TSWHS_WS1Presentation

1
OCTOBER 6, 2015
THOMAS S. WOOTTON
HIGH SCHOOL
FEASIBILITY STUDY
Work Session #1
October 6, 2015
1
1
OCTOBER 6, 2015
SAMAHA HISTORY
* 60 Years of design, providing architectural, interior design, and planning services
in the Washington metropolitan area.
* 25 Years working with Montgomery County Public Schools.
* Over 20 projects with Montgomery County Public Schools.
* Over 20 School Phased Occupied Renovations
Educational Experience
CHILD DEVELOPMENT CENTERS
ARLINGTON SERVICE CENTER
BOLLING
FORT MEADE
FORT MYER
GOOD BEGINNINGS
INDIAN HEAD
LORD OF LIFE
NAVEL SECURITY STATION
NNMC BETHESDA
PATUXENT
QUANTICO
ST. GEORGES DAYCARE
SYDENSTRICKER DAYCARE
TEDDY BEAR DAYCARE
ELEMENTARY SCHOOLS
ALEXANDRIA COUNTRY DAY
ARTHUR MIDDLETON
BAILEY’S
BARRETT
BURTONSVILLE
CRESTWOOD
CUNNINGHAM PARK
DANIELS RUN
DR. GUSTAVUS BROWN
FORESTVILLE
EVA TURNER
FORT BELVOIR
GREAT FALLS
INDIAN HEAD
JACKSON ROAD
JAMESTOWN
MOUNT DANIEL
NOTTINGHAM
TUCKAHOE
VIRGINIA HILLS
WEYANOKE
MIDDLE SCHOOLS
AUBURN
BETHESDA-CHEVY CHASE #2
CABIN JOHN
ELKRIDGE LANDING
FRANKLIN
KILMER
LIBERTY
MACFARLAND
MAYFIELD WOODS
NORTH BETHESDA
NYSMITH SCHOOL (K-8)
ORMOND STONE
RACHEL CARSON
ROCK TERRACE
TILDEN
WASHINGTON IRVING
WESTMINSTER(K-8)
HIGH SCHOOLS
ANNANDALE
BROAD RUN
CHANTILLY
GAITHERSBURG
HAYFIELD SECONDARY
HENRY E. LACKEY
LAKE BRADDOCK SECONDARY
LEE
LOUDOUN VALLEY
MARSHALL
MOUNT VERNON
NORTHWEST
NORTHWOOD
SHERWOOD
THOMAS WOOTTON
THOMAS STONE
WALTER JOHNSON
WATKINS MILL WELLNESS
* PROJECTS LOCATED IN MONTGOMERY COUNTY
2
1
OCTOBER 6, 2015
SEVEN PRINCIPLES OF DESIGN
1. Schools are centers of our communities.
2. The design of schools evolves through a
community based design process.
3. The design of schools should be
student centered.
4. Learning spaces should be flexible and
adaptable.
5. The learning environment should be
secure and healthy.
6. Technology should infuse learning.
7. The historic and urban character of the
school must be respected.
3
1
OCTOBER 6, 2015
FEASIBILITY STUDY PROCESS
* SPACE SUMMARY AND EDUCATIONAL SPECIFICATIONS ARE DEVELOPED
* MCPS SELECTS ARCHITECT AND ENGINEERS
* MCPS HIRES CONSULTANTS TO CONDUCT AN NRIFSD PLAN, GEOTECHNICAL REPORT, AND
SITE SURVEY
* KICK-OFF MEETING HELD TO SET UP MEETING DATES
* ARCHITECT AND ENGINEERS CONDUCT A PRELIMINARY EXISTING CONDITIONS SURVEY
* NOTIFICATIONS ARE SENT TO THE SCHOOL AND COMMUNITY INVITING THEM TO
PARTICIPATE IN THE FEASIBILITY STUDY WORK SESSIONS
* EASEMENTS OR RIGHT-OF-WAY ARE IDENTIFIED ON SITE
* ARCHITECT PRESENTS POSSIBLE DESIGN SOLUTIONS FOR THE PROJECT AT EACH WORK
SESSION. THE DESIGNS WILL BE REVISED PER STAFF, STUDENT, AND COMMUNITY INPUT.
