February 22, 2013 MEMORANDUM OF CONFERENCE PROJECT Potomac Elementary School Modernization Feasibility Study Montgomery County Public Schools ARCHITECT’S PROJECT NO. 522030 DATE AND LOCATION February 21, 2011, Work Session #2 PRESENT * * For Montgomery County Public Schools Mr. Jim Tokar Ms. Julie Morris Ms. Linda Goldberg For Moseley Architects Mr. Jim Henderson Mr. Eric Garcia Work Session sign-in sheet attached DISCUSSIONS AND DECISIONS. The purpose of the meeting was to review the ideas discussed at the first work session, and present options for consideration. The following items were discussed: 1. Jim Henderson reviewed the work session activities. Based on the brainstorming exercises, a statement of the guiding principles for this modernization was presented. It reads: Potomac Elementary School Modernization Study Guiding Principles Site is efficiently laid out to promote student safety, and addresses existing circulation issues. Building design is aesthetically pleasing, naturally lit, incorporates sustainable design, encourages collaboration, and can accommodate community use. Classroom spaces are state of the art, flexible and interactive learning spaces. 2. The existing site constraints were discussed: a. There is a potential stream valley buffer on the ream valley buffer on the site near the existing softball backstop. No construction will be allowed within a 100’ radius of that buffer. b. The existing stand of mature trees on the northeast corner of the site will remain in place. MA-10 RE: Potomac Elementary School Modernization Feasibility Study Montgomery County Public Schools Page 2 c. February 22, 2013 Currently the site only has one entrance off of River Road. The Feasibility Study will explore adding a second entrance to improve site circulation. It is not known if a second entrance will be permitted at this time. The Study will develop options for both one and two entrance scenarios. 3. Five Options were presented to the attendees. Options 1 through 3 replace the existing school entirely. Options 4 and 5 re-use a significant portion of the building. Future Options will take the grade level classroom designations off of the plans. 4. Afternoon dismissal is currently from Gym. 5. Option 1 – “L” Shaped Plan a. Kindergarten away from Main Entrance to school, and close to playgrounds b. Clustering of Kindergarten classrooms is good. c. Multi-Purpose room in location good for community use, but bad for playground access. Consider moving across hallway next to gymnasium. d. All exploratory classrooms in one place may cause internal traffic flow problems. e. The “L” shaped plan allows for only one main corridor to access different parts of the building. This may be an internal traffic flow concern. f. Consider providing access from Multi-Purpose room to playground. 6. Option 2 – Courtyard Option a. Swap locations of Kindergarten and Second Grade classrooms to move Kindergarten away from main entrance. Kindergarten Classrooms close to bus loop is preferred. b. Provide second entrance / exit to courtyard. c. Consider traffic and noise along hallway between Multi-Purpose and Music / Art Classrooms. 7. Option 3 – “F” Shaped Plan a. Front door faces River Road. b. Gymnasium is in bad location for field access. c. The attendees liked that the Media Center as hub for building, across from administration. d. Consider an open stair at the south corner of the Media Center. e. Attendees did not like the linear classroom relationships. Prefer clustered classrooms. f. Internal travel distance from Art to Kindergarten is too long. Consider connecting classroom wings. RE: Potomac Elementary School Modernization Feasibility Study Montgomery County Public Schools Page 3 February 22, 2013 8. Option 4 – Three Story Existing Option a. Southeast structure of the building will be re-used. This piece of the building was chosen to be re-used because it is on two levels that can be connected with accessible ramps. The existing gym and multi-purpose rooms are smaller than the programmed sizes, and will not be re-used in this option. The existing media Center will be turned into a courtyard to allow more natural light to enter the center of the building. b. Supervision of fields is not good in this option because it requires two sides of the building to be supervised. c. The attendees did not want a three story option if possible. This Option will be dropped from consideration. 9. Option 5 – Two Story Existing Option a. This option re-uses that same portion of the existing building as Option 4. b. This option was preferred over Option 4 because of site supervision and only two stories of classrooms. The above information is the writer’s recollection of the discussions and decisions at the meeting. Should there be any additions or corrections, please notify the writer within two weeks of distribution for correction. NOTES BY: REVIEWED BY: Eric Garcia Project Manager James Henderson Vice President DISTRIBUTION: As indicated by (*) above Montgomery County Public Schools POTOMAC ELEMENTARY SCHOOL MODERNIZATION STUDY MEETING #2 - FEBRUARY 21, 2013 Jim Henderson, AIA, LEED BD+C Managing Principal Eric Garcia, LEED BD+C Project Manager Olivia Brookman, LEED BD+C Meeting Schedule Committee Meeting #1 – February 6, 6:30pm Committee Meeting #2 – February 21, 3:45pm Committee Meeting #3 – March 7, 7:00 pm Committee Meeting #4 – March 19, 3:45pm PTA Presentation – April 11, 7:00 pm Potomac Elementary School Modernization Study Idea Mining Potomac Elementary School Modernization Study Potomac Elementary School Modernization Study Idea Mining Potomac Elementary School Modernization Study Guiding Principles Potomac Elementary School Modernization Study Potomac Elementary School Modernization Study Potomac Elementary School Guiding Principles • Site is efficiently laid out to promote student safety, and addresses existing circulation issues. • Building design is aesthetically pleasing, naturally lit, incorporates sustainable design, encourages collaboration, and can accommodate community use. • Classroom spaces are state of the art, flexible and interactive learning spaces. Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Diagramming Exercises Potomac Elementary School Modernization Study Group Reports Potomac Elementary School Modernization Study Existing Site Plan Potomac Elementary School Modernization Study Option 1 – Site Plan Potomac Elementary School Modernization Study Option 1 – Lower Floor Plan Potomac Elementary School Modernization Study Option 1 – Upper Floor Plan Potomac Elementary School Modernization Study Option 1 Potomac Elementary School Modernization Study Option 2 – Site Plan Potomac Elementary School Modernization Study Option 2 – Lower Floor Plan Potomac Elementary School Modernization Study Option 2– Upper Floor Plan Potomac Elementary School Modernization Study Option 3 – Site Plan Potomac Elementary School Modernization Study Option 3 – Lower Floor Plan Potomac Elementary School Modernization Study Option 3 – Upper Floor Plan Potomac Elementary School Modernization Study Option 3 Potomac Elementary School Modernization Study Option 4 – Site Plan Potomac Elementary School Modernization Study Option 4 – Lower Floor Plan Potomac Elementary School Modernization Study Option 4 – 2nd and 3rd Floor Plan Potomac Elementary School Modernization Study Option 4 Potomac Elementary School Modernization Study Option 5 – Site Plan Potomac Elementary School Modernization Study Option 5 – Lower Floor Plan Potomac Elementary School Modernization Study Option 5 – Upper Floor Plan Potomac Elementary School Modernization Study Option 5 Potomac Elementary School Modernization Study 1 Potomac Elementary School Modernization Study 2 3 4 Potomac Elementary School Modernization Study 5 Meeting Schedule Committee Meeting #1 – February 6, 6:30pm Committee Meeting #2 – February 21, 3:45pm Committee Meeting #3 – March 7, 7:00 pm Committee Meeting #4 – March 19, 3:45pm PTA Presentation – April 11, 7:00 pm Potomac Elementary School Modernization Study www.moseleyprojects.com Potomac Elementary School Modernization Study
© Copyright 2026 Paperzz