Current

RADON SCREENING SURVEY – FOLLOW-UP ROSEMOUNT ELEMENTARY SCHOOL
16400 Alden Ave, Gaithersburg, Maryland 20877
EXECUTIVE SUMMARY
Date of Test Report:
Round of Testing:
3/14/16 Follow-Up
Initial
Follow-up
Post Remediation
# Rooms Tested
# Rooms > 4.0 pCi/L:
Low Value:
High Value:
Confirmed Rooms ≥ 4.0 pCi/L US EPA
Action Level
3
0
0.7
1.1
0
Summary of Sampling Events ≥ 4.0 pCi/L
Room
127
128
130 Gym
130 Gym
Result (pCi/L)
2/29/16 (Rev 1 Initial)
1.2 (Open Window)
1.7 (Open Window)
1.1 (Open Door)
<0.3 (Open Door)
Result (pCi/L)
3/14/16 Follow-Up
0.9
1.1
0.7
Missing
Average Result
(pCi/L)
1.1
1.4
0.9
<0.3
E
NGIN E E R S
• P
LAN NE R S
• S
C I E N TI S T S
• C
ON S TR UC TI ON
M
AN AG ER S
936 RIDGEBROOK ROAD • SPARKS, MD 21152 • 410-316-7800 • (FAX) 410-316-7935
MCPS RADON TESTING
Executive Summary: Rosemont Elementary School
Date of Test Report:
Round of Testing:
# Rooms Tested:
# Rooms ≥ 4.0 pCi/L:
Low Value:
High Value:
3/14/2016
Initial
Follow-up
Post Remediation
3
0
0.7
1.1
Project Status:
Retesting completed; no further action at this time.
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
E
NGIN E E R S
• P
LAN NE R S
• S
C I E N TI S T S
• C
ON S TR UC TI ON
M
AN AG ER S
936 RIDGEBROOK ROAD • SPARKS, MD 21152 • 410-316-7800 • (FAX) 410-316-7935
March 14, 2016
Mr. Richard Cox
Indoor Air Quality Team Leader
Montgomery County Public Schools
850 Hungerford Drive
Rockville, MD 20850
Re:
Radon Testing Services
KCI Job # 12146341.29
Location:
Rosemont Elementary School
16400 Alden Avenue
Gaithersburg, MD 20877
Dear Mr. Cox:
KCI Technologies, Inc. (KCI) is pleased to submit the following report to the Montgomery County Public
Schools (MCPS) pursuant to completing a “short-term” 3 day radon test for the Sequoyah Elementary
School, located at 16400 Alden Avenue in Gaithersburg, Maryland 20877 (subject site).
Scope of Services:
KCI conducted radon testing at the subject site to evaluate indoor radon levels relative to the USEPA's
recommended action level of 4.0 picocuries per Liter (pCi/L) - the level at which EPA recommends that
schools take action to reduce the level. KCI conducted the radon testing in accordance with American
Association of Radon Scientists and Technologists (AARST) Protocol for Conducting Measurements of
Radon and Radon Decay Products in Schools and Large Buildings. A National Radon Safety Board
(NRSB) Radon Measurement Specialist (certification #14SS056) supervised the testing. Additional
information on radon management and the health effects of radon exposure is available from
www.montgomerycountymd.gov/dep/air/radon or www.epa.gov/radon.
KCI visited the site on February 22, 2016 and deployed six (6) activated charcoal (AC) radon test kits.
KCI deployed radon test kits in frequently-occupied ground contact rooms, and other areas, (if applicable)
in accordance with AARST guidance. A floor plan map of the building with the test locations is included
as Attachment A of this report.
As a quality control measure, KCI included duplicate samples, field blanks, lab transit blanks, and office
blanks in accordance with AARST recommendations. In addition, KCI submitted six (6) test kits to
Bowser-Morner, Inc. as spike samples. The spiked tests were exposed to a known radon concentration by
Bowser-Morner prior to being returned to the laboratory for analysis.
