types of
layout
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts
critically, generating alternatives which form the basis for selection and
development of improved methods?
Correct Answer
Critical examination
Your Answer
Development and selection
Page 2
pom 12
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing
order set as a primary function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores issue
orders
Your Answer
Operational layouts , Move orders , Pre-filled stores issue
orders
Select The Blank
Question
The wage payable to the workman is calculated by ________ the
quantity produced by him by the specified rate per piece, in the straight piece
rate method.
Correct Answer
Multiplying
Your Answer
Dividing
True/False
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
How to reveal the capability of the sampling plan to discriminate
between good lots and bad lots?
Correct Answer
Operating characteristics curve ( OC )
Your Answer
Operating characteristics curve ( OC )
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is
called
Correct Answer
MRP
Your Answer
MRP
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording
for method study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method
study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on
savings
Your Answer
Monitoring and control , Performance appraisal , Audit on
savings
True/False
Question
Only skilled worker can use the fixed limit gauge.
Correct Answer
False
Your Answer
False
Page 3
pom 12
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a
small network?
Correct Answer
Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of product
which forms the vital part of engineering function?
Correct Answer
Material specifications
Your Answer
Material specifications
Select The Blank
Question
We can say that ________ occurs when there is a distinct change
in the physical or chemical characteristic of an object.
Correct Answer
Operation
Your Answer
Manufacturing
True/False
Question
There is no need for progressing when the customers do the
follow-up on their own to know the status of their jobs.
Correct Answer
False
Your Answer
False
True/False
Question
The component produced on completely automatic machines may
be subjected to sampling inspection while parts produced on semi-automatic
and completely manual operated machines require cent percent inspection.
Correct Answer
True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous activities of
both hands are recorded opposite to each other on the chart.
Correct Answer
True
Your Answer
False
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some
value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct Answer
Preparation of material estimates
Your Answer
indenting all required material
Page 4
pom 12
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order
requires following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Shop order
Select The Blank
Question
The ________ is necessary when the job requires detailed of one
or more of the job characteristics with the help of special equipment which is
not available at the producing company.
Correct Answer
Inspection order
Your Answer
Inspection order
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions ,
Bill of material
Your Answer
Commercial standards , Assembly and testing instructions ,
Bill of material
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of
Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
Select The Blank
Question
The design of any layout is governed by large number of factors
and the best layout is expected to ________ all these factors.
Correct Answer
Optimise
Your Answer
Consider
Multiple Choice Single Answer
Question
How should a dummy activity be represented in a network?
Correct Answer
By dotted line
Your Answer
By circle
Select The Blank
Question
Production Planning is a centralised activity which includes
Page 5
pom 12
functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple
sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple
sampling plan
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer
Level of uncertainty
Your Answer
Level of uncertainty
Select The Blank
Question
In Gantt Chart, the vertical lines devide horizontal lines into
small squares which represents ________.
Correct Answer
Units of measurement
Your Answer
No. of Jobs
Select The Blank
Question
Activities comprising of a project are of two types, deterministic
and ________.
Correct Answer
Variable
Your Answer
Variable
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Page 6
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Correct Answer
Your Answer
It pays in the long run to inform the customer regarding expected delays in the deliveries.
True
True
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and construction
Your Answer
Avaialability of adequat e land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Order Quantity , Delivery Dates , Plant layout
True/False
Question
needs.
Availability of training schools, colleges and management institutes reduces the company's internal training
Correct Answer
Your Answer
True
False
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Lime stone
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan Wage Payment
Craft Facilities Planning
Work Sampling
Wage Payment
Production Scheduling
Machine utilization
Gantt Chart Production Scheduling
Sampling Inspection
Charting technique
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Symptom of ill planned purchasing
Stock on hand
Over ordering
Over ordering
Factor influencing material planning
Lead time
Lead time
Net requirement of material under MRP
Stock on hand
Price of material
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a small network?
Correct Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities
along each path. , Enumerate all paths in the network and list down activities on each path .
Your Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along
each path. , Enumerate all paths in the network and list down activities on each path.
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Correct Answer
Your Answer
Tool breakage has got nearly zero chances in case of eventual breakdown.
False
False
Multiple Choice Multiple Answer
Question
Which are the three types of float?
Correct Answer
Total float , Independent float , Free float
Your Answer
Total float , Dependent float , Free float
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer
Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Overhauling
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.
Correct Answer
One
Your Answer
One
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )
Your Answer
Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )
Multiple Choice Multiple Answer
Question
Correct Answer
Your Answer
True/False
Question
small.
Correct Answer
Your Answer
Which of the following are minimum requirement for a good quality of design?
Resonable cost , Resonable procurement time , Resonable manufacturing time
Resonable cost , Resonable procurement time , Resonable manufacturing time
In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is
False
True
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
labourious
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps the operating personnel?
Correct Answer
Identify the presence of an assignable cause before it develops
Your Answer
Reduces chances of rejections
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Reduced salvage value of machine
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of product which forms the vital part of engineering
function?
Correct Answer
Material specifications
Your Answer
Performance specifications
Multiple Choice Single Answer
Question
Which of the following is a cause of plant breakdown?
Correct Answer
Overloading of machines
Your Answer
Overloading of machines
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using flow process chart?
Correct Answer
Eliminating the operations or combining the operations with another , Reducing the distance traveled by
the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the
waiting time and thereby reduce production losses
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
True/False
Question
Correct Answer
Your Answer
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
True
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
Correct Answer
Your Answer
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
False
False
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Quality
True/False
Question
Correct Answer
Your Answer
Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.
True
True
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Idle wages
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influence
Correct Answer
Product cost
Your Answer
Order procurement
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer
To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
Your Answer
To forecast the defect , To identify causes of ma jor repetative failures , To quantify the frequency of
preventive inspection
True/False
Question
Correct Answer
Your Answer
Shop order is one of the subsidiary order
True
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
The component produced on completely automatic machines may be subjected to sampling inspection while parts
produced on semi-automatic and completely manual operated machines require cent percent inspection.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very large
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Policies regarding issue of licences , Productivity of labour
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Correct Answer
Your Answer
It pays in the long run to inform the customer regarding expected delays in the deliveries.
True
True
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for buildi ng and construction
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
Select The Blank
Question
Correct Answer
Your Answer
A good maintenance system is not a luxary but a ________.
Necessity
Necessity
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Order Quantity , Delivery Dates , Plant layout
True/False
Question
needs.
Correct Answer
Your Answer
Availability of training schools, colleges and management institutes reduces the company's internal training
True
False
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Lime stone
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan Wage Payment
Craft Facilities Planning
Work Sampling
Wage Payment
Production Scheduling
Machine utilization
Gantt Chart Production Scheduling
Sampling Inspection
Charting technique
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Symptom of ill planned purchasing
Stock on hand
Over ordering
Over ordering
Factor influencing material planning
Lead time
Net requirement of material under MRP
Stock on hand
Multiple Choice Multiple Answer
Lead time
Price of material
Question
Which of the following are steps to identify the critical path in a small network?
Correct Answer
Compare the durations of all paths to identify the longest path. , Sum up the d urations of activities
along each path. , Enumerate all paths in the network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along
each path. , Enumerate all paths in the network and list down activities on each path.
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Correct Answer
Your Answer
Tool breakage has got nearly zero chances in case of eventual breakdown.
False
False
Multiple Choice Multiple Answer
Question
Which are the three types of float?
Correct Answer
Total float , Independent float , Free float
Your Answer
Total float , Dependent float , Free float
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer
Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards
Multiple Choice Single Answer
Question
Any premise in which persons a re employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Overhauling
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.
Correct Answer
One
Your Answer
One
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )
Your Answer
Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good quality of design?
Correct Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
True/False
Question
small.
Correct Answer
Your Answer
In case of control chart, large smaples such as n=15 or 20 are used if the pro cess standard deviation is
False
True
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
labourious
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps the operating personnel?
Correct Answer
Identify the presence of an assignable cause before it develops
Your Answer
Reduces chances of rejections
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Reduced salvage value of machine
Multiple Choice Single Answer
Question
function?
Correct Answer
Your Answer
What do you understand by the metallergical aspects of product which forms the vital part of engineering
Material specifications
Performance specifications
Multiple Choice Single Answer
Question
Which of the following is a cause of plant breakdown?
Correct Answer
Overloading of machines
Your Answer
Overloading of machines
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using flow process chart?
Correct Answer
Eliminating the operations or combining the operations with another , Reducing the distance traveled by
the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the
waiting time and thereby reduce production losses
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
True/False
Question
Correct Answer
Your Answer
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
True
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
True/False
Question
In case of centralised inspection, inspection rooms generally become bott leneck and cause delay in taking
action regarding rejection or rework.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
Correct Answer
Your Answer
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
False
False
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Quality
True/False
Question
Correct Answer
Your Answer
Delay in completion of projects result in unwelcome additions to the fixed manufacturing expenses.
True
True
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of co mpany to produce.
Correct Answer
Opportunity cost
Your Answer
Idle wages
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influence
Correct Answer
Product cost
Your Answer
Order procurement
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer
To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
Your Answer
To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
True/False
Question
Correct Answer
Your Answer
Shop order is one of the subsidiary order
True
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
The component produced on completely automatic machines may be subjected to sampling inspection while parts
produced on semi-automatic and completely manual operated machines require cent percent inspection.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very large
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a particular site f rom
legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Policies regarding issue of licences , Productivity of labour
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Correct Answer
Your Answer
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
True
True
Multiple Choice Multiple Answer
Question
Which of the following a spects are essential to ensure quality of purchased items?
Correct Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers
understand the requirements
Your Answer
Vendor performance evaluation , Making sure that suppliers understand the requirements , Defining right
quality for the job
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of quality?
Correct Answer
Quality of conformance , Purpose of product , Quality of design
Your Answer
Quality of conformance , Quality of design
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alte rnative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Equipment utilization , Ease of supervision
Match The Following
Question
Correct Answer
Your Answer
Toung Sweet Sweet
Eye
Crack Crack
Nose
Burnout
Burnout
Ear
Impact
Impact
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time
may assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the completion of an activity , Activity
time must be independent of any influence which the preceding or succeeding activity may have on it. , Activ ity time may assume
that just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings
Multiple Choice Multiple Answer
Question
Which of the following are characteristics of an operating c haracteristics curve?
Correct Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Select The Blank
Question
The ________ breakdowns usually cost more, partl y due to damage done to the adjustment components and partly
due to emergency actions.
Correct Answer
Unexpected
Your Answer
Partial
Multiple Choice Single Answer
Question
Why stores issue order should not be issued as soon as it is prepar ed?
Correct Answer
Material may or may not be available at the time of preparation
Your Answer
Inventory investment will increase
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Multiple Answer
Question
Plant layout facilitates processing of products in most effective manner through the following
Correct Answer
Shortest possible distance , Shortest processing time , Minimum movement
Your Answer
Shortest possible distance , Shortest processing time , Minimum movement
True/False
Question
Correct Answer
Your Answer
After goods have been manufactured, route sheets and operation layouts should not be collected back.
False
False
Multiple Choice Single Answer
Question
Process planning is the process of
Correct Answer
establishing shortest and most economic path of production
Your Answer
establishing shortest and most economic path of production
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Select The Blank
Question
The ________ is specified to indicate the maximum permissible variability in t he dimensions product or parts.
Correct Answer
Tolerance
Your Answer
Tolerance
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department to identify and draw
correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.
Correct Answer
Shutdo wn Maintenance
Your Answer
Shutdown Maintenance
True/False
Question
Correct Answer
Your Answer
A load chart specifies the work to be carried out by each person of company during shift hours.
False
True
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
True/False
Question
Correct Answer
Your Answer
Under MRP system for common items order for procurement is placed based on requirement for each product
False
True
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms to the laid dow n design?
Correct Answer
Quality of conformance
Your Answer
Quality of conformance
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Job card
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
True/False
Question
Correct Answer
Your Answer
In case of forward pass computation, the earliest event time of the first event is zero.
True
True
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machi ne set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up , Due to
purposely done mistakes by unsatisfied worker
True/False
Question
Correct Answer
Your Answer
A sampling plan which perfectly discriminates wi ll have vertical OC curve.
True
True
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing order set as a primary function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer
Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and engineering changes carried out in
the equipment during it's period of service.
Correct Answer
Equipment history card
Your Answer
Equipment history card
True/False
Question
Correct Answer
Your Answer
Specifications is the basic tool of inspection.
True
True
Match The Following
Question
Correct Answer
Your Answer
Forcasting requirement for indirect material
Past consumption analysis technique Economic order quantity
Inventory control by classification ABC Analysis
Structure of the product
BOM
ABC Analysis
BOM
Material Planning for dependent demand
MRP
MRP
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per instruction is called
Correct Answer
Work Order
Your Answer
Job Instructions
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer
Shop Supervisor
Your Answer
Shop Supervisor
True/False
Question
Correct Answer
Your Answer
A lot declared rejected in sampling inspection should not be inspected 100% in any case.
False
True
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable Quality Level (AQL )?
Correct Answer
Very high
Your Answer
Average
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating
True/False
Question
Correct Answer
Your Answer
The dispatching function is of very importance in flow and mass production units.
False
True
True/False
Question
Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer
Your Answer
False
False
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule
ASSIGNMENT
Q.1) What is “Operations Management”? What are the objectives of Operations Management? Enlist key elements of Operations
Management.
Answer.1)
An operation may be defined “as the process of changing inputs into outputs thereby adding value to some entity”.Right quality,
right quantity, right time and right price are the four basic requirements of
the customers and as such they determine the
extent of customer satisfaction. And if these can be provided at a minimum cost, then the value of goods produced or services
rendered increases. Thus the objectives of production management are “to produce goods and services of the right quality, in
the right quantities, according to the time schedule and a minimum cost”.
Objectives of production management may be amplified as under:
•
Producing the right kind of goods and services that satisfy customers’ needs (effectiveness objective).
•
Maximizing output of goods and services with minimum resource inputs (efficiency objective).
•
Ensuring that goods and services produced conform to pre-set quality specifications (quality objective).
•
Minimizing throughput-time- the time that elapses in the conversion process- by reducing delays, waiting time and idle
time (lead time objective).
•
Maximizing utilization of manpower, machines, etc. (Capacity utilization objective).
•
Minimizing cost of producing goods or rendering a service (Cost ob jective).
Key elements of Operations Management
1.
Product selection and design
The right kind of products and good designs of the products are crucial for the success of an organizing. A wrong selection of
the product and/or poor design of the products can render the company’s operation ineffective and non-competitive.
Products/services, therefore, must be chosen after detailed evaluation of the product/services alternatives in conformity with
the organization’s objectives. Techniques like value engineering may be employed in creating alternate designs, which are free
from unnecessary features and meet the intended functions at the lowest cost.
2.
Process selection and planning
Selection of the optimal “conversion system” is as important as choice of products/services and their design. Process
selection decisions include decisions concerning choice of technology, Equipment, machines, material handling systems,
mechanization and automation. Process planning involves detailing of processes if resource conversion required and their
sequence.
3
Facilities (Plant) location
Plant location decisions are strategic decisions and once plant is set up at a location, it is comparatively immobile and can
be shifted later only at a considerable cost and interruption of production. Although problem of location choice does not fall
within preview the production function and it occurs infrequently, yet it is of crucial importance because of its major effect
on the performance of every department including production. Therefore, it is important to choose the right location, which
will minimize total “delivered customer” cost (Production and distribution cost). Locational dec isions involve evaluation of
locational alternatives against multiplicity of relevant factors considering their relative importance to the organization and
selecting those, which are operationally advantageous to the organization.
4. Facilities (Plant) layout and materials handling
Plant layout is concerned with relative location of one department (Work centre) with another in order to facilitate material
flow and processing of a product in the most efficient manner through the shortest possible time. A good layout reduces
material handling cost, eliminates delays and congestion, improves co-ordination, provide good housekeeping etc. while a poor
layout results in congestion, waste, frustration, inefficiency and loss of profit.
5.
Capacity Planning
Capacity planning concerns determination and acquisition of productive resource to ensure that their availability matches the
demand. Capacity decisions have a direct
Influence on performance of production system in respect of both resource productivity and customer service (i.e. delivery
performance). Excess capacity results in low resource productivity while inadequate capacity leads to poor customer service.
Capacity planning decisions can be short-term decisions. Long-term capacity planning decisions concern expansion/contraction
of major facilities required in the conversion process, economics of multiple shift operation, development of vendors for major
components etc. Short term capacity planning decisions concern issues like overtime working, sub -contracting, shift
adjustments etc. Break even analysis is a valuable tool for capacity planning.
6.
Production Planning and Control (PPC)
Production planning is the system for specifying the production procedure to obtain the desired output in a given t ime at
optimum cost in conformance with specified standard of quality, and control is essential to ensure that manufacturing takes
place in the manner stated in the plan.
7.
Inventory control
Inventory control deals with determination of optimal inventory levels of raw materials, components, parts, tools; finished
goods, spares and supplies to ensure their availability with minimum capital lock up. Material requirement planning (MRP) and
just-in-Time (JIT) are the latest techniques that can help the firm to reduce inventory.
8.
Quality assurance and control
Quality is an important aspect of production system and it must ensure that services and products produced by the company
conform to the declared quality standards at the minimum cost A total quality assurance system includes such aspects as
setting standards of quality, inspection of purchased and sub-contracted parts, control of quality during manufacture and
inspection of finished product including performance testing etc.
9.
Work study and job design
Work-study, also called time and motion study, is concerned with improvement of productivity in the existing jobs and the
maximization of productivity in the design of new jobs. Two principal component of work-study are:
(i)
(ii)
Method study
Work measurement
Method study has been defined (BS 3138) as the systematic recording and critical
examination of the existing and proposed
ways of doing work, as a means of developing and applying easier and more effective methods and reducing costs. Method study
when applied to production methods yields one or more of the following benefits:
•
•
•
•
•
•
•
•
Improved work environment
Improved facility layout
Better utilization of facilities
Greater safety
Lesser materials handling
Smooth production flow
Lower work-in-process
Higher earnings for the workmen
10.
Maintenance and replacement
Maintenance and replacement involve selection of optimal maintenance Preventive and/or breakdown) policy to ensure higher
equipment availability at minimum maintenance and repair cost. Preventive maintenance, which includes preventive inspection,
planned lubrication, periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the equipment and
machines, etc. is most appropriate for critical machines.
11.
Cost reduction and cost control
Effective production management must ensure minimum cost of production and in this context cost reduction and cost control
acquires significant importance. There are large number of tools and techniques available that can help to make a heavy dent
on the production cost.
Q.2) What is batch Production? What are its key characteristics? Compare these characteristics with those of project
production.
Answer.2)
Batch production is characterized by the manufacture of a limited number of a product (but many such quantities of
different products) produced at periodic intervals
and stocked in warehouses as finished goods (or finished parts) awaiting
sales (or withdrawal for assembly). Typic al examples of batch production are: process industries such as pharmaceuticals,
paints, chemicals; medium and heavy engineering industry engaged in the manufacture of electric motors, switch gears, heavy
motor vehicles, internal combustion engines; manufacture of ready made garments; manufacture of assembly shops such as machine
tools; sub contractors which take on machining of batches of components to the drawings of a large manufacture etc.
Characteristics of batch production
(a)
Short runs:
Short production runs and frequent changes of set also characterize batch production up. The equipment and the assembly
set up is used for a limited
number of parts or assemblies and is then changed to make a different product. The production is generally made to stock.
(b) Skilled labour in specific trades:
The labour force is expected to posses skill in one specific manufacturing process, Turning, milling, drilling, welding,
grinding, hobbing, fitting etc.
The operator may perform simpler machine set-ups but the separate machine tool setter performs those involving complex
operations.
(c) Supervision to possess knowledge of a specific process
The supervision has considerable knowledge of a specific process. Supervisor in the grinding section for example, may
not expert in turning and drilling work but s expected to possess a find of knowledge of different types of grinding
operations.
Similarly a supervisor in the gear shop is expected to have sound knowledge in working of different types of gear cutting
machines.
(d) Limited span of control:
The amount of supervision required in batch production is lower than that of jobbing production. The ration of direct
workmen to supervisors is more or less a function of batch size. The smaller the batches, the lower are the ratio of direct
workers to supervisors, and vice versa. This is because smaller lots require each supervisor to spend a grea t deal of his time
in allocating new work, giving instructions, follow up on the shop floor for proper movement of materials from and to the
machines, identifying delays and interruptions, and arranging, in consultation with planning, work load in his sect ion to keep
his men busy.
(e) General purpose machines and process type of layout
Plant and equipment is procured and arranged to obtain maximum flexibility. General purpose machines
and handling equipment capable of performing variety of operations with minimum set –up times are installed in lieu of variety
of products. The machines are arranged to give process layout-layout by function. Similar machines capable of doing similar
types of operations are grouped together and kept at o ne place. Presses for example, are put together and kept at one place
milling machines are placed together at another place, drilling machines are kept at the third place, gear cutting machines are
located at the fourth place and so on. Each Group of machines is usually designated as a work centre or a section or a shop.
(f) Manual materials handling:
Materials handling in batch production as compared to jobbing production are small. Individual components and parts are placed
in trolleys and trays and are transported as unit loads. Materials handling may be mechanized by deploying power driven
trucks.
(g)
Manufacturing cycle time affected due to queues:
The manufacture cycle time is comparatively smaller than jobbing production but is much more than mass and flow production.
The batches of work tend to queue up at different machines due to differing cycles times, batch sizes and sequence of
operations.
(h)
Large work-in-progress:
Work in progress is comparatively large due to varying work content of d ifferent components, imbalance in manufacturing times,
formation of queues between the machines.
(i)
Flexibility of production schedules:
Disruptions due to machine breakdown or absenteeism do not seriously affect production as job can be shifted to anoth er machine
or another operator from another machine can be shifted.
(j) Need to have production planning and control:
Functions of production planning and control in a batch production unit are more complex than those in jobbing production or
mass and flow production:
•
Materials control and tools control functions are important.
ensure routine replenishment
•
Some kind of replenishment system needs to be used to
Detailed operational layout and route sheets are prepared for each part of the produc t.
•
Loading and scheduling needs to be more detailed and more sophisticated since every machine requires to be individually
scheduled.
•
Progressing function is very important to collect information on progress of work.
maintained to record progress of each component.
•
A separate progress card needs t o be
Expediting is generally necessary since quite often jobs, due to imbalances in work content, tend to lag behind
Q.3) (a) Why are locational decisions important? What factors should be taken into account while deciding location of a unit
to manufacture washing machines?
Answer.3a)
Locational decisions generally arise when:
•
A new manufacturing (or servicing) unit is to be set up.
•
Existing plant operations are difficult to expand due to poor selection of site earlier.
•
The growth of the business makes it advisable to establish additional facilities in new territories.
•
There is emergence of new social (chronic labour problems) political (political instability or economic conditions that
suggest a change in the location of the existing plant.
•
The product development has over weighted the advantages of the existing plant.
•
The changes in the industrial Policy of the Government, favoring decentralizing and dispersal of industries to achieve
overall development of the country, do not permit expansion of the existing plant
FACTORS GOVERNING PLANT LOCATION
Plant location studies are conducted in three phases:
(i)
General territory selection
(ii) Community selection, and
(iii) Site selection
1.
Proximity to market:
Every company is in business to market and it can survive only if their product reaches the consumers on time and at the
competitive price. The ratio of selling costs to sales generally increases with distance. Therefore, i n the choice of
location o the plant, the factor of “proximity to the market” is given the highest priority. Locating a plant nearer to the
market is preferred if:
•
•
•
•
The
The
The
The
product is
product is
promptness
product is
fragile.
susceptible to spoilage.
of service is required.
relatively inexpensive and transportation costs add significantly to the cost.
Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in Bombay, it may be started in
Thane, Kalyan or Poona. If the product is exported, location near ports is desirable. This is particularly important for
producers who sell bulky commodities, which incur high transportation costs
Nearness to market not only lowers transportation costs but also g ives many other benefits namely:
•
•
•
A good many administrative problems, which cause perpetual headaches and add to costs, are avoided.
Liaison with dealers or whole sellers can be maintained economically and easily
Other costs such as commission to mi ddlemen, which at times run as high as 20 to 50 percent can be reduced significantly.
•
Customer’s accounts do not remain outstanding for settlement.
reduces selling costs.
2.
This recovery is easy and less time saving which itself
Proximity to source of raw materials:
Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important that the firm gets its
requirements of raw materials at the right time and at the reasonable price for which the plant must be located in th e
neighborhood of some source which can meet the raw materials requirement of the unit “Proximity to supply of raw materials”
factor assumes still greater importance if raw materials are of perishable nature or if they are expensive to transport, or if
their weight is substantially reduced by processing.
Proximity to sources of raw materials is equally important for small units. This is because usually small units are not
considered important customers. They get least priority and in the event of scarcit y are the one to be struck off first from
the list. The availability of materials to small units to a large extent thus depends on their follow up and personal visits
to the supplier’s plant which is possible only if the buyer’s plant is close by.
3.
Infrastructural facilities:
Infrastructural facilities consider availability of utilities like power water, disposal of waste etc. These form the life blood of many types of industries without which there facilities may come to a stand still. Underestimating the need of any
one of the utilities can be extremely costly and inconvenient.
Certain industries, for example, aluminium, steel, etc are power intensive and must be located close to the sites of power
generation failing which the shortage of, or increase in cost of generating power may spell problems for their survival.
Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal plating, food preparation
etc. requires perennial source of water. Mineral content of water may also be an important factor. Treatment of water is an
expense to be considered while comparing economics of different locations.
Drainage facilities are important for process industries otherwise disposal of process waster can create lot of di fficulties.
4.
Transport facilities:
Transportation cost to the value added is a key determinant of the plant location. The structure of the transportation cost
depends on (i) Characteristics of the commodity (ii) average distance of shipment (iii) medi um of shipment: rail, road, and air
sea.
The need for transport arises because raw materials and fuel are to be moved to factory site and finished goods are to be
transported from factory to markets. Other things being equal since transport cost has a m ajor effect on product cost, the
regions well served by transport facilities are most suitable for industrial locations.
5.
Labour and wages:
Plant location should be such that required labour is easily available in the neighbourhood. Importing labour from outside is
usually costly and it causes lot of administrative problems. Availability of required labour locally is better since problem
of arranging accommodation and other related problems do not arise. Since normally workers with specific skills are required,
some sort of training facility should also be available in the neighborhood. Skilled employees are easily available if ITI’s,
or Engineering colleges are there in the neighbourhood.
6.
Legislation and taxation:
The policies of the state Government and Local Bodies relating to issue of licenses, building codes, labour laws, etc. are the
factors in selecting/rejecting a particular community/site.
In order to disperse industries and ensure balanced economic growth, both Central and State government offer a package of
incentives for setting up industries in particular locations. Exemption from excise duty, sales tax and octroi, soft loans
from financial institutions, subsidy in electricity charges, etc. are some of the incentives offered.
Since taxes and duties levied by the State Government and Local bodies substantially influence product cost, the incidence of
such taxes/levies must be taken into account while selecting a community/site.
7.
Climatic conditions:
Climatic factors may not have a major influence these days because of modern air conditioning facilities available today.
However, it may be important factor for certain industries like textile mills, which require high humidity.
8.
Industrial and labour attitudes:
Community attitudes towards supporting hostile trade union activities are an important factor. Locating facilities in a
certain region/community may not be desirable as frequent labour problems and interruptions are harmful to the plant in the
long run. Political situation in the state and attitude of the government towards labour activities also influences selection
of the site for the plant.
9.
Safety requirement:
Safety factor may be important for certain industries such as:
Nuclear power plants
Explosive factories
Location of such industries close to border areas is undesirable.
10.
Community facilities (or social infrastructure):
Community facilities imply accommodation, educational, entertainment and transport facilities.
Accommodation is needed unless the employees are local residents. Accommodation should be easily available, comparatively
cheap and near some public transport stop.
The locational area should be fully developed, be accessible by road and should have a convenient and efficient public
transport system operating between the area and the township to enable employees, officials, customers and suppliers to make
easy trips for their work
11.
Community attitudes:
Community attitudes towards work (i.e. whether the people in the location are hard working or otherwise) as well as their
attitudes towards the incoming entrepreneurs (helpful and cooperative or otherwise) can make or mar an industry. Locational
decisions, therefore, must take such factors also into account particularly while setting u p labour intensive units.
12.
Supporting industries and services:
Locational factors should also include proximity of services needed by the firm. A firm desirous of getting some or all parts
made from outside or some of the operations done from outsid e must see that such sub-contractors are located in the
neighbourhood. Getting a job done from units located at far off places will mean not only additional transportation cost but
also time consuming and costly. Also if units are too far off, the control on quality of work done by them cannot be
exercised.
13.
Suitability of the land:
Site selection should also take into account topography and soil structure of the land. The soil structure must be capable of
bearing loads of foundations. Though mode rn building techniques can overcome the limitations of the soil, but if considerable
improvement is required then selection of a low cost and may ultimately turn out to be expensive.
14.
Availability and cost of the land:
Site size (Plot size) must be large enough to accommodate the present production facilities, parking and access facilities but
also leave sufficient room for future expansion. As a general rule, a site five times the actual plant size is considered
minimum for all these things including future expansion.
ECONOMY SURVEY OF THE SITE SELECTION:
An ideal location is one where the cost of obtaining materials and processing them into finished product plus the cost of
distributing the finished product to customers is minimum.
One of the most commonly used approaches consists of following steps:
Step 1:
Prepare a list of all relevant factors.
Step 2:
Estimate expenses on materials, transport, wages, power etc for each location on each of the above factors.
Step 3:
Collect data on intangible factors like community facilities, community attitudes etc.
Step 4:
Analyse the tangible data for each location and calculate rate of return on investment.
Step 5:
Select provisionally a locational based on financial data.
Step 6:
data.
Compare the intangible data for the different locations and select the optimal location considering
Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout?
intangible
Answer.3)(b)
OBJECTIVE OF A GOOD PLANT LAYOUT
Only through an efficient layout, the organization can attain the following objectives:
(i)
Economy in handling of materials, work-in-process and finished goods.
(ii)
Minimization of product delays.
(iii) Lesser work-in-progress and minimum manufacturing cycle time.
(iv)
Efficient utilization of available space.
(v)
Easy supervision and better production control.
(vi)
Greater flexibility for changes in product design and for future expansion.
(vii) Better working conditions by eliminating causes of excessive noise, objectionable odor smoke etc.
PRINCIPLES OF A GOOD LAYOUT
(i)
Overall integration of factors:
A good layout is one that integrates men, materials, machines and supporting activities and others in a way that the best
compromise is obtained
No layout can satisfy each and every principle of a good layout. Some criterion may conflict with some other criterion and as
a result no layout can be ideal it has to integrate all factors into the best possible compromise.
(ii) Minimum movement:
A good layout is one that permits the minimum movement between the operations.
The plant and machinery in case of product layout and departments
sequence of operations of most of the products.
in case of process layout should be arranged as per
?
Since straight line is the shortest distance between any two points, men and materials as far as possible should be made
to move along the straight path
A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or reduces material handling in place of
stairs or a distant door.
(iii) Uni-direction flow:
A good layout is one that makes the materials move only in the forward direction, towards stage of completion, with any
backtracking.
?
Since straight line is the sho rtest distance between any two, points, materials as far as possible should be made to move
on the principle of straight line flow. And when straight line flow is not possible, other flows like U -shaped flow, circular
flow or zig zag flow may be adopted, but the layout may ensure that materials move in the forward direction (Fig 4.1)
?
To ensure forward flow, equipment if necessary may be duplicated.
(iv) Effective use of available space:
A good layout is one that makes effective use of available space b oth horizontal and vertical
•
Backtracking and duplicated movements consume more time, involve un -necessary materials handling, add to cost and lead to
inefficiency.
•
Raw materials, work-in-progress and finished goods should be piled vertically one above another rather than being strewn
on the floor.
•
Pallets or equivalents should be made use of to pile up several layers one above another
•
Area below the work tables or in the cupboards built into the wall are welcome since they reduce requirement of space
(v)
Maximum visibility:
A good layout is one that makes men, machines and materials ready observable at all
times.
•
All departments should be smoothly integrated, convenient to service and easy to supervise
•
Every piece of positioning or screening or partitioning should be scrutinized and carefully planned.
•
Special cupboards, enclosures, offices, partitions etc. should be avoided except when their utility is established beyond
doubt.
(vi)
Maximum accessibility:
A good layout is one that makes all servicing and maintenance point readily
accessible.
•
Machines should be kept sufficiently apart and with reasonable clearance from
The wall so that lubrication, adjustment and replacement of belts, removal of parts at the time of repairs etc can be done
conveniently by the maintenance staff.
Area in front of electrical panels and fire extinguishers should be kept free from obstructions.
Q.4) How does production planning differ from production control? What are the key functions of production planning and
control?
Answer.4)
Production planning versus production control.
Planning (Planning the work) Control (Working the Plan)
Planning involves collection and maintenance of data regarding time standards, materials and their specifications, machines and
their quantities, tools and their process capabilities, drawings and operational layouts etc.
Planning is seeing that requirements tool, machines, men, instructions, authorization and the like -will be available at the
right time and in the right quantities and are of proper quality.
Planning involves preparations of load charts and fitting various work orders into uncommitted time available on the company’s
facilities (men or machines).
Planning involves preparation of all necessary forms and paper work.
Planning involves designing suitable feed back as to what may happen.
Planning involves forwarding thinking regarding the remedial action to be taken if the job falls behind schedule.
Planning therefore is a centralized
Activity (in the office) and includes such functions as materials control, tools control, process planning and scheduling.
Control involves dissemination of data preparation of reports regarding output, machine and labour efficiency, percent
defectives etc.
Control is seeing the requirements are actually made available at the right place and in the right quantities.
Control involves actual seeing that the jobs are started and completed as per schedule prepared by the scheduling cell of the
PPC.
Control involves actual issue of forms and paper work.
Control involves keeping track of what is happening and collecting information as to what has happened.
Control involves suggesting remedial action when the job is falling behind schedule.
Control is thus a diffused activity (in the shops) and includes functions such as dispatching, progressing and expediting.
FUNCTIONS OF PRODUCTION PLANNING AND CONTROL:
Production planning and control is normally assigned two sets of functions:
(I)Regular functions and
(ii) Optional functions.
(i)
Regular functions are those, which are generally assigned to PPC in most of the organizations through the importance of
the function, may vary from industry to industry.
(ii)
Optional functions are those, which may be assigned to PPC depending upon policy of the management of the firm.
Common (or Regular Functions) Optional Functions
Order Preparation includes activities like making of work orders, converting work orders to shop orders, preparing auxiliary
orders and releasing such orders to those concerned to authorize their activities
Materials control concerns preparations of materials estimates, indenting non-stock materials, ascertaining availability of
materials purchased to stock, continual follow-up with purchase and stores for timely receipt of materials, and advising stores
to allocate required quantities or available materials (alternatively on their receipt) against specific shop orders.
Process planning or Routing concerns fixation of method of manufacture: operations and their sequence, machine tool for each
operation, jigs and fixtures, measuring instruments and gauges etc. to enable shops to produce goods of the right quality at
the lowest cost.
Tools control concerns preparations of estimates of cutting tools (Standards as week As non-standards tools), gauges and
measuring instruments, jigs and fixtures etc indenting non-stick tooling: follow up with tool room for timely manufacture of
jigs and fixtures; periodical replenishment of worn-out-non-consumable tooling (e.g. work arbors, collets, copying masters,
Allen keys, spanners, etc.
Scheduling concerns preparation of machine loads, fixation of calendar dates of various operations to be performed on a job,
coordination with sales to confirm delivery dates of new items and periodical preparation of dispatch schedules of regular
items.
Dispatching concerns preparation and distribution of shop orders and manufacturing instructions to the concerned department as
their authority to perform the work according to the predetermined schedule.
Progressing concerns collection of data from manufacturing shops, recording of progress of work, and comparing progress against
the plan.
Expediting concerns intensive progress chasing to identify delays and interruptions which may hold up production, devising
cures from time to time to keep rate of production in line with the schedule, communicating possible failure in delivery
commitments to Sales Department.
Cost Estimation concerns preparations of
Preproduction cost estimates to be used by sales department for quotation purposes (Alternatively this may be assigned to
Costing Department Or Industrial Engineering Department)
Work measurement concern fixation of time to be allowed to a qualified workman to carry out a specific task, under specified
conditions and at the defined level of performance. Work measurement employs scientific, well-known techniques like time
study, work sampling standard data, production study, analytical estimating etc. (Alternatively, work measurement function may
be assigned to Industrial Engineering department.
Sub-Contract concerns offloading of certain work on outside vendors for economic reasons or to augment the existing
manufacturing facilities (Sub-contract work alternatively) be handled by Materials/purchase Department)
Capacity planning concerns estimation of requirements of men and machines as the basis of decision making to meet the firm’s
increased volume of business (Some companies prefer to assign this function to Engineering department.
Demand forecasting concerns making projection of company’s product market. Though, long term forecasts are given by Sales
Department but short term forecasts required for materials planning, machine loading, sub contract ing etc may be prepared by
PPC department
Q.12 (a) What is critical path? What does it signify? How is it identified?
Answer.2)(a)
Critical path analysis, an important aid to planning, scheduling and coordinating the activities if large scale proje cts. Is a
synthesis of two independent techniques: Programme Evaluation and Review Technique (PERT) and Critical Path Method (CPM).
Though the two techniques were developed independently, they are only superficially different. The two method have many
features in common and are now combined into a technique called Critical Path Analysis (CPA) or Network Analysis.
There are three basic different between a PERT network and CPM network:
•
PERT is event oriented while CPM is activity oriented (i.e. PERT pr epares network from events while CPM builds if from
activities)
•
PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes three time estimates for each activity
while CPM makes one time estimate)
•
Activity time in CPM technique are related to costs while it is not so in PERT since it is event oriented
Significance of critical path
Critical path analysis offers several advantages.
It
(i)
Forces through pre-planning. Each and every activity compromising the project is identified and recorded. Nothing is
left to memory or chance which prevents crises in scheduling
(ii) Increases coordination of tasks as technological relationship between the activities suggests which activities can run
simultaneously and which should succeed others.
(iii) Helps computations of different project duration’s for different level of resources and thereby select a plan that
minimizes total project cost.
(iv) Indicates optimal start and finish times of each activity of the project.
(v)
Defines areas of responsibility of different departmental heads for timely execution of the project.
(vi) Facilitates progress reporting and limits unnecessary discussion at the progress meetings.
(vii) Identifies troubles spot often in advance and apply remedial measures.
(viii)
Enables the plan to be revised in accordance with changes/changing circumstances.
(ix) Helps to exercise “control by exception” and prevents cost overruns.
A Project comprises a series of activities and the identification of the individual activities requires knowledge and
experience of the men responsible for the planning of the project. Even the preliminaries -mere listing of the activities-make
the operating personnel:
•
Think of details about the project well in advance.
•
Observe critically the way in which the various activities interact or compete for scarce resources
•
Improve upon the original plans even before network is formally drawn and analyzed.
A project, therefore, must be torn into a set of identifiable activities.
under:
There are no set rules but general guidelines are as
•
An activity should represent the smallest unit of the operation or set of operations over which management desires
control.
•
An activity should represent an operation or set of operations, which can be performed
using a particular kind of
equipment or a special skill. For example in construction project, plumbing is considered as one activity while wiring can be
considered as another activity since the first activity requires plumbers and the second activity needs electricians.
Q.12) (b)
Activity
1-2
02
1-3
02
1-4
02
2-5
01
3-5
04
4-5
02
4-6
02
5-6
03
Optimistic
03
10
04
06
06
10
01
01
05
12
03
04
05
08
05
13
Most Likely Pessimistic
Answer:
(a) Expected time of an activity can be obtained from the three time estimates using the formula:
te = a + 4m +b
6
where
m
b
a
=
=
=
Optimistic time
most likely time
pessimistic time
a
m
b
=
=
=
2
3
10
For activity (1-2)
te
=
2 + 4 x 3 + 10
6
te
=
24
6
=
4
Expected times of all activities of the network, calculated on above lines, are tabulated below.
Activity
Three
1-2
02-03-10
1-3
02-04-06
1-4
02-06-10
2-5
01-01-01
3-5
04-05-12
4-5
02-03-04
4-6
02-05-08
5-6
03-05-13
time estimates
4
4
6
1
6
3
5
6
Expected time
5
6
6
3
4
6
4
1
Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6)
Variance is
Vi
=
(b –a) X (b – a)
6
6
V1-3
=
4
9
V3-5
=
16
9
V5-6
=
25
9
V
=
V1-3 + V3-5 + V5-6
V
=
5
Standard deviation Z
?
=
=
T - Tcp
19 -16
?5
=
3
2.236
=
1.34
The approximate probability value when Z = 1.34 is 0.9099
?The probability of completion of critical path by the schedule time of 19 weeks = 91%
Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance? What are the key activities of Preventive
Maintenance?
Answer.5)
Preventive maintenance anticipates failures and adopts necessary actions to check failures before they occur. It includes
activities like inspection, lubrication cleaning and unkeeps, minor adjustments and replacements found necessary at the time of
inspection etc. Preventive maintenance can be either: running maintenance or “shut down maintenance”.
Running maintenance
includes maintenance activities (e.g. minor adjustments
In machines revealed through inspections, lubrication, cleaning and
unkeep etc.)
Which are carried out when the machine is still r unning. Shutdown maintenance includes preventive
maintenance activities such as minor component replacement whose needs are identified through inspections, which require
stoppage of Machines. Preventive inspection is one of the key activities of preventiv e maintenance which
is usually
performed by making use of human senses – watch) eye), listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) –
but the trend is Changing towards use of condition monitoring instruments. Such maintenance. Pra ctice is known as predictive
maintenance or condition based maintenance.
Q.10) (a) What are X-R Charts? How are they made and used in controlling a process?
Answer.10)
X-R chart is a pair of chart consisting of a average (called X chart) and a range
Chart (called R chart) placed one below another on a piece of graph paper. The X chart is used to control the mean value of
the characteristic an R-chart is used to restrict the range of variations in the values. X -R charts are drawn when the
characteristics are measurable. Each chart consists of three values: a central line, upper control limit and lower control
limit. The central line represents the arithmetic average of the sample means which equals the mean of the population, u. The
upper and lower control limits are located at three standard deviation on either side of the central line.
Samples of fixed size are drawn at regular intervals and measurements are taken.
The samples wise values of the mean
and range are plotted in their respective X
and R charts.
The spread of sample points in the charts is studied to decide the remedial action (if any) to be taken. The X chart analyses
whether or not the mean of the quality Characteristics is within control while R-chart analyses whether or not the variability
is within control.
STEPS TO PREPARE X-R CHART
A pre-requisite to the preparation of the chart is the decision on the following aspects:
•
Quality Characteristics refer to the property of the product, which is to be assessed. The quality characteristics must
be capable of being measured. In case of more than quality characteristics, separate chart is made for each quality
characteristic.
•
Sample size refers to number of pieces comprising each sample. Sample size is an important decision. It is a common
practice to use sample of n = 4 or 5 to have low appraisal cost. Large samples such as n = 15 or 20 are used if the process
standard deviation is large.
•
Sample Population refers to the number of samples to be collected to construct a control chart. The number of samples
must be sufficient. Usually, 20 samples each of size 4 or 5 are enough to have good estimates of the process average (X) and
dispersion (R).
•
Time Interval measures the time gap between consecutive samples. Time interval, as a genera rule, should be proportional
to the average frequency of out-of-control conditions. It is a fairly complex decision since a number of factors such as cost
economy, susceptibility of the process to disturbances; convenience of the inspector etc. requires to be considered.
The making of X-R Charts involves the following Steps:
Step 1:
(a)
(b)
(c)
Collect Data
Collect sufficient samples spread over a reasonable period. Each sample must be of equal size.
Measure each component comprising the sample for the given quality characteristic
Record individual measurements on a work data sheet.
Step 2:
Calculate mean (X) and Range (R) of each sample
A
The mean which is written as X (X bar) is average of each sample and is
Obtained by totaling the individual measurements of the units comprising the sample and dividing the total by the sample size
(number of units in each sample)
B
The range, which is written as R, is obtained as the difference between the highest and th e lowest measurement of a
sample.
C
The values of X and R are recorded sample wise either on the extreme right of the individual measurements on the data
sheet or in a separate table.
Step 3:
Calculate grand Average (X) and mean Range (R)
A
The grand average, which is written as, X (X double bar) is the average of the sample averages and is obtained by
dividing the total of the averages of all the samples by the total number of samples.
B
The mean range, which is written as, R (R bar) is the average of the ranges and is obtained by dividing the total of the
ranges of the samples by the total number of samples.
Step 4:
Set up Control chart for the average
A
Set up a control chart with the central line drawn at X (X double bar), upper control limit located X + A2R (R bar) and
the lower control limit set up at X-A2R.
B
Plot the averages to see whether the process was under control when samples were drawn.
C
If all points fall within the control limits, the process is said to be under control
D
If process is not under control (indicated by some points falling outside the control limits), eliminate points outside
the control limits and compute new trial control limits for the remaining points.
E
Repeat step 4 (d) until all points fall within the control limits
F
Control limits in a particular situation should be revised from time to time as additional data is accumulated.
Step 5: Calculate control limits of the range chart
A
The control chart for range chart is set up with central line as R, upper cont rol limit (UCLR) located at D4R above the
central line and lower control limit (LCL) at D3R below the central line
B
Plot the value of the range of each sample.
C
If all points fall within the control limits no modification is necessary unless it is desired to reduce the process
dispersion
D
if range chart exhibits lack of control indicated by some points falling outside the control limits, eliminate those
points out of control and compute new trial control limits
E
Repeat step 5 (d) until all points fall within the control limits.
F
Control limits in a practical situation should be revised time to time
as additional data
is accumulated.
Step 6: Use control chart
A
B
Collect samples of fixed size at specified intervals of time.
Measure each unit of the sample for the quality characteristics, calculate mean and the range of each sample.
C
D
Plot the values of X and R of each sample in their respective charts
Study the trend of the points to interpret and suggest
remedial
action
Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries to maintain the actual percentage at
3 + 0.3 percent. It tests hourly in samples of five. The following table shows the results of last five samples. Set up a
control chart for mean and examine whether the process is under control.
A) Solution:
(i)
Collect data
(ii) Calculate mean (X bar) and range(R bar)
Sample No.
Arithmetic Mean (X bar)
1
2
3
0.3
0.1
0.1
2.92
2.98
3.06
Range(R)
4
5
3
3
0
0.2
(iii) Calculate grand average and the mean range
X(X bar)
=
2.92 + 2.98 + 3.06 + 3 + 3
5
=
R
=
0.3 + 0.1 + 0.1 + 0 + 0.2
5
=
(iv)
2.992
0.14
Set Up control chart for the average
Central Line = CLx = X(X bar)
Upper Control Limit
=
2.992 + 0.5768 x 0.14
=
3.476
Lower Control Limit
=
2.992 - 0.5768 x 0.14
=
2.507
(v)
Set up a range chart
Central line CLR
=
2.992
=
UCLx = X (X bar) + A2.R(R bar)
=
UCLx = X (X bar) - A2.R(R bar)
=
R(R bar)
=
0.14
=
=
D3.R (R bar)
=
D4.R (R bar)
Lower control limit
LCLR
=
0 x 0.14
=
0
Lower control limit
=
=
UCLR
2.114 x 0.14
=
0.29596
Q.6) What is method study? Describe the procedural steps to develo p easier and effective methods.
Answer.6)
Method study is the systematic recording and critical examination of existing and proposed ways of doing work, as a means of
developing and applying easier and more effective methods and reducing costs.
Method study is an organized approach and its investigation rests on the following six basic steps outlined in the block
diagram
•
Select
the work to be analyzed.
•
Record
all facts relating to the existing method.
•
Examine
the recorded facts critically but impartially.
•
Develop
the most economical method commensurate with plant Requirements
•
Install
the new method as standard practice.
•
Maintain
the new method.
Selection of the job
Selections of the jobs to be studied for methods improvement by the method study practioner is a managerial responsibility and
it (selection) may be based on economic technical or human consideration. Economic consideration justifies selection based on
the economic worth (i.e. money saving potential) of the job.
Technical consideration identifies jobs, which require studies to overcome manufacturing difficulties (excessive rejection,
relaxation in prefixed performance standards, inability if the shops to stick to specified machining parameters such as speeds,
feeds, depth of cut etc., inconsistent quality etc.) Human consideration in job selection is usually given weightage while
introducing method study practices for the first time.
Recording of facts
Systematic recording is the mo st crucial step in method improvement. Since recording by long hand (or by descriptive method)
has its limitations, it is not recommended for use in method study. Instead, five symbols and eight charting conventions are
used to record facts relating to the job under study. Five typical symbols are O, ||, ?, D and V and eight charting
conventions concern composition of the chart, reject, rework, repletion, change of state, introducing of new material, combined
events and numbering of events. The document on which details of the process are recorded by the above referred symbols and
conventions is called chart. There are four basic types of chart: (i) operation process chart (ii) Flow process chart (iii)
multiple activity charts and (iv) two handed process chart.
Besides charts, two types of diagrams-flow diagram and string diagram are drawn when recording details of an existing layout.
Travel chart is another typical chart, which is used to record frequency of movements (weight x distance) between work
centres/departments.
Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic motions) may be studied with micro
motion study. Glibreth, founder father of micro motion study, also developed photographic techniques cal led cyclograph and
chronocylegraph to record path of the motions of the members of the body.
Critical examination
Critical examination aims to analyze the facts critically and thereby give rise to alternatives, which form the basis of
selection and development of easier, and effective methods.
Critical examination is conducted through a systematic and methodical questioning process. Each activity recorded on the
chart, whether it relates to processing or inspection, or material handling, or to any oth er aspect, is picked up one at a time
and is examined minutely. The questioning process is considered under five major heads, namely the purpose, the place, the
sequence, the person and the means. These five aspects in critical examination are referred to as five governing
considerations.
Development and selection:
Development and selection stage concerns short listing of ideas generated at the critical examination stage, testing each short
listed idea for its technical and economic feasibility, and making selection among the alternatives wherever choice exists. To
develop ideas and to ascertain their technical and economical feasibility, the method study practioner needs to solicit the
cooperation of personnel from different departments of the company. Various techniques available for the development and
selection purpose are: cost benefit analysis, break even analysis, investment analysis and critical path analysis.
Installation
‘Installation’ (or implementation) of the proposed method involves preparation of project report on recommendations making oral
presentation to the top management, securing approval of the decision maker, assisting line management during implementation,
arranging training of workmen, and getting jobs (operations) retime after implementation, arranging training of workmen, and
getting jobs (operations) retimed after implementation.
Maintenance
“ Maintenance” phase is the follow up phase after implementation, which serves as a monitoring and control mechanism . It helps
to ensure that the revised methods are set into concrete and workmen do not revert back to old methods. It also provides an
opportunity to the practitioner to assess the effectiveness of the approach followed by him and makes changes in the
methodology (if required).
Q.9) (a) What desirable conditions need to be present to be present to guarantee success of an incentive scheme?
Answer.9)
A good wage incentive plan should have the following characteristics.
•
Administrative simplicity:
The incentive system should be simple and must be easily understood by the workers and their representatives. An incentives
scheme, which can be understood, only by engineers and mathematicians or a scheme which involves the use of complex formulate
or references and cross -references is sure to fail. The incentive scheme should be such that workmen can calculate their own
earnings easily and quickly.
•
Minimum clerical work:
The system should fit into existing system of production and cost control.
the clerical work.
•
Maximum coverage:
The system should cover as many workmen as possible.
morale of those not covered by the scheme.
