COMMUNITY PRESENTATION DECEMBER 15, 2015 THOMAS S. WOOTTON HIGH SCHOOL FEASIBILITY STUDY Community Presentation December 15, 2015 1 COMMUNITY PRESENTATION DECEMBER 15, 2015 CAPITAL IMPROVEMENTS PROGRAM (CIP) z FEASIBILITY STUDY JULY 2015 - JAN. 2016 z DESIGN TO CONSTRUCTION FALL 2016 - SPRING 2019 z CONSTRUCTION JUL. 2019 - AUG. 2021 2 COMMUNITY PRESENTATION DECEMBER 15, 2015 PROGRAM CLASSROOMS CLASSR CLA CLASSROOM SSROOM OOMS S CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION NET SQUARE FOOTAGE: GROSS SQUARE FOOTAGE: (65% EFFICIENCY) SPECIAL S CCD EDUCATION E BUILDING ESOL SERVICES ART ADMIN ADMIN COUNSE COU COUNSELING NSELIN LING G HEALTH HEALTH CCRD SCIENCE SC SCIENC SCI ENCE NCE TECH PHYSICAL EDUCATION 249,820 SF 384,338 SF MEDIA CENTER AUDITORIUM AOIT STUDENT DINING 3 COMMUNITY PRESENTATION DECEMBER 15, 2015 EXISTING SITE PLAN TENNIS COURTS ROBERT FROST MIDDLE SCHOOL SOFTBALL FIELD BASEBALL FIELD PRACTICE FIELD STADIUM WOOTT ON PAR KWAY DROP OFF KING STUDENT PARKING EXISTING SCHOOL STAFF PAR TENNIS COURTS GYM ENTRY MAIN ENTRY BUSES AUDITORIUM ENTRY 4 COMMUNITY PRESENTATION DECEMBER 15, 2015 EXISTING GROUND FLOOR SECOND GYM CCD BUILDING ABOVE AUX GYM LOCKER ROOMS -16’-10” AUX GYM BUILDING SERVICES TECHNOLOGY WEIGHT GYM -13’-4” BOILER KITCHEN DINING -13’-4” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 5 COMMUNITY PRESENTATION DECEMBER 15, 2015 EXISTING FIRST FLOOR CLASSROOMS CLASSROOMS COURTYARD GYM BELOW COURTYARD CLASSROOMS CLASSROOMS MAIN GYM 0’ COURTYARD COMMONS MUSIC SUITE HEATLH SUITE MEDIA CENTER STAGE ART SUITE COURTYARD COUNS SUITE ADMIN OFFICES CLASSROOMS 0’ AUDITORIUM 3’-8” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 6 COMMUNITY PRESENTATION DECEMBER 15, 2015 EXISTING SECOND FLOOR CLASSROOMS CLASSROOMS CLASSROOMS 13’-4” CLASSROOMS GYM BELOW CLASSROOMS SCIENCE SUITE CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 7 COMMUNITY PRESENTATION DECEMBER 15, 2015 SITE PLAN - OPTION 1 BASEBALL FIELD SOFTBALL FIELD PRACTICE FIELD PRACTICE FIELD EXISTING SCHOOL TO BE RENOVATED STADIUM AUDITORIUM ENTRY MAIN ENTRY NEW ADDITION BUSES - 30 PARKING - 60 WOOTT ON PAR KWAY PARKING PARKING 160 DROP OFF - 231 BL EA CH ER S BL EA CH ER S TENNIS BUS STACKING - 30 CAR STACKING - 40 PROP PARKING - 451 EXIST PARKING - 472 8 COMMUNITY PRESENTATION DECEMBER 15, 2015 SITE PLAN - OPTION 1 AUDITORIUM ENTRY NEW ADDITION PARKING MAIN ENTRY DROP OFF PARKING 160 - 231 EXISTING SCHOOL TO BE RENOVATED BUSES - 30 PARKING - 60 WOOTTON P ARKWAY 9 COMMUNITY PRESENTATION DECEMBER 15, 2015 GROUND FLOOR - OPTION 1 TENNIS HEALTH CCD AUX. GYMS COURTYARD -13’-4” -16’-10” AUX. GYM EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED LOCKERS LOBBY -16’-4” HEALTH SUITE -16’-10” ADMIN SUITE COUNSL SUITE -16’-4” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 10 COMMUNITY PRESENTATION DECEMBER 15, 2015 FIRST FLOOR - OPTION 1 PRACTICE FIELDS PRACTICE FIELDS CLASSROOMS CLASSROOMS -19’-8” 0’ AUXILIARY GYMS COURTYARD COURTYARD 0’ LFI MECHANICAL SPEC. ED. STAFF SUPP. COURTYARD CLASSROOMS -16’-10” SECOND GYM SCB AUDITORIUM STAGE MAIN GYM 0’ COMMONS COURTYARD MUSIC SUITE ART SUITE COMMONS 0’ CLASSROOMS MEDIA CENTER -13’-4” TV COURTYARD STAFF SUPP. EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED 3’-8” 0’ CLASSROOMS 3’-8” KITCHEN COMMONS