2016 Project Priority List by Priority Order (PDF: 152 KB/11 pages)

PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
*
*
*
*
*
Rank
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
System
Randall
Tower
Winger
Pipestone
Houston
Lowry
Stacy
Stockton
Lewiston
Aurora
Carlton
Oronoco
Albert Lea
Brooten
Ostrander
Cuyuna
Alden
Nicollet
Lewisville
Easton
Comfrey
Minnesota Lake
Montrose
Onamia
Onamia
Deer River
Twin Valley
Kerkhoven
Hanley Falls
Lewisville
Bigfork
Round Lake
Drinking Water Protection Section
651-201-4700
Project
Treatment - Remove Nitrate
Treatment - Plant Improvements
Treatment - Remove Fe/As and Wells
Treatment - New Plant - Gross Alpha/Rad
Treatment - Radium Removal
Treatment - New Plant - Remove As
Treatment - Remove Radium
Source - New Low Radium Well
Source - New Blending Well for Radium
Consolidation - E Mesabi Joint Water Sys
Watermain - Extension to High As Wells
New System - Phase 2
Watermain - Consolidate Stables Area
Source - Replace Wells #1 & #2
Source - New Well #3, Rehab Well #2
Source - Repl with Wells #2 & #3/Treat
Treatment - Repl Fe/Mn Plant & Well
Source - Replace Well No. 1
Source - Connection to RRRWS
Watermain - Connect to Wells
Storage - Tower Rehab/Seal Well
Watermain - Connect to Wells
Source - New Well & Wellhouse
Treatment - New Plant
Watermain - Looping
Treatment - Wellhouse Rehab
Treatment - Plant Rehab
Treatment - Remove Fe/Mn
Watermain - Replace & Loop Main
Watermain - Looping & Hydrants
Source - New Well & Plant Rehab
Treatment - Plant Rehab
1
Project #
1490005-1
1690051-2
1600013-2
1590005-3
1280005-2
1610007-3
1130016-3
1850020-5
1850006-6
1690002-6
1090003-5
1550036-3
1240001-1
1730005-5
1230008-3
1180011-4
1240004-2
1520004-8
1830003-3
1220005-5
1080001-8
1220013-1
1860016-4
1480003-4
1480003-5
1310007-4
1540008-2
1760006-1
1870005-4
1830003-2
1310001-6
1530008-1
Priority
Points
40.0
30.0
30.0
30.0
30.0
30.0
30.0
25.0
25.0
20.0
17.5
15.5
15.0
15.0
15.0
15.0
15.0
15.0
13.0
13.0
13.0
13.0
13.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
PHI
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
650
500
220
4317
980
257
1357
365
1400
2225
987
600
18356
647
256
231
661
1111
250
199
382
683
2498
875
875
903
900
759
304
250
443
411
Estimated
Project Cost
$1,595,200
$2,460,000
$1,231,000
$15,373,350
$2,600,000
$1,802,799
$2,200,000
$515,715
$948,259
$28,000,000
$7,336,821
$300,000
$1,254,000
$146,500
$1,236,900
$459,300
$1,935,000
$127,885
$1,036,550
$1,690,000
$241,701
$1,560,000
$956,250
$2,954,000
$396,966
$476,000
$690,000
$1,950,000
$2,699,000
$542,040
$129,489
$1,024,200
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
*
*
*
*
Rank
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
System
Pelican Rapids
Marble
Cyrus
Cyrus
Winthrop
Wells
Morris
Perham
Jackson
Madison
Garfield
Garfield
Greenbush
Gary
Gary
Gary
Wheaton
Morgan
Kandiyohi
Kandiyohi
LeRoy
Mountain Iron
Littlefork
Breckenridge
Murdock
Comfrey
Comfrey
Bowlus
Nicollet
Stewart
Harris
Buffalo
Drinking Water Protection Section
651-201-4700
Project
Watermain - Replace & Loop - Phase 2
Watermain - Replace and Loop Main
Treatment - New Plant, Remove Fe/Mn
Watermain - Replace 1930's Main & Loop
Watermain - Replace 8th Street & Loop
Treatment - Lime Softening Plant
Treatment - New Softening Plant
Watermain - Repl & Loop 3rd St NE
Watermain - New River Crossing
Treatment - Plant Rehab
Treatment - New Plant, Remove Fe/Mn
Source - New Well
Watermain - Repl Area 3 - Old Ridge Rd.
