Rochester Institute of Technology FY2015-FY2017 Over $20K Final Capital Pending & Active Projects Summary Project 1 Restricted: EXPANSION (1) Institute of Health Sciences New Facility ($10.0M Bond, $0.5M Gift, $4.5M RIT) Total Project Source (5) 12 $15,000,000 EX/Bond /RF Project Expenditures 12/31/14 $7,534,836 Project Balance $7,465,164 (2) 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ADAPTATION University Center @ 40 Franklin Street ($1.5M Fed, $2.6M State, $2.6M RIT): F&A FMS 40 Franklin St. 1st & 3rd Floor CUE Renovation ($1.5M Fed, $2.37M NYS) F&A FMS 40 Franklin St. Building Improvements ($2.6M RIT, $0.23M NYS) Institute Hall NY Battery Lab ($467.5K NYSERDA, $230.3K RIT) F&A FMS Jefferson Road Lighting ($574.5K NYS DOT, Henrietta $9.6K, $86.0K RIT) GIS Prax-Air Gas Compression Project (NYS ESD Grant) NTID Energy Audit ($130.9K Fed / $11.0K NYSERDA) GIS Prototyping Lab (NYS ESD Grant) Total Restricted Designated: EXPANSION (1) COS Institute Hall Laboratory Instrumentation F&A FMS Space Management Software F&A FMS Polisseni Locker Room Build Out KGCOE Institute Hall Chem E/BME Lab Equipment F&A FMS Substation Upgrade COS Lab Renovations F&A FMS 40 Franklin St. Urban Entrepreneur Center KGCOE Center for Micro Engineering MOCVD Clean Room F&A Housing Colony Manor Renovation Design CIAS-SAC Booth Rotoclone Exhaust Unit Student Affairs Office Renovation CODE (3) F&A FMS New Simplex Fire Alarm Software System DEFERRED MAINTENANCE (4) F&A FMS Peterson/Bell Domestic Hot Water System Replacement Total Designated Projects Total Projects 3,866,350 2,833,650 697,793 670,137 144,342 141,900 141,093 $23,495,265 EX EX/RF EX/RF EX/RF RF $589,600 369,772 175,000 150,000 6,000,000 3,000,000 463,407 347,712 214,000 164,015 100,000 RF 275,000 111,800 $11,960,306 $35,455,571 EX EX RF RF RF Bond12 Bond12 RF RF RF RF RF RF RF 84,995 3,781,355 213,735 2,619,915 551,223 146,570 53,336 616,801 0 144,342 89,908 51,992 90,264 50,830 $8,618,296 $14,876,969 $564,998 195,439 0 71,088 42,510 2,281,833 381,739 14,083 0 0 0 $24,602 174,333 175,000 78,912 5,957,490 718,167 81,668 333,630 214,000 164,015 100,000 0 275,000 9,800 102,000 $3,561,489 $8,398,817 $12,179,785 $23,275,786 (3) (4) (5) END NOTES Expansion and Adaptation – Alterations or additions to existing space, construction of additional square footage to the total plant for academic or university priorities, purchase and all associated costs for new property acquisitions in support of current or future development, purchase of major non-physical plant equipment in support of academic or administrative programs. (1) Expansion – Initiatives: Projects that expand the University’s physical plant or infrastructure; general improvements that impact the strategic nature of academic programs or relocations of major functional units. (2) Adaptation – Projects that directly support and improve the instructional and interactive relationships between students and faculty; projects that enhance lecture halls, classrooms, student life, computer labs, and other technological innovations; projects that further research opportunities. Code - Code and Safety Compliance: Improvements necessary to enhance the safety of RIT’s people, equipment and buildings; projects that comply with the requirements of all regulatory agencies and appropriate statutes; projects that specifically address Americans with Disabilities and Section 504 rehabilitation standards. Deferred Maintenance – Correction of building problems to prevent further damage, loss of building use or negative impact on a program’s economic vitality. Source Legend - Bond=Debt Financed, EX=Externally Funded, RF=Reserves Funded
© Copyright 2026 Paperzz