Sem -6

Gujarat Technological University
No. GTU/DP/Pract/summer-2012/5573
Date: 29/05/2012
Diploma Semester 6, Regular Practical Exam Time Table Summer - 2012 for zone - 1
(Ahmedabad)
For Electrical Branch
DATE
04-06-2012
05-06-2012
06-06-2012
07-06-2012
08-06-2012
11-06-2012
Centre:
SUBJECT
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electrical tranction and control
Elec.of Build. & Complexes )
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electrical tranction and control
Electrification of Build. & Complexes
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electrical tranction and control
Electrification of Build. & Complexes
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electrical tranction and control
Elec.of Build. & Complexes )
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Elec.of Build. & Complexes )Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Elec.of Build. & Complexes )
T.I.D.S SURENDRANAGAR (WADHWAN)(652)
SUBJECT EXAM CEN.
CODE
CODE
350901
350902
360901
360902
360903
360904
360905
360907
350901
350902
360901
360902
360903
360904
360905
360907
350901
350902
360901
360902
360903
360904
360905
360907
350901
350902
360901
360902
360903
360904
360905
360907
350901
350902
360901
360902
360903
360904
360907
350901
350902
360901
360902
360903
360904
360907
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
652
BATCH
A,B
1 STUDENT
A,B
A,B
1 STUDENT
A,B
SUBJECT
DATE
04-06-2012
05-06-2012
06-06-2012
07-06-2012
08-06-2012
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
Electric Traction & Control
360905
609
350901
350902
360901
360902
360903
360904
360905
609
609
609
609
609
609
609
Electrical Installation & Maintenance
Industrial Electronics
Project
11-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Centre:
SUBJECT EXAM CEN.
CODE
CODE
C.U SHAH POLYTECHNIC, SURENDRANAGAR (609)
BATCH
A,B
E,F
C,D
C,D
A,B
E,F
E,F
C,D
A,B
DLM(6TH)
DLM(8TH)
A,B
C,D
DLM(8TH)
DLM(6TH)
E,F
DLM(8TH)
DLM(8TH)+ 1
REGULAR
STUDENT
SUBJECT
DATE
SUBJECT EXAM CEN.
CODE
CODE
BATCH
Industrial Electronics
Project
Power Station Engineering
04-06-2012
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
05-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
06-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
07-06-2012 Power Station Engineering
360902
617
A,B
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
08-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
11-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
DLM(8TH)
Centre:
GOVERNMENT POLYTECHNIC, AHMEDABAD (617)
A,B
C,D
DLM(8TH)
C,D
A,B
DLM(8TH)
DLM(8TH)
A,B
DLM(6TH)
C,D
DLM(6TH)
C,D
SUBJECT
DATE
Electrical Installation & Maintenance
Industrial Electronics
Project
04-06-2012 Power Station Engineering
Switchgear & Protection
05-06-2012
06-06-2012
07-06-2012
08-06-2012
11-06-2012
Centre:
SUBJECT EXAM CEN.
CODE
CODE
350901
350902
360901
360902
360903
640
640
640
640
640
Microprocessor
360904
640
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
R.C.T. I. , AHMEDABAD (640)
BATCH
DLM(8th)+ 1
REGULAR
STUDENT
C,D
A,B
E,F
G,H+DLM(8th)
E,F
C,D
G,H+DLM(8th)
A,B
G,H+DLM(8th)
E,F
A,B
C,D
A,B
G,H
C,D
E,F
DLM(6TH)
DLM(6TH)
SUBJECT
DATE
04-06-2012
05-06-2012
06-06-2012
07-06-2012
08-06-2012
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
Electric Traction & Control
360905
643
350901
350902
360901
360902
360903
360904
360905
643
643
643
643
643
643
643
Electrical Installation & Maintenance
Industrial Electronics
Project
11-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Centre:
SUBJECT EXAM CEN.
CODE
CODE
SARVODAY POLYTECHNIC, LIMBDI (643)
BATCH
A,B
C,D
C,D
A,B
A,B
C,D
C,D
A,B
SUBJECT
DATE
04-06-2012
05-06-2012
06-06-2012
07-06-2012
08-06-2012
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
Electric Traction & Control
360905
646
350901
350902
360901
360902
360903
360904
360905
646
646
646
646
646
646
646
Electrical Installation & Maintenance
Industrial Electronics
Project
11-06-2012 Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Centre:
SUBJECT EXAM CEN.