Source - Two New Wells
Treatment - Remove Fe/Mn
Watermain - Looping
Treatment - Plant Rehab
Treatment - Remove Fe/Mn & New Wells
Treatment - New Fe/Mn Plant & Wells
Watermain - Looping
Source - Backup Well
Source - New Well
Watermain - Replace & Loop Various Areas
Treatment - Lime Softening Plant
Treatment - Repl Plant, Remove Fe/Mn
Treatment - Repl Media + Improvements
Watermain - Looping
Source - Backup Well #3
Treatment - Replace Fe/Mn Plant
Watermain - Looping
Watermain - Looping
Treatment - Repl 1981 Plant add 3 Wells
2
Project #
1560019-4
1310023-2
1610001-1
1610001-2
1720008-2
1220010-2
1750005-2
1560023-7
1320003-4
1370004-4
1210021-1
1210021-2
1680002-9
1540010-1
1540010-2
1540010-4
1780004-3
1640006-3
1340003-3
1340003-5
1500009-1
1690035-3
1360004-6
1840002-1
1760007-1
1080001-3
1080001-6
1490009-1
1520004-7
1430009-6
1130005-5
1860005-4
Priority
Points
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
2374
626
303
303
1399
2307
5205
3000
3354
1656
308
308
719
204
204
204
1424
896
491
491
900
2869
645
3559
282
382
360
276
1111
564
378
12120
Estimated
Project Cost
$1,904,263
$397,206
$750,000
$750,000
$524,704
$12,000,000
$19,526,530
$2,302,000
$420,000
$1,005,000
$987,527
$121,234
$456,306
$290,400
$886,380
$146,916
$1,212,000
$2,125,000
$2,084,000
$201,600
$752,482
$539,000
$4,014,930
$13,584,000
$1,900,000
$620,149
$349,000
$40,880
$1,865,565
$311,021
$364,320
$11,200,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
Rank
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
System
Myrtle
Evansville
Deerwood
Saint Cloud
Gaylord
Pennock
Gary
Kandiyohi
Saint Paul Regional Water Services
Onamia
Kelliher
Kelliher
Myrtle
Myrtle
Hoffman
Hoffman
Eagle Bend
Eagle Bend
Eagle Bend
Evansville
Echo
Echo
Canby
Canby
Crosby
Crosby
Blackduck
Wadena
Lewisville
Lewisville
Ironton
Ironton
Drinking Water Protection Section
651-201-4700
Project
Storage - New Hydropneumatic Tank
Storage - Replace Storage Tank
Storage - Replace w/100,000 Gal Tower
Storage - New 1.5MG South Elevated Tank
Storage - Repl w/200,000 Gal Tower
Storage - Repl with 50,000 Gal Tower
Storage - New 50,000 Gal Tower
Storage - Repl Tower w/75,000 Gal Tower
Other - Generator W. St. Paul Booster
Storage - Tower Rehab
Storage - Replace 50,000 Gal Tower
Watermain - Replace Old Main
Source - New Pump & Generator
Watermain - Replace Mains
Watermain - Replace & Loop
Conservation - Meters
Watermain - Phase 2 Replacement
Watermain - Phase 3 Replacement
Watermain - Phase 4 Replacement
Treatment - Plant Rehab
Storage - Replace 50,000 Gal Tower
Watermain - Repl CSAH 20, 3rd & East Sts
Watermain - Replacement, Phase 2
Watermain - Replacement, Phase 3
Watermain - Phase 2 Improvements
Watermain - Phase 3 Improvements
Watermain - Repl Summit Ave & Main St. N
Watermain - Replace SW Portion of City
Storage - Elevated Tank Rehab
Conservation - Replace Meters
Source - Rehabilitate Well #2
Treatment - Replace Plant
3
Project #
1240015-2
1210013-9
1180012-6
1730027-6
1720002-3
1340006-1
1540010-3
1340003-4
1620026-19
1480003-6
1040017-1
1040017-2
1240015-1
1240015-3
1260006-5
1260006-6
1770004-4
