download

Matakuliah
Tahun
Versi
: H0204/ Rekayasa Sistem Komputer
: 2005
: v0 / Revisi 1
Pertemuan 10
Faktor Manusia dalam kehandalan
1
Learning Outcomes
Pada akhir pertemuan ini, diharapkan mahasiswa
akan mampu :
• Menghitung nilai kehandalan suatu sistem
2
Outline Materi
•
•
•
•
Analisis faktor manusia
Operational Sequence Diagram
Detail Task Analysis
Keperluan SDM dan Pelatihan
3
Analisis faktor manusia- (1)
• Pertimbangan
karakteristik
harus
diberikan
untuk
– anthopometric pengguna (dimensi fisik manusia)
Standing Body Dimensions
Seated Body Dimensions
– faktor sensorik (penglihatan, pendengaran, dan lainlain),
– faktor physiologikal (dampak dari lingkungan),
– psykologikal (kebutuhan, harapan, sikap, motivasi)
• Operational Sequence Diagrams (see table
10.1)
4
5
Analisis faktor manusia- (2)
• Detailed Task Analysis
– Operasi perkerjaan (job operation) / SOP
(Standard Operating Procedure)
– Kerja (duties)
– Tugas (task)
– Subtugas (sub task)
– Elemen tugas (task element)
6
Keperluan SDM dan Pelatihan
• Lihat gambar diagram faktor kebutuhan
manusia
• Tabel 10.2 : Maintainability Prediction
Worksheet
• Tabel 10.3 : Maintainability Prediction Data
Summary
• Tabel 10.4: Preventive Maintenance Data
Summary
7
Table 10.2 Maintainability Prediction
Worksheet
Part A
Part B
Part C
Part D
Part E
Part F
Part G
0.161
0.102
0.021
0.084
0.452
0.191
0.022
N
2
4
5
1
9
8
7
Total
(N).()
Part
Category

0.322
0.408
0.105
0.084
4.060
1.520
0.154
Maintenance Times (Hours)
Loc
Iso
Acc
Ali
Che
Int
Mcti
0.02
0.01
0.03
0.01
0.02
0.01
0.02
0.08
0.05
0.04
0.03
0.04
0.02
0.05
0.14
0.12
0.11
0.10
0.13
0.11
0.15
0.01
0.01
0.02
0.02
0.01
-
0.01
0.02
0.01
0.03
0.03
0.02
0.05
0.11
0.12
0.14
0.11
0.08
0.07
0.15
0.037
0.330
0.330
0.300
0.320
0.240
0.420
6.653
Total
N= quantity of partsIso = isolation
(N).().
(Mcti)
0.119
0.134
0.034
0.025
1.299
0.364
0.064
2.039
Che = checkout
= failure rate
Acc = access
Int = interchange
Loc = localization
Ali = alignment
Mcti = maintenance cycle time
For determination of MMHci, enter manhours for maintenance time
8
Table 10.3 Maintainability Prediction
Data Summary
Worksheet Factors
Worksheet
No.
Item
Designation
1
2
3
4
5
Assembly 1
Assembly 2
Assembly 3
Assembly 4
Assembly 5
7.776
5.328
8.411
6.653
5.112
3.021
1.928
2.891
2.039
2.576
13
Assembly 13
5.112
3.112
86.476
33.118
 (N)()
Grand Total
 (N)()(Mcti)
Mct =
 (N)()
 (N)()(Mcti)
33.118
=
=
0.382 hour
86.486
9
Table 10.4 Preventive Maintenance Data
Summary
Description of
Preventive
Maintenance
Task
Task Frequency
Task Time
Product
(fpti)(N)
(Mpti)
(fpti)(N)(Mpti)
1. Lubricate…
2. Calibrate…
0.115
0.542
5.500
4.234
0.060
0.220
31. Service…..
0.321
3.315
0.106
Grand Total
13.260
 (fpti)(N)(Mpti)
Mpt =
 (fpti)(N)
31.115
31.115
=
=
2.346 hour
13.260
10
Tugas/Evaluasi
Assignment (Tugas Kelompok)
• Lakukan Analisis Kehandalan,
Maintenance System Requirement
Analysis di suatu perusahaan ( industri
fabrikasi)
• Hasil Survei dan Analisis akan
dipresentasikan pada pertemuan 13 & 14
(minggu terakhir sebelum Mid Term)
11