KCI returned to the site on February 25, 2016 to retrieve the radon sampling test kits. KCI shipped all
radon tests via overnight delivery to Airchek, Inc. for analysis by gamma-ray spectroscopy. Airchek, Inc.
is a NRSB certified analytical laboratory for radon analysis (certification # ARL1402) located at 1936
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
Mr. Richard Cox
March 14, 2016
Page 3
Butler Bridge Road, Mills River, North Carolina.
Evaluation of Testing Conditions:
The operating condition that represents the greatest amount of significantly occupied time for this
building is; heating active, with outdoor temperature averages ≤ 65° F.
KCI concludes that the test period reasonably represents normal conditions when the building is
significantly occupied. Clear characterization of the radon hazard is most likely to be observed under this
normal operating condition. Based on the evaluation of test conditions, this test should reasonably
characterize radon hazards.
KCI also conducted observations of field conditions which could affect the results of the test and
compiled weather data for the testing period. Note that strong storms and heavy rainfall were recorded
during the test period. The unusual weather conditions may have resulted in atypical radon test results for
this facility.
KCI recorded observations of the following conditions in each room at the time of deployment and
collection of the radon test kits:
•
•
•
•
•
•
Indoor temperature,
HVAC Operation,
Dehumidifier operation,
Humidifier operation,
Ceiling fan operation, and
Open windows or doors.
Results:
The results of the radon test analysis indicated the following:
Radon Concentration
≥4.0 piC/L
<4.0 piC/L
Room
none
Result
n/a
See Attachment B
Notes:
D- Duplicate sample
The field blank, office blanks, and lab transit blanks had test results of less than the laboratory detection
limit of 0.3 pCi/L. Review of the duplicate sample analysis indicates that adequate laboratory
measurement precision was achieved. The Spike sample analysis results indicate the laboratory is
operating within statistical control limits.
The sampling locations, field observations, and analytical results are listed on Table 1 (Attachment B).
The laboratory analytical results are also attached (Attachment C). Laboratory results and exposure data
for the spike samples are also included in Attachment C.
Our professional services have been performed in accordance with customary principles and practices in
the field of industrial hygiene and engineering. If you have any questions or comments regarding this
report, please feel free to contact me at (410) 316-7800.
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
Mr. Richard Cox
March 14, 2016
Page 4
Sincerely,
James M. Moulsdale
Radon Measurement Specialist
KCI Technologies, Inc.
Attachments:
A- Floor Plan with Test Locations
B- Table 1-Radon Test Summary Spreadsheet
C- Laboratory Analytical Results
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
ATTACHMENT A
Floor Plan With Test Locations
ATTACHMENT B
Radon Test Summary Spreadsheet
Table Notes:
AC- Activated Charcoal
ACI- Air Chek, Inc.
D- Duplicate
FB- Field Blank
KCI- KCI Technologies, Inc.
OB- Office Blank*
PM- Project Manager
QC- Quality Control
*Office blanks were submitted at a rate of 1% for all samples deployed in Phase 9 testing. Office
blanks were not submitted under each school individually.
Radon Testing Results
Rosemont Elementary School
Test Period: 02/22/16-02/25/16
Kit Number
7726853
7726813
7726806
7726812
Table Note:
* Missing or Compromised Sample
*
Room / Area
127
128
GYM - 130
GYM - 130 (Missing)
Result
0.9
1.1
0.7
-
Radon Testing Results
Rosemont Elementary School
Test Period: 02/22/16-02/25/16
Kit Number
7726821