It should not involve any significant addition to
A scheme if applied to a few workmen creates a demoralizing effect on the
•
Direct
Incentive payments should increase at least in direct proportion to the increase in output by the operator. There are two
reasons:
Firstly because it is more difficult to producer extra units and secondly because saving in the overheads are far greater at
higher levels of production.
•
Period of Payment
The period of payment should be as short as possible
•
Adequate guaranteed minimum hourly rate
The scheme must ensure adequate guaranteed minimum hourly rate to all incentive workers regardless of their output. Such an
hourly guaranteed rate is normally referred to as the guaranteed base rate.
The guaranteed base rate must be realistic and should be at least equal to the hourly rate payable to a non-incentive worker
doing similar job in the industry. Incentive earnings of the workers should never be regarded as a substitute for poor wages.
•
Accurate and yet attainable performance standards
Performance standards should be set through systematic work measurement studies. The experts to that there is no dispute or
malpractice and yet the standards are attainable so that a worker working at normal pace can attain them should base the
standards of measurement on the assessment.
Further the incentive plan should be such that it provides an opportunity to all average workers to earn reasonable earnings.
•
Consistency of the standards
Standards once fixed should not be changed unless there is a permanent change in methods, or change in equipment, or change in
material and plan should provide for the provisions to modify the performance standards.
•
Inbuilt check on process rejections
A good incentive scheme should exercise a check on the operator against achieving higher bonus by poor workmanship. Payment
should be made only for pieces declared acceptable by the inspection department and a workman constantly producing substandard
pieces should be liable for disciplinary action.
•
Payment of partially completed jobs
The problem of payment for the incomplete work arises only in case of long cycle jobs. Situations do arise when the jobs are
of very long cycle duration and cannot be finished within the bonus period. Similarly, a semi-finished job may require to be
handed over by one operator to another at the end of shift, or prior to having a holiday. The scheme should clearly spell out
as how assessment of work done by the workmen on the same job will be carried out and how disputes arising out of such
assessment would be resolved.
•
Payment of Idle Time
Adequate safeguards must be provided to compensate the operator for the time lost due to reasons beyond his control. A good
incentive scheme should ensure that an operator does not suffer financial loss for reasons attributable to the managerial
weakness, e.g.: lack of material due to bad buying, breakdowns of the machines due to poor maintenance practices, non availability of work etc. Thus an operator rendered idle because of factors attributable to the management should be given a
lieu bonus.
•
Safeguards
The scheme should be fair not only to the employees but also to the employer.
incorporated to protect.
Safeguarding clauses as under should be
a.
Management’s right to change a standard when there are changes in methods. Materials and machines
b.
Management’s right to withdraw or discontinue temporarily a scheme during bad period.
c.
Management’s right to initiate disciplinary action against operators who continually produce sub -standard articles.
d.
Management’s right to initiate disciplinary action against employees who, time and again, do not achieve minimum standard
of production even in the presence of fair and accurate standards.
e.
Management’s right to initiate disciplinary action against employees who, time and again are found using speeds and feeds
higher than those recommended in the process sheet (or operational layouts)
•
Maximum ceiling on the earnings
The system should have built-in-control against higher earnings beyond a certain limit. Firstly, the system should discourage
workers to work beyond a certain limit otherwise too attractive an incentive scheme may induce the worker to work more and more
and thereby adversely affect his health. Secondly, the system should ensure that in case of loose standards the company does
not lose financially.
•
Consistency of Plan
The plan should be consistent over a period of time.
plan is lost if there are frequent revisions.
Frequent changes in the plan make it’s functioning difficult.
Faith in
•
Acceptance of Labour Body
The scheme should finally have acceptance of the labour body. The body of workers’ representatives to prevent any
misunderstanding and ill-feeling later on must accept the basic incentive plan and its provisions.
•
Continuous Use
The scheme should be in continuous use.
makes it’s functioning difficult.
The temporary use of the scheme in good times and its discontinuation in bad times
•
Define End Results
The plan must result in reduction in per unit labor cost.
Q 13)
Answer 13)
i) Average Cycle time
Normal Time
=
=
0.22 + 0.24 + 0.28 + 0.26 + 0.25
5
=
0.25
Observed time x Rating
100
=
0.25 x 80
100
=
0.2
Similarly, average cycle time and normal time for all the elements are calculated and tabulated a s below
Element
A
0.25
B
0.15
C
0.35
D
0.102
E
0.12
Avg. cycle time
80
0.2
100
0.15
120
0.42
90
0.0918
100
0.12
Rating
Normal time
Total Normal time
=
0.2 + 0.15 + 0.42 + 0.0918 + 0.12
Total Normal time
=
0.9818
ii)
=
15
x
x
0.9818
Relaxation Allowance
100
=
0.1473
Contingency Allowance
=
100
5
?Standard time
=
0.0491
0.9818
Normal time + Relaxation Allowance + Contingency Allowance
=
?Standard time
0.9818 + 0.1473 + 0.0491
=
1.1782
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers
understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand
the requirements
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.
Correct Answer
Unexpected
Your Answer
Unexpected
True/False
Question
Correct Answer
Your Answer
After goods have been manufactured, route sheets and operation layouts should not be collected back.
False
False
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage defectives in the zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.
Correct Answer
Your Answer
Rectangular
Rectangular
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production sc hedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic consideration while selecting a job for method study?
Correct Answer
Unorderly movement of men and materials , Excessive process defectives , Too many suggestions received
for improvement from a department or section
Your Answer
Unorderly movement of men and materials , Excessive process defectives , Inconsistent quality
True/False
Question
During set up of X bar-R control chart, control limts should be practically revised from time to time as
additional data is accumulated.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
Match The Following
Question
Correct Answer
Your Answer
Toung Sweet Sweet
Eye
Crack Crack
Nose
Burnout
Burnout
Ear
Impact
Roughness
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
True/False
Question
are spoiled.
Correct Answer
Your Answer
True/False
Question
Correct Answer
Floor inspection delays the identification of faults which can not be rectified immediately before large lots
False
False
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
True
Your Answer
True
Multiple Choice Single Answer
Question
The document which incorporates details of process planning for a job is called
Correct Answer
Route Sheet
Your Answer
Route Sheet
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Breakdown
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer
No relation
Your Answer
No relation
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time
may assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the completion of an activity , Activity
time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume
that just the normal quantity of resources required to carry out the activity are available.
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering department to obtain the utilisation
index?
Correct Answer
Work Sampling Studies
Your Answer
Break Even Analysis
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation in method study recording?
Correct Answer
Change in physical characteristic , Consumption of physical effort , Change in chemical characteristic
Your Answer
Change in physical characteristic , Consumption of physical effort , Movement of material
True/False
Question
Correct Answer
Your Answer
An activity can share the same tail event and same head event with any other activity.
False
True
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's usage.
Correct Answer
Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Woolen
Select The Blank
Question
Correct Answer
Your Answer
The ________ are the definitions of the measurable as well as nonmeasurable characteristics of the product.
Specifications
Specifications
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer
Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following defects can be observed during preventive inspection by using human senses?
Correct Answer
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Working Maintenance
True/False
Question
Correct Answer
Your Answer
Independent float either affects the float of preceding activities or that of succeeding activities.
False
False
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
True/False
Question
Correct Answer
Your Answer
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
False
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Match The Following
Question
Correct Answer
Factor Analysis
Your Answer
Method to evaluate layouts
Minimization of production delays
Maximum visibility
Technique for evolving and analysis of layouts
Objective of good layout
Principles of good layout
Scale model Layout analysis
Objective of good layout
Principles of good layout
Method to evaluate layouts
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning for high value material
Correct Answer
MRP
Your Answer
MRP
Multiple Choice Single Answer
Question
What do you understand by totality of features and characteristics of a product or service that bears on it's
ability to satisfy the customer?
Correct Answer
Quality
Your Answer
Quality
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
One of the sophisticated operations research techniques used in material planning is
Correct Answer
Dynamic programming
Your Answer
Dynamic programming
True/False
Question
Correct Answer
Your Answer
Job life is one of the factors that influence Process Planning
True
True
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management advocated by F W Taylor
Correct Answer
Selection of best worker for each particular task , Division of work between worker and management ,
Training and development of the workmen
Your Answer
Selection of best worker for each particular task , Division of work between worker and management , Training
and development of the workmen
Multiple Choice Single Answer
Question
Product layout is employed for manufacturing following products
Correct Answer
refrigirators
Your Answer
ships
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Job
Multiple Choice Multiple Answer
Question
Which of the following situations demand the technical consideration while selecting a job for method study?
Correct Answer
Jobs having inconsistent quality , Operations inviting frequent requests from supervisors f or
relaxation in allowed time because of variations in materials and tool performance , Jobs in which too many man -hours are spend
in checking and rechecking work
Your Answer
Jobs having inconsistent quality , Operations inviting frequent requests from supervisors for relaxation in
allowed time because of variations in materials and tool performance , Jobs in which too many man -hours are spend in checking
and rechecking work
True/False
Question
of goods.
Correct Answer
Your Answer
Quality control determines what, when, and how m uch to inspect while inspection actually conducts examination
True
True
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Producer's risk
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Opportunity cost
True/False
Question
Correct Answer
Your Answer
True/False
Question
Correct Answer
Your Answer
All activities must not be tied up into the network
False
False
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
False
True
Multiple Choice Multiple Answer
Question
Which of the following may be the objectives of project crashing?
Correct Answer
To achieve uniformity in requirement of resources , To complete the project in the least possible time
, To reduce project cost below it's normal cost
Your Answer
To complete the project in the least possible time , To achieve uniformity in requirement of resources , To
improve the labour efficiency
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without actual measurement s , Improper selection of samples
Your Answer
Recording done without actual measurements , Improper selection of samples
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning for high value material
Correct Answer
MRP
Your Answer
MRP
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow
should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
True/False
Question
Correct Answer
Your Answer
The event numbers as far as possible reflect the logical relationships of the activities.
True
False
Multiple Choice Multiple Answer
Question
Correct Answer
Your Answer
True/False
Question
Correct Answer
Your Answer
Material Requirement Planning is very useful in following situations
Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle
Long Lead time for procurement , Several levels of assemblies in product , Long manufacturing cycle
Cent percent inspection is often more practical and economical than sampling inspection.
False
False
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's usage.
Correct Answer
Quality of design
Your Answer
Quality of conformance
True/False
Question
Correct Answer
Your Answer
Both, preventive and breakdown maintenance work must be assigned to the same team.
False
False
Multiple Choice Single Answer
Question
Following is one of the tasks of Production Control
Correct Answer
Actual issue of forms and documents
Your Answer
Actual issue of forms and documents
Multiple Choice Single Answer
Question
Process Engineer does no t get sufficient time for designing tooling for most economic production run when
Correct Answer
Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
What is the specific name for the Gantt chart when it shows at a glance the scheduling of various operations
involved in a job?
Correct Answer
Job Schedule
Your Answer
Load Chart
Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer
Maintenance
Your Answer
Maintenance
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Crash cost
Multiple Choice Multiple Answer
Question
Which of the following factors decide the choice between the cent percent and sampli ng inspection?
Correct Answer
Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Your Answer
Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Multiple Choice Single Answer
Question
Which of the following is the criteria for the pe rcentage defectives in the zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Single Answer
Question
In mass/batch production organizations where goods are produced for stocking, Work Order is raised on the
basis of
Correct Answer
Sales Programme
Your Answer
Sales Order
Match The Following
Question
Correct Answer
Fixed Position Layout
Your Answer
Project Layout
Functional Layout
Product Layout
Line Layout Project Layout
Process Layout
Functional Layout job layout
Combined Layout
Mixed Layout
Mixed Layout
Multiple Choice Single Answer
Question
What do you understand by the measurement of work to establish allowed time for a job for the defined method?
Correct Answer
Work measurement
Your Answer
Work measurement
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Correct Answer
Your Answer
Objective of Work Study is to improve Productivity
True
False
Multiple Choice Multiple Answer
Question
Which are the distinct functions of scientific quality control?
Correct Answer
Acceptance function , Preventive function , Assurance function
Your Answer
Acceptance function , Feedback function , Preventive function
Match The Following
Question
Correct Answer
Your Answer
Interruption for machine utilisation
Input for scheduling
Preventive maintenance
Overlapping of operations
Strings
Preventive maintenance
Technique of scheduling Critical Path Analysis
Scheduling Device Strings
Critical Path Analysis
Blackboard
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.
Correct Answer
Your Answer
Rectangular
Rectangular
True/False
Question
Correct Answer
Your Answer
Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity in process layout
True
True
True/False
Question
Correct Answer
Your Answer
Since value of c can never be negativee, hence" if LCLp works out to be negative, it is taken as zero."
True
True
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer
Shop Supervisor
Your Answer
Worker
True/False
Question
Correct Answer
Your Answer
The dispatching function is of very importance in flow and mass production units.
False
True
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
It helps to identify the set of activities and events which are critical and as such must be carefully
controlled and monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise
"control by exception".
Your Answer
It helps to identify the set of activities and events which are critical and as such must be carefully
controlled and monitored , It helps to exercise "control by exception".
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Open purchase order
True/False
Question
Correct Answer
Your Answer
An ideal OC curve is never possible only with cent percent inspection.
False
True
Match The Following
Question
Correct Answer
Your Answer
Table lubrication Weekly
Six monthly
Draining and refilling of oil reserviors of plunger pump
Parts lubricated with oil nipple
Tools and slideways
True/False
Question
Correct Answer
Your Answer
Yearly
Yearly
Daily Weekly
two to three times a day
Daily
The operator should not stop production if first piece is not approved by the inspector.
False
False
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
True/False
Question
Correct Answer
Your Answer
For p-chart, the central line of fraction defectives is determined by average percentage defectives.
True
True
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in
delivery date commitment to sales departme nt , Devising cures to keep rate of production in line with schedule
Your Answer
Recording progress of work , Communicating possible delays in delivery date commitment to sales department ,
Devising cures to keep rate of production in line with schedule
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer
After completion of operation
Your Answer
After completion of operation
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Move order
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan
requirement of replacement spares
Your Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement
of replacement spares
Multiple Choice Multiple Answer
Question
Which of the following processes or activities are denoted by using symbols while recording in method study?
Correct Answer
Transport , Delay , Storage
Your Answer
Transport , Rejection , Storage
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
True/False
Question
Correct Answer
Your Answer
A properly designed sampling plan can control sampling errors and completely eliminate them.
False
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
True/False
Question
Correct Answer
Your Answer
Grouping of machines gives a lot of flexibility in loading and scheduling
True
True
True/False
Question
Correct Answer
Your Answer
A lot declared rejected in sampling inspection should not be inspected 100% in any case.
False
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Ec onomically viable
True/False
Question
The plotting of activities - critical, non-critical and dummy activities- is strictly according to their
precedence relationship.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are activities of corrective maintenance?
Correct Answer
Modifications and improvements , Overhauling , Emergency repairs
Your Answer
Modifications and improvements , Overhauling , Lubrication as per schedul e
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer
Product Planning
Your Answer
Order Processing
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By experience
Your Answer
By vendor plant surveys , By the perofrmance of first lot , By experience
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Match The Following
Question
Correct Answer
Pessimistic time
b
p
Expected time
Te
Te
Optimistic time
a
o
Most likely time
m
m
Your Answer
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Progress cards
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow
should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without actual measurements , Improper selection of samples
Your Answer
Biases in measurements , Recording done without actual measurements , Improper selection of samples
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is composed as series of connected
arrows and circles to describe the interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Flow chart
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the occurances of defectives?
Correct Answer
On manufacturing process
Your Answer
On manufacturing process
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions of the members of the body during method
study?
Correct Answer
Cyclograph
Your Answer
Pictograph
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lot s with quality equal to or better than AQL
.
Correct Answer
Your Answer
True/False
Question
or work centres.
Correct Answer
Your Answer
Rectangular
Bell
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations
True
True
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department to identify and draw
correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Quality
True/False
Question
Correct Answer
Your Answer
Floor inspection promotes tendency of machines to drift out of limits and produce defectives.
False
False
True/False
Question
Correct Answer
Your Answer
A sampling plan which perfectly discriminates will have vertical OC curve.
True
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the existing method during method study?
Correct Answer
Charts , Diagrams , Templates or models
Your Answer
Control plans , Charts , Templates or models
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Correct Answer
Both forecast and pending orders
Your Answer
Past sales
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Acceptable quality level
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Total cost
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms to the laid down design?
Correct Answer
Quality of conformance
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Open purchase order
True/False
Question
Correct Answer
Your Answer
An ideal OC curve is never possible only with cent percent inspection.
False
True
Match The Following
Question
Correct Answer
Your Answer
Table lubrication Weekly
Six monthly
Draining and refilling of oil reserviors of plunger pump
Parts lubricated with oil nipple
Tools and slideways
True/False
Question
Correct Answer
Your Answer
Yearly
Yearly
Daily Weekly
two to three times a day
Daily
The operator should not stop production if first piece is not approved by the inspector.
False
False
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
True/False
Question
Correct Answer
Your Answer
For p-chart, the central line of fraction defectives is determined by average percentage defectives.
True
True
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of production in line with schedule
Your Answer
Recording progress of work , Communicating possible delays in delivery date commitment to sales department ,
Devising cures to keep rate of production in line with schedule
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer
After completion o f operation
Your Answer
After completion of operation
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Move order
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan
requirement of replacement spares
Your Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to plan requirement
of replacement spares
Multiple Choice Multiple Answer
Question
Which of the following processes or activities are denoted by using symbols while recording in method study?
Correct Answer
Transport , Delay , Storage
Your Answer
Transport , Rejection , Storage
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
True/False
Question
Correct Answer
Your Answer
A properly designed sampling plan can control sampling errors and completely eli minate them.
False
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.
Correct Answer
Your Answer
Shutdown Maintenance
Shutdown Maintenance
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
True/False
Question
Correct Answer
Your Answer
Grouping of machines gives a lot of flexibility in loading and scheduling
True
True
True/False
Question
Correct Answer
Your Answer
A lot declared rejected in sampling inspection should not be inspected 100% in any case.
False
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
True/False
Question
The plotting of activities - critical, non-critical and dummy activities- is strictly according to their
precedence relationship.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are activities of corrective maintenance?
Correct Answer
Modifications and improvements , Overhauling , Emergency repairs
Your Answer
Modifications and improvements , Overhauling , Lubrication as per schedule
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer
Product Planning
Your Answer
Order Processing
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By experience
Your Answer
By vendor plant surveys , By the perofrmance of first l ot , By experience
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Match The Following
Question
Correct Answer
Pessimistic time
b
p
Expected time
Te
Te
Optimistic time
a
o
Most likely time
m
m
Your Answer
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Progress cards
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of material / personnel. In a good layout the flow
should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying cl ose to mean of the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without actual measurements , Improper selection of samples
Your Answer
Biases in measurements , Recording done without actual measurement s , Improper selection of samples
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is composed as series of connected
arrows and circles to describe the interrelationship of the activities i nvolved?
Correct Answer
Network
Your Answer
Flow chart
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the occurances of defectives?
Correct Answer
On manufacturing process
Your Answer
On manufacturing process
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions of the members of the body during method
study?
Correct Answer
Cyclograph
Your Answer
Pictograph
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL
.
Correct Answer
Your Answer
True/False
Question
or work centres.
Correct Answer
Your Answer
Rectangular
Bell
In Gantt Chart, the horizontal lines devide vertical lines into sections which represents either operations
True
True
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department to identify a nd draw
correct reference.
Correct Answer
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in respect of ________
Correct Answer
Delive ry performance
Your Answer
Quality
True/False
Question
Correct Answer
Your Answer
Floor inspection promotes tendency of machines to drift out of limits and produce defectives.
False
False
True/False
Question
A sampling plan wh ich perfectly discriminates will have vertical OC curve.
Correct Answer
Your Answer
True
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the existing method during method study?
Correct Answer
Charts , Diagrams , Templates or models
Your Answer
Control plans , Charts , Templates or models
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.
Correct Answer
Unexpe cted
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Correct Answer
Both forecast and pending orders
Your Answer
Past sales
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Acceptable quality level
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an a ctivity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Total cost
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms to the laid down design?
Correct Answer
Quality of conformance
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
Your Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine set up
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
are spoiled.
Correct Answer
Your Answer
Floor inspection delays the identification of faults which can not be rectified immediately before large lots
False
False
Multiple Choice Single Answer
Question
Management often fails to realize the importance of efficient layout due to following reason
Correct Answer
losses resulting from poor layout are not directly shown in the financial statements
Your Answer
losses resulting from poor layout are not directly shown in the financial statements
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
Which method of critical path determination begins with the end event and moves backward to the start event
of the project network?
Correct Answer
Backward pass computation
Your Answer
Backward pass computation
True/False
Question
Correct Answer
Your Answer
True/False
Complexity and difficulty of Planning is influenced by types of layout
True
False
Question
Correct Answer
Your Answer
For p-chart, p bar is the ratio of total number of units inspected to the total number of units defectives.
False
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct Answer
Master production schedule , Product structure , Lead time for procurement/manufacturing
Your Answer
Master production schedule , Lead time for procurement/manufacturing , list of machines
Multiple Choice Single Answer
Question
Which is the ideal place to wr ite a description of an activity in a network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and partly
due to emergency actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
True/False
Question
Correct Answer
Your Answer
Systematic maintenance system can completely eliminate the wear and tear of machines.
False
True
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Single Answer
Question
Providing flexibility in plant layout means
Correct Answer
Layout can be changed without much cost if required
Your Answer
Layout can be changed without much cost if required
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer
Defining right quality for the job , Vendor performance evalu ation , Making sure that suppliers
understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that suppliers understand
the requirements
Multiple Choice Multiple Answer
Question
Which of the following are scheduling techniques?
Correct Answer
Critical Path Analysis , Index Method , Johnson's two machine algorithm
Your Answer
Critical Path Analysis , Index Method , Johnson's two machine algorithm
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
Correct Answer
Your Answer
A network should be progression of activities always moving forward.
True
True
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very large
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Shop order
Multiple Choice Single Answer
Question
What do you understand by the selection of the job for the method study on the basis of money saving
potential of the job?
Correct Answer
Economic consideration
Your Answer
Economic consideration
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be
shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted
easily
Multiple Choice Single Answer
Question
Which is the ideal place to inspect jigs and fixtures in a mass manufacturing unit?
Correct Answer
Separate inspection room
Your Answer
Separate inspection room
Multiple Choice Single Answer
Question
How to reveal the capability of the sampling plan to discriminate between good lots and bad lots?
Correct Answer
Operating ch aracteristics curve ( OC )
Your Answer
Operating characteristics curve ( OC )
True/False
Question
planned.
Correct Answer
Your Answer
It would not affect the project completion time if non -critical activities take little loner time than
True
True
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through inspection which
requires stoppage of machines.
Correct Answer
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Match The Following
Question
Correct Answer
Your Answer
Forcasting requirement for indirect material
Past consumption analysis technique Past consumption analysis technique
Inventory control by classification ABC Analysis
Structure of the product
BOM
BOM
Material Planning for dependent demand
True/False
Question
Correct Answer
Your Answer
ABC Analysis
MRP
MRP
The dispatching function is of very importance in flow and mass production units.
False
True
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of materials while defining the qualitative
requirement?
Correct Answer
Material composition , Dimensions , Any heat treatment if required
Your Answer
Material composition , Dimensions , Cost of material
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
True/False
Question
An activity should represent an operation or set of operations which can be performed using a particular kind
of equipment or a special skill.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan ?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
True/False
Question
In case of forward pass computation, the earliest event time of a plain event equals the earliest event time
of the preceding event plus duration of activity emanating from the preceding event.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are ideal situations for the preventive inspection?
Correct Answer
Weekly off and holidays , Non-production hours , Stand-up equipment
Your Answer
Weekly off and holidays , Non-production hours , Stand-up equipment
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities and entry points of materials are recorded to
have graphic view of operations and inspections involved in the process?
Correct Answer
Operation process chart
Your Answer
Flow Process chart
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Symptom of ill planned purchasing
Reorder level
Over ordering
Over ordering
Factor influencing material planning
Lead time
Lead time
Net requirement of material under MRP
Stock on hand
Stock on hand
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influence
Correct Answer
Product cost
Your Answer
Product cost
Multiple Choice Single Answer
Question
Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps which
indicate whether the dimension is correct, oversize or undersize?
Correct Answer
Multiple gauging
Your Answer
Multiple gauging
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good quality of design?
Correct Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.
Correct Answer
One
Your Answer
One
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
Correct Answer
Your Answer
As a general rule, the number of tail event of an activity is more than that of it's head event.
False
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time
may assume that just the normal quantity of resources required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the completion of an activity , Activity
time must be independent of any influence which the preceding or succeeding activity may have on it. , Activity time may assume
that just the normal quantity of resources required to carry out the activity are available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
True/False
Question
Correct Answer
Your Answer
All activities must not be tied up into the network
False
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control
limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are
computed.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time estimate or three time estimate?
Correct Answer
Level of uncertainty
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or
by diverting work to other machine.
Correct Answer
Control board
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and activities which could
affect the quality of end product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan Wage Payment
Craft Facilities Planning
Work Sampling
Wage Payment
Facilities Planning
Machine utilization
Gantt Chart Production Scheduling
Machine utilization
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very large
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of workmen
is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay du ring recording of method study?
Correct Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs
awaiting at the machines for their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools stores , Jobs awaiting
at the machines for their turn
True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Reduce lead time
True/False
Question
Correct Answer
Your Answer
Cent percent inspection is often more practical and economical than sampling inspection.
False
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be
shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown , Models can be shifted
easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer
Quality of design
Your Answer
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Study different plant la youts and select the most optimum one , Study the extent of traffic over the
different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the
movement of material.
Your Answer
Study different plant layouts and select the most optimum one , Study the extent of traffic over the
different routes of the plant , Identify the extent of backtracking, cross traffic and obstacles encountered during the
movement of material.
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
Your Answer
False
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Correct Answer
Your Answer
Cellular layout is based on the concept of Group Technology
True
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production , Communicating possible delays in
delivery date commitment to sales department , Devising cures to keep rate of production in line with sch edule
Your Answer
Recording progress of work , Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer
Overtime working
Your Answer
Overtime working
True/False
Question
Correct Answer
Your Answer
In case of forward pass computation, the earliest event time of the first event is zero.
True
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
True/False
Question
As a general rule, a site five times the actual plant s ize is considered minimum for parking, access
facilities and future expansion.
Correct Answer
True
Your Answer
True
True/False
Question
Correct Answer
Your Answer
Independent float either affects the float of preceding activities or that of succeeding activities.
False
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per instruction is called
Correct Answer
Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department like Stores can be measured
by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Correct Answer
Your Answer
Site selection should also take into account topography and soil structure of the land.
True
True
Multiple Choice Single Answer
Question
Which manufacturing meth od is ideal for the use of air gauges as inspection device?
Correct Answer
Mass
Your Answer
Batch
True/False
Question
Correct Answer
Your Answer
Kanban system is essentially a computer based system for production scheduling and control
False
False
Multiple Choice Multiple Answer
Question
Which are three different bases to establish an activity time?
Correct Answer
Past experience , Judgement , Historical data
Your Answer
Past experience , Judgement , Historical data
True/False
Question
Inspection order is must even for simple jobs which can be inspected by shop inspector with the tooling
available on shop.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer
Low Skilled Labour & Special Purpose Machines
Your Answer
Semiskilled Labour & General Purpose Machines
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Delivery performance
True/False
Question
In case of X bar, if the process is not under control indicated by some points falling outside the control
limits, such points outside the control limits are eliminated and new trial control limits for the remaining points are
computed.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job characteristics with the
help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Job card
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Cn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
True/False
Question
Correct Answer
Your Answer
Tn
Lubrication survey should never be done for a new machine.
False
False
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Single Answer
Question
Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to meet the
specifications of final product and the other is, it must be
Correct Answer
Cost effective method
Your Answer
Cost effective method
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing order set as a primary function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
Which are the major types of defects?
Correct Answer
Minor , Major , Critical
Your Answer
Minor , Critical , General
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing Production?
Correct Answer
Highly Skilled
Your Answer
Highly Skilled
Multiple Choice Multiple Answer
Question
Which are the sources of information to update the progress card daily?
Correct Answer
Detachable ticket , Daily production report , Job Card
Your Answer
Detachable ticket , Daily production report , Job Card
True/False
Question
Correct Answer
Your Answer
In case of forward pass computation, the earliest event time of the first event is zero.
True
True
Multiple Choice Multiple Answer
Question
Which are the distinct functions of scientific quality control?
Correct Answer
Acceptance function , Preventive function , Assurance function
Your Answer
Acceptance function , Preventive function , Assurance function
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Production schedule , Commercial standards , Bill of material
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is called
Correct Answer
MRP
Your Answer
MRP
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
Semiskilled
Multiple Choice Multiple Answer
Question
Major contributors in the development of Control Charts, Sampling plan a re
Correct Answer
F H Dodge , H G Roming , Walter Schewhart
Your Answer
F H Dodge , H G Roming , Walter Schewhart
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Event
True/False
Question
scheduled.
Correct Answer
Your Answer
Feasibility of time schedule requires that an activity be scheduled before any of it's predecessors are
False
True
Multiple Choice Single Answer
Question
Which method of critical path determination begins with the end event and moves backward to the start event
of the project network?
Correct Answer
Backward pass computation
Your Answer
Backward pass computation
True/False
Question
Correct Answer
Your Answer
Operation process charts though indicates the sequence of events but do not show movements.
True
True
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out s imultaneously and both
activities require definite time to finish?
Correct Answer
Concurrent activities
Your Answer
Concurrent activities
True/False
Question
One major difference between CPM and PERT is the former's adaptability for the projects where high degree of
uncertainty prevails and activity times during performance are expected to vary considerably for certain activities.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management advocated by F W Taylor
Correct Answer
Selection of best worker for each particular task , Division of work between worker and management ,
Training and development of the workmen
Your Answer
Selection of best worker for each particular task , Division of work between worker and management , Training
and development of the workmen
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Poor Machine Utilization
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to prepare and follow as a part of preventive maintenance
system?
Correct Answer
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep schedule , Lubrication schedule
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates that the process is in a state of
statistical control?
Correct Answer
Random variability
Your Answer
Random variability
True/False
Question
Even in a small set up wherein maintenance of a machine is looked after by a mechanic cum worker, he should
report directly to the person responsible for the manufacturing operations.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activ ities and entry points of materials are recorded to
have graphic view of operations and inspections involved in the process?
Correct Answer
Operation process chart
Your Answer
Operation process chart
Multiple Choice Single Answer
Question
Plant Layout decisions are considered to be
Correct Answer
Strategic
Your Answer
Strategic
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the manufacturer of a machine?
Correct Answer
It gives instructions regarding installation and operation of the equipment , It contains note on
common troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Your Answer
It gives instructions regarding installation and operation of the equipment , It contains note on common
troubles with causes and remedies for troubleshooting , It enlists points, frequency and type of lubrication
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer
After completion of operation
Your Answer
After completion of operation
Multiple Choice Multiple Answer
Question
Which of the following situations demand that the human consideration should be given preference over other
considerations?
Correct Answer
Inconsistent earnings where the earnings are tied to output , Poor morale evidenced by petty or trivial
complaints , Repeated cases of accidents and health hazards
Your Answer
Excessive rejections , Poor morale evidenced by petty or trivial complaints , Repeated cases of accidents and
health hazards
True/False
Question
Correct Answer
Your Answer
A network can have more than one starting event but completion event must be onl y one.
False
True
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity in a network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of materials while defining the qualitative
requirement?
Correct Answer
Material composition , Dimensions , Any heat treatment if required
Your Answer
Material composition , Dimensions , Any heat treatment if required
Match The Following
Question
Correct Answer
Your Answer
When to inspect
Stages of inspection
What to inspect
Specification
How to inspect
Inspection devices
How much to inspect
Stages of inspection
Specification
Inspection devices
Sampling or cent percent inspection Sampling or cent percent inspection
Multiple Choice Multiple Answer
Question
How the concept of float is helpful to planners?
Correct Answer
To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent
peaks and valleys in requirement of resources
Your Answer
To decide priorities in allocation of resources , To minimize the requirement of resources , To prevent peaks
and valleys in requirement of resources
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Correct Answer
Your Answer
It pays in the long run to inform the customer regarding expected delays in the deliveries.
True
True
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of p arts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available ,
Plant expansion is easier due to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be available , Plant
expansion is easier due to less or no restriction for building and construction
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Order Quantity , Delivery Dates , Plant layout
True/False
Question
needs.
Correct Answer
Your Answer
Availability of training schools, colleges and management institutes reduces the company's internal training
True
False
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Lime stone
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan Wage Payment
Craft Facilities Planning
Work Sampling
Wage Payment
Production Scheduling
Machine utilization
Gantt Chart Production Scheduling
Sampling Inspection
Charting technique
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Symptom of ill planned purchasing
Stock on hand
Over ordering
Over ordering
Factor influencing material planning
Lead time
Lead time
Net requirement of material under MRP
Stock on hand
Price of material
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a small network?
Correct Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities
along each path. , Enumerate all paths in the network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along
each path. , Enumerate all paths in the network and list down activities on eac h path.
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Correct Answer
Your Answer
Tool breakage has got nearly zero chances in case of eventual breakdown.
False
False
Multiple Choice Multiple Answer
Question
Which are the three types of float?
Correct Answer
Total float , Independent float , Free float
Your Answer
Total float , Dependent float , Free float
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer
Effective Capacity per work centre , Ratio of skilled to unskilled labour , Performance standards
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling inspection can be
considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Overhauling
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of
acceptance of ________.
Correct Answer
One
Your Answer
One
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash time )
Your Answer
Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash time )
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good quality of design?
Correct Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
True/False
Question
small.
Correct Answer
Your Answer
In case of control chart, large smaples such as n=15 or 20 are used if the process standard deviation is
False
True
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the centralised inspection.
Correct Answer
easier
Your Answer
labourious
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps the operating personnel?
Correct Answer
Identify the presence of an assignable cause before it develops
Your Answer
Reduces chances of rejections
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Reduced salvage value of machine
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of product which forms the vital part of engineering
function?
Correct Answer
Material specifications
Your Answer
Performance specifications
Multiple Choice Single Answer
Question
Which of the following is a cause of plant breakdown?
Correct Answer
Overloading of machines
Your Answer
Overloading of machines
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using flow process chart?
Correct Answer
Eliminating the operations or combining the operations with another , Reducing the distance traveled by
the workmen or materials , Avoiding the waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials , Reducing rejections drastically , Avoiding the
waiting time and thereby reduce production losses
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
True/False
Question
Correct Answer
Your Answer
Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure of machinery.
True
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and cause delay in taking
action regarding rejection or rework.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant is constantly watched
through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
Correct Answer
Your Answer
The problems of congestion, bottlenecks and backtracking can not be visualized by using templates and models.
False
False
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Quality
True/False
Question
Correct Answer
Your Answer
Delay in completion of projects result in unwelcome add itions to the fixed manufacturing expenses.
True
True
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer
Opportunity cost
Your Answer
Idle wages
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for location decision as taxes/duties substantially
influence
Correct Answer
Product cost
Your Answer
Order procurement
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer
To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
Your Answer
To forecast the defect , To identify causes of major repetative failures , To quantify the frequency of
preventive inspection
True/False
Question
Correct Answer
Your Answer
Shop order is one of the subsidiary order
True
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
The component produced on completely automatic machines may be subjected to sampling inspection while par ts
produced on semi-automatic and completely manual operated machines require cent percent inspection.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff , Number of
workmen is not very large
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line st aff , Number of workmen
is not very large
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a particular site from
legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Policies regarding issue of licences , Productivity of labour
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Kanban system is essentially a computer based system for production scheduling and
control
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is one of the best known statistical relationship regarding process
control.
Correct Answer
Normal distribution
Your Answer
Normal distribution
True/False
Question
Floor inspection promotes tendency of machines to drift out of limits and produce
defectives.
Correct Answer
False
Your Answer
False
True/False
Question
In case of two handed process chart, inspection symbol is used when check by touch
or feel is involved.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are reason due to which the progress of work is rarely in line with it's plan?
Correct Answer
Absenteeism , Machine breakdowns , Substandard performance against prefixed
production standards
Your Answer
Absenteeism , Change in operation sequence , Machine breakdowns
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Question
What does the points falling outside the control limits indicate?
Correct Answer
Presence of assignable causes
Your Answer
Presence of assignable causes
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method
study?
Correct Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn
at tools stores , Jobs awaiting at the machines for their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at
tools stores , Jobs awaiting at the machines for their turn
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following situations
Correct Answer
Long Lead time for procurement , Several levels of assemblies in product ,
Long manufacturing cycle
Your Answer
Long Lead time for procurement , Several levels of assemblies in product , Long
manufacturing cycle
Select The Blank
Question
Principle underlying the Moving Average mrthod is that future demand shall be
________ past demand.
Correct Answer
Average of
Your Answer
Higher than
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
True/False
Question
Complexity and difficulty of Planning is influenced by types of layout
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improved methods?
Correct Answer
Critical examination
Your Answer
Development and selection
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing order set as a primary
function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Select The Blank
Question
The wage payable to the workman is calculated by ________ the quantity produced by
him by the specified rate per piece, in the straight piece rate method.
Correct Answer
Multiplying
Your Answer
Dividing
True/False
Question
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
How to reveal the capability of the sampling plan to discriminate between good lots
and bad lots?
Correct Answer
Operating characteristics curve ( OC )
Your Answer
Operating characteristics curve ( OC )
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is called
Correct Answer
MRP
Your Answer
MRP
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings
True/False
Question
Only skilled worker can use the fixed limit gauge.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a small network?
Correct Answer
Compare the durations of all paths to identify the longest path. , Sum up the
durations of activities along each path. , Enumerate all paths in the network and list down
activities on each path.
Your Answer
Compare the durations of all paths to identify the longest path. , Sum up the
durations of activities along each path. , Enumerate all paths in the network and list down
activities on each path.
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of product which forms the vital
part of engineering function?
Correct Answer
Material specifications
Your Answer
Material specifications
Select The Blank
Question
We can say that ________ occurs when there is a distinct change in the physical or
chemical characteristic of an object.
Correct Answer
Operation
Your Answer
True/False
Question
Manufacturing
There is no need for progressing when the customers do the follow-up on their own
to know the status of their jobs.
Correct Answer
False
Your Answer
False
True/False
Question
The component produced on completely automatic machines may be subjected to
sampling inspection while parts produced on semi -automatic and completely manual operated
machines require cent percent inspection.
Correct Answer
True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.
Correct Answer
True
Your Answer
False
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can
be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct Answer
Preparation of material estimates
Your Answer
indenting all required material
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Shop order
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing company.
Correct Answer
Inspection order
Your Answer
Inspection order
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Machine utilization
Gantt Chart Production Scheduling Production Scheduling
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
Select The Blank
Question
The design of any layout is governed by large number of factors and the best layout
is expected to ________ all these factors.
Correct Answer
Optimise
Your Answer
Consider
Multiple Choice Single Answer
Question
How should a dummy activity be represented in a network?
Correct Answer
By dotted line
Your Answer
By circle
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as
________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time estimate or three time
estimate?
Correct Answer
Level of uncertainty
Your Answer
Level of uncertainty
Select The Blank
Question
In Gantt Chart, the vertical lines devide horizontal lines into small squares which
represents ________.
Correct Answer
Units of measurement
Your Answer
No. of Jobs
Select The Blank
Question
Activities comprising of a project are of two types, deterministic and ________.
Correct Answer
Variable
Your Answer
Variable
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
POM assgn : Parmeet
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer
True
Your Answer
True
True/False
Question
Correct Answer
After goods have been manufactured, route sheets and operation layouts
should not be collected back.
False
Your Answer
False
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable Quality Level
(AQL )?
Correct Answer
Very high
Your Answer
True/False
Question
Very high
Correct Answer
For p-chart, p bar is the ratio of total number of units inspected to the total
number of units defectives.
False
Your Answer
False
Select The Blank
Question
Correct Answer
The ________ is specified to indicate the maximum permissible variability in
the dimensions product or parts.
Tolerance
Your Answer
Tolerance
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Time
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing Production?
Correct Answer
Highly Skilled
Your Answer
Highly Skilled
Multiple Choice Multiple Answer
Question
Correct Answer
Your Answer
Select The Blank
Question
Which are the general principles underlying probability aspects of project
planning?
Statistically three time estimate of an activity conform to Beta distribution. ,
Expected time divides the area under the curve into two equal parts. ,
Expected time of an activity is located at one third of the distance between
"m" and mid-range { (a+b)/2 } away from the most likely time.
Statistically three time estimate of an activity conform to Beta distribution. ,
Expected time divides the area under the curve into two equal parts. ,
Expected time of an activity is located at one third of the distance between
"m" and mid-range { (a+b)/2 } away from the most likely time.
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Select The Blank
Question
Correct Answer
The ________ pertain to the climatic conditions which the component ,
product or material should withstand.
Environmental specifications
Your Answer
Environmental specifications
Match The Following
Question
Correct Answer
Your Answer
Bottom compartment of control
board
Bunch of work orders arranged in Bunch of work orders arranged in a
a sequence in which they are to
sequence in which they are to be
be processed.
processed.
Control board
Pictorial view of machine loading
activity
Pictorial view of machine loading
activity
Top compartment of control board Work order of item currently
being worked on the machine
Work order of item currently being
worked on the machine
Middle compartment of control
board
Work order of item to be processed
next on the machine
Select The Blank
Question
Work order of item to be
processed next on the machine
Correct Answer
OC curve of ideal sampling plan suggests that all lots less than 3%
defectives have the probability of acceptance of ________.
One
Your Answer
One
Multiple Choice Single Answer
Question
Which is the right time to prepare stores issue order?
Correct Answer
When route sheet is ready
Your Answer
When route sheet is ready
Multiple Choice Single Answer
Question
What is the reason of excessive friction between parts?
Correct Answer
Improper or lack of lubrication
Your Answer
Improper or lack of lubrication
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps the operating
personnel?
Correct Answer
Identify the presence of an assignable cause before it develops
Your Answer
Identify the presence of an assignable cause before it develops
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct Answer
Thick Line , Red Line , Double Line
Your Answer
Thick Line , Double Line
True/False
Question
Correct Answer
The control chart for number of defectives is more convenient to make than
control chart for fraction defectives sincethe fugure of number of defectives
units can be directly taken from the inspection report.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires
following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Shop order
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
Inherent Safety' is one of the principle of good layout. In context of layout,
this can be achieved by the following
Correct Answer
Clear gangway, location of material and material handling system
Your Answer
Safety training
Match The Following
Question
Correct Answer
Your Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout
Burnout
Ear
Impact
Impact
Multiple Choice Single Answer
Question
How much time does the dummy activity take?
Correct Answer
Zero Time
Your Answer
Zero Time
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Single Answer
Question
What does tail of an arrow represent?
Correct Answer
Start of an activity
Your Answer
Start of an activity
Select The Blank
Question
Correct Answer
The ________ is the probability that a good lot will be rejected by the
sampling plan.
Producer's risk
Your Answer
Producer's risk
Select The Blank
Question
Correct Answer
The ________ is the probability that a bad lot will be accepted by the
sampling plan.
Consumer's risk
Your Answer
Consumer's risk
Multiple Choice Multiple Answer
Question
Which of the following are the most suitable cases where we can use CPA as
effective technique of scheduling?
Correct Answer
Overhauling of a CNC machine , Purchase and installation of a newly
imported special purpose machine , Design, production and testing of
prototype of a fighter aircraft.
Your Answer
Overhauling of a CNC machine , Purchase and installation of a newly
imported special purpose machine , Design, production and testing of
prototype of a fighter aircraft.
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be
carried out simultaneously and both activities require definite time to finish?
Correct Answer
Concurrent activities
Your Answer
Select The Blank
Question
Concurrent activities
Correct Answer
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Specifications
Your Answer
Specifications
Select The Blank
Question
Correct Answer
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Forwarding note
Your Answer
Forwarding note
True/False
Question
Correct Answer
The steeper the OC curve, the better is the discrimination between good and
bad lots.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Multiple Answer
Question
Which are the different types of flow process charts used for method study?
Correct Answer
Equipment type , Man type , Material type
Your Answer
Equipment type , Man type , Material type
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions of the
members of the body during method study?
Correct Answer
Cyclograph
Your Answer
Cyclograph
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
True/False
Question
Continuous flow of material , Highly mechanised material handling , Virtually
zero manufacturing cycle time
Continuous flow of material , Highly mechanised material handling , Virtually
zero manufacturing cycle time
Correct Answer
Use of accurate measuring instruments and better supervision for inspectors
is not possible in case of floor inspection as co mpared to centralised
inspection system.
True
Your Answer
True
True/False
Question
Correct Answer
Dust gets mixed with lubricants, forms an abrasive substance and causes
pre-mature failure of machinery.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are
regulated to the extent desirable.
Quality control
Your Answer
Quality control
Multiple Choice Multiple Answer
Question
Correct Answer
Your Answer
True/False
Question
Which of the following aspects are essential to ensure quality of purchased
items?
Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Correct Answer
Process Planning is concerned with decisions regarding requirement of
machines and manpower for meeting customer demand
False
Your Answer
True
True/False
Question
Correct Answer
All activities lying on the non-critical paths must have total float and free
float.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following method can be adopted to overcome the problem of
rushing up a job for it's timely completion?
Correct Answer
Use of optimum speeds and feeds , Subcontracting , Job splitting
Your Answer
Use of optimum speeds and feeds , Subcontracting , Job splitting
Multiple Choice Single Answer
Question
Which of the following data is unnecessary for scheduling process?
Correct Answer
Cost breakup of products
Your Answer
Cost breakup of products
Multiple Choice Multiple Answer
Question
Which of the following are the major steps of making of the X bar-R control
chart?
Correct Answer
Collection of data , Claculation of mean,range,grand average and mean
range , Set up control chart for average and calculate control limits of range
chart
Your Answer
Collection of data , Claculation of mean,range,grand average and mean
range , Set up control chart for average and calculate control limits of range
chart
POM assgn : Parmeet
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process
in X bar-R- control chart?
Correct Answer
Recording done without actual measurements , Improper selection of
samples , Biases in measurements
Your Answer
Improper selection of samples , Biases in measurements , Recording done
without actual measurements
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Reorder level
Symptom of ill planned
purchasing
Over ordering
Over ordering
Factor influencing material
planning
Lead time
Lead time
Net requirement of material under Stock on hand
MRP
Stock on hand
Multiple Choice Multiple Answer
Question
What are the benefits of inspection and quality control?
Correct Answer
Your Answer
Select The Blank
Question
Adequate maintenance of quality , Ensures parts are within specified limits
of accuracy , Gives economy in production through reduction of defective
work
Adequate maintenance of quality , Ensures parts are within specified limits
of accuracy , Gives economy in production through reduction of defective
work
Correct Answer
The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth
unhealthy conditions and preventive
Preventive Maintenance
Your Answer
Preventive Maintenance
Multiple Choice Single Answer
Question
What do you mean by design modifications made to reduce time and effort
required in carrying out maintenance work ?
Correct Answer
Design-in Maintenance
Your Answer
True/False
Design-in Maintenance
Question
Correct Answer
Even in a small set up wherein maintenance of a machine is looked after by
a mechanic cum worker, he should report directly to the person responsible
for the manufacturing operations.
True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following technique makes three time estimates for each
activity?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Select The Blank
Question
Project Evaluation & Review Technique
Correct Answer
A set of activities to keep an equipment in the specified condition is called
as ________.
Maintenance
Your Answer
Maintenance
Multiple Choice Multiple Answer
Question
Which of the following are characteristics of an operating characteristics
curve?
Correct Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Multiple Choice Multiple Answer
Question
Which three of the following are causes of continuous upward pattern of
Xbar-R control chart?
Correct Answer
Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer
True/False
Question
Wear of tool , Untrained operator , Abnormal rise in temperature
Correct Answer
Inspection should be conducted on all incoming materials, semifinished
items, bought out components, subcontract items prior to any operation,
assembly.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is necessary when the job requires detailed of one or more
of the job characteristics with the help of special equipment which is not
available at the producing company.
Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
True/False
Question
Correct Answer
Since value of c can never be negativee, hence" if LCLp works out to be
negative, it is taken as zero."
True
Your Answer
False
Multiple Choice Single Answer
Question
What do you understand by the quality specified by the designer on behalf
the customer?
Correct Answer
Quality of design
Your Answer
Select The Blank
Question
Quality of design
Correct Answer
The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
True/False
Question
Correct Answer
Maintenance function must be decentralised apart from a size of a
manufacturing organisation for it's better functioning.
False
Your Answer
False
True/False
Question
Correct Answer
Repetitive movements between work stations which are difficult to be
traced on string diagrams can be conveniently shown on flow diagrams.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which method is used to trace especially those movements which are too
fast for human eye to pursue?
Correct Answer
Cyclegraph
Your Answer
Cyclegraph
Match The Following
Question
Correct Answer
Your Answer
Template
Two dimensional cutouts
Two dimensional cutouts
REL chart
Degree of closeness
Degree of closeness
Flow diagram
Tracing movements
Tracing movements
Travel chart
Distance and frequency of
movements
Distance and frequency of
movements
Select The Blank
Question
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .
Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
What does the points falling outside the control limits indicate?
Correct Answer
Presence of assignable causes
Your Answer
Presence of chance causes
Multiple Choice Multiple Answer
Question
Which information is recorded in an equipment card?
Correct Answer
Your Answer
True/False
Question
Date of commissioning , Equipment specifications , Name and address of
manufacturer
Date of commissioning , Equipment specifications , Name and address of
manufacturer
Correct Answer
Inspection should be avoided prior to long run of a manufacturing stage as
it becomes duplication of work and cost.
False
Your Answer
False
True/False
Question
Correct Answer
Delay in completion of projects result in unwelcome additions to the fixed
manufacturing expenses.
True
Your Answer
True
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Production Planning
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low product variety
and large volumes?
Correct Answer
Low Skilled Labour & Special Purpose Machines
Your Answer
Select The Blank
Question
Low Skilled Labour & Special Purpose Machines
Correct Answer
In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
True/False
Question
Correct Answer
In case of X bar, if the process is not under control indicated by some
points falling outside the control limits, such points outside the control limits
are eliminated and new trial control limits for the remaining points are
computed.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Plant Layout is concerned with optimum arrangement of the following
Correct Answer
Storage space , Machines , Material Handling Equipment
Your Answer
Storage space , Machines , Material Handling Equipment
Multiple Choice Single Answer
Question
What is the location of upper control limit in the X bar-R control chart?
Correct Answer
3 standard deviations above central line
Your Answer
3 standard deviations above central line
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
Correct Answer
While numbering as per Fulkerson's rule, arrows emerging from the initial
event are deleted so as to create one or more initial events.
True
Your Answer
False
Multiple Choice Single Answer
Question
Why stores issue order should not be issued as soon as it is prepared?
Correct Answer
Material may or may not be available at the time of preparation
Your Answer
Material may or may not be available at the time of preparation
Multiple Choice Single Answer
Question
Which characteristics are verified in cent percent sampling?
Correct Answer
All important characteristics
Your Answer
Only characteristics related to performance
Select The Blank
Question
Correct Answer
An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of
service.
Equipment history card
Your Answer
Equipment history card
Multiple Choice Multiple Answe r
Question
Features of Cellular layout are
Correct Answer
Your Answer
It is a type of mixed layout , Uses concept of Group Technology , Facilities
are grouped in to cells
It is a type of mixed layout , Uses concept of Group Technology , Facilities
are grouped in to cells
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Poor Customer Service
Multiple Choice Multiple Answer
Question
Which of the following factors affect the quality control function?
Correct Answer
Quality of workmanship , Production aids , Manufacturing facilities
Your Answer
Quality of workmanship , Competitive prices , Manufacturing facilities
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic consideration while
selecting a job for method study?