* PRELIMINARY CODE ANALYSIS IS COMPLETED
* PRELIMINARY PROJECT PHASING WILL BE DEVELOPED
* COST ESTIMATES FOR EACH OF THE FINAL THREE OPTIONS WILL BE PROVIDED FOR
BUDGETING PURPOSES
* FINAL OPTIONS WILL BE PRESENTED TO THE MCPS DOC DIRECTOR FOR REVIEW AND
APPROVAL
* ARCHITECT PREPARES DRAFT FEASIBILITY STUDY REPORT FOR MCPS REVIEW
* FINAL FEASIBILITY STUDY REPORT WILL BE DISTRIBUTED TO THE SCHOOL AND
COMMUNITY STAKEHOLDERS
* FEASIBILITY STUDY WILL BE SUBMITTED TO MSDE FOR REVIEW
* PROJECT WILL BE INCLUDED IN THE NEXT CIP FOR CONSIDERATION
4
1
OCTOBER 6, 2015
SITE ISSUES
* EXISTING STADIUM TO REMAIN
* BUS LOADING
* STUDENT DROP OFF
* VIEW TO SERVICE AREA/RECEIVING
* LIMITED SPACE FOR ADDITION
* GRADE CHANGES
BUILDING ISSUES
* EXISTING WINDOWLESS SPACES
* EXISTING AUDITORIUM SEATS 1,200
* EXISTING SPACES DO NOT MEET CURRENT EDUCATION SPECIFICATIONS
* EXISTING GYM ENTRY HAS A LOW PROFILE
CONSTRUCTION ISSUES
* PHASED OCCUPIED CONSTRUCTION
5
1
OCTOBER 6, 2015
PROGRAM
CLASSROOMS
CLASSR
CLA
CLASSROOM
SSROOM
OOMS
S
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
NET SQUARE FOOTAGE:
GROSS SQUARE FOOTAGE:
(65% EFFICIENCY)
SPECIAL
S
CCD
EDUCATION
E
BUILDING
ESOL SERVICES
ART
ADMIN
ADMIN
COUNSE
COU
COUNSELING
NSELIN
LING
G
HEALTH
HEALTH
CCRD
SCIENCE
SC
SCIENC
SCI
ENCE
NCE
TECH
PHYSICAL
EDUCATION
249,820 SF
384,338 SF
MEDIA
CENTER
AUDITORIUM
AOIT
STUDENT
DINING
6
1
OCTOBER 6, 2015
EXISTING SITE PLAN
STAFF PARKING
BASEBALL FIELD
AUDITORIUM ENTRY
TENNIS COURTS
MAIN ENTRY
PRACTICE
FIELD
BUSES
EXISTING SCHOOL
GYM
ENTRY
ROBERT FROST MIDDLE SCHOOL
STUDENT PARKING
SOFTBALL
FIELD
FOOTBALL FIELD
WOOTT
ON PAR
KWAY
DROP OFF
7
1
OCTOBER 6, 2015
EXISTING GROUND FLOOR
SECOND GYM
CCD
BUILDING
ABOVE
AUX
GYM
LOCKER
ROOMS
-16’-10”
AUX
GYM
BUILDING
SERVICES
TECHNOLOGY
WEIGHT
GYM
-13’-4”
BOILER
KITCHEN
DINING
-13’-4”
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
8
1
OCTOBER 6, 2015
EXISTING FIRST FLOOR
CLASSROOMS
CLASSROOMS
COURTYARD
GYM BELOW
COURTYARD
CLASSROOMS
CLASSROOMS
MAIN GYM
0’
COURTYARD
COMMONS
MUSIC
SUITE
HEATLH
SUITE
MEDIA
CENTER
STAGE
ART
SUITE
COURTYARD
COUNS
SUITE
ADMIN
OFFICES
CLASSROOMS
0’
AUDITORIUM
3’-8”
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
9
1
OCTOBER 6, 2015
EXISTING SECOND FLOOR
CLASSROOMS
CLASSROOMS
CLASSROOMS
13’-4”
CLASSROOMS
GYM BELOW
CLASSROOMS
SCIENCE
SUITE
