Vishwakarma Yojana: Format for preparing report of Techno-Economic Survey of Village.

PROGRESS REPORT: I
Data Collection Phase
“VISHWAKARMA YOJNA: AN APPROACH TOWARDS
RURBANISATION FOR
Prepared by
--------------VILLAGE, ---------DISTRICT
NAME
ENROLLMENT NO
YEAR: 2013-14
GUJARAT TECHNOLOGICAL UNIVERSITY
Chandkheda, Ahmedabad – 382424
Gujarat
Vishwakarma Yojana: Progress Report-I
Content
Sr. No.
Particulars
1
Introduction of Village
2
Geographical Detail
4
Demographical Detail
5
Occupational Detail
6
Physical Infrastructure Facilities
Page No.
- Drinking Water
- Drainage Network
- Transportation & Road Network
- Electricity
- Sanitation Facilities
- Irrigation Facilities
- Housing condition
7
Social Infrastructure Facilities
- Health Facilities
- Education Facilities
8
Socio-Cultural Facilities
-Community Hall
-Public Library
-Public Garden /Park/Playground
-Village Pond/Lake
9
Other Facilities
10
Sustainable Infrastructure Facilities
Gujarat Technological University, Gujarat
Page 1
-Other Recreation Facilities
Vishwakarma Yojana: Progress Report-I
Guidelines
 All text – 12 point Arial Fonts
 Titles – 14 point bold Arial Font
 Table Caption – Above the Table (For Example Table 1)
 Figure Caption – Below the Figure (For Example Figure 1)
 1.5 line spacing between consecutive paragraphs
 Header and footer as presented in this file.
 Geographical location with Google map of appropriate size
 Show Demographical details with charts/ graphs

No. of males, female, sex ratio, literacy rate and other related details.
 Show all the Physical facilities (water supply, drainage network, road network,
SWM, Sanitation (toilet) facilities, Electricity supply) with appropriate photograph
and make proper comment on existing conditions/ issues.
 Show all the Present health facilities (Dispensaries, PHC, CHC or Private
Hospitals) with photographs and comment on existing conditions/ Problems faced
by villagers.
 Show all the Education facilities (Aaganwadi, Primary, secondary, higher
secondary schools, ITI, Other courses) with photographs and comment on
existing conditions/ Problems faced by villagers.
 Show all the Socio-Cultural facilities (Community hall, Public library, Garden,
market area, Ponds/lakes, Playground/Park) with appropriate photographs and
make proper comment on existing conditions/ issues.
 If any other details are available then specify it with proper comment &
 Mention the available Renewable infrastructure (Biogas Plants, Solar street lights
or any) facilities.
Gujarat Technological University, Gujarat
Page 1
photographs.
Vishwakarma Yojana: Progress Report-I
 Give details of Renewable infrastructure facilities which is going to be designed
by your group in this semester and give appropriate reason for designing the
proposal.
-SD-
Page 1
I/C Registrar
Gujarat Technological University, Gujarat
Vishwakarma Yojana: Progress Report-I
For Reference:
Page 1
1. Guidelines for Technoeconomical Survey of Villages for Vishwakarma Yojana
Phase-II
( http://www.gtu.ac.in/circulars/13Aug/3082013.pdf)
2. Invitation to MBA students for Participation in Vishwakarma Yojana Phase II
(http://gtu.ac.in/circulars/13Aug/29082013.pdf)
3. Willingness for Participation in Training Programme of Vishwakarma Yojana
PhaseII
( http://gtu.ac.in/circulars/13Aug/23082013.pdf)
4. Report of Orientation Programme of Vishwakarma Yojana held on 12th
August,2013 at VVP Engineering,Rajkot
(http://gtu.ac.in/circulars/13Aug/Rajkot_Final_Report-12_08_13.pdf)
5 Report of Orientation Programme of Vishwakarma Yojana held on 7th
August,2013 at Dr. S & S.S Gandhy Engineering college,Surat
(http://www.gtu.ac.in/circulars/13Aug/Surat_Final_Report-07_08_13.pdf)
6 Report of Orientation Programme of VishwakarmaYojana Held on 5th August,
2013 at SKPCET, Visnagar, Mehsana
(http://www.gtu.ac.in/circulars/13Aug/VISNAGAR_Final_%20Report05_08_13.pdf)
7 Report of Orientation Programme of VishwakarmaYojana held on 3rd August,2013
at Government polytechnic , Godhara
( http://www.gtu.ac.in/circulars/13Aug/Godhra_Report_03-08-13.pdf)
8 Circular for Remuneration to the participant of VishwakarmaYojana Phase II:
(http://gtu.ac.in/circulars/13Aug/03082013.pdf)
9 Report of Orientation Programme of VishwakarmaYojana held on 1st August,2013
at BVM College,V V Nagar,Anand
(http://gtu.ac.in/circulars/13Aug/02082013_01.pdf)
10 Guidelines for Survey of VishwakarmaYojana Phase II with Survey form
(http://gtu.ac.in/circulars/13Aug/01082013_01.pdf)
11 Minutes of Orientation Programme of VishwakarmaYojana held on 31st july @
Vadodara
(http://gtu.ac.in/circulars/13Aug/01082013.pdf)
12 Schedule of Orientation Program of VishwakarmaYojana Phase-II
(http://gtu.ac.in/circulars/13Jul/Orientation_Program.pdf)
13 Institutes allotment for VishwakarmaYojana phase-II part-I(Revised)
(http://gtu.ac.in/circulars/13Jul/VY-II_Institute%20Allotment-23-7-2013.pdf)
14 Important information for all Principals for VishwakarmaYojana
(http://gtu.ac.in/circulars/13Jul/Vishwakarma_Yojana.pdf)
Gujarat Technological University, Gujarat