Preliminary Plans Presentation Bethesda-Chevy Chase Middle School #2 New School Prepared for Montgomery County Board of Education January 2014 Preliminary Plans Presentation Bethesda - Chevy Chase Middle School #2 New School 3701 Saul Road Kensington, MD 20895 Montgomery County Board of Education Mr. Philip Kauffman Mrs. Patricia B. O’Neill Mr. Christopher S. Barclay Ms. Shirley Brandman Dr. Judith R. Docca Mr. Michael A. Durso Mrs. Rebecca Smondrowski Mr. Justin Kim President Vice President Member Member Member Member Member Student Member Montgomery County Schools Administration Dr. Joshua P. Starr Mr. James C. Song Mr. R. Craig Shuman Mr. Michael P. Shpur Mr. Dennis F. Cross Mrs. Deborah Szyfer Superintendent of Schools Director, Department of Facilities Management Director, Division of Construction Architect, Division of Construction Project Manager, Division of Construction Facility Planner, Division of Long-range Planning Bethesda - Chevy Chase Middle School #2 Page 1 Facility Advisory Process Involvement Involvement The preliminary plans for the Bethesda-Chevy Chase Middle School #2 project were developed based on the educational specifications prepared by Montgomery County Public Schools (MCPS). Through a series of public work sessions, several design alternatives were developed and evaluated. The proposed plans presented herein were modified and evaluated in accordance with suggestions and recommendations received during the schematic design work sessions. Participants in the Facility Advisory Process Ms. Alison Serino Ms. Laura Hennessy Mr. Seth Adams Ms. Lorena Alvarez Ms. Carrie Bazyluk Ms. Diana Borlase Mr. Hill Carter Ms. Judy Carter Mr. Dennis Cross Ms. Laura Dennis Ms. Lori Duke Ms. Cathy Fink Ms. Alison Gee Mr. Fritz Hirst Ms. Jessica Hughes Ms. Leslie Jarvis Ms. Amy Jones Mr. Josh Jones Ms. Christie Leu Ms. Charylann Maas Principal Assistant Principal Assistant to the Director Parent Neighbor Parent Parent Parent Project Manager Parent Teacher Neighbor Parent Parent Parent Parent Neighbor Neighbor Parent Teacher Bethesda - Chevy Chase Middle School #2 Westland Middle School Westland Middle School MCPS - Division of Construction Community Community Rosemary Hills Elementary School Community Community MCPS-Division of Construction Community MCPS Community Community Westland Middle School Community North Chevy Chase Elementary School Community Community Community Westland Middle School Page 2 Facility Advisory Process Involvement (continued) Facility Advisory Participants (continued) Ms. Patty McDermott Ms. Karie McMickle Ms. Kristen Mosbaek Ms. Seth Niman Mr. Erik Peek Mr. Rafe Petersen Mr. John Robinson Ms. Laurie Rosen Ms. Sarah Salnick Ms. Beth Scofield Mr. Jonathan Shimmons Mr. Michael Shpur Mr. John Sonnier Mr. Teddy Springer Mr. Cory Springer Mr. Bill Stephens Ms. Jillian Storms Mr. John Swiatocha Ms. Deborah Szyfer Mr. David Welch Parent Parent Parent Parent Neighbor Parent Neighbor Parent Teacher Parent Parent Architect Parent/Neighbor Parent Parent Parent School Facilities Architect Teacher Planner Parent Bethesda - Chevy Chase Middle School #2 Rosemary Hills Elementary School Community Community Rosemary Hills Elementary School Community Roesmary Hills Elementary School Community Community Westland Middle School Rock Creek Forest Elementary School Community MCPS-Division of Construction Community Community Community Rosemary Hills Primary School Maryland State Department of Education Westland Middle School MCPS-Division of Long-range Planning North Chevy Chase Elementary School Page 2A Project Information Background/History Location: 3701 Saul Road Kensington, MD 20895 Cluster: Bethesda-Chevy Chase Cluster History: Bethesda-Chevy Chase Middle School #2 will be located on a property that was once the home of Kensington Junior High School. Due to enrollment declines, this school was closed in 1979 and razed. The property was subsequently conveyed to the Maryland-National Capital Park and Planning Commission (M-NCPPC) for its current use as Rock Creek Hills Local Park. The property consists of 13.39 acres of land. A reclamation provision in the deed for property enables the school system to retrieve the property because it is needed for public school use. Bethesda-Chevy Chase Middle School #2 is needed to address middle school enrollment increases in the Bethesda-Chevy Chase cluster. Currently, Westland Middle School serves the whole cluster area. In addition, not all grade 6 students in the cluster are enrolled at Westland Middle School. Chevy Chase and North Chevy Chase elementary schools have served students in grades 3-6 for many years. The new middle school will enable these grade 6 students to attend a middle school. The forecast for Westland Middle School, shown in the table below, incorporates the reassignment of grade 6 students from Chevy Chase and North Chevy Chase elementary