Switchover Data Mismatch Deferror Prevention Feature Module for Release 5.0 MR 1.1 Revised Date: April 15, 2008 This feature module describes enhancements for Release 5.0 MR1.1 to prevent Oracle data mismatch errors upon switchover. Previously, at EMS switchover, the standby EMS platform was transitioned to active without waiting for the Oracle replication queue to completely drain from the active EMS. To alleviate this, the Session Manager (SMG) now waits 120 seconds when a switchover is initiated to allow the replication queue to drain. Two new commands, Query Oracle Replication Queue on the Active Element Management System (EMS) and Control Element Manager to Switchover have also been added. Caution If any command response states that the Oracle Replication Queue is broken, contact Cisco TAC. Query Oracle Replication Queue on the Active EMS Two new commands permit querying either the status of a job or the number of unpushed calls left in the replication queue. Americas Headquarters: Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA © 2007 Cisco Systems, Inc. All rights reserved. Switchover Data Mismatch Deferror Prevention Feature Module for Release 5.0 MR 1.1 Control Element Manager to Switchover Job Status Query This command queries the job status of the Oracle Replication Queue. A user must be logged in to Oracle to execute this command. This example shows that the replication PUSH job is broken. The Oracle Replication Queue is not draining. If the Oracle Replication Queue is broken, it will never drain. Examples priems# su - oracle Sample response: $ dbadm -r push_job_status JOB=2 BROKEN=Y FAILURES=0 Query Number of Unpushed Calls This command queries Oracle for the number of unpushed calls left in the Replication Queue and the estimated time for the Queue to drain. The following example shows that there are 18262 calls in the Replication Queue that may take up to 514 seconds to drain. Examples $ dbadm -r unpushed_defcall_cnt Sample response: UNPUSHED_CALLS=18262 ESTIMATED_PUSH_TIME_SECOND=514 Control Element Manager to Switchover When the CLI Control Element Manager to Switchover command is executed, the system now checks the replication queue for unpushed calls. If the number of unpushed calls is greater than a preset threshold, the control command fails. If switchover is still desired, regardless of the unpushed calls in the queue, the option FORCED=Y is permitted. However, the system now waits 120 seconds before switching over, which allows as many unpushed calls as possible to drain. Release 5.0 MR1.1 2 Switchover Data Mismatch Deferror Prevention Feature Module for Release 5.0 MR 1.1 Control Element Manager to Switchover Control Element Manager without Forced=Y This command checks the status of the Oracle Replication Queue before executing a switchover. The following example shows that the control command fails because the Oracle PUSH job is broken. A Database Alarm is given. Contact Cisco TAC for support. Examples CLI>control element-manager id=EM01; target-state=standby-active; Sample response: Reply: Failure: at 2007-07-19 15:50:42 by optiuser The replication queue contains 128262 transactions, and it is expected to take 513 seconds for the queue to drain. Control Element Manager with Forced=Y The following example forces the system to switchover. It does not check the status of the Oracle Replication Queue. Examples CLI>control element-manager id=EM01; target-state=standby-active; force=y CCVP, the Cisco logo, and Welcome to the Human Network are trademarks of Cisco Systems, Inc.; Changing the Way We Work, Live, Play, and Learn is a service mark of Cisco Systems, Inc.; and Access Registrar, Aironet, Catalyst, CCDA, CCDP, CCIE, CCIP, CCNA, CCNP, CCSP, Cisco, the Cisco Certified Internetwork Expert logo, Cisco IOS, Cisco Press, Cisco Systems, Cisco Systems Capital, the Cisco Systems logo, Cisco Unity, Enterprise/Solver, EtherChannel, EtherFast, EtherSwitch, Fast Step, Follow Me Browsing, FormShare, GigaDrive, HomeLink, Internet Quotient, IOS, iPhone, IP/TV, iQ Expertise, the iQ logo, iQ Net Readiness Scorecard, iQuick Study, LightStream, Linksys, MeetingPlace, MGX, Networkers, Networking Academy, Network Registrar, PIX, ProConnect, ScriptShare, SMARTnet, StackWise, The Fastest Way to Increase Your Internet Quotient, and TransPath are registered trademarks of Cisco Systems, Inc. and/or its affiliates in the United States and certain other countries. All other trademarks mentioned in this document or Website are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (0711R) Copyright © 2007 Cisco Systems, Inc. All rights reserved. Release 5.0 MR1.1 3 Switchover Data Mismatch Deferror Prevention Feature Module for Release 5.0 MR 1.1 Control Element Manager to Switchover Release 5.0 MR1.1 4
© Copyright 2026 Paperzz