DINING 3’-8” 3’-8” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 0’ 11 COMMUNITY PRESENTATION DECEMBER 15, 2015 SECOND FLOOR - OPTION 1 PRACTICE FIELDS PRACTICE FIELDS CLASSROOMS 19’-8” CLASSROOMS COURTYARD LOBBY 13’-4” ROOF LFI COURTYARD AUDITORIUM 13’-4” STAFF SUPP. COURTYARD SCB SPEC. ED. 13’-4” GYMNASIUMS COMMONS ROOF COURTYARD ROOF COLLEGE INSTITUTE STAFF SUPP. FLY LOFT MUSIC CLASSROOMS ROOF MEDIA CENTER STAFF SUPP. CLASSROOMS COURTYARD AOIT LABS 13’-4” STUD. ACT. CLASSROOMS DINING EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 12 COMMUNITY PRESENTATION DECEMBER 15, 2015 THIRD FLOOR - OPTION 1 COURTYARD ROOF COURT YARD COURT YARD ROOF FLY LOFT ROOF GYMNASIUMS COURTYARD ROOF MP LAB ENGINEERING LAB COMP. LAB COMP. LAB TECHNOLOGY LABS STAFF SUPP. AUDITORIUM ROOF STAFF SUPP. 28’-0” ROOF ROOF ROOF SCIENCE SUITE COURTYARD SCIENCE SUITE SCIENCE SUITE EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 13 COMMUNITY PRESENTATION DECEMBER 15, 2015 SITE PLAN - OPTION 2 BASEBALL FIELD SOFTBALL FIELD TENNIS PRACTICE FIELD EXISTING SCHOOL TO BE RENOVATED STADIUM NEW ADDITION BUSES - 30 WOOTT ON PAR KWAY PARKING - 61 - 235 MAIN ENTRY PARKING PARKING 160 DROP OFF AUDITORIUM ENTRY BUS STACKING - 30 CAR STACKING - 40 PROP PARKING - 456 EXIST PARKING - 472 14 COMMUNITY PRESENTATION DECEMBER 15, 2015 SITE PLAN - OPTION 2 NEW ADDITION - 235 MAIN ENTRY DROP OFF PARKING 160 AUDITORIUM ENTRY PARKING EXISTING SCHOOL TO BE RENOVATED BUSES - 30 PARKING - 61 WOOTTON P ARKWAY 15 COMMUNITY PRESENTATION DECEMBER 15, 2015 GROUND FLOOR - OPTION 2 TENNIS HEALTH CCD AUX. GYMS COURTYARD -13’-4” -16’-10” LOCKERS EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED LOBBY -13’-4” STUDENT ACTIVITIES HEALTH SUITE ADMIN SUITE COUNSL SUITE -13’-4” -13’-4” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 0’ 16 COMMUNITY PRESENTATION DECEMBER 15, 2015 FIRST FLOOR - OPTION 2 PRACTICE FIELDS 19’-8” TECHNOLOGY LAB CLASSROOMS AOIT LABS 3’-8” ENGINEERING LAB CLASSROOMS 0’ COURTYARD COURTYARD MP LAB AUX. GYMS LFI COURTYARD MUSIC SUITE STAFF SUPP. COURTYARD SCB CLASSROOMS -16’-10” SECOND GYM MAIN GYM STAFF SUPP. LOBBY 3’-8” 0’ COMMONS AUDITORIUM COURTYARD ART SUITE 0’ COMMONS 3’-8” CLASSROOMS TV MEDIA CENTER -13’-4” STAGE KITCHEN COURTYARD STAFF SUPP. DINING CLASSROOMS 12’ EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 0’ 3’-8” 17 COMMUNITY PRESENTATION DECEMBER 15, 2015 SECOND FLOOR - OPTION 2 SCIENCE SUITE CLASSROOMS CLASSROOMS COURTYARD COURTYARD ROOF LFI COURTYARD 13’-4” MUSIC SPEC. ED. GYMNASIUMS 13’-4” SPEC. ED. STAFF SUPP. COURTSCB YARD ROOF COMMONS AUDITORIUM COURTYARD CLASSROOMS ROOF FLY LOFT COLLEGE INSTITUTE MEDIA CENTER STAFF SUPP. CLASSROOMS ROOF COURTYARD 13’-4” STUD. ACT. CLASSROOMS DINING EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 18 COMMUNITY PRESENTATION DECEMBER 15, 2015 THIRD FLOOR - OPTION 2 SCIENCE SUITE 28’-0” COURTYARD COURTYARD ROOF COURT YARD ROOF COURT YARD ROOF GYMNASIUMS COURTYARD ROOF AUDITORIUM ROOF FLY LOFT ROOF ROOF COURTYARD ROOF EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 19 COMMUNITY PRESENTATION DECEMBER 15, 2015 SITE PLAN - OPTION 3 BASEBALL FIELD SOFTBALL FIELD PRACTICE FIELD NEW ADDITION PARKING 160 DROP OFF GYM ENTRY AUDITORIUM ENTRY MAIN ENTRY PARKING - 127 WOOTT ON PAR KWAY PAR EXISTING