Risk Assessment - Guidance Notes Version 1.1 March 2015 Risk Assessments Risk Assessment is a simple process, which, if done correctly, will ensure that those working on behalf of the University are properly informed about their working conditions, risks and how to avoid them. This document will assist you in completing a risk assessment, based on the Health and Safety Executive’s 5-step model (for more on that, see http://www.hse.gov.uk/risk/controlling-risks.htm). Step 1 – Identify the Hazards Identify hazards relating to the activity/location/equipment you’re envisaging working with, which you could reasonably expect to result in harm or loss, including business disruption or property damage. Some of the following are hazards that you might want to consider, but this list is not exhaustive: Health & Safety hazards (i.e. tripping, manual handling, fire hazards) Working Environment (i.e. noise, lighting, temperature / humidity / ventilation) Equipment Communications Estates & Buildings Many hazards can be eliminated without needing to write up a full risk assessment. For example, hazards related to damaged or unserviceable equipment can be removed entirely by decommissioning it. Trailing wires can be re-positioned, largely removing the risk of people tripping up, and unblocking a fire exit door eliminates hazards relating to difficulties exiting the building. Step 2 - Determine who might be harmed and how It may not be necessary to identify individuals; however, specific groups of staff who may be at risk will need to be assessed. Categories may include young workers, trainees, new or expectant mothers, people working on their own (lone working) at any point, etc. Also consider potential risks to other people who may visit the area/come into proximity with the set-up, such as cleaning staff, maintenance workers, visitors to the area (e.g. on Open Days or visits from schools), and even trespassers. Page 1 of 6 Risk Assessment - Guidance Notes Version 1.1 March 2015 Step 3 - Evaluate the risks and establish control measures This step involves considering the hazards you’d identified in Step 1 and assigning each a risk rating (see below). For hazards with a significantly high risk rating, additional control measures will need to be identified which would bring down the level of risk. Also at this stage, responsibility for carrying out each of the additional control measures needs to be assigned to a specific person, and recorded. Here’s a trigger-list of aspects to consider for a lab/workshop setting: Student Projects Specialist environments 1) during normal use Hazards related to each piece of equipment Each type of substance carrying a "Hazardous" label 3.1 2) during servicing & maintenance, if carried out by lab stuff. If servicing/ maintenance is done by manufacturer/central services, this needs to be recorded clearly. Safety data sheet for each type of hazardous substance will have information on hazards. COSHH risk assessment will looking at how the substance is used in this specific lab, and the relevant protective measures Rating the risks This system for measuring risk focuses on scoring the likelihood (probability) of a hazard causing harm and the severity of the likely harm (the impact of the risk). The magnitude/level of the risk is then scored as Likelihood x Consequences. The risk matrix table that follows gives you an at-a-glance value for how significant a risk is, and whether you need to consider additional measures to reduce it. It is understood that you are using your judgement in assigning ratings to the probability of harm/damage and the likely severity, and that the ratings will therefore be subjective. The standard that the Health and Safety Executive recommends that you apply therefore is to consider what is “reasonably foreseeable” based on the information available at the time of doing the Risk Assessment. Likelihood Estimated probability of harm Do not believe will happen, one-off. Exceptional circumstances Could occur at some time, not expected but possible. May/could occur at some time. Will probably occur. Likely to occur. Estimated Likelihood Likelihood Rating Very Unlikely 1 Unlikely 2 Likely / Possible Very Likely Almost certain 3 4 5 Page 2 of 6 Risk Assessment - Guidance Notes Version 1.1 March 2015 Severity Severity rating: 1 Minor / Potential consequences minimal Injury Complaint/ Claim Potential 2 3 Minor / 3 day some damage reportable Over seven days Minor injury or off work / Minor injury not illness, first aid Possible hospital requiring first aid treatment treatment needed required. Locally resolved complaint Justified complaint affecting customer experience 4 Long- term 5 Catastrophic Major injuries RIDDOR reportable. or long term