Correct Answer
Unorderly movement of men and materials , Excessive process defectives ,
Too many suggestions received for improvement from a department or
section
Your Answer
Unorderly movement of men and materials , Excessive process defectives ,
Too many suggestions received for improvement from a department or
section
True/False
Question
Correct Answer
Systematic maintenance system can completely eliminate the wear and tear
of machines.
False
Your Answer
False
Select The Blank
Question
Correct Answer
Capacity decisions have a direct influence on performance of production
system in respect of ________
Delivery performance
Your Answer
Delivery performance
Select The Blank
Question
Correct Answer
The ________ must ensure that the product satisfy the functional
requirements of it's usage.
Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
Where does the central line is located in case of p-chart?
Correct Answer
at p bar
Your Answer
at p bar
Multiple Choice Single Answer
Question
The product layout has following disadvantage
Correct Answer
Layout is not flexible
Your Answer
Layout is not flexible
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Production
Select The Blank
Question
Production Planning is a centralised activity which
includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots
less than 3% defectives have the probability of acceptance of ________.
Correct Answer
One
Your Answer
One
Multiple Choice Single Answer
Question
The document which incorporates details of process
planning for a job is called
Correct Answer
Route Sheet
Your Answer
Route Sheet
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive
testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow
detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Single Answer
Question
What do you understand by the difference between the
specification limits within which manufacturing process is expected to
produce?
Correct Answer
Design tolerance
Your Answer
Design tolerance
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed
in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
True/False
Question
Inspection Order can be a verbal order
Correct Answer
True
Your Answer
False
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is
commonly known as
Correct Answer
Productivity
Your Answer
Productivity
True/False
Question
The plotting of activities - critical, non-critical and
dummy activities- is strictly according to their precedence
relationship.
Correct Answer
True
Your Answer
False
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Select The Blank
Question
A set of activities to keep an equipment in the specified
condition is called as ________.
Correct Answer
Maintenance
Your Answer
Maintenance
Multiple Choice Single Answer
Question
How to claculate the producer risk in the OC Curve?
Correct Answer
Probability that a good lot will be rejected by the
sampling
Your Answer
Probability that a good lot will be rejected by the
sampling
Multiple Choice Single Answer
Question
How non-critical activities are shown in the time chart
during project scheduling?
Correct Answer
Thin lines
Your Answer
Thin lines
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
True/False
Question
Fixed cost is lower in case of continuous production than
intermittent production.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Low Productivity
True/False
Question
Floor inspection promotes tendency of machines to drift
out of limits and produce defectives.
Correct Answer
False
Your Answer
False
Select The Blank
Question
Capacity decisions have a direct influence on performance
of production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Delivery performance
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce
inventory is called
Correct Answer
MRP
Your Answer
MRP
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality of
end
product are regulated to the extent desirable.
Correct Answer
Quality control
Your Answer
Quality control
Match The Following
Question Correct Answer Your Answer
Temperature of motor Body Body
Exhaust gas Smell Smell
Air leakage Listen Listen
Corrosion Watch Watch
Multiple Choice Single Answer
Question
Which characteristics are verified in cent percent
sampling?
Correct Answer
All important characteristics
Your Answer
All important characteristics
Multiple Choice Multiple Answer
Question
What are the benefits of inspection and quality control?
Correct Answer
Gives economy in production through reduction of
defective work , Adequate maintenance of quality , Ensures parts are
within specified limits of accuracy
Your Answer
Adequate maintenance of quality , Ensures parts are
within specified limits of accuracy , Gives economy in production
through
reduction of defective work
Multiple Choice Single Answer
Question
In mass/batch production organizations where goods are
produced for stocking, Work Order is raised on the basis of
Correct Answer
Sales Programme
Your Answer
Sales Programme
True/False
Question
While making X bar-R-chart, values of X bar and R are
recoded samplewise either on the extreme right of the individual
measurements on the data sheet or in a separate sheet.
Correct Answer
True
Your Answer
False
Multiple Choice Single Answer
Question
What is the meaning of surplus material in context with
stores issue order?
Correct Answer
Materials issued are not fully consumed
Your Answer
Materials issued are not fully consumed
True/False
Question
Cent percent inspection is often more practical and
economical than sampling inspection.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Eliminates problems and frequent breakdowns ,
Increases life of an equipment , It helps to plan requirement of
replacement
spares
Your Answer
Eliminates problems and frequent breakdowns , Increases
life of an equipment , It helps to plan requirement of replacement
spares
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
True/False
Question
In case of X bar, if the process is not under control
indicated by some points falling outside the control limits, such
points
outside the control limits are eliminated and new trial control limits
for the remaining points are computed.
Correct Answer
True
Your Answer
False
Select The Blank
Question
The easiest way to bring the delayed job within the
promised delivery time by using extra shift or weekly holiday is
________.
Correct Answer
Overtime working
Your Answer
Overtime working
True/False
Question
A sampling plan which perfectly discriminates will have
vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for
Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Multiple Answer
Question
Which of the following are the most suitable cases where
we can use CPA as effective technique of scheduling?
Correct Answer
Overhauling of a CNC machine , Purchase and
installation of a newly imported special purpose machine , Design,
production
and testing of prototype of a fighter aircraft.
Your Answer
Overhauling of a CNC machine , Purchase and
installation of a newly imported special purpose machine , Design,
production and
testing of prototype of a fighter aircraft.
True/False
Question
Sample sizes for the construction of p-chart are typicaly
larger that for Xbar-R-charts.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic
inspection to unearth unhealthy conditions and preventive
Correct Answer
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
It would not affect the project completion time if
non-critical activities take little loner time than planned.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of
quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
Multiple Choice Single Answer
Question
What is the location of lower control limit in the X bar-R
control chart?
Correct Answer
3 standard deviations below central line
Your Answer
3 standard deviations below central line
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of
Project Production?
Correct Answer
Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer
Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Multiple Choice Multiple Answer
Question
Which of the following may be the objectives of project
crashing?
Correct Answer
To complete the project in the least possible time ,
To reduce project cost below it's normal cost , To achieve uniformity
in requirement of resources
Your Answer
To complete the project in the least possible time , To
reduce project cost below it's normal cost , To achieve uniformity in
requirement of resources
Multiple Choice Single Answer
Question
What is the basic philosophy of statistical process
control?
Correct Answer
Prevention is better than cure
Your Answer
Prevention is better than cure
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the
achievement of quality?
Correct Answer Quality of design , Quality of conformance , Purpose of product
Your Answer
Quality of conformance , Quality of design
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project
which is composed as series of connected arrows and circles to
describe the interrelationship of the activities involved?
Correct Answer Network
Your Answer
Network
Multiple Choice Multiple Answer
Question
Which of the following cases indicates change in physical
characteristic?
Correct Answer Turning , Grinding , Drilling
Your Answer
Turning , Grinding , Drilling
Multiple Choice Single Answer
Question
What do you mean by the verification of object against
predetermined standards of quality or quantity or both?
Correct Answer Inspection
Your Answer
Quality assurance
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer Factory
Your Answer
Factory
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic
inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer
Preventive Maintenance
Select The Blank
Question
The ________ is the defect level for which lots are regarded as
bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
How non-critical activities are shown in the time chart during
project scheduling?
Correct Answer Thin lines
Your Answer
Thin lines
Select The Blank
Question
An ________ history card is the record of all repairs,
replacements and engineering changes carried out in the
equipment during it's period of service.
Correct Answer Equipment history card
Your Answer
Equipment history card
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer
Shop Supervisor
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
True/False
Motion
Question
Every network does not necessarily have a critical path.
Correct Answer False
Your Answer
False
Select The Blank
Question
Production Planning is a centralised activity which includes
functions such as ________
Correct Answer Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Which method of critical path determination begins with the end
event and moves backward to the start event of the project
network?
Correct Answer Backward pass computation
Your Answer
Backward pass computation
True/False
Question
Scrap allowance is added to net requirement of material while
ordering for material
Correct Answer True
Your Answer
True
True/False
Question
Dust gets mixed with lubricants, forms an abrasive substance
and causes pre-mature failure of machinery.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
True/False
Question
Reducing handling costs
It would not affect the project completion time if non-critical
activities take little loner time than planned.
Correct Answer True
Your Answer
True
Select The Blank
Question
The ________ is the process of withdrawing the equipment from
the production line, dismantling it unitwise, visualising defects,
effecting adjustments, replacing worn-out parts and finally
building it up to get desired accuracies.
Correct Answer Reconditioning
Your Answer
Reconditioning
True/False
Question
Flow process charts do record movements as well as visual
pictures.
Correct Answer False
Your Answer
False
True/False
Question
Process Planning is concerned with decisions regarding
requirement of machines and manpower for meeting customer
demand
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to
J.M.Juran?
Correct Answer Quality of design
Your Answer
Quality of design
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is
called
Correct Answer MRP
Your Answer
MRP
Multiple Choice Multiple Answer
Question
Which of the following are examples of consumption of physical
effort during recording for method study?
Correct Answer Bending , Positioning , Unloading
Your Answer
Bending , Positioning , Drilling
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which three of the following options can be used to reduce the
duration of activity during project crashing?
Correct Answer Allocating more manpower and machines than originally planned
for. , Working additional shifts or overtime. , Awarding work to
vendors who charge extra but expedite deliveries.
Your Answer
Allocating more manpower and machines than originally planned
for. , Working additional shifts or overtime. , Awarding work to
vendors who charge extra but expedite deliveries.
Multiple Choice Single Answer
Question
Which is the next stage to the inspection based quality control in
the historical development of quality management.
Correct Answer Quality assurance
Your Answer
Quality assurance
Match The Following
Question
Correct Answer
Your Answer
Bottom compartment of
control board
Bunch of work orders
arranged in a sequence in
which they are to be
processed.
Bunch of work orders
arranged in a sequence in
which they are to be
processed.
Control board
Pictorial view of machine
loading activity
Pictorial view of machine
loading activity
Top compartment of
control board
Work order of item
Work order of item
currently being worked on currently being worked on
the machine
the machine
Middle compartment of
control board
Work order of item to be
processed next on the
machine
Work order of item to be
processed next on the
machine
Select The Blank
Question
The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuous
checking.
Correct Answer Condition monitoring
Your Answer
Condition monitoring
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management advocated
by F W Taylor
Correct Answer Selection of best worker for each particular task , Division of
work between worker and management , Training and
development of the workmen
Your Answer
Selection of best worker for each particular task , Division of
work between worker and management , Training and
development of the workmen
Multiple Choice Multiple Answer
Question
How the concept of float is helpful to planners?
Correct Answer To decide priorities in allocation of resources , To minimize the
requirement of resources , To prevent peaks and valleys in
requirement of resources
Your Answer
To decide priorities in allocation of resources , To minimize the
requirement of resources
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Which kind of defect can be called as minor defect?
Correct Answer Which does not reduce the usability of the product for its
intended use
Your Answer
Which does not reduce the usability of the product for its
intended use
Select The Blank
Question
The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.
Correct Answer Tolerance
Your Answer
Tolerance
True/False
Question
Sampling inspection is best suited when cost of inspection is
much higher than the loss arising from the acceptance of a
defective part.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Which element of a network represents a task which has got a
definite beginning and definite end?
Correct Answer Activity
Your Answer
Activity
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for
evaluation of layout in factor analysis method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
Necessity
Select The Blank
Question
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer
Standards
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of
materials while defining the qualitative requirement?
Correct Answer Material composition , Dimensions , Any heat treatment if
required
Your Answer
Material composition , Dimensions , Any heat treatment if
required
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly
known as
Correct Answer Productivity
Your Answer
Productivity
True/False
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Which portion of the perforated route sheet should be signed by
the operator or supervisor?
Correct Answer Lower portion
Your Answer
Lower portion
True/False
Question
In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outside
the control limits are eliminated and new trial control limits for the
remaining points are computed.
Correct Answer True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Scale model
Layout analysis
Modelling approach to
layouts
Factor Analysis
Method to evaluate
layouts
Technique for evolving and
analysis of layouts
Minimization of production Objective of good layout
delays
Objective of good layout
Maximum visibility
Principles of good layout
True/False
Question
Principles of good layout
Maintenance function must be decentralised apart from a size of
a manufacturing organisation for it's better functioning.
Correct Answer False
Your Answer
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Process Sheets for parts in batch production are not maintained
as standard process sheet
Correct Answer False
Your Answer
False
True/False
Question
Theoretical capacity equals number of normal working hours of
that machine.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the basic requirements of the " Quality of Design "?
Correct Answer Identification of right product , Selection of appropriate features ,
Ensure that product renders satisfactory service to customer
Your Answer
Identification of right product , Selection of appropriate features ,
Ensure that product renders satisfactory service to customer
Match The Following
Question
Correct Answer
Your Answer
Change in chemical
characteristic
Chemical reaction
Chemical reaction
Consumption of effort
Posting a ledger
Welding
Information given
Giving directions or
instructions
Posting a ledger
Subtraction
Removal of worn-out part Removal of worn-out part
from a machine
from a machine
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of
purchased items?
Correct Answer Defining right quality for the job , Vendor performance evaluation
, Making sure that suppliers understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation
, Making sure that suppliers understand the requirements
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special
equipment which is not available at the producing company.
Correct Answer Inspection order
Your Answer
Move order
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of
company to produce.
Correct Answer Opportunity cost
Your Answer
Idle wages
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting
or rejecting a particular site from legislation and taxation point of
view?
Correct Answer Labour laws , Building codes , Policies regarding issue of
licences
Your Answer
Labour laws , Policies regarding issue of licences
True/False
Question
Skill of labour force in a product type layout is usually higher
than in the process type of layout
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer
Level of uncertainty
Multiple Choice Single Answer
Question
Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer
automobile components
True/False
Question
Diversified labour is adequately available in rural area as
compared to urban area.
Correct Answer False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level Reorder level
Single source of supply
Symptom of ill planned
purchasing
Over ordering
Over ordering
Factor influencing material Lead time
planning
Reorder level
Net requirement of
material under MRP
Stock on hand
Stock on hand
True/False
Question
In case of backward pass computation, the latest event time of
the end event equals to the earliest event time minus duration of
that activity.
Correct Answer False
Your Answer
True
Select The Blank
Question
The ________ is the probability that a good lot will be rejected
by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
Which of the following technique makes three time estimates for
each activity?
Correct Answer Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
True/False
Question
Suburban location provides the compromise netween rural and
urban locations.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Which time is determined by the backward pass computation
method of determination of critical path ?
Correct Answer Latest allowable time for each event
Your Answer
Latest allowable time for each event
Multiple Choice Single Answer
Question
What do you understand by the measurement of work to
establish allowed time for a job for the defined method?
Correct Answer Work measurement
Your Answer
Motion economy
True/False
Question
Even in a small set up wherein maintenance of a machine is
looked after by a mechanic cum worker, he should report directly
to the person responsible for the manufacturing operations.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Out of two basic criteria for the selection of a manufacturing
method, one is, it must be able to meet the specifications of final
product and the other is, it must be
Correct Answer Cost effective method
Your Answer
Cost effective method
True/False
Question
Kanban system is essentially a computer based system for
production scheduling and control
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following symbols are used in flow process chart
but not used in operation process chart?
Correct Answer Storage , Delay , Transport
Your Answer
Storage , Delay
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer
Skilled in one specific Manufacturing Process
Multiple Choice Multiple Answer
Question
Which of the following are the major steps of making of the X
bar-R control chart?
Correct Answer Collection of data , Claculation of mean,range,grand average
and mean range , Set up control chart for average and calculate
control limits of range chart
Your Answer
Claculation of mean,range,grand average and mean range , Set
up control chart for average and calculate control limits of range
chart , Calculate the coefficient of deviation
True/False
Question
For p-chart, p bar is the ratio of total number of units inspected to
the total number of units defectives.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project
Production?
Correct Answer PERT & CPM
Your Answer
Break Even Analysis
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some maintenance
related characteristics by making use of human senses, when
equipment is in operation?
Correct Answer Extrernal inspection
Your Answer
Internal inspection
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing
tooling for most economic production run when
Correct Answer Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Single Answer
Question
How dummy activities are shown in the time chart during project
scheduling?
Correct Answer Vertical lines
Your Answer
True/False
Question
Dotted lines
The control chart for number of defectives is more convenient to
make than control chart for fraction defectives sincethe fugure of
number of defectives units can be directly taken from the
inspection report.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due
to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Availability of excellent
transportation and communication facilities
Multiple Choice Multiple Answer
Question
Which utilities are considered as infrastructural requirements?
Correct Answer Disposal of waste , Power , Water
Your Answer
Power , Labour , Water
Multiple Choice Single Answer
Question
What do you understand by the timeframe for the maintenance
needs of the equipment?
Correct Answer Maintenance inspection schedule
Your Answer
Maintenance inspection schedule
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in
setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in
setting
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low
product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer
Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the
facts critically, generating alternatives which form the basis for
selection and development of improved methods?
Correct Answer Critical examination
Your Answer
Critical examination
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer
Collaboration
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer Quality of design
Your Answer
Quality of conformance
Multiple Choice Multiple Answer
Question
Gross requirement of finished product is determined on the basis
of following
Correct Answer Forecasted sales , Pending sales order , Management decision
to stock
Your Answer
Pending sales order , Management decision to stock , Gross
Market requirement
Select The Blank
Question
The ________ includes preventive maintenance activities whose
needs are identified through inspection which requires stoppage
of machines.
Correct Answer Shutdown Maintenance
Your Answer
Working Maintenance
Select The Blank
Question
A set of activities to keep an equipment in the specified condition
is called as ________.
Correct Answer Maintenance
Your Answer
Maintenance
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing
Production?
Correct Answer Highly Skilled
Your Answer
Highly Skilled
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer
Operation
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the quality
of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer
Quality control
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory
as a process average.
Correct Answer Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using
mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Flow process charts do record movements as well as visual
pictures.
Correct Answer False
Your Answer
False
True/False
Question
The OC curve is based on the assumption that if the lot is large
in comparison to the sample, the probabilities of the OC curve
will follow a poisson distribution.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly
known as
Correct Answer Productivity
Your Answer
Productivity
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order
requires following documents
Correct Answer Sales Order , Work order , Shop order
Your Answer
Work order , Purchase order
Select The Blank
Question
The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuous
checking.
Correct Answer Condition monitoring
Your Answer
Preventive maintenance
Match The Following
Question
Correct Answer
Your Answer
Scheduling of interrelated Critical Path Analysis
activities of small projects
with consideration of
uncertainty of duration of
activities.
Critical Path Analysis
Two machines &
Johnson's Two Machine
processing time depends Algorithm
on sequence of job
loading
Johnson's Two Machine
Algorithm
Sufficient orders and
resonable choice of
machines
Index Method
Index Method
Time relationship between Critical Ratio Scheduling
when a product is
required and when it can
be made available
Time series
Select The Blank
Question
Production control work is ________ in case of floor inspection
as compared with the centralised inspection.
Correct Answer easier
Your Answer
easier
Match The Following
Question
Correct Answer
Your Answer
When to inspect
Stages of inspection
Specification
What to inspect
Specification
Standard
How to inspect
Inspection devices
Tools & Jigs
How much to inspect
Sampling or cent percent Stages of inspection
inspection
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer Production Planning
Your Answer
Process Planning
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
Reduce lead time
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct Answer Preparation of material estimates
Your Answer
Preparation of material estimates
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
In case of X bar-R charts, statistical limits are calculated from
averages of samples of n (4,5,…) instead of single sample of
large size to reduce the spread of natural variability.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Your Answer
Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer
Low Productivity
Select The Blank
Question
Production Planning is a centralised activity which includes
functions such as ________
Correct Answer Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the
manufacturer of a machine?
Correct Answer It gives instructions regarding installation and operation of the
equipment , It contains note on common troubles with causes
and remedies for troubleshooting , It enlists points, frequency
and type of lubrication
Your Answer
It gives instructions regarding installation and operation of the
equipment , It contains note on common troubles with causes
and remedies for troubleshooting
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct Answer Master production schedule , Product structure , Lead time for
procurement/manufacturing
Your Answer
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
True/False
Question
Necessity
Shape od an OC curve is a function of sample size and the
acceptance number.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective
maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Your Answer
Predictive Maintenance , Shutdown Maintenance
True/False
Question
For p-chart, "Inspection by variables" is much faster than
"Inspection by attributes"
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to
emergency actions.
Correct Answer Unexpected
Your Answer
Partial
True/False
Question
Cent percent inspection is a must if the inspection is of
destructive nature.
Correct Answer False
Your Answer
False
True/False
Question
Since value of p can never be positive, hence" if LCLp works out
to be positive, it is taken as zero."
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill
of material
Your Answer
Production schedule , Commercial standards , Assembly and
testing instructions
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using
mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial
engineering department to obtain the utilisation index?
Correct Answer Work Sampling Studies
Your Answer
Method Study
True/False
Question
An ideal OC curve is never possible only with cent percent
inspection.
Correct Answer False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted
by the sampling plan.
Correct Answer Consumer's risk
Your Answer
Producer's risk
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
True/False
Question
The operator should not stop production if first piece is not
approved by the inspector.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer Operation
Your Answer
Conversion
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which
can be carried out simultaneously and both activities require
definite time to finish?
Correct Answer Concurrent activities
Your Answer
Concurrent activities
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer
Dotted line
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by diverting
work to other machine.
Correct Answer Control board
Your Answer
Control board
Multiple Choice Single Answer
Question
What do you understand by PERT ?
Correct Answer Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting
or rejecting a particular site from legislation and taxation point of
view?
Correct Answer Labour laws , Building codes , Policies regarding issue of
licences
Your Answer
Labour laws , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the
achievement of quality?
Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer
Purpose of product , Process specifications , Quality of design
Select The Blank
Question
The ________ is the probability that a good lot will be rejected
by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
What do you mean by the project duration for which the total
cost is minimum?
Correct Answer Optimum duration
Your Answer
Optimum duration
True/False
Question
Originating process of raw material influence Process Planning
Correct Answer True
Your Answer
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the
facts critically, generating alternatives which form the basis for
selection and development of improved methods?
Correct Answer Critical examination
Your Answer
Development and selection
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic
inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer
Design-in Maintenance
Select The Blank
Question
The term ________ emplies the foregone profit due to inability
of company to produce.
Correct Answer Opportunity cost
Your Answer
Down time cost
True/False
Question
A network should employ only those dummy activities which are
absolutely necessary.
Correct Answer True
Your Answer
True
Select The Blank
Question
A set of activities to keep an equipment in the specified
condition is called as ________.
Correct Answer Maintenance
Your Answer
Maintenance
True/False
Question
While making X bar-R-chart, values of X bar and R are recoded
samplewise either on the extreme right of the individual
measurements on the data sheet or in a separate sheet.
Correct Answer True
Your Answer
False
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer Quality of design
Your Answer
Quality of inspection
True/False
Question
Even if any activity on the critical path is delayed, project
completes on the scheduled time.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than
numerical way, in case of Gantt chart ?
Correct Answer Graphical approach
Your Answer
Symbolic pproach
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling
plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling
plan
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work centre ,
Performance standards
Your Answer
Overlapping of operations , Effective Capacity per work centre ,
Performance standards
Select The Blank
Question
The ________ is necessary when the job requires detailed of
one or more of the job characteristics with the help of special
equipment which is not available at the producing company.
Correct Answer Inspection order
Your Answer
Stores issue order
Select The Blank
Question
The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuous
checking.
Correct Answer Condition monitoring
Your Answer
Condition monitoring
True/False
Question
Diversified labour is adequately available in rural area as
compared to urban area.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following cases indicated that the operation has
occurred?
Correct Answer Movement of components to assembly section , Raw material
movement , A worker's trip to grinder to sharpen the tools
Your Answer
Movement of components to assembly section , A worker's trip
to grinder to sharpen the tools , Tools kept in rack of tool crib
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates
that the process is in a state of statistical control?
Correct Answer Random variability
Your Answer
Set up variability
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory
as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data
during the method study?
Correct Answer Operation process chart , Multiple activity chart , Flow process
chart
Your Answer
Operation process chart , Multiple activity chart , Flow process
chart
True/False
Question
The operator should not stop production if first piece is not
approved by the inspector.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer
introduction of new product
Multiple Choice Single Answer
Question
What do you mean by a single event which represents the joint
completion of more than one activities?
Correct Answer Merge event
Your Answer
Merge event
True/False
Question
The control chart for number of defectives is more convenient to
make than control chart for fraction defectives sincethe fugure of
number of defectives units can be directly taken from the
inspection report.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer Fulkerson's Rule
Your Answer
Juran's Rule
True/False
Question
In case of two handed process chart, the simultaneous activities
of both hands are recorded opposite to each other on the chart.
Correct Answer True
Your Answer
True/False
Question
True
All activities lying on the non-critical paths must have total float
and free float.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Your Answer
Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Your Answer
Fixed position layout
Select The Blank
Question
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant
variability of the manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the
drawing
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of
work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer
True/False
Question
Job cards , Progress cards , Network updating
In case of backward pass computation, the latest event time of
the end event equals to the earliest event time minus duration of
that activity.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using
mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Match The Following
Question
Correct Answer
Your Answer
Scheduling Device
Strings
Strings
Interruption for machine
utilisation
Preventive maintenance
Preventive maintenance
Input for scheduling
Overlapping of operations Critical Path Analysis
Technique of scheduling
Critical Path Analysis
JIT
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer
Summary , Introduction , Analysis
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for
evaluation of layout in factor analysis method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer product is very heavy involving assembly of large number of
parts
Your Answer
product is very heavy involving assembly of large number of
parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as
bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer Commercial standards , Assembly and testing instructions , Bill
of material
Your Answer
Commercial standards , Assembly and testing instructions , Bill
of material
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing
tooling for most economic production run when
Correct Answer Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project
which is composed as series of connected arrows and circles to
describe the interrelationship of the activities involved?
Correct Answer Network
Your Answer
True/False
Flow chart
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted
by the sampling plan.
Correct Answer Consumer's risk
Your Answer
Consumer's risk
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method
during method study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort
involved in writing , Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective
part form ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the
sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort
during recording for method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are regulated to
the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal
and hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most
economic production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the
method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance
specifications
Your Answer Material specifications , Dimensional specifications , Performance
specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner
through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum
movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to
following reason
Correct Answer losses resulting from poor layout are not directly shown in the
financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial
statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any
of it's predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating
personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project
cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost
below it's normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth unhealthy
conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average
percentage defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improved
methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety
and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method
during method study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort
involved in writing , Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective
part form ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the
sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort
during recording for method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are regulated to
the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal
and hence any subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most
economic production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in
Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the
method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance
specifications
Your Answer Material specifications , Dimensional specifications , Performance
specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner
through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum
movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to
following reason
Correct Answer losses resulting from poor layout are not directly shown in the
financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial
statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any
of it's predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating
personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project
cost below it's normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost
below it's normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth unhealthy
conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average
percentage defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of improved
methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety
and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of
improved methods?
Correct Answer Critical examination
Your Answer
Development and selection
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of the plant
is constantly watched through systematic inspection to unearth unhealthy conditions
and preventive
Correct Answer Preventive Maintenance
Your Answer
Design-in Maintenance
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to
produce.
Correct Answer Opportunity cost
Your Answer
True/False
Question
Down time cost
A network should employ only those dummy activities which are absolutely necessary.
Correct Answer
True
Your Answer
True
Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as
________.
Correct Answer Maintenance
Your Answer
True/False
Question
Maintenance
Correct Answer
While making X bar-R-chart, values of X bar and R are recoded samplewise either on
the extreme right of the individual measurements on the data sheet or in a separate
sheet.
True
Your Answer
False
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of it's
usage.
Correct Answer Quality of design
Your Answer
Quality of inspection
True/False
Question
Correct Answer
Even if any activity on the critical path is delayed, project completes on the scheduled
time.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than numerical way, in case of
Gantt chart ?
Correct Answer Graphical approach
Your Answer
Symbolic pproach
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Your Answer
Overlapping of operations , Effective Capacity per work centre , Performance standards
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the
producing company.
Correct Answer Inspection order
Your Answer
Stores issue order
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer
True/False
Question
Condition monitoring
Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following cases indicated that the operation has occurred?
Correct Answer
Your Answer
Movement of components to assembly section , Raw material movement , A worker's
trip to grinder to sharpen the tools
Movement of components to assembly section , A worker's trip to grinder to sharpen
the tools , Tools kept in rack of tool crib
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates that the process is in a
state of statistical control?
Correct Answer Random variability
Your Answer
Set up variability
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer
Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data during the method
study?
Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer
True/False
Question
Operation process chart , Multiple activity chart , Flow process chart
The operator should not stop production if first piece is not approved by the inspector.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer
introduction of new product
Your Answer
introduction of new product
Multiple Choice Single Answer
Question
What do you mean by a single event which represents the joint completion of more
than one activities?
Correct Answer Merge event
Your Answer
Merge event
True/False
Question
Correct Answer
The control chart for number of defectives is more convenient to make than control
chart for fraction defectives sincethe fugure of number of defectives units can be
directly taken from the inspection report.
True
Your Answer
True
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Juran's Rule
True/False
Question
Correct Answer
In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.
True
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout
Select The Blank
Question
The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Job cards , Progress cards , Network updating
True/False
Question
Correct Answer
In case of backward pass computation, the latest event time of the end event equals to
the earliest event time minus duration of that activity.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Match The Following
Question
Correct Answer
Your Answer
Scheduling Device
Strings
Strings
Interruption for machine
utilisation
Preventive maintenance
Preventive maintenance
Input for scheduling
Overlapping of operations
Critical Path Analysis
Technique of scheduling
Critical Path Analysis
JIT
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer
Summary , Introduction , Body
Your Answer
Summary , Introduction , Analysis
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for evaluation of layout in factor
analysis method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is composed as
series of connected arrows and circles to describe the interrelationship of the activities
involved?
Correct Answer
Network
Your Answer
Flow chart
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Consumer's risk
POM assgn
True/False
Question
Flow process charts do record movements as well as visual pictures.
Correct Answer
False
Your Answer
False
True/False
Question
Correct Answer
The OC curve is based on the assumption that if the lot is large in comparison to
the sample, the probabilities of the OC curve will follow a poisson distribution.
False
Your Answer
True
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Select The Blank
Question
Work order , Purchase order
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Preventive maintenance
Match The Following
Question
Correct Answer
Your Answer
Scheduling of interrelated
activities of small projects with
consideration of uncertainty of
duration of activities.
Critical Path Analysis
Critical Path Analysis
Two machines & processing time
depends on sequence of job
loading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable
choice of machines
Index Method
Time relationship between when a Critical Ratio Scheduling
product is required and when it
can be made available
Index Method
Time series
Select The Blank
Question
Correct Answer
Production control work is ________ in case of floor inspection as compared with
the centralised inspection.
easier
Your Answer
easier
Match The Following
Question
Correct Answer
Your Answer
When to inspect
Stages of inspection
Specification
What to inspect
Specification
Standard
How to inspect
Inspection devices
Tools & Jigs
How much to inspect
Sampling or cent percent
inspection
Stages of inspection
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
Select The Blank
Question
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .
Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product
to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Reduce lead time
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct Answer
Preparation of material estimates
Your Answer
Preparation of material estimates
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
True/False
Question
Reduce material handling cost
Correct Answer
In case of X bar-R charts, statistical limits are calculated from averages of
samples of n (4,5,…) instead of single sample of large size to reduce the spread of
natural variability.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Low Productivity
Select The Blank
Question
Correct Answer
Production Planning is a centralised activity which includes functions such as
________
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s
is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the manufacturer of a
machine?
Correct Answer
It gives instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting ,
It enlists points, frequency and type of lubrication
Your Answer
It gives instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct Answer
Your Answer
Select The Blank
Question
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Master production schedule , Product structure , Lead time for
procurement/manufacturing
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
True/False
Question
Shape od an OC curve is a function of sample size and the acceptance number.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer
Predictive Maintenance , Shutdown Maintenance
True/False
Question
Correct Answer
For p-chart, "Inspection by variables" is much faster than "Inspection by
attributes"
False
Your Answer
True
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer
Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
Correct Answer
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Unexpected
Your Answer
Partial
True/False
Question
Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer
False
Your Answer
False
True/False
Question
Correct Answer
Since value of p can never be positive, hence" if LCLp works out to be positive, it
is taken as zero."
False
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Production schedule , Commercial standards , Assembly and testing instructions
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering department to
obtain the utilisation index?
Correct Answer
Work Sampling Studies
Your Answer
True/False
Question
Method Study
An ideal OC curve is never possible only with cent percent inspection.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling
plan.
Correct Answer
Consumer's risk
Your Answer
Producer's risk
Select The Blank
Question
Correct Answer
The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
True/False
Question
Correct Answer
The operator should not stop production if first piece is not approved by the
inspector.
False
Your Answer
False
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity
can be defined as
Correct Answer
Operation
Your Answer
Conversion
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?
Correct Answer
Concurrent activities
Your Answer
Concurrent activities
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct Answer
Thick Line , Red Line , Double Line
Your Answer
Dotted line
Select The Blank
Question
Correct Answer
A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
Control board
Your Answer
Control board
Multiple Choice Single Answer
Question
What do you understand by PERT ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of
quality?
Correct Answer
Quality of conformance , Purpose of product , Quality of design
Your Answer
Select The Blank
Question
Purpose of product , Process specifications , Quality of design
Correct Answer
The ________ is the probability that a good lot will be rejected by the sampling
plan.
Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
What do you mean by the project duration for which the total cost is minimum?
Correct Answer
Optimum duration
Your Answer
Optimum duration
True/False
Question
Originating process of raw material influence Process Planning
Correct Answer
True
Your Answer
True
POM assgn
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is call ed
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct
Answer
Your Answer
Dependent and independent
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Reduce material handling cost
Reduce material handling cost
As a general rule, the number of tail event of an activity is more than that of it's head
event.
False
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct
Answer
Your Answer
Producer's risk
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct
Answer
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct
Environmental specifications
Answer
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct
Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Large varaitions in hardness of material , Tool wear , Errors in setting
All activities must not be tied up into the network
False
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct
0.01 to 10%
Answer
Your Answer
0.01 to 10%
True/False
Question
Correct
Answer
Your Answer
In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and new
trial control limits for the remaining points are computed.
True
True
Multiple Choice Single Answe r
Question
What is the base for considering activity time as single time estimate or three time
estimate?
Correct
Level of uncertainty
Answer
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct
Acceptable quality level
Answer
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within
it's normal time?
Correct
Normal cost
Answer
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct
Answer
Your Answer
Necessity
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.
Correct
Control board
Answer
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Correct
Quality control
Answer
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct
Factory
Answer
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct
Answer
Your Answer
Hiring capacity
Hiring capacity
Multiple Choice Multiple Answer
Question
Correct
Answer
Your Answer
In an organization there may not be a formal PPC department if
Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method study?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Inspection order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.
False
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct
Sales Order , Work order , Shop order
Answer
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
To meet the intended function at lowest cost
Reduce lead time
Cent percent inspection is often more practical and economical than sampling inspection.
False
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct
Answer
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct
Answer
Your Answer
Project Evaluation & Review Technique
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct
Answer
Your Answer
Quality of design
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Study
traffic
traffic
Study
traffic
traffic
different plant layouts and select the most optimum one , Study the extent of
over the different routes of the plant , Identify the extent of backtracking, cross
and obstacles encountered during the movement of material.
different plant layouts and select the most optimum one , Study the extent of
over the different routes of the plant , Identify the extent of backtracking, cross
and obstacles encountered during the movement of material.
A load chart specifies the work to be carried out by each person of company during shift
hours.
False
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Material Specification , Sequence of operation , Skill of Labour
Material Specification , Sequence of operation , Skill of Labour
Cellular layout is based on the concept of Group Technology
True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct
Answer
Your Answer
Time
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct
Answer
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct
Condition monitoring
Answer
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct
Answer
Your Answer
Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department , Devising cures to
keep rate of production in line with schedule
Recording progress of work , Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to sales
department
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct
easier
Answer
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.
Correct
Overtime working
Answer
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct
Answer
Your Answer
True
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Activity
Activity
As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.
True
True
Independent float either affects the float of preceding activities or that of succeeding
activities.
False
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per
instruction is called
Correct
Work Order
Answer
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured by
Correct
Proportion of Cubic volume space utilized
Answer
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct
Operation
Answer
Your Answer
Operation
POM assgn
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
Correct Answer
As a general rule, the number of tail event of an activity is more than that of it's
head event.
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct Answer
0.01 to 10%
Your Answer
True/False
Question
0.01 to 10%
Correct Answer
In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and
new trial control limits for the remaining points are computed.
True
Your Answer
True
Multiple Choice Single Answe r
Question
What is the base for considering activity time as single time estimate or three time
estimate?
Correct Answer
Level of uncertainty
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity
within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
Correct Answer
Control board
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Correct Answer
Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer
Factory
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff
, Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the line staff
, Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method
study?
Correct Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
True/False
Question
Correct Answer
Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Reduce lead time
True/False
Question
Correct Answer
Cent percent inspection is often more practical and economical than sampling
inspection.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer
Quality of design
Your Answer
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Your Answer
True/False
Question
Study different plant layouts and select the most optimum one , Study the extent of
traffic over the different routes of the plant , Identify the extent of backtracking,
cross traffic and obstacles encountered during the movement of material.
Study different plant layouts and select the most optimum one , Study the extent of
traffic over the different routes of the plant , Identify the extent of backtracking,
cross traffic and obstacles encountered during the movement of material.
Correct Answer
A load chart specifies the work to be carried out by each person of company during
shift hours.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Your Answer
Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department , Devising cures to
keep rate of production in line with schedule
Recording progress of work , Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to sales
department
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct Answer
easier
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
True/False
Question
Overtime working
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
True/False
Question
Correct Answer
As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.
True
Your Answer
True
True/False
Question
Correct Answer
Independent float either affects the float of preceding activities or that of succeeding
activities.
False
Your Answer
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as
per instruction is called
Correct Answer
Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can
be defined as
Correct Answer
Operation
Your Answer
Operation
POM - Aish
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
What do you mean by the project duration for which the total
cost is minimum?
Correct Answer
Optimum duration
Your Answer
Optimum duration
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
Your Answer
under ordering , stockouts , Over ordering
Multiple Choice Single Answer
Question
Which kind of defect can be called as minor defect?
Correct Answer
Which does not reduce the usability of the product
for its intended use
Your Answer
Which does not reduce the usability of the product for its
intended use
Multiple Choice Single Answer
Question
What does CPA stand for?
Correct Answer
Critical Path Analysis
Your Answer
Critical Project Analysis
True/False
Question
Grouping of machines gives a lot of flexibility in loading and
scheduling
Correct Answer
True
Your Answer
True
True/False
Question
Fixed cost is lower in case of continuous production than
intermittent production.
Correct Answer
False
Your Answer
False
Select The Blank
Question
Function concerned with fixation of time allowed to qualified
worker for a job is called ________.
Correct Answer
Work Measurement
Your Answer
Time Measurement
Select The Blank
Page 1
POM - Aish
Question
The design of any layout is governed by large number of
factors and the best layout is expected to ________ all these factors.
Correct Answer
Optimise
Your Answer
Consider
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer
Continuous flow of material , Highly mechanised
material handling , Virtually zero manufacturing cycle time
Your Answer
Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer
Operators awaiting instructions from supervisor ,
Worker waiting for his turn at tools stores , Jobs awaiting at the machines for
their turn
Your Answer
Operators awaiting instructions from supervisor , Worker
waiting for his turn at tools stores , Jobs awaiting at the machines for their
turn
True/False
Question
Root cause of most of the breakdowns is failure of the
lubrication system.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in
a small network?
Correct Answer
Compare the durations of all paths to identify the
longest path. , Sum up the durations of activities along each path. , Enumerate
all paths in the network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each path. , Enumerate all
paths in the network and list down activities on each path.
Match The Following
Page 2
Question Correct Answer
POM - Aish
Your Answer
Emerson Efficiency Plan
Wage Payment
Craft
Facilities Planning
Wage Payment
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Multiple Choice Multiple Answer
Question
What are the benefits of overhauling?
Correct Answer
It increases useful life of an equipment and it's parts
, Advance planning allows to attend equipment without disturbing the production
programme , Advance planning allows to prepare and keep ready the list of
replacement spares
Your Answer
It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without disturbing the production
programme , Advance planning allows to prepare and keep ready the list of
replacement spares
True/False
Question
The event numbers as far as possible reflect the logical
relationships of the activities.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
True/False
Question
Proper care and storage is not an essential part of a well
planned lubrication system.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Page 3
POM - Aish
Question
Scale model used for layout analysis have following advantages
Correct Answer
Nontechnical person finds it easy to comprehend ,
Ovehead facilities can be shown , Models can be shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is
commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using
mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
True/False
Question
Theoretical capacity equals number of normal working hours
of that machine.
Correct Answer
True
Your Answer
True
True/False
Question
It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncritical activity.
Correct Answer
False
Your Answer
False
Select The Blank
Question
Production Planning is a centralised activity which includes
functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
True/False
Question
In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper and lower
statistical limits are worked out and inserted into a chart.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ is the process of assigning calender dates to
Page 4
POM - Aish
the various operations of a job.
Correct Answer
Scheduling
Your Answer
Scheduling
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
Which of the following cases indicates change in physical
characteristic?
Correct Answer
Turning , Grinding , Drilling
Your Answer
Turning , Grinding , Drilling
Match The Following
Question Correct Answer
Your Answer
Combined Layout Mixed Layout
Fixed Position Layout
Mixed Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout Functional Layout
Select The Blank
Question
Two welknown timing methods are cumulative method and
________.
Correct Answer
Fly back method
Your Answer
Continuous method
Multiple Choice Single Answer
Question
How many types of charts are used for the purpose of method
study?
Correct Answer
Four
Your Answer
Eight
Page 5
POM - Aish
True/False
Question
Sampling inspection suffice to check the work of line
inspectors and stage inspectors.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Where the ignorance towards the degradation of machine leads
to?
Correct Answer
Eventual breakdown
Your Answer
Eventual breakdown
Multiple Choice Single Answer
Question
One of the sophisticated operations research techniques used
in material planning is
Correct Answer
Dynamic programming
Your Answer
Dynamic programming
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low
product variety and large volumes?
Correct Answer
Low Skilled Labour & Special Purpose Machines
Your Answer
Low Skilled Labour & Special Purpose Machines
True/False
Question
It pays in the long run to inform the customer regarding
expected delays in the deliveries.
Correct Answer
True
Your Answer
True
Select The Blank
Question
The ________ is a set of tools and techniques by which
products are made to comply with the specifications at minimum cost to the
firm.
Correct Answer
Quality control system
Your Answer
Quality control system
Select The Blank
Question
A ________ is another typical chart which is used to record
frequency of movements between work centers.
Correct Answer
Travel chart
Your Answer
Frequency chart
True/False
Page 6
POM - Aish
Question
Cent percent inspection does not mean inspection of
component for 100% quality characteristics.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill
of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
Select The Blank
Question
Any incentive scheme must achieve the ________ of the
organisation.
Correct Answer
Objectives
Your Answer
Tax goals
Multiple Choice Single Answer
Question
Document raised by Sales department for goods manufactured
to stock is called
Correct Answer
Shipment order
Your Answer
Stock order
Multiple Choice Single Answer
Question
What do you understand by the timeframe for the
maintenance needs of the equipment?
Correct Answer
Maintenance inspection schedule
Your Answer
Maintenance inspection schedule
True/False
Question
Three time estimates are transformed into expected time
before using it into a network.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by planned corrective manitenance which
provides an opportunity to undertake design modifications in the equipment to
eliminate or reduce frequency of breakdowns.
Correct Answer
Design-out Maintenance
Your Answer
Design-in Maintenance
Page 7
POM assgn : Mayur
True/False
Question
Correct Answer
For p-chart, fraction defective units in each sample is calculated by dividing
number of defectives by the number of pieces in the sample.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using flow process
chart?
Correct Answer
Eliminating the operations or combining the operations with another ,
Reducing the distance traveled by the workmen or materials , Avoiding the
waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials , Avoiding the
waiting time and thereby reduce production losses , Eliminating the
operations or combining the operations with another
Select The Blank
Question
Correct Answer
The ________ is specified to indicate the maximum permissible variability
in the dimensions product or parts.
Tolerance
Your Answer
Tolerance
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a
product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Select The Blank
Question
Correct Answer
The ________ is the probability that a bad lot will be accepted by the
sampling plan.
Consumer's risk
Your Answer
Consumer's risk
Multiple Choice Single Answer
Question
Which element of a network represents a task which has got a definite
beginning and definite end?
Correct Answer
Activity
Your Answer
Activity
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Poor Customer Service
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Your Answer
Select The Blank
Question
Avaialability of adequate land at lower cost , Both
labour can be available , Plant expansion is easier
restriction for building and construction
Avaialability of adequate land at lower cost , Both
labour can be available , Plant expansion is easier
restriction for building and construction
skilled and unskilled
due to less or no
skilled and unskilled
due to less or no
Correct Answer
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Specifications
Your Answer
Specifications
Multiple Choice Multiple Answer
Question
Which are the first three steps of Critical Path Analysis technique?
Correct Answer
Activity relationships , Activity identification , Network construction
Your Answer
Activity relationships , Activity identification , Network construction
Select The Blank
Question
Correct Answer
Capacity decisions have a direct influence on performance of production
system in respect of ________
Delivery performance
Your Answer
Delivery performance
Select The Blank
Question
Correct Answer
The ________ pertain to the climatic conditions which the component ,
product or material should withstand.
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash
time )
Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash
time )
Your Answer
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts
critically, generating alternatives which form the basis for selection and
development of improved methods?
Correct Answer
Critical examination
Your Answer
True/False
Question
Critical examination
Correct Answer
During set up of X bar-R control chart, control limts should be practically
revised from time to time as additional data is accumulated.
True
Your Answer
True
Multiple Choice Multiple Ans wer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Part Sketch , Standard Time , Jigs and fixtures
True/False
Question
Every network does not necessarily have a critical path.
Correct Answer
False
Your Answer
False
Select The Blank
Question
Correct Answer
An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of
service.
Equipment history card
Your Answer
Equipment history card
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is called
Correct Answer
MRP
Your Answer
MRP
True/False
Question
Correct Answer
In case of two handed process chart, inspection symbol is used when check
by touch or feel is involved.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing order set as a
primary function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management advocated by F W
Taylor
Correct Answer
Selection of best worker for each particular task , Division of work between
worker and management , Training and development of the workmen
Your Answer
Selection of best worker for each particular task , Division of work between
worker and management , Training and development of the workmen
True/False
Question
Correct Answer
The OC curve is based on the assumption that if the lot is large in
comparison to the sample, the probabilities of the OC curve will follow a
poisson distribution.
False
Your Answer
False
True/False
Question
Correct Answer
Inspection order is must even for simple jobs which can be inspected by
shop inspector with the tooling available on shop.
False
Your Answer
False
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Breakdown
True/False
Question
Correct Answer
Cent percent inspection is often more practical and economical than
sampling inspection.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule
Select The Blank
Question
Correct Answer
The term ________ emplies the foregone profit due to inability of company
to produce.
Opportunity cost
Your Answer
Opportunity cost
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the
production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Multiple Choice Multiple Answer
Question
Which are the subfactors of community facilities or social infrastructure?
Correct Answer
Accomodation , Educational , Entertainment
Your Answer
Accomodation , Educational , Entertainment
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
True/False
Factory
Question
Only skilled worker can use the fixed limit gauge.
Correct Answer
False
Your Answer
False
Select The Blank
Question
Correct Answer
The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth
unhealthy conditions and preventive
Preventive Maintenance
Your Answer
Preventive Maintenance
Select The Blank
Question
Correct Answer
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Forwarding note
Your Answer
Forwarding note
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Single Answer
Question
What do you understand by totality of features and characteristics of a
product or service that bears on it's ability to satisfy the customer?
Correct Answer
Quality
Your Answer
Quality
Multiple Choice Single Answer
Question
What do you mean by a single event which represents the joint completi on
of more than one activities?
Correct Answer
Merge event
Your Answer
True/False
Question
Merge event
Correct Answer
All activities lying on the non-critical paths must have total float and free
float.
False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
Correct Answer
The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are
regulated to the extent desirable.
Quality control
Your Answer
Quality control
Match The Following
Question
Subtraction
Correct Answer
Your Answer
Removal of worn-out part from a
machine
Removal of worn-out part from a
machine
Change in chemical characteristic Chemical reaction
Chemical reaction
Consumption of effort
Posting a ledger
Posting a ledger
Information given
Giving directions or instructions
Giving directions or instructions
Multiple Choice Single Answer
Question
Product layout is employed for manufacturing following products
Correct Answer
refrigirators
Your Answer
refrigirators
POM assgn : Meena
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
Correct Answer
As a general rule, the number of tail event of an activity is more than that of it's head
event.
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Your Answer
Select The Blank
Question
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Correct Answer
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
Select The Blank
Question
Correct Answer
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Correct Answer
In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and
new trial control limits for the remaining points are computed.
True
Your Answer
True
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time estimate or three time
estimate?
Correct Answer
Level of uncertainty
Your Answer
Select The Blank
Question
Availability of labour
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity
within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Select The Blank
Question
Correct Answer
A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
Control board
Your Answer
Move order
Select The Blank
Question
Correct Answer
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer
Factory
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff
, Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the line staff
, Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method
study?
Correct Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
True/False
Question
Correct Answer
Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product
to
Correct Answer
To meet the intended function at lowest cost
Your Answer
True/False
Question
Reduce lead time
Correct Answer
Cent percent inspection is often more practical and economical than sampling
inspection.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer
Quality of design
Your Answer
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Your Answer
True/False
Question
Study different plant layouts and select the most optimum one , Study the extent of
traffic over the different routes of the plant , Identify the extent of backtracking, cross
traffic and obstacles encountered during the movement of material.
Study different plant layouts and select the most optimum one , Study the extent of
traffic over the different routes of the plant , Identify the extent of backtracking, cross
traffic and obstacles encountered during the movement of material.
Correct Answer
A load chart specifies the work to be carried out by each person of company during
shift hours.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Your Answer
Select The Blank
Question
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Your Answer
Select The Blank
Question
Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department , Devising cures to
keep rate of production in line with schedule
Recording progress of work , Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to sales
department
Correct Answer
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
easier
Your Answer
time consuming
Select The Blank
Question
Correct Answer
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
True/False
Question
Correct Answer
As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.
True
Your Answer
True
True/False
Question
Correct Answer
Independent float either affects the float of preceding activities or that of succeeding
activities.
False
Your Answer
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as
per instruction is called
Correct Answer
Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department
like Stores can be measured by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can
be defined as
Correct Answer
Operation
Your Answer
Operation
POM assgn : GS Kumars
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
Correct Answer
As a general rule, the number of tail event of an activity is more than that of it's head
event.
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Your Answer
Select The Blank
Question
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Correct Answer
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
False
Select The Blank
Question
Correct Answer
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Correct Answer
In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and
new trial control limits for the remaining points are computed.
True
Your Answer
True
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time estimate or three time
estimate?
Correct Answer
Level of uncertainty
Your Answer
Select The Blank
Question
Availability of labour
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quali ty level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity
within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Select The Blank
Question
Correct Answer
A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
Control board
Your Answer
Move order
Select The Blank
Question
Correct Answer
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer
Factory
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the line staff
, Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the line staff
, Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method
study?