1770004-5
1770004-6
1210013-8
1870003-3
1870003-4
1870001-4
1870001-5
1180008-7
1180008-8
1040014-1
1800004-4
1830003-4
1830003-5
1180017-5
1180017-6
Priority
Points
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
48
612
532
66169
2305
508
204
491
422660
875
310
310
48
48
682
682
613
613
613
612
271
271
1903
1903
2312
2312
785
4293
250
250
498
498
Estimated
Project Cost
$9,800
$887,513
$923,000
$4,643,022
$1,675,765
$768,400
$831,600
$638,000
$515,000
$315,000
$750,000
$1,757,000
$58,500
$224,640
$770,000
$171,000
$865,000
$485,000
$215,925
$1,476,773
$774,300
$1,371,700
$2,099,389
$2,782,911
$750,000
$3,670,000
$746,463
$4,925,000
$328,800
$95,570
$38,900
$1,235,600
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
Rank
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
System
Ironton
Pine River
Pine River
Herman
Herman
Herman
Clarissa
Clarissa
Deerwood
Deerwood
Deerwood
Bagley
Watkins
Currie
Aitkin
Isle
Isle
Isle
Round Lake
Menahga
Menahga
Menahga
Mahnomen
Mahnomen
Mahnomen
Winger
Howard Lake
Pelican Rapids
Pelican Rapids
Barrett
Barrett
Waubun
Drinking Water Protection Section
651-201-4700
Project
Conservation - Replace Meters
Source - Replace Wellhouses 1 & 2
Storage - Rehab Towers 1 & 2
Source - New Well #2/Rehab #1
Storage - Replace Elevated Tower
Watermain - Loop and Replace
Watermain - Repl Various Blocks
Conservation - Replace Meters
Watermain - Repl 4 inch Mains, Phase 2
Watermain - Repl 4 inch Mains, Phase 3
Watermain - Replace Under Hwy 210
Watermain - Replace Cast Iron Main
Storage - New 50,000 Gal Tower
Watermain - Replace and Loop
Watermain - Loop & Replace
Watermain - Replacement
Source - Improvements
Storage - Tower Rehab
Storage - 50,000 Gallon Tower Rehab
Storage - Repl w/100,000 Gal Tower
Watermain - Main Street East Repl
Watermain - First Street NW Repl
Other - Backup Generators
Watermain - Replace Various Areas
Source - Upgrade Well #4
Storage - Replace 50,000 Gal Tower
Conservation - Replace Meters
Storage - Recoat Water Tower
Watermain - Repl Various Street
Treatment - Plant Rehab
Watermain - Replace Various Areas
Storage - Repl w/100,000 Gallon Tower
4
Project #
1180017-7
1110019-4
1110019-5
1260005-2
1260005-3
1260005-4
1770003-5
1770003-6
1180012-2
1180012-4
1180012-5
1150001-2
1470010-2
1510003-1
1010001-7
1480001-5
1480001-6
1480001-7
1530008-2
1800001-2
1800001-3
1800001-4
1440002-10
1440002-8
1440002-9
1600013-3
1860010-7
1560019-3
1560019-6
1260002-4
1260002-5
1440004-1
Priority
Points
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
498
944
944
425
425
425
681
681
590
590
590
1235
948
232
1984
745
745
745
411
1228
1228
1228
1222
1222
1222
220
2016
2374
2476
415
415
388
Estimated
Project Cost
$114,000
$860,000
$785,000
$200,000
$750,000
$580,000
$2,492,000
$108,000
$275,436
$787,000
$95,000
$1,563,239
$751,500
$2,033,000
$413,600
$753,100
$307,700
$294,500
$234,000
$770,000
$458,430
$360,378
$220,500
$3,518,545
$208,000
$831,000
$253,000
$500,000
$667,600
$475,750
$824,907
$635,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
Rank
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
System
