March 07, 2013 MEMORANDUM OF CONFERENCE PROJECT Potomac Elementary School Modernization Feasibility Study Montgomery County Public Schools ARCHITECT’S PROJECT NO. 522030 DATE AND LOCATION Thursday March 08, 2011, Work Session #3 PRESENT * * For Montgomery County Public Schools Mr. Jim Tokar Ms. Julie Morris Ms. Linda Goldberg For Moseley Architects Mr. Jim Henderson Mr. Eric Garcia Work Session sign-in sheet attached DISCUSSIONS AND DECISIONS. The purpose of the meeting was to review the revisions made to options 1 through 4 as discussed at work session #2: 1. General comments and decisions: a. Option 1, 2 and 5 will move forward for further development. b. Each option will be placed on two site layouts. One with two entrances off of River Road and the second showing only the existing entrance. c. The computer lab should be adjacent to the media center in all options. d. Show more future classrooms. 4 at an addition and 4 portables if possible. e. Staging for drop off/ pickup is at the multipurpose room. Consider use when locating entrances. 2. Option 1: a. Classroom bar should slide to the left to create a “T” configuration to address concerns of distance and hall congestion. b. Administration is to move to the classroom bar at the River Road side, media art and music suites are to slide down to the plan south. MA-10 RE: Potomac Elementary School Modernization Feasibility Study Montgomery County Public Schools Page 2 c. March 12, 2013 Kindergarten classrooms are to move to the left to be at the intersection of wings. d. Parking along the River Road side should be double loaded. 3. Option 2: a. Eliminate space between kindergarten classrooms. b. Provide a second courtyard access between the computer lab and classroom. c. Kindergarten would be improved if classrooms are located at the intersection near the future classrooms. d. Classrooms should be clustered together. 4. Option 4: a. Long hallways b. Proximity of wings is not desirable. c. Distance between wings and length of travel distances make a connection on the plan east side necessary. Connecting wings makes the plan similar to Option 2. d. This option is eliminated from further study. 5. Option 5: a. Kindergarten classrooms are to be relocated to the left side of the new classroom wing, adjacent to the gymnasium. The above information is the writer’s recollection of the discussions and decisions at the meeting. Should there be any additions or corrections, please notify the writer within two weeks of distribution for correction. NOTES BY: REVIEWED BY: Eric Garcia Project Manager James Henderson Vice President DISTRIBUTION: As indicated by (*) above Montgomery County Public Schools POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY WORK SESSION #3 – MARCH 7, 2013 Jim Henderson, AIA, LEED BD+C Managing Principal Eric Garcia, LEED BD+C Project Manager Meeting Schedule Work Session #1 – February 6, 6:30pm Work Session #2 – February 21, 3:45pm Work Session #3 – March 7, 7:00 pm Work Session #4 – March 19, 3:45pm PTA Presentation – April 11, 7:00 pm Potomac Elementary School Modernization Study Work Session #1 – Idea Mining Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Work Session #2 1 2 4 3 5 Potomac Elementary School Modernization Study Existing Site Plan Potomac Elementary School Modernization Study Option 1.1 – Site Plan Potomac Elementary School Modernization Study Option 1.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 1 .1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 2.1 – Site Plan Potomac Elementary School Modernization Study Option 2.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 2.1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 3.1 – Site Plan Potomac Elementary School Modernization Study Option 3.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 3 .1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 5.1 – Site Plan Potomac Elementary School Modernization Study Option 5.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 5 .1 – Upper Floor Plan Potomac Elementary School Modernization Study 1.1 2.1 3.1 5.1 Potomac Elementary School Modernization Study Meeting Schedule Work Session #1 – February 6, 6:30pm Work Session #2 – February 21, 3:45pm Work Session #3 – March 7, 7:00 pm Work Session #4 – March 19, 3:45pm PTA Presentation – April 11, 7:00 pm Potomac Elementary School Modernization Study www.moseleyprojects.com Potomac Elementary School Modernization Study Montgomery County Public Schools POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY WORK SESSION #3 – MARCH 7, 2013 Jim Henderson, AIA, LEED BD+C Managing Principal Eric Garcia, LEED BD+C Project Manager Meeting Schedule Work Session #1 – February 6, 6:30pm Work Session #2 – February 21, 3:45pm Work Session #3 – March 7, 7:00 pm Work Session #4 – March 19, 3:45pm PTA Presentation – April 11, 7:00 pm Potomac Elementary School Modernization Study Work Session #1 – Idea Mining Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Work Session #2 1 2 4 3 5 Potomac Elementary School Modernization Study Existing Site Plan Potomac Elementary School Modernization Study Option 1.1 – Site Plan Potomac Elementary School Modernization Study Option 1.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 1 .1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 2.1 – Site Plan Potomac Elementary School Modernization Study Option 2.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 2.1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 3.1 – Site Plan Potomac Elementary School Modernization Study Option 3.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 3 .1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 5.1 – Site Plan Potomac Elementary School Modernization Study Option 5.1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 5 .1 – Upper Floor Plan Potomac Elementary School Modernization Study 1.1 2.1 3.1 5.1 Potomac Elementary School Modernization Study Meeting Schedule Work Session #1 – February 6, 6:30pm Work Session #2 – February 21, 3:45pm Work Session #3 – March 7, 7:00 pm Work Session #4 – March 19, 3:45pm PTA Presentation – April 11, 7:00 pm Potomac Elementary School Modernization Study www.moseleyprojects.com Potomac Elementary School Modernization Study
© Copyright 2026 Paperzz