1 OCTOBER 6, 2015 THOMAS S. WOOTTON HIGH SCHOOL FEASIBILITY STUDY Work Session #1 October 6, 2015 1 1 OCTOBER 6, 2015 SAMAHA HISTORY * 60 Years of design, providing architectural, interior design, and planning services in the Washington metropolitan area. * 25 Years working with Montgomery County Public Schools. * Over 20 projects with Montgomery County Public Schools. * Over 20 School Phased Occupied Renovations Educational Experience CHILD DEVELOPMENT CENTERS ARLINGTON SERVICE CENTER BOLLING FORT MEADE FORT MYER GOOD BEGINNINGS INDIAN HEAD LORD OF LIFE NAVEL SECURITY STATION NNMC BETHESDA PATUXENT QUANTICO ST. GEORGES DAYCARE SYDENSTRICKER DAYCARE TEDDY BEAR DAYCARE ELEMENTARY SCHOOLS ALEXANDRIA COUNTRY DAY ARTHUR MIDDLETON BAILEY’S BARRETT BURTONSVILLE CRESTWOOD CUNNINGHAM PARK DANIELS RUN DR. GUSTAVUS BROWN FORESTVILLE EVA TURNER FORT BELVOIR GREAT FALLS INDIAN HEAD JACKSON ROAD JAMESTOWN MOUNT DANIEL NOTTINGHAM TUCKAHOE VIRGINIA HILLS WEYANOKE MIDDLE SCHOOLS AUBURN BETHESDA-CHEVY CHASE #2 CABIN JOHN ELKRIDGE LANDING FRANKLIN KILMER LIBERTY MACFARLAND MAYFIELD WOODS NORTH BETHESDA NYSMITH SCHOOL (K-8) ORMOND STONE RACHEL CARSON ROCK TERRACE TILDEN WASHINGTON IRVING WESTMINSTER(K-8) HIGH SCHOOLS ANNANDALE BROAD RUN CHANTILLY GAITHERSBURG HAYFIELD SECONDARY HENRY E. LACKEY LAKE BRADDOCK SECONDARY LEE LOUDOUN VALLEY MARSHALL MOUNT VERNON NORTHWEST NORTHWOOD SHERWOOD THOMAS WOOTTON THOMAS STONE WALTER JOHNSON WATKINS MILL WELLNESS * PROJECTS LOCATED IN MONTGOMERY COUNTY 2 1 OCTOBER 6, 2015 SEVEN PRINCIPLES OF DESIGN 1. Schools are centers of our communities. 2. The design of schools evolves through a community based design process. 3. The design of schools should be student centered. 4. Learning spaces should be flexible and adaptable. 5. The learning environment should be secure and healthy. 6. Technology should infuse learning. 7. The historic and urban character of the school must be respected. 3 1 OCTOBER 6, 2015 FEASIBILITY STUDY PROCESS * SPACE SUMMARY AND EDUCATIONAL SPECIFICATIONS ARE DEVELOPED * MCPS SELECTS ARCHITECT AND ENGINEERS * MCPS HIRES CONSULTANTS TO CONDUCT AN NRIFSD PLAN, GEOTECHNICAL REPORT, AND SITE SURVEY * KICK-OFF MEETING HELD TO SET UP MEETING DATES * ARCHITECT AND ENGINEERS CONDUCT A PRELIMINARY EXISTING CONDITIONS SURVEY * NOTIFICATIONS ARE SENT TO THE SCHOOL AND COMMUNITY INVITING THEM TO PARTICIPATE IN THE FEASIBILITY STUDY WORK SESSIONS * EASEMENTS OR RIGHT-OF-WAY ARE IDENTIFIED ON SITE * ARCHITECT PRESENTS POSSIBLE DESIGN SOLUTIONS FOR THE PROJECT AT EACH WORK SESSION. THE DESIGNS WILL BE REVISED PER STAFF, STUDENT, AND COMMUNITY INPUT. * PRELIMINARY CODE ANALYSIS IS COMPLETED * PRELIMINARY PROJECT PHASING WILL BE DEVELOPED * COST ESTIMATES FOR EACH OF THE FINAL THREE OPTIONS WILL BE PROVIDED FOR BUDGETING PURPOSES * FINAL OPTIONS WILL BE PRESENTED TO THE MCPS DOC DIRECTOR FOR REVIEW AND APPROVAL * ARCHITECT PREPARES DRAFT FEASIBILITY STUDY REPORT FOR MCPS REVIEW * FINAL FEASIBILITY STUDY REPORT WILL BE DISTRIBUTED TO THE SCHOOL AND COMMUNITY STAKEHOLDERS * FEASIBILITY STUDY WILL BE SUBMITTED TO MSDE FOR REVIEW * PROJECT WILL BE INCLUDED IN THE NEXT CIP FOR CONSIDERATION 4 1 OCTOBER 6, 2015 SITE ISSUES * EXISTING STADIUM TO REMAIN * BUS