Correct Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
True/False
Question
Correct Answer
Inspection order is must even for simple jobs which can be inspected by shop
inspector with the tooling available on shop.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product
to
Correct Answer
To meet the intended function at lowest cost
Your Answer
True/False
Question
Reduce lead time
Correct Answer
Cent percent inspection is often more practical and economical than sampling
inspection.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct Answer
Quality of design
Your Answer
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Your Answer
True/False
Question
Study different plant layouts and select the most optimum one , Study the extent of
traffic over the different routes of the plant , Identify the extent of backtracking, cross
traffic and obstacles encountered during the movement of material.
Study different plant layouts and select the most optimum one , Study the extent of
traffic over the different routes of the plant , Identify the extent of backtracking, cross
traffic and obstacles encountered during the movement of material.
Correct Answer
A load chart specifies the work to be carried out by each person of company during
shift hours.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Your Answer
Select The Blank
Question
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Your Answer
Select The Blank
Question
Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department , Devising cures to
keep rate of production in line with schedule
Recording progress of work , Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to sales
department
Correct Answer
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
easier
Your Answer
time consuming
Select The Blank
Question
Correct Answer
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
True/False
Question
Correct Answer
As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.
True
Your Answer
True
True/False
Question
Correct Answer
Independent float either affects the float of preceding activities or that of succeeding
activities.
False
Your Answer
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as
per instruction is called
Correct Answer
Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department
like Stores can be measured by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can
be defined as
Correct Answer
Operation
Your Answer
Operation
POM assgn
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is call ed
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Seema
Select The Blank
Question
The ________ is the process of withdrawing the equipment from the production line,
dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out
parts and finally building it up to get desired accuracies.
Correct
Reconditioning
Answer
Your Answer
Overhauling
Multiple Choice Single Answer
Question
What do you understand by the measurement of work to establish allowed time for a job
for the defined method?
Correct
Work measurement
Answer
Your Answer
Work measurement
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct
Answer
Your Answer
Productivity
Productivity
Multiple Choice Single Answer
Question
What is the location of lower control limit in the X bar-R control chart?
Correct
Answer
Your Answer
3 standard deviations below central line
2 standard deviations below central line
Match The Following
Question
Correct Answer
Your Answer
Factor Analysis
Method to evaluate layouts
Technique for evolving and
analysis of layouts
Minimization of production delays Objective of good layout
Principles of good layout
Maximum visibility
Principles of good layout
Layout analysis
Scale model
Layout analysis
Method to evaluate layouts
Multiple Choice Single Answer
Question
What is the name of the document on which details of the process are recorded by the
symbols and charting conventions?
Correct
Chart
Answer
Your Answer
Chart
Multiple Choice Single Answer
Question
Which kind of inspection is followed in case of process layout?
Correct
Answer
Your Answer
First off inspection
Cent percent inspection
Multiple Choice Multiple Answer
Question
Which of the following defects can be observed during preventive inspection by using
human senses?
Correct
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Answer
Your Answer
Deviation from normal sound , Excessive Vibration , Leakage of a gas
True/False
Question
Correct
Answer
Your Answer
Process Sheets for parts in batch production are not maintained as standard process
sheet
False
True
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.
Correct
Forwarding note
Answer
Your Answer
Move order
Select The Blank
Question
A set of activities to keep an equipment in the specified condition is called as ________.
Correct
Answer
Your Answer
Maintenance
Maintenance
Multiple Choice Multiple Answer
Question
What are the advantages of three dimensional models?
Correct
Answer
Your Answer
Overhead facilities can be shown , Can be shifted easily and quickly , Even non-technical
person can use it
Overhead facilities can be shown , Economical , Can be shifted easily and quickly
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct
Condition monitoring
Answer
Your Answer
Preventive maintenance
Multiple Choice Single Answer
Question
What do you understand by the selection of the job for the method study on the basis of
money saving potential of the job?
Correct
Economic consideration
Answer
Your Answer
Economic consideration
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in
respect of ________
Correct
Delivery performance
Answer
Your Answer
Quality
Multiple Choice Multiple Answer
Question
Which of the following are the objectives of a good maintenance system?
Correct
Answer
Your Answer
Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring
maximum plant availability
Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring
maximum plant availability
Match The Following
Question
Correct Answer
Your Answer
First off inspection
First piece produced after tool
change
First piece produced after tool
change
Critical operation inspection
After whose no rework is possible Last operation
Patrolling inspection
Inspection at the place of actual
production
Inspection at the place of actual
production
Key operation inspection
Costlier operation
After whose no rework is possible
True/False
Question
Correct
Answer
Your Answer
In case of backward pass computation, the latest event time of a tail event equals to the
latest event time of the succeeding ( Head ) event minus duration of the activity
converging to the head event..
True
True
Multiple Choice Multiple Answer
Question
Which of the following factors affect the quality control function?
Correct
Answer
Your Answer
Quality of workmanship , Production aids , Manufacturing facilities
Quality of workmanship , Production aids , Manufacturing facilities
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct
Answer
Your Answer
True/False
Refrigerator , Tyre for automobile , Television Set
Refrigerator , Tyre for automobile , Television Set
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Cent percent inspection does not mean inspection of component for 100% quality
characteristics.
True
True
Cellular layout is based on the concept of Group Technology
True
True
A lot declared rejected in sampling inspection should not be inspected 100% in any
case.
False
False
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?
Correct
Concurrent activities
Answer
Your Answer
Concurrent activities
True/False
Question
Correct
Answer
Your Answer
Recording of movement is not necessary in case of method study in any form.
False
False
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Correct
Shutdown Maintenance
Answer
Your Answer
Shutdown Maintenance
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct
easier
Answer
Your Answer
easier
True/False
Question
In case of backward pass computation, the latest event time of the burst event equals
the smallest of the difference between the latest event time of the head event less
duration of the activity converging on the head event.
Correct
Answer
Your Answer
True
True
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct
Unexpected
Answer
Your Answer
Unexpected
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method study?
Correct
Answer
Your Answer
Brazing , Welding , Riveting
Brazing , Welding , Riveting
Multiple Choice Multiple Answer
Question
Which kind of natural delays and interruptions are considered during estimation of
activity time?
Correct
Shop efficiency , Breakdowns , Absenteeism
Answer
Your Answer
Shop efficiency , Breakdowns , Absenteeism
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps the operating personnel?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Identify the presence of an assignable cause before it develops
Identify the presence of an assignable cause before it develops
Inspection Order can be a verbal order
True
True
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct
Answer
Your Answer
Over ordering , under ordering , stockouts
Over ordering , under ordering , stockouts
Multiple Choice Single Answer
Question
Inherent Safety' is one of the principle of good layout. In context of layout, this can be
achieved by the following
Correct
Answer
Your Answer
Clear gangway, location of material and material handling system
Proper plant location
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct
Answer
Your Answer
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question
Which are the general principles underlying probability aspects of project planning?
Correct
Answer
Your Answer
Statistically three time estimate of an activity conform to Beta distribution. , Expected
time divides the area under the curve into two equal parts. , Expected time of an activity
is located at one third of the distance between "m" and mid-range { (a+b)/2 } away
from the most likely time.
Statistically three time estimate of an activity conform to Beta distribution. , Expected
time divides the area under the curve into three equal parts. , Expected time of an
activity is located at one third of the distance between "m" and mid-range { (a+b)/2 }
away from the most likely time.
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.
Correct
One
Answer
Your Answer
0.5
True/False
Question
Correct
Answer
Your Answer
Grouping of machines gives a lot of flexibility in loading and scheduling
True
True
Select The Blank
Question
The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.
Correct
Tolerance
Answer
Your Answer
Tolerance
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct
Answer
Your Answer
Tight
Tight
Multiple Choice Multiple Answer
Question
Correct
Answer
Your Answer
Which are the first three steps of Critical Path Analysis technique?
Activity relationships , Activity identification , Network construction
Activity relationships , Activity identification , Network construction
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct
Acceptable quality level
Answer
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
What do you understand by the critical analysis of existing jobs to develop easier and
effective method?
Correct
Method study
Answer
Your Answer
Method study
Multiple Choice Multiple Answer
Question
Which utilities are considered as infrastructural requirements?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Disposal of waste , Power , Water
Power , Labour , Water
During set up of X bar-R control chart, control limts should be practically revised from
time to time as additional data is accumulated.
True
False
Multiple Choice Single Answer
Question
What do you understand by identification of defects in materials, components,
machining processes or men to fix responsibility of defectives, thereby preventing or
minimising occurance of defectives?
Correct
Preventive function
Answer
Your Answer
Preventive function
POM assgn : Naresh
True/False
Question
Objective of Work Study is to improve Productivity
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities and entry
points of materials are recorded to have graphic view of operations and
inspections involved in the process?
Correct Answer
Operation process chart
Your Answer
Flow Process chart
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Stress testing , Visual Testing , Magnetic flow detectors
Multiple Choice Single Answer
Question
What do you mean by the selection of the job for the method study on the
basis of manufacturing difficulties?
Correct Answer
Technical consideration
Your Answer
True/False
Question
Manufacturing consideration
Correct Answer
After goods have been manufactured, route sheets and operation layouts
should not be collected back.
False
Your Answer
False
True/False
Question
Correct Answer
Expediting action is necessary if the delays and interruptions are abnormal
and hence any subsequent delay is bound to extend the promised delivery
date.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity
times?
Correct Answer
Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. ,
Activity time may assume that just the normal quantity of resources
required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the
completion of an activity , Infinite resources are available to carry out the
activity , Activity time may assume that just the normal quantity of
resources required to carry out the activity are available.
Multiple Choice Multiple Answer
Question
Which are the distinguished features of TQM ?
Correct Answer
Covers all kinds of industries , Gradual removal of interdepartmental barriers
, Continuous improvement
Covers all kinds of industries , Continuous improvement , Corrective function
Your Answer
Multiple Choice Multiple Answer
Question
How many of the following are types of specification?
Correct Answer
Your Answer
Select The Blank
Question
Material specifications , Dimensional specifications , Performance
specifications
Cost specifications , Material specifications , Performance specifications
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Select The Blank
Question
Correct Answer
A ________helps to avoid crowding of jobs at a particular machine by
change of route of some of the jobs or by diverting work to other machine.
Control board
Your Answer
Control board
True/False
Question
Correct Answer
Site selection should also take into account topography and soil structure of
the land.
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
Correct Answer
The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity in a network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Select The Blank
Question
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .
Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Single Answer
Question
What is the purpose of squares used in progress chart?
Correct Answer
To record the progress of work for each operation
Your Answer
To record the progress of work for each operation
Select The Blank
Question
Correct Answer
An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of
service.
Equipment history card
Your Answer
Equipment specification sheet
Select The Blank
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
What do you understand by the properties which are difficult to measure
quantitatively but usually measured by the comarision and then classification
into acceptable or unacceptable?
Correct Answer
Attributes
Your Answer
Specifications
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer
No relation
Your Answer
No relation
True/False
Question
Correct Answer
Independent float either affects the float of preceding activities or that of
succeeding activities.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Crash cost
Multiple Choice Multiple Answer
Question
Which three of the following are causes of continuous upward pattern of
Xbar-R control chart?
Correct Answer
Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer
Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable Quality Level (AQL
)?
Correct Answer
Very high
Your Answer
Very high
Multiple Choice Multiple Answer
Question
Which of the following factors related to the labour and wages are considered
while deciding the plant location?
Correct Answer
Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer
Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage defectives in the
zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Select The Blank
Question
Lots having the percentage defective in AQL is equal to LPTD
Correct Answer
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of
Correct Answer
the job characteristics with the help of special equipment which is not
available at the producing company.
Inspection order
Your Answer
Inspection order
True/False
Question
Correct Answer
Quality can not be inspected into a product, it must be manufactured into it
by the supplier.
True
Your Answer
False
Select The Blank
Question
Correct Answer
The ________ is the probability that a good lot will be rejected by the
sampling plan.
Producer's risk
Your Answer
Producer's risk
True/False
Question
Correct Answer
A properly designed sampling plan can control sampling errors and
completely eliminate them.
False
Your Answer
True
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated route
sheet?
Correct Answer
After completion of operation
Your Answer
At the start of the operation
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process in
X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without actual measurements ,
Improper selection of samples
Your Answer
Biases in measurements , Defect in materials , Improper selection of
samples
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than numerical way,
in case of Gantt chart ?
Correct Answer
Graphical approach
Your Answer
True/False
Graphical approach
Question
Correct Answer
Kanban system is essentially a computer based system for production
scheduling and control
False
Your Answer
True
True/False
Question
Correct Answer
The earliest start time of an activity equals earliest time for the event from
which activity arrow originates.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following situations demand the technical consideration while
selecting a job for method study?
Correct Answer
Jobs having inconsistent quality , Operations inviting frequent requests from
supervisors for relaxation in allowed time because of variations in materials
and tool performance , Jobs in which too many man-hours are spend in
checking and rechecking work
Your Answer
Jobs having inconsistent quality , Operations inviting frequent requests from
supervisors for relaxation in allowed time because of variations in materials
and tool performance , Jobs in which too many man-hours are spend in
checking and rechecking work
Select The Blank
Question
Correct Answer
The ________ is specified to indicate the maximum permissible variability in
the dimensions product or parts.
Tolerance
Your Answer
Drawing
True/False
Question
Correct Answer
Theoretical capacity equals number of normal working hours of that
machine.
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Change in chemical characteristic Chemical reaction
Chemical reaction
Consumption of effort
Posting a ledger
Posting a ledger
Information given
Giving directions or instructions
Giving directions or instructions
Subtraction
Removal of worn-out part from a
machine
Removal of worn-out part from a
machine
Multiple Choice Multiple Answer
Question
Which are the factors on which the structure of the transportation cost
depends?
Correct Answer
Average distance of shipment , Characteristics of the commodity , Medium of
shipment
Your Answer
Select The Blank
Question
Average distance of shipment , Characteristics of the commodity , Medium of
shipment
Correct Answer
The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are
regulated to the extent desirable.
Quality control
Your Answer
Quality control
POM assgn : Raj
True/False
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Flow process charts do record movements as well as visual pictures.
False
False
The OC curve is based on the assumption that if the lot is large in comparison to the
sample, the probabilities of the OC curve will follow a poisson distribution.
False
True
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct
Answer
Your Answer
Productivity
Productivity
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct
Sales Order , Work order , Shop order
Answer
Your Answer
Work order , Purchase order
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct
Condition monitoring
Answer
Your Answer
Preventive maintenance
Match The Following
Question
Correct Answer
Your Answer
Scheduling of interrelated
activities of small projects with
consideration of uncertainty of
duration of activities.
Critical Path Analysis
Critical Path Analysis
Two machines & processing time
depends on sequence of job
loading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable
choice of machines
Index Method
Time relationship between when a Critical Ratio Scheduling
product is required and when it
can be made available
Index Method
Time series
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct
easier
Answer
Your Answer
easier
Match The Following
Question
Correct Answer
Your Answer
When to inspect
Stages of inspection
Specification
What to inspect
Specification
Standard
How to inspect
Inspection devices
Tools & Jigs
How much to inspect
Sampling or cent percent
inspection
Stages of inspection
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct
Answer
Your Answer
Production Planning
Process Planning
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal
to or better than AQL .
Correct
Rectangular
Answer
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct
Answer
Your Answer
To meet the intended function at lowest cost
Reduce lead time
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct
Answer
Your Answer
Preparation of material estimates
Preparation of material estimates
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct
Answer
Reduce material handling cost
Your Answer
True/False
Question
Correct
Answer
Your Answer
Reduce material handling cost
In case of X bar-R charts, statistical limits are calculated from averages of samples of n
(4,5,…) instead of single sample of large size to reduce the spread of natural variability.
True
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct
Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct
Answer
Your Answer
Reducing handling costs
Reducing handling costs
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct
Answer
Your Answer
Poor Customer Service
Low Productivity
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct
Answer
Your Answer
Scheduling
Scheduling
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct
Factory
Answer
Your Answer
Factory
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the manufacturer of a machine?
Correct
Answer
Your Answer
It gives instructions regarding installation and operation of the equipment , It contains
note on common troubles with causes and remedies for troubleshooting , It enlists
points, frequency and type of lubrication
It gives instructions regarding installation and operation of the equipment , It contains
note on common troubles with causes and remedies for troubleshooting
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct
Answer
Your Answer
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Necessity
Necessity
Shape od an OC curve is a function of sample size and the acceptance number.
True
False
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Predictive Maintenance , Shutdown Maintenance
For p-chart, "Inspection by variables" is much faster than "Inspection by attributes"
False
True
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct
Answer
Your Answer
Suitability of land
Suitability of land
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct
Unexpected
Answer
Your Answer
Partial
True/False
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Cent percent inspection is a must if the inspection is of destructive nature.
False
False
Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken
as zero."
False
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct
Answer
Your Answer
Time
Standard deviation
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct
Answer
Your Answer
Commercial standards , Assembly and testing instructions , Bill of material
Production schedule , Commercial standards , Assembly and testing instructions
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct
Answer
Your Answer
Refrigerator , Tyre for automobile , Television Set
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering department to obtain
the utilisation index?
Correct
Work Sampling Studies
Answer
Your Answer
Method Study
True/False
Question
Correct
Answer
Your Answer
An ideal OC curve is never possible only with cent percent inspection.
False
False
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct
Answer
Your Answer
Consumer's risk
Producer's risk
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.
Correct
Overtime working
Answer
Your Answer
Overtime working
True/False
Question
Correct
Answer
Your Answer
The operator should not stop production if first piece is not approved by the inspector.
False
False
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct
Operation
Answer
Your Answer
Conversion
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?
Correct
Concurrent activities
Answer
Your Answer
Concurrent activities
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct
Answer
Your Answer
Thick Line , Red Line , Double Line
Dotted line
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.
Correct
Control board
Answer
Your Answer
Control board
Multiple Choice Single Answer
Question
What do you understand by PERT ?
Correct
Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a particular
site from legislation and taxation point of view?
Correct
Labour laws , Building codes , Policies regarding issue of licences
Answer
Your Answer
Labour laws , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of quality?
Correct
Answer
Your Answer
Quality of conformance , Purpose of product , Quality of design
Purpose of product , Process specifications , Quality of design
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct
Answer
Your Answer
Producer's risk
Producer's risk
Multiple Choice Single Answer
Question
What do you mean by the project duration for which the total cost is minimum?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Optimum duration
Optimum duration
Originating process of raw material influence Process Planning
True
True
POM assgn : Raj
Multiple Choice Single Answer
Question
Which of the following data is unnecessary for scheduling process?
Correct Answer
Cost breakup of products
Your Answer
Cost breakup of products
Multiple Choice Single Answer
Question
Management often fails to realize the importance of efficient layout due to
following reason
Correct Answer
losses resulting from poor layout are not directly shown in the financial
statements
Your Answer
losses resulting from poor layout are not directly shown in the financial
statements
Multiple Choice Multiple Answer
Question
Which are the distinguished features of TQM ?
Correct Answer
Your Answer
Covers all kinds of industries , Gradual removal of interdepartmental barriers ,
Continuous improvement
Covers all kinds of industries , Continuous improvement , Corrective function
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
Your Answer
True/False
Question
It helps to identify the set of activities and events which are critical and as such
must be carefully controlled and monitored , It identifies activities to be given
preference in allocation of resources. , It helps to exercise "control by exception".
It helps to identify the set of activities and events which are critical and as such
must be carefully controlled and monitored , It identifies activities to be given
preference in allocation of resources. , It helps to exercise "control by exception".
Process layout is also called line layout
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Document raised by Sales department for goods manufactured to stock is called
Correct Answer
Shipment order
Your Answer
Stock order
Multiple Choice Multiple Answer
Question
Which of the following factors affect the quality control function?
Correct Answer
Quality of workmanship , Production aids , Manufacturing facilities
Your Answer
Quality of workmanship , Production aids , Manufacturing facilities
Multiple Choice Single Answer
Question
Which kind of defect can be called as minor defect?
Correct Answer
Which does not reduce the usability of the product for its intended use
Your Answer
Which does not reduce the usability of the product for its intended u se
Select The Blank
Question
Correct Answer
A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
Control board
Your Answer
Control board
Multiple Choice Single Answer
Question
What do you understand by totality of features and characteristics of a product or
service that bears on it's ability to satisfy the customer?
Correct Answer
Quality
Your Answer
Select The Blank
Question
Quality
Correct Answer
The ________ is the probability that a good lot will be rejected by the sampling
plan.
Producer's risk
Your Answer
Producer's risk
Match The Following
Question
Correct Answer
Your Answer
Change in physical characteristic
Punching
Assembly
Addition
Assembly
Posting a ledger
Consumption of physical effort
Lifting
Lifting
Information received
Taking dictation
Taking dictation
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Your Answer
Progress chasing to identify delays which may hold up production ,
Communicating possible delays in delivery date commitment to sales department ,
Devising cures to keep rate of production in line with schedule
Progress chasing to identify delays which may hold up production ,
Communicating possible delays in delivery date commitment to sales department ,
Devising cures to keep rate of production in line with schedule
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following situations
Correct Answer
Long Lead time for procurement , Several levels of assemblies in product , Long
manufacturing cycle
Your Answer
True/False
Question
Demand for the product is not known , Long Lead time for procurement , Long
manufacturing cycle
Specifications is the basic tool of inspection.
Correct Answer
True
Your Answer
True
True/False
Question
Shop order is one of the subsidiary order
Correct Answer
True
Your Answer
True
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
Select The Blank
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Select The Blank
Question
Correct Answer
An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of service.
Equipment history card
Your Answer
Equipment history card
True/False
Question
Correct Answer
Floor inspection promotes tendency of machines to drift out of limits and produce
defectives.
False
Your Answer
False
Select The Blank
Question
Correct Answer
The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
Multiple Choice Multiple Answer
Question
Which of the following observations are expected from the preventive
maintenance person?
Correct Answer
Wrong allignments , Overheating defects , Excessive play
Your Answer
Select The Blank
Question
Wrong allignments , Overheating defects , Excessive play
Correct Answer
The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.
Quality control system
Your Answer
Design system
Multiple Choice Multiple Answer
Question
Which are the first three steps of Critical Path Analysis technique?
Correct Answer
Activity identification , Network construction , Activity relationships
Your Answer
Activity relationships , Activity identification , Network construction
Multiple Choice Multiple Answer
Question
What are the benefits of inspection and quality control?
Correct Answer
Your Answer
Adequate maintenance of quality , Ensures parts are within specified limits of
accuracy , Gives economy in production through reduction of defective work
Adequate maintenance of quality , Ensures parts are within specified limits of
accuracy , Gives economy in production through reduction of defective work
Multiple Choice Multiple Answer
Question
Gross requirement of finished product is determined on the basis of following
Correct Answer
Forecasted sales , Pending sales order , Management decision to stock
Your Answer
Pending sales order , Management decision to stock , Gross Market requirement
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the occurances of defectives?
Correct Answer
On manufacturing process
Your Answer
On manufacturing process
True/False
Question
Correct Answer
Operation process charts though indicates the sequence of events but do not show
movements.
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by planned corrective manitenance which provides an
opportunity to undertake design modifications in the equipment to eliminate or
reduce frequency of breakdowns.
Correct Answer
Design-out Maintenance
Your Answer
Design-in Maintenance
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
Select The Blank
Question
Correct Answer
The ________ is the process of withdrawing the equipment from the production
line, dismantling it unitwise, visualising defects, effecting adjustments, replacing
worn -out parts and finally building it up to get desired accuracies.
Reconditioning
Your Answer
Reconditioning
Multiple Choice Single Answer
Question
Which varaible is taken along the ordinate or Y axis?
Correct Answer
Quality
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
What are the benefits of overhauling?
Correct Answer
Your Answer
Select The Blank
Question
It increases useful life of an equipment and it's parts , Advance planning allows to
attend equipment without disturbing the production programme , Advance
planning allows to prepare and keep ready the list of replacement spares
It increases useful life of an equipment and it's parts , Advance planning allows to
attend equipment without disturbing the production programme , It eliminates the
chances of breakdown
Correct Answer
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
0.01 to 10%
Your Answer
0.10 to 10%
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
True/False
Question
Skilled in one specific Manufacturing Process
Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer
False
Your Answer
False
True/False
Question
Job life is one of the factors that influence Process Planning
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
Plant Layout decisions are considered to be
Correct Answer
Strategic
Your Answer
Strategic
True/False
Question
Correct Answer
In case of X bar-R charts,it is ensured that the assignable causes are detected
before the tolerances are violated, upper and lower statistical limits are worked
out and inserted into a chart.
True
Your Answer
True
True/False
Question
Labour turnover rate is higher in case of rural area as compared to urban area.
Correct Answer
False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Number of defectives chart
np-chart
np-chart
Range chart
R chart
X chart
Fraction defective chart
p-chart
p-chart
Defects chart
c-chart
c-chart
Select The Blank
Question
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .
Rectangular
Your Answer
Bell
True/False
Question
Correct Answer
Cent percent inspection is required on WIP prior to the key, critical or costly
operation.
True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low product variety and large
volumes?
Correct Answer
Low Skilled Labour & Special Purpose Machines
Your Answer
Select The Blank
Question
Low Skilled Labour & Special Purpose Machines
Correct Answer
The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.
Tolerance
Your Answer
Tolerance
POM assgn : Senthil
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort in volved in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Deepak
True/False
Question
Correct Answer
Skill of labour force in a product type layout is usually higher than in the process type
of layout
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which information is recorded in an equipment card?
Correct Answer
Your Answer
True/False
Question
Date of commissioning , Equipment specifications , Name and address of
manufacturer
Date of commissioning , Equipment specifications , Name and address of
manufacturer
Suburban location provides the compromise netween rural and urban locations.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following information is available in summary of part in a chart during
methods study?
Correct Answer
Frequency of each symbol , Total time for each symbol , Total distance travelled by
the object
Your Answer
Frequency of each symbol , Total time for each symbol , Present and proposed
method
Multiple Choice Multiple Answer
Question
Which of the following activities can become a part of a preventive maintenance
system?
Correct Answer
Condition monitoring , Planned Lubrication , Preventive inspection
Your Answer
True/False
Question
Planned Lubrication , Overhauling , Preventive inspection
Correct Answer
In case of two handed process chart, storage symbol is used when either hand is
used as grip or vice to hold an object.
True
Your Answer
False
Select The Blank
Question
The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Correct Answer
Specifications
Your Answer
Standards
Multiple Choice Single Answer
Question
Correct Answer
Out of two basic criteria for the selection of a manufacturing method, one is, it must
be able to meet the specifications of final product and the other is, it must be
Cost effective method
Your Answer
Cost effective method
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer
Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Order Quantity
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in
respect of ________
Correct Answer
Delivery performance
Your Answer
True/False
Question
Delivery performance
Correct Answer
Activities whose earliest finish times and latest finish times are not equal constitutes
the critical path.
False
Your Answer
False
True/False
Question
An ideal OC curve is never possible only with cent percent inspection.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low product variety and large
volumes?
Correct Answer
Low Skilled Labour & Special Purpose Machines
Your Answer
Semiskilled Labour & General Purpose Machines
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
True/False
Question
Correct Answer
As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.
True
Your Answer
False
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of quality?
Correct Answer
Quality of conformance , Purpose of product , Quality of design
Your Answer
Quality of conformance , Purpose of product , Process specifications , Quality of
design
Multiple Choice Multiple Answer
Question
Which of the following industries justify the use of move order?
Correct Answer
Power plant , Steel plant , Heavy machinery manufacturing
Your Answer
Power plant , Steel plant , Heavy machinery manufacturing
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data during the method
study?
Correct Answer
Operation process chart , Multiple activity chart , Flow process chart
Your Answer
Single handed process chart , Operation process chart , Flow process chart
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Poor Customer Service
Multiple Choice Single Answer
Question
Which document is used for returning the surplus material?
Correct Answer
Stores Return Note
Your Answer
Stores Return Note
Multiple Choice Multiple Answer
Question
Which kind of natural delays and interruptions are considered during estimation of
activity time?
Correct Answer
Shop efficiency , Breakdowns , Absenteeism
Your Answer
Breakdowns , Absenteeism , Delay due to shortage of resources
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Production Planning , Manpower Planning
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of company to
produce.
Correct Answer
Opportunity cost
Your Answer
True/False
Question
Down time cost
Job life is one of the factors that influence Process Planning
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Network updating
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.
Correct Answer
Equipment history card
Your Answer
Equipment history card
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured by
Correct Answer
Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Open purchase order
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of
route of some of the jobs or by diverting work to other machine.
Correct Answer
Control board
Your Answer
Forwarding note
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
What do you mean by the study of repetitive short cycle operations which involve
quick hand / feet motions?
Correct Answer
Micromotion study
Your Answer
Cycle study
True/False
Question
The steeper the OC curve, the better is the discrimination between good and bad lots.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production schedule
in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Your Answer
Delay in receipt of material from vendor , Excessive absenteeism
Multiple Choice Single Answer
Question
Which is the next stage to the inspection based quality control in the historical
development of quality management.
Correct Answer
Quality assurance
Your Answer
Quality assurance
Multiple Choice Single Answer
Question
Which is the most popular scientific tool for project planning?
Correct Answer
Critical path analysis
Your Answer
Critical path analysis
True/False
Question
Planned lubrication is said to be the nervous system of the equipment.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What is the basic philosophy of statistical process control?
Correct Answer
Prevention is better than cure
Your Answer
Prevention is better than cure
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can
be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer
Product Planning
Your Answer
Order Processing
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer
Acceptable quality level
Your Answer
Acceptable quality level
Match The Following
Question
Correct Answer
Your Answer
Community Facilities
Educational facility
Educational facility
Proximity to market
Fragile product
Fragile product
Industrial and labour attitude
Productivity of labour
Productivity of labour
Legislation and taxation
Licenses
Licenses
POM assgn : Deepak
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Select The Blank
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Running Maintenance
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates that the process
is not in a state of statistical control?
Correct Answer
Assignable variability
Your Answer
Planned variability
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering department
to obtain the utilisation index?
Correct Answer
Work Sampling Studies
Your Answer
Break Even Analysis
Multiple Choice Single Answer
Question
Process type layout is suitable when
Correct Answer
there is wide variation in processing time of operations
Your Answer
Product is required in huge quantity
Multiple Choice Multiple Answer
Question
What are the advantages of three dimensional models?
Correct Answer
Your Answer
Select The Blank
Question
Even non-technical person can use it , Overhead facilities can be shown , Can be
shifted easily and quickly
Even non-technical person can use it , Overhead facilities can be shown ,
Economical
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Operation
True/False
Question
Since recording by descriptive method has it's limitations, it is not recommended
for use in method study.
Correct Answer
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
Correct Answer
The ________ pertain to the climatic conditions which the component , product
or material should withstand.
Environmental specifications
Your Answer
Material specifications
Multiple Choice Multiple Answer
Question
Which of the following situations demand that the human consideration should
be given preference over other considerations?
Correct Answer
Inconsistent earnings where the earnings are tied to output , Poor morale
evidenced by petty or trivial complaints , Repeated cases of accidents and health
hazards
Your Answer
Excessive rejections , Poor morale evidenced by petty or trivial complaints ,
Repeated cases of accidents and health hazards
Multiple Choice Multiple Answer
Question
Which are the different situations in which the process capability studies of the
various process are likely to fit?
Correct Answer
Process variability is just adequate , Good process variability but bad process
centering , Good process variability but poor process centering
Your Answer
Very good process variability but process is off-centre , Good process variability
but bad process centering , Good process variability but poor process centering
Select The Blank
Question
Correct Answer
A set of activities to keep an equipment in the specified condition is called as
________.
Maintenance
Your Answer
Maintenance
True/False
Question
Correct Answer
Feasibility of time schedule requires that an activity be scheduled before any of
it's predecessors are scheduled.
False
Your Answer
True
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Match The Following
Question
Correct Answer
Your Answer
Factor Analysis
Method to evaluate layouts
Method to evaluate layouts
Minimization of production delays Objective of good layout
Principles of good layout
Maximum visibility
Principles of good layout
Technique for evolving and
analysis of layouts
Scale model
Layout analysis
Modelling approach to layouts
Multiple Choice Multiple Answer
Question
Which of the following are the most suitable cases where we can use CPA as
effective technique of scheduling?
Correct Answer
Overhauling of a CNC machine , Purchase and installation of a newly imported
special purpose machine , Design, production and testing of prototype of a
fighter aircraft.
Your Answer
Overhauling of a CNC machine , Purchase and installation of a newly imported
special purpose machine , Production of batch of 1000 jobs on two machines
True/False
Question
Correct Answer
With a general OC curve, probability of acceptance of lots of good quality is
never unity.
True
Your Answer
True
Select The Blank
Question
Correct Answer
OC curve of ideal sampling plan suggests that all lots less than 3% defectives
have the probability of acceptance of ________.
One
Your Answer
Two
Select The Blank
Question
Correct Answer
The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at
the producing company.
Inspection order
Your Answer
Job card
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as
________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
Following is not an input information for Process Planning
Correct Answer
Inventory level
Your Answer
Standard Time Data
True/False
Question
All activities must not be tied up into the network
Correct Answer
False
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
False
True/False
Question
Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
One of the following is not a gross material
Correct Answer
cotton
Your Answer
Timber
True/False
Question
Correct Answer
Limit gauges are not useful when it is necessary to measure the exact amount of
variation.
True
Your Answer
False
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer
No relation
Your Answer
No relation
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct Answer
Thick Line , Red Line , Double Line
Your Answer
Thick Line , Dotted line
Multiple Choice Single Answer
Question
Which manufacturing method is ideal for the use of air gauges as inspection
device?
Correct Answer
Mass
Your Answer
Process
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer
Predictive Maintenance , Design-out Maintenance , Design-in Maintenance
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the manufacturer of a
machine?
Correct Answer
It gives instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting
, It enlists points, frequency and type of lubrication
Your Answer
It gives instructions regarding installation and operation of the equipment , It
contains note on common troubles with causes and remedies for troubleshooting
, It enlists points, frequency and type of lubrication
Select The Blank
Question
Correct Answer
The ________ is a set of tools and techniques by which products are made to
comply with the specifications at minimum cost to the firm.
Quality control system
Your Answer
Design system
Multiple Choice Single Answer
Question
Provision of drainage facilities is important for the following type of industry
Correct Answer
Chemical Process
Your Answer
Chemical Process
Multiple Choice Multiple Answer
Question
Which are three different bases to establish an activity time?
Correct Answer
Past experience , Judgement , Historical data
Your Answer
Actual measurement , Past experience , Historical data
Multiple Choice Single Answer
Question
Inherent Safety' is one of the principle of good layout. In context of layout, this
can be achieved by the following
Correct Answer
Clear gangway, location of material and material handling system
Your Answer
Clear gangway, location of material and material handling system
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Hardness , Burrs
True/False
Question
Correct Answer
Diversified labour is adequately available in rural area as compared to urban
area.
False
Your Answer
True
True/False
Question
Fixed cost is lower in case of continuous production than intermittent production.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Why graphical method of recording is preferred over the descriptive method
during method study?
Correct Answer
It segregates effective part form ineffective parts , It reduces effort involved in
writing , Critical examinations easier and more effective
Your Answer
It segregates effective part form ineffective parts , It reduces effort involved in
writing , Critical examinations easier and more effective
Multiple Choice Single Answer
Question
Process planning is the process of
Correct Answer
establishing shortest and most economic path of production
Your Answer
establishing shortest and most economic path of production
Multiple Choice Multiple Answer
Question
Which are the different types of flow process charts used for method study?
Correct Answer
Equipment type , Man type , Material type
Your Answer
True/False
Question
Equipment type , Material type , Operator type
Correct Answer
In case of X bar-R charts, statistical limits are calculated from averages of
samples of n (4,5,…) instead of single sample of large size to reduce the spread
of natural variabilit y.
True
Your Answer
True
Multiple Choice Single Answer
Question
How does motion economy prove useful in mass production?
Correct Answer
It improves work bench layout and evolve logical sequence of assembly of parts
Your Answer
It improves work bench layout and evolve logical sequence of assembly of parts
Select The Blank
Question
Correct Answer
The ________ is the probability that a bad lot will be accepted by the sampling
plan.
Consumer's risk
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
Correct Answer
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Forwarding note
Your Answer
Forwarding note
POM assgn : GS Kumars
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involved in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooli ng for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cycl egraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of stati stical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Raj
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of
improved methods?
Correct Answer
Critical examination
Your Answer
Select The Blank
Question
Development and selection
Correct Answer
The ________ advocates maintenance procedures whereby the condition of the
plant is constantly watched through systematic inspection to unearth unhealthy
conditions and preventive
Preventive Maintenance
Your Answer
Design-in Maintenance
Select The Blank
Question
Correct Answer
The term ________ emplies the foregone profit due to inability of company to
produce.
Opportunity cost
Your Answer
Down time cost
True/False
Question
Correct Answer
A network should employ only those dummy activities which are absolutely
necessary.
True
Your Answer
True
Select The Blank
Question
Correct Answer
A set of activities to keep an equipment in the specified condition is called as
________.
Maintenance
Your Answer
Maintenance
True/False
Question
Correct Answer
While making X bar-R-chart, values of X bar and R are recoded samplewise either
on the extreme right of the individual measurements on the data sheet or in a
separate sheet.
True
Your Answer
False
Select The Blank
Question
Correct Answer
The ________ must ensure that the product satisfy the functional requirements of
it's usage.
Quality of design
Your Answer
Quality of inspection
True/False
Question
Correct Answer
Even if any activity on the critical path is delayed, project completes on the
scheduled time.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than numerical way, in
case of Gantt chart ?
Correct Answer
Graphical approach
Your Answer
Symbolic pproach
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Your Answer
Select The Blank
Question
Overlapping of operations , Effective Capacity per work centre , Performance
standards
Overlapping of operations , Effective Capacity per work centre , Performance
standards
Correct Answer
The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at the
producing company.
Inspection order
Your Answer
Stores issue order
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
True/False
Question
Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following cases indicated that the operation has occurred?
Correct Answer
Your Answer
Movement of components to assembly section , Raw material movement , A
worker's trip to grinder to sharpen the tool s
Movement of components to assembly section , A worker's trip to grinder to
sharpen the tools , Tools kept in rack of tool crib
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates that the process
is in a state of statistical control?
Correct Answer
Random variability
Your Answer
Select The Blank
Question
Set up variability
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer
Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data during the method
study?
Correct Answer
Operation process chart , Multiple activity chart , Flow process chart
Your Answer
True/False
Question
Operation process chart , Multiple activity chart , Flow process chart
Correct Answer
The operator should not stop production if first piece is not approved by the
inspector.
False
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer
introduction of new product
Your Answer
introduction of new product
Multiple Choice Single Answer
Question
What do you mean by a single event which represents the joint completion of
more than one activities?
Correct Answer
Merge event
Your Answer
Merge event
True/False
Question
Correct Answer
The control chart for number of defectives is more convenient to make than
control chart for fraction defectives sincethe fugure of number of defectives units
can be directly taken from the inspection report.
True
Your Answer
True
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Juran's Rule
True/False
Question
Correct Answer
In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.
True
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Select The Blank
Question
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout
Correct Answer
The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Specifications
Your Answer
Specifications
Multiple Choice Single Answe r
Question
How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Job cards , Progress cards , Network updating
True/False
Question
Correct Answer
In case of backward pass computation, the latest event time of the end event
equals to the earliest event time minus duration of that activity.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Match The Following
Question
Correct Answer
Your Answer
Scheduling Device
Strings
Strings
Interruption for machine
utilisation
Preventive maintenance
Preventive maintenance
Input for scheduling
Overlapping of operations
Critical Path Analysis
Technique of scheduling
Critical Path Analysis
JIT
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer
Summary , Introduction , Body
Your Answer
Summary , Introduction , Analysis
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for evaluation of layout in
factor analysis method
Correct Answer
Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing tooling for most
economic production run when
Correct Answer
Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is
composed as series of connected arrows and circles to describe the
interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Flow chart
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s
is called
Correct Answer
Factory
Your Answer
Select The Blank
Question
Factory
Correct Answer
The ________ is the probability that a bad lot will be accepted by the sampling
plan.
Consumer's risk
Your Answer
Consumer's risk
POM assgn
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is call ed
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn : Rahul
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Your Answer
Select The Blank
Question
Eliminates problems and frequent breakdowns , Increases life of an
equipment , It helps to plan requirement of replacement spares
Eliminates problems and frequent breakdowns , Increases life of an
equipment , It helps to plan requirement of replacement spares
Correct Answer
Production control work is ________ in case of floor inspection as
compared with the centralised inspection.
easier
Your Answer
time consuming
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Moderate
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which of the following information is available in summary of part in a chart
during methods study?
Correct Answer
Frequency of each symbol , Total time for each symbol , Total distance
travelled by the object
Your Answer
Frequency of each symbol , Total time for each symbol , Present and
proposed method
True/False
Question
Correct Answer
Development of a good lubrication programme begins with the identification
of lubrication points.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity
times?
Correct Answer
Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. ,
Activity time may assume that just the normal quantity of resources
required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the
completion of an activity , Infinite resources are available to carry out the
activity , Activity time must be independent of any influence which the
preceding or succeeding activity may have on it.
Select The Blank
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
True/False
Question
Correct Answer
The operator should not stop production if first piece is not approved by the
inspector.
False
Your Answer
False
True/False
Question
Correct Answer
Sampling inspection suffice to check the work of line inspectors and stage
inspectors.
True
Your Answer
False
True/False
Question
Correct Answer
Feasibility of time schedule requires that an activity be scheduled before
any of it's predecessors are scheduled.
False
Your Answer
True
True/False
Question
Correct Answer
In case of backward pass computation method, the latest event time
represents the latest occurrence time of the event.
True
Your Answer
True
Select The Blank
Question
Correct Answer
Capacity decisions have a direct influence on performance of production
system in respect of ________
Delivery performance
Your Answer
Quality
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Engineering & Resources Technique
Select The Blank
Question
Correct Answer
An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of
service.
Equipment history card
Your Answer
Equipment history card
Select The Blank
Question
Correct Answer
The ________ breakdowns usually cost more, partly due to damage done
to the adjustment components and partly due to emergency actions.
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Which is the ideal place to write a time allotted for an activity in a network?
Correct Answer
Below the arrow
Your Answer
Below the arrow
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge
of the condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Overhauling
Multiple Choice Multiple Answer
Question
Which of the following factors related to the labour and wages are
considered while deciding the plant location?
Correct Answer
Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer
Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single Answer
Question
What do you mean by planned corrective manitenance which provides an
opportunity to undertake design modifications in the equipment to
eliminate or reduce frequency of breakdowns.
Correct Answer
Design-out Maintenance
Your Answer
True/False
Question
Design-in Maintenance
Correct Answer
It pays in the long run to inform the customer regarding expected delays in
the deliveries.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is a set of tools and techniques by which products are made
to comply with the specifications at minimum cost to the firm.
Quality control system
Your Answer
Quality control system
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing Production?
Correct Answer
Highly Skilled
Your Answer
Highly Skilled
Match The Following
Question
Correct Answer
Your Answer
Temperature of motor
Body
Watch
Exhaust gas
Smell
Smell
Air leakage
Listen
Listen
Corrosion
Watch
Body
Multiple Choice Single Answer
Question
Which is the most popular scientific tool for project planning?
Correct Answer
Critical path analysis
Your Answer
Fishbone diagram
Multiple Choice Single Answer
Question
One of the sophisticated operations research techniques used in material
planning is
Correct Answer
Dynamic programming
Your Answer
Select The Blank
Question
MAPI method
Correct Answer
A set of activities to keep an equipment in the specified condition is called
as ________.
Maintenance
Your Answer
Maintenance
True/False
Question
Correct Answer
Cent percent inspection is required on WIP prior to the key, critical or costly
operation.
True
Your Answer
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer
Operation
Your Answer
Select The Blank
Question
Manufacturing
Correct Answer
In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer
Study different plant layouts and select the most optimum one , Study the
Your Answer
extent of traffic over the different routes of the plant , Identify the extent of
backtracking, cross traffic and obstacles encountered during the movement
of material.
Study different plant layouts and select the most optimum one , Study the
extent of traffic over the different routes of the plant , Identify the extent of
backtracking, cross traffic and obstacles encountered during the movement
of material.
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
Skilled in one specific Manufacturing Process
Multiple Choice Single Answer
Question
What do you understand by the inspection conducted on all nonreworkable
jobs prior to their movement to the scrap yard?
Correct Answer
Salvage inspection
Your Answer
True/False
Question
Salvage inspection
Correct Answer
Cent percent inspection does not mean inspection of component for 100%
quality characteristics.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative
layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
True/False
Question
Flow of Material , Equipment utilization , Delivery performance
Correct Answer
In a control chart, as a general rule, time interval should be inversely
proportional to the average frequency of out of control conditions.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following situations demand the technical consideration while
selecting a job for method study?
Correct Answer
Jobs having inconsistent quality , Operations inviting frequent requests
from supervisors for relaxation in allowed time because of variations in
materials and tool performance , Jobs in which too many man-hours are
spend in checking and rechecking work
Your Answer
Excessive overtime , Operations inviting frequent requests from supervisors
for relaxation in allowed time because of variations in materials and tool
performance , Jobs in which too many man-hours are spend in checking
and rechecking work
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be
carried out simultaneously and both activities require definite time to
finish?
Correct Answer
Concurrent activities
Your Answer
Select The Blank
Question
Concurrent activities
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .
Rectangular
Your Answer
Oval
Multiple Choice Single Answer
Question
What is expected from stores department after they receive the stores
issue order from dispatcher?
Correct Answer
Keep material ready for issue to shop when authorized
Your Answer
Keep material ready for issue to shop when authorized
Multiple Choice Multiple Answer
Question
Which are the distinct functions of scientific quality control?
Correct Answer
Acceptance function , Preventive function , Assurance function
Your Answer
Feedback function , Preventive function , Assurance function
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
Your Answer
It helps to identify the set of activities and events which are critical and as
such must be carefully controlled and monitored , It identifies activities to
be given preference in allocation of resources. , It helps to exercise "control
by exception".
It helps to identify the set of activities and events which are critical and as
such must be carefully controlled and monitored , It identifies activities to
be given preference in allocation of resources. , It helps to exercise "control
by exception".
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following situations
Correct Answer
Your Answer
Long Lead time for procurement , Several levels of assemblies in product ,
Long manufacturing cycle
Long Lead time for procurement , Several levels of assemblies in product ,
Demand for the product is not known
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Planned lubrication is said to be the nervous system of the
equipment.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Features of Cellular layout are
Correct Answer It is a type of mixed layout , Uses concept of Group Technology
, Facilities are grouped in to cells
Your Answer
It is a type of mixed layout , Uses concept of Group Technology
, Facilities are grouped in to cells
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the
quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer
Quality control
Multiple Choice Multiple Answer
Question
What are the advantages of three dimensional models?
Correct Answer Even non-technical person can use it , Overhead facilities can
be shown , Can be shifted easily and quickly
Your Answer
Even non-technical person can use it , Overhead facilities can
be shown , Can be shifted easily and quickly
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer Predetermination of manufacturing requirements
Your Answer
Review of progress
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Question
Which are the three basic types of control chart by attribute?
Correct Answer p-chart , c-chart , np-chart
Your Answer
Xbar-R-chart , c-chart , np-chart
Select The Blank
Question
The term ________ emplies the foregone profit due to inability
of company to produce.
Correct Answer Opportunity cost
Your Answer
Opportunity cost
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer
Thick Line , Red Line , Double Line
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer
Low Productivity
Multiple Choice Single Answer
Question
What do you understand by the timeframe for the maintenance
needs of the equipment?
Correct Answer Maintenance inspection schedule
Your Answer
Material Requirement planning
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is
called
Correct Answer MRP
Your Answer
MRP
Match The Following
Question
Correct Answer
Your Answer
Scheduling Device
Strings
Critical Path Analysis
Interruption for machine
utilisation
Preventive maintenance
Overlapping of operations
Input for scheduling
Overlapping of operations Blackboard
Technique of scheduling
Critical Path Analysis
JIT
Multiple Choice Multiple Answer
Question
Plant Layout is concerned with optimum arrangement of the
following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer
Machines , Material Handling Equipment , Storage space
True/False
Question
Independent float either affects the float of preceding activities
or that of succeeding activities.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the basic requirements of the " Quality of Design "?
Correct Answer Identification of right product , Selection of appropriate features ,
Ensure that product renders satisfactory service to customer
Your Answer
Identification of right product , Selection of appropriate features ,
Ensure that product renders satisfactory service to customer
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct Answer Preparation of material estimates
Your Answer
indenting all required material
Multiple Choice Single Answer
Question
What do you mean by the verification of object against
predetermined standards of quality or quantity or both?
Correct Answer Inspection
Your Answer
Inspection
Multiple Choice Multiple Answer
Question
Which of the following symbols are used in flow process chart
but not used in operation process chart?
Correct Answer Storage , Delay , Transport
Your Answer
Delay , Inspection , Transport
Multiple Choice Multiple Answer
Question
Which are the distinguished features of TQM ?
Correct Answer Covers all kinds of industries , Gradual removal of
interdepartmental barriers , Continuous improvement
Your Answer
Covers all kinds of industries , Gradual removal of
interdepartmental barriers , Corrective function
True/False
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Production Planning , Manpower Planning
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities
and entry points of materials are recorded to have graphic view
of operations and inspections involved in the process?
Correct Answer Operation process chart
Your Answer
Operation process chart
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions
of the members of the body during method study?
Correct Answer Cyclograph
Your Answer
Cyclograph
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer Quality of design
Your Answer
Quality of conformance
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted
by the sampling plan.
Correct Answer Consumer's risk
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic
inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer
Design-in Maintenance
True/False
Question
In case of forward pass computation, the earliest event time of a
plain event equals the earliest event time of the preceding event
plus duration of activity emanating from the preceding event.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer
Probability that a bad lot will be accepted by the sampling
True/False
Question
An activity can share the same tail event and same head event
with any other activity.
Correct Answer False
Your Answer
True/False
Question
False
Expediting action is necessary if the delays and interruptions are
abnormal and hence any subsequent delay is bound to extend
the promised delivery date.
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for
evaluation of layout in factor analysis method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple Answer
Question
Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantity
mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish
Your Answer
A dimensional check with measuring instrument , Visual check
of burrs and finish , Check the operator performance
True/False
Question
Since value of c can never be negativee, hence" if LCLp works
out to be negative, it is taken as zero."
Correct Answer True
Your Answer
True
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer
Machine
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant
variability of the manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the
drawing
True/False
Question
Job life is one of the factors that influence Process Planning
Correct Answer True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using
mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
Necessity
True/False
Question
Process layout is also called line layout
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Which document is used for returning the surplus material?
Correct Answer Stores Return Note
Your Answer
Stores Return Note
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation in
method study recording?
Correct Answer Change in physical characteristic , Consumption of physical
effort , Change in chemical characteristic
Your Answer
Change in physical characteristic , Movement of material ,
Change in chemical characteristic
True/False
Question
Breakdown of machines, absenteeism of worker does not
dislocate the manufacturing activity in process layout
Correct Answer True
Your Answer
True
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by diverting
work to other machine.
Correct Answer Control board
Your Answer
Move order
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
True/False
Question
Sampling inspection is best suited when cost of inspection is
much higher than the loss arising from the acceptance of a
defective part.
Correct Answer True
Your Answer
True
Select The Blank
Question
The ________ advocates maintenance procedures whereby the
condition of the plant is constantly watched through systematic
inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer
Preventive Maintenance
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer
Poor Customer Service
True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer False
Your Answer
False
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory
as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
True/False
Question
Inspection Order can be a verbal order
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer Product Planning
Your Answer
Product Planning
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Maintenance function must be decentralised apart from a size of
a manufacturing organisation for it's better functioning.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Your Answer
Highly mechanised material handling
Select The Blank
Question
The ________ is a set of tools and techniques by which
products are made to comply with the specifications at minimum
cost to the firm.
