November 29, 2012 CLARKSBURG / DAMASCUS MIDDLE SCHOOL NO. 2 SCHEMATIC DESIGN MEETING # 4 21243.00/075 ATTENDEES: See attached list. * [] Before an item in bold face indicates a correction to the notes. Indicates an item which occurred subsequent to the meeting. Notes: SD4.1 Mr. Parker summarized the previous meeting. Specifics are available as part of the previous meeting notes. Revisions are noted below. SD4.2 Mr. Parker discussed the presentation to be given to the PTA. The PTA meeting will be a presentation, not a workshop. The design team will provide a 15/20 minute presentation of the design to the PTA. Participant members will have feeder schools announce the presentation at their meetings next week. Another presentation will be made to the community at the end of the Construction Document phase to show the design as it exists going to bid. SD4.3 Mr. Parker explained the process of the BOE approval of the schematic design. The principal and a member of the community will be asked to represent the community to the BOE. SD4.4 A presentation was given by the Architect. A copy is attached to these notes. SD4.5 A revised site plan was shown. One way traffic pattern thru the main parking area creates greater car stacking distance. This creates a sizeable retaining wall at the southwest corner of the parking lot. The entrance to the parking lot/student drop/off loop will be a three vehicle wide entry. Staff parking has been added in the bus loop area. Pedestrian access will be provided from both Skylark Road and Little Seneca Parkway. Internal cross country paving will be provided. An area for a future community garden was also shown. North/South building orientation is maintained. Revisions from the last meeting included the addition of a sidewalk on the south side of the parking lot, a skinned infield area at the baseball field, and addition of benches at the baseball field. SD4.6 The following revisions were recommended by the participants. The sidewalk from the bus loop to the main entrance should be straighten out to facilitate student walking patterns. A fence should provided between the bus loop and the student drop/off loop for student safety. SD4.7 Plan modifications were shown. The classroom wing was reorganized and stacked evenly on all floors. Guidance was relocated to the opposite side of the east/west corridor and given an entrance onto the main entry corridor. The additional auxiliary gym was added adjacent to the other auxiliary gyms. Teacher planning areas are shown as a combined space per floor to increase the size of the rooms. Technology and Multipurpose labs were relocated to the opposite side of the corridor from their previous location. The Bridge program was incorporated where the staff lounge was in the previous design. The program area for the staff lounge has been divided up to allow for a staff dining area on the first floor, and a staff lounge area on the third floor. The two additional science labs were provided on the third floor. Revisions included further development of the administration and guidance areas, the bridge program, the kitchen area, and the central core spaces. Restrooms sizes at the media center (second floor) and directly below were reduced to allow second exits from the media center and the Multipurpose Lab. The option to revise the cafeteria CALVERTON / MCLEAN / CHARLOTTESVILLE 11720 Beltsville Drive Suite 600 / Calverton MD 20705 / Tel 301.595.1000 / Fax 301.595.0089 / grimmandparker.com Clarksburg Damascus Middle School No. 2 Schematic Design Meeting #4 Page No. 2 orientation is included. SD4.8 The participants had no comments on the floor plans. SD4.9 Modified character sketches of the potential building elevations were presented. These included the three/ window per classroom scheme. Revisions included extending the canopies at the stair exits and modification to the bridge program elevation. The east and north elevations were also shown. SD4.10 The following revisions were recommended by the participants. The main