Waubun
Waubun
Badger
Badger
Badger
Badger
Erskine
Erskine
Clarkfield
Clarkfield
Clarkfield
Sacred Heart
Sacred Heart
Calumet
Calumet
Frazee
Vernon Center
Bovey
Little Falls
Little Falls
Little Falls
Walnut Grove
Walker
Walker
Sebeka
Sebeka
Cyrus
Glenwood
Glenwood
Glenwood
Glenwood
Welcome
Drinking Water Protection Section
651-201-4700
Project
Watermain - Replacement
Conservation - Install Meters
Treatment - Repl Plant Piping System
Storage - Replace Riser Pipe
Watermain - Repl Area 1
Watermain - Repl Area 2
Storage - Remove Original Tower
Watermain - Replace 1947 Lines
Storage - New Elevated Tank
Watermain - Repl Cast Iron Mains
Treatment - Plant Rehab
Treatment - Plant Rehab
Watermain - Replace
Watermain - Alley Replacement
Watermain - Repl 6th Ave/Shipka St.
Watermain - Replace Cast Iron Mains
Treatment - Plant Rehab
Watermain - Replace in Business Area
Treatment - Phase 1- Filter Rehab
Treatment - Phase 2 - Reclaim Tank Rehab
Treatment - Phase 3 - Plant Rehab
Water Main - Replace Old Water Main
Watermain - Repl for Michigan Ave
Watermain - Replace on South Side
Treatment - New Plant, Remove Iron
Watermain - Replace, Phase 2
Conservation - Install Meters
Watermain - Phase 3 Replacement
Source - Rehab Well No. 5 & 6 Pumphouses
Watermain - Phase 1 Replacement
Watermain - Phase 2 Replacement
Storage - Repl w/150,000 Gal Tower
5
Project #
1440004-2
1440004-3
1680001-2
1680001-3
1680001-4
1680001-5
1600005-6
1600005-7
1870002-4
1870002-5
1870002-6
1650013-1
1650013-2
1310004-3
1310004-4
1030014-1
1070019-1
1310003-1
1490002-5
1490002-6
1490002-7
1640014-1
1110013-5
1110013-6
1800002-7
1800002-8
1610001-3
1610003-10
1610003-7
1610003-8
1610003-9
1460011-2
Priority
Points
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
388
388
474
474
369
369
431
431
841
841
841
548
548
383
383
1374
332
662
8797
8797
8797
685
1186
1186
710
676
303
2594
2594
2594
2594
673
Estimated
Project Cost
$2,500,000
$140,000
$102,182
$38,318
$836,000
$667,000
$58,000
$1,179,150
$1,728,736
$1,861,787
$409,477
$520,487
$3,290,270
$415,000
$260,000
$676,710
$85,560
$658,880
$1,400,000
$1,300,000
$280,500
$833,500
$574,031
$1,339,405
$1,750,000
$975,000
$83,500
$958,000
$435,200
$1,165,000
$708,000
$1,157,700
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
*
*
Rank
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
System
Starbuck
Starbuck
Gaylord
Easton
Brooten
Browerville
Hibbing
Eveleth
Eveleth
Eveleth
Winnebago
Elbow Lake
Elbow Lake
Winthrop
Pipestone
Chisholm
Perham
Saint James
Heron Lake
Heron Lake
Jackson
Jackson
Jackson
Redwood Falls
Northrop
Nashwauk
Red Lake Falls
Osakis
Osakis
Carlton
Carlton
Fairmont
Drinking Water Protection Section
651-201-4700
Project
Conservation - Replace Meters
Watermain - Repl Cast Iron Mains
Conservation - Replace Meters
Conservation - Replace Meters
Treatment - New Plant, Remove Fe/Mn
Watermain - TH 71 Replacement
Distribution - Rehab So Booster Station
Storage - Recondition West Water Tower
Watermain - Repl Garfield Street
Storage - 750,000 Gal Tower Rehab
Watermain - Repl Cast Iron Mains
Watermain - Replace for Division St.