Correct Answer Quality control system
Your Answer
Production system
Multiple Choice Single Answer
Question
What do you understand by the extent the products
manufactured conforms to the laid down design?
Correct Answer Quality of conformance
Your Answer
Quality of conformance
Multiple Choice Multiple Answer
Question
Which of the following observations are expected from the
preventive maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer
Wrong allignments , Overheating defects , Excessive play
Select The Blank
Question
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant
variability of the manufacturing process?
Correct Answer Inclusion of certain tolerance on the basic dimensions in the
drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the
drawing
Select The Blank
Question
The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.
Correct Answer Tolerance
Your Answer
Tolerance
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
Capacity decisions have a direct influence on performance of
production system in respect of ________
Correct Answer Delivery performance
Your Answer
Delivery performance
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted
by the sampling plan.
Correct Answer Consumer's risk
Your Answer
Consumer's risk
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?
Correct Answer Preventive inspection schedule , Cleaning and upkeep schedule
, Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep schedule
, Lubrication schedule
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer Summary , Introduction , Body
Your Answer
True/False
Summary , Introduction , Analysis
Question
F W Taylor devised a system for classifying motions into basic
divisions called Therbligs
Correct Answer False
Your Answer
False
True/False
Question
A properly designed sampling plan can control sampling errors
and completely eliminate them.
Correct Answer False
Your Answer
False
True/False
Question
Since value of p can never be positive, hence" if LCLp works out
to be positive, it is taken as zero."
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some maintenance
related characteristics by making use of human senses, when
equipment is in operation?
Correct Answer Extrernal inspection
Your Answer
Daily inspection
Multiple Choice Multiple Answer
Question
Which of the following information is available in summary of
part in a chart during methods study?
Correct Answer Frequency of each symbol , Total time for each symbol , Total
distance travelled by the object
Your Answer
Frequency of each symbol , Total time for each symbol ,
Present and proposed method
Multiple Choice Single Answer
Question
Which kind of labour force is required in case of Jobbing
Production?
Correct Answer Highly Skilled
Your Answer
True/False
Question
Semiskilled
In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated, upper
and lower statistical limits are worked out and inserted into a
chart.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the existing
method during method study?
Correct Answer Charts , Diagrams , Templates or models
Your Answer
Charts , Diagrams , Templates or models
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing
the production schedule in a factory?
Correct Answer Errors in drawings , Delay in receipt of material from vendor ,
Excessive absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor ,
Excessive absenteeism
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Single Answer
Question
Following is one of the tasks of Production Control
Correct Answer Actual issue of forms and documents
Your Answer
Actual issue of forms and documents
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
Reducing handling costs
True/False
Question
A lot declared rejected in sampling inspection should not be
inspected 100% in any case.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and
address of manufacturer
Your Answer
Equipment specifications
Multiple Choice Multiple Answer
Question
Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantity
mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish
Your Answer
Physical count of incoming material against the quantity
mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish
Multiple Choice Multiple Answer
Question
What is the basic minimum requirement for those who are
responsible for the quality of design?
Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and
production process adopted by industries in the developed
market , Continuous effort in product development
Your Answer
In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and
production process adopted by industries in the developed
market , Continuous effort in product development
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
True/False
Question
Regular lubrication with carefully selected lubricants is an
essential factor in the maintenance of high grade machine tools
working under continuous load.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Following is not an input information for Process Planning
Correct Answer Inventory level
Your Answer
Drawings
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than
3% defectives have the probability of acceptance of ________.
Correct Answer One
Your Answer
One
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is
called
Correct Answer MRP
Your Answer
CPM
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose
of making any product/s is called
Correct Answer Factory
Your Answer
True/False
Question
Factory
Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer
True
True/False
Question
The OC curve is based on the assumption that if the lot
is large in comparison to the sample, the probabilities of
the OC curve will follow a poisson distribution.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer To forecast the defect , To identify causes of major
repetative failures , To quantify the frequency of
preventive inspection
Your Answer
To forecast the defect , To identify causes of major
repetative failures , To quantify the frequency of
preventive inspection
True/False
Question
Systematic maintenance system can completely
eliminate the wear and tear of machines.
Correct Answer False
Your Answer
False
Select The Blank
Question
Production control work is ________ in case of floor
inspection as compared with the centralised inspection.
Correct Answer easier
Your Answer
time consuming
True/False
Question
Originating process of raw material influence Process
Planning
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer Activity
Your Answer
Activity
Multiple Choice Single Answer
Question
What do you mean by the selection of the job for the
method study on the basis of manufacturing difficulties?
Correct Answer Technical consideration
Your Answer
Manufacturing consideration
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer
Shop Supervisor
True/False
Question
Fixed cost is lower in case of continuous production than
intermittent production.
Correct Answer False
Your Answer
True
Select The Blank
Question
An ________ history card is the record of all repairs,
replacements and engineering changes carried out in the
equipment during it's period of service.
Correct Answer Equipment history card
Your Answer
Equipment history card
True/False
Question
Grouping of machines gives a lot of flexibility in loading
and scheduling
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled
and unskilled labour can be available , Plant expansion
is easier due to less or no restriction for building and
construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled
and unskilled labour can be available , Plant expansion
is easier due to less or no restriction for building and
construction
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively
employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some
maintenance related characteristics by making use of
human senses, when equipment is in operation?
Correct Answer Extrernal inspection
Your Answer
Daily inspection
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of
Labour
Your Answer
Material Specification , Sequence of operation , Order
Quantity
Multiple Choice Single Answer
Question
Data from Process Sheet can be used to
Correct Answer Prepare load and schedule charts
Your Answer
Prepare load and schedule charts
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is
commonly known as
Correct Answer Productivity
Your Answer
Productivity
Match The Following
Question
Correct Answer
Your Answer
Net requirement of
material under MRP
Stock on hand
Stock on hand
Fixation of inventory
level
Reorder level
Reorder level
Symptom of ill planned Over ordering
purchasing
Over ordering
Factor influencing
material planning
Price of material
Lead time
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by
using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Select The Blank
Question
The ________ is necessary when the job requires
detailed of one or more of the job characteristics with the
help of special equipment which is not available at the
producing company.
Correct Answer Inspection order
Your Answer
Job card
True/False
Question
Limit gauges are not useful when it is necessary to
measure the exact amount of variation.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
Reducing handling costs
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good
quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer
0.10 to 10%
Select The Blank
Question
The ________ is the maximum percentage defective that
for the purpose of sampling inspection can be
considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project
Production?
Correct Answer Continuous flow of material , Highly mechanised material
handling , Virtually zero manufacturing cycle time
Your Answer
Continuous flow of material , Virtually zero manufacturing
cycle time
Select The Blank
Question
Goods after final inspection should accompany
________to enable dispatch department to identify and
draw correct reference.
Correct Answer Forwarding note
Your Answer
Move order
Select The Blank
Question
Production Planning is a centralised activity which
includes functions such as ________
Correct Answer Scheduling
Your Answer
Expediting
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical
path in a small network?
Correct Answer Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each
path. , Enumerate all paths in the network and list down
activities on each path.
Your Answer
Compare the durations of all paths to identify the longest
path. , Sum up the durations of activities along each
path. , Enumerate all paths in the network and list down
activities on each path.
Select The Blank
Question
Capacity decisions have a direct influence on
performance of production system in respect of
________
Correct Answer Delivery performance
Your Answer
Delivery performance
True/False
Question
Floor inspection promotes tendency of machines to drift
out of limits and produce defectives.
Correct Answer False
Your Answer
False
True/False
Question
Even if any activity on the critical path is delayed, project
completes on the scheduled time.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a
network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer
Thick Line , Red Line , Double Line
Multiple Choice Single Answer
Question
Which phase of method study is concerned with
analyzing the facts critically, generating alternatives
which form the basis for selection and development of
improved methods?
Correct Answer Critical examination
Your Answer
Development and selection
True/False
Question
Operation Process Chart provides information on time
and distances
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
The document which incorporates details of process
planning for a job is called
Correct Answer Route Sheet
Your Answer
Route Sheet
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby
adding some value to entity can be defined as
Correct Answer Operation
Your Answer
Manufacturing
Select The Blank
Question
The ________ are the definitions of the measurable as
well as nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
Multiple Choice Multiple Answer
Question
Which of the following method can be adopted to
overcome the problem of rushing up a job for it's timely
completion?
Correct Answer Use of optimum speeds and feeds , Subcontracting , Job
splitting
Your Answer
Use alternative materials , Subcontracting , Job splitting
Multiple Choice Multiple Answer
Question
What is the basic minimum requirement for those who
are responsible for the quality of design?
Correct Answer In depth knowledge about alternative materials and
manufacturing processes , access to latest technology
and production process adopted by industries in the
developed market , Continuous effort in product
development
Your Answer
In depth knowledge about alternative materials and
manufacturing processes , access to latest technology
and production process adopted by industries in the
developed market , Continuous effort in product
development
Multiple Choice Single Answer
Question
Following is not an input information for Process
Planning
Correct Answer Inventory level
Your Answer
Drawings
Multiple Choice Single Answer
Question
Which kind of inspection is followed in case of product
layout?
Correct Answer Pilot inspection
Your Answer
Vendor inspection
Match The Following
Question
Correct Answer
Your Answer
Bottom compartment of Bunch of work orders
control board
arranged in a sequence
in which they are to be
processed.
Bunch of work orders
arranged in a sequence
in which they are to be
processed.
Control board
Pictorial view of
Pictorial view of machine
machine loading activity loading activity
Top compartment of
control board
Work order of item
Work order of item
currently being worked currently being worked
on the machine
Middle compartment of Work order of item to
control board
be processed next on
the machine
on the machine
Work order of item to be
processed next on the
machine
Select The Blank
Question
The ________ is the probability that a bad lot will be
accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer
Consumer's risk
Multiple Choice Single Answer
Question
How to reveal the capability of the sampling plan to
discriminate between good lots and bad lots?
Correct Answer Operating characteristics curve ( OC )
Your Answer
Operating characteristics curve ( OC )
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
Correct Answer
Your Answer
An Ideal OC curve is ________ shaped curve that accpets all
the lots with quality equal to or better than AQL .
Rectangular
Rectangular
Multiple Choice Multiple Answer
Question
How the concept of float is helpful to planners?
Correct Answer
To decide priorities in allocation of resources , To minimize the
requirement of resources , To prevent peaks and valleys in
requirement of resources
Your Answer
To minimize the requirement of resources , To prevent peaks
and valleys in requirement of resources , To decide priorities in
allocation of resources
Multiple Choice Single Answer
Question
The product layout has following disadvantage
Correct Answer
Layout is not flexible
Your Answer
Layout is not flexible
Multiple Choice Single Answer
Question
What do you understand by the difference between the
specification limits within which manufacturing process is
expected to produce?
Correct Answer
Design tolerance
Your Answer
Design tolerance
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities
which can be carried out simultaneously and both activities
require definite time to finish?
Correct Answer
Concurrent activities
Your Answer
True/False
Question
Concurrent activities
Correct Answer
Complexity and difficulty of Planning is influenced by types of
layout
True
Your Answer
True
True/False
Question
Dispatching function is not a part of Production Planning
Correct Answer
True
Your Answer
False
True/False
Question
Correct Answer
Sample sizes for the construction of p-chart are typicaly larger
that for Xbar-R-charts.
True
Your Answer
Select The Blank
Question
True
Correct Answer
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Quality of design
Your Answer
Quality of design
Select The Blank
Question
Correct Answer
The term ________ emplies the foregone profit due to inability
of company to produce.
Opportunity cost
Your Answer
Opportunity cost
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of
the process in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without actual
measurements , Improper selection of samples
Your Answer
Biases in measurements , Recording done without actual
measurements , Improper selection of samples
Multiple Choice Multiple Answer
Question
Which of the following method can be adopted to overcome
the problem of rushing up a job for it's timely completion?
Correct Answer
Job splitting , Use of optimum speeds and feeds ,
Subcontracting
Your Answer
Subcontracting , Job splitting
Select The Blank
Question
Correct Answer
The ________ is the probability that a bad lot will be accepted
by the sampling plan.
Consumer's risk
Your Answer
Consumer's risk
Match The Following
Question
Correct Answer
Your Answer
What to inspect
Specification
Specification
How to inspect
Inspection devices
Inspection devices
How much to inspect
Sampling or cent percent
inspection
Sampling or cent percent
inspection
When to inspect
Stages of inspection
Stages of inspection
True/False
Question
Correct Answer
Flow process charts do record movements as well as visual
pictures.
False
Your Answer
False
True/False
Question
Originating process of raw material influence Process Planning
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following variables which operate periodically are
the reasons for the cyclic pattern depicting peaks and valleys
during Xbar-R control chart?
Correct Answer
Wornout positions , Fatigue , Roller eccentricity
Your Answer
Wornout positions , Fatigue , Roller eccentricity
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while
selecting or rejecting a particular site from legislation and
taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of
licences
Your Answer
Labour laws , Building codes , Policies regarding issue of
licences
True/False
Question
Cent percent inspection is a must if the inspection is of
destructive nature.
Correct Answer
False
Your Answer
False
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Select The Blank
Question
Correct Answer
The ________ breakdowns usually cost more, partly due to
damage done to the adjustment components and partly due to
emergency actions.
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Plant location decisions concern following type of
organizations
Correct Answer
Manufacturing and service organizations
Your Answer
Manufacturing and service organizations
Multiple Choice Multiple Answer
Question
Following are some of the Principles of Management
advocated by F W Taylor
Correct Answer
Your Answer
True/False
Question
Selection of best worker for each particular task , Division of
work between worker and management , Training and
development of the workmen
Selection of best worker for each particular task , Division of
work between worker and management , Training and
development of the workmen
Correct Answer
As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future
expansion.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
What is the basic minimum requirement for those who are
responsible for the quality of design?
Correct Answer
In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and
production process adopted by industries in the developed
market , Continuous effort in product development
Your Answer
In depth knowledge about alternative materials and
manufacturing processes , access to latest technology and
production process adopted by industries in the developed
market , Continuous effort in product development
Match The Following
Question
Correct Answer
Your Answer
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Emerson Efficiency Plan
Wage Payment
Wage Payment
Multiple Choice Single Answer
Question
What do you understand by inspection conducted on all jobs
received back from a customer as defectives?
Correct Answer
Appraisal inspection
Your Answer
Appraisal inspection
Multiple Choice Multiple Answer
Question
Which of the following are the major steps of making of the X
bar-R control chart?
Correct Answer
Collection of data , Claculation of mean,range,grand average
and mean range , Set up control chart for average and
calculate control limits of range chart
Your Answer
Collection of data , Claculation of mean,range,grand average
and mean range , Set up control chart for average and
calculate control limits of range chart
Multiple Choice Single Answer
Question
What do you understand by identification of defects in
materials, components, machining processes or men to fix
responsibility of defectives, thereby preventing or minimising
occurance of defectives?
Correct Answer
Preventive function
Your Answer
Preventive function
Multiple Choice Single Answer
Question
What do you mean by planned corrective manitenance which
provides an opportunity to undertake design modifications in
the equipment to eliminate or reduce frequency of
breakdowns.
Correct Answer
Design-out Maintenance
Your Answer
Design-out Maintenance
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Breakdown
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to prepare
and follow as a part of preventive maintenance system?
Correct Answer
Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity in a
network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer
Factory
Your Answer
Factory
Select The Blank
Question
The ________ is the probability that a good lot will be rejected
by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress
of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating
Multiple Choice Single Answer
Question
What does the additional cost incurred to reduce the duration
of an activity by one unit of time represent?
Correct Answer
Activity cost slope
Your Answer
Select The Blank
Question
Activity cost slope
Correct Answer
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is
________.
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly
known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer
Operation
Your Answer
True/False
Question
Operation
Correct Answer
An activity can share the same tail event and same head event
with any other activity.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
What are the benefits of inspection and quality control?
Correct Answer
Adequate maintenance of quality , Ensures parts are within
specified limits of accuracy , Gives economy in production
through reduction of defective work
Your Answer
Adequate maintenance of quality , Ensures parts are within
specified limits of accuracy , Gives economy in production
through reduction of defective work
Multiple Choice Multiple Answer
Question
Which utilities are considered as infrastructural requirements?
Correct Answer
Disposal of waste , Power , Water
Your Answer
Disposal of waste , Power , Water
Select The Blank
Question
Correct Answer
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
POM assgn
Multiple Choice Multiple Answer
Question Why graphical method of recording is preferred over the descriptive method during method
study?
Correct Answer It segregates effective part form ineffective parts , It reduces effort involv ed in writing ,
Critical examinations easier and more effective
Your Answer Critical examinations easier and more effective , It segregates effective part form
ineffective parts , It reduces effort involved in writing
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which of the following are examples of consumption of physical effort during recording for
method study?
Correct Answer Bending , Positioning , Unloading
Your Answer Bending , Positioning , Unloading
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Select The Blank
Question The ________ are the definitions of the measurabl e as well as nonmeasurable characteristics
of the product.
Correct Answer Specifications
Your Answer Specifications
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Quality control
True/False
Question Expediting action is necessary if the delays and interruptions are abnormal and hence any
subsequent delay is bound to extend the promised delivery date.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process Engineer does not get sufficient time for designing tooling for most economic
production run when
Correct Answer Delivery time is less
Your Answer Delivery time is less
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
True/False
Question Breakdown of machines, absenteeism of worker does not dislocate the manufacturing activity
in process layout
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Acceptable quality level
Multiple Choice Single Answer
Question What do you mean by lowest possible direct cost required to complete an activity within it's
crashed time?
Correct Answer Crash cost
Your Answer Crash cost
Multiple Choice Multiple Answer
Question Which are the first three steps of Critical Path Analysis technique?
Correct Answer Activity relationships , Activity identification , Network construction
Your Answer Activity relationships , Activity identification , Network construction
True/False
Question Dust gets mixed with lubricants, forms an abrasive substance and causes pre-mature failure
of machinery.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following can be subtypes of corrective maintenance?
Correct Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of
an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer Operation
Your Answer Production
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What is the meaning of " Product features" according to J.M.Juran?
Correct Answer Quality of design
Your Answer Quality of design
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Photograph , Cyclegraph , Chronocyclegraph
True/False
Question All activities must not be tied up into the network
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are types of sampling plan?
Correct Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Minimum movement
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
True/False
Question Operation Process Chart provides information on time and distances
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Sequence of operation
Multiple Choice Single Answer
Question Management often fails to realize the importance of efficient layout due to following reason
Correct Answer losses resulting from poor layout are not directly shown in the financial statements
Your Answer losses resulting from poor layout are not directly shown in the financial statements
True/False
Question Inspection order is must even for simple jobs which can be inspected by shop inspector with
the tooling available on shop.
Correct Answer False
Your Answer True
True/False
Question Feasibility of time schedule requires that an activity be scheduled before any of it's
predecessors are scheduled.
Correct Answer False
Your Answer True
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is call ed
Correct Answer Factory
Your Answer Factory
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What is the basic philosophy of statistical process control?
Correct Answer Prevention is better than cure
Your Answer Prevention is better than cure
Multiple Choice Single Answer
Question How does the control chart of statistical quality control helps the operating personnel?
Correct Answer Identify the presence of an assignable cause before it develops
Your Answer Identify the presence of an assignable cause before it develops
Multiple Choice Single Answer
Question Where does the central line is located in case of p-chart?
Correct Answer at p bar
Your Answer at p bar
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
True/False
Question A network should be progression of activities always moving forward.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
True/False
Question For p-chart, the central line of fraction defectives is determined by average percentage
defectives.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Critical examination
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of product layout?
Correct Answer Pilot inspection
Your Answer Pilot inspection
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Wage Payment
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Sampling Inspection
Gantt Chart Production Scheduling Production Scheduling
POM assgn
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct
Answer
Your Answer
Dependent and independent
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Reduce material handling cost
Reduce material handling cost
As a general rule, the number of tail event of an activity is more than that of it's head
event.
False
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct
Answer
Your Answer
Producer's risk
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct
Answer
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct
Environmental specifications
Answer
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct
Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Large varaitions in hardness of material , Tool wear , Errors in setting
All activities must not be tied up into the network
False
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct
0.01 to 10%
Answer
Your Answer
0.01 to 10%
True/False
Question
Correct
Answer
Your Answer
In case of X bar, if the process is not under control indicated by some points falling
outside the control limits, such points outside the control limits are eliminated and new
trial control limits for the remaining points are computed.
True
True
Multiple Choice Single Answe r
Question
What is the base for considering activity time as single time estimate or three time
estimate?
Correct
Level of uncertainty
Answer
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct
Acceptable quality level
Answer
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an activity within
it's normal time?
Correct
Normal cost
Answer
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct
Answer
Your Answer
Necessity
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.
Correct
Control board
Answer
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every element of production and
activities which could affect the quality of end product are regulated to the extent
desirable.
Correct
Quality control
Answer
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct
Answer
Your Answer
Factory
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct
Answer
Your Answer
Hiring capacity
Hiring capacity
Multiple Choice Multiple Answer
Question
Correct
Answer
Your Answer
In an organization there may not be a formal PPC department if
Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during recording of method study?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Operators awaiting instructions from supervisor , Worker waiting for his turn at tools
stores , Jobs awaiting at the machines for their turn
Inspection order is must even for simple jobs which can be inspected by shop inspector
with the tooling available on shop.
False
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following documents
Correct
Answer
Your Answer
Sales Order , Work order , Shop order
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
To meet the intended function at lowest cost
Reduce lead time
Cent percent inspection is often more practical and economical than sampling inspection.
False
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct
Answer
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Nontechnical person finds it easy to comprehend , Ovehead facilities can be shown ,
Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct
Answer
Your Answer
Project Evaluation & Review Technique
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to J.M.Juran?
Correct
Answer
Your Answer
Quality of design
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity
Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Study different plant layouts and select the most optimum one , Study the extent of traffic
over the different routes of the plant , Identify the extent of backtracking, cross traffic and
obstacles encountered during the movement of material.
Study different plant layouts and select the most optimum one , Study the extent of traffic
over the different routes of the plant , Identify the extent of backtracking, cross traffic and
obstacles encountered during the movement of material.
A load chart specifies the work to be carried out by each person of company during shift
hours.
False
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Material Specification , Sequence of operation , Skill of Labour
Material Specification , Sequence of operation , Skill of Labour
Cellular layout is based on the concept of Group Technology
True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct
Answer
Your Answer
Time
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct
Answer
Your Answer
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Avaialability of adequate land at lower cost , Both skilled and unskilled labour can be
available , Plant expansion is easier due to less or no restriction for building and
construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition
of an item from routine or continuous checking.
Correct
Condition monitoring
Answer
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct
Answer
Your Answer
Progress chasing to identify delays which may hold up production , Communicating
possible delays in delivery date commitment to sales department , Devising cures to keep
rate of production in line with schedule
Recording progress of work , Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date commitment to sales
department
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct
easier
Answer
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.
Correct
Overtime working
Answer
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct
Answer
Your Answer
True
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
True/False
Question
Correct
Answer
Your Answer
Activity
Activity
As a general rule, a site five times the actual plant size is considered minimum for
parking, access facilities and future expansion.
True
True
Independent float either affects the float of preceding activities or that of succeeding
activities.
False
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per
instruction is called
Correct
Work Order
Answer
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space for a department like
Stores can be measured by
Correct
Proportion of Cubic volume space utilized
Answer
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct
Operation
Answer
Your Answer
Operation
POM assgn
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
Your Answer
It identifies activities to be given preference in allocation of resources. , It helps to
exercise "control by exception". , It helps to identify the set of activities and events
which are critical and as such must be carefully controlled and monitored
It helps to identify the set of activities and events which are critical and as such must
be carefully controlled and monitored , It identifies activities to be given preference in
allocation of resources. , It helps to exercise "control by exception".
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Bell
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
Why method study should precede work measurement?
Correct Answer
Time for a job can be accessed accurately only after standardizing the method
Your Answer
Time for a job can be accessed accurately only after standardizing the method
Select The Blank
Question
The ________ is the process of withdrawing the equipment from the production line,
dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out
parts and finally building it up to get desired accuracies.
Correct Answer
Reconditioning
Your Answer
Reconditioning
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
Break Even Analysis
True/False
Question
Correct Answer
In case of backward pass computation, the latest event time of the end event equals
to the earliest event time minus duration of that activity.
False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Draining and refilling of oil
reserviors of plunger pump
Yearly
Hourly
Parts lubricated with oil nipple
Daily
Weekly
Tools and slideways
two to three times a day
Six monthly
Table lubrication
Weekly
two to three times a day
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
What is expected from stores department after they receive the stores issue order
from dispatcher?
Correct Answer
Keep material ready for issue to shop when authorized
Your Answer
True/False
Question
Keep material ready for issue to shop when authorized
Every network does not necessarily have a critical path.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the subfactors of community facilities or social infrastructure?
Correct Answer
Accomodation , Educational , Entertainment
Your Answer
Accomodation , Labour laws , Educational , Entertainment
Multiple Choice Single Answer
Question
One of the following is not a gross material
Correct Answer
cotton
Your Answer
Coal
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a small network?
Correct Answer
Your Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations
of activities along each path. , Enumerate all paths in the network and list down
activities on each path.
Sum up the durations of activities along each path. , Find out the shortest path among
all paths. , Enumerate all paths in the network and list down activities on each path. ,
Compare the durations of all paths to identify the longest path.
Multiple Choice Multiple Answer
Question
Which of the following factors affect the quality control function?
Correct Answer
Quality of workmanship , Production aids , Manufacturing facilities
Your Answer
Quality of workmanship , Production aids , Competitive prices , Manufacturing facilities
True/False
Question
Correct Answer
The plotting of activities - critical, non-critical and dummy activities- is strictly
according to their precedence relationship.
True
Your Answer
True
True/False
Question
Process layout is also called line layout
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By experience
Your Answer
By vendor plant surveys , By reputation , By the perofrmance of first lot , By
experience
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?
Correct Answer
Concurrent activities
Your Answer
Concurrent activities
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
True/False
Question
Necessity
Correct Answer
Quality can not be inspected into a product, it must be manufactured into it by the
supplier.
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by the preventive maintenance by using five human senses?
Correct Answer
Preventive inspection
Your Answer
Manual inspection
Multiple Choice Single Answer
Question
What do you mean by design modifications made to reduce time and effort required in
carrying out maintenance work ?
Correct Answer
Design-in Maintenance
Your Answer
True/False
Question
Design-in Maintenance
Correct Answer
A load chart specifies the work to be carried out by each person of company during
shift hours.
False
Your Answer
True
Multiple Choice Single Answer
Question
Process type layout is suitable when
Correct Answer
there is wide variation in processing time of operations
Your Answer
there is wide variation in processing time of operations
Multiple Choice Single Answer
Question
Where the ignorance towards the degradation of machine leads to?
Correct Answer
Eventual breakdown
Your Answer
Eventual breakdown
True/False
Question
Dispatching function is not a part of Production Planning
Correct Answer
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
First off inspection
First piece produced after tool
change
First piece produced after tool
change
Critical operation inspection
After whose no rework is possible Costlier operation
Patrolling inspection
Inspection at the place of actual
production
Inspection at the place of actual
production
Key operation inspection
Costlier operation
After whose no rework is possible
Multiple Choice Multiple Answer
Question
Which three of the following options can be used to reduce the duration of activity
during project crashing?
Correct Answer
Allocating more manpower and machines than originally planned for. , Working
additional shifts or overtime. , Awarding work to vendors who charge extra but
expedite deliveries.
Your Answer
Allocating more manpower and machines than originally planned for. , Conduct work
study for that activity , Working additional shifts or overtime. , Awarding work to
vendors who charge extra but expedite deliveries.
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct Answer
0.01 to 10%
Your Answer
True/False
Question
0.10 to 10%
Correct Answer
Three time estimates are transformed into expected time before using it into a
network.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
What is indicated by the erratic pattern points falling above and below the control
limits in the Xbar-R-control chart?
Correct Answer
Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer
Defects in materials , Poorly trained operators , Frequent adjustments of machines ,
Clogging of fixtures and holes
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct Answer
Condition monitoring
Your Answer
Preventive maintenance
Multiple Choice Single Answer
Question
Which kind of inspection is followed in case of process layout?
Correct Answer
First off inspection
Your Answer
Pilot inspection
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for evaluation of layout in factor
analysis method
Correct Answer
Flow of material , Equipment utilization , W orking condition
Your Answer
Flow of information , Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple Answer
Question
Why graphical method of recording is preferred over the descriptive method during
method study?
Correct Answer
It segregates effective part form ineffective parts , It reduces effort involved in writing
, Critical examinations easier and more effective
Your Answer
It segregates effective part form ineffective parts , It reduces effort involved in writing
, It improves morale of workers , Critical examinations easier and more effective
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have
the probability of acceptance of ________.
Correct Answer
One
Your Answer
True/False
Question
One
Correct Answer
Floor inspection delays the identification of faults which can not be rectified
immediately before large lots are spoiled.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some defects in moving parts, internal
cracks, and others , when machine is under preplanned shutdown?
Correct Answer
Internal inspection
Your Answer
Internal inspection
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in
respect of ________
Correct Answer
Delivery performance
Your Answer
Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are illustrations of inspection?
Correct Answer
Your Answer
Physical count of incoming material against the quantity mentioned in delivery challan
, A dimensional check with measuring instrument , Visual check of burrs and finish
Physical count of incoming material against the quantity mentioned in delivery challan
, A dimensional check with measuring instrument , Visual check of burrs and finish ,
Check the operator performance
Multiple Choice Multiple Answer
Question
Which of the following variables which operate periodically are the reasons for the
cyclic pattern depicting peaks and valleys during Xbar-R control chart?
Correct Answer
Wornout positions , Fatigue , Roller eccentricity
Your Answer
Wornout positions , Intentional mistakes by unsatisfied worker , Fatigue , Roller
eccentricity
Multiple Choice Single Answer
Question
Which portion of the perforated route sheet should be signed by the operator or
supervisor?
Correct Answer
Lower portion
Your Answer
Top portion
LIST OF
ATTEMPTED
QUESTIONS
AND
ANSWERS
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
Your Answer
It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by exception". ,
It helps to identify the set of activities and events which are critical and as such must be carefully controlled and
monitored
It helps to identify the set of activities and events which are critical and as such must be carefully controlled and
monitored , It identifies activities to be given preference in allocation of resources. , It helps to exercise "control by
exception".
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or better than AQL .
Correct Answer
Rectangular
Your Answer
Bell
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
Why method study should precede work measurement?
Correct Answer
Time for a job can be accessed accurately only after standardizing the method
Your Answer
Time for a job can be accessed accurately only after standardizing the method
Select The Blank
Question
Correct Answer
The ________ is the process of withdrawing the equipment from the production line, dismantling it unitwise,
visualising defects, effecting adjustments, replacing worn-out parts and finally building it up to get desired
accuracies.
Reconditioning
Your Answer
Reconditioning
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
Break Even Analysis
True/False
Question
In case of backward pass computation, the latest event time of the end event equals to the earliest event time
minus duration of that activity.
Correct Answer
False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Draining and refilling of oil reserviors of
plunger pump
Yearly
Hourly
Parts lubricated with oil nipple
Daily
Weekly
Tools and slideways
two to three times a day
Six monthly
Table lubrication
Weekly
two to three times a day
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the adjustment components and
partly due to emergency actions.
Correct Answer
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
What is expected from stores department after they receive the stores issue order from dispatcher?
Correct Answer
Keep material ready for issue to shop when authorized
Your Answer
Keep material ready for issue to shop when authorized
True/False
Question
Every network does not necessarily have a critical path.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the subfactors of community facilities or social infrastructure?
Correct Answer
Accomodation , Educational , Entertainment
Your Answer
Accomodation , Labour laws , Educational , Entertainment
Multiple Choice Single Answer
Question
One of the following is not a gross material
Correct Answer
cotton
Your Answer
Coal
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a small network?
Correct Answer
Compare the durations of all paths to identify the longest path. , Sum up the durations of activities along each path.
, Enumerate all paths in the network and list down activities on each path.
Your Answer
Sum up the durations of activities along each path. , Find out the shortest path among all paths. , Enumerate all
paths in the network and list down activities on each path. , Compare the durations of all paths to identify the
longest path.
Multiple Choice Multiple Answer
Question
Which of the following factors affect the quality control function?
Correct Answer
Quality of workmanship , Production aids , Manufacturing facilities
Your Answer
Quality of workmanship , Production aids , Competitive prices , Manufacturing facilities
True/False
Question
The plotting of activities - critical, non-critical and dummy activities- is strictly according to their precedence
relationship.
Correct Answer
True
Your Answer
True
True/False
Question
Process layout is also called line layout
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By experience
Your Answer
By vendor plant surveys , By reputation , By the perofrmance of first lot , By experience
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out simultaneously and both
activities require definite time to finish?
Correct Answer
Concurrent activities
Your Answer
Concurrent activities
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
True/False
Question
Quality can not be inspected into a product, it must be manufactured into it by the supplier.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by the preventive maintenance by using five human senses?
Correct Answer
Preventive inspection
Your Answer
Manual inspection
Multiple Choice Single Answer
Question
What do you mean by design modifications made to reduce time and effort required in carrying out maintenance
work ?
Correct Answer
Design-in Maintenance
Your Answer
Design-in Maintenance
True/False
Question
A load chart specifies the work to be carried out by each person of company during shift hours.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Process type layout is suitable when
Correct Answer
there is wide variation in processing time of operations
Your Answer
there is wide variation in processing time of operations
Multiple Choice Single Answer
Question
Where the ignorance towards the degradation of machine leads to?
Correct Answer
Eventual breakdown
Your Answer
Eventual breakdown
True/False
Question
Dispatching function is not a part of Production Planning
Correct Answer
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
First off inspection
First piece produced after tool change
First piece produced after tool change
Critical operation inspection
After whose no rework is possible
Costlier operation
Patrolling inspection
Inspection at the place of actual production
Inspection at the place of actual production
Key operation inspection
Costlier operation
After whose no rework is possible
Multiple Choice Multiple Answer
Question
Which three of the following options can be used to reduce the duration of activity during project crashing?
Correct Answer
Allocating more manpower and machines than originally planned for. , Working additional shifts or overtime. ,
Awarding work to vendors who charge extra but expedite deliveries.
Your Answer
Allocating more manpower and machines than originally planned for. , Conduct work study for that activity ,
Working additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer
0.01 to 10%
Your Answer
0.10 to 10%
True/False
Question
Three time estimates are transformed into expected time before using it into a network.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
What is indicated by the erratic pattern points falling above and below the control limits in the Xbar-R-control
chart?
Correct Answer
Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer
Defects in materials , Poorly trained operators , Frequent adjustments of machines , Clogging of fixtures and holes
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an item from routine
or continuous checking.
Cor rect Answer
Condition monitoring
Your Answer
Preventive maintenance
Multiple Choice Single Answer
Question
Which kind of inspection is followed in case of process layout?
Correct Answer
First off inspection
Your Answer
Pilot inspection
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for evaluation of layout in factor analysis method
Correct Answer
Flow of material , Equipment utilization , Working condition
Your Answer
Flow of information , Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple Answer
Question
Why graphical method of recording is preferred over the descriptive method during method study?
Correct Answer
It segregates effective part form ineffective parts , It reduces effort involved in writing , Critical examinations easier
and more effective
Your Answer
It segregates effective part form ineffective parts , It reduces effort involved in writing , It improves morale of
workers , Critical examinations easier and more effective
Select The Blank
Question
OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the probability of acceptance
of ________.
Correct Answer
One
Your Answer
One
True/False
Question
Floor inspection delays the identification of faults which can not be rectified immediately before large lots are
spoiled.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some defects in moving parts, internal cracks, and others , when
machine is under preplanned shutdown?
Correct Answer
Internal inspection
Your Answer
Internal inspection
Select The Blank
Question
Capacity decisions have a direct influence on performance of production system in respect of ________
Correct Answer
Delivery performance
Your Answer
Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are illustrations of inspection?
Correct Answer
Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish
Your Answer
Physical count of incoming material against the quantity mentioned in delivery challan , A dimensional check with
measuring instrument , Visual check of burrs and finish , Check the operator performance
Multi ple Choice Multiple Answer
Question
Which of the following variables which operate periodically are the reasons for the cyclic pattern depicting peaks
and valleys during Xbar-R control chart?
Correct Answer
Wornout positions , Fatigue , Roller eccentricity
Your Answer
Wornout positions , Intentional mistakes by unsatisfied worker , Fatigue , Roller eccentricity
Multiple Choice Single Answer
Qu estion
Which portion of the perforated route sheet should be signed by the operator or supervisor?
Correct Answer
Lower portion
Your Answer
Top portion
Topic
Chapter 1 - Production Manufacturing Function
Operation concept of production
Production as the conversion process
Alteration
Transportation
Storage
Inspection
Productivity of conversion process
Objectives of Production Management
Components of production function
Aspects of Management
product selection and design
Process selection and planning
Facilities (Plant) location
Facilities (plant) layout and materials handling
Capacity planning
forecasting
production planning and contril (PPC)
Inventory Control
Quality assurance and control
work study and job design
Method study
work measurement
Maintenance and replacement
cost reduction and cost control
short history of production management
Adam smith (1776)
Charles Babbage (1883)
F.W. Taylor (1859 to 1915)
Frank B. Gilbreth (1917)
Henry Ford (1913)
Henry Gantt (1913)
Harington Emerson (1913)
F.W. Harris (1914)
Walter Shewhart (1924)
F.H. Dodge H.G. Roming & W. Shewhart (1931)
L.H.C. Tippett (1937)
Between 1940-1980
Present day position
Prganisation for production
Typical organisation structure
The responsibilities of a production manager
qualities of production manager
intelligence
enthusiasm and perseverance
imagination
resourcefulness
self control
sympathy
communication ability
flexibility
Page No
1
2
2
2
2
2
3
4
4
5
5
5
6
6
6
7
7
7
8
8
8
8
9
9
9
9
10
10
11
11
11
12
12
12
12
12
12
13
14
15
15
16
16
16
16
16
16
16
16
16
production as a co-ordination function
Chapter 2- Manufacturing Methods
Definition
factors influenceing choice of manufacturing method
effect of volume/variety
relationship between degree of repetitive and manufacturing method
capacity of the plant
flexibility
lead time
efficiency
environment
Classification of manufacturing methods
project production
Jobbing production
batch production
Mass & Flow production
process production
selection of the manufacturing methods
Chapter 3 -Facilities (Plant) Location
when does a location decision arise (Necessity)
factors governing plant location
procimity to market
procimity to sources of raw materials
gros materials
pure material
Infrastructureal facilities
transport facilities
labour wages
legisiation and taxation
climate conditions
Industrial and loaur attitudes
safety requirement
communtiy facilities (social infrasturcture)
community attitudes
supporting industries and services
waste disposal
availability and cost of the land
suitability of the land
economic survey for the site selection
Urban versus rural site location
sub urban loaction
typical examples on plant location
Chapter 4 - Facilities( Plant) Layout
objective of a good plant layout
principles of a good layout
types of layout
process or functional layout
product or line layout
project or fixed position layout
comparison between prodcut layout and process layout
cost analysis of basic forms of layout
combination layout (mixed layout)
17
23
24
24
25
25
25
26
26
26
27
27
29
31
34
35
36
41
42
43
44
45
45
46
46
46
47
47
47
47
48
48
48
49
49
49
49
51
52
53
60
60
64
65
66
68
69
72
73
factors governing plantlayout
system layout procedure
tools and techniques for layout analysis
space determination and area allocation
evaluation of layout plans and selection of the optima layout
Chapter 5- Production Planning and Control
meaning
production planning versus production control
objective of production control (PC)
functions of production planning and control
organisation of PPC department
status of the PPC department in the company
degree of centralisation
internal structure
Chapter 6 - Production Planning (Order Preparation)
work order preparation
subsidiary orders
Chapter 7 - Prodcution Planning (Material Planning)
factors of influencing material planning
technique for materials planning
bill of materials
material requirement planning (MRP)
procedural steps in MRP
computerised system of MRP
past consumption anlaysis technique
moving average method
exponential smoothing
Inventory control
other operations research techniques
Chapter 8- Production Planning (Process Planning)
inputs of process planning
factors influencing process planning
steps in process planning
route sheets
processing planning in differece situations
documents in process planning
Route sheets example
Chapter 9- Production Planning (Loading & Scheduling)
why scheduling
inputs of scheduling
gantt charts
technique of scheduling
Chapter 10- Production control (Dispatching)
Function of dispatching
how dispatching function is perdormed
dispatching under difeerenct situations
documents in dispatching
Chapter 11- Production Control (Processing or Follow-Up)
Functions in progressing
documents in progressing
Chapter 12- Project Planning & control Critical Path Analysis (PERT/CPM)
Meaning of project
74
74
76
79
80
89
90
91
91
93
93
94
94
101
104
109
110
111
113
113
117
117
117
118
119
120
126
127
128
129
131
131
132
137
136
142
147
153
160
161
161
167
175
181
need for systematic approach
what is CPA
what can CPA give
network logic
procedural steps
activity identification
activity relationships
network construction
node labelling
Fulkerson's rule
activity time estimation
project classification
PERT concept of multipe times
use of time estimation
unit of time etimation
network time analysis
critical path
non critical paths nad float times
forward computation (earliest event times)
backward pass computation (latest allowable event times)
computation for analysis of activity durations
activity float analysis
types of float
probability aspects of project planning
cost analysis and crashing of activities
time cost relationship
graphical representation of project costs
procedural steps
project crashing
project scheduling
project monitoring
computer applications in project management
Chapter 13 - Maintenace of the Plant
typical causes of plant breakdown
costs association with an eventual breakdown
objectives of a good maintenance system
types of maintenance
elements of a good maintenance system
preventive maintenance
planned maintenance
unplanned maintenance
Basic activities of the preventive maintenace
Preventive inspection
planned lubricants
cleaning and upkeep
minor adjustments and replacements
equipment records
corrective maintenance
condtional monitoring
organisation for maintenance
Chapter 14- Quality Management( Inspection and Quality Control)
definition of quality
182
183
183
184
189
189
190
193
200
200
202
203
203
206
206
207
207
209
210
212
213
215
215
224
234
234
236
237
238
251
252
255
270
270
271
271
276
277
273
275
279
279
282
285
287
288
293
293
296
304
J.M Juran's views of quality
historical development of quality management
the achivement of quality
quality of design
customer's acceptance of the product and its price
quality of conformance
quality standards
meaning of quality control
three basic aspects of quality control
inspection versus quality control
inspection planning
what to inspect specification
stages of inspection
where to inspect places of inspection
how to inspect inspection devices
how much to inspect sampling or cent percent inspection
how to exercise control over qulity
quality control of purchased material
need for control
defining the right quality
selecting suppliers for quality
ensuring suppliers understanding requirement
monitoring suppliers quality
defect identificationand defect prevention
importance of defect prevention
vendor performance evaluation
quality control of work done at the home plant
organisation for inspection and quality control
Chapter 15- Quality Management Acceptance Sampling
types of inspection
basis of sampling inspection
defects and their classification
critical defect
major defect
minor defect
operating characterisitc curve
Parameter of an OC curve
relationship between the parameters
OC curve of an ideal plan
OC curve of general plan
zone of acceptance and rejction
zone of indecision
10 specification an operating characheteristic curve
acceptable quality level (AQL
Lot tolerance percent defectives LTPD
producer's risk Alpha
consumer risk Beeta
types of sampling plans
single sampling plan
double sampling plan
multiple sampling plan
comparison of different sampling plan
305
205
306
307
307
308
309
310
310
311
312
313
313
316
319
322
323
324
324
324
325
326
327
328
329
331
331
333
343
344
345
345
345
345
346
347
348
349
349
349
350
351
351
351
352
352
352
353
354
356
358
Chapter 16- Quality Management Statistical Process Control SPC
Principles underlying process control
control charts as tool for process control
types of control charts
control charts for variables (X-R charts)
Theory
steps to prepare X-R chart
what are control charts by attributes
control charts for fraction defectives P-chart
control charts for number defectives nP chart
control charts for the number of defects c-Chart
Chapter 17 Work Study Method study
what is work study
introduction to method study
Basic procedure of method study
selection of the job
recording of facts
method study symbols
operation process chart OPC
Flow process chart FPC
templates and models
three dimensional models
critical examination
development and selection
installation of the proposed method
maintenance of the proposed method
Chapter -18 Work Study Work Measurement
informal standard
Elwood S Buffa
uses of work measurement data
equitable standards
control of exception
rational basis of incentives
sub standard workers
techniques of work measurement
PMTS - method of time measurement (MTM)
TMU
time study
time study procedure
steps in time study
select the job to be timed
select the operator
flyback method
rating
determine representative time of each element
observed time into normal time
assess relaxation and other allowance
calculate standard time of the job
constituents of standard time
standard time computation
operator efficiency
standard time computation involving frequency of elements
353
368
369
370
371
374
383
384
388
390
401
402
404
407
410
411
421
431
431
432
433
435
436
447
447
448
448
449
449
450
451
451
452
452
453
453
453
454
455
455
455
456
456
457
457
458
458
461
standard time computation when stop watch readings are given
462
standard time computation when stop watch readings involved some foreign elements
464
work sampling
467
Morrow
468
Procedure for conducting a work sampling study
468
Master list of work and delay elements
469
Divgi Metalwares Pvt Ltd
469
want of tools
469
want of work
469
interference
470
Duration of the study
471
number of observers
471
accuracy desired
471
cyclical work patterns
472
accuracy
472, 481
confidence
472
activity percentage
472
design the study
473
number of observation
473
total number of rounds and rounds per day
474
average time between the rounds
475
fix up the time required to make a round
476
compare average time per round with time required to make a round
476
prepare the schedule for the rounds
477
datasheet
478
summary of recommendations
482
setting performance standards with work sampling
483
rating index
483
overall time per unit
484
effective time per unit
484
breakdown of effective time
484
normal time per piece
485
standard time per piece
485
adavantage and disadvantage of work sampling over time study
488
random rounds
492
clock time for the random rounds
492
machine controlled time
496
hand controlled time
496
standard time
497
Chapter -19 Financial incentives
509
fear motivation
509
motivation
509
non financial incentives
509
semi financial incentives
510
financial incentives
510
incentive scheme
510,513
individual incentives
511
minimisation of loss of time
511
equitable wage earnings
512
reduction in supervision
512
managerial functions
512
surplus labour , indirect workmen
512
wage incentive plan
fair wage structure
overtime
quality control
accurate projection of future busimess
labour body
training of supervisors
good incentive plan
safeguards
classification of standards incentive plans
classification of std wage incentive plans
straight piece rate methods
characteristic of piece rate system
Differential piece rate method
taylor differential piece rate method
the merrick differential piece rate method
gantt task and bonus scheme
emerson efficiency plan
Halsey system
halsey plan
halsey weir plan
Rowan system
incentive bonus
bedaux point system
barath variable sharing plan
earnings
Preiestman production plan
Productivity bonus unde the plan
513
514
514
514
515
515
515
516
518
519
520
521
521
524
524
524
528
530
531
532
533
534
535
537
538
539
539
POM assgn : Shagun
True/False
Question
Correct Answer
It pays in the long run to inform the customer regarding expected delays in
the deliveries.
True
Your Answer
True
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer
Your Answer
Select The Blank
Question
Avaialability of adequate land at lower cost , Both skilled and unskilled
labour can be available , Plant expansion is easier due to less or no
restriction for building and construction
Avaialability of adequate land at lower cost , Both skilled and unskilled
labour can be available , Plant expansion is easier due to less or no
restriction for building and construction
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Worker
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Order Quantity , Delivery Dates , Plant layout
True/False
Question
Correct Answer
Availability of training schools, colleges and management institutes reduces
the company's internal training needs.
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Lime stone
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Production Scheduling
Work Sampling
Machine utilization
Sampling Inspection
Gantt Chart
Production Scheduling
Charting technique
Match The Following
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Stock on hand
Symptom of ill planned
purchasing
Over ordering
Over ordering
Factor influencing material
planning
Lead time
Lead time
Net requirement of material under Stock on hand
MRP
Price of material
Multiple Choice Multiple Answer
Question
Which of the following are steps to identify the critical path in a small
network?
Correct Answer
Compare the durations of all paths to identify the longest path. , Sum up
the durations of activities along each path. , Enumerate all paths in the
network and list down activities on each path.
Your Answer
Compare the durations of all paths to identify the longest path. , Sum up
the durations of activities along each path. , Enumerate all paths in the
network and list down activities on each path.
Select The Blank
Question
Correct Answer
In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Tool breakage has got nearly zero chances in case of eventual breakdown.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are the three types of float?
Correct Answer
Total float , Independent float , Free float
Your Answer
Total float , Dependent float , Free float
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Your Answer
Overlapping of operations , Effective Capacity per work centre ,
Performance standards
Effective Capacity per work centre , Ratio of skilled to unskilled labour ,
Performance standards
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
Select The Blank
Question
Factory
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quality level
Your Answer
Lot Tolerance Percentage Defective
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Overhauling
Select The Blank
Question
Correct Answer
OC curve of ideal sampling plan suggests that all lots less than 3%
defectives have the probability of acceptance of ________.
One
Your Answer
One
Multiple Choice Single Answer
Question
How to calculate activity cost slope?
Correct Answer
Activity cost slope = ( Crash cost - Normal cost ) / ( Normal time - Crash
time )
Your Answer
Activity cost slope = ( Normal cost - Crash cost ) / ( Normal time - Crash
time )
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good quality of
design?
Correct Answer
Resonable cost , Resonable procurement time , Resonable manufacturing
time
Your Answer
Resonable cost , Resonable procurement time , Resonable manufacturing
time
True/False
Question
Correct Answer
In case of control chart, large smaples such as n=15 or 20 are used if the
process standard deviation is small.
False
Your Answer
True
Select The Blank
Question
Correct Answer
Production control work is ________ in case of floor inspection as compared
with the centralised inspection.
easier
Your Answer
labourious
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Single Answer
Question
How does the control chart of statistical quality control helps the operating
personnel?
Correct Answer
Identify the presence of an assignable cause before it develops
Your Answer
Reduces chances of rejections
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Reduced salvage value of machine
Multiple Choice Single Answer
Question
What do you understand by the metallergical aspects of product which
forms the vital part of engineering function?
Correct Answer
Material specifications
Your Answer
Performance specifications
Multiple Choice Single Answer
Question
Which of the following is a cause of plant breakdown?
Correct Answer
Overloading of machines
Your Answer
Overloading of machines
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using flow process
chart?
Correct Answer
Eliminating the operations or combining the operations with another ,
Reducing the distance traveled by the workmen or materials , Avoiding the
waiting time and thereby reduce production losses
Your Answer
Reducing the distance traveled by the workmen or materials , Reducing
rejections drastically , Avoiding the waiting time and thereby reduce
production losses
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
True/False
Question
Correct Answer
Dust gets mixed with lubricants, forms an abrasive substance and causes
pre-mature failure of machinery.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method study?
Correct Answer
Delay , Operation , Inspection
Your Answer
Operation , Inspection , Production
True/False
Question
Correct Answer
In case of centralised inspection, inspection rooms generally become
bottleneck and cause delay in taking action regarding rejection or rework.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth
unhealthy conditions and preventive
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
Correct Answer
The problems of congestion, bottlenecks and backtracking can not be
visualized by using templates and models.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Quality
True/False
Question
Correct Answer
Delay in completion of projects result in unwelcome additions to the fixed
manufacturing expenses.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The term ________ emplies the foregone profit due to inability of company
to produce.