Death or major incapacity / permanent incapacity disability/fracture (loss of limb) Justified complaint Multiple justified involving lack of complaints appropriate customer care Multiple claims or single major claim Service/ Loss/interruption Loss/interruptio Loss/interruption Loss/interruption > Permanent loss of Business > 1 hour n > 8 hours > 1 day 1 week service or facility Interruption Enforcement Action. Reduced rating. Low rating. Minor Recommendatio Challenging Critical report. recommendations Inspection/ ns given. recommendations Multiple Prosecution Minor nonAudit Non-compliance Non-compliance challenging compliance with with standards with core recommendations. standards standards Major noncompliance with core standards Page 3 of 6 Risk Assessment - Guidance Notes Version 1.1 March 2015 Risk Rating Matrix The scores from the above tables can be plotted onto the risk matrix below showing the resulting risk scores (Risk = Likelihood x Severity). Severity Likelihood 1 2 3 4 5 1 1 2 3 4 5 2 2 4 6 8 10 3 3 6 9 12 15 4 4 8 12 16 20 5 5 10 15 20 25 Once you have a risk score, they can be roughly grouped in four categories. Risk scores are viewed as acceptable, adequate, tolerable or unacceptable: Acceptable (1-4) Adequate (5-9) Tolerable (10-16) Unacceptable (17-25) No further action required, but ensure controls are maintained Look to improve at next review Look to improve within specified timescale Stop activity and make immediate improvements For risks rated within the Tolerable or Unacceptable categories, you need to consider what further measures can be taken to reduce the risk to Acceptable or Adequate level. Page 4 of 6 Risk Assessment - Guidance Notes Version 1.1 March 2015 3.2 Select risk control measures For each identified risk rated 10 or above (deep-orange and red range), you will need to consider additional measures to reduce the risk. General approaches for risk control measures are shown below, starting with the most potent and then listing measures that mitigate the risk in progressively less reliable ways: If possible ELIMINATE/REMOVE the risk SUBSTITUTE the equipment/procedure with a less risky option ENCLOSE/SEGREGATE the risk PREVENT access to the risk ORGANISE work to reduce exposure to the risk SAFE SYSTEMS OF WORK (e.g. procedures or protocols) Issuing PERSONAL PROTECTIVE EQUIPMENT 3.3 Rate the residual risk Once you’ve identified reasonably practicable measures to reduce each of the risks originally scoring 10 and above, you need to re-assess the resulting reduced level of risk, using the same formula for Risk Score = Likelihood x Severity. Continue with this process, introducing additional risk controls until all risk scores are brought down to the Acceptable-Adequate range (1-9). If you need assistance with identifying appropriate, reasonable and practicable risk control measures, please contact your local Health & Safety Co-ordinator, or the Quality, Safety, Health & Environment (QSHE) Office. 3.4 Assign responsibility for implementing the risk control measures and specify due date Assign responsibility for implementing each risk control measure to a specific person and brief them on timescales etc. Check on the implementation to ensure that the risk controls you selected are effective in practice and that risk levels are being effectively controlled. Review if necessary. Further guidance and resources for completing the Risk Assessment process are available on the Health and Safety Executive website: http://www.hse.gov.uk/risk/controlling-risks.htm Page 5 of 6 Risk Assessment - Guidance Notes Version 1.1 March 2015 Residual Risk Rating (RL x RS) Residual Severity (RS) Further Risk Controls required (if Risk Rating is 5 or above) Residual likelihood (RL) Existing Risk Controls Risk Rating (LxS) Who may be harmed? Severity (S) Hazards Identified Likelihood (L) Step 4: Record your assessment and recommendations on the Risk Assessment form Responsible for implementing further Risk Control measures Due Date for implementing measures Step 5: Monitor & Review All risk assessments must be reviewed and revised as necessary, therefore all assessments and safe systems of work will need to be reviewed annually, or before as circumstances dictate. A review of the assessment may be required following: The assessment lapsing past its valid-to date (default valid period is 12 months) Any accident or near-miss event connected with the work activity New guidance / legislation being published relating to the activity or process New equipment/processes being introduced which are likely to affect the risks New staff arriving who may have less experience with the task or process Date of assessment: Due for review: Review process: Page 6 of 6
© Copyright 2026 Paperzz