entrance canopy should be extended overhangs around to the first exit from the Cafeteria, to provide cover from inclement weather and increase visibility to the student drop/off loop. An entrance element or canopy should be provided on the Skylark entrance to the main corridor (north side of the building). SD4.11 Consensus was reached on the site, building plan and elevation design direction from the participants. No additional workshops are necessary. NEXT MEETING: 1. The schematic design presentation meeting has been scheduled for Tuesday, December 11, 2012, at 7:00 p.m. at Rocky Hill Middle School. THESE NOTES ARE THE OFFICIAL RECORD OF THE MEETING AND REPRESENT THE UNDERSTANDING OF THE WRITER OF ITEMS DISCUSSED AND DECISIONS MADE DURING THIS MEETING. WE SHALL ASSUME OUR UNDERSTANDING TO BE CORRECT UNLESS WRITTEN NOTICE TO THE CONTRARY IS BROUGHT TO OUR ATTENTION WITHIN SEVEN DAYS. Author: Don Porter DPR/drp Attachments: Sign/in List, Presentation. J:\proj\2012\21243\Docs\04 Meeting Minutes\CDMS#2 SD Meeting 4.docx Project Name: Clarksburg / Damascus Middle School No. 2 Date: November 29, 2012 Mr./Ms ./Mrs./ Name Dr. First Last Representing 1 Ms. Sue Amick Clarksburg Cluster Coordinator 2 Mr. Dennis F. Cross MCPS Division of Construction 3 Mr. Greg Edmundson Rocky Hill Middle School Principal 4 Mr. Steve Parker Grimm and Parker Architects 5 Ms. Donna Pfeiffer MCCPTA/Clarksburg Cluster 6 Mr. Don Porter Grimm and Parker Architects 7 Mr. Todd Powell Parent 8 Ms. Janet Sanchez MCCPTA/Clarksburg Cluster 9 Mr. Shreenivas Suvarna Clarksburg Cluster Coordinator Karen Ward Rocky Hill MS PTA 10 Ms. Clarksburg-Damascus Middle School creating together: meaningful architecture + student success Your Project: Schedule Clarksburg | Damascus Middle School Feasibility Study: Complete Schematic Design: Begun October 2012 Meeting #1: Thursday, October 11th at 3:00 pm at Rocky Hill Middle School Meeting #2: Thursday, November 1st at 7:00 pm at Rocky Hill Middle School Meeting #3: Thursday, November 15th at 3:00pm at Rocky Hill Middle School Meeting #4: Thursday, November 29th at 7:00 pm at Rocky Hill Middle School PTA Presentation: Tuesday, December 11th at 7:00 pm at Rocky Hill Middle School Design Development: Begins January, 2013 Preliminary Plans Brochure: February 2013 Construction Documents and Permits: February 2014 Bid: March 2014 Start Construction: May 2014 School Opening: Fall 2016 Site Recommendation – Previous Meeting Clarksburg Damascus Middle School – Prepared November 15 Site Recommendation – Updated Clarksburg Damascus Middle School – Prepared November 29 Site Recommendation – Updated Addition Clarksburg Damascus Middle School – Prepared November 29 Floor plans – first floor Clarksburg Damascus Middle School – Proposed Layout Nov. 15 Floor plans – first floor Clarksburg Damascus Middle School – Proposed Layout Nov. 29 Floor plans – second floor Clarksburg Damascus Middle School – Proposed Layout Nov 15 Floor plans – second floor Clarksburg Damascus Middle School – Proposed Layout Nov 29 Floor plans – third floor Clarksburg Damascus Middle School – Proposed Layout Nov. 15 Floor plans – third floor Clarksburg Damascus Middle School – Proposed Layout Nov. 29 Elevation Clarksburg Damascus Middle School – Preferred Character Sketch Nov. 15 Elevation – South Elevation Clarksburg Damascus Middle School –Character Sketch Nov. 29 Elevation – East Elevation Clarksburg Damascus Middle School –Character Sketch Nov. 29 Elevation – North Elevation Clarksburg Damascus Middle School –Character Sketch Nov. 29 Perspective Clarksburg Damascus Middle School – Preferred Character Sketch Nov. 15 Perspectives Clarksburg Damascus Middle School –Character Sketch Nov. 29 Perspectives Clarksburg Damascus Middle School –Character Sketch Nov. 29 Perspectives Clarksburg Damascus Middle School –Character Sketch Nov. 29 Aerial Perspectives Clarksburg Damascus Middle School –Character Sketch Nov. 29 Aerial Perspectives Clarksburg Damascus Middle School –Character Sketch Nov. 29
© Copyright 2026 Paperzz