CODE
CODE
N.M.GOPANI POLYTECHNIC, RANPUR (646)
BATCH
A,B
C,D
E
F
C,D
E
F
A,B
E
F
A,B
C,D
2 STU
F
A,B
C,D
E
DATE
04-06-2012
05-06-2012
06-06-2012
07-06-2012
08-06-2012
11-06-2012
Centre:
SUBJECT
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
Electric Traction & Control
Electrical Installation & Maintenance
Industrial Electronics
Project
Power Station Engineering
Switchgear & Protection
Microprocessor
Electric Traction & Control
SUBJECT EXAM CEN.
CODE
CODE
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
350901
350902
360901
360902
360903
360904
360905
360905
350901
350902
360901
360902
360903
360904
360905
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
BATCH
A,B
C,D
E,F+DLM(8TH)
C,D
E,F
A,B
DLM(8TH)
E,F+DLM(8TH)
A,B
C,D
DLM(6TH)
DLM(6TH)
E,F+DLM(8TH)
C,D
A,B
B.P.T.I, BHAVNAGAR ( 649 )
NOTE :
1. DAILY TWO BATCHES, EACH OF 22 STUDENTS.
2. DIVIDE BATCHES WITH LETTERS A,B,C,D,E,F….
3. ADD MORE SHEETS FOR ADDITIONAL INSTITUTES.THIS SHEET CAN ACCOMMODATE 3 INSTITUTES.
4. START FROM THE STARTING DATE OF EXAMINATION AND COMPLETE ALL INSTITUTES' SCHEDULE FOR THE SAME
For Civil Branch
Exam centre with code
G.P.Ahmedabad - 617
G.P.Ahmedabad - 617
G.P.Ahmedabad - 617
G.P.Ahmedabad - 617
G.P.Ahmedabad - 617
G.G.P.Ahmedabad - 614
G.G.P.Ahmedabad - 614
G.G.P.Ahmedabad - 614
G.G.P.Ahmedabad - 614
G.G.P.Ahmedabad - 614
R.C.T.I.Ahd - 640
R.C.T.I.Ahd - 640
R.C.T.I.Ahd - 640
R.C.T.I.Ahd - 640
R.C.T.I.Ahd - 640
C.U.Shah S'nagar - 609
C.U.Shah S'nagar - 609
C.U.Shah S'nagar - 609
C.U.Shah S'nagar - 609
C.U.Shah S'nagar - 609
B.P.I. Bhavnagar - 649
B.P.I. Bhavnagar - 649
B.P.I. Bhavnagar - 649
B.P.I. Bhavnagar - 649
B.P.I. Bhavnagar - 649
R.H.Patel Goblaj - 641
R.H.Patel Goblaj - 641
R.H.Patel Goblaj - 641
R.H.Patel Goblaj - 641
R.H.Patel Goblaj - 641
Sarvodaya Plytechnic
Limbdi - 643
Sarvodaya Plytechnic
Limbdi - 643
Sarvodaya Plytechnic
Limbdi - 643
Sarvodaya Plytechnic
Limbdi - 643
Sarvodaya Plytechnic
Limbdi - 643
Name of subject with code
D.S.S. - 360602
A.C.T. - 360604
D.P. - 360605
C.T. - 360606
A.T.E. - 360610
A.C.T. - 360604
C.T. - 360606
D.P. - 360605
D.S.S. - 360602
A.T.E. - 360610
D.S.S. - 360602
A.C.T. - 360604
D.P. - 360605
C.T. - 360606
A.T.E. - 360610
D.S.S. - 360602
A.C.T. - 360604
D.P. - 360605
C.T. - 360606
A.T.E. - 360610
D.S.S. - 360602
A.C.T. - 360604
D.P. - 360605
C.T. - 360606
A.T.E. - 360610
D.S.S. - 360602
A.C.T. - 360604
D.P. - 360605
C.T. - 360606
A.T.E. - 360610
Exam date
4th & 5th june 2012
7th & 8th june 2012
4th , 5th & 6th june 2012
4th & 5th june 2012
8th & 11th june 2012
4th & 5th june 2012
4th & 5th june 2012
7th , 8th & 11th june 2012
7th & 8th june 2012
6th & 7th june 2012
11th june 2012
6th june 2012
7th june 2012
8th june 2012
4th june 2012
7th & 8th june 2012
6th & 7th june 2012
6th & 7th june 2012
11th & 12th june 2012
4th & 5th june 2012
6th to 9th june 2012
4th to 6th june 2012
6th to 9th june 2012
4th to 6th june 2012
4th to 6th june 2012
6th june 2012
11th june 2012
8th june 2012
7th june 2012
5th june 2012
D.S.S. - 360602
7th june 2012
A.C.T. - 360604
11th june 2012
D.P. - 360605
5th june 2012
C.T. - 360606
8th june 2012
A.T.E. - 360610
4th june 2012
For Mechanical branch
BRANCH
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
CENTRE
CODE
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
609
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
632
632
CENTRE NAME
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
C.U.SHAH,SURENDRANAGAR
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
GP, AHMEDABAD.
