Rochester Institute of Technology FY2013-FY2015 Over $20K Final Capital Projects Summary Total Approved Project Source (5) Restricted: EXPANSION (1) 1 $37,000,000 EX/Bond12/CF Gene Polisseni Center ($25.5M Bond, $4.0M Gift, $7.5M RIT) EX/Bond12 Institute of Health Sciences New Facility ($14.5M Bond, $0.5M Gift) 2 15,000,000 NTID Sebastian and Lenore Rosica Hall ($2.5M Gift, $5.5M NTID) 3 8,000,000 EX/NTID (2) ADAPTATION NTID Hugh L. Carey Hall Redesign ($3.04M NTID, $1.6M Fed, $1.16M RIT) 4 5,800,000 NTID/EX/CF F&A FMS Jefferson Road Lighting Design (NYS Grant) 5 385,000 EX NTID Energy Audit ($130.9K Fed / $11K NYSERDA) 6 141,900 Fed/EX Total Restricted $66,326,900 Designated: EXPANSION (1) 7 F&A Dining Services Freshens at Institute Hall 380,000 Bond/Aux (2) ADAPTATION Bond12 8 F&A FMS Substation Upgrade 6,000,000 Bond12/CF COS Lab Renovations ($2.0M Bond $1.0M RIT) 9 3,000,000 10 F&A FMS CIMS Relocation 2,627,998 CF 11 F&A FMS CIMS Quad Renovation 788,383 PF 12 ITS Ross Data Center Renovation 244,200 CF 13 KGCOE Chemical Engineering Principals Teaching Lab 200,000 CF 14 KGCOE Chemical Engineering Process Teaching Lab 200,000 CF 15 KGCOE Biomedical Engineering Teaching Lab 200,000 CF 16 CAST ECTET Audio Engineering Technology Equipment 134,600 CF/PF CODE (3) 17 RIT Inn & Conference Center Handicap Accessibility West Entrance 127,350 CF (4) DEFERRED MAINTENANCE 18 F&A Housing University Commons Door Mullions 118,980 CF Total Designated Projects $14,021,511 Total Projects $80,348,411 Page 1 of 2 Project Expenditures 12/31/12 $335,944 0 3,926,700 437,886 36,027 0 $4,736,557 Project Balance $36,664,056 15,000,000 4,073,300 5,362,114 348,973 141,900 $61,590,343 125,296 254,704 14,950 0 0 551,451 1,375 133,472 3,468 179,853 67,882 5,985,050 3,000,000 2,627,998 236,932 242,825 66,528 196,532 20,147 66,718 6,500 120,850 0 $1,084,248 $5,820,805 118,980 $12,937,263 $74,527,606 Rochester Institute of Technology FY2013-FY2015 Over $20K Final Capital Projects Summary Total Approved Project Source (5) Project Expenditures 12/31/12 Project Balance End Notes Expansion and Adaptation – Alterations or additions to existing space, construction of additional square footage to the total plant for academic or university priorities, purchase and all associated costs for new property acquisitions in support of current or future development, purchase of major non-physical plant equipment in support of academic or administrative programs. (1) Expansion – Initiatives: Projects that expand the University’s physical plant or infrastructure; general improvements that impact the strategic nature of academic programs or relocations of major functional units. (2) Adaptation – Projects that directly support and improve the instructional and interactive relationships between students and faculty; projects that enhance lecture halls, classrooms, student life, computer labs, and other technological innovations; projects that further research opportunities (3) Code - Code and Safety Compliance: Improvements necessary to enhance the safety of RIT’s people, equipment and buildings; projects that comply with the requirements of all regulatory agencies and appropriate statutes; projects that specifically address Americans with Disabilities and Section 504 rehabilitation standards. (4) Deferred Maintenance – Correction of building problems to prevent further damage, loss of building use or negative impact on a program’s economic vitality. (5) Source Legend: AUX=Auxiliary, Bond=Debt Financing, CF=Current Fund, EX=Externally Funded, Feds=Federal Appropriation for NTID, NTID=NTID, PF=Plant Fund Page 2 of 2
© Copyright 2026 Paperzz