Matakuliah Tahun Versi : Mechatronics 2 : 2005 : 1.0/0 Week 5 SEQUENTIAL MOTION (LDR) 1 Learning Outcomes • By the end of this session, students can develop Ladder Diagram to perform sequential motions. 2 Sequential Motion • Sequential motion is meant to be performing 1 motion after the others. • Performing sequential tasks in a parallel like fashion. • The use of flags will overcome this problem. • Latching concept. • Controller and actuator concept. • Latching concept in performing a sequential motion. 3 Flags & Latching Concept • Flag is an internal relay and is most often used to memorize events. • It must be declared in an allocation list prior to using it. • Flags can be used in both conditional part and executive part. • Latching concept allows to create a single solenoid valve to act as a double solenoid valve. 4 Implementation of Latching Concept S1 ( F0,0) F 0,0 F 0,0 ( L1 ) 5 Implementation of Latching Concept (continued) • F0,0 = internal relay utility • If S1 switch (normally open) is pressed, then electric current will flow through F0,0 coil and F0,0 switch will be closed accordingly. • A latch condition will occur. 6 • A latch condition can be stopped by adding a normally closed switch into the system. • This switch is required to cut the current which is flowing through F0,0 coil. • As no more current flow through F0,0 coil, the F0,0 switch will open and stop the latching condition. 7 Stopping the Latched Condition S1 S2 (NC) ( F0,0) F 0,0 F 0,0 NC = normally closed ( L1 ) 8
© Copyright 2026 Paperzz