KPT, VIRAMGAM
KPT, VIRAMGAM
EXAMINATION
DATE
dd/mmm/yy
4 June 2012
8 June 2012
8 June 2012
7 June 2012
8 June 2012
11 June 2012
11 June 2012
12 June 2012
8 June 2012
12 June 2012
7 June 2012
4 June 2012
5 June 2012
6 June 2012
6 June 2012
7 June 2012
7 June 2012
4 June 2012
6 June 2012
7 June 2012
4 June 2012
11 June 2012
11 June 2012
4 June 2012
11 June 2012
4 June 2012
6 June 2012
6 June 2012
5 June 2012
7 June 2012
12 June 2012
11 June 2012
12 June 2012
7 June 2012
5 June 2012
11 June 2012
6 June 2012
7 June 2012
5 June 2012
7 June 2012
5 June 2012
8 June 2012
BATCH
SUBJECT
CODE
SUBJECT
NAME
GH
AB
GHI
ABC
DEF
GHI
ABC
D6A,D6B
C
FI
D6A,D6B
DEF
D8A,D8B
ABC
DE
D8A,D8B
GHI
D8A,D8B
GHI
DEF
ABC
DEF
D6A,D6B
DE
D6A,D6B
ABC
DEF
D8A,D8B
DEF
D8A,D8B
D6A,D6B
AB
CF
D6A,D6B,D6C
D8A,D8B
DEF
ABC
DEF
ABC
ABC
ABC
AB
2361906
2361906
2361904
2361916
2361916
2361916
2361920
2351902
2361906
2361906
2351906
2361904
2361904
2361904
2361906
2361906
2361902
2361920
2361920
2361920
2361902
2361902
2351905
2361906
2351905
2361920
2361920
2361906
2361902
2361920
2351902
2361906
2361906
2351906
2361904
2361910
2361904
2361904
2361910
2361902
2361904
2361906
PROJ-II
PROJ-II
IE (P)
FAB.TECH
FAB.TECH
FAB.TECH
PPE (P)
DME
PROJ-II
PROJ-II
TH.E (P)
IE (P)
IE (P)
IE (P)
PROJ-II
PROJ-II
CG&CAM
PPE (P)
PPE (P)
PPE (P)
CG&CAM
CG&CAM
ECC
PROJ-II
ECC
PPE (P)
PPE (P)
PROJ-II
CG&CAM
PPE (P)
DME
PROJ-II
PROJ-II
TH.E (P)
IE (P)
AMS
IE (P)
IE (P)
AMS
CG&CAM
IE (P)
PROJ-II
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
632
632
632
632
632
632
632
632
632
633
633
633
633
633
633
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
640
641
641
641
641
641
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
KPT, VIRAMGAM
LJP, AHMEDABAD
LJP, AHMEDABAD
LJP, AHMEDABAD
LJP, AHMEDABAD
LJP, AHMEDABAD
LJP, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RCTI, AHMEDABAD
RHP, GOBLAJ
RHP, GOBLAJ
RHP, GOBLAJ
RHP, GOBLAJ
RHP, GOBLAJ
11 June 2012
7 June 2012
8 June 2012
7 June 2012
4 June 2012
6 June 2012
4 June 2012
6 June 2012
5 June 2012
7 June 2012
8 June 2012
11 June 2012
5 June 2012
4 June 2012
6 June 2012
7 June 2012
8 June 2012
6 June 2012
7 June 2012
7 June 2012
8 June 2012
11 June 2012
5 June 2012
12 June 2012
6 June 2012
7 June 2012
4 June 2012
6 June 2012
8 June 2012
7 June 2012
8 June 2012
6 June 2012
11 June 2012
5 June 2012
6 June 2012
11 June 2012
12 June 2012
5 June 2012
12 June 2012
8 June 2012
5 June 2012
5 June 2012
12 June 2012
11 June 2012
4 June 2012
6 June 2012
5 June 2012
8 June 2012
CF
ABC
DEF
DEF
DE
ABC
ABC
DEF
DEF
ABC
AB
C
ABC
ABC
ABC
DE
AB
ABC
JKL
ABC
D8A
DEF
GHI
JKL
IL
D8A
D6A,D6B.D6C
JKF
DEG
GHI
JKL
D6A,D6B.D6C
D8A
JK
GH
HIL
ABC
ABC
DEF
CF
D6A,D6B.D6C
DEF
GHI
AB
AB
AB
AB
AB
2361906
2361920
2361920
2361916
2361906
2361902
2361916
2361904
2361902