7726822
Table Note:
* Missing or Compromised Sample
QC Type
D (128)
FB (GYM - 130)
Result
1.1
< 0.3
ATTACHMENT C
Laboratory Analytical Results
March** LABORATORY ANALYSIS
8,
REPORT **
2016
Radon test result report for:
ROSEMONT ELEMENTARY SCHOOL
MAIN
Kit #
7726853
7726813
7726821
7726812
7726806
7726822
Room Id
127
128
128
GYM - 130
GYM - 130
GYM - 130
Started
2016-02-22 @ 10:00 am
2016-02-22 @ 10:00 am
2016-02-22 @ 10:00 am
@
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
Ended
2016-02-25 @ 9:00 am
2016-02-25 @ 9:00 am
2016-02-25 @ 9:00 am
@
2016-02-25 @ 9:00 am
2016-02-25 @ 9:00 am
pCi/L
0.9 ± 0.3
1.1 ± 0.3
1.1 ± 0.3
Analyzed
2016-02-29
2016-02-29
2016-02-29
0.7 ± 0.3
< 0.3
2016-02-29
2016-02-29
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
March** LABORATORY ANALYSIS
9,
REPORT **
2016
Radon test result report for:
MCPS
Phase 9 Office Blanks
Kit #
7712568
7712584
7719460
7719481
7719497
7719498
Room Id
0
0
0
0
0
0
Started
2016-02-22 @ 6:00 pm
2016-02-22 @ 6:00 pm
2016-02-22 @ 6:00 pm
2016-02-22 @ 6:00 pm
2016-02-22 @ 6:00 pm
2016-02-22 @ 6:00 pm
Ended
2016-02-25 @ 3:00 pm
2016-02-25 @ 3:00 pm
2016-02-25 @ 3:00 pm
2016-02-25 @ 3:00 pm
2016-02-25 @ 3:00 pm
2016-02-25 @ 3:00 pm
pCi/L
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
Analyzed
2016-02-29
2016-02-29
2016-02-29
2016-02-29
2016-02-29
2016-02-29
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
March** LABORATORY ANALYSIS
9,
REPORT **
2016
Radon test result report for:
MCPS
Phase 9 Office Blanks
Kit #
7731626
7731633
7735204
Room Id
0
0
0
Started
2016-02-23 @ 2:00 pm
2016-02-23 @ 2:00 pm
2016-02-23 @ 2:00 pm
Ended
2016-02-26 @ 3:00 pm
2016-02-26 @ 3:00 pm
2016-02-26 @ 3:00 pm
pCi/L
< 0.3
< 0.3
< 0.3
Analyzed
2016-03-01
2016-03-01
2016-03-01
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
February
23, ** LABORATORY ANALYSIS
REPORT **
2016
Radon test result report for:
TRANSIT- PHASE 7, 8, 9
NONE
Kit #
7734937
7734946
7734955
7734956
7734959
7734930
7734953
7734954
7734940
7734949
7734948
7734939
7734942
7734929
7734933
7734934
7734936
7734943
7734944
7734935
7734928
7734952
7734947
7734931
7734932
7718520
7718523
7718522
7718521
7734945
7734960
7734958
7734951
7734957
7734938
Room Id
1
10
11
12
13
14
15
16
17
18
19
2
20
21
22
23
24
25
26
27
28
29
3
30
31
32
33
34
35
4
5
6
7
8
9
Started
2016-02-19 @ 3:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 3:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 3:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 3:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
2016-02-19 @ 4:00 pm
Ended
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
2016-02-22 @ 11:00 am
pCi/L
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
Analyzed
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
2016-02-23
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
February
15, ** LABORATORY ANALYSIS
REPORT **
2016
Spike Sample Laboratory Results
Radon test result report for:
MCPS
Kit #
7718273
7718281
7718282
7718288
7718289
7718291
Room Id
101A
102B
103C
104D
105E
106F
Started
2016-01-30 @ 9:00 am
2016-01-30 @ 9:00 am
2016-01-30 @ 9:00 am
2016-01-30 @ 9:00 am
2016-01-30 @ 9:00 am
2016-01-30 @ 9:00 am
Ended
2016-02-01 @ 9:00 am
2016-02-01 @ 9:00 am
2016-02-01 @ 9:00 am
2016-02-01 @ 9:00 am
2016-02-01 @ 9:00 am
2016-02-01 @ 9:00 am
pCi/L
6.5 ± 0.6
6.4 ± 0.6
6.3 ± 0.6
6.7 ± 0.6
6.6 ± 0.6
6.5 ± 0.6
Analyzed
2016-02-04
2016-02-04
2016-02-04
2016-02-04
2016-02-04
2016-02-04
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
Note: Spike samples are test canisters that are deliberately exposed to a controlled high level of radon in a laboratory.
They provide a quality control measure in the testing process and do NOT reflect radon levels in the building being
tested.