Opportunity cost
Your Answer
Idle wages
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for location
decision as taxes/duties substantially influence
Correct Answer
Product cost
Your Answer
Order procurement
Multiple Choice Multiple Answer
Question
What are the uses of failure statistics analysis?
Correct Answer
Your Answer
True/False
Question
To forecast the defect , To identify causes of major repetative failures , To
quantify the frequency of preventive inspection
To forecast the defect , To identify causes of major repetative failures , To
quantify the frequency of preventive inspection
Shop order is one of the subsidiary order
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
Correct Answer
The ________ is the probability that a good lot will be rejected by the
sampling plan.
Producer's risk
Your Answer
Lot Tolerance Percentage Defective
True/False
Question
Correct Answer
The component produced on completely automatic machines may be
subjected to sampling inspection while parts produced on semi-automatic
and completely manual operated machines require cent percent inspection.
True
Your Answer
False
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Your Answer
Work is highly repetitive in nature , Planning activities are performed by the
line staff , Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the
line staff , Number of workmen is not very large
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or
rejecting a particular site from legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Policies regarding issue of licences , Productivity of labour
POM assgn : Shagun
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Open purchase order
True/False
Question
An ideal OC curve is never possible only with cent percent inspection.
Correct Answer
False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Table lubrication
Weekly
Six monthly
Draining and refilling of oil
reserviors of plunger pump
Yearly
Yearly
Parts lubricated with oil nipple
Daily
Weekly
Tools and slideways
two to three times a day
Daily
True/False
Question
Correct Answer
The operator should not stop production if first piece is not approved by the
inspector.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the
production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
True/False
Question
Correct Answer
For p-chart, the central line of fraction defectives is determined by average
percentage defectives.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Progress chasing to identify delays which may hold up production ,
Communicating possible delays in delivery date commitment to sales
department , Devising cures to keep rate of production in line with schedule
Your Answer
Recording progress of work , Communicating possible delays in delivery
date commitment to sales department , Devising cures to keep rate of
production in line with schedule
Multiple Choice Single Answer
Question
When should operator or supervisor is supposed to sign the perforated
route sheet?
Correct Answer
After completion of operation
Your Answer
Select The Blank
Question
After completion of operation
Correct Answer
The ________ is necessary when the job requires detailed of one or more
of the job characteristics with the help of special equipment which is not
available at the producing company.
Inspection order
Your Answer
Move order
Multiple Choice Multiple Answer
Question
What are the benefits of reconditioning?
Correct Answer
Your Answer
Eliminates problems and frequent breakdowns , Increases life of an
equipment , It helps to plan requirement of replacement spares
Eliminates problems and frequent breakdowns , Increases life of an
equipment , It helps to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question
Which of the following processes or activities are denoted by using symbols
while recording in method study?
Correct Answer
Transport , Delay , Storage
Your Answer
Transport , Rejection , Storage
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
True/False
Question
Correct Answer
A properly designed sampling plan can control sampling errors and
completely eliminate them.
False
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Select The Blank
Question
Correct Answer
The ________ pertain to the climatic conditions which the component ,
product or material should withstand.
Environmental specifications
Your Answer
Environmental specifications
True/False
Question
Grouping of machines gives a lot of flexibility in loading and scheduling
Correct Answer
True
Your Answer
True
True/False
Question
Correct Answer
A lot declared rejected in sampling inspection should not be inspected
100% in any case.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
True/False
Question
Correct Answer
The plotting of activities - critical, non-critical and dummy activities- is
strictly according to their precedence relationship.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are activities of corrective maintenance?
Correct Answer
Modifications and improvements , Overhauling , Emergency repairs
Your Answer
Modifications and improvements , Overhauling , Lubrication as per schedule
Multiple Choice Single Answer
Question
Following is not a function of PPC
Correct Answer
Product Planning
Your Answer
Order Processing
Multiple Choice Multiple Answer
Question
Which of the following three methods used to select the qualified supplier?
Correct Answer
By vendor plant surveys , By reputation , By experience
Your Answer
Select The Blank
Question
By vendor plant surveys , By the perofrmance of first lot , By experience
Correct Answer
The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are
regulated to the extent desirable.
Quality control
Your Answer
Quality control
Match The Following
Question
Correct Answer
Your Answer
Pessimistic time
b
p
Expected time
Te
Te
Optimistic time
a
o
Most likely time
m
m
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Job cards , Progress cards
Multiple Choice Single Answer
Question
One of the characterstic of layout is about the flow of material / personnel.
In a good layout the flow should be
Correct Answer
Unidirectional
Your Answer
Unidirectional
Multiple Choice Multiple Answer
Question
What is indicated by the hugging points lying close to mean of the process
in X bar-R- control chart?
Correct Answer
Biases in measurements , Recording done without actual measurements ,
Improper selection of samples
Your Answer
Biases in measurements , Recording done without actual measurements ,
Improper selection of samples
Multiple Choice Multiple Answer
Question
Operation Layout generally contains following information
Correct Answer
Part Sketch , Standard Time , Jigs and fixtures
Your Answer
Sequence of operations , Standard Time , Jigs and fixtures
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is
composed as series of connected arrows and circles to describe the
interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Flow chart
Multiple Choice Single Answer
Question
Where does the SPC exercises the control to prevent the occurances of
defectives?
Correct Answer
On manufacturing process
Your Answer
On manufacturing process
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions of the
members of the body during method study?
Correct Answer
Cyclograph
Your Answer
Select The Blank
Question
Pictograph
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .
Rectangular
Your Answer
Bell
True/False
Question
Correct Answer
In Gantt Chart, the horizontal lines devide vertical lines into sections which
represents either operations or work centres.
True
Your Answer
True
Select The Blank
Question
Correct Answer
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Forwarding note
Your Answer
Forwarding note
Select The Blank
Question
Correct Answer
Capacity decisions have a direct influence on performance of production
system in respect of ________
Delivery performance
Your Answer
Quality
True/False
Question
Correct Answer
Floor inspection promotes tendency of machines to drift out of limits and
produce defectives.
False
Your Answer
True/False
Question
False
A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer
Operation
Your Answer
Manufacturing
Multiple Choice Multiple Answer
Question
Which are the different methods to record details of the existing method
during method study?
Correct Answer
Charts , Diagrams , Templates or models
Your Answer
Select The Blank
Question
Control plans , Charts , Templates or models
Correct Answer
The ________ breakdowns usually cost more, partly due to damage done
to the adjustment components and partly due to emergency actions.
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Correct Answer
Both forecast and pending orders
Your Answer
Past sales
Select The Blank
Question
Correct Answer
The ________ is the probability that a bad lot will be accepted by the
sampling plan.
Consumer's risk
Your Answer
Acceptable quality level
Select The Blank
Question
Correct Answer
The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an
activity within it's normal time?
Correct Answer
Normal cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Total cost
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms
to the laid down design?
Correct Answer
Quality of conformance
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer
Your Answer
Due to mistakes in reading blue prints , Due to errors in tooling , Due to
wrong machine set up
Due to mistakes in reading blue prints , Due to errors in tooling , Due to
wrong machine set up
POM assgn
Multiple Choice Single Answer
Question
Which phase of method study is concerned with analyzing the facts critically,
generating alternatives which form the basis for selection and development of
improved methods?
Correct Answer
Critical examination
Your Answer
Select The Blank
Question
Development and selection
Correct Answer
The ________ advocates maintenance procedures whereby the condition of the
plant is constantly watched through systematic inspection to unearth unhealthy
conditions and preventive
Preventive Maintenance
Your Answer
Design-in Maintenance
Select The Blank
Question
Correct Answer
The term ________ emplies the foregone profit due to inability of company to
produce.
Opportunity cost
Your Answer
Down time cost
True/False
Question
Correct Answer
A network should employ only those dummy activities which are absolutely
necessary.
True
Your Answer
True
Select The Blank
Question
Correct Answer
A set of activities to keep an equipment in the specified condition is called as
________.
Maintenance
Your Answer
Maintenance
True/False
Question
Correct Answer
While making X bar-R-chart, values of X bar and R are recoded samplewise either
on the extreme right of the individual measurements on the data sheet or in a
separate sheet.
True
Your Answer
False
Select The Blank
Question
Correct Answer
The ________ must ensure that the product satisfy the functional requirements of
it's usage.
Quality of design
Your Answer
Quality of inspection
True/False
Question
Correct Answer
Even if any activity on the critical path is delayed, project completes on the
scheduled time.
False
Your Answer
False
Multiple Choice Single Answer
Question
Which is the alternative way of indicating the load other than numerical way, in
case of Gantt chart ?
Correct Answer
Graphical approach
Your Answer
Symbolic pproach
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer
Your Answer
Select The Blank
Question
Overlapping of operations , Effective Capacity per work centre , Performance
standards
Overlapping of operations , Effective Capacity per work centre , Performance
standards
Correct Answer
The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at the
producing company.
Inspection order
Your Answer
Stores issue order
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
True/False
Question
Diversified labour is adequately available in rural area as compared to urban area.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following cases indicated that the operation has occurred?
Correct Answer
Your Answer
Movement of components to assembly section , Raw material movement , A
worker's trip to grinder to sharpen the tools
Movement of components to assembly section , A worker's trip to grinder to
sharpen the tools , Tools kept in rack of tool crib
Multiple Choice Single Answer
Question
What is the reason of fluctuations, if the control chart evaluates that the process
is in a state of statistical control?
Correct Answer
Random variability
Your Answer
Select The Blank
Question
Set up variability
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
Product layout is suitable when
Correct Answer
Products have reasonable stable demand
Your Answer
Products are not required in large quantities
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data during the method
study?
Correct Answer
Operation process chart , Multiple activity chart , Flow process chart
Your Answer
True/False
Question
Operation process chart , Multiple activity chart , Flow process chart
Correct Answer
The operator should not stop production if first piece is not approved by the
inspector.
False
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer
introduction of new product
Your Answer
introduction of new product
Multiple Choice Single Answer
Question
What do you mean by a single event which represents the joint completion of
more than one activities?
Correct Answer
Merge event
Your Answer
Merge event
True/False
Question
Correct Answer
The control chart for number of defectives is more convenient to make than
control chart for fraction defectives sincethe fugure of number of defectives units
can be directly taken from the inspection report.
True
Your Answer
True
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Juran's Rule
True/False
Question
Correct Answer
In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.
True
Your Answer
True
True/False
Question
All activities lying on the non-critical paths must have total float and free float.
Correct Answer
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Select The Blank
Question
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout
Correct Answer
The ________ are the definitions of the measurable as well as nonmeasurable
characteristics of the product.
Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
How industry has responded to the fact of existence of inherant variability of the
manufacturing process?
Correct Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Your Answer
Inclusion of certain tolerance on the basic dimensions in the drawing
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Job cards , Progress cards , Network updating
True/False
Question
Correct Answer
In case of backward pass computation, the latest event time of the end event
equals to the earliest event time minus duration of that activity.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer
Cracks , Burrs , Texture
Your Answer
Cracks , Burrs , Texture
Match The Following
Question
Correct Answer
Your Answer
Scheduling Device
Strings
Strings
Interruption for machine
utilisation
Preventive maintenance
Preventive maintenance
Input for scheduling
Overlapping of operations
Critical Path Analysis
Technique of scheduling
Critical Path Analysis
JIT
Multiple Choice Multiple Answer
Question
Which are the three distinct parts of the chart?
Correct Answer
Summary , Introduction , Body
Your Answer
Summary , Introduction , Analysis
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Project Layout
Product Layout
Line Layout
Line Layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Following are the commonly used factors considered for evaluation of layout in
factor analysis method
Correct Answer
Flow of material , Equipment utilization , Working condition
Your Answer
Flow of material , Equipment utilization , Working condition
Multiple Choice Single Answer
Question
Fixed position layout is adopted when
Correct Answer
product is very heavy involving assembly of large number of parts
Your Answer
product is very heavy involving assembly of large number of parts
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Commercial standards , Assembly and testing instructions , Bill of material
Multiple Choice Single Answer
Question
Process Engineer does not get sufficient time for designing tooling for most
economic production run when
Correct Answer
Delivery time is less
Your Answer
Delivery time is less
Multiple Choice Single Answer
Question
What do you mean by the graphical representation of the project which is
composed as series of connected arrows and circles to describe the
interrelationship of the activities involved?
Correct Answer
Network
Your Answer
Flow chart
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s
is called
Correct Answer
Factory
Your Answer
Select The Blank
Question
Factory
Correct Answer
The ________ is the probability that a bad lot will be accepted by the sampling
plan.
Consumer's risk
Your Answer
Consumer's risk
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer Activity
Your Answer
Activity
True/False
Question
Skill of labour force in a product type layout is usually higher than in the
process type of layout
Correct Answer False
Your Answer
True
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared
with the centralised inspection.
Correct Answer easier
Your Answer
easier
True/False
Question
In case of X bar, if the process is not under control indicated by some points
falling outside the control limits, such points outside the control limits are
eliminated and new trial control limits for the remaining points are computed.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer introduction of new product
Your Answer
introduction of new product
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in product ,
Long manufacturing cycle
Your Answer
Long Lead time for procurement , Several levels of assemblies in product ,
Long manufacturing cycle
True/False
Question
The plotting of activities - critical, non-critical and dummy activities- is strictly
according to their precedence relationship.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Data from Process Sheet can be used to
Correct Answer Prepare load and schedule charts
Your Answer
Monitor progress of work
Multiple Choice Single Answer
Question
How should a dummy activity be represented in a network?
Correct Answer By dotted line
Your Answer
By dotted line
Select The Blank
Question
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Correct Answer Specifications
Your Answer
Specifications
True/False
Question
A load chart specifies the work to be carried out by each person of company
during shift hours.
Correct Answer False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Scheduling of interrelated
Critical Path Analysis
activities of small projects with
consideration of uncertainty of
duration of activities.
Critical Path Analysis
Two machines & processing Johnson's Two Machine
time depends on sequence of Algorithm
job loading
Critical Ratio Scheduling
Sufficient orders and
Index Method
resonable choice of machines
Johnson's Two Machine
Algorithm
Time relationship between
when a product is required
and when it can be made
Time series
Critical Ratio Scheduling
available
True/False
Question
Systematic maintenance system can completely eliminate the wear and tear
of machines.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
Providing flexibility in plant layout means
Correct Answer Layout can be changed without much cost if required
Your Answer
Machine allocation can be changed easily
True/False
Question
Since value of p can never be positive, hence" if LCLp works out to be
positive, it is taken as zero."
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which information is recorded in an equipment card?
Correct Answer Date of commissioning , Equipment specifications , Name and address of
manufacturer
Your Answer
Price of an equipment , Equipment specifications , Name and address of
manufacturer
Multiple Choice Multiple Answer
Question
Which of the following method can be adopted to overcome the problem of
rushing up a job for it's timely completion?
Correct Answer Use of optimum speeds and feeds , Subcontracting , Job splitting
Your Answer
Use of optimum speeds and feeds , Subcontracting , Job splitting
Multiple Choice Multiple Answer
Question
Which of the following method can be used to record the facts during the
method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer
Micromotion study , Cyclegraph , Chronocyclegraph
Multiple Choice Multiple Answer
Question
Which are the sources of information to update the progress card daily?
Correct Answer Detachable ticket , Daily production report , Job Card
Your Answer
Detachable ticket , Daily production report , Job Card
Multiple Choice Single Answer
Question
What do you understand by the critical analysis of existing jobs to develop
easier and effective method?
Correct Answer Method study
Your Answer
Method study
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as
________
Correct Answer Scheduling
Your Answer
Scheduling
Multiple Choice Multiple Answer
Question
Plant layout facilitates processing of products in most effective manner
through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer
Shortest possible distance , Shortest processing time , Minimum movement
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
Dispatching function is not a part of Production Planning
Correct Answer True
Your Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which are the distinct functions of scientific quality control?
Correct Answer Acceptance function , Preventive function , Assurance function
Your Answer
Acceptance function , Preventive function , Assurance function
True/False
Question
The component produced on completely automatic machines may be
subjected to sampling inspection while parts produced on semi-automatic
and completely manual operated machines require cent percent inspection.
Correct Answer True
Your Answer
True
Match The Following
Question
Draining and refilling of oil
reserviors of plunger pump
Correct Answer
Your Answer
Yearly
Yearly
Parts lubricated with oil nipple Daily
Daily
Tools and slideways
two to three times a day
two to three times a day
Table lubrication
Weekly
Weekly
Multiple Choice Multiple Answer
Question
Which of the following are examples of consumption of physical effort during
recording for method study?
Correct Answer Bending , Positioning , Unloading
Your Answer
Positioning , Unloading , Drilling
True/False
Question
Labour turnover rate is higher in case of rural area as compared to urban
area.
Correct Answer False
Your Answer
True
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Correct Answer Forwarding note
Your Answer
Forwarding note
Multiple Choice Single Answer
Question
What does CPA stand for?
Correct Answer Critical Path Analysis
Your Answer
Critical Path Analysis
Select The Blank
Question
The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth
unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer
Preventive Maintenance
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning for high value
material
Correct Answer MRP
Your Answer
Exponential smoothing
Multiple Choice Single Answer
Question
What is the name of the document on which details of the process are
recorded by the symbols and charting conventions?
Correct Answer Chart
Your Answer
Flowsheet
Multiple Choice Multiple Answer
Question
Which are the general principles underlying probability aspects of project
planning?
Correct Answer Statistically three time estimate of an activity conform to Beta distribution. ,
Expected time divides the area under the curve into two equal parts. ,
Expected time of an activity is located at one third of the distance between
"m" and mid-range { (a+b)/2 } away from the most likely time.
Your Answer
Statistically three time estimate of an activity conform to Beta distribution. ,
Expected time divides the area under the curve into two equal parts. ,
Expected time of an activity is located at one third of the distance between
"m" and mid-range { (a+b)/2 } away from the most likely time.
Multiple Choice Multiple Answer
Question
Gross requirement of finished product is determined on the basis of following
Correct Answer Forecasted sales , Pending sales order , Management decision to stock
Your Answer
Pending sales order , Management decision to stock , Gross Market
requirement
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by
using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
True/False
Question
An activity should represent an operation or set of operations which can be
performed using a particular kind of equipment or a special skill.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specifications , Performance
specifications
Your Answer
Cost specifications , Material specifications , Dimensional specifications
Select The Blank
Question
The ________ is specified to indicate the maximum permissible variability in
the dimensions product or parts.
Correct Answer Tolerance
Your Answer
Tolerance
Select The Blank
Question
The ________ pertain to the climatic conditions which the component ,
product or material should withstand.
Correct Answer Environmental specifications
Your Answer
Environmental specifications
Select The Blank
Question
The ________ is a set of tools and techniques by which products are made
to comply with the specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer
Quality control system
Multiple Choice Single Answer
Question
Which chart sets out the sequence of flow of work of a product, or any part of
it through the section or department or a factory by recording the events
under review using appropriate symbols?
Correct Answer Flow process chart
Your Answer
Operation process chart
Multiple Choice Single Answer
Question
What do you understand by the measurement of work to establish allowed
time for a job for the defined method?
Correct Answer Work measurement
Your Answer
Work measurement
Multiple Choice Multiple Answer
Question
Which three of the following options can be used to reduce the duration of
activity during project crashing?
Correct Answer Allocating more manpower and machines than originally planned for. ,
Working additional shifts or overtime. , Awarding work to vendors who
charge extra but expedite deliveries.
Your Answer
Allocating more manpower and machines than originally planned for. ,
Working additional shifts or overtime. , Awarding work to vendors who
charge extra but expedite deliveries.
Multiple Choice Single Answer
Question
Which photographic technique is used to record path of motions of the
members of the body during method study?
Correct Answer Cyclograph
Your Answer
Cyclograph
POM assgn : Amit
True/False
Question
Correct Answer
The problems of congestion, bottlenecks and backtracking can not be
visualized by using templates and models.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Following are some of the factors which influence process planning
Correct Answer
Order Quantity , Process capability of machine , Delivery Dates
Your Answer
Process capability of machine , Delivery Dates , Order Quantity
Multiple Choice Single Answer
Question
Gross requirement of products is determined on the basis of
Correct Answer
Both forecast and pending orders
Your Answer
Both forecast and pending orders
True/False
Question
Correct Answer
Skill of labour force in a product type layout is usually higher than in the
process type of layout
False
Your Answer
True
Multiple Choice Single Answer
Question
In exponential smoothing method,for a stable demand pattern and better
smoothing effect, value of fraction( Alpha) selected is
Correct Answer
0.05 to 0.10
Your Answer
True/False
Question
0.05 to 0.10
Correct Answer
Recording of movement is not necessary in case of method study in any
form.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following may be the objectives of project crashing?
Correct Answer
Your Answer
To complete the project in the least possible time , To reduce project cost
below it's normal cost , To achieve uniformity in requirement of resources
To complete the project in the least possible time , To reduce project cost
below it's normal cost , To achieve uniformity in requirement of resources
Multiple Choice Single Answer
Question
Correct Answer
Which is the next stage to the inspection based quality control in the
historical development of quality management.
Quality assurance
Your Answer
Total Quality management
Select The Blank
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Low Productivity
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
True/False
Question
Correct Answer
Inspection should be conducted on all incoming materials, semifinished
items, bought out components, subcontract items prior to any operation,
assembly.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is the maximum percentage defective that for the purpose of
sampling inspection can be considered satisfactory as a process average.
Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
Production Planning includes
Correct Answer
Predetermination of manufacturing requirements
Your Answer
Predetermination of manufacturing requirements
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer
Your Answer
Select The Blank
Question
Progress chasing to identify delays which may hold up production ,
Communicating possible delays in delivery date commitment to sales
department , Devising cures to keep rate of production in line with schedule
Progress chasing to identify delays which may hold up production ,
Communicating possible delays in delivery date commitment to sales
department , Devising cures to keep rate of production in line with schedule
Correct Answer
The ________ is the watch dog which ensures that every element of
production and activities which could affect the quality of end product are
regulated to the extent desirable.
Quality control
Your Answer
Quality control
True/False
Question
Correct Answer
A load chart specifies the work to be carried out by each person of company
during shift hours.
False
Your Answer
False
Match The Following
Question
Correct Answer
Your Answer
Pessimistic time
b
b
Expected time
Te
Te
Optimistic time
a
a
Most likely time
m
m
True/False
Question
Breakdown is inversly proportional to the investment in W.I.P.
Correct Answer
False
Your Answer
True
Select The Blank
Question
Correct Answer
Production Planning is a centralised activity which includes functions such as
________
Scheduling
Your Answer
Scheduling
Select The Blank
Question
Correct Answer
A set of activities to keep an equipment in the specified condition is called
as ________.
Maintenance
Your Answer
Maintenance
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Select The Blank
Question
Correct Answer
The ________ is the probability that a good lot will be rejected by the
sampling plan.
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a
product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings
True/False
Question
short cycle job should be studied for macroscopic motions.
Correct Answer
False
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is a set of tools and techniques by which products are made
to comply with the specifications at minimum cost to the firm.
Quality control system
Your Answer
Quality control system
True/False
Question
Inspection Order can be a verbal order
Correct Answer
True
Your Answer
False
Multiple Choice Single Answer
Question
Need for change in layout can occur due to following reason
Correct Answer
introduction of new product
Your Answer
improve quality
Select The Blank
Question
Correct Answer
Goods after final inspection should accompany ________to enable dispatch
department to identify and draw correct reference.
Forwarding note
Your Answer
Forwarding note
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating
Select The Blank
Question
Correct Answer
The term ________ emplies the foregone profit due to inability of company
to produce.
Opportunity cost
Your Answer
Opportunity cost
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to complete an
activity within it's crashed time?
Correct Answer
Crash cost
Your Answer
Normal cost
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
What do you mean by the selection of the job for the method study on the
basis of manufacturing difficulties?
Correct Answer
Technical consideration
Your Answer
True/False
Question
Economic consideration
Correct Answer
In case of backward pass computation, the latest event time of the end
event equals to the earliest event time minus duration of that activity.
False
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Multiple Choice Multiple Ans wer
Question
Which of the following are examples of addition during recording for method
study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Brazing , Welding , Riveting
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is expected?
Correct Answer
Skilled in one specific Manufacturing Process
Your Answer
Skilled in all Manufacturing Processes
Select The Blank
Question
Correct Answer
The ________ is necessary when the job requires detailed of one or more
of the job characteristics with the help of special equipment which is not
available at the producing company.
Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Which are the factors on which the structure of the transportation cost
depends?
Correct Answer
Average distance of shipment , Characteristics of the commodity , Medium
of shipment
Your Answer
Average distance of shipment , Characteristics of the commodity , Medium
of shipment
Multiple Choice Single Answer
Question
Which is the ideal place to inspect jigs and fixtures in a mass manufacturing
unit?
Correct Answer
Separate inspection room
Your Answer
True/False
Question
Separate inspection room
Correct Answer
In Gantt Chart, the horizontal lines devide vertical lines into sections which
represents either operations or work centres.
True
Your Answer
True
POM assgn : Amit
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good quality of design?
Correct Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer
Resonable manufacturing time , Resonable cost , Resonable procurement time
Multiple Choice Single Answer
Question
Where does the central line is located in case of p-chart?
Correct Answer
at p bar
Your Answer
at median
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s
is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product
to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Select The Blank
Question
To meet the intended function at lowest cost
Correct Answer
The ________ is the probability that a good lot will be rejected by the sampling
plan.
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following situations
Correct Answer
Your Answer
Select The Blank
Question
Long Lead time for procurement , Several levels of assemblies in product , Long
manufacturing cycle
Long Lead time for procurement , Long manufacturing cycle , Demand for the
product is not known
Correct Answer
The ________ is the watch dog which ensures that every element of production
and activities which could affect the quality of end product are regulated to the
extent desirable.
Quality control
Your Answer
Quality control
Select The Blank
Question
Correct Answer
The ________ is the process of withdrawing the equipment from the production
line, dismantling it unitwise, visualising defects, effecting adjustments, replacing
worn -out parts and finally building it up to get desired accuracies.
Reconditioning
Your Answer
Overhauling
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
True/False
Question
Correct Answer
In case of two handed process chart, the simultaneous activities of both hands are
recorded opposite to each other on the chart.
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Single Answer
Question
What do you mean by the study of repetitive short cycle operations which involve
quick hand / feet motions?
Correct Answer
Micromotion study
Your Answer
True/False
Question
Correct Answer
Macromotion study
An activity should represent an operation or set of operations which can be
performed using a particular kind of equipment or a special skill.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
True/False
Question
Correct Answer
In case of X bar, if the process is not under control indicated by some points
falling outside the c ontrol limits, such points outside the control limits are
eliminated and new trial control limits for the remaining points are computed.
True
Your Answer
True
True/False
Question
Correct Answer
After goods have been manufactured, route sheets and operation layouts should
not be collected back.
False
Your Answer
False
True/False
Question
Planned lubrication is said to be the nervous system of the equipment.
Correct Answer
True
Your Answer
True
Multiple Choice Single Answer
Question
What does the points falling outside the control limits indicate?
Correct Answer
Presence of assignable causes
Your Answer
Mean = Standard deviation
Multiple Choice Single Answer
Question
Which industry out of the following industries require maximum consideration for
safety factor while selecting plant location?
Correct Answer
Nuclear power plant
Your Answer
Nuclear power plant
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer
Large varaitions in hardness of material , Tool wear , Errors in setting
Your Answer
Large varaitions in hardness of material , Play in guide rods , Errors in setting
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method
study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
True/False
Question
Brazing , Welding , Riveting
Correct Answer
An activity can share the same tail event and same head event with any other
activity.
False
Your Answer
True
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Single Answer
Question
Which kind of gauge consists of electrical contacts operating a series of colloured
signal lamps which indicate whether the dimension is correct, oversize or
undersize?
Correct Answer
Multiple gauging
Your Answer
Multiple gauging
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
True/False
Question
Only skilled worker can use the fixed limit gauge.
Correct Answer
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which are major benefits of identifying the critical path?
Correct Answer
It helps to identify the set of activities and events which are critical and as such
must be carefully controlled and monitored , It identifies activities t o be given
preference in allocation of resources. , It helps to exercise "control by exception".
It helps to identify the set of activities and events which are critical and as such
must be carefully controlled and monitored , It reduces the paperwork , It
identifies activities to be given preference in allocation of resources.
Your Answer
Multiple Choice Multiple Answer
Question
Which are reason due to which the progress of work is rarely in line with it's plan?
Correct Answer
Your Answer
Select The Blank
Question
Absenteeism , Machine breakdowns , Substandard performance against prefixed
production standards
Absenteeism , Machine breakdowns , Substandard performance against prefixed
production standards
Correct Answer
The ________ is necessary when the job requires detailed of one or more of the
job characteristics with the help of special equipment which is not available at the
producing company.
Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Your Answer
Select The Blank
Question
Activity time should be obtained from the person responsible for the completion of
an activity , Activity time must be independent of any influence which the
preceding or succeeding activity may have on it. , Activity time may assume that
just the normal quantity of resources required to carry out the activity are
available.
Activity time should be obtained from the person responsible for the completion of
an activity , Activity time must be independent of any influence which the
preceding or succeeding activity may have on it. , Activity time may assume that
just the normal quantity of resou rces required to carry out the activity are
available.
Correct Answer
Capacity decisions have a direct influence on performance of production system in
respect of ________
Delivery performance
Your Answer
Delivery performance
True/False
Question
Correct Answer
Breakdown of machines, absenteeism of worker does not dislocate the
manufacturing activity in process layout
True
Your Answer
True
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity
can be defined as
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Multiple Answer
Question
Which of the following possibilities can be explored by using flow process chart?
Correct Answer
Your Answer
Eliminating the operations or combining the operations with another , Reducing
the distance traveled by the workmen or materials , Avoiding the waiting time and
thereby reduce production losses
Eliminating the operations or combining the operations with another , Reducing
the distance traveled by the workmen or materials , Avoiding the waiting time and
thereby reduce production losses
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as
per instruction is called
Correct Answer
Work Order
Your Answer
True/False
Question
Work Order
Correct Answer
Dust gets mixed with lubricants, forms an abrasive substance and causes premature failure of machinery.
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Draining and refilling of oil
reserviors of plunger pump
Yearly
Yearly
Parts lubricated with oil nipple
Daily
Daily
Tools and slideways
two to three times a day
two to three times a day
Table lubrication
Weekly
Weekly
Select The Blank
Question
Correct Answer
Production control work is ________ in case of floor inspection as compared with
the centralised inspection.
easier
Your Answer
easier
True/False
Question
Operation process charts though indicates the sequence of events but do not show
movements.
Correct Answer
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ is the probability that a bad lot will be accepted by the sampling
plan.
Consumer's risk
Your Answer
Consumer's risk
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer
Hiring capacity
Your Answer
Hiring capacity
Select The Blank
Question
Correct Answer
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Unexpected
Your Answer
Unexpected
Select The Blank
Question
Correct Answer
Production Planning is a centralised activity which includes functions such as
________
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Which is the zone beyond LTPD in case of Oc curve of a general plan?
Correct Answer
Zone of rejection
Your Answer
Zone of rejection
Multiple Choice Single Answer
Question
Where the ignorance towards the degradation of machine leads to?
Correct Answer
Eventual breakdown
Your Answer
Eventual breakdown
Production / Operations Management—Page 1
ASSIGNMENT
Q.1) What is “Operations Management”? What are the objectives of Operations
Management? Enlist key elements of Operations Management.
Answer.1)
An operation may be defined “as the process of changing inputs into outputs thereby
adding value to some entity”.Right quality, right quantity, right time and right price are
the four basic requirements of the customers and as such they determine the extent of
customer satisfaction. And if these can be provided at a minimum cost, then the value of
goods produced or services rendered increases. Thus the objectives of production
management are “to produce goods and services of the right quality, in the right
quantities, according to the time schedule and a minimum cost”.
Objectives of production management may be amplified as under:
 Producing the right kind of goods and services that satisfy customers’ needs
(effectiveness objective).
 Maximizing output of goods and services with minimum resource inputs (efficiency
objective).
 Ensuring that goods and services produced conform to pre-set quality specifications
(quality objective).
 Minimizing throughput-time- the time that elapses in the conversion process- by reducing
delays, waiting time and idle time (lead time objective).
 Maximizing utilization of manpower, machines, etc. (Capacity utilization objective).
 Minimizing cost of producing goods or rendering a service (Cost objective).
Key elements of Operations Management
1. Product selection and design
The right kind of products and good designs of the products are crucial for the success of an
organizing. A wrong selection of the product and/or poor design of the products can render the
company’s operation ineffective and non-competitive. Products/services, therefore, must be
chosen after detailed evaluation of the product/services alternatives in conformity with the
organization’s objectives. Techniques like value engineering may be employed in creating
alternate designs, which are free from unnecessary features and meet the intended functions at the
lowest cost.
2. Process selection and planning
Selection of the optimal “conversion system” is as important as choice of products/services and
their design. Process selection decisions include decisions concerning choice of technology,
Production / Operations Management—Page 2
Equipment, machines, material handling systems, mechanization and automation. Process
planning involves detailing of processes if resource conversion required and their sequence.
3 Facilities (Plant) location
Plant location decisions are strategic decisions and once plant is set up at a location, it is
comparatively immobile and can be shifted later only at a considerable cost and interruption of
production. Although problem of location choice does not fall within preview the production
function and it occurs infrequently, yet it is of crucial importance because of its major effect on
the performance of every department including production. Therefore, it is important to choose
the right location, which will minimize total “delivered customer” cost (Production and
distribution cost). Locational decisions involve evaluation of locational alternatives against
multiplicity of relevant factors considering their relative importance to the organization and
selecting those, which are operationally advantageous to the organization.
4. Facilities (Plant) layout and materials handling
Plant layout is concerned with relative location of one department (Work centre) with another in
order to facilitate material flow and processing of a product in the most efficient manner through
the shortest possible time. A good layout reduces material handling cost, eliminates delays and
congestion, improves co-ordination, provide good housekeeping etc. while a poor layout results
in congestion, waste, frustration, inefficiency and loss of profit.
5. Capacity Planning
Capacity planning concerns determination and acquisition of productive resource to ensure that
their availability matches the demand. Capacity decisions have a direct
Influence on performance of production system in respect of both resource productivity and
customer service (i.e. delivery performance). Excess capacity results in low resource productivity
while inadequate capacity leads to poor customer service. Capacity planning decisions can be
short-term decisions. Long-term capacity planning decisions concern expansion/contraction of
major facilities required in the conversion process, economics of multiple shift operation,
development of vendors for major components etc. Short term capacity planning decisions concern
issues like overtime working, sub-contracting, shift adjustments etc. Break even analysis is a
valuable tool for capacity planning.
6. Production Planning and Control (PPC)
Production planning is the system for specifying the production procedure to obtain the desired
output in a given time at optimum cost in conformance with specified standard of quality, and
control is essential to ensure that manufacturing takes place in the manner stated in the plan.
7.
Inventory control
Inventory control deals with determination of optimal inventory levels of raw materials,
components, parts, tools; finished goods, spares and supplies to ensure their availability with
minimum capital lock up. Material requirement planning (MRP) and just -in-Time (JIT) are the
latest techniques that can help the firm to reduce inventory.
Production / Operations Management—Page 3
8. Quality assurance and control
Quality is an important aspect of production system and it must ensure that services and products
produced by the company conform to the declared quality standards at the minimum cost A total
quality assurance system includes such aspects as setting standards of quality, inspection of
purchased and sub-contracted parts, control of quality during manufacture and inspection of
finished product including performance testing etc.
9. Work study and job design
Work-study, also called time and motion study, is concerned with improvement of productivity in
the existing jobs and the maximization of productivity in the design of new jobs. Two principal
component of work-study are:
(i)
(ii)
Method study
Work measurement
Method study has been defined (BS 3138) as the systematic recording and critical examination
of the existing and proposed ways of doing work, as a means of developing and applying easier
and more effective methods and reducing costs. Method study when applied to production
methods yields one or more of the following benefits:








Improved work environment
Improved facility layout
Better utilization of facilities
Greater safety
Lesser materials handling
Smooth production flow
Lower work-in-process
Higher earnings for the workmen
10. Maintenance and replacement
Maintenance and replacement involve selection of optimal maintenance Preventive and/or
breakdown) policy to ensure higher equipment availability at minimum maintenance and repair
cost. Preventive maintenance, which includes preventive inspection, planned lubrication,
periodic cleaning and upkeep, planned replacement of parts, condition monitoring of the
equipment and machines, etc. is most appropriate for critical machines.
11. Cost reduction and cost control
Effective production management must ensure minimum cost of production and in this context
cost reduction and cost control acquires significant importance. There are large number of tools
and techniques available that can help to make a heavy dent on the production cost.
Production / Operations Management—Page 4
Q.2) What is batch Production? What are its key characteristics? Compare these
characteristics with those of project production.
Answer.2)
Batch production is characterized by the manufacture of a limited number of a product
(but many such quantities of different products) produced at periodic intervals and stocked in
warehouses as finished goods (or finished parts) awaiting sales (or withdrawal for assembly).
Typical examples of batch production are: process industries such as pharmaceuticals, paints,
chemicals; medium and heavy engineering industry engaged in the manufacture of electric
motors, switch gears, heavy motor vehicles, internal combustion engines; manufacture of ready
made garments; manufacture of assembly shops such as machine tools; sub contractors which
take on machining of batches of components to the drawings of a large manufacture etc.
Characteristics of batch production
(a) Short runs:
Short production runs and frequent changes of set also characterize batch
production up. The equipment and the assembly set up is used for a limited
number of parts or assemblies and is then changed to make a different product. The
production is generally made to stock.
(b) Skilled labour in specific trades:
The labour force is expected to posses skill in one specific manufacturing
process, Turning, milling, drilling, welding, grinding, hobbing, fitting etc.
The operator may perform simpler machine set-ups but the separate machine tool setter
performs those involving complex operations.
(c) Supervision to possess knowledge of a specific process
The supervision has considerable knowledge of a specific process. Supervisor in
the grinding section for example, may not expert in turning and drilling work but s
expected to possess a find of knowledge of different types of grinding operations.
Similarly a supervisor in the gear shop is expected to have sound knowledge in working
of different types of gear cutting machines.
(d) Limited span of control:
The amount of supervision required in batch production is lower than that of
jobbing production. The ration of direct workmen to supervisors is more or less a
function of batch size. The smaller the batches, the lower are the ratio of direct workers
to supervisors, and vice versa. This is because smaller lots require each supervisor to
spend a great deal of his time in allocating new work, giving instructions, follow up on
the shop floor for proper movement of materials from and to the machines, identifying
delays and interruptions, and arranging, in consultation with planning, work load in his
section to keep his men busy.
(e) General purpose machines and process type of layout
Plant and equipment is procured and arranged to obtain maximum flexibility.
General purpose machines and handling equipment capable of performing variety of operations
with minimum set –up times are installed in lieu of variety of products. The machines are
Production / Operations Management—Page 5
arranged to give process layout-layout by function. Similar machines capable of doing similar
types of operations are grouped together and kept at one place. Presses for example, are put
together and kept at one place milling machines are placed together at another place, drilling
machines are kept at the third place, gear cutting machines are located at the fourth place and so
on. Each Group of machines is usually designated as a work centre or a section or a shop.
(f) Manual materials handling:
Materials handling in batch production as compared to jobbing production are
small. Individual components and parts are placed in trolleys and trays and are
transported as unit loads. Materials handling may be mechanized by deploying power
driven trucks.
(g) Manufacturing cycle time affected due to queues:
The manufacture cycle time is comparatively smaller than jobbing production but
is much more than mass and flow production. The batches of work tend to queue up at
different machines due to differing cycles times, batch sizes and sequence of operations.
(h) Large work-in-progress:
Work in progress is comparatively large due to varying work content of different
components, imbalance in manufacturing times, formation of queues between the
machines.
(i) Flexibility of production schedules:
Disruptions due to machine breakdown or absenteeism do not seriously affect
production as job can be shifted to another machine or another operator from another
machine can be shifted.
(j) Need to have production planning and control:
Functions of production planning and control in a batch production unit are more
complex than those in jobbing production or mass and flow production:
 Materials control and tools control functions are important. Some kind of replenishment
system needs to be used to ensure routine replenishment
 Detailed operational layout and route sheets are prepared for each part of the product.
 Loading and scheduling needs to be more detailed and more sophisticated since every
machine requires to be individually scheduled.
 Progressing function is very important to collect information on progress of work. A
separate progress card needs to be maintained to record progress of each component.
 Expediting is generally necessary since quite often jobs, due to imbalances in work
content, tend to lag behind
Production / Operations Management—Page 6
Q.3) (a) Why are locational decisions important? What factors should be taken into
account while deciding location of a unit to manufacture washing machines?
Answer.3a)
Locational decisions generally arise when:
 A new manufacturing (or servicing) unit is to be set up.
 Existing plant operations are difficult to expand due to poor selection of site earlier.
 The growth of the business makes it advisable to establish additional facilities in new
territories.
 There is emergence of new social (chronic labour problems) political (political instability
or economic conditions that suggest a change in the location of the existing plant.
 The product development has over weighted the advantages of the existing plant.
 The changes in the industrial Policy of the Government, favoring decentralizing and
dispersal of industries to achieve overall development of the country, do not permit
expansion of the existing plant
FACTORS GOVERNING PLANT LOCATION
Plant location studies are conducted in three phases:
(i)
(ii)
(iii)
1.
General territory selection
Community selection, and
Site selection
Proximity to market:
Every company is in business to market and it can survive only if their product reaches the
consumers on time and at the competitive price. The ratio of selling costs to sales generally
increases with distance. Therefore, in the choice of location o the plant, the factor of “proximity
to the market” is given the highest priority. Locating a plant nearer to the market is preferred if:




The product is fragile.
The product is susceptible to spoilage.
The promptness of service is required.
The product is relatively inexpensive and transportation costs add significantly to the
cost.
Bread, soap factories, etc. require the market to be nearby. If factory cannot be started in
Bombay, it may be started in Thane, Kalyan or Poona. If the product is exported, location near
ports is desirable. This is particularly important for producers who sell bulky commodities,
which incur high transportation costs
Production / Operations Management—Page 7
Nearness to market not only lowers transportation costs but also gives many other benefits
namely:
 A good many administrative problems, which cause perpetual headaches and add to
costs, are avoided.
 Liaison with dealers or whole sellers can be maintained economically and easily
 Other costs such as commission to middlemen, which at times run as high as 20 to 50
percent can be reduced significantly.
 Customer’s accounts do not remain outstanding for settlement. This recovery is easy and
less time saving which itself reduces selling costs.
2. Proximity to source of raw materials:
Since raw materials usually constitute 50 to 60 percent of the total product cost, it is important
that the firm gets its requirements of raw materials at the right time and at the reasonable price for
which the plant must be located in the neighborhood of some source which can meet the raw
materials requirement of the unit “Proximity to supply of raw materials” factor assumes still
greater importance if raw materials are of perishable nature or if they are expensive to transport,
or if their weight is substantially reduced by processing.
Proximity to sources of raw materials is equally important for small units. This is because
usually small units are not considered important customers. They get least priority and in the
event of scarcity are the one to be struck off first from the list. The availability of materials to
small units to a large extent thus depends on their follow up and personal visits to the supplier’s
plant which is possible only if the buyer’s plant is close by.
3. Infrastructural facilities:
Infrastructural facilities consider availability of utilities like power water, disposal of waste etc.
These form the life-blood of many types of industries without which there facilities may come to
a stand still. Underestimating the need of any one of the utilities can be extremely costly and
inconvenient.
Certain industries, for example, aluminium, steel, etc are power intensive and must be located
close to the sites of power generation failing which the shortage of, or increase in cost of
generating power may spell problems for their survival.
Similarly, chemical process industries like paper and pulp, cement, steel, sugar laundries, metal
plating, food preparation etc. requires perennial source of water. Mineral content of water may
also be an important factor. Treatment of water is an expense to be considered while comparing
economics of different locations.
Drainage facilities are important for process industries otherwise disposal of process waster can
create lot of difficulties.
4. Transport facilities:
Transportation cost to the value added is a key determinant of the plant location. The structure of
the transportation cost depends on (i) Characteristics of the commodity (ii) average distance of
shipment (iii) medium of shipment: rail, road, and air sea.
Production / Operations Management—Page 8
The need for transport arises because raw materials and fuel are to be moved to factory site and
finished goods are to be transported from factory to markets. Other things being equal since
transport cost has a major effect on product cost, the regions well served by transport facilities are
most suitable for industrial locations.
5. Labour and wages:
Plant location should be such that required labour is easily available in the neighbourhood.
Importing labour from outside is usually costly and it causes lot of administrative problems.
Availability of required labour locally is better since problem of arranging accommodation and
other related problems do not arise. Since normally workers with specific skills are required,
some sort of training facility should also be available in the neighborhood. Skilled employees are
easily available if ITI’s, or Engineering colleges are there in the neighbourhood.
6. Legislation and taxation:
The policies of the state Government and Local Bodies relating to issue of licenses, building
codes, labour laws, etc. are the factors in selecting/rejecting a particular community/site.
In order to disperse industries and ensure balanced economic growth, both Central and State
government offer a package of incentives for setting up industries in particular locations.
Exemption from excise duty, sales tax and octroi, soft loans from financial institutions, subsidy in
electricity charges, etc. are some of the incentives offered.
Since taxes and duties levied by the State Government and Local bodies substantially influence
product cost, the incidence of such taxes/levies must be taken into account while selecting a
community/site.
7. Climatic conditions:
Climatic factors may not have a major influence these days because of modern air conditioning
facilities available today. However, it may be important factor for certain industries like textile
mills, which require high humidity.
8. Industrial and labour attitudes:
Community attitudes towards supporting hostile trade union activities are an important factor.
Locating facilities in a certain region/community may not be desirable as frequent labour
problems and interruptions are harmful to the plant in the long run. Political situation in the state
and attitude of the government towards labour activities also influences selection of the site for
the plant.
9. Safety requirement:
Safety factor may be important for certain industries such as:
Nuclear power plants
Explosive factories
Location of such industries close to border areas is undesirable.
Production / Operations Management—Page 9
10. Community facilities (or social infrastructure):
Community facilities imply accommodation, educational, entertainment and transport facilities.
Accommodation is needed unless the employees are local residents. Accommodation should be
easily available, comparatively cheap and near some public transport stop.
The locational area should be fully developed, be accessible by road and should have a
convenient and efficient public transport system operating between the area and the township to
enable employees, officials, customers and suppliers to make easy trips for their work
11. Community attitudes:
Community attitudes towards work (i.e. whether the people in the location are hard working or
otherwise) as well as their attitudes towards the incoming entrepreneurs (helpful and cooperative
or otherwise) can make or mar an industry. Locational decisions, therefore, must take such
factors also into account particularly while setting up labour intensive units.
12. Supporting industries and services:
Locational factors should also include proximity of services needed by the firm. A firm desirous
of getting some or all parts made from outside or some of the operations done from outside must
see that such sub-contractors are located in the neighbourhood. Getting a job done from units
located at far off places will mean not only additional transportation cost but also time consuming
and costly. Also if units are too far off, the control on quality of work done by them cannot be
exercised.
13. Suitability of the land:
Site selection should also take into account topography and soil structure of the land. The soil
structure must be capable of bearing loads of foundations. Though modern building techniques
can overcome the limitations of the soil, but if considerable improvement is required then
selection of a low cost and may ultimately turn out to be expensive.
14. Availability and cost of the land:
Site size (Plot size) must be large enough to accommodate the present production facilities,
parking and access facilities but also leave sufficient room for future expansion. As a general
rule, a site five times the actual plant size is considered minimum for all these things including
future expansion.
Production / Operations Management—Page 10
ECONOMY SURVEY OF THE SITE SELECTION:
An ideal location is one where the cost of obtaining materials and processing them into finished
product plus the cost of distributing the finished product to customers is minimum.
One of the most commonly used approaches consists of following steps:
Step 1:
Prepare a list of all relevant factors.
Step 2:
Estimate expenses on materials, transport, wages, power etc for each location on
each of the above factors.
Step 3: Collect data on intangible factors like community facilities, community attitudes etc.
Step 4:
Analyse the tangible data for each location and calculate rate of return on
investment.
Step 5:
Select provisionally a locational based on financial data.
Step 6:
Compare the intangible data for the different locations and select the optimal
location considering intangible data.
Production / Operations Management—Page 11
Q.3) (b) What are objectives of a good layout? Discuss any six principles of a good layout?
Answer.3)(b)
OBJECTIVE OF A GOOD PLANT LAYOUT
Only through an efficient layout, the organization can attain the following objectives:
(i)
Economy in handling of materials, work-in-process and finished goods.
(ii)
Minimization of product delays.
(iii)
Lesser work-in-progress and minimum manufacturing cycle time.
(iv)
Efficient utilization of available space.
(v)
Easy supervision and better production control.
(vi)
Greater flexibility for changes in product design and for future expansion.
(vii)
Better working conditions by eliminating causes of excessive noise, objectionable odor
smoke etc.
PRINCIPLES OF A GOOD LAYOUT
(i)
Overall integration of factors:
A good layout is one that integrates men, materials, machines and supporting
activities and others in a way that the best compromise is obtained
No layout can satisfy each and every principle of a good layout. Some criterion may
conflict with some other criterion and as a result no layout can be ideal it has to
integrate all factors into the best possible compromise.
(ii)
Minimum movement:
A good layout is one that permits the minimum movement between the
operations.
The plant and machinery in case of product layout and departments
in case of
process layout should be arranged as per sequence of operations of most of the
products.
 Since straight line is the shortest distance between any two points, men
and materials as far as possible should be made to move along the
straight path
A door may be made in a wall or a hole may be drilled in a ceiling if that eliminates or
reduces material handling in place of stairs or a distant door.
Production / Operations Management—Page 12
(iii)
Uni-direction flow:
A good layout is one that makes the materials move only in the forward
direction, towards stage of completion, with any backtracking.
 Since straight line is the shortest distance between any two, points,
materials as far as possible should be made to move on the principle of
straight line flow. And when straight line flow is not possible, other
flows like U-shaped flow, circular flow or zig zag flow may be adopted,
but the layout may ensure that materials move in the forward direction
(Fig 4.1)
 To ensure forward flow, equipment if necessary may be duplicated.
(iv)
Effective use of available space:
A good layout is one that makes effective use of available space both
horizontal and vertical
 Backtracking and duplicated movements consume more time, involve un-necessary
materials handling, add to cost and lead to inefficiency.
 Raw materials, work-in-progress and finished goods should be piled vertically one above
another rather than being strewn on the floor.
 Pallets or equivalents should be made use of to pile up several layers one above another
 Area below the work tables or in the cupboards built into the wall are welcome since they
reduce requirement of space
(v)
Maximum visibility:
A good layout is one that makes men, machines and materials ready observable at all
times.
 All departments should be smoothly integrated, convenient to service and easy to
supervise
 Every piece of positioning or screening or partitioning should be scrutinized and carefully
planned.
 Special cupboards, enclosures, offices, partitions etc. should be avoided except when
their utility is established beyond doubt.
(vi)
Maximum accessibility:
A good layout is one that makes all servicing and maintenance point readily
accessible.
 Machines should be kept sufficiently apart and with reasonable clearance from
The wall so that lubrication, adjustment and replacement of belts, removal of parts at the
time of repairs etc can be done conveniently by the maintenance staff.
Area in front of electrical panels and fire extinguishers should be kept free from
obstructions.
Production / Operations Management—Page 13
Q.4) How does production planning differ from production control? What are the key
functions of production planning and control?
Answer.4)
Production planning versus production control.
Planning (Planning the work)
Control (Working the Plan)
Planning involves collection and maintenance
of data regarding time standards, materials and
their specifications, machines and their
quantities, tools and their process capabilities,
drawings and operational layouts etc.
Control involves dissemination of data
preparation of reports regarding output,
machine and labour efficiency, percent
defectives etc.