2361920
2361906
2361906
2361930
2361902
2361904
2361906
2361906
2361920
2361920
2361908
2361920
2361908
2361908
2361908
2361906
2361904
2351906
2361902
2361902
2361904
2361904
2351902
2361906
2361906
2361906
2361902
2361902
2361904
2361904
2361906
2351905
2361920
2361920
2361906
2361904
2361916
2361902
2361920
PROJ-II
PPE (P)
PPE (P)
FAB.TECH
PROJ-II
CG&CAM
FAB.TECH
IE (P)
CG&CAM
PPE (P)
PROJ-II
PROJ-II
AE (P)
CG&CAM
IE (P)
PROJ-II
PROJ-II
PPE (P)
PPE (P)
RAC (P)
PPE (P)
RAC (P)
RAC (P)
RAC (P)
PROJ-II
IE (P)
TH.E (P)
CG&CAM
CG&CAM
IE (P)
IE (P)
DME
PROJ-II
PROJ-II
PROJ-II
CG&CAM
CG&CAM
IE (P)
IE (P)
PROJ-II
ECC
PPE (P)
PPE (P)
PROJ-II
IE (P)
FAB.TECH
CG&CAM
PPE (P)
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
643
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
646
649
649
649
649
649
649
649
649
649
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
SARVODAY, LIMBDI
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
NMG, RANPUR
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
7 June 2012
11 June 2012
8 June 2012
12 June 2012
4 June 2012
5 June 2012
7 June 2012
7 June 2012
8 June 2012
11 June 2012
12 June 2012
7 June 2012
8 June 2012
4 June 2012
5 June 2012
12 June 2012
4 June 2012
5 June 2012
5 June 2012
4 June 2012
7 June 2012
8 June 2012
12 June 2012
8 June 2012
6 June 2012
12 June 2012
12 June 2012
8 June 2012
11 June 2012
4 June 2012
6 June 2012
7 June 2012
8 June 2012
4 June 2012
12 June 2012
6 June 2012
7 June 2012
7 June 2012
4 June 2012
6 June 2012
8 June 2012
11 June 2012
4 June 2012
5 June 2012
11 June 2012
4 June 2012
5 June 2012
7 June 2012
DEF
GHI
ABC
DEF
DEF
ABC
I
ABC
JK
CF
AB
GH
DE
JK
GHI
JK
GHI
DEF
JK
ABC
JK
GHI
F
DEF
ABC
ABC
GHI
AB
CI
ABC
DEF
DEF
GHI
GH
DE
GHI
ABC
GHI
DEF
D8A,D8B
DEG
HI
JK
GHI
DEF
GHI
DEF
D6A,D6B
2361902
2361902
2361916
2361916
2361904
2361904
2361906
2361920
2361920
2361906
2361906
2361906
2361906
2361916
2361916
2361902
2361920
2361920
2361906
2361902
2361904
2361904
2361906
2361904
2361904
2361902
2361920
2361906
2361906
2361920
2361920
2361902
2361902
2361906
2361906
2361910
2361910
2361904
2361910
2361904
2361902
2361902
2361910
2361910
2361910
2361920
2361920
2351906
CG&CAM
CG&CAM
FAB.TECH
FAB.TECH
IE (P)
IE (P)
PROJ-II
PPE (P)
PPE (P)
PROJ-II
PROJ-II
PROJ-II
PROJ-II
FAB.TECH
FAB.TECH
CG&CAM
PPE (P)
PPE (P)
PROJ-II
CG&CAM
IE (P)
IE (P)
PROJ-II
IE (P)
IE (P)
CG&CAM
PPE (P)
PROJ-II
PROJ-II
PPE (P)
PPE (P)
CG&CAM
CG&CAM
PROJ-II
PROJ-II
AMS
AMS
IE (P)
AMS
IE (P)
CG&CAM
CG&CAM
AMS
AMS
AMS
PPE (P)
PPE (P)
TH.E (P)
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
MECHANICAL
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
649
652
652
652
652
652
652
667
667
667
667
667
667
667
667
667
667
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
SIR B.P.I., BHAVNAGAR.