Treatment - Rehabilitate Plant
Watermain - Replace Various Blocks
Watermain - Replace TH30
Watermain - Repl for Lakeview Additions
Watermain - Replace 2nd Ave SW
Watermain - Repl TH 4
Other - Connect to Red Rock Rural Water
Storage - Replace 100,000 Gal Tower
Storage - Recondition/Paint East Tower
Watermain - Replace & Install
Treatment - High Service Pump Imp.
Watermain - Ponderosa to N. Redwood
Storage - Tower Rehab
Watermain - TH 65 Replacement
Watermain - Repl Various Areas
Watermain - Repl 7 Blocks Downtown
Watermain - Replace Various Blocks
Watermain - Replace for School Ave
Treatment - Plant Rehab
Storage - New 3.0 MG Reservoir
6
Project #
1610008-1
1610008-2
1720002-4
1220005-6
1730005-6
1770002-4
1690022-5
1690018-6
1690018-7
1690018-8
1220011-2
1260003-2
1260003-5
1720008-1
1590005-4
1690007-2
1560023-8
1830006-6
1320002-2
1320002-3
1320003-1
1320003-2
1320003-3
1640008-3
1460006-2
1310024-4
1630003-2
1210020-5
1210020-6
1090003-3
1090003-4
1460003-2
Priority
Points
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
1343
1274
2305
199
647
735
22000
3865
3770
3770
1437
1275
1275
1399
4317
4960
3000
4611
698
691
3469
3469
3354
5327
227
986
1429
1740
1740
810
987
10666
Estimated
Project Cost
$312,000
$235,400
$275,000
$45,100
$1,181,700
$441,200
$790,000
$673,149
$237,794
$1,312,172
$2,087,000
$665,000
$1,000,000
$950,700
$574,493
$1,477,086
$872,922
$2,900,000
$1,580,769
$800,000
$175,000
$1,738,700
$454,440
$750,000
$277,830
$1,274,670
$1,487,079
$522,083
$735,200
$667,000
$2,000,000
$2,063,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
Rank
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
System
Moose Lake
Greenbush
Greenbush
Greenbush
Greenbush
Houston
Houston
Wheaton
Wheaton
Tracy
Tracy
New London
Sherburn
Sherburn
Lakefield
Morgan
Hawley
LeRoy
LeRoy
LeRoy
Silver Bay
Grove City
Rush City
Hitterdal
Hitterdal
Ostrander
Ostrander
Morristown
Murdock
Warren
Riverton
Wykoff
Drinking Water Protection Section
651-201-4700
Project
Source - Well #1 Rehab, New Well House
Watermain - Repl Along Hwy 7
Watermain - Relocation Along Hwy 32
Watermain - Repl Area 1 - Main Street
Watermain - Repl Area 2 - 5th Street
Watermain - Ellsworth St. Repair
Watermain - Jackson, Lincoln, Spruce Sts
Storage - Recoat Tower, Add Safety Items
Conservation - Replace Meters
Storage - Tower Rehab
Watermain - Loop and Replace
Watermain - Repl Various Blocks
Treatment - Replace Fe/Mn Plant
Storage - Tower Rehab
Treatment - Add RO/Plant Rehab
Storage - Tower Rehab
Watermain - Replace, Phase 3
Storage - Repl with 120,000 Gallon Tower
Watermain - Replace for East County Rd.