Planning is seeing that requirements tool,
machines, men, instructions, authorization and
the like-will be available at the right time and
in the right quantities and are of proper quality.
Planning involves preparations of load charts
and fitting various work orders into
uncommitted time available on the company’s
facilities (men or machines).
Planning involves preparation of all necessary
forms and paper work.
Planning involves designing suitable feed back
as to what may happen.
Planning involves forwarding thinking
regarding the remedial action to be taken if the
job falls behind schedule.
Planning therefore is a centralized
Activity (in the office) and includes such
functions as materials control, tools control,
process planning and scheduling.
Control is seeing the requirements are actually
made available at the right place and in the
right quantities.
Control involves actual seeing that the jobs are
started and completed as per schedule prepared
by the scheduling cell of the PPC.
Control involves actual issue of forms and
paper work.
Control involves keeping track of what is
happening and collecting information as to
what has happened.
Control involves suggesting remedial action
when the job is falling behind schedule.
Control is thus a diffused activity (in the shops)
and includes functions such as dispatching,
progressing and expediting.
Production / Operations Management—Page 14
FUNCTIONS OF PRODUCTION PLANNING AND CONTROL:
Production planning and control is normally assigned two sets of functions:
(I)Regular functions and
(ii) Optional functions.
(i)
Regular functions are those, which are generally assigned to PPC in most of the
organizations through the importance of the function, may vary from industry to
industry.
(ii)
Optional functions are those, which may be assigned to PPC depending upon policy
of the management of the firm.
Common (or Regular Functions)
Optional Functions
Order Preparation includes activities like
making of work orders, converting work orders
to shop orders, preparing auxiliary orders and
releasing such orders to those concerned to
authorize their activities
Cost Estimation concerns preparations of
Preproduction cost estimates to be used by
sales department for quotation purposes
(Alternatively this may be assigned to Costing
Department
Or
Industrial
Engineering
Department)
Materials control concerns preparations of
materials estimates, indenting non-stock
materials, ascertaining availability of materials
purchased to stock, continual follow-up with
purchase and stores for timely receipt of
materials, and advising stores to allocate
required quantities or available materials
(alternatively on their receipt) against specific
shop orders.
Work measurement concern fixation of time to
be allowed to a qualified workman to carry out
a specific task, under specified conditions and
at the defined level of performance. Work
measurement employs scientific, well-known
techniques like time study, work sampling
standard data, production study, analytical
estimating
etc.
(Alternatively,
work
measurement function may be assigned to
Industrial Engineering department.
Sub-Contract concerns offloading of certain
work on outside vendors for economic reasons
or to augment the existing manufacturing
facilities (Sub-contract work alternatively) be
handled by Materials/purchase Department)
Process planning or Routing concerns fixation
of method of manufacture: operations and their
sequence, machine tool for each operation, jigs
and fixtures, measuring instruments and gauges
etc. to enable shops to produce goods of the
right quality at the lowest cost.
Tools control concerns preparations of
estimates of cutting tools (Standards as week
As non-standards tools), gauges and measuring
instruments, jigs and fixtures etc indenting nonstick tooling: follow up with tool room for
timely manufacture of jigs and fixtures;
periodical replenishment of worn-out-nonconsumable tooling (e.g. work arbors, collets,
copying masters, Allen keys, spanners, etc.
Capacity planning concerns estimation of
requirements of men and machines as the basis
of decision making to meet the firm’s increased
volume of business (Some companies prefer to
assign this function to Engineering department.
Production / Operations Management—Page 15
Scheduling concerns preparation of machine
loads, fixation of calendar dates of various
operations to be performed on a job,
coordination with sales to confirm delivery
dates of new items and periodical preparation
of dispatch schedules of regular items.
Dispatching
concerns
preparation
and
distribution of shop orders and manufacturing
instructions to the concerned department as
their authority to perform the work according
to the predetermined schedule.
Progressing concerns collection of data from
manufacturing shops, recording of progress of
work, and comparing progress against the plan.
Expediting concerns intensive progress chasing
to identify delays and interruptions which may
hold up production, devising cures from time to
time to keep rate of production in line with the
schedule, communicating possible failure in
delivery commitments to Sales Department.
Demand
forecasting
concerns
making
projection of company’s product market.
Though, long term forecasts are given by Sales
Department but short term forecasts required
for materials planning, machine loading, sub
contracting etc may be prepared by PPC
department
Production / Operations Management—Page 16
Q.12 (a) What is critical path? What does it signify? How is it identified?
Answer.2)(a)
Critical path analysis, an important aid to planning, scheduling and coordinating the
activities if large scale projects. Is a synthesis of two independent techniques: Programme
Evaluation and Review Technique (PERT) and Critical Path Method (CPM).
Though the two techniques were developed independently, they are only superficially different.
The two method have many features in common and are now combined into a technique called
Critical Path Analysis (CPA) or Network Analysis.
There are three basic different between a PERT network and CPM network:
 PERT is event oriented while CPM is activity oriented (i.e. PERT prepares network from
events while CPM builds if from activities)
 PERT provides for an allowance for uncertainty while CPM does not (i.e. PERT makes
three time estimates for each activity while CPM makes one time estimate)
 Activity time in CPM technique are related to costs while it is not so in PERT since it is
event oriented
Significance of critical path
Critical path analysis offers several advantages. It
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
Forces through pre-planning. Each and every activity compromising the project is
identified and recorded. Nothing is left to memory or chance which prevents crises
in scheduling
Increases coordination of tasks as technological relationship between the activities
suggests which activities can run simultaneously and which should succeed others.
Helps computations of different project duration’s for different level of resources and
thereby select a plan that minimizes total project cost.
Indicates optimal start and finish times of each activity of the project.
Defines areas of responsibility of different departmental heads for timely execution
of the project.
Facilitates progress reporting and limits unnecessary discussion at the progress
meetings.
Identifies troubles spot often in advance and apply remedial measures.
Enables the plan to be revised in accordance with changes/changing circumstances.
Helps to exercise “control by exception” and prevents cost overruns.
A Project comprises a series of activities and the identification of the individual activities requires
knowledge and experience of the men responsible for the planning of the project. Even the
preliminaries-mere listing of the activities-make the operating personnel:
 Think of details about the project well in advance.
 Observe critically the way in which the various activities interact or compete for scarce
resources
Production / Operations Management—Page 17
 Improve upon the original plans even before network is formally drawn and analyzed.
A project, therefore, must be torn into a set of identifiable activities. There are no set rules but
general guidelines are as under:
 An activity should represent the smallest unit of the operation or set of operations over
which management desires control.
 An activity should represent an operation or set of operations, which can be performed
using a particular kind of equipment or a special skill. For example in
construction project, plumbing is considered as one activity while wiring can be
considered as another activity since the first activity requires plumbers and the second
activity needs electricians.
Production / Operations Management—Page 18
Q.12) (b)
Activity
1-2
1-3
1-4
2-5
3-5
4-5
4-6
5-6
Optimistic
02
02
02
01
04
02
02
03
Most Likely
03
04
06
01
05
03
05
05
Pessimistic
10
06
10
01
12
04
08
13
Answer:
(a) Expected time of an activity can be obtained from the three time estimates using the formula:
te = a + 4m +b
6
where
a
m
b
=
=
=
Optimistic time
most likely time
pessimistic time
a
m
b
=
=
=
2
3
10
For activity (1-2)
te
=
2 + 4 x 3 + 10
6
te
=
24
6
=
4
Expected times of all activities of the network, calculated on above lines, are tabulated below.
Activity
1-2
1-3
1-4
2-5
3-5
4-5
4-6
5-6
Three time estimates
02-03-10
02-04-06
02-06-10
01-01-01
04-05-12
02-03-04
02-05-08
03-05-13
Expected time
4
4
6
1
6
3
5
6
Production / Operations Management—Page 19
4
5
6
6
3
6
3
4
6
4
1
2
1
5
Critical path is 1-3,3-5,5-6 and the duration for the project is 16 weeks (4+6+6)
Variance is
Vi
=
(b –a) X (b – a)
6
6
V1-3
=
4
9
V3-5
=
16
9
V5-6
=
25
9
V
=
V1-3 + V3-5 + V5-6
V
=
5
Standard deviation Z
=
T - Tcp

=
19 -16
5
=
=
3
2.236
1.34
The approximate probability value when Z = 1.34 is 0.9099
The probability of completion of critical path by the schedule time of 19 weeks = 91%
Production / Operations Management—Page 20
Q.5) What is preventive maintenance? Why it is better than Breakdown Maintenance?
What are the key activities of Preventive Maintenance?
Answer.5)
Preventive maintenance anticipates failures and adopts necessary actions to check
failures before they occur. It includes activities like inspection, lubrication cleaning and unkeeps,
minor adjustments and replacements found necessary at the time of inspection etc. Preventive
maintenance can be either: running maintenance or “shut down maintenance”.
Running
maintenance includes maintenance activities (e.g. minor adjustments
In machines revealed
through inspections, lubrication, cleaning and unkeep etc.)
Which are carried out when the
machine is still running. Shutdown maintenance includes preventive maintenance activities such
as minor component replacement whose needs are identified through inspections, which require
stoppage of Machines. Preventive inspection is one of the key activities of preventive
maintenance which
is usually performed by making use of human senses – watch) eye),
listen (ear), Touch (hand, leg, body) smell (nose) and taste (tongue) – but the trend is Changing
towards use of condition monitoring instruments. Such maintenance. Practice is known as
predictive maintenance or condition based maintenance.
Production / Operations Management—Page 21
Q.10) (a) What are X-R Charts? How are they made and used in controlling a process?
Answer.10)
X-R chart is a pair of chart consisting of a average (called X chart) and a range
Chart (called R chart) placed one below another on a piece of graph paper. The X chart is used to
control the mean value of the characteristic an R-chart is used to restrict the range of variations in
the values. X-R charts are drawn when the characteristics are measurable. Each chart consists of
three values: a central line, upper control limit and lower control limit. The central line represents
the arithmetic average of the sample means which equals the mean of the population, u. The
upper and lower control limits are located at three standard deviation on either side of the central
line.
Samples of fixed size are drawn at regular intervals and measurements are taken.
The
samples wise values of the mean and range are plotted in their respective X
and R charts.
The spread of sample points in the charts is studied to decide the remedial action (if any) to be
taken. The X chart analyses whether or not the mean of the quality Characteristics is within
control while R-chart analyses whether or not the variability is within control.
STEPS TO PREPARE X-R CHART
A pre-requisite to the preparation of the chart is the decision on the following aspects:
 Quality Characteristics refer to the property of the product, which is to be assessed. The
quality characteristics must be capable of being measured. In case of more than quality
characteristics, separate chart is made for each quality characteristic.
 Sample size refers to number of pieces comprising each sample. Sample size is an
important decision. It is a common practice to use sample of n = 4 or 5 to have low
appraisal cost. Large samples such as n = 15 or 20 are used if the process standard
deviation is large.
 Sample Population refers to the number of samples to be collected to construct a control
chart. The number of samples must be sufficient. Usually, 20 samples each of size 4 or 5
are enough to have good estimates of the process average (X) and dispersion (R).
 Time Interval measures the time gap between consecutive samples. Time interval, as a
genera rule, should be proportional to the average frequency of out-of-control conditions.
It is a fairly complex decision since a number of factors such as cost economy,
susceptibility of the process to disturbances; convenience of the inspector etc. requires to
be considered.
The making of X-R Charts involves the following Steps:
Step 1:
(a)
(b)
(c)
Step 2:
A
Collect Data
Collect sufficient samples spread over a reasonable period. Each sample must be
of equal size.
Measure each component comprising the sample for the given quality
characteristic
Record individual measurements on a work data sheet.
Calculate mean (X) and Range (R) of each sample
The mean which is written as X (X bar) is average of each sample and is
Production / Operations Management—Page 22
B
C
Step 3:
A
B
Step 4:
Obtained by totaling the individual measurements of the units comprising the
sample and dividing the total by the sample size (number of units in each sample)
The range, which is written as R, is obtained as the difference between the
highest and the lowest measurement of a sample.
The values of X and R are recorded sample wise either on the extreme right of
the individual measurements on the data sheet or in a separate table.
Calculate grand Average (X) and mean Range (R)
The grand average, which is written as, X (X double bar) is the average of the
sample averages and is obtained by dividing the total of the averages of all the
samples by the total number of samples.
The mean range, which is written as, R (R bar) is the average of the ranges and is
obtained by dividing the total of the ranges of the samples by the total number of
samples.
Set up Control chart for the average
A
Set up a control chart with the central line drawn at X (X double bar), upper
control limit located X + A2 R (R bar) and the lower control limit set up at X-A2R.
B
Plot the averages to see whether the process was under control when samples
were drawn.
If all points fall within the control limits, the process is said to be under control
If process is not under control (indicated by some points falling outside the
control limits), eliminate points outside the control limits and compute new trial
control limits for the remaining points.
Repeat step 4 (d) until all points fall within the control limits
Control limits in a particular situation should be revised from time to time as
additional data is accumulated.
C
D
E
F
Step 5: Calculate control limits of the range chart
A
B
C
D
E
F
The control chart for range chart is set up with central line as R, upper control
limit (UCLR) located at D4R above the central line and lower control limit
(LCL) at D3R below the central line
Plot the value of the range of each sample.
If all points fall within the control limits no modification is necessary unless it is
desired to reduce the process dispersion
if range chart exhibits lack of control indicated by some points falling outside the
control limits, eliminate those points out of control and compute new trial control
limits
Repeat step 5 (d) until all points fall within the control limits.
Control limits in a practical situation should be revised time to time
as
additional data is accumulated.
Production / Operations Management—Page 23
Step 6: Use control chart
A
B
Collect samples of fixed size at specified intervals of time.
Measure each unit of the sample for the quality characteristics, calculate mean
and the range of each sample.
C
D
Plot the values of X and R of each sample in their respective charts
Study the trend of the points to interpret and suggest remedial action
Q10 (b) ABC company produces a solvent, which must contain 3 percent of alcohol. It tries
to maintain the actual percentage at 3 + 0.3 percent. It tests hourly in samples of five. The
following table shows the results of last five samples. Set up a control chart for mean and
examine whether the process is under control.
A) Solution:
(i)
Collect data
(ii)
Calculate mean (X bar) and range(R bar)
(iii)
Sample No.
Arithmetic Mean (X bar)
Range(R)
1
2
3
4
5
2.92
2.98
3.06
3
3
0.3
0.1
0.1
0
0.2
Calculate grand average and the mean range
X(X bar)
R
=
2.92 + 2.98 + 3.06 + 3 + 3
5
=
2.992
=
0.3 + 0.1 + 0.1 + 0 + 0.2
5
=
0.14
Production / Operations Management—Page 24
(iv)
Set Up control chart for the average
Central Line = CLx = X(X bar)
=
2.992
Upper Control Limit
=
UCLx = X (X bar) + A2.R(R bar)
=
2.992 + 0.5768 x 0.14
=
3.476
=
UCLx = X (X bar) - A2.R(R bar)
=
2.992 - 0.5768 x 0.14
=
2.507
Central line CLR
=
R(R bar)
=
Lower control limit
=
LCLR =
D3.R (R bar)
=
0 x 0.14
=
0
=
UCLR =
=
2.114 x 0.14
=
0.29596
Lower Control Limit
(v)
Set up a range chart
Lower control limit
0.14
D4.R (R bar)
Production / Operations Management—Page 25
Q.6) What is method study? Describe the procedural steps to develop easier and effective
methods.
Answer.6)
Method study is the systematic recording and critical examination of existing and
proposed ways of doing work, as a means of developing and applying easier and more effective
methods and reducing costs.
Method study is an organized approach and its investigation rests on the following six basic steps
outlined in the block diagram
 Select
the work to be analyzed.
 Record
all facts relating to the existing method.
 Examine
the recorded facts critically but impartially.
 Develop
the most economical method commensurate with plant Requirements
 Install
the new method as standard practice.
 Maintain
the new method.
Selection of the job
Selections of the jobs to be studied for methods improvement by the method study
practioner is a managerial responsibility and it (selection) may be based on economic
technical or human consideration. Economic consideration justifies selection based on
the economic worth (i.e. money saving potential) of the job.
Technical consideration identifies jobs, which require studies to overcome manufacturing
difficulties (excessive rejection, relaxation in prefixed performance standards, inability if
the shops to stick to specified machining parameters such as speeds, feeds, depth of cut
etc., inconsistent quality etc.) Human consideration in job selection is usually given
weightage while introducing method study practices for the first time.
Recording of facts
Systematic recording is the most crucial step in method improvement. Since recording
by long hand (or by descriptive method) has its limitations, it is not recommended for use
in method study. Instead, five symbols and eight charting conventions are used to record
facts relating to the job under study. Five typical symbols are O, ||, , D and V and eight
charting conventions concern composition of the chart, reject, rework, repletion, change
of state, introducing of new material, combined events and numbering of events. The
document on which details of the process are recorded by the above referred symbols and
conventions is called chart. There are four basic types of chart: (i) operation process
chart (ii) Flow process chart (iii) multiple activity charts and (iv) two handed process
chart.
Besides charts, two types of diagrams-flow diagram and string diagram are drawn when
recording details of an existing layout. Travel chart is another typical chart, which is
used to record frequency of movements (weight x distance) between work
centres/departments.
Production / Operations Management—Page 26
Repetitive short cycle operation which involves quick hand/feel motions (i.e. microscopic
motions) may be studied with micro motion study. Glibreth, founder father of micro
motion study, also developed photographic techniques called cyclograph and
chronocylegraph to record path of the motions of the members of the body.
Critical examination
Critical examination aims to analyze the facts critically and thereby give rise to
alternatives, which form the basis of selection and development of easier, and effective
methods.
Critical examination is conducted through a systematic and methodical questioning
process. Each activity recorded on the chart, whether it relates to processing or
inspection, or material handling, or to any other aspect, is picked up one at a time and is
examined minutely. The questioning process is considered under five major heads,
namely the purpose, the place, the sequence, the person and the means. These five
aspects in critical examination are referred to as five governing considerations.
Development and selection:
Development and selection stage concerns short listing of ideas generated at the critical
examination stage, testing each short listed idea for its technical and economic feasibility,
and making selection among the alternatives wherever choice exists. To develop ideas
and to ascertain their technical and economical feasibility, the method study practioner
needs to solicit the cooperation of personnel from different departments of the company.
Various techniques available for the development and selection purpose are: cost benefit
analysis, break even analysis, investment analysis and critical path analysis.
Installation
‘Installation’ (or implementation) of the proposed method involves preparation of project
report on recommendations making oral presentation to the top management, securing
approval of the decision maker, assisting line management during implementation,
arranging training of workmen, and getting jobs (operations) retime after implementation,
arranging training of workmen, and getting jobs (operations) retimed after
implementation.
Maintenance
“ Maintenance” phase is the follow up phase after implementation, which serves as a
monitoring and control mechanism. It helps to ensure that the revised methods are set
into concrete and workmen do not revert back to old methods. It also provides an
opportunity to the practitioner to assess the effectiveness of the approach followed by
him and makes changes in the methodology (if required).
Production / Operations Management—Page 27
Q.9) (a) What desirable conditions need to be present to be present to guarantee success of
an incentive scheme?
Answer.9)
A good wage incentive plan should have the following characteristics.
 Administrative simplicity:
The incentive system should be simple and must be easily understood by the workers and
their representatives. An incentives scheme, which can be understood, only by engineers and
mathematicians or a scheme which involves the use of complex formulate or references and
cross-references is sure to fail. The incentive scheme should be such that workmen can
calculate their own earnings easily and quickly.
 Minimum clerical work:
The system should fit into existing system of production and cost control. It should not
involve any significant addition to the clerical work.
 Maximum coverage:
The system should cover as many workmen as possible. A scheme if applied to a few
workmen creates a demoralizing effect on the morale of those not covered by the scheme.
 Direct
Incentive payments should increase at least in direct proportion to the increase in output by
the operator. There are two reasons:
Firstly because it is more difficult to producer extra units and secondly because saving in the
overheads are far greater at higher levels of production.
 Period of Payment
The period of payment should be as short as possible
 Adequate guaranteed minimum hourly rate
The scheme must ensure adequate guaranteed minimum hourly rate to all incentive workers
regardless of their output. Such an hourly guaranteed rate is normally referred to as the
guaranteed base rate.
The guaranteed base rate must be realistic and should be at least equal to the hourly rate
payable to a non-incentive worker doing similar job in the industry. Incentive earnings of the
workers should never be regarded as a substitute for poor wages.
 Accurate and yet attainable performance standards
Performance standards should be set through systematic work measurement studies. The
experts to that there is no dispute or malpractice and yet the standards are attainable so that a
worker working at normal pace can attain them should base the standards of measurement on
the assessment.
Production / Operations Management—Page 28
Further the incentive plan should be such that it provides an opportunity to all average
workers to earn reasonable earnings.
 Consistency of the standards
Standards once fixed should not be changed unless there is a permanent change in methods,
or change in equipment, or change in material and plan should provide for the provisions to
modify the performance standards.
 Inbuilt check on process rejections
A good incentive scheme should exercise a check on the operator against achieving higher
bonus by poor workmanship. Payment should be made only for pieces declared acceptable
by the inspection department and a workman constantly producing substandard pieces should
be liable for disciplinary action.
 Payment of partially completed jobs
The problem of payment for the incomplete work arises only in case of long cycle jobs.
Situations do arise when the jobs are of very long cycle duration and cannot be finished
within the bonus period. Similarly, a semi-finished job may require to be handed over by one
operator to another at the end of shift, or prior to having a holiday. The scheme should
clearly spell out as how assessment of work done by the workmen on the same job will be
carried out and how disputes arising out of such assessment would be resolved.
 Payment of Idle Time
Adequate safeguards must be provided to compensate the operator for the time lost due to
reasons beyond his control. A good incentive scheme should ensure that an operator does not
suffer financial loss for reasons attributable to the managerial weakness, e.g.: lack of material
due to bad buying, breakdowns of the machines due to poor maintenance practices, nonavailability of work etc. Thus an operator rendered idle because of factors attributable to the
management should be given a lieu bonus.
 Safeguards
The scheme should be fair not only to the employees but also to the employer. Safeguarding
clauses as under should be incorporated to protect.
a. Management’s right to change a standard when there are changes in methods. Materials
and machines
b. Management’s right to withdraw or discontinue temporarily a scheme during bad period.
c. Management’s right to initiate disciplinary action against operators who continually
produce sub-standard articles.
d. Management’s right to initiate disciplinary action against employees who, time and
again, do not achieve minimum standard of production even in the presence of fair and
accurate standards.
e. Management’s right to initiate disciplinary action against employees who, time and again
are found using speeds and feeds higher than those recommended in the process sheet (or
operational layouts)
 Maximum ceiling on the earnings
The system should have built-in-control against higher earnings beyond a certain limit.
Firstly, the system should discourage workers to work beyond a certain limit otherwise too
attractive an incentive scheme may induce the worker to work more and more and thereby
Production / Operations Management—Page 29
adversely affect his health. Secondly, the system should ensure that in case of loose
standards the company does not lose financially.
 Consistency of Plan
The plan should be consistent over a period of time. Frequent changes in the plan make it’s
functioning difficult. Faith in plan is lost if there are frequent revisions.
 Acceptance of Labour Body
The scheme should finally have acceptance of the labour body. The body of workers’
representatives to prevent any misunderstanding and ill-feeling later on must accept the basic
incentive plan and its provisions.
 Continuous Use
The scheme should be in continuous use. The temporary use of the scheme in good times and
its discontinuation in bad times makes it’s functioning difficult.
 Define End Results
The plan must result in reduction in per unit labor cost.
Production / Operations Management—Page 30
Q 13)
Answer 13)
i) Average Cycle time
Normal Time
=
0.22 + 0.24 + 0.28 + 0.26 + 0.25
5
=
0.25
=
Observed time x Rating
100
=
0.25 x 80
100
=
0.2
Similarly, average cycle time and normal time for all the elements are calculated and
tabulated as below
Element
A
B
C
D
E
ii)
Avg. cycle time
0.25
0.15
0.35
0.102
0.12
Rating
80
100
120
90
100
Normal time
0.2
0.15
0.42
0.0918
0.12
Total Normal time
=
0.2 + 0.15 + 0.42 + 0.0918 + 0.12
Total Normal time
=
0.9818
15
100
x
=
0.1473
Contingency Allowance =
5
100
x
Standard time
=
0.0491
Relaxation Allowance =
0.9818
0.9818
Normal time + Relaxation Allowance + Contingency Allowance
=
Standard time
=
1.1782
0.9818 + 0.1473 + 0.0491
POM assgn : Sushant
Multiple Choice Multiple Answer
Question Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Multiple Choice Multiple Answer
Question What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It
helps to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Multiple Choice Multiple Answer
Question Which kind of natural delays and interruptions are considered during estimation of activity
time?
Correct Answer Shop efficiency , Breakdowns , Absenteeism
Your Answer Breakdowns , Absenteeism , Delay due to shortage of resources
Multiple Choice Multiple Answer
Question How to exercise control over quality?
Correct Answer Periodical analysis of inspecting reports to establish causes of rejections , Preperation of
quality standard and specifications , Exercising control over inputs
Your Answer Periodical analysi s of inspecting reports to establish causes of rejections , Preperation of
quality standard and specifications , Replacing existing measuring instruments by those having smaller
least count. , Exercising control over inputs
True/False
Question In case of forward pass computation, the earliest event time of a plain event equals the
earliest event time of the preceding event plus duration of activity emanating from the preceding event.
Correct Answer True
Your Answer True
True/False
Question Any proposed change must not be intimated to workers in advance.
Correct Answer False
Your Answer False
Select The Blank
Question The ________ are the definitions of the measurable as well as nonmeasurable characteristi cs
of the product.
Correct Answer Specifications
Your Answer Standards
Multiple Choice Multiple Answer
Question How many of the following are types of specification?
Correct Answer Material specifications , Dimensional specificati ons , Performance specifications
Your Answer Material specifications , Dimensional specifications , Performance specifications
Select The Blank
Question A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer Collaboration
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Multiple Choice Single Answer
Question Which phase of method study is concerned with analyzing the facts critically, generating
alternatives which form the basis for selection and development of improved methods?
Correct Answer Critical examination
Your Answer Development and selection
Multiple Choice Single Answer
Question In exponential smoothing method,for a stable demand pattern and better smoothing e ffect,
value of fraction( Alpha) selected is
Correct Answer 0.05 to 0.10
Your Answer 0.20 to 0.25
Multiple Choice Single Answer
Question Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer Reduce process rejections
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Acceptable quality level
Multiple Choice Multiple Answer
Question Which of the following observations are expected from the preventive maintenance person?
Correct Answer Wrong allignments , Overheating defects , Excessive play
Your Answer Wrong allignments , Overheating defects , Excessive play
Multiple Choice Single Answer
Question When should operator or supervisor is supposed to sign the perforated route sheet?
Correct Answer After completion of operation
Your Answer After completion of operation
Select The Blank
Question The ________ must ensure that the product satisfy the functional requirements of it's usage.
Correct Answer Quality of design
Your Answer Quality of conformance
Multiple Choice Single Answer
Question What do you understand by the properties which are difficult to measure quantitatively but
usually measured by the comarision and then classification into acceptable or unacceptable?
Correct Answer Attributes
Your Answer Attributes
Multiple Choice Multiple Answer
Question Which of the following may be the objectives of project crashing?
Correct Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources
Your Answer To complete the project in the least possible time , To reduce project cost below it's
normal cost , To achieve uniformity in requirement of resources , To improve the labour efficiency
True/False
Question Since recording by descriptive method has it's limitations, it is not recommended for use in
method study.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What do you mean by the selection of the job for the method study on the basis of
manufacturing difficulties?
Correct Answer Technical consideration
Your Answer Economic consideration
Multiple Choice Single Answer
Question One of the external factors influencing Material Planning is
Correct Answer Price trends
Your Answer Price trends
Select The Blank
Question The ________ is the maximum percentage defective that for the purpose of sampling
inspection can be considered satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer Lot Tolerance Percentage Defective
True/False
Question Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer False
Your Answer True
Select The Blank
Question Capacity decisions have a direct influence on performance of production system in respect of
________
Correct Answer Delivery performance
Your Answer Delivery performance
Multiple Choice Multiple Answer
Question Which of the following factors related to the labour and wages are considered while deciding
the plant location?
Correct Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Your Answer Prevailing wage pattern , Productivity of labour , Industrial relations
Multiple Choice Single Answer
Question Which is the ideal place to write a description of an activity in a network?
Correct Answer Above the arrow
Your Answer Above the arrow
True/False
Question If the firm has adopted elaborate planned maintenance system, there is no chance of any
unplanned maintenance work.
Correct Answer False
Your Answer False
Match The Following
Question Correct Answer Your Answer
Change in chemical characteristic Chemical reaction Chemical reaction
Consumption of effort Posting a ledger Giving directions or instructions
Information given Giving directions or instructions Posting a ledger
Subtraction Removal of worn-out part from a machine Removal of worn -out part from a machine
Select The Blank
Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.
Correct Answer One
Your Answer One
Select The Blank
Question A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single Answer
Question Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
True/False
Question Both, preventive and breakdown maintenance work must be assigned to the same team.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Product layout is employed for manufacturing following products
Correct Answer refrigirators
Your Answer automobile components
Multiple Choice Single Answer
Question What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer Breakdown
Multiple Choice Multiple Answer
Question What is indicated by the erratic pattern points falling above and below the control limits in the
Xbar-R-control chart?
Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
True/False
Question In case of two handed process chart, inspection symbol is used when check by touch or feel is
involved.
Correct Answer True
Your Answer True
True/False
Question Site selection should also take into account topography and soil structure of the land.
Correct Answer True
Your Answer False
Multiple Choice Single Answer
Question The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Effectiveness
Select The Blank
Question A ________helps to avoid crowding of jobs at a particular machine by change of route of
some of the jobs or by diverting work to other machine.
Correct Answer Control board
Your Answer Control board
Match The Following
Question Correct Answer Your Answer
Emerson Efficiency Plan Wage Payment Sampling Inspection
Craft Facilities Planning Facilities Planning
Work Sampling Machine utilization Production Scheduling
Gantt Chart Production Scheduling Charting technique
True/False
Question Only skilled worker can use the fixed limit gauge.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which are the different methods to record details of the existing method during method
study?
Correct Answer Charts , Diagrams , Templates or models
Your Answer Charts , Diagrams
Multiple Choice Single Answer
Question Which photographic technique is used to record path of motions of the members of the body
during method study?
Correct Answer Cyclograph
Your Answer Flowgraph
Select The Blank
Question The ________ is the watch dog which ensures that every element of production and activities
which could affect the quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer Inspection
True/False
Question In case of centralised inspection, inspection rooms generally become bottleneck and cause
delay in taking action regarding rejection or rework.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are minimum requirement for a good quality of de sign?
Correct Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
POM assgn
True/False
Question
Flow process charts do record movements as well as visual pictures.
Correct Answer
False
Your Answer
False
True/False
Question
Correct Answer
The OC curve is based on the assumption that if the lot is large in comparison to the
sample, the probabilities of the OC curve will follow a poisson distribution.
False
Your Answer
True
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known as
Correct Answer
Productivity
Your Answer
Productivity
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires following
documents
Correct Answer Sales Order , Work order , Shop order
Your Answer
Work order , Purchase order
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the
condition of an item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer
Preventive maintenance
Match The Following
Question
Correct Answer
Your Answer
Scheduling of interrelated
activities of small projects with
consideration of uncertainty of
duration of activities.
Critical Path Analysis
Critical Path Analysis
Two machines & processing time
depends on sequence of job
loading
Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm
Sufficient orders and resonable
choice of machines
Index Method
Time relationship between when a Critical Ratio Scheduling
product is required and when it
can be made available
Index Method
Time series
Select The Blank
Question
Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct Answer easier
Your Answer
easier
Match The Following
Question
Correct Answer
Your Answer
When to inspect
Stages of inspection
Specification
What to inspect
Specification
Standard
How to inspect
Inspection devices
Tools & Jigs
How much to inspect
Sampling or cent percent
inspection
Stages of inspection
Multiple Choice Single Answer
Question
Material Planning is an integral part of
Correct Answer
Production Planning
Your Answer
Process Planning
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality
equal to or better than AQL .
Correct Answer Rectangular
Your Answer
Rectangular
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
Reduce lead time
Multiple Choice Single Answer
Question
Material control function of PPC is concerned with
Correct Answer
Preparation of material estimates
Your Answer
Preparation of material estimates
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer
Reduce material handling cost
Your Answer
True/False
Question
Reduce material handling cost
Correct Answer
In case of X bar-R charts, statistical limits are calculated from averages of samples of
n (4,5,…) instead of single sample of large size to reduce the spread of natural
variability.
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer
Your Answer
Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Fixed position layout , Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer
Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer
Poor Customer Service
Your Answer
Low Productivity
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
What are the uses of the instruction manual provided by the manufacturer of a
machine?
Correct Answer It gives instructions regarding installation and operation of the equipment , It contains
note on common troubles with causes and remedies for troubleshooting , It enlists
points, frequency and type of lubrication
Your Answer
It gives instructions regarding installation and operation of the equipment , It contains
note on common troubles with causes and remedies for troubleshooting
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct Answer
Your Answer
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
True/False
Question
Shape od an OC curve is a function of sample size and the acceptance number.
Correct Answer
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following can be subtypes of corrective maintenance?
Correct Answer
Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance
Your Answer
Predictive Maintenance , Shutdown Maintenance
True/False
Question
For p-chart, "Inspection by variables" is much faster than "Inspection by attributes"
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer
Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer Unexpected
Your Answer
Partial
True/False
Question
Cent percent inspection is a must if the inspection is of destructive nature.
Correct Answer
False
Your Answer
False
True/False
Question
Correct Answer
Since value of p can never be positive, hence" if LCLp works out to be positive, it is
taken as zero."
False
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer
Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which of the following are examples of specifications?
Correct Answer
Commercial standards , Assembly and testing instructions , Bill of material
Your Answer
Production schedule , Commercial standards , Assembly and testing instructions
Multiple Choice Multiple Answer
Question
Which of the following products should be produced by using mass production?
Correct Answer
Refrigerator , Tyre for automobile , Television Set
Your Answer
Refrigerator , Tyre for automobile , Television Set
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering department to
obtain the utilisation index?
Correct Answer Work Sampling Studies
Your Answer
True/False
Question
Method Study
An ideal OC curve is never possible only with cent percent inspection.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer
Consumer's risk
Your Answer
Producer's risk
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using
extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
True/False
Question
Overtime working
The operator should not stop production if first piece is not approved by the inspector.
Correct Answer
False
Your Answer
False
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can
be defined as
Correct Answer Operation
Your Answer
Conversion
Multiple Choice Single Answer
Question
Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?
Correct Answer Concurrent activities
Your Answer
Concurrent activities
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a network?
Correct Answer
Thick Line , Red Line , Double Line
Your Answer
Dotted line
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular machine by change of route
of some of the jobs or by diverting work to other machine.
Correct Answer Control board
Your Answer
Control board
Multiple Choice Single Answer
Question
What do you understand by PERT ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a
particular site from legislation and taxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of quality?
Correct Answer
Quality of conformance , Purpose of product , Quality of design
Your Answer
Purpose of product , Process specifications , Quality of design
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
What do you mean by the project duration for which the total cost is minimum?
Correct Answer
Optimum duration
Your Answer
Optimum duration
True/False
Question
Originating process of raw material influence Process Planning
Correct Answer
True
Your Answer
True
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of
following type
Correct Answer Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
As a general rule, the number of tail event of an activity is more
than that of it's head event.
Correct Answer False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected
by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning
activity times?
Correct Answer Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independent
of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are
available.
Your Answer
Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independent
of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are
available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of
alternative layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in
setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in
setting
True/False
Question
All activities must not be tied up into the network
Correct Answer False
Your Answer
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outside
the control limits are eliminated and new trial control limits for
the remaining points are computed.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory
as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by diverting
work to other machine.
Correct Answer Control board
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the
quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer Factory
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very
large
Your Answer
Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very
large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
True/False
Question
Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order
requires following documents
Correct Answer Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
Reduce lead time
True/False
Question
Cent percent inspection is often more practical and economical
than sampling inspection.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to
J.M.Juran?
Correct Answer Quality of design
Your Answer
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant ,
Identify the extent of backtracking, cross traffic and obstacles
encountered during the movement of material.
Your Answer
Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant ,
Identify the extent of backtracking, cross traffic and obstacles
encountered during the movement of material.
True/False
Question
A load chart specifies the work to be carried out by each person
of company during shift hours.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due
to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due
to less or no restriction for building and construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuous
checking.
Correct Answer Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date
commitment to sales department , Devising cures to keep rate
of production in line with schedule
Your Answer
Recording progress of work , Progress chasing to identify delays
which may hold up production , Communicating possible delays
in delivery date commitment to sales department
Select The Blank
Question
Production control work is ________ in case of floor inspection
as compared with the centralised inspection.
Correct Answer easier
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time of
the first event is zero.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer Activity
Your Answer
Activity
True/False
Question
As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future
expansion.
Correct Answer True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities
or that of succeeding activities.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different
functions to take action as per instruction is called
Correct Answer Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured by
Correct Answer Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer Operation
Your Answer
Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of
following type
Correct Answer Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer
Reduce material handling cost
True/False
Question
As a general rule, the number of tail event of an activity is more
than that of it's head event.
Correct Answer False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected
by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning
activity times?
Correct Answer Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independent
of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are
available.
Your Answer
Activity time should be obtained from the person responsible for
the completion of an activity , Activity time must be independent
of any influence which the preceding or succeeding activity may
have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are
available.
Select The Blank
Question
The ________ pertain to the climatic conditions which the
component , product or material should withstand.
Correct Answer Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of
alternative layouts
Correct Answer Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Ease of supervision , Delivery performance
Multiple Choice Multiple Answer
Question
Which of the following are assignable cause?
Correct Answer Large varaitions in hardness of material , Tool wear , Errors in
setting
Your Answer
Large varaitions in hardness of material , Tool wear , Errors in
setting
True/False
Question
All activities must not be tied up into the network
Correct Answer False
Your Answer
False
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot
may vary between ________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
True/False
Question
In case of X bar, if the process is not under control indicated by
some points falling outside the control limits, such points outside
the control limits are eliminated and new trial control limits for
the remaining points are computed.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What is the base for considering activity time as single time
estimate or three time estimate?
Correct Answer Level of uncertainty
Your Answer
Availability of labour
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory
as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost required to
complete an activity within it's normal time?
Correct Answer Normal cost
Your Answer
Normal cost
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer
Necessity
Select The Blank
Question
A ________helps to avoid crowding of jobs at a particular
machine by change of route of some of the jobs or by diverting
work to other machine.
Correct Answer Control board
Your Answer
Move order
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect the
quality of end product are regulated to the extent desirable.
Correct Answer Quality control
Your Answer
Quality control
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of
making any product/s is called
Correct Answer Factory
Your Answer
Factory
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Wage Payment
Craft
Facilities Planning
Facilities Planning
Work Sampling
Machine utilization
Machine utilization
Gantt Chart
Production Scheduling
Production Scheduling
Select The Blank
Question
A ________ is another form of subcontracting.
Correct Answer Hiring capacity
Your Answer
Hiring capacity
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very
large
Your Answer
Work is highly repetitive in nature , Planning activities are
performed by the line staff , Number of workmen is not very
large
Multiple Choice Multiple Answer
Question
Which of the following cases can be treated as delay during
recording of method study?
Correct Answer Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
Your Answer
Operators awaiting instructions from supervisor , Worker waiting
for his turn at tools stores , Jobs awaiting at the machines for
their turn
True/False
Question
Inspection order is must even for simple jobs which can be
inspected by shop inspector with the tooling available on shop.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order
requires following documents
Correct Answer Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Purchase order
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in
design of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
Reduce lead time
True/False
Question
Cent percent inspection is often more practical and economical
than sampling inspection.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead
facilities can be shown , Models can be shifted easily
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Multiple Choice Single Answer
Question
What is the meaning of " Product features" according to
J.M.Juran?
Correct Answer Quality of design
Your Answer
Quality of design
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity
Cc
Cc
Normal time of an activity Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an activity Cn
Cn
Multiple Choice Multiple Answer
Question
What are uses of diagrams in method study?
Correct Answer Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant ,
Identify the extent of backtracking, cross traffic and obstacles
encountered during the movement of material.
Your Answer
Study different plant layouts and select the most optimum one ,
Study the extent of traffic over the different routes of the plant ,
Identify the extent of backtracking, cross traffic and obstacles
encountered during the movement of material.
True/False
Question
A load chart specifies the work to be carried out by each person
of company during shift hours.
Correct Answer False
Your Answer
True
Multiple Choice Multiple Answer
Question
Route Sheet generally contains following information
Correct Answer Material Specification , Sequence of operation , Skill of Labour
Your Answer
Material Specification , Sequence of operation , Skill of Labour
True/False
Question
Cellular layout is based on the concept of Group Technology
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
Which varaible is taken along the abscissa or X axis?
Correct Answer Time
Your Answer
Standard deviation
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due
to less or no restriction for building and construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled and
unskilled labour can be available , Plant expansion is easier due
to less or no restriction for building and construction
Select The Blank
Question
The ________ is the maintenance work initiated on a result of
knowledge of the condition of an item from routine or continuous
checking.
Correct Answer Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Expediting function is concerned with following activities
Correct Answer Progress chasing to identify delays which may hold up
production , Communicating possible delays in delivery date
commitment to sales department , Devising cures to keep rate
of production in line with schedule
Your Answer
Recording progress of work , Progress chasing to identify delays
which may hold up production , Communicating possible delays
in delivery date commitment to sales department
Select The Blank
Question
Production control work is ________ in case of floor inspection
as compared with the centralised inspection.
Correct Answer easier
Your Answer
time consuming
Select The Blank
Question
The easiest way to bring the delayed job within the promised
delivery time by using extra shift or weekly holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
True/False
Question
In case of forward pass computation, the earliest event time of
the first event is zero.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer Activity
Your Answer
Activity
True/False
Question
As a general rule, a site five times the actual plant size is
considered minimum for parking, access facilities and future
expansion.
Correct Answer True
Your Answer
True
True/False
Question
Independent float either affects the float of preceding activities
or that of succeeding activities.
Correct Answer False
Your Answer
False
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different
functions to take action as per instruction is called
Correct Answer Work Order
Your Answer
Work Order
Multiple Choice Single Answer
Question
A good layout makes effective use of space. Utilization of space
for a department like Stores can be measured by
Correct Answer Proportion of Cubic volume space utilized
Your Answer
Ratio of area utilised to area available
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding
some value to entity can be defined as
Correct Answer Operation
Your Answer
Operation
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question
Material Requirement Planning is very useful in following situations
Correct Answer Long Lead time for procurement , Several levels of assemblies in
product , Long manufacturing cycle
Your Answer
Long Lead time for procurement , Several levels of assemblies in
product , Long manufacturing cycle
Select The Blank
Question
The ________ is specified to indicate the maximum permissible
variability in the dimensions product or parts.
Correct Answer Tolerance
Your Answer
Standard
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and
engineering changes carried out in the equipment during it's period of
service.
Correct Answer Equipment history card
Your Answer
Equipment history card
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer Breakdown
Your Answer
Breakdown
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
How dummy activities are shown in the time chart during project
scheduling?
Correct Answer Vertical lines
Your Answer
Vertical lines
Multiple Choice Single Answer
Question
Which of the following technique makes three time estimates for each
activity?
Correct Answer Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
True/False
Question
Expediting action is necessary if the delays and interruptions are
abnormal and hence any subsequent delay is bound to extend the
promised delivery date.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of materials
while defining the qualitative requirement?
Correct Answer Material composition , Dimensions , Any heat treatment if required
Your Answer
Material composition , Dimensions , Any heat treatment if required
True/False
Question
Limit gauges are not useful when it is necessary to measure the exact
amount of variation.
Correct Answer True
Your Answer
False
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad
lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design
of a product to
Correct Answer To meet the intended function at lowest cost
Your Answer
Increase resourse utilization
Multiple Choice Single Answer
Question
What do you mean by the preventive maintenance by using five human
senses?
Correct Answer Preventive inspection
Your Answer
Sensitive inspection
Multiple Choice Multiple Answer
Question
Which of the following are typical examples of limit gauges?
Correct Answer Snap gauge , Plug gauge , Ring gauge
Your Answer
Snap gauge , Plug gauge , Ring gauge
Multiple Choice Multiple Answer
Question
Which are the major types of defects?
Correct Answer Minor , Major , Critical
Your Answer
Major , Critical
Match The Following
Question
Correct Answer
Your Answer
Emerson Efficiency Plan
Wage Payment
Facilities Planning
Craft
Facilities Planning
Production Scheduling
Work Sampling
Machine utilization
Sampling Inspection
Gantt Chart
Production Scheduling
Charting technique
Select The Blank
Question
The ________ is the maximum percentage defective that for the
purpose of sampling inspection can be considered satisfactory as a
process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Single Answer
Question
A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer
Reducing handling costs
Multiple Choice Multiple Answer
Question
Which of the following charts are used for the recording of data during
the method study?
Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer
Operation process chart , Multiple activity chart , Flow process chart
Multiple Choice Single Answer
Question
What do you mean by the selection of the job for the method study on
the basis of manufacturing difficulties?
Correct Answer Technical consideration
Your Answer
Human consideration
True/False
Question
An activity can share the same tail event and same head event with any
other activity.
Correct Answer False
Your Answer
False
Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the
sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer
Poor Customer Service
True/False
Question
All activities must not be tied up into the network
Correct Answer False
Your Answer
True
Multiple Choice Single Answer
Question
Technique which can help an organization to reduce inventory is called
Correct Answer MRP
Your Answer
True/False
CPM
Question
Dust gets mixed with lubricants, forms an abrasive substance and
causes pre-mature failure of machinery.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following situations demand the technical consideration
while selecting a job for method study?
Correct Answer Jobs having inconsistent quality , Operations inviting frequent requests
from supervisors for relaxation in allowed time because of variations in
materials and tool performance , Jobs in which too many man-hours are
spend in checking and rechecking work
Your Answer
Jobs having inconsistent quality , Operations inviting frequent requests
from supervisors for relaxation in allowed time because of variations in
materials and tool performance , Jobs in which too many man-hours are
spend in checking and rechecking work
Multiple Choice Multiple Answer
Question
Which of the following are examples of attributes?
Correct Answer Cracks , Burrs , Texture
Your Answer
Cracks , Hardness , Burrs
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary
between ________.
Correct Answer 0.01 to 10%
Your Answer
0.01 to 10%
Select The Blank
Question
The ________ must ensure that the product satisfy the functional
requirements of it's usage.
Correct Answer Quality of design
Your Answer
Quality of inspection
True/False
Question
Delay in completion of projects result in unwelcome additions to the
fixed manufacturing expenses.
Correct Answer True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following activities are used while recording for method
study?
Correct Answer Delay , Operation , Inspection
Your Answer
Delay , Operation , Inspection
True/False
Question
Root cause of most of the breakdowns is failure of the lubrication
system.
Correct Answer True
Your Answer
True
Select The Blank
Question
The term ________ emplies the foregone profit due to inability of
company to produce.
Correct Answer Opportunity cost
Your Answer
Opportunity cost
True/False
Question
Latest finishing date is the latest event time of the tail event.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
What is the basic minimum requirement for those who are responsible
for the quality of design?
Correct Answer In depth knowledge about alternative materials and manufacturing
processes , access to latest technology and production process
adopted by industries in the developed market , Continuous effort in
product development
Your Answer
In depth knowledge about alternative materials and manufacturing
processes , access to latest technology and production process
adopted by industries in the developed market , Continuous effort in
product development
True/False
Question
If the firm has adopted elaborate planned maintenance system, there is
no chance of any unplanned maintenance work.
Correct Answer False
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling ,
Virtually zero manufacturing cycle time
Your Answer
Continuous flow of material , Highly mechanised material handling ,
Virtually zero manufacturing cycle time
Multiple Choice Single Answer
Question
Which document is used for returning the surplus material?
Correct Answer Stores Return Note
Your Answer
Stores Return Note
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Time and Motion
Match The Following
Question
Correct Answer
Your Answer
Factor Analysis
Method to evaluate layouts
Method to evaluate layouts
Minimization of production
delays
Objective of good layout
Objective of good layout
Maximum visibility
Principles of good layout
Principles of good layout
Scale model
Layout analysis
Layout analysis
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value
to entity can be defined as
Correct Answer Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
What does the additional cost incurred to reduce the duration of an
activity by one unit of time represent?
Correct Answer Activity cost slope
Your Answer
Activity time slope
Select The Blank
Question
Production control work is ________ in case of floor inspection as
compared with the centralised inspection.
Correct Answer easier
Your Answer
easier
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
The ratio of output to input of a production system is commonly known
as
Correct Answer Productivity
Your Answer
Productivity
Multiple Choice Single Answer
Question
Which of the following policies is advisable in case of low product
variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer
Low Skilled Labour & Special Purpose Machines
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question
The ________ must ensure that the product satisfy the
functional requirements of it's usage.
Correct Answer Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following information is available in
summary of part in a chart during methods study?
Correct Answer Frequency of each symbol , Total time for each symbol ,
Total distance travelled by the object
Your Answer
Frequency of each symbol , Total time for each symbol
True/False
Question
The event numbers as far as possible reflect the logical
relationships of the activities.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer
Quality
Multiple Choice Multiple Answer
Question
Which of the following schedules are recommended to
prepare and follow as a part of preventive maintenance
system?
Correct Answer Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Your Answer
Preventive inspection schedule , Cleaning and upkeep
schedule , Lubrication schedule
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some
maintenance related characteristics by making use of
human senses, when equipment is in operation?
Correct Answer Extrernal inspection
Your Answer
Extrernal inspection
Multiple Choice Multiple Answer
Question
Which are different ways to show critical path in a
network?
Correct Answer Thick Line , Red Line , Double Line
Your Answer
Thick Line , Red Line , Double Line
Multiple Choice Multiple Answer
Question
What are the benefits of overhauling?
Correct Answer It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without
disturbing the production programme , Advance planning
allows to prepare and keep ready the list of replacement
spares
Your Answer
It increases useful life of an equipment and it's parts ,
Advance planning allows to attend equipment without
disturbing the production programme , Advance planning
allows to prepare and keep ready the list of replacement
spares
Match The Following
Question
Correct Answer
Your Answer
Combined Layout
Mixed Layout
Mixed Layout
Fixed Position Layout
Project Layout
Line Layout
Product Layout
Line Layout
Shop layout
Process Layout
Functional Layout
Functional Layout
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while
selecting or rejecting a particular site from legislation and
taxation point of view?
Correct Answer Labour laws , Building codes , Policies regarding issue of
licences
Your Answer
Labour laws , Building codes , Policies regarding issue of
licences
Select The Blank
Question
The ________ is the maximum percentage defective that
for the purpose of sampling inspection can be considered
satisfactory as a process average.
Correct Answer Acceptable quality level
Your Answer
Acceptable quality level
Multiple Choice Multiple Answer
Question
Major contributors in the development of Control Charts,
Sampling plan are
Correct Answer F H Dodge , H G Roming , Walter Schewhart
Your Answer
F H Dodge , H G Roming , Walter Schewhart
True/False
Question
Skill of labour force in a product type layout is usually
higher than in the process type of layout
Correct Answer False
Your Answer
True
True/False
Question
Repetitive movements between work stations which are
difficult to be traced on string diagrams can be
conveniently shown on flow diagrams.
Correct Answer False
Your Answer
True
Select The Blank
Question
The ________ is necessary when the job requires
detailed of one or more of the job characteristics with the
help of special equipment which is not available at the
producing company.