TIDS, WADHVAN
TIDS, WADHVAN
TIDS, WADHVAN
TIDS, WADHVAN
TIDS, WADHVAN
TIDS, WADHVAN
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
DALIA, KHEDA
12 June 2012
12 June 2012
8 June 2012
12 June 2012
11 June 2012
4 June 2012
5 June 2012
5 June 2012
6 June 2012
4 June 2012
6 June 2012
12 June 2012
6 June 2012
8 June 2012
12 June 2012
7 June 2012
8 June 2012
5 June 2012
6 June 2012
6 June 2012
4 June 2012
8 June 2012
5 June 2012
11 June 2012
7 June 2012
7 June 2012
6 June 2012
8 June 2012
5 June 2012
6 June 2012
12 June 2012
5 June 2012
8 June 2012
12 June 2012
11 June 2012
ABC
JK
JK
GHI
D6A,D6B
DEF
ABC
D8A,D8B
ABC
ABC
JKF
D6A,D6B
GH
CF
DE
D8A,D8B
AB
JK
I
ABC
C
ABC
ABC
ABC
AB
ABC
D
AB
D
ABC
D
ABC
D
ABC
CD
2361910
2361920
2361904
2361904
2351902
2361904
2361904
2361920
2361920
2361902
2361902
2351905
2361906
2361906
2361906
2361906
2361906
2361906
2361906
2361904
2361906
2361916
2361920
2361902
2361906
2361916
2361902
2361906
2361904
2361920
2361920
2361902
2361916
2361904
2361906
AMS
PPE (P)
IE (P)
IE (P)
DME
IE (P)
IE (P)
PPE (P)
PPE (P)
CG&CAM
CG&CAM
ECC
PROJ-II
PROJ-II
PROJ-II
PROJ-II
PROJ-II
PROJ-II
PROJ-II
IE (P)
PROJ-II
FAB.TECH
PPE (P)
CG&CAM
PROJ-II
FAB.TECH
CG&CAM
PROJ-II
IE (P)
PPE (P)
PPE (P)
CG&CAM
FAB.TECH
IE (P)
PROJ-II
For EC Branch
center
code
614
614
614
614
614
614
614
614
614
614
614
614
617
617
617
617
617
617
617
617
617
617
617
617
617
617
617
center Name
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT GIRLS
POLYTECHNIC,AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
Branch branch Subject
Name code
Code
Subject Full Name
Exam Time
DATE
EC
11
2361107
Consumer electronics
10:00 AM 09-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM 11-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM 09-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM 11-Jun-12
EC
11
361101
Mobile Communication
10:00 AM 11-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 07-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 08-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 07-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 08-Jun-12
EC
11
2361108
project-2
10:00 AM 04-Jun-12
EC
11
2361108
project-2
10:00 AM 05-Jun-12
EC
11
2361108
project-2
10:00 AM 06-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
4-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
5-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
6-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
4-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
5-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
6-Jun-12
EC
11
361101
Mobile Communication
10:00 AM
6-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 07-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 08-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 09-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 07-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 08-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 09-Jun-12
EC
11
2361108
project-2
10:00 AM 07-Jun-12
EC
11
2361108
project-2
10:00 AM 08-Jun-12
617
617
632
632
632
632
632
633
633
633
633
633
633
633
633
633
633
633
633
641
641
641
641
641
643
643
643
643
643
643
643
643
643
GOVERNMENT POLYTECHNIC
AHMEDABAD
GOVERNMENT POLYTECHNIC
AHMEDABAD
K.P.THAKKAR SWA.
KRISHANAJEEVANDAS INSTI OF
TECH,SOKLI
K.P.THAKKAR SWA.
KRISHANAJEEVANDAS INSTI OF
TECH,SOKLI
K.P.THAKKAR SWA.
KRISHANAJEEVANDAS INSTI OF
TECH,SOKLI
K.P.THAKKAR SWA.
KRISHANAJEEVANDAS INSTI OF
TECH,SOKLI
K.P.THAKKAR SWA.