schools beginning in the 2017–2018 school year, when the new middle school opens. Future boundary changes will establish the service area for the new middle school one year before it opens. Site Size: 13.39 acres WESTLAND MIDDLE SCHOOL Program Capacity Enrollment Available Space Actual 2013-2014 1097 1223 (126) Bethesda - Chevy Chase Middle School #2 Projections 2014-2015 1097 1312 (216) 2015-2016 1097 1366 (270) 2016-2017 1097 1437 (340) 2017-2018 1097 1642 (546) 2018-2019 1097 1702 (606) 2019-2020 1097 1694 (598) Page 3 Project Information (continued) Educational Program Objectives The purpose of this project is to construct a new middle school in the Bethesda-Chevy Chase cluster to accommodate growth and help alleviate overcrowding at Westland Middle School. The project will meet the requirements of the educational specifications for a new middle school by providing forty-five (46) teaching spaces for grades six through eight when completed in August 2017. The new building will be designed for a capacity of 944 students with the core spaces designed to accommodate 1,200 students. Twelve (12) additional classrooms have been master-planned for future expansion. The building and site will be in full compliance with the Americans with Disabilities Act (ADA). The project will be designed to achieve Leadership in Energy and Environmental Design (LEED) Silver certification or higher by the United States Green Building Council (USGBC) under the LEED for Schools rating system. The flexible building design for the school will accommodate current and future middle school program delivery models and programs. A philosophy of adaptable classrooms will accommodate various presentation formats and learning activities and interactive education computer technology has been incorporated in the plan. Multipurpose laboratories will be provided to support a variety of middle school elective offerings at the school. Science laboratories will be located on each floor to support the middle school team philosophy. Each instructional area will have adequate learning spaces, work areas, and other support spaces. Furniture that is easily reconfigurable will be provided to maximize flexibility throughout the school. The school will provide a safe environment for students and staff by including a secure entry and visual monitoring of the primary building entrance points. The design of the building allows for good internal circulation and for after-hours community use. Support spaces such as the cafeteria, instructional media center, and gymnasium will be available to the community for use during non-school hours, while securing the rest of the building. Bethesda - Chevy Chase Middle School #2 Page 3A Project Information (continued) Teaching Stations and Spaces Provided When Completed (Number of teaching spaces used to calculate the capacity of the school is indicated within parentheses) English/Foreign Language/Math/ Social Studies (23) Standard Classrooms Science: Science Laboratories Science Prep/Project/Storage Chemical Storage Other Instructional Support Areas Team Resource Center/Workroom Arts Planning Area Interdisciplinary Textbook Storage Departmental Textbook Storage Foreign Language Textbook Storage Instructional Data Assistant Room Developmental Reading (8) 4 1 9 1 3 3 1 1 1 ESOL Classrooms ESOL Classroom (1) Special and Alternative Education Special Education Classrooms Special Education Team Room Resource Room Speech and Language Therapy Occupational Therapy/Physical Therapy (2) 1 1 1 1 Bethesda - Chevy Chase Middle School #2 Music Suite Instrumental Music Room General Music/Choral Room General/Choral Storage Music Office Music Practice Rooms (1) (1) 1 1 2 Visual Arts Suite Art Room Storage Kiln Room (1) 1 1 Multipurpose Technology Laboratory Multipurpose Technology Laboratory Computer Technology Laboratory Technology Preparation/Storage (1) (1) 1 Multipurpose Laboratory Multipurpose Laboratory Storage (1) 1 Page 3B Project Information (continued) Teaching Stations and Spaces Provided When Completed (continued) (Number of teaching spaces used to calculate the capacity of the school is indicated within parentheses) Physical Education Gymnasium (Equals 2 teaching stations) Auxiliary Gym (Dance) Auxiliary Gym (Fitness/Weight Room) Auxiliary Gym (Wrestling) Health Classroom Locker Rooms Storage Rooms Toilet Rooms Shower/Drying Rooms Laundry Room Offices Common Planning Area General Storage Outdoor Storage Interagency Coordinating Board Storage Computer Support Storage Room/Office Area Telecommunication Equipment Closet Telecommunication Closet (1) (1) (1) (1) (1) 2 2 2 2 1 2 1 2 1 1 1 1 5 Bethesda - Chevy Chase Middle School #2 Instructional Media Center Reading Room Listening Viewing Project Area Direct Instructional Area Workroom/Materials Prep. Room Office Technology Information Access Center Storage, Media General Storage (Upper Floor) Multimedia Production Room 1 2 1 1 1 1 1 1 1 Student Activities School Store Student Government Storage Closet 1 1 Administration Suite General Office Principal’s Office Assistant Principal’s Office Student Support Specialist Office Administrative Secretary’s Office Workroom/Storage/Toilet Area Storage Conference Room Copier Workroom In-School Suspension Room Financial Seceratary’s Office Security Office Testing Room 1 1 3 1 1 1 1 1 1 1 1 1 1 Page 3C Project Information (continued) Teaching Stations and Spaces Provided When Completed (continued) (Number of teaching spaces used to calculate the capacity of the school is indicated within parentheses) Guidance Suite Kitchen Area Counselor’s Office Service Area (4 service lines) 5 Waiting Room Food Preparation 1 Conference Room Dry Food Storage 1 Records Room Refrigerator 1 Itinerant Staff Office Freezer 1 Office Health Suite Locker/Toilet Room Waiting Room Loading Platform 1 Treatment/Medication Area Receiving Area 1 Office/Health Assessment Room Chemical Storage Area 1 Health Assessment/Isolation Room 1 Rest Area Building Services Facilities 2 Toilet Room Building Services Office 2 Storage Locker/Shower Area 1 Plant Equipment Operator Office Staff Facilities Compactor/Trash Room Staff Lounge Receiving and Storage Area 1 Telephone Room General Storage Rooms 1 Building Service Outdoor Storage Student Dining Student Dining 1 Stage Total Teaching Stations 1 Storage 1 Chair Storage 1 Bethesda - Chevy Chase Middle School #2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 1 (46) Page 3D Project Information (continued) Site Design Site Features: Bethesda-Chevy Chase Middle School # 2 will be located on a 13.39 acre parcel of land on Saul Road in Kensington, Maryland. Until its demolition in 1979, the site was the home of the former Kensington Junior High School. After the original school was demolished, the property was conveyed to the Maryland-National Capital Park and Planning Commission, who continues to operate the site as the Rock Creek Hills Park. However, Montgomery County Public Schools retained the right to reclaim the property at such time as it was needed for use as a school. The site fronts on and is accessed via Saul Road to the south and Haverhill Drive to the east. The property is surrounded by a mixture of single and multi-family residences. The developed portion of the existing site consists of grass playfields, paved play courts, and two parking areas. The undeveloped portion of the site consists of hillside forest stands and a stream buffer along the westernmost boundary of the site. An existing 8-inch diameter Washington Suburban Sanitary Commission water main runs through the property, in and along the stream buffer. The existing site slopes from the northern athletic fields downgrade to the southwestern portion of the site, draining to the stream just west of the property. In order to minimize the building footprint and protect the natural site areas, the new school has been designed as a four-story building that takes advantage of the steeply-sloped areas of the site. Two driveway entrances will continue to serve the new school. The existing south entrance on Saul Road will be improved and will provide access and parking spaces for approximately 110 vehicles, a student drop-off loop and a service drive. The existing east entrance driveway on Haverhill Drive will be reconfigured to provide a separate bus loop for 20 buses. The portion of the site to the north and east of the new school will feature new tennis and basketball courts, a paved sprint running track, two soccer fields overlaying two softball fields, and a paved wellness path. Bethesda - Chevy Chase Middle School #2 Page 3E Project Information (continued) Site Design (continued) Stormwater Management: A new stormwater management system will be provided to meet Environmental Site Design (ESD) requirements to the maximum extent practicable and to meet the Montgomery County Department of Permitting Services requirements. ESD options include a vegetated green roof on the new building, micro-bioretention facilities, and preserving natural forested areas. Underground structural facilities will be proposed in areas where no surface treatment options are viable. Utilities: New utility services, including water, sewer, gas, telephone, data, and electric, will be provided to support the needs of the new school. All utility service connections will be made to existing utility lines located in and along Saul Road. Exterior Lighting: Wall-mounted lighting fixtures will be installed on the exterior of the new building and will be shielded to protect adjacent residences from intrusive glare while maintaining light levels for safety and security. Pole-mounted parking area lighting fixtures will be 100% down-lighting to minimize light pollution into the night sky. All exterior light