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
10
1
OCTOBER 6, 2015
SITE PLAN - OPTION 1A
RKING
STAFF PA
BUSES
BASEBALL FIELD
AUDITORIUM ENTRY
NEW ADDITION
EXISTING SCHOOL
TO BE RENOVATED
MAIN ENTRY
GYM
ENTRY
DROP OFF
STUDENT PARKING
SOFTBALL
FIELD
FOOTBALL FIELD
WOOTT
ON PAR
KWAY
TENNIS
COURTS
BUS STACKING - 22
CAR STACKING - 40
STAFF PARKING - 180
STUDENT PARKING - 150
11
1
OCTOBER 6, 2015
GROUND FLOOR - OPTION 1A
HEALTH
CCD
SECOND GYM
-13’-4”
BUILDING
ABOVE
LOBBY
-16’-10”
TEAM
ROOMS
LOCKER
ROOMS
BUILDING
SERVICES
WEIGHT
GYM
-13’-4”
COMMONS
KITCHEN
DINING
-13’-4”
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
-13’-4”
12
1
OCTOBER 6, 2015
FIRST FLOOR - OPTION 1A
0’
BUILDING
ABOVE
CLASSROOMS
ENGINEERING
LABS
CLASSROOMS
COURTYARD
10’-8”
GYM BELOW
LFI
COURTYARD
TECHNOLOGY
LABS
SCB
COURTYARD
CLASSROOMS
MAIN GYM
MUSIC
SUITE
COMMONS
0’
AUX GYMS
3’-8”
COURTYARD
COURTYARD
HEATLH
SUITE
MEDIA
CENTER
0’
3’-8”
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
STAGE
ART
SUITE
COURTYARD
AOIT
COUNS
SUITE
COLLEGE
INSTITUTE
ADMIN
OFFICES
AUDITORIUM
3’-8”
MECH
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
13
1
OCTOBER 6, 2015
SECOND FLOOR - OPTION 1A
CLASSROOMS
CLASSROOMS
SCIENCE
SUITE
18’-4”
CLASSROOMS
13’-4”
GYM BELOW
CLASSROOMS
CLASSROOMS
STUDENT
ACTIVITIES
CLASSROOMS
CLASSROOMS
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
14
1
OCTOBER 6, 2015
THIRD FLOOR - OPTION 1A
SCIENCE
SUITE
33’
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
15
1
OCTOBER 6, 2015
SITE PLAN - OPTION 2A
RKING
STAFF PA
AUDITORIUM ENTRY
BUSES
BASEBALL FIELD
NEW ADDITION
EXISTING SCHOOL
TO BE RENOVATED
PRACTICE
FIELD
GYM
ENTRY
DROP OFF
STUDENT PARKING
SOFTBALL
FIELD
FOOTBALL FIELD
MAIN ENTRY
WOOTT
ON PAR
KWAY
TENNIS
COURTS
BUS STACKING - 22
CAR STACKING - 40
STAFF PARKING - 180
STUDENT PARKING - 150
16
1
OCTOBER 6, 2015
GROUND FLOOR - OPTION 2A
CCD
SECOND GYM
-13’-4”
LOBBY
TEAM
ROOMS
-16’-10”
BUILDING
ABOVE
LOCKER
ROOMS
WEIGHT
GYM
BUILDING
SERVICES
ENGINEER
LAB -13’-4”
COURTYARD
TECHNOLOGY
LABS
MP
LAB
AOIT
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
-13’-4”
17
1
OCTOBER 6, 2015
FIRST FLOOR - OPTION 2A
ART
SUITE
CLASSROOMS
MUSIC
SUITE
CLASSROOMS
COURTYARD
GYM BELOW
LFI
COURTYARD
SCB
COURTYARD
STAGE
CLASSROOMS
AUDITORIUM
0’
MAIN GYM
COURTYARD
COMMONS
HEATLH
SUITE
COURTYARD
SCIENCE
SUITE
COUNS
SUITE
ADMIN