KRISHANAJEEVANDAS INSTI OF
TECH,SOKLI
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
L.J.POLYTECHNIC,AHMEDABAD
R.H.PATEL INSTI. OF
TECHNOLOGY,GOBLAJ,KHEDA
R.H.PATEL INSTI. OF
TECHNOLOGY,GOBLAJ,KHEDA
R.H.PATEL INSTI. OF
TECHNOLOGY,GOBLAJ,KHEDA
R.H.PATEL INSTI. OF
TECHNOLOGY,GOBLAJ,KHEDA
R.H.PATEL INSTI. OF
TECHNOLOGY,GOBLAJ,KHEDA
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
EC
11
2361108
project-2
10:00 AM 09-Jun-12
EC
11
2361108
project-2
10:00 AM 11-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
7-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
4-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM
5-Jun-12
EC
11
2361103
Computer Networks
10:00 AM
6-Jun-12
EC
11
2361108
project-2
EC
EC
EC
EC
EC
EC
EC
EC
EC
EC
EC
EC
11
11
11
11
11
11
11
11
11
11
11
11
2361107
2361107
2361101
2361101
361101
2361102
2361102
2361103
2361103
Consumer electronics
Consumer electronics
Mobile Communication
Mobile Communication
Mobile Communication
VLSI Technology
VLSI Technology
Computer Networks
Computer Networks
2361108
2361108
2361108
project-2
project-2
project-2
EC
11
2361107
Consumer electronics
10:00 AM 07-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM 08-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 06-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 04-Jun-12
EC
11
2361108
project-2
10:00 AM 05-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
4-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
5-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM
6-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
4-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
5-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM
6-Jun-12
EC
11
361101
Mobile Communication
10:00 AM
6-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM
7-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM
8-Jun-12
10:00 AM 08-Jun-12
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
10:00 AM
04-Jun-12
05-Jun-12
07-Jun-12
08-Jun-12
08-Jun-12
09-Jun-12
11-Jun-12
09-Jun-12
11-Jun-12
04-Jun-12
05-Jun-12
06-Jun-12
643
643
643
643
643
643
643
643
643
643
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
SARVODAYA POLYTECHNIC
INSTITUTE, LIMBDI
EC
11
2361102
VLSI Technology
10:00 AM
9-Jun-12
EC
11
361102
VLSI Technology
10:00 AM
9-Jun-12
EC
11
2361103
Computer Networks
10:00 AM
7-Jun-12
EC
11
2361103
Computer Networks
10:00 AM
8-Jun-12
EC
11
2361103
Computer Networks
10:00 AM
9-Jun-12
EC
11
361103
Computer Networks
10:00 AM
9-Jun-12
EC
11
2361108
project-2
10:00 AM 07-Jun-12
EC
11
2361108
project-2
10:00 AM 08-Jun-12
EC
11
2361108
project-2
10:00 AM
EC
11
2361108
project-2
10:00 AM 11-Jun-12
9-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361107
Consumer electronics
10:00 AM 04-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361107
Consumer electronics
10:00 AM 05-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361101
Mobile Communication
10:00 AM 04-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361101
Mobile Communication
10:00 AM 05-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
361101
Mobile Communication
10:00 AM 05-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361102
VLSI Technology
10:00 AM 06-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361102
VLSI Technology
10:00 AM 07-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
361102
VLSI Technology
10:00 AM 07-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361103
Computer Networks
10:00 AM 06-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361103
Computer Networks
10:00 AM 07-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
361103
Computer Networks
10:00 AM 07-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361108
project-2
10:00 AM 08-Jun-12
646
SHRI N.M.GOPANI POLYTECHNIC
INSTITUTE,RANPUR
EC
11
2361108
project-2
10:00 AM 11-Jun-12
652
652
652
652
652
652
652
652
652
652
652
652
652
652
667
667
667
667
667
667
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
VARDHMAN BHARTI TRUST,
TECHNICAL INSTITUTE OF DIPLOMA
STUDIES, WADHVAN
DALIA INSTI. OF DIPLOMA
STUDIES, KHEDA
DALIA INSTI. OF DIPLOMA
STUDIES, KHEDA
DALIA INSTI. OF DIPLOMA
STUDIES, KHEDA
DALIA INSTI. OF DIPLOMA
STUDIES, KHEDA
DALIA INSTI. OF DIPLOMA
STUDIES, KHEDA
DALIA INSTI. OF DIPLOMA
STUDIES, KHEDA
EC
11