Correct Answer Inspection order
Your Answer
Job card
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation
in method study recording?
Correct Answer Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Your Answer
Change in physical characteristic , Consumption of
physical effort , Change in chemical characteristic
Select The Blank
Question
The ________ is the maintenance work initiated on a
result of knowledge of the condition of an item from
routine or continuous checking.
Correct Answer Condition monitoring
Your Answer
Overhauling
True/False
Question
All activities lying on the non-critical paths must have total
float and free float.
Correct Answer False
Your Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer Time and Motion
Your Answer
Method
Match The Following
Question
Correct Answer
Your Answer
Crash cost of an activity Cc
Cc
Normal time of an
activity
Tn
Tn
Crash time of activity
Tc
Tc
Normal cost of an
activity
Cn
Cn
Multiple Choice Multiple Answer
Question
Which are the advantages of suburban location?
Correct Answer Avaialability of adequate land at lower cost , Both skilled
and unskilled labour can be available , Plant expansion is
easier due to less or no restriction for building and
construction
Your Answer
Avaialability of adequate land at lower cost , Both skilled
and unskilled labour can be available , Plant expansion is
easier due to less or no restriction for building and
construction
True/False
Question
In case of X bar-R charts,it is ensured that the assignable
causes are detected before the tolerances are violated,
upper and lower statistical limits are worked out and
inserted into a chart.
Correct Answer True
Your Answer
False
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage
defectives in the zone of the indecision?
Correct Answer Lots having the percentage defective more than AQL but
less than LPTD
Your Answer
Lots having the percentage defective less than AQL but
more than LPTD
Select The Blank
Question
The easiest way to bring the delayed job within the
promised delivery time by using extra shift or weekly
holiday is ________.
Correct Answer Overtime working
Your Answer
Overtime working
Multiple Choice Single Answer
Question
What do you mean by lowest possible direct cost
required to complete an activity within it's crashed time?
Correct Answer Crash cost
Your Answer
Crash cost
Multiple Choice Single Answer
Question
In case of Batch Production which kind of labour is
expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer
Semiskilled
Multiple Choice Multiple Answer
Question
Which three of the following are causes of continuous
upward pattern of Xbar-R control chart?
Correct Answer Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
Your Answer
Wear of tool , Abnormal rise in temperature ,
Accumulation of dirt
True/False
Question
Root cause of most of the breakdowns is failure of the
lubrication system.
Correct Answer True
Your Answer
True
True/False
Question
It is not necessary to know spare time available on the
non-critical path to allow a little delay for noncritical
activity.
Correct Answer False
Your Answer
False
True/False
Question
MRP software generates time periodwise requiremetn of
subassemblies
Correct Answer True
Your Answer
True
True/False
Question
In case of two handed process chart, the simultaneous
activities of both hands are recorded opposite to each
other on the chart.
Correct Answer True
Your Answer
True
Multiple Choice Single Answer
Question
What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer
Critical Path Method
Multiple Choice Multiple Answer
Question
Which of the following are major inputs to scheduling?
Correct Answer Overlapping of operations , Effective Capacity per work
centre , Performance standards
Your Answer
Overlapping of operations , Effective Capacity per work
centre , Performance standards
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
Multiple Choice Single Answer
Question
What do you mean by the verification of object against
predetermined standards of quality or quantity or both?
Correct Answer Inspection
Your Answer
Inspection
Multiple Choice Multiple Answer
Question
What are the advantages of templates over diagrams?
Correct Answer Can be conveniently moved on the graph paper , Less
laborious , Saves time
Your Answer
Can be conveniently moved on the graph paper , Less
laborious , Unskilled person can do and analyze it
True/False
Question
It would not affect the project completion time if noncritical activities take little loner time than planned.
Correct Answer True
Your Answer
True
Select The Blank
Question
The ________ is the probability that a good lot will be
rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer
Producer's risk
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose
of making any product/s is called
Correct Answer Factory
Your Answer
Factory
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that
accpets all the lots with quality equal to or better than
AQL .
Correct Answer Rectangular
Your Answer
Bell
Multiple Choice Single Answer
Question
Which is the right time to prepare stores issue order?
Correct Answer When route sheet is ready
Your Answer
When route sheet is ready
Multiple Choice Single Answer
Question
Which element of a network represents a task which has
got a definite beginning and definite end?
Correct Answer Activity
Your Answer
Activity
Multiple Choice Single Answer
Question
Which kind of preventive inspection detects some defects
in moving parts, internal cracks, and others , when
machine is under preplanned shutdown?
Correct Answer Internal inspection
Your Answer
Internal inspection
Select The Blank
Question
Production Planning is a centralised activity which
includes functions such as ________
Correct Answer Scheduling
Your Answer
Dispatching
Select The Blank
Question
The ________ is the watch dog which ensures that every
element of production and activities which could affect
the quality of end product are regulated to the extent
desirable.
Correct Answer Quality control
Your Answer
Quality control
Select The Blank
Question
Goods after final inspection should accompany
________to enable dispatch department to identify and
draw correct reference.
Correct Answer Forwarding note
Your Answer
Forwarding note
Multiple Choice Single Answer
Question
Who has introduced the useful concept of control chart in
1931?
Correct Answer Walter Shewhart
Your Answer
Walter Shewhart
POM assgn : Sushant
True/False
Question
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased items?
Correct Answer
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making sure that
suppliers understand the requirements
Vendor performance evaluation , Making sure that suppliers understand the requirements
, Defining right quality for the job
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is
called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Single Answer
Question
Which of the following technique is event oriented ?
Correct Answer
Project Evaluation & Review Technique
Your Answer
Project Evaluation & Review Technique
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Multiple Answer
Question
Which of the following concepts must be understood for the achievement of quality?
Correct Answer
Quality of conformance , Purpose of product , Quality of design
Your Answer
Quality of conformance , Quality of design
Multiple Choice Multiple Answer
Question
Following are some of the factors considered for evaluation of alternative layouts
Correct Answer
Flow of Material , Equipment utilization , Ease of supervision
Your Answer
Flow of Material , Equipment utilization , Ease of supervision
Match The Following
Question
Correct Answer
Your Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout
Burnout
Ear
Impact
Impact
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Your Answer
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Activity time should be obtained from the person responsible for the completion of an
activity , Activity time must be independent of any influence which the preceding or
succeeding activity may have on it. , Activity time may assume that just the normal
quantity of resources required to carry out the activity are available.
Multiple Choice Multiple Answer
Question
Which are the subtasks of the maintenance phase of the method study?
Correct Answer
Monitoring and control , Performance appraisal , Audit on savings
Your Answer
Monitoring and control , Performance appraisal , Audit on savings
Multiple Choice Multiple Answer
Question
Which of the following are characteristics of an operating characteristics curve?
Correct Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer
Producer risk , Consumer Risk , Acceptable Quality Level
Select The Blank
Question
The ________ breakdowns usually cost more, partly due to damage done to the
adjustment components and partly due to emergency actions.
Correct Answer
Unexpected
Your Answer
Partial
Multiple Choice Single Answer
Question
Why stores issue order should not be issued as soon as it is prepared?
Correct Answer
Material may or may not be available at the time of preparation
Your Answer
Inventory investment will increase
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
In case of an OC curve, the risk of rejecting a good quality lot may vary between
________.
Correct Answer
0.01 to 10%
Your Answer
0.01 to 10%
Multiple Choice Multiple Answer
Question
Plant layout facilitates processing of products in most effective manner through the
following
Correct Answer
Shortest possible distance , Shortest processing time , Minimum movement
Your Answer
True/False
Question
Shortest possible distance , Shortest processing time , Minimum movement
Correct Answer
After goods have been manufactured, route sheets and operation layouts should not be
collected back.
False
Your Answer
False
Multiple Choice Single Answer
Question
Process planning is the process of
Correct Answer
establishing shortest and most economic path of production
Your Answer
establishing shortest and most economic path of production
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to entity can be
defined as
Correct Answer
Operation
Your Answer
Operation
Select The Blank
Question
The ________ is specified to indicate the maximum permissible variability in the
dimensions product or parts.
Correct Answer
Tolerance
Your Answer
Tolerance
Select The Blank
Question
Goods after final inspection should accompany ________to enable dispatch department
to identify and draw correct reference.
Correct Answer
Forwarding note
Your Answer
Select The Blank
Forwarding note
Question
Correct Answer
The ________ includes preventive maintenance activities whose needs are identified
through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
True/False
Question
Correct Answer
A load chart specifies the work to be carried out by each person of company during shift
hours.
False
Your Answer
True
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra
shift or weekly holiday is ________.
Correct Answer
Overtime working
Your Answer
True/False
Question
Overtime working
Correct Answer
Under MRP system for common items order for procurement is placed based on
requirement for each product
False
Your Answer
True
Multiple Choice Single Answer
Question
What do you understand by the extent the products manufactured conforms to the laid
down design?
Correct Answer
Quality of conformance
Your Answer
Quality of conformance
Select The Blank
Question
The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing
company.
Correct Answer
Inspection order
Your Answer
Job card
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Deifinite , Undesrstandable , Economically viable
True/False
Question
In case of forward pass computation, the earliest event time of the first event is zero.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer
Your Answer
True/False
Question
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up , Due to purposely done mistakes by unsatisfied worker
A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following is a part of preparing manufacturing order set as a primary
function of dispatching?
Correct Answer
Operational layouts , Move orders , Pre-filled stores issue orders
Your Answer
Operational layouts , Rejection reports , Move orders , Pre-filled stores issue orders
Select The Blank
Question
An ________ history card is the record of all repairs, replacements and engineering
changes carried out in the equipment during it's period of service.
Correct Answer
Equipment history card
Your Answer
True/False
Question
Equipment history card
Specifications is the basic tool of inspection.
Correct Answer
True
Your Answer
True
Match The Following
Question
Correct Answer
Your Answer
Forcasting requirement for indirect Past consumption analysis
material
technique
Economic order quantity
Inventory control by classification
ABC Analysis
ABC Analysis
Structure of the product
BOM
BOM
Material Planning for dependent
demand
MRP
MRP
Multiple Choice Single Answer
Question
The document raised by PPC which authorises different functions to take action as per
instruction is called
Correct Answer
Work Order
Your Answer
Job Instructions
Multiple Choice Single Answer
Question
Who prepares the daily production report?
Correct Answer
Shop Supervisor
Your Answer
Shop Supervisor
True/False
Question
A lot declared rejected in sampling inspection should not be inspected 100% in any case.
Correct Answer
False
Your Answer
True
Multiple Choice Single Answer
Question
How is the probability of acceptance in case of Acceptable Quality Level (AQL )?
Correct Answer
Very high
Your Answer
Average
Multiple Choice Multiple Answer
Question
Which are the different methods of recording actual progress of work?
Correct Answer
Display boards , Progress cards , Network updating
Your Answer
Display boards , Progress cards , Network updating
True/False
Question
The dispatching function is of very importance in flow and mass production units.
Correct Answer
False
Your Answer
True
True/False
Question
Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer
False
Your Answer
False
Select The Blank
Question
The ________ pertain to the climatic conditions which the component , product or
material should withstand.
Correct Answer
Environmental specifications
Your Answer
Environmental specifications
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
Production Planning is a centralised activity which includes functions such as ________
Correct Answer
Scheduling
Your Answer
Scheduling
Multiple Choice Single Answer
Question
Which rule is used for numbering of events?
Correct Answer
Fulkerson's Rule
Your Answer
Fulkerson's Rule
POM assgn : Grace
True/False
Question
Correct Answer
Floor inspection delays the identification of faults which can not be rectified
immediately before large lots are spoiled.
False
Your Answer
False
Multiple Choice Single Answer
Question
Management often fails to realize the importance of efficient layout due to
following reason
Correct Answer
losses resulting from poor layout are not directly shown in the financial
statements
Your Answer
losses resulting from poor layout are not directly shown in the financial
statements
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question
Which method of critical path determination begins with the end event and
moves backward to the start event of the project network?
Correct Answer
Backward pass computation
Your Answer
True/False
Question
Backward pass computation
Complexity and difficulty of Planning is influenced by types of layout
Correct Answer
True
Your Answer
False
True/False
Question
Correct Answer
For p-chart, p bar is the ratio of total number of units inspected to the total
number of units defectives.
False
Your Answer
True
Multiple Choice Single Answer
Question
What is represented by an arrow in a network?
Correct Answer
Activity
Your Answer
Activity
Multiple Choice Multiple Answer
Question
MRP utilises the following information
Correct Answer
Master production schedule , Product structure , Lead time for
procurement/manufacturing
Master production schedule , Lead time for procurement/manufacturing , list
of machines
Your Answer
Multiple Choice Single Answer
Question
Which is the ideal place to write a description of an activity in a network?
Correct Answer
Above the arrow
Your Answer
Above the arrow
Select The Blank
Question
Correct Answer
The ________ breakdowns usually cost more, partly due to damage done to
the adjustment components and partly due to emergency actions.
Unexpected
Your Answer
Unexpected
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
True/False
Question
Factory
Correct Answer
Systematic maintenance system can completely eliminate the wear and tear
of machines.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are types of non-destructive testing?
Correct Answer
Visual Testing , Eddy current , Magnetic flow detectors
Your Answer
Visual Testing , Eddy current , Magnetic flow detectors
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Multiple Choice Single Answer
Question
Providing flexibility in plant layout means
Correct Answer
Layout can be changed without much cost if required
Your Answer
Layout can be changed without much cost if required
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased
items?
Correct Answer
Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Multiple Choice Multiple Answer
Question
Which of the following are scheduling techniques?
Correct Answer
Critical Path Analysis , Index Method , Johnson's two machine algorithm
Your Answer
Critical Path Analysis , Index Method , Johnson's two machine algorithm
Select The Blank
Question
Correct Answer
The ________ advocates maintenance procedures whereby the condition of
the plant is constantly watched through systematic inspection to unearth
unhealthy conditions and preventive
Preventive Maintenance
Your Answer
Preventive Maintenance
True/False
Question
A network should be progression of activities always moving forward.
Correct Answer
True
Your Answer
True
Multiple Choice Multiple Answer
Question
In an organization there may not be a formal PPC department if
Correct Answer
Your Answer
Select The Blank
Question
Work is highly repetitive in nature , Planning activities are performed by the
line staff , Number of workmen is not very large
Work is highly repetitive in nature , Planning activities are performed by the
line staff , Number of workmen is not very large
Correct Answer
The ________ is necessary when the job requires detailed of one or more of
the job characteristics with the help of special equipment which is not
available at the producing company.
Inspection order
Your Answer
Inspection order
Multiple Choice Multiple Answer
Question
Order preparation process for products manufatured to order requires
following documents
Correct Answer
Sales Order , Work order , Shop order
Your Answer
Sales Order , Work order , Shop order
Multiple Choice Single Answer
Question
What do you understand by the selection of the job for the method study on
the basis of money saving potential of the job?
Correct Answer
Economic consideration
Your Answer
Select The Blank
Question
Economic consideration
Correct Answer
Production Planning is a centralised activity which includes functions such as
________
Scheduling
Your Answer
Scheduling
Multiple Choice Multiple Answer
Question
Scale model used for layout analysis have following advantages
Correct Answer
Your Answer
Nontechnical person finds it easy to comprehend , Ovehead facilities can be
shown , Models can be shifted easily
Nontechnical person finds it easy to comprehend , Ovehead facilities can be
shown , Models can be shifted easily
Multiple Choice Single Answer
Question
Which is the ideal place to inspect jigs and fixtures in a mass manufacturing
unit?
Correct Answer
Separate inspection room
Your Answer
Separate inspection room
Multiple Choice Single Answer
Question
How to reveal the capability of the sampling plan to discriminate between
good lots and bad lots?
Correct Answer
Operating characteristics curve ( OC )
Your Answer
True/False
Question
Operating characteristics curve ( OC )
Correct Answer
It would not affect the project completion time if non-critical activities take
little loner time than planned.
True
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ inclu des preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Shutdown Maintenance
Match The Following
Question
Correct Answer
Your Answer
Forcasting requirement for
indirect material
Past consumption analysis
technique
Past consumption analysis
technique
Inventory control by classification ABC Analysis
ABC Analysis
Structure of the product
BOM
BOM
Material Planning for dependent
demand
MRP
MRP
True/False
Question
Correct Answer
The dispatching function is of very importance in flow and mass production
units.
False
Your Answer
True
Multiple Choice Multiple Answer
Question
Which features should be covered by the specifications of materials while
defining the qualitative requirement?
Correct Answer
Material composition , Dimensions , Any heat treatment if required
Your Answer
Select The Blank
Question
Material composition , Dimensions , Cost of material
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation
Your Answer
Operation
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Select The Blank
Question
A good maintenance system is not a luxary but a ________.
Correct Answer
Necessity
Your Answer
Necessity
Multiple Choice Single Answer
Question
The process of changing inputs into outputs thereby adding some value to
entity can be defined as
Correct Answer
Operation
Your Answer
True/False
Question
Operation
Correct Answer
An activity should represent an operation or set of operations which can be
performed using a particular kind of equipment or a special skill.
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are types of sampling plan?
Correct Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
Your Answer
Single sampling plan , Double sampling plan , Multiple sampling plan
True/False
Question
Correct Answer
In case of forward pass computation, the earliest event time of a plain event
equals the earliest event time of the preceding event plus duration of activity
emanating from the preceding event.
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are ideal situations for the preventive inspection?
Correct Answer
Weekly off and holidays , Non-production hours , Stand-up equipment
Your Answer
Weekly off and holidays , Non-production hours , Stand-up equipment
Multiple Choice Single Answer
Question
What do you mean by the chart on which the major activities and entry points
of materials are recorded to have graphic view of operations and inspections
involved in the process?
Correct Answer
Operation process chart
Your Answer
Match The Following
Flow Process chart
Question
Correct Answer
Your Answer
Fixation of inventory level
Reorder level
Reorder level
Symptom of ill planned
purchasing
Over ordering
Over ordering
Factor influencing material
planning
Lead time
Lead time
Net requirement of material under Stock on hand
MRP
Stock on hand
Multiple Choice Single Answer
Question
Taxes / duties levied is one of the important determinant for location decision
as taxes/duties substantially influence
Correct Answer
Product cost
Your Answer
Product cost
Multiple Choice Single Answer
Question
Which kind of gauge consists of electrical contacts operating a series of
colloured signal lamps which indicate whether the dimension is correct,
oversize or undersize?
Correct Answer
Multiple gauging
Your Answer
Multiple gauging
Multiple Choice Multiple Answer
Question
Which of the following are minimum requirement for a good quality of design?
Correct Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Your Answer
Resonable cost , Resonable procurement time , Resonable manufacturing time
Select The Blank
Question
Correct Answer
OC curve of ideal sampling plan suggests that all lots less than 3% defectives
have the probability of acceptance of ________.
One
Your Answer
One
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question An ________ history card is the record of all repairs, replacements and engineering changes
carried out in the equipment during it's period of service.
Correct Answer Equipment history card
Your Answer Equipment history card
Select The Blank
Question The ________ pertain to the climatic conditions which the component , product or material
should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be defined
as
Correct Answer Operation
Your Answer Operation
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
True/False
Question A lot declared rejected in sampling inspection should not be inspected 100% in any case.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Single Answer
Question What do you mean by the graphical representation of the project which is composed as series
of connected arrows and circles to describe the interrelationship of the activities involved?
Correct Answer Network
Your Answer Network
True/False
Question Since value of p can never be positive, hence" if LCLp works out to be positive, it is taken as
zero."
Correct Answer False
Your Answer False
True/False
Question Kanban system is essentially a computer based system for production scheduling and control
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following possibilities can be explored by using flow process chart?
Correct Answer Eliminating the operations or combining the operations with another , Reducing the
distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production
losses
Your Answer Eliminating the operations or combining the operations with another , Reducing the
distance traveled by the workmen or materials , Avoiding the waiting time and thereby reduce production
losses
Multiple Choice Multiple Answer
Question Which are the subfactors of community facilities or social infrastructure?
Correct Answer Accomodation , Educational , Entertainment
Your Answer Accomodation , Educational , Entertainment
True/False
Question Only skilled worker can use the fixed limit gauge.
Correct Answer False
Your Answer False
Select The Blank
Question The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Single Answer
Question A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Multiple Choice Multiple Answer
Question Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer Due to wrong machine set up , Due to mistakes in reading blue prints , Due to errors in
tooling
Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Single Answer
Question What do you understand by identification of defects in materials, components, machining
processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of
defectives?
Correct Answer Preventive function
Your Answer Preventive function
Multiple Choice Multiple Answer
Question Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Single Answer
Question Which kind of relationship exists between those activities which can be carried out
simultaneously and both activities require definite time to finish?
Correct Answer Concurrent activities
Your Answer Concurrent activities
Multiple Choice Multiple Answer
Question Which are the sources of information to update the progress card daily?
Correct Answer Detachable ticket , Daily production report , Job Card
Your Answer Detachable ticket , Daily production report , Job Card
Multiple Choice Single Answer
Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to
meet the specifications of final product and the other is, it must be
Correct Answer Cost effective method
Your Answer Cost effective method
Multiple Choice Multiple Answer
Question Which of the following charts are used for the recording of data during the method study?
Correct Answer Operation process chart , Multiple activity chart , Flow process chart
Your Answer Operation process chart , Multiple activity chart , Flow process chart
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
True/False
Question Suburban location provides the compromise netween rural and urban locations.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following method can be used to record the facts during the method study?
Correct Answer Micromotion study , Cyclegraph , Chronocyclegraph
Your Answer Micromotion study , Cyclegraph , Chronocyclegraph
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Question Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Low Productivity
Multiple Choice Single Answer
Question Which varaible is taken along the ordinate or Y axis?
Correct Answer Quality
Your Answer Quality
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory
Multiple Choice Multiple Answer
Question Which of the following defects can be observed during preventive inspection by using human
senses?
Correct Answer Leakage of a gas , Deviation from normal sound , Excessive Vibration
Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Multiple Choice Multiple Answer
Question Which of the following are uses of the lubricants?
Correct Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust ,
Keep temperature of bearings within allowable limits
Your Answer Retard rate of wear and tear of moving parts , Protect parts from moisture and dust , Keep
temperature of bearings within allowable limits
Multiple Choice Single Answer
Question Why method study should precede work measurement?
Correct Answer Time for a job can be accessed accurately only after standardizing the method
Your Answer Time for a job can be accessed accurately only after standardizing the method
True/False
Question In case of two handed process chart, storage symbol is used when either hand is used as grip or
vice to hold an object.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Process type layout is suitable when
Correct Answer there is wide variation in processing time of operations
Your Answer there is wide variation in processing time of operations
Multiple Choice Single Answer
Question Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Select The Blank
Question The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Single Answer
Question What is the location of upper control limit in the X bar-R control chart?
Correct Answer 3 standard deviations above central line
Your Answer 3 standard deviations above central line
Multiple Choice Single Answer
Question Which of the following data is unnecessary for scheduling process?
Correct Answer Cost breakup of products
Your Answer Cost breakup of products
Multiple Choice Multiple Answer
Question Which of the following are typical examples of limit gauges?
Correct Answer Snap gauge , Plug gauge , Ring gauge
Your Answer Snap gauge , Plug gauge , Ring gauge
True/False
Question Sample sizes for the construction of p-chart are typicaly larger that for Xbar-R-charts.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are the basic requirements of quality standard?
Correct Answer Deifinite , Undesrstandable , Economically viable
Your Answer Deifinite , Undesrstandable , Economically viable
Multiple Choice Multiple Answer
Question Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Match The Following
Question Correct Answer Your Answer
Community Facilities Educational facility Educational facility
Proximity to market Fragile product Fragile product
Industrial and labour attitude Productivity of labour Productivity of labour
Legislation and taxation Licenses Licenses
True/False
Question Breakdown of a machine is normally accompanied by added machine setup cost such as
resetting of jobs or change of jobs.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are examples of gross materials?
Correct Answer Timber , Iron ore , Sugar cane
Your Answer Timber , Iron ore , Sugar cane
Select The Blank
Question The easiest way to bring the delayed job within the promised delivery time by using extra shift
or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Select The Blank
Question Production Planning is a centralised activity which includes functions such as ________
Correct Answer Scheduling
Your Answer Scheduling
Multiple Choice Single Answer
Question In case of Batch Production which kind of labour is expected?
Correct Answer Skilled in one specific Manufacturing Process
Your Answer Skilled in one specific Manufacturing Process
Select The Blank
Question A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Single Answer
Question A good layout makes effective use of space. Utilization of space for a department like Stores
can be measured by
Correct Answer Proportion of Cubic volume space utilized
Your Answer No such measure in use
True/False
Question One major difference between CPM and PERT is the former's adaptability for the projects
where high degree of uncertainty prevails and activity times during performance are expected to vary
considerably for certain activities.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Multiple Choice Single Answer
Question Which industry out of the following industries require maximum consideration for safety factor
while selecting plant location?
Correct Answer Nuclear power plant
Your Answer Nuclear power plant
Select The Blank
Question The easiest way to bring the delayed job within the promised delivery time by using extra shift
or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
Select The Blank
Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.
Correct Answer One
Your Answer One
Multiple Choice Multiple Answer
Question Following are some of the Principles of Management advocated by F W Taylor
Correct Answer Selection of best worker for each particular task , Division of work between worker and
management , Training and development of the workmen
Your Answer Selection of best worker for each particular task , Division of work between worker and
management , Training and development of the workmen
Multiple Choice Single Answer
Question Out of two basic criteria for the selection of a manufacturing method, one is, it must be able to
meet the specifications of final product and the other is, it must be
Correct Answer Cost effective method
Your Answer Cost effective method
Multiple Choice Single Answer
Question What does CPA stand for?
Correct Answer Critical Path Analysis
Your Answer Critical Path Analysis
Multiple Choice Multiple Answer
Question What is the basic minimum requirement for those who are responsible for the quality of
design?
Correct Answer In depth knowledge about alternative materials and manufacturing processes , access to
latest technology and production process adopted by industries in the developed market , Continuous effort
in product development
Your Answer In depth knowledge about alternative materials and manufacturing processes , access to
latest technology and production process adopted by industries in the developed market , Continuous effort
in product development
True/False
Question A lot declared rejected in sampling inspection should not be inspected 100% in any case.
Correct Answer False
Your Answer False
True/False
Question A network should employ only those dummy activities which are absolutely necessary.
Correct Answer True
Your Answer True
Multiple Choice Multiple Answer
Question Which of the following are scheduling techniques?
Correct Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
Your Answer Critical Path Analysis , Index Method , Johnson's two machine algorithm
True/False
Question The component produced on completely automatic machines may be subjected to sampling
inspection while parts produced on semi-automatic and completely manual operated machines require cent
percent inspection.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Single Answer
Question Which of the following policies is advisable in case of low product variety and large volumes?
Correct Answer Low Skilled Labour & Special Purpose Machines
Your Answer Low Skilled Labour & Special Purpose Machines
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory
Multiple Choice Multiple Answer
Question Plant layout facilitates processing of products in most effective manner through the following
Correct Answer Shortest possible distance , Shortest processing time , Minimum movement
Your Answer Shortest possible distance , Shortest processing time
Multiple Choice Single Answer
Question Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Multiple Choice Single Answer
Question A good plant layout helps in
Correct Answer Reducing handling costs
Your Answer Reducing handling costs
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Mixed Layout
Fixed Position Layout Project Layout Project Layout
Product Layout Line Layout Line Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Question Which kind of inspection is followed in case of process layout?
Correct Answer First off inspection
Your Answer First off inspection
True/False
Question Even if any activity on the critical path is delayed, project completes on the scheduled time.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Inadequate production capacity ultimately leads to
Correct Answer Poor Customer Service
Your Answer Poor Customer Service
Select The Blank
Question The ________ is the probability that a bad lot will be accepted by the sampling plan.
Correct Answer Consumer's risk
Your Answer Consumer's risk
Multiple Choice Multiple Answer
Question Which are the different methods of recording actual progress of work?
Correct Answer Display boards , Progress cards , Network updating
Your Answer Display boards , Progress cards , Network updating
Select The Blank
Question Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct Answer easier
Your Answer easier
Multiple Choice Single Answer
Question Product layout offer following advantages
Correct Answer There is economy in manufacturing time
Your Answer There is economy in manufacturing time
True/False
Question Flow process charts do record movements as well as visual pictures.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Main objective of a good plant layout is
Correct Answer Reduce material handling cost
Your Answer Reduce material handling cost
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Multiple Choice Multiple Answer
Question Features of Cellular layout are
Correct Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped
in to cells
Your Answer It is a type of mixed layout , Uses concept of Group Technology , Facilities are grouped in
to cells
True/False
Question Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer True
Your Answer True
Select The Blank
Question The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Multiple Answer
Question What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to
plan requirement of replacement spares
Multiple Choice Single Answer
Question What does head of an arrow represent?
Correct Answer End of an activity
Your Answer End of an activity
Multiple Choice Single Answer
Question What do you mean by planned corrective manitenance which provides an opportunity to
undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns.
Correct Answer Design-out Maintenance
Your Answer Design-out Maintenance
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be defined
as
Correct Answer Operation
Your Answer Operation
Multiple Choice Multiple Answer
Question Which of the following are characteristics of an operating characteristics curve?
Correct Answer Producer risk , Consumer Risk , Acceptable Quality Level
Your Answer Producer risk , Consumer Risk , Acceptable Quality Level
Match The Following
Question Correct Answer Your Answer
Toung Sweet Sweet
Eye Crack Crack
Nose Burnout Burnout
Ear Impact Impact
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Multiple Choice Multiple Answer
Question Which three of the following options can be used to reduce the duration of activity during
project crashing?
Correct Answer Allocating more manpower and machines than originally planned for. , Working
additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Your Answer Allocating more manpower and machines than originally planned for. , Working additional
shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Select The Blank
Question Goods after final inspection should accompany ________to enable dispatch department to
identify and draw correct reference.
Correct Answer Forwarding note
Your Answer Forwarding note
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Single Answer
Question Which of the following technique makes three time estimates for each activity?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
True/False
Question Mixed layouts are generally used in case of product is to be produced in different sizes/types:
contains too many components
Correct Answer True
Your Answer True
True/False
Question In case of two handed process chart, storage symbol is used when either hand is used as grip or
vice to hold an object.
Correct Answer True
Your Answer True
Match The Following
Question Correct Answer Your Answer
Fixation of inventory level Reorder level Reorder level
Symptom of ill planned purchasing Over ordering Over ordering
Factor influencing material planning Lead time Lead time
Net requirement of material under MRP Stock on hand Stock on hand
Multiple Choice Multiple Answer
Question Following are the commonly used factors considered for evaluation of layout in factor analysis
method
Correct Answer Flow of material , Equipment utilization , Working condition
Your Answer Flow of material , Equipment utilization , Working condition
Multiple Choice Multiple Answer
Question Which of the following are examples of pure materials?
Correct Answer Bakeries , Ice factories , Woolen
Your Answer Bakeries , Ice factories , Woolen
Multiple Choice Multiple Answer
Question Which of the following factors decide the choice between the cent percent and sampling
inspection?
Correct Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Your Answer Nature of inspection , Natural tolerance versus design tolerance , Vendor's quality rating
Multiple Choice Single Answer
Question What do you mean by planned corrective manitenance which provides an opportunity to
undertake design modifications in the equipment to eliminate or reduce frequency of breakdowns.
Correct Answer Design-out Maintenance
Your Answer Design-out Maintenance
Multiple Choice Single Answer
Question The product layout has following disadvantage
Correct Answer Layout is not flexible
Your Answer Layout is not flexible
Multiple Choice Multiple Answer
Question Which utilities are considered as infrastructural requirements?
Correct Answer Disposal of waste , Power , Water
Your Answer Disposal of waste , Power , Water
Multiple Choice Multiple Answer
Question Which are the factors on which the structure of the transportation cost depends?
Correct Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment
Your Answer Average distance of shipment , Characteristics of the commodity , Medium of shipment
Multiple Choice Multiple Answer
Question Which are the three basic types of control chart by attribute?
Correct Answer p-chart , c-chart , np-chart
Your Answer p-chart , c-chart , np-chart
True/False
Question It would not affect the project completion time if non-critical activities take little loner time
than planned.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question A good layout makes effective use of space. Utilization of space for a department like Stores
can be measured by
Correct Answer Proportion of Cubic volume space utilized
Your Answer Proportion of Cubic volume space utilized
Multiple Choice Single Answer
Question Process planning is the process of
Correct Answer establishing shortest and most economic path of production
Your Answer establishing shortest and most economic path of production
Multiple Choice Single Answer
Question Who prepares the daily production report?
Correct Answer Shop Supervisor
Your Answer Shop Supervisor
Multiple Choice Multiple Answer
Question Which of the following are examples of gross materials?
Correct Answer Timber , Iron ore , Sugar cane
Your Answer Timber , Iron ore , Sugar cane
Multiple Choice Multiple Answer
Question Which of the following defects can be observed during preventive inspection by using human
senses?
Correct Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer Deviation from normal sound , Excessive Vibration , Leakage of a gas
Multiple Choice Multiple Answer
Question Which of the following are the objectives of a good maintenance system?
Correct Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring
maximum plant availability
Your Answer Elimination of unsafe conditions , Minimisation of wear and tear of machines , Ensuring
maximum plant availability
Select The Blank
Question Production control work is ________ in case of floor inspection as compared with the
centralised inspection.
Correct Answer easier
Your Answer easier
Select The Blank
Question The easiest way to bring the delayed job within the promised delivery time by using extra shift
or weekly holiday is ________.
Correct Answer Overtime working
Your Answer Overtime working
True/False
Question Latest starting date is the latest finishing time minus activity duration.
Correct Answer True
Your Answer True
Select The Blank
Question In case of an OC curve, the risk of rejecting a good quality lot may vary between ________.
Correct Answer 0.01 to 10%
Your Answer 0.01 to 10%
Select The Blank
Question The ________ advocates maintenance procedures whereby the condition of the plant is
constantly watched through systematic inspection to unearth unhealthy conditions and preventive
Correct Answer Preventive Maintenance
Your Answer Preventive Maintenance
Select The Blank
Question The ________ breakdowns usually cost more, partly due to damage done to the adjustment
components and partly due to emergency actions.
Correct Answer Unexpected
Your Answer Unexpected
Select The Blank
Question The term ________ emplies the foregone profit due to inability of company to produce.
Correct Answer Opportunity cost
Your Answer Opportunity cost
Multiple Choice Single Answer
Question Process type layout is suitable when
Correct Answer there is wide variation in processing time of operations
Your Answer there is wide variation in processing time of operations
Select The Blank
Question The ________ is the process of withdrawing the equipment from the production line,
dismantling it unitwise, visualising defects, effecting adjustments, replacing worn-out parts and finally
building it up to get desired accuracies.
Correct Answer Reconditioning
Your Answer Reconditioning
True/False
Question One major difference between CPM and PERT is the former's adaptability for the projects
where high degree of uncertainty prevails and activity times during performance are expected to vary
considerably for certain activities.
Correct Answer False
Your Answer False
True/False
Question Kanban system is essentially a computer based system for production scheduling and control
Correct Answer False
Your Answer False
Select The Blank
Question The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer Lot Tolerance Percentage Defective
Your Answer Lot Tolerance Percentage Defective
Multiple Choice Single Answer
Question How dummy activities are shown in the time chart during project scheduling?
Correct Answer Vertical lines
Your Answer Dotted lines
Match The Following
Question Correct Answer Your Answer
Factor Analysis Method to evaluate layouts Method to evaluate layouts
Minimization of production delays Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Scale model Layout analysis Layout analysis
Multiple Choice Multiple Answer
Question In an organization there may not be a formal PPC department if
Correct Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Your Answer Work is highly repetitive in nature , Planning activities are performed by the line staff ,
Number of workmen is not very large
Multiple Choice Multiple Answer
Question Which three of the following are causes of continuous upward pattern of Xbar-R control chart?
Correct Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
Your Answer Wear of tool , Abnormal rise in temperature , Accumulation of dirt
True/False
Question A network should employ only those dummy activities which are absolutely necessary.
Correct Answer True
Your Answer True
Select The Blank
Question The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer Shutdown Maintenance
Your Answer Shutdown Maintenance
Multiple Choice Single Answer
Question What do you understand by identification of defects in materials, components, machining
processes or men to fix responsibility of defectives, thereby preventing or minimising occurance of
defectives?
Correct Answer Preventive function
Your Answer Preventive function
Select The Blank
Question OC curve of ideal sampling plan suggests that all lots less than 3% defectives have the
probability of acceptance of ________.
Correct Answer One
Your Answer One
Select The Blank
Question A set of activities to keep an equipment in the specified condition is called as ________.
Correct Answer Maintenance
Your Answer Maintenance
Multiple Choice Single Answer
Question One of the external factors influencing Material Planning is
Correct Answer Price trends
Your Answer Price trends
Multiple Choice Multiple Answer
Question What is indicated by the erratic pattern points falling above and below the control limits in the
Xbar-R-control chart?
Correct Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
Your Answer Defects in materials , Poorly trained operators , Frequent adjustments of machines
True/False
Question Inspection should be conducted prior to an operaion, after whose completion no rework
whatsoever is possible.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question What do you mean by CPM?
Correct Answer Critical Path Method
Your Answer Critical Path Method
True/False
Question Planned lubrication is said to be the nervous system of the equipment.
Correct Answer True
Your Answer True
True/False
Question In case of X bar-R charts,it is ensured that the assignable causes are detected before the
tolerances are violated, upper and lower statistical limits are worked out and inserted into a chart.
Correct Answer True
Your Answer True
Multiple Choice Single Answer
Question Provision of drainage facilities is important for the following type of industry
Correct Answer Chemical Process
Your Answer Chemical Process
LIST OF ATTEMPTED QUESTIONS AND ANSWERS
Multiple Choice Multiple Answer
Question How the concept of float is helpful to planners?
Correct Answer To minimize the requirement of resources , To prevent peaks and valleys in requirement
of resources , To decide priorities in allocation of resources
Your Answer To decide priorities in allocation of resources , To minimize the requirement of resources ,
To prevent peaks and valleys in requirement of resources
True/False
Question Floor inspection delays the identification of faults which can not be rectified immediately
before large lots are spoiled.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question What is the location of lower control limit in the X bar-R control chart?
Correct Answer 3 standard deviations below central line
Your Answer 3 standard deviations below central line
Multiple Choice Multiple Answer
Question Which of the following variables which operate periodically are the reasons for the cyclic
pattern depicting peaks and valleys during Xbar-R control chart?
Correct Answer Wornout positions , Fatigue , Roller eccentricity
Your Answer Wornout positions , Fatigue , Roller eccentricity
Select The Blank
Question The ________ pertain to the climatic conditions which the component , product or material
should withstand.
Correct Answer Environmental specifications
Your Answer Environmental specifications
Multiple Choice Multiple Answer
Question Order preparation process for products manufatured to order requires following documents
Correct Answer Sales Order , Work order , Shop order
Your Answer Sales Order , Work order , Shop order
Multiple Choice Single Answer
Question What do you understand by the measurement of work to establish allowed time for a job for the
defined method?
Correct Answer Work measurement
Your Answer Work measurement
True/False
Question Suburban location provides the compromise netween rural and urban locations.
Correct Answer True
Your Answer True
Match The Following
Question Correct Answer Your Answer
Scale model Layout analysis Technique for evolving and analysis of layouts
Factor Analysis Method to evaluate layouts Method to evaluate layouts
Minimization of production delays Objective of good layout Objective of good layout
Maximum visibility Principles of good layout Principles of good layout
Multiple Choice Multiple Answer
Question Plant Layout is concerned with optimum arrangement of the following
Correct Answer Storage space , Machines , Material Handling Equipment
Your Answer Storage space , Machines , Material Handling Equipment
Multiple Choice Single Answer
Question The process of changing inputs into outputs thereby adding some value to entity can be defined
as
Correct Answer Operation
Your Answer Production
True/False
Question A sampling plan which perfectly discriminates will have vertical OC curve.
Correct Answer True
Your Answer False
Multiple Choice Multiple Answer
Question Which kind of possible defectives can be reduced due to first off inspection?
Correct Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Your Answer Due to mistakes in reading blue prints , Due to errors in tooling , Due to wrong machine
set up
Multiple Choice Multiple Answer
Question Which of the following concepts must be understood for the achievement of quality?
Correct Answer Quality of conformance , Purpose of product , Quality of design
Your Answer Quality of conformance , Quality of design
Multiple Choice Single Answer
Question Site factors for plant location include
Correct Answer Suitability of land
Your Answer Suitability of land
Multiple Choice Single Answer
Question The ratio of output to input of a production system is commonly known as
Correct Answer Productivity
Your Answer Productivity
Multiple Choice Multiple Answer
Question Which of the following cases indicated that the operation has occurred?
Correct Answer Movement of components to assembly section , Raw material movement , A worker's
trip to grinder to sharpen the tools
Your Answer Movement of components to assembly section , Raw material movement , A worker's trip
to grinder to sharpen the tools
Multiple Choice Single Answer
Question Which kind of gauge consists of electrical contacts operating a series of colloured signal lamps
which indicate whether the dimension is correct, oversize or undersize?
Correct Answer Multiple gauging
Your Answer Multiple gauging
Select The Blank
Question A ________helps to avoid crowding of jobs at a particular machine by change of route of some
of the jobs or by diverting work to other machine.
Correct Answer Control board
Your Answer Forwarding note
True/False
Question Proper care and storage is not an essential part of a well planned lubrication system.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer Factory
Your Answer Factory
Multiple Choice Multiple Answer
Question Major contributors in the development of Control Charts, Sampling plan are
Correct Answer F H Dodge , H G Roming , Walter Schewhart
Your Answer F H Dodge , Walter Schewhart , L H C Tippet
Multiple Choice Single Answer
Question How to claculate the producer risk in the OC Curve?
Correct Answer Probability that a good lot will be rejected by the sampling
Your Answer Probability that a good lot will be rejected by the sampling
Multiple Choice Single Answer
Question How many types of charts are used for the purpose of method study?
Correct Answer Four
Your Answer Eight
Multiple Choice Multiple Answer
Question Which three of the following options can be used to reduce the duration of activity during
project crashing?
Correct Answer Allocating more manpower and machines than originally planned for. , Working
additional shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Your Answer Allocating more manpower and machines than originally planned for. , Working additional
shifts or overtime. , Awarding work to vendors who charge extra but expedite deliveries.
Multiple Choice Single Answer
Question What does head of an arrow represent?
Correct Answer End of an activity
Your Answer End of an activity
Match The Following
Question Correct Answer Your Answer
Combined Layout Mixed Layout Project Layout
Fixed Position Layout Project Layout job layout
Product Layout Line Layout Mixed Layout
Process Layout Functional Layout Functional Layout
Multiple Choice Single Answer
Question How to reveal the capability of the sampling plan to discriminate between good lots and bad
lots?
Correct Answer Operating characteristics curve ( OC )
Your Answer Operating characteristics curve ( OC )
Select The Blank
Question The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.
Correct Answer Condition monitoring
Your Answer Condition monitoring
Select The Blank
Question The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer Producer's risk
Your Answer Producer's risk
Multiple Choice Multiple Answer
Question Which of the following are minimum requirement for a good quality of design?
Correct Answer Resonable procurement time , Resonable cost , Resonable manufacturing time
Your Answer Resonable cost , Resonable procurement time , Resonable manufacturing time
Select The Blank
Question The ________ is a set of tools and techniques by which products are made to comply with the
specifications at minimum cost to the firm.
Correct Answer Quality control system
Your Answer Quality control system
Select The Blank
Question The ________ is necessary when the job requires detailed of one or more of the job
characteristics with the help of special equipment which is not available at the producing company.
Correct Answer Inspection order
Your Answer Inspection order
True/False
Question Delay in completion of projects result in unwelcome additions to the fixed manufacturing
expenses.
Correct Answer True
Your Answer True
Select The Blank
Question One detachable ticket is prepared for each ________.
Correct Answer Operation
Your Answer Operation
True/False
Question Objective of Work Study is to improve Productivity
Correct Answer True
Your Answer False
True/False
Question As a general rule, the number of tail event of an activity is more than that of it's head event.
Correct Answer False
Your Answer False
Multiple Choice Single Answer
Question How critical activities are shown in the time chart during project scheduling?
Correct Answer Solid lines
Your Answer Solid lines
Multiple Choice Multiple Answer
Question Which of the following products should be produced by using mass production?
Correct Answer Refrigerator , Tyre for automobile , Television Set
Your Answer Refrigerator , Tyre for automobile , Television Set
Select The Blank
Question Work study is also called ________ study
Correct Answer Time and Motion
Your Answer Time and Motion
Multiple Choice Multiple Answer
Question What are the benefits of reconditioning?
Correct Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps
to plan requirement of replacement spares
Your Answer Eliminates problems and frequent breakdowns , Increases life of an equipment , It helps to
plan requirement of replacement spares
Select The Blank
Question A good maintenance system is not a luxary but a ________.
Correct Answer Necessity
Your Answer Necessity
Multiple Choice Single Answer
Question Which of the following technique is event oriented ?
Correct Answer Project Evaluation & Review Technique
Your Answer Project Evaluation & Review Technique
Multiple Choice Multiple Answer
Question Which of the following is not the characteristic of Project Production?
Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
Your Answer Continuous flow of material , Highly mechanised material handling , Virtually zero
manufacturing cycle time
True/False
Question Breakdown of a machine is normally accompanied by added machine setup cost such as
resetting of jobs or change of jobs.
Correct Answer True
Your Answer True
True/False
Question The problems of congestion, bottlenecks and backtracking can not be visualized by using
templates and models.
Correct Answer False
Your Answer False
Multiple Choice Multiple Answer
Question Which of the following are illustrations of inspection?
Correct Answer Physical count of incoming material against the quantity mentioned in delivery challan ,
A dimensional check with measuring instrument , Visual check of burrs and finish
Your Answer Physical count of incoming material against the quantity mentioned in delivery challan ,
Visual check of burrs and finish , Check the operator performance
POM assgn : Senthil
Multiple Choice Multiple Answer
Question
Which of the following aspects are essential to ensure quality of purchased
items?
Correct Answer
Defining right quality for the job , Vendor performance evaluation , Maki ng
sure that suppliers understand the requirements
Your Answer
Defining right quality for the job , Vendor performance evaluation , Making
sure that suppliers understand the requirements
Select The Blank
Question
Correct Answer
The ________ breakdowns usually cost more, partly due to damage done
to the adjustment components and partly due to emergency actions.
Unexpected
Your Answer
Unexpected
True/False
Question
Correct Answer
After goods have been manufactured, route sheets and operation layouts
should not be collected back.
False
Your Answer
False
True/False
Question
Correct Answer
In case of centralised inspection, inspection rooms generally become
bottleneck and cause delay in taking action regarding rejection or rework.
True
Your Answer
True
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Your Answer
Dependent and independent
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any
product/s is called
Correct Answer
Factory
Your Answer
Factory
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Your Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question
Correct Answer
Which of the following is the criteria for the percentage defectives in the
zone of the indecision?
Lots having the percentage defective more than AQL but less than LPTD
Your Answer
Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method
study?
Correct Answer
Brazing , Welding , Riveting
Your Answer
Select The Blank
Question
Brazing , Welding , Riveting
Correct Answer
The easiest way to bring the delayed job within the promised delivery time
by using extra shift or weekly holiday is ________.
Overtime working
Your Answer
Overtime working
Select The Blank
Question
Correct Answer
An Ideal OC curve is ________ shaped curve that accpets all the lots with
quality equal to or better than AQL .
Rectangular
Your Answer
Rectangular
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the
production schedule in a factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Your Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive
absenteeism
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic consideration while
selecting a job for method study?
Correct Answer
Unorderly movement of men and materials , Excessive process defectives ,
Too many suggestions received for improvement from a department or
section
Your Answer
Unorderly movement of men and materials , Excessive process defectives ,
Inconsistent quality
True/False
Question
Correct Answer
During set up of X bar-R control chart, control limts should be practically
revised from time to time as additional data is accumulated.
True
Your Answer
False
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Your Answer
Absolute uniformity , Undesrstandable , Economically viable
Match The Following
Question
Correct Answer
Your Answer
Toung
Sweet
Sweet
Eye
Crack
Crack
Nose
Burnout
Burnout
Ear
Impact
Roughness
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
Your Answer
Acceptable quality level
True/False
Question
Correct Answer
Floor inspection delays the identification of faults which can not be rectified
immediately before large lots are spoiled.
False
Your Answer
False
True/False
Question
Correct Answer
Cent percent inspection is required on WIP prior to the key, critical or costly
operation.
True
Your Answer
True
Multiple Choice Single Answer
Question
The document which incorporates details of process planning for a job is
called
Correct Answer
Route Sheet
Your Answer
True/False
Question
Route Sheet
Correct Answer
Repetitive movements between work stations which are difficult to be
traced on string diagrams can be conveniently shown on flow diagrams.
False
Your Answer
True
Multiple Choice Single Answer
Question
Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Your Answer
PERT & CPM
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a
product to
Correct Answer
To meet the intended function at lowest cost
Your Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Your Answer
Breakdown
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer
No relation
Your Answer
No relation
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Your Answer
Tight
Select The Blank
Question
Correct Answer
The ________ is the maintenance work initiated on a result of knowledge of
the condition of an item from routine or continuous checking.
Condition monitoring
Your Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity
times?
Correct Answer
Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. ,
Activity time may assume that just the normal quantity of resources
required to carry out the activity are available.
Your Answer
Activity time should be obtained from the person responsible for the
completion of an activity , Activity time must be independent of any
influence which the preceding or succeeding activity may have on it. ,
Activity time may assume that just the normal quantity of resources
required to carry out the activity are available.
Multiple Choice Single Answer
Question
Which of the following techniques is used by industrial engineering
department to obtain the utilisation index?
Correct Answer
Work Sampling Studies
Your Answer
Break Even Analysis
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or
rejecting a particular site from legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Your Answer
Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation in method study
recording?
Correct Answer
Change in physical characteristic , Consumption of physical effort , Change
in chemical characteristic
Your Answer
Change in physical characteristic , Consumption of physical effort ,
Movement of material
True/False
Question
Correct Answer
An activity can share the same tail event and same head event with any
other activity.
False
Your Answer
True
Select The Blank
Question
Correct Answer
The ________ must ensure that the product satisfy the functional
requirements of it's usage.
Quality of design
Your Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Your Answer
Bakeries , Ice factories , Woolen
Select The Blank
Question
Correct Answer
The ________ are the definitions of the measurable as well as
nonmeasurable characteristics of the product.
Specifications
Your Answer
Specifications
Multiple Choice Single Answer
Question
Site factors for plant location include
Correct Answer
Suitability of land
Your Answer
Suitability of land
Select The Blank
Question
Correct Answer
The ________ is the probability that a good lot will be rejected by the
sampling plan.
Producer's risk
Your Answer
Producer's risk
Multiple Choice Multiple Answer
Question
Which of the following defects can be observed during preventive inspection
by using human senses?
Correct Answer
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Your Answer
Select The Blank
Question
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Correct Answer
The ________ includes preventive maintenance activities whose needs are
identified through inspection which requires stoppage of machines.
Shutdown Maintenance
Your Answer
Working Maintenance
True/False
Question
Correct Answer
Independent float either affects the float of preceding activities or that of
succeeding activities.
False
Your Answer
False
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
Your Answer
Over ordering , under ordering , stockouts
True/False
Question
Correct Answer
F W Taylor devised a system for classifying motions into basic divisions
called Therbligs
False
Your Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion
Your Answer
Time and Motion
Match The Following
Question
Correct Answer
Your Answer
Factor Analysis
Method to evaluate layouts
Technique for evolving and
analysis of layouts
Minimization of production delays Objective of good layout
Objective of good layout
Maximum visibility
Principles of good layout
Principles of good layout
Scale model
Layout