SCHOOL TO BE RENOVATED STADIUM BUSES - 30 KING - 92 TENNIS BUS STACKING - 30 CAR STACKING - 40 PROP PARKING - 379 EXIST PARKING - 472 20 COMMUNITY PRESENTATION DECEMBER 15, 2015 GROUND FLOOR - OPTION 3 TENNIS SECOND GYM CCD -13’-4” GYM ENTRANCE LOBBY TEAM ROOMS WEIGHT GYM -16’-10” BUILDING ABOVE LOCKER ROOMS BUILDING SERVICES ENGINEER LAB -13’-4” COURTYARD TECHNOLOGY LABS MP LAB AOIT EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION -13’-4” 21 COMMUNITY PRESENTATION DECEMBER 15, 2015 FIRST FLOOR - OPTION 3 PRACTICE FIELDS ART SUITE CLASSROOMS MUSIC SUITE CLASSROOMS COURTYARD GYM BELOW 0’ LFI COURTYARD SCB COURTYARD STAGE CLASSROOMS 3’-8” 0’ MAIN GYM AUDITORIUM ACTIVITIES ENTRANCE COURTYARD COMMONS AUX GYMS HEATLH SUITE COURTYARD COUNS SUITE SCIENCE SUITE LOBBY COURTYARD COLLEGE INSTITUTE CLASSROOMS LOBBY BELOW KITCHEN DINING ADMIN OFFICES MECH EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 0’ MAIN ENTRANCE ACTIVITIES ENTRANCE 22 COMMUNITY PRESENTATION DECEMBER 15, 2015 SECOND FLOOR - OPTION 3 CLASSROOMS CLASSROOMS ROOF COURTYARD COURTYARD SPECIAL ED 13’-4” ROOF CLASSROOMS GYM BELOW COURTYARD EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED ROOF BELOW AUX GYMS BELOW CLASSROOMS COURTYARD 13’-4” SCIENCE SUITE MEDIA CENTER CLASSROOMS ROOF BELOW CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 23 COMMUNITY PRESENTATION DECEMBER 15, 2015 SITE PLAN - OPTION 4 BASEBALL FIELD SOFTBALL FIELD PRACTICE FIELDS NEW ADDITION STADIUM PARKING 160 WOOTT ON PAR DROP O FF GYM ENTRY KWAY BUSES - 92 PARKING TENNIS COURTS EXISTING SCHOOL TO BE RENOVATED AUD. ENTRY MAIN ENTRY PARKING 127 BUS STACKING - 30 CAR STACKING - 40 PROP PARKING - 379 EXIST PARKING - 472 24 COMMUNITY PRESENTATION DECEMBER 15, 2015 GROUND FLOOR - OPTION 4 HEALTH CCD SECOND GYM -13’-4” -16’-10” BUILDING ABOVE LOBBY TEAM ROOMS LOCKER ROOMS BUILDING SERVICES WEIGHT GYM -13’-4” COMMONS KITCHEN DINING -13’-4” EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION -13’-4” 25 COMMUNITY PRESENTATION DECEMBER 15, 2015 FIRST FLOOR - OPTION 4 BUILDING ABOVE CLASSROOMS 0’ CLASSROOMS ENGINEERING LABS COURTYARD GYM BELOW LFI COURTYARD SCB COURTYARD CLASSROOMS LOBBY MAIN GYM COMMONS 3’-8” MUSIC SUITE COMMONS 0’ AUX GYMS 19’-8” TECHNOLOGY LABS COURTYARD COURTYARD HEATLH SUITE MEDIA CENTER EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED 3’-8” 0’ STAGE ART SUITE COURTYARD AOIT COUNS SUITE ROOF COLLEGE INSTITUTE ADMIN OFFICES AUDITORIUM 3’-8” MECH CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 26 COMMUNITY PRESENTATION DECEMBER 15, 2015 SECOND FLOOR - OPTION 4 CLASSROOMS 0’ CLASSROOMS SCIENCE SUITE COURTYARD 19’-8” 2ND GYM ROOF BELOW CLASSROOMS COURTYARD 19’-8” COURTYARD 13’-4” GYM BELOW COMMONS COURTYARD COURTYARD STUDENT ACTIVITIES COURTYARD MECH CLASSROOMS CLASSROOMS ROOF ROOF MEDIA CENTER ROOF COURTYARD 13’-4” CLASSROOMS CLASSROOMS 3’-8” EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 0’ 27 COMMUNITY PRESENTATION DECEMBER 15, 2015 THIRD FLOOR - OPTION 4 SCIENCE SUITE COURTYARD COURTYARD COURTYARD 34’-4” COURTYARD EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED COURTYARD ROOF ROOF ROOF COURTYARD COURTYARD CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 28 COMMUNITY PRESENTATION DECEMBER 15, 2015 QUESTIONS? 29
© Copyright 2026 Paperzz