2361107
Consumer electronics
10:00 AM 04-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM 05-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM 04-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM 05-Jun-12
EC
11
361101
Mobile Communication
10:00 AM 05-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 06-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 07-Jun-12
EC
11
361102
VLSI Technology
10:00 AM 07-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 06-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 07-Jun-12
EC
11
361103
Computer Networks
10:00 AM 07-Jun-12
EC
11
2361108
project-2
10:00 AM 08-Jun-12
EC
11
2361108
project-2
10:00 AM 09-Jun-12
EC
11
2361108
project-2
10:00 AM 11-Jun-12
EC
11
2361107
Consumer electronics
10:00 AM 11-Jun-12
EC
11
2361101
Mobile Communication
10:00 AM 05-Jun-12
EC
11
2361102
VLSI Technology
10:00 AM 04-Jun-12
EC
11
2361103
Computer Networks
10:00 AM 06-Jun-12
EC
11
2361108
project-2
10:00 AM 07-Jun-12
EC
11
2361108
project-2
10:00 AM 08-Jun-12
For Bio - Medical Branch
BRANCH
CENTER
CODE
BIO-MEDICAL
BIO-MEDICAL
BIO-MEDICAL
614
BIO-MEDICAL
BIO-MEDICAL
BIO-MEDICAL
BIO-MEDICAL
BIO-MEDICAL
617
BIO-MEDICAL
BIO-MEDICAL
SUB
SUB NAME
CODE
2360301 Biomedical Signal
Rehabilitation
2360302
engineering
2360303 Project-II
GGP AHMEDABAD
Telemedical
2360304
Instrumentation
Opthelmic
2360308
Instrumentation
Biomedical Signal
2360301
Processing
Rehabilitation
2360302
engineering
GP AHMEDABAD 2360303 Project-II
Telemedical
2360304
Instrumentation
Opthelmic
2360308
Instrumentation
CENTRE NAME
EXAM
BATCHES
DATE
9-Jun-12
(1-42)
8-Jun-12
(1-42)
4-Jun-12
(1-42)
11-Jun-12
(1-42)
6-Jun-12
(1-42)
8-Jun-12
(1-24)
6-Jun-12
(1-24)
7-Jun-12
(1-24)
11-Jun-12
(1-24)
4-Jun-12
(1-24)
For IC Branch
BRANCH
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
CENTER
CODE
CENTRE NAME
SUB CODE
SUB NAME
361701 Applied instrumentation
Industrial Electronics &
control
Biomedical
361703
Instrumentation
361702
617
GP AHMEDABAD
361704 Microcontroller
361705
Advanced Process
Control
EXAM DATE BATCHES
8-Jun-12
11-Jun-12
6-Jun-12
7-Jun-12
8-Jun-12
11-Jun-12
4-Jun-12
5-Jun-12
4-Jun-12
5-Jun-12
(1-45)
(46-66)
(1-45)
(46-66)
(46-66)
(1-45)
(1-45)
(46-66)
(46-66)
(1-45)
For Computer Branch
Date
Center Name
Branch
Name
Branch
Code
Subject
Code
Subject
Name
Time
04-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
06-06-2012
07-06-2012
08-06-2012
11-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
06-06-2012
07-06-2012
07-06-2012
08-06-2012
08-06-2012
11-06-2012
04-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
06-06-2012
07-06-2012
08-06-2012
11-06-2012
04-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
GP,Ahmedabad
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
Govt poly for Girls
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
R C T I ,Ahmedabad
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
2360701
2360703
2360707
2360701
2360703
2360707
2360701
2360703
2360707
2360704
2360704
2360704
2360704
2360707
2360704
2360707
2360701
2360704
2360707
2360701
2360703
2360701
2360703
2360703
2360701
2360703
2360704
2360701
2360703
2360704
2360701
2360703
2360704
2360707
2360707
2360707
2360701
2360703
2360707
2360701
2360703
PHP
CM
DCC
PHP
CM
DCC
PHP
CM
DCC
PROJ-II
PROJ-II
PROJ-II
PROJ-II
DCC
PROJ-II
DCC
PHP
PROJ-II
DCC
PHP
CM
PHP
CM
CM
PHP
CM
PROJ-II
PHP
CM
PROJ-II
PHP
CM
PROJ-II
DCC
DCC
DCC
PHP
CM
DCC
PHP
CM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
05-06-2012
06-06-2012
06-06-2012
06-06-2012
07-06-2012
08-06-2012
11-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
07-06-2012
07-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
07-06-2012
08-06-2012
08-06-2012
11-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
07-06-2012
07-06-2012
08-06-2012
04-06-2012
05-06-2012
06-06-2012
07-06-2012
07-06-2012
08-06-2012
08-06-2012
11-06-2012
04-06-2012
05-06-2012
07-06-2012
11-06-2012
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
C U Shah, Surendranagar
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
L J Polytechnic, Ahmedabad
K P Thakkar, Viramgam
K P Thakkar, Viramgam
K P Thakkar, Viramgam
K P Thakkar, Viramgam
K P Thakkar, Viramgam
K P Thakkar, Viramgam
K P Thakkar, Viramgam
K P Thakkar, Viramgam
TIDS,vadhavan
TIDS,vadhavan
TIDS,vadhavan