E
NGIN E E R S
 P
LAN NE R S
 S
C I E N TI S T S
 C
ON S TR UC TI ON
M
AN AG ER S
936 RIDGEBROOK ROAD  SPARKS, MD 21152  410-316-7800  (FAX) 410-316-7935
MCPS RADON TESTING
Executive Summary: Rosemont Elementary School
Date of Test Report:
Round of Testing:
# Rooms Tested:
# Rooms ≥ 4.0 pCi/L:
Low Value:
High Value:
2/29/2016 (Rev 1)
Initial
Follow-up
Post Remediation
63
0
< 0.3
3.2
Project Status:
Initial testing completed; compromised samples need re-test.
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
E
NGIN E E R S
 P
LAN NE R S
 S
C I E N TI S T S
 C
ON S TR UC TI ON
M
AN AG ER S
936 RIDGEBROOK ROAD  SPARKS, MD 21152  410-316-7800  (FAX) 410-316-7935
February 29, 2016 (Rev 1)
Mr. Richard Cox
Indoor Air Quality Team Leader
Montgomery County Public Schools
850 Hungerford Drive
Rockville, MD 20850
Re:
Radon Testing Services
KCI Job # 12146341.19
Location:
Rosemont Elementary School
16400 Alden Avenue
Gaithersburg, MD 20877
Dear Mr. Cox:
KCI Technologies, Inc. (KCI) is pleased to submit the following report to the Montgomery County Public
Schools (MCPS) pursuant to completing a “short-term” 3 day radon test for the Rosemont Elementary
School, located at 16400 Alden Avenue in Gaithersburg, Maryland 20877 (subject site).
Scope of Services:
KCI conducted radon testing at the subject site to evaluate indoor radon levels relative to the USEPA's
recommended action level of 4.0 picocuries per Liter (pCi/L) - the level at which EPA recommends that
schools take action to reduce the level. KCI conducted the radon testing in accordance with American
Association of Radon Scientists and Technologists (AARST) Protocol for Conducting Measurements of
Radon and Radon Decay Products in Schools and Large Buildings. A National Radon Safety Board
(NRSB) Radon Measurement Specialist (certification #14SS056) supervised the testing. Additional
information on radon management and the health effects of radon exposure is available from
www.montgomerycountymd.gov/dep/air/radon or www.epa.gov/radon.
KCI visited the site on December 15, 2016 and deployed hundred seventy-seven (77) activated charcoal
(AC) radon test kits. KCI deployed radon test kits in frequently-occupied ground contact rooms, and other
areas, (if applicable) in accordance with AARST guidance. A floor plan map of the building with the test
locations is included as Attachment A of this report.
As a quality control measure, KCI included duplicate samples, field blanks, lab transit blanks, and office
blanks in accordance with AARST recommendations. In addition, KCI submitted six (6) test kits to
Bowser-Morner, Inc. as spike samples. The spiked tests were exposed to a known radon concentration by
Bowser-Morner prior to being returned to the laboratory for analysis.
KCI returned to the site on December 18, 2016 to retrieve the radon sampling test kits. KCI shipped all
radon tests via overnight delivery to Airchek, Inc. for analysis by gamma-ray spectroscopy. Airchek, Inc.
is a NRSB certified analytical laboratory for radon analysis (certification # ARL1402) located at 1936
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
Mr. Richard Cox
February 29, 2016
Page 3
Butler Bridge Road, Mills River, North Carolina.
Evaluation of Testing Conditions:
The operating condition that represents the greatest amount of significantly occupied time for this
building is; heating active, with outdoor temperature averages ≤ 65° F.
KCI concludes that the test period reasonably represents normal conditions when the building is
significantly occupied. Clear characterization of the radon hazard is most likely to be observed under this
normal operating condition. Based on the evaluation of test conditions, this test should reasonably
characterize radon hazards.
KCI also conducted observations of field conditions which could affect the results of the test and
compiled weather data for the testing period. KCI recorded observations of the following conditions in
each room at the time of deployment and collection of the radon test kits:






Indoor temperature,
HVAC Operation,
Dehumidifier operation,
Humidifier operation,
Ceiling fan operation, and
Open windows or doors.
