Matakuliah Tahun Versi : H0204/ Rekayasa Sistem Komputer : 2005 : v0 / Revisi 1 Pertemuan 10 Faktor Manusia dalam kehandalan 1 Learning Outcomes Pada akhir pertemuan ini, diharapkan mahasiswa akan mampu : • Menghitung nilai kehandalan suatu sistem 2 Outline Materi • • • • Analisis faktor manusia Operational Sequence Diagram Detail Task Analysis Keperluan SDM dan Pelatihan 3 Analisis faktor manusia- (1) • Pertimbangan karakteristik harus diberikan untuk – anthopometric pengguna (dimensi fisik manusia) Standing Body Dimensions Seated Body Dimensions – faktor sensorik (penglihatan, pendengaran, dan lainlain), – faktor physiologikal (dampak dari lingkungan), – psykologikal (kebutuhan, harapan, sikap, motivasi) • Operational Sequence Diagrams (see table 10.1) 4 5 Analisis faktor manusia- (2) • Detailed Task Analysis – Operasi perkerjaan (job operation) / SOP (Standard Operating Procedure) – Kerja (duties) – Tugas (task) – Subtugas (sub task) – Elemen tugas (task element) 6 Keperluan SDM dan Pelatihan • Lihat gambar diagram faktor kebutuhan manusia • Tabel 10.2 : Maintainability Prediction Worksheet • Tabel 10.3 : Maintainability Prediction Data Summary • Tabel 10.4: Preventive Maintenance Data Summary 7 Table 10.2 Maintainability Prediction Worksheet Part A Part B Part C Part D Part E Part F Part G 0.161 0.102 0.021 0.084 0.452 0.191 0.022 N 2 4 5 1 9 8 7 Total (N).() Part Category 0.322 0.408 0.105 0.084 4.060 1.520 0.154 Maintenance Times (Hours) Loc Iso Acc Ali Che Int Mcti 0.02 0.01 0.03 0.01 0.02 0.01 0.02 0.08 0.05 0.04 0.03 0.04 0.02 0.05 0.14 0.12 0.11 0.10 0.13 0.11 0.15 0.01 0.01 0.02 0.02 0.01 - 0.01 0.02 0.01 0.03 0.03 0.02 0.05 0.11 0.12 0.14 0.11 0.08 0.07 0.15 0.037 0.330 0.330 0.300 0.320 0.240 0.420 6.653 Total N= quantity of partsIso = isolation (N).(). (Mcti) 0.119 0.134 0.034 0.025 1.299 0.364 0.064 2.039 Che = checkout = failure rate Acc = access Int = interchange Loc = localization Ali = alignment Mcti = maintenance cycle time For determination of MMHci, enter manhours for maintenance time 8 Table 10.3 Maintainability Prediction Data Summary Worksheet Factors Worksheet No. Item Designation 1 2 3 4 5 Assembly 1 Assembly 2 Assembly 3 Assembly 4 Assembly 5 7.776 5.328 8.411 6.653 5.112 3.021 1.928 2.891 2.039 2.576 13 Assembly 13 5.112 3.112 86.476 33.118 (N)() Grand Total (N)()(Mcti) Mct = (N)() (N)()(Mcti) 33.118 = = 0.382 hour 86.486 9 Table 10.4 Preventive Maintenance Data Summary Description of Preventive Maintenance Task Task Frequency Task Time Product (fpti)(N) (Mpti) (fpti)(N)(Mpti) 1. Lubricate… 2. Calibrate… 0.115 0.542 5.500 4.234 0.060 0.220 31. Service….. 0.321 3.315 0.106 Grand Total 13.260 (fpti)(N)(Mpti) Mpt = (fpti)(N) 31.115 31.115 = = 2.346 hour 13.260 10 Tugas/Evaluasi Assignment (Tugas Kelompok) • Lakukan Analisis Kehandalan, Maintenance System Requirement Analysis di suatu perusahaan ( industri fabrikasi) • Hasil Survei dan Analisis akan dipresentasikan pada pertemuan 13 & 14 (minggu terakhir sebelum Mid Term) 11
© Copyright 2026 Paperzz