Treatment - Rehab Filter
Watermain - Repl at Banks, Rehab P Stat
Watermain - Replace Cast Iron Main
Watermain - Replace for TH 361
Storage - New 50,000 Gallon Tower
Conservation - Install Meters
Storage - New 50,000 Gal Tower
Watermain - Repl Cast Iron Mains
Treatment - New Plant, Remove Radium
Storage - New 75,000 Gal Tower
Watermain - Northwest Area Repl
Watermain - Replace
Watermain - County Road 5
7
Project #
1090009-3
1680002-5
1680002-6
1680002-7
1680002-8
1280005-3
1280005-4
1780004-1
1780004-4
1420010-3
1420010-4
1340005-2
1460007-1
1460007-2
1320004-3
1640006-5
1140006-7
1500009-2
1500009-3
1500009-4
1380003-9
1470007-3
1130013-5
1140007-3
1140007-4
1230008-1
1230008-2
1660007-1
1760007-2
1450012-4
1180025-4
1230013-4
Priority
Points
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
1259
719
719
719
719
980
980
1508
1424
2179
2179
1251
1115
1115
1694
896
1850
900
900
900
1980
625
3058
201
201
256
256
1042
282
1567
114
444
Estimated
Project Cost
$1,100,000
$590,904
$155,000
$889,206
$424,033
$143,780
$652,500
$450,000
$420,000
$350,000
$616,100
$590,000
$3,599,140
$422,133
$5,126,600
$407,000
$2,872,000
$787,950
$560,232
$362,137
$1,212,879
$1,851,000
$1,006,284
$625,000
$75,000
$758,100
$2,113,325
$1,254,000
$635,000
$743,477
$104,000
$297,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
*
Rank
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
System
Comfrey
Comfrey
Silver Lake
Hanska
Hanska
Paynesville
Cuyuna
Cuyuna
Cuyuna
Alden
Aurora
Aurora
Oslo
Lincoln-Pipestone RWS
Saint Paul Regional Water Services
Saint Paul Regional Water Services
Waseca
Minneapolis
Minneapolis
Richmond
Lowry
Lowry
Winsted
Stewart
Stewart
Baudette
Henderson
Harris
Montrose
Montrose
Brooklyn Park
Brooklyn Park
Drinking Water Protection Section
651-201-4700
Project
Watermain - Replace Cast Iron Main
Conservation - Replace Meters
Storage - New 115,000 Gallon Tank
Source - Replace Well #1 with #4
Watermain - Repl Transite Main - Phase 2
Distribution - Booster Station
Storage - Replace with New Tower
Watermain - Replace for City
Conservation - Replace Meters
Conservation - Replace Meters
Treatment - Renovate Plant
Storage - Replace Ground Storage
Watermain - Replace & Looping
Watermain - Connection to Lewis & Clark
Other - Repl McCarrons Elec. Equipment
Treatment - Repl High Service Pump
Watermain - Replace Elm Ave
Treatment - Fridley Plant Rehab
Treatment - Recarb Improvements
Storage - Recoat 70,000 Gallon Tower
Storage - New 50,000 Gallon Tower
Storage - Demolish Tower
Storage - Tower Rehab
Storage - Repl w/100,000 Gal Tower
Watermain - Replacement
Storage - Repl w/50,000 Gal East Tower
Source - New Well #3
Storage - Tower Rehab
Treatment - Remove Fe/Mn
Storage - Repl Tower w/100,000 Gal Tower
Source - Rehab Wellhouses 2, 3, & #11
Watermain - From Well #11 to WTP
8
Project #
1080001-5
1080001-7
1430008-1
1080002-1
1080002-6
1730018-3
1180011-5
1180011-6
1180011-7
1240004-4
1690002-4
1690002-5
1450008-1
1410007-1
1620026-18
1620026-20
1810004-2
1270024-11
1270024-12
1730022-4
1610007-4
1610007-5
1430010-4
1430009-2
1430009-5
1390001-3
1720006-1
1130005-4
1860016-5
1860016-6
1270005-3
1270005-4
Priority
Points
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
360
360
837
419
419
2298
231
231
231
661
2225
2225
330
12271
422660
422660
9427
411273
411273
1325
257
257
2355
564
564
1084
886
378
2498
2498
75781
75781
Estimated
Project Cost
$1,678,000
$114,000