Results:
The results of the radon test analysis indicated the following:
Radon Concentration
≥4.0 piC/L
<4.0 piC/L
Room
none
Result
n/a
See Attachment B
Notes:
D- Duplicate sample
All field blanks, office blank, and lab transit blanks had test results of less than the laboratory detection
limit of 0.3 pCi/L. Review of the duplicate sample analysis indicates that adequate laboratory
measurement precision was achieved. The Spike sample analysis results indicate the laboratory is
operating within statistical control limits.
The sampling locations, field observations, and analytical results are listed on Table 1 (Attachment B).
The laboratory analytical results are also attached (Attachment C). Laboratory results and exposure data
for the spike samples are also included in Attachment C.
Our professional services have been performed in accordance with customary principles and practices in
the field of industrial hygiene and engineering. If you have any questions or comments regarding this
report, please feel free to contact me at (410) 316-7800.
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
Mr. Richard Cox
February 29, 2016
Page 4
Sincerely,
James M. Moulsdale
Radon Measurement Specialist
KCI Technologies, Inc.
Attachments:
A- Floor Plan with Test Locations
B- Table 1-Radon Test Summary Spreadsheet
C- Laboratory Analytical Results
KC I T E C H N O L O G I E S , I N C .
www.kci.com
Employee-Owned Since 1988
ATTACHMENT A
Floor Plan With Test Locations
ATTACHMENT B
Radon Test Summary Spreadsheet
Table Notes:
AC- Activated Charcoal
ACI- Air Chek, Inc.
D- Duplicate
FB- Field Blank
KCI- KCI Technologies, Inc.
OB- Office Blank
PM- Project Manager
QC- Quality Control
Radon Testing Results
Rosemont E.S.
Test Period: 12/15/15-12/18/15
Kit Number
7704847
7706345
7706339
7706327
7706337
7706336
7704818
7706343
7704892
7706316
7704826
7706333
7706326
7706334
7704817
7706338
7704816
7704855
7704814
7706332
7706346
7706331
7706352
7706350
7706314
7706306
7706347
7704835
7704837
7704834
7706324
7706325
7704838
7704839
7706323
7704895
7704830
7704831
7706319
7706344
7704815
7706307
7706308
7706301
7706303
7704827
Table Note:
* Missing or Compromised Sample
*
*
*
*
Room / Area
1
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
120
121
122
123
124
125
126
131
204
207
210
101A
101B
101C
101D
103A
104B
110A
113A
115A
117A
118A
127 (Open Window/Exterior Door)
128 (Open Window/Exterior Door)
130 GYM (Open Window/Exterior Door)
130 GYM (Open Window/Exterior Door)
ALL PURP STORAGE
Result
0.6
0.7
1.2
0.9
1.4
1.2
1.5
0.7
2.6
2.8
1.7
1.6
1.9
1.3
2.3
3.2
2.2
2.4
1.2
2.2
0.6
1.1
0.8
0.6
1.2
0.8
0.7
1.6
1.0
1.3
0.7
1.1
1.2
0.9
2.1
1.4
1.7
2.1
2.3
1.8
0.9
1.2
1.7
< 0.3
1.1
1.4
Radon Testing Results
Rosemont E.S.
Test Period: 12/15/15-12/18/15
Kit Number
7706329
7706313
7704823
7706322
7704824
7704825
7704828
7706311
7704821
7706315
7704819
7704820
7704822
7704833
7706321
7706318
7704836
7706328
7704840
7706305
Table Note:
* Missing or Compromised Sample
Room / Area
ALL PURPOSE ROOM
ALL PURPOSE ROOM
ASSIST PRINCE
BUILD SERV OFF
CONF. OFF
HEALTH ROOM
HR1
KITCHEN
MAIN OFFICE
MEDIA CENT OFF
MEDIA CENTER
MEDIA CENTER
MEDIA STORAGE
PRINCIPAL
PTA
SPED
STAFF LOUNGE
STAGE
STORAGE A
WORKRM 1
Result
1.8
1.7
1.0
0.8
1.0
0.8
1.1
0.9
0.7
1.9
2.3
2.7
2.7
0.7
1.0
2.5
1.2
1.3
1.3
2.0
Radon Testing Results
Rosemont E.S.
