Serah Terima Proyek
Pertemuan 13
Ir. Michael Tedja, M.T.
TESTING & COMMISIONING
TAHAPAN :

SERAH TERIMA I :
1. TEST PARSIAL
2. TEST TOTAL FUNGSI

SERAH TERIMA II :
1. PENYELESAIAN NON CONFORMANCE
2. TEST BOD (KADAR OKSIGEN) & COD (KADAR GAS CO)
INGAT :


TEST TOTAL FUNGSI UNTUK ALAT - BUKAN DAYA
TEST SPRINKLER - SMOKE DETECTOR- HYDRANT BOX DI
LOKASI TERJAUH
Ir. Michael Tedja, M.T.
TESTING & COMMISIONING
1. PEKERJAAN STRUKTUR
2. PEKERJAAN ARSITEKTUR
3. PEKERJAAN M & E :
AIR BERSIH - AIR KOTOR - AIR KOTORAN
 AIR CONDITION
 TELPON & PABX
 STP : BOD (KADAR OKSIGEN) & COD (KADAR GAS CO)
 LIFT/ESCALATOR
 GONDOLA
 PRESSURE FAN
 WATER PUMP
 LISTRIK - GENSET
 SECURITY SYSTEM

Ir. Michael Tedja, M.T.
HANDLING OVER
DOKUMENTASI :

AS BUILT DRAWING

LIST OF MATERIAL

LIST OF SUB CONTRACTOR

MANUAL OPERATION : SIPIL - ARSITEKTUR - M & E

MAINTENANCE METHOD : SIPIL - ARSITEKTUR - M & E

SURAT JAMINAN PEKERJAAN

SURAT JAMINAN MATERIAL

BERITA ACARA PELATIHAN OPERASIONAL

STRUKTUR ORGANISASI KONTRAKTOR
Ir. Michael Tedja, M.T.
REPORTING
LAPORAN PERTANGGUNGJAWABAN MANAJEMEN :
I. PENDAHULUAN
II. PERTANGGUNGJAWABAN KEBIJAKAN UMUM :
1.
2.
3.
4.
STRUKTUR ORGANISASI
PEMBAGIAN TUGAS-TANGGUNG JAWAB-WEWENANG
PERSONALIA
HASIL PENYUSUNAN RENCANA KERJA :
A. TAHAP FEASIBILITY STUDY
B. TAHAP DISAIN
C. TAHAP TENDER
D. TAHAP KONSTRUKSI
E. TAHAP TESTING & COMMISIONING
REPORTING
LAPORAN PERTANGGUNGJAWABAN MANAJEMEN :
5. HASIL PEKERJAAN :
A. TAHAP FEASIBILITY STUDY
B. TAHAP DISAIN
C. TAHAP TENDER
D. TAHAP KONSTRUKSI
E. TAHAP TESTING & COMMISIONING
6. HAL-HAL YANG MENGHAMBAT : INTERNAL & EKSTENAL
7. HAL-HAL YANG MENDUKUNG : INTERNAL & EKSTERNAL
8. KESIMPULAN
9. SARAN
REPORTING
LAPORAN PERTANGGUNGJAWABAN MANAJEMEN :
III. PERTANGGUNGJAWABAN KEBIJAKAN KEUANGAN
1. LAPORAN KEUANGAN
2. DAFTAR INVENTARIS :
A. AWAL PROYEK
B. AKHIR PROYEK
IV. LAMPIRAN
1. GAMBAR RENCANA & AS BUILT DRAWING
2. DOKUMEN TENDER
3. PENAWARAN
4. DOKUMEN KONTRAK
5. LAPORAN KONSULTAN & KONTRAKTOR
V. PENUTUP