LOADING * STUDENT DROP OFF * VIEW TO SERVICE AREA/RECEIVING * LIMITED SPACE FOR ADDITION * GRADE CHANGES BUILDING ISSUES * EXISTING WINDOWLESS SPACES * EXISTING AUDITORIUM SEATS 1,200 * EXISTING SPACES DO NOT MEET CURRENT EDUCATION SPECIFICATIONS * EXISTING GYM ENTRY HAS A LOW PROFILE CONSTRUCTION ISSUES * PHASED OCCUPIED CONSTRUCTION 5 1 OCTOBER 6, 2015 PROGRAM CLASSROOMS CLASSR CLA CLASSROOM SSROOM OOMS S CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION NET SQUARE FOOTAGE: GROSS SQUARE FOOTAGE: (65% EFFICIENCY) SPECIAL S CCD EDUCATION E BUILDING ESOL SERVICES ART ADMIN ADMIN COUNSE COU COUNSELING NSELIN LING G HEALTH HEALTH CCRD SCIENCE SC SCIENC SCI ENCE NCE TECH PHYSICAL EDUCATION 249,820 SF 384,338 SF MEDIA CENTER AUDITORIUM AOIT STUDENT DINING 6 1 OCTOBER 6, 2015 EXISTING SITE PLAN STAFF PARKING BASEBALL FIELD AUDITORIUM ENTRY TENNIS COURTS MAIN ENTRY PRACTICE FIELD BUSES EXISTING SCHOOL GYM ENTRY ROBERT FROST MIDDLE SCHOOL STUDENT PARKING SOFTBALL FIELD FOOTBALL FIELD WOOTT ON PAR KWAY DROP OFF 7 1 OCTOBER 6, 2015 EXISTING GROUND FLOOR SECOND GYM CCD BUILDING ABOVE AUX GYM LOCKER ROOMS -16’-10” AUX GYM BUILDING SERVICES TECHNOLOGY WEIGHT GYM -13’-4” BOILER KITCHEN DINING -13’-4” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 8 1 OCTOBER 6, 2015 EXISTING FIRST FLOOR CLASSROOMS CLASSROOMS COURTYARD GYM BELOW COURTYARD CLASSROOMS CLASSROOMS MAIN GYM 0’ COURTYARD COMMONS MUSIC SUITE HEATLH SUITE MEDIA CENTER STAGE ART SUITE COURTYARD COUNS SUITE ADMIN OFFICES CLASSROOMS 0’ AUDITORIUM 3’-8” CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 9 1 OCTOBER 6, 2015 EXISTING SECOND FLOOR CLASSROOMS CLASSROOMS CLASSROOMS 13’-4” CLASSROOMS GYM BELOW CLASSROOMS SCIENCE SUITE CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 10 1 OCTOBER 6, 2015 SITE PLAN - OPTION 1A RKING STAFF PA BUSES BASEBALL FIELD AUDITORIUM ENTRY NEW ADDITION EXISTING SCHOOL TO BE RENOVATED MAIN ENTRY GYM ENTRY DROP OFF STUDENT PARKING SOFTBALL FIELD FOOTBALL FIELD WOOTT ON PAR KWAY TENNIS COURTS BUS STACKING - 22 CAR STACKING - 40 STAFF PARKING - 180 STUDENT PARKING - 150 11 1 OCTOBER 6, 2015 GROUND FLOOR - OPTION 1A HEALTH CCD SECOND GYM -13’-4” BUILDING ABOVE LOBBY -16’-10” TEAM ROOMS LOCKER ROOMS BUILDING SERVICES WEIGHT GYM -13’-4” COMMONS KITCHEN DINING -13’-4” EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION -13’-4” 12 1 OCTOBER 6, 2015 FIRST FLOOR - OPTION 1A 0’ BUILDING ABOVE CLASSROOMS ENGINEERING LABS CLASSROOMS COURTYARD 10’-8” GYM BELOW LFI COURTYARD TECHNOLOGY LABS SCB COURTYARD CLASSROOMS MAIN GYM MUSIC SUITE COMMONS 0’ AUX GYMS 3’-8” COURTYARD COURTYARD HEATLH SUITE MEDIA CENTER 0’ 3’-8” EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED STAGE ART SUITE COURTYARD AOIT COUNS SUITE COLLEGE INSTITUTE ADMIN OFFICES AUDITORIUM 3’-8” MECH CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 13 1 OCTOBER 6, 2015 SECOND FLOOR - OPTION 1A CLASSROOMS CLASSROOMS SCIENCE SUITE 18’-4” CLASSROOMS 13’-4” GYM BELOW CLASSROOMS CLASSROOMS STUDENT ACTIVITIES CLASSROOMS CLASSROOMS EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 14 1 OCTOBER 6, 2015 THIRD FLOOR - OPTION 1A SCIENCE SUITE 33’ EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 15 1 OCTOBER 