Test Period: 12/15/15-12/18/15
Kit Number
7706317
7706335
7706342
7706349
7706309
7706304
7704807
7706312
7706330
7706341
7704360
*
*
Table Note:
* Missing or Compromised Sample
QC Type
D (109)
D (115)
D (117)
D (121)
D (128:Open Window/Exterior Door)
D (130 GYM:Open Window/Exterior Door)
D (ALL PURP STORAGE)
D (KITCHEN)
FB (126)
FB (SPED)
OB (OFFICE BLANK)
Result
2.5
2.6
2.2
0.8
1.6
0.7
0.6
1.1
< 0.3
< 0.3
< 0.3
ATTACHMENT C
Laboratory Analytical Results
December
31, ** LABORATORY ANALYSIS
REPORT **
2015
Radon test result report for:
ROSEMONT E.S.
Kit #
7706345
7706324
7706325
7704838
7704839
7706339
7706327
7706323
7706337
7704895
7706336
7704818
7706343
7704892
7706316
7706317
7704826
7704830
7706333
7706326
7706334
7704831
7704817
7706335
7706338
7706319
7704816
7706342
7704855
7706344
7704814
7704815
7706332
7706346
7706349
7706331
7706352
Room Id
101
101A
101B
101C
101D
102
103
103A
104
104B
105
106
107
108
109
109
110
110A
111
112
113
113A
114
115
115
115A
116
117
117
117A
118
118A
120
121
121
122
123
Started
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
Ended
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
pCi/L
0.7 ± 0.3
0.7 ± 0.3
1.1 ± 0.3
1.2 ± 0.3
0.9 ± 0.3
1.2 ± 0.3
0.9 ± 0.3
2.1 ± 0.3
1.4 ± 0.3
1.4 ± 0.3
1.2 ± 0.3
1.5 ± 0.3
0.7 ± 0.3
2.6 ± 0.3
2.8 ± 0.4
2.5 ± 0.4
1.7 ± 0.3
1.7 ± 0.4
1.6 ± 0.3
1.9 ± 0.3
1.3 ± 0.3
2.1 ± 0.3
2.3 ± 0.4
2.6 ± 0.4
3.2 ± 0.4
2.3 ± 0.4
2.2 ± 0.4
2.2 ± 0.3
2.4 ± 0.4
1.8 ± 0.3
1.2 ± 0.3
0.9 ± 0.3
2.2 ± 0.3
0.6 ± 0.3
0.8 ± 0.3
1.1 ± 0.3
0.8 ± 0.3
Analyzed
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
December
31, ** LABORATORY ANALYSIS
REPORT **
2015
Radon test result report for:
ROSEMONT E.S.
Kit #
Room Id
7706350
124
7706314
125
7706330
126
7706306
126
7706307
127
7706308
128
7706309
128
7706301 130 GYMNASIUM
7706303 130 GYMNASIUM
7706304 130 GYMNASIUM
7706347
131
7704835
204
7704837
207
7704834
210
7706329 ALL PURP ROOM
7704827 ALL PURP STORAGE
7704807 ALL PURP STORAGE
7706313 ALL PURPOSE RM
7704823
ASSIST PRINCE
7706322
BUIL SERV OFF
7704824 CONFERENCE OFF
7704825
HEALTH ROOM
7704828
HR1
7706311
KITCHEN
7706312
KITCHEN
7704821
MAIN OFFICE
7706315 MEDIA CENT OFF
7704819
MEDIA CENTER
7704820
MEDIA CENTER
7704822 MEDIA STORAGE
7704847
O1
7704833
PRINCIPAL
7706321
PTA
7706341
SPED
7706318
SPED
7704836
STAFF LOUNGE
7706328
STAGE
Started
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 1:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 10:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 3:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 2:00 pm
2015-12-15 @ 4:00 pm
2015-12-15 @ 2:00 pm
Ended
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 10:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 10:00 am
2015-12-18 @ 10:00 am
2015-12-18 @ 10:00 am
2015-12-18 @ 10:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 10:00 am
2015-12-18 @ 10:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 12:00 pm
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
2015-12-18 @ 12:00 pm
2015-12-18 @ 10:00 am
pCi/L
0.6 ± 0.3
1.2 ± 0.3
< 0.3
0.8 ± 0.3
1.2 ± 0.3
1.7 ± 0.3
1.6 ± 0.3
< 0.3
1.1 ± 0.3
0.7 ± 0.3
0.7 ± 0.3
1.6 ± 0.3
1.0 ± 0.3
1.3 ± 0.3
1.8 ± 0.3
1.4 ± 0.3
0.6 ± 0.3
1.7 ± 0.4
1.0 ± 0.3
0.8 ± 0.3
1.0 ± 0.3
0.8 ± 0.3
1.1 ± 0.3
0.9 ± 0.3
1.1 ± 0.3
0.7 ± 0.3
1.9 ± 0.3
2.3 ± 0.3
2.7 ± 0.3
2.7 ± 0.4
0.6 ± 0.3
0.7 ± 0.3
1.0 ± 0.3
< 0.3
2.5 ± 0.4
1.2 ± 0.3
1.3 ± 0.3
Analyzed
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
2015-12-22
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
December
31, ** LABORATORY ANALYSIS
REPORT **
2015
Radon test result report for:
ROSEMONT E.S.