$598,000
$255,000
$2,335,000
$630,000
$616,800
$1,273,155
$55,650
$105,000
$155,000
$310,000
$3,812,000
$8,687,000
$7,536,000
$700,000
$2,917,000
$51,000,000
$7,030,000
$92,000
$675,583
$45,000
$800,000
$635,747
$1,123,799
$650,000
$359,864
$149,900
$7,000,000
$598,500
$1,825,000
$1,150,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
*
*
Rank
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
System
Brooklyn Park
Coon Rapids
Buffalo
Burnsville
Burnsville
Big Lake
Coon Rapids
Belle Plaine
Lake Elmo
Cold Spring
Maple Plain
Hanska
Hanska
South Bend Township
Bird Island
Atwater
Atwater
Plato
Plato
Elgin
Biscay
Madison Lake
Rice
Rice
Glyndon
Eagle Lake
Courtland
Cold Spring
Rice Lake
Rice Lake
Waverly
Randolph
Drinking Water Protection Section
651-201-4700
Project
Watermain - Replace CSAH 103
Storage - Repl East Tower w/1.5 MG Tower
Watermain - Replace Southeast
Conservation - Replace Meters
Treatment - Groundwater Plant Rehab
Source - Additional Well #8
Storage - Baffle Wall in West Reservoir
Source - Replace Well #1 with #5
Extension - SW Area, Well Contam
Source - Replace Wells 4, 5, & 6
Source - New Well #4 & Test Well
Treatment - New Plant, Remove Fe/Mn
Watermain - One Loop
Source - New Well & Transite Main
Watermain - SE Loop to Plant
Watermain - Loop North
Watermain - Loop South
Source - Additional Well #4
Treatment - New Plant, Remove Fe/Mn
Watermain-Rolling Hills Interconnection
Source - Backup Well #2
Watermain - Repl 4th & 5th, Loop 227th
Source - Adtl Well #4
Watermain - Looping
Watermain - Looping Two Areas
Treatment - New Plant, Remove Fe/Mn
Treatment - Rehab Plant & New Well #5
Treatment - Nitrate, Fe & Mn Removal
Watermain - East Calvary Road Loop
Watermain - Martin Road Loop
Treatment - Wellhouse Rehab
Source New Well, Rehab Wellhouse
9
Project #
1270005-5
1020017-1
1860005-6
1190002-1
1190002-2
1710002-5
1020017-2
1700001-1
1820009-3
1730006-3
1270021-4
1080002-2
1080002-5
1070026-5
1650001-3
1340001-5
1340001-7
1430007-1
1430007-2
1790001-2
1430001-1
1070007-6
1050002-4
1050002-7
1140005-5
1070002-2
1520001-4
1730006-2
1690049-1
1690049-2
1860019-6
1190025-1
Priority
Points
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
8.0
8.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
PHI
No
No
No
No
No
No
No
No
Yes
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
75781
61476
12120
61262
61262
9000
61476
5000
3639
4053
1768
419
419
325
1042
1090
1090
355
355
981
109
935
1279
1279
1393
2070
611
4053
650
650
997
355
Estimated
Project Cost
$1,928,859
$4,075,000
$2,200,000
$7,388,970
$5,507,400
$1,350,000
$275,000
$505,000
$6,075,000
$841,000
$585,000
$1,352,000
$405,000
$920,300
$444,000
$289,000
$180,000
$475,000
$2,655,375
$242,088
$42,000
$831,417
$80,000
$300,000
$535,000
$3,500,000
$1,660,000
$5,705,000
$1,740,538
$1,300,000
$340,000
$888,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
*
*
*
*
*
*
Rank
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
System
Becker
Cologne
Cologne
Oronoco
Minnetrista
Ghent
Hanska
Bird Island
Atwater
Waldorf
Waldorf
Waldorf
Plato
Racine
Proctor
Hokah
Barnesville
Blomkest
Brownton
Raymond
Madison Lake
Madison Lake
Rice
Cottonwood
Ghent
Lewiston
Courtland
Cold Spring
Hampton
Waverly
Lonsdale
Randolph
Drinking Water Protection Section
651-201-4700
Project
Source - Additional Well #7
Treatment - New Plant, Remove Fe/Mn
Source - New Well
Watermain - Extend SW, Priv Well Cont.