6, 2015 SITE PLAN - OPTION 2A RKING STAFF PA AUDITORIUM ENTRY BUSES BASEBALL FIELD NEW ADDITION EXISTING SCHOOL TO BE RENOVATED PRACTICE FIELD GYM ENTRY DROP OFF STUDENT PARKING SOFTBALL FIELD FOOTBALL FIELD MAIN ENTRY WOOTT ON PAR KWAY TENNIS COURTS BUS STACKING - 22 CAR STACKING - 40 STAFF PARKING - 180 STUDENT PARKING - 150 16 1 OCTOBER 6, 2015 GROUND FLOOR - OPTION 2A CCD SECOND GYM -13’-4” LOBBY TEAM ROOMS -16’-10” BUILDING ABOVE LOCKER ROOMS WEIGHT GYM BUILDING SERVICES ENGINEER LAB -13’-4” COURTYARD TECHNOLOGY LABS MP LAB AOIT EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION -13’-4” 17 1 OCTOBER 6, 2015 FIRST FLOOR - OPTION 2A ART SUITE CLASSROOMS MUSIC SUITE CLASSROOMS COURTYARD GYM BELOW LFI COURTYARD SCB COURTYARD STAGE CLASSROOMS AUDITORIUM 0’ MAIN GYM COURTYARD COMMONS HEATLH SUITE COURTYARD SCIENCE SUITE COUNS SUITE ADMIN OFFICES COURTYARD AUX GYMS CLASSROOMS COLLEGE INSTITUTE EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED 3’-8” LOBBY KITCHEN DINING MECH CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 18 1 OCTOBER 6, 2015 SECOND FLOOR - OPTION 2A CLASSROOMS CLASSROOMS SPECIAL ED CLASSROOMS GYM BELOW CLASSROOMS COURTYARD 13’-4” SCIENCE SUITE MEDIA CENTER CLASSROOMS EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 19 1 OCTOBER 6, 2015 SITE PLAN - OPTION 3A G T PARKIN STUDEN FF O P O DR ACTIVITY ENTRY NEW ADDITION BASEBALL FIELD ACTIVITY ENTRY EXISTING SCHOOL TO BE RENOVATED STUDENT PARKING NEW ADDITION TENNIS COURTS BUSES MAIN ENTRY STAFF PARKING SOFTBALL FIELD FOOTBALL FIELD WOOTT ON PAR KWAY PRACTICE FIELD BUS STACKING - 18 CAR STACKING - 55 STAFF PARKING - 150 STUDENT PARKING - 200 20 1 OCTOBER 6, 2015 GROUND FLOOR - OPTION 3A HEALTH COURTYARD CCD AOIT STUDENT ACTIVITIES COUNS SUITE COLLEGE INSTITUTE LOBBY -13’-4” -16’-10” ADMIN SUITE HEATLH SUITE EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 21 1 OCTOBER 6, 2015 FIRST FLOOR - OPTION 3A CLASSROOMS CLASSROOMS 0’ TEAM ROOMS LOCKER ROOMS COURTYARD 0’ MUSIC SUITE LFI COURTYARD 0’ SCB LOBBY CLASSROOMS ENGINEERING LAB AUDITORIUM COMMONS MP LAB TECHNOLOGY LAB COURTYARD ART SUITE COURTYARD ART SUITE 3’-8” EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED STAGE KITCHEN 0’ CLASSROOMS COURTYARD COMMONS DINING COURTYARD MEDIA CENTER 3’-8” CLASSROOMS CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 22 1 OCTOBER 6, 2015 SECOND FLOOR - OPTION 3A SECOND GYM CLASSROOMS MAIN GYM CLASSROOMS 13’-4” 16’ CLASSROOMS AUX GYMS 8’ SPEC ED 0’ LOBBY CLASSROOMS SCIENCE SUITE SPEC ED SCIENCE SUITE 13’-4” EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 23 1 OCTOBER 6, 2015 THIRD FLOOR - OPTION 3A EXISTING BUILDING OUTLINE NEW BUILDING OUTLINE EXISTING TO BE RENOVATED CLASSROOMS 28’ CLASSROOMS CLASSROOMS CLASSROOM SUPPORT SCIENCE AND TECHNOLOGY SCIENCE AND TECH SUPPORT ARTS AND MUSIC ARTS AND MUSIC SUPPORT ACTIVITIES ACTIVITIES SUPPORT ADMINISTRATION SERVICES CIRCULATION 24 1 OCTOBER 6, 2015 QUESTIONS? Feasibility Study Work Session Schedule Work Session #1 October 6, 2015 2:45 pm Work Session #2 October 22, 2015 7:00 pm Work Session #3 November 4, 2015 2:45 pm Work Session #4 December 2, 2015 7:00 pm Community Presentation December 15, 2015 7:00 pm 25
© Copyright 2026 Paperzz