OFFICES
COURTYARD
AUX GYMS
CLASSROOMS
COLLEGE
INSTITUTE
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
3’-8”
LOBBY
KITCHEN
DINING
MECH
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
18
1
OCTOBER 6, 2015
SECOND FLOOR - OPTION 2A
CLASSROOMS
CLASSROOMS
SPECIAL ED
CLASSROOMS
GYM BELOW
CLASSROOMS
COURTYARD
13’-4”
SCIENCE
SUITE
MEDIA
CENTER
CLASSROOMS
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
19
1
OCTOBER 6, 2015
SITE PLAN - OPTION 3A
G
T PARKIN
STUDEN
FF
O
P
O
DR
ACTIVITY ENTRY
NEW ADDITION
BASEBALL FIELD
ACTIVITY ENTRY
EXISTING SCHOOL
TO BE RENOVATED
STUDENT
PARKING
NEW ADDITION
TENNIS
COURTS
BUSES
MAIN ENTRY
STAFF PARKING
SOFTBALL
FIELD
FOOTBALL FIELD
WOOTT
ON PAR
KWAY
PRACTICE
FIELD
BUS STACKING - 18
CAR STACKING - 55
STAFF PARKING - 150
STUDENT PARKING - 200
20
1
OCTOBER 6, 2015
GROUND FLOOR - OPTION 3A
HEALTH
COURTYARD
CCD
AOIT
STUDENT
ACTIVITIES
COUNS
SUITE
COLLEGE
INSTITUTE
LOBBY
-13’-4”
-16’-10”
ADMIN
SUITE
HEATLH
SUITE
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
21
1
OCTOBER 6, 2015
FIRST FLOOR - OPTION 3A
CLASSROOMS
CLASSROOMS
0’
TEAM
ROOMS
LOCKER
ROOMS
COURTYARD
0’
MUSIC
SUITE
LFI
COURTYARD
0’
SCB
LOBBY
CLASSROOMS
ENGINEERING
LAB
AUDITORIUM
COMMONS
MP LAB
TECHNOLOGY
LAB
COURTYARD
ART
SUITE
COURTYARD
ART
SUITE
3’-8”
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
STAGE
KITCHEN
0’
CLASSROOMS
COURTYARD
COMMONS
DINING
COURTYARD
MEDIA
CENTER
3’-8”
CLASSROOMS
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
22
1
OCTOBER 6, 2015
SECOND FLOOR - OPTION 3A
SECOND GYM
CLASSROOMS
MAIN GYM
CLASSROOMS
13’-4”
16’
CLASSROOMS
AUX GYMS
8’
SPEC ED
0’
LOBBY
CLASSROOMS
SCIENCE
SUITE
SPEC ED
SCIENCE
SUITE
13’-4”
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
23
1
OCTOBER 6, 2015
THIRD FLOOR - OPTION 3A
EXISTING BUILDING OUTLINE
NEW BUILDING OUTLINE
EXISTING TO BE RENOVATED
CLASSROOMS
28’
CLASSROOMS
CLASSROOMS
CLASSROOM SUPPORT
SCIENCE AND TECHNOLOGY
SCIENCE AND TECH SUPPORT
ARTS AND MUSIC
ARTS AND MUSIC SUPPORT
ACTIVITIES
ACTIVITIES SUPPORT
ADMINISTRATION
SERVICES
CIRCULATION
24
1
OCTOBER 6, 2015
QUESTIONS?
Feasibility Study Work Session Schedule
Work Session #1
October 6, 2015
2:45 pm
Work Session #2
October 22, 2015
7:00 pm
Work Session #3
November 4, 2015
2:45 pm
Work Session #4
December 2, 2015
7:00 pm
Community Presentation
December 15, 2015
7:00 pm
25