TIDS,vadhavan
TIDS,vadhavan
TIDS,vadhavan
TIDS,vadhavan
TIDS,vadhavan
Sarvoday, Limdi
Sarvoday, Limdi
Sarvoday, Limdi
Sarvoday, Limdi
Sarvoday, Limdi
Sarvoday, Limdi
Sarvoday, Limdi
Sarvoday, Limdi
DIDS,Memdavad
DIDS,Memdavad
DIDS,Memdavad
DIDS,Memdavad
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
Computer
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
2360707
2360701
2360703
2360707
2360704
2360704
2360704
2360701
2360703
2360701
2360703
2360704
2360707
2360704
2360707
2360704
2360707
2360704
2360707
2360701
2360701
2360703
2360703
2360703
2360704
2360703
2360704
2360707
2360701
2360707
2360701
2360704
2360704
2360701
2360701
2360703
2360703
2360705
2360705
2360701
2360703
2360708
2360704
DCC
PHP
CM
DCC
PROJ-II
PROJ-II
PROJ-II
PHP
CM
PHP
CM
PROJ-II
DCC
PROJ-II
DCC
PROJ-II
DCC
PROJ-II
DCC
PHP
PHP
CM
CM
CM
PROJ-II
CM
PROJ-II
DCC
PHP
DCC
PHP
PROJ-II
PROJ-II
PHP
PHP
CM
CM
CGM
CGM
PHP
CM
NOS
PROJ-II
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
For IT Branch
Date
04-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
07-06-2012
07-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
06-06-2012
07-06-2012
07-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
07-06-2012
07-06-2012
08-06-2012
08-06-2012
11-06-2012
11-06-2012
04-06-2012
05-06-2012
05-06-2012
06-06-2012
04-06-2012
04-06-2012
05-06-2012
05-06-2012
05-06-2012
06-06-2012
06-06-2012
06-06-2012
07-06-2012
07-06-2012
08-06-2012
center
code
center Name
Branch
Name
branch
code
Subject
Code
Subject Full
Name
exam Time
614
614
614
614
614
614
614
614
617
617
617
617
617
617
617
617
617
649
649
649
649
649
649
649
649
649
649
649
649
633
633
633
633
640
640
640
640
640
640
640
640
640
640
640
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Girls Polytechnic
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
Govt. Polytechnic Abad
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
BPTI
L.J.POLYTECHNIC
L.J.POLYTECHNIC
L.J.POLYTECHNIC
L.J.POLYTECHNIC
RCTI
RCTI
RCTI
RCTI
RCTI
RCTI
RCTI
RCTI
RCTI
RCTI
RCTI
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
16
2361602
2361607
2361602
2361607
2361607
2361608
2361607
2361608
2361601
2361601
2361601
2361602
2361608
2361604
2361606
2361606
2361608
2361601
2361606
2361601
2361606
2361601
2361606
2361602
2361608
2361602
2361608
2361602
2361608
2361601
2361602
2361608
2361604
2361601
2361608
2361601
2361604
2361608
2361601
2361604
2361608
2361602
2361604
2361602
IS
CLD
IS
CLD
ASP
PROJECT
ASP
PROJECT
ASP
IS
ASP
IS
PROJECT
ERP
MC
MC
PROJECT
ASP
MC
ASP
MC
ASP
MC
IS
PROJECT
IS
PROJECT
IS
PROJECT
ASP
IS
PROJECT
ERP
ASP
PROJECT
ASP
ERP
PROJECT
ASP
ERP
PROJECT
IS
ERP
IS
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
11-06-2012
04-06-2012
05-06-2012
07-06-2012
08-06-2012
04-06-2012
05-06-2012
06-06-2012
07-06-2012
04-06-2012
05-06-2012
07-06-2012
08-06-2012
640
632
632
632
632
652
652
652
652
667
667
667
667
RCTI
KPT,Viramgam
KPT,Viramgam
KPT,Viramgam
KPT,Viramgam
TIDS,Vadhavan
TIDS,Vadhavan
TIDS,Vadhavan
TIDS,Vadhavan
DIDS,Memdavad
DIDS,Memdavad
DIDS,Memdavad
DIDS,Memdavad
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
16
16
16
16
16
16
16
16
16
16
16
16
16
2361602
2361601
2361604
2361608
2361602
2361601
2361602
2361608
2361606
2361601
2361608
2361606
2361602
IS
ASP
ERP
PROJECT
IS
ASP
IS
PROJECT
MC
ASP
PROJECT
MC
IS
For Chemical Branch
Exam Date
dd/mm/yy
04-06-2012
05-06-2012
07-06-2012
08-06-2012
09-06-2012
Center
Code
649
649
649
649
649
Center Name
SIR B.P.I., BHAVNAGAR
SIR B.P.I., BHAVNAGAR
SIR B.P.I., BHAVNAGAR
SIR B.P.I., BHAVNAGAR
SIR B.P.I., BHAVNAGAR
Branch
BATCH
CHEMICAL
CHEMICAL
CHEMICAL
CHEMICAL
CHEMICAL
ABC
ABC
ABC
ABC
ABC
SUBJECT
CODE
360503
360504
360501
360502
360507
SUBJECT
NAME
CEPE
CPED
Project
FT
Polymer Tech.
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
10:30 AM
Important Instructions for Students appearing in above mentioned examinations:
1. All students of Zone - 1 Institutes are instructed to remain Present at exam center as per the Schedule
2. All the students are required to carry hall ticket with them issued by the university during exam time.
3. They must be in their respective examination hall 30 minutes before exam time failing which entry will not
be permitted.
‐sd‐
I/C Controller of Examination
Gujarat Technological University