Kit #
Room Id
Started
7704840
STORAGE A 2015-12-15 @ 4:00 pm
7706305 WORKROOM 1 2015-12-15 @ 10:00 pm
Ended
2015-12-18 @ 11:00 am
2015-12-18 @ 11:00 am
pCi/L
1.3 ± 0.3
2.0 ± 0.4
Analyzed
2015-12-22
2015-12-22
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
December
31, ** LABORATORY ANALYSIS
REPORT **
2015
Radon test result report for:
ROSEMONT E.S.
OFFICE BLANK
Kit #
7704360
Room Id
Started
OFFICE BLANK 2015-12-15 @ 3:00 pm
Ended
2015-12-18 @ 3:00 pm
pCi/L
< 0.3
Analyzed
2015-12-22
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
December
29, ** LABORATORY ANALYSIS
REPORT **
2015
Radon test result report for:
TRANSIT DEC 14 2015
NONE
Kit #
7704395
7706508
7706510
7706511
7706505
7704371
7706506
7704381
7704399
7704390
7704396
7704364
7704370
7704368
7706524
7706526
7706518
7706516
Room Id
TRANSIT 1
TRANSIT 10
TRANSIT 11
TRANSIT 12
TRANSIT 13
TRANSIT 14
TRANSIT 15
TRANSIT 16
TRANSIT 17
TRANSIT 18
TRANSIT 2
TRANSIT 3
TRANSIT 4
TRANSIT 5
TRANSIT 6
TRANSIT 7
TRANSIT 8
TRANSIT 9
Started
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
2015-12-13 @ 10:00 am
Ended
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
2015-12-15 @ 10:00 am
pCi/L
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
< 0.3
Analyzed
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
2015-12-16
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
December
23, ** LABORATORY ANALYSIS
REPORT **
2015
Spike Sample Laboratory Results
Radon test result report for:
MCPS
Kit #
7706380
7706381
7706208
7705132
7706366
7706211
Room Id
101
102
103
104
105
106
Started
2015-12-18 @ 9:00 am
2015-12-18 @ 9:00 am
2015-12-18 @ 9:00 am
2015-12-18 @ 9:00 am
2015-12-18 @ 9:00 am
2015-12-18 @ 9:00 am
Ended
2015-12-21 @ 9:00 am
2015-12-21 @ 9:00 am
2015-12-21 @ 9:00 am
2015-12-21 @ 9:00 am
2015-12-21 @ 9:00 am
2015-12-21 @ 9:00 am
pCi/L
25.2
26.5
27.7
28.6
26.5
26.1
Analyzed
2015-12-23
2015-12-23
2015-12-23
2015-12-23
2015-12-23
2015-12-23
Air Chek, Inc. 1936 Butler Bridge Rd, Mills River, NC 28759-3892 Phone: (828) 684-0893 Fax: (828) 684-8498
Note: Spike samples are test canisters that are deliberately exposed to a controlled high level of radon in a laboratory.
They provide a quality control measure in the testing process and do NOT reflect radon levels in the building being
tested.