March 22, 2012 THOMAS EDISON HIGH SCHOOL OF TECHNOLOGY MODERNIZATION SCHEMATIC DESIGN MEETING NO. 5 21202.20/075 ATTENDEES: See attached sign in sheet. Meeting Notes: NEW BUSINESS: 5.1 Prior to the scheduled meeting, a meeting was held with the Edison building services and guidance staff. The following comments and concerns were expressed: • The building services staff expressed concern about truck access to the loading dock. This will be further developed. • Staff also noted that the elevator needs to be bigger than the standard passenger elevator. The design team will size the elevator similar to the existing elevator. • The loading dock shall be 3’ tall. • Outdoof storage shall move to the lower level and be sized for tractor storage. • Guidance expressed concern about the size of the waiting room, which is smaller than they currently have. Ms. Szyfer advised that staff should reserve judgment until the furniture layout is presented during the design development phase. • Guidance also expressed that the Career Center should have glass to the corridor, but should not be a “fishbowl”. • Car drop-off curb cut on Dalewood Dr shall include a parking space for Culinary Arts staff to unload supplies. Walkway shall extend from parking area to kitchen. • Administration / General Office area shall be located off the main entrance vestibule; visitors will enter the office thru the vestibule for security/control. 5.2 Grimm + Parker provided a Powerpoint presentation which included revisions to the site plan and a presentation of the revised scheme. A Site option showing a ramp at the back of the building to the car storage area was included. The building plan revisions consisted of guidance being relocated near admin, with the staff room and staff offices relocated to the upper floor. Character sketches of the interior and exterior of the building were presented. The following comments and concerns were expressed: • Mr. Hamlin suggested that the Student Council room should be relocated on the main space. This suggestion was well received and will be incorporated. • Staff noted that the amount of Network Ops storage appeared excessive. Ms. Szyfer stated only 650sf of storage is required for Network Ops; the additional 1000sf of exterior computer storage listed in the site program will be deleted. • A concern was expressed about the use of metal panels in the elevations. The concerns were that some metal panels can become “dated” in appearance over time. The design team noted that metal panels help reflect a high-tech appearance, and that initial color selection and high-quality finishes to prevent fading are important to avoid “dated” appearance. • There was a desire to look at color in the glass on the elevations. Mr. Cross advised CALVERTON / MCLEAN 11720 Beltsville Drive Suite 600 / Calverton MD 20705 / Tel 301.595.1000 / Fax 301.595.0089/ grimmandparker.com Thomas Edison High School of Technology Modernization Schematic Design Meeting No. 5 Page No. 2 that MCPS does not allow the use of colored glass. 5.3 The site options were discussed. The ramp option reduces the car storage area below program. There was a good deal of discussion of the need for this ramp. The consensus was that this was a convenience that was important, but should not be the guiding factor in the site layout. The following comments were expressed: • Elimination of the ramp will allow the loading dock to be less congested. • There was a suggestion to add a freight elevator to allow truck deliveries for the automotive areas to be done at the loading dock. The design team will investigate this option. The freight elevator will connect 1st & 2nd floors only. • The school will provide a list of deliveries to the design team, including schedule/frequency and the size of trucks that currently come for all types of deliveries. • Plaza paving at main entrance will extend across bus loop to parking area. This will provide a pedestrian crossing and indicate to busses to start queuing to the south. • An outdoor seating terrace will be investigated for Café Edison/restaurant. • A screen wall is needed at dumpsters and bus storage area to screen this area from Randolph Road. • Bollards need to be provided for safety at all truck access areas. • The need for the ramp will be discussed among the Edison staff and a determination will be made. 5.4 The following current schedule was provided by Edison HS staff for coordination with bus loop shared with Wheaton HS: • Morning Session 7:45am - 10:15am Bus Drop-off 7:30 - 8:10am (indicates time buses are present in the bus loop) Bus Pick-up 9:30 - 10:20am • Afternoon Session 11:00am - 1:30pm Bus Drop-off 10:30 – 11:00am (indicates time buses are present in the bus loop) Bus Pick-up 12:45 – 1:35pm NEXT MEETING: 1. The next schematic design meeting has been scheduled for Thursday, April 12, 2012, at 6:30 p.m. at Thomas Edison School of Technology. THESE NOTES ARE THE OFFICIAL RECORD OF THE MEETING AND REPRESENT THE UNDERSTANDING OF THE WRITER OF ITEMS DISCUSSED AND DECISIONS MADE DURING THIS MEETING. WE SHALL ASSUME OUR UNDERSTANDING TO BE CORRECT UNLESS WRITTEN NOTICE TO THE CONTRARY IS BROUGHT TO OUR ATTENTION WITHIN SEVEN DAYS. Author: Don Porter DRP/drp J:\proj\2012\21202.20\Docs\04-Meeting Minutes\2012-0322 SD Meeting 5\EHS 032212-sd05.doc Thomas Edison High School of Technology Modernization Project Name: Date: March 22, 2012 Mr./Ms ./Mrs./ Name Dr. First Last Representing John Brewer Foundations 2 Mrs. Julie Broyles Thomas Edison School of Technology 3 Ms. Karen Burlingame Grimm and Parker Architects 4 Ms. Dennis F. Cross 5 Ms. Theresa Defino MCPS Division of Construction Thomas Edison School of Technology Community Member 6 Ms. Judith Flaherty Thomas Edison School of Technology 7 Mr. Rick Gangloff Foundations 8 Mrs. Juli Griffin Gross 9 Mr. Carlos Hamlin Thomas Edison School of Technology Principal -Thomas Edison School of Technology 10 Ms. Melanie Hennigan Grimm and Parker Architects 11 Mr. William Merson Thomas Edison School of Technology 12 Mr. Steve Parker Grimm and Parker Architects 13 Mr. Don Porter Grimm and Parker Architects 14 Mr. Antonio Rebelo Grimm and Parker Architects 15 Mr. Leo Schwartz CTF / ATF / ITF 16 Ms. Debbie Szyfer MCPS Long-Range Planning 17 Ms. Kieran Wilmes Grimm and Parker Architects 18 Mr. Eric Zeigler Thomas Edison School of Technology 1 Mr.
© Copyright 2026 Paperzz