Treatment - Two Plants
Storage - New 50,000 Gal Tower
Storage - Repl w/100,000 Gal Tower
Other - Backup Generator
Watermain - Replace North
Treatment - Plant Rehab & Well Valves
Storage - Tower Rehab
Watermain - Replace with Meters
Storage - Repl w/100,000 Gallon Tower
Storage - New 75,000 Gal Tower
Watermain - Replace Various Blocks
Watermain - Repl STH 44
Watermain - Replacement - Phase 1
Storage - 20,000 Gal Ground Tank
Watermain - Replace Various Streets
Watermain - Repl Day St./ Emerson Ave.
Treatment - New Fe/Mn Plant for Well #3
Conservation - Replace Meters
Treatment - Plant Rehab
Watermain - Repl Cast Iron Mains
Conservation - Replace Meters
Conservation - Replace Meters
Storage - Replace w/100,000 Gal Tower
Distribution - Raw Water Line from Wells
Watermain - Replace Cast Iron Main
Watermain - Interconnect
Watermain - Repl Cast Iron Main - Area 5
Storage - Tower Rehab
10
Project #
1710008-1
1100004-4
1100004-5
1550036-2
1270036-3
1420004-1
1080002-3
1650001-4
1340001-4
1810003-1
1810003-2
1810003-3
1430007-3
1500012-1
1690042-4
1280004-1
1140001-4
1340002-1
1430002-4
1340008-1
1070007-5
1070007-7
1050002-5
1420002-1
1420004-2
1850006-5
1520001-1
1730006-4
1190010-4
1860019-4
1660006-2
1190025-2
Priority
Points
7.0
7.0
7.0
7.0
7.0
6.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
PHI
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
Pop.
4297
1519
1519
600
2913
364
419
1042
1090
227
227
227
355
425
2854
572
2600
186
807
764
935
935
1279
1212
364
1507
579
4053
763
997
3800
355
Estimated
Project Cost
$639,000
$7,375,587
$326,759
$1,800,000
$9,800,000
$660,000
$638,000
$158,250
$350,000
$389,870
$439,840
$2,080,300
$841,000
$726,000
$1,807,404
$377,400
$2,600,000
$431,638
$1,992,000
$660,000
$705,000
$110,000
$500,000
$570,434
$98,000
$204,000
$1,085,000
$1,771,000
$643,250
$1,485,400
$1,752,300
$375,000
10/4/2016
PRIORITY ORDER
Minnesota Drinking Water Revolving Loan Fund
2017 Project Priority List
New
*
*
Rank
321
322
323
324
325
326
327
328
329
330
System
Belle Plaine
Darwin
Darwin
Cologne
Empire Township
Carver
Carver
Chanhassen
Minnetrista
Minnetrista
Project
Treatment - RO for Vulnerability
Watermain - Replace Main
Conservation - Install Meters
Source - Well #1 Rehab
Treatment - New Plant, Remove Ra, Fe, Mn
Storage - Recoat 100,000 Gal Tower
Treatment - New Skid Plant & New Well #5
Treatment - West Fe/Mn Plant
Storage - New 0.5 MG Tower
Watermain - South/Central Connection
Project #
1700001-3
1470002-2
1470002-3
1100004-1
1190009-2
1100017-3
1100017-6
1100001-1
1270036-4
1270036-5
Total
Drinking Water Protection Section
651-201-4700
11
Priority
Points
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
PHI
No
No
No
No
No
No
No
No
No
No
Pop.
5002
244
244
1519
1300
1300
4000
23179
2913
2913
Estimated
Project Cost
$1,215,000
$922,000
$140,000
$24,000
$7,500,000
$272,000
$2,840,000
$18,360,000
$2,400,000
$2,800,000
$558,953,131
10/4/2016