fixtures will be light emitting diode (LED). To conserve energy, all exterior lighting will operate on timers. Bethesda - Chevy Chase Middle School #2 Page 3F Project Information (continued) Building Design General Description: The proposed four-story building, designed to meet MCPS educational specifications, is organized around a central courtyard. The main entrance to the school is on the first floor (lowest level) and is located on the west side of the building facing the student drop-off lane. The administration, guidance, and health suites are located on this lowest level to enhance security and supervision. Also located on the first floor are the cafeteria, music suite, kitchen, and service area. A secondary entrance, on the second floor, with access from Haverhill Drive, is adjacent to the bus loading area north of the building. The security office is located at the second floor entrance to provide added supervision. The building is divided into an activities area and an academic area. Separating activities spaces such as the gymnasiums, instructional media center, and student dining facilities from the academic spaces allows for community use of the activity spaces after school while maintaining security for the classrooms. The academic spaces are organized with one grade level per floor. Locker pods are provided for each grade level at the ends of the corridors and along the courtyard, allowing natural light into the corridors. The gymnasium and locker rooms are on the second floor with direct access to the athletic fields. Auxiliary gymnasiums are located on the third floor. Building design goals included: * Creating a defined and welcoming entry with administrative suite control and supervision. * Creating a building with functional spatial relationships. * Creating a building that allows easy supervision of students. * Allowing convenient and secure non-school hours access to activity areas of the building. * Designing a building that respects the surrounding neighborhood. * Minimizing the footprint of the building to preserve existing green space and trees. Bethesda - Chevy Chase Middle School #2 Page 3G Project Information (continued) Building Design (continued) Classroom Technology: Classrooms are designed to support interactive educational technology that includes controlled wireless computer access and interactive whiteboard systems. Individual classrooms will have distributed computer outlets on the walls and allow multiple group teaching areas within a classroom. Individual classrooms will be designed to provide flexible teaching spaces, i.e., small group sessions or lecture sessions. Students can be organized into small groups for project-oriented teaching or face a teacher in a traditional lecture-teaching method. Code Compliance/Accessibility: All areas will be designed to meet the most current national and local building codes including fire, life-safety, and health standards. The facility will be in full compliance with the Americans with Disabilities Act (ADA). Sustainable Design Intent (LEED): The project will be registered and certified with Leadership in Energy and Environmental Design (LEED) Silver or higher, through the United States Green Building Council (USGBC). • Encouraging alternative transportation to the school by providing conveniently located bike racks and preferred parking for low emitting/ fuel efficient vehicles and carpools • Preserving a high percentage of vegetated open space to protect the surrounding ecosystem • Managing stormwater to both reduce runoff quantity and improve quality • Using highly-reflective roof surfaces to reduce heat island effect and heat gain to the building • Installing water conserving, low-flow plumbing fixtures • Optimizing the energy performance of the building by providing a highly energy efficient building envelope, lighting system and heating, ventilation and air conditioning (HVAC) system • Optimizing equipment selection, installation, and operation of HVAC equipment through enhanced commissioning of the building systems • Diverting construction “waste” from landfills that can instead be salvaged for reuse or recycled • Adhering to construction indoor air quality management plans and using low-emitting building materials to safeguard occupant health • Providing a high level of occupant control over individual lighting and thermal comfort to promote enhanced indoor environment • Using construction materials that are recycled and regionally manufactured • Implementing a Green Housekeeping plan • Maximizing daylight in classrooms • Minimizing background noise level from HVAC systems in classrooms and other core learning spaces and control reverberation time with sufficient sound absorptive materials Bethesda - Chevy Chase Middle School #2 Page 3H Project Information (continued) Building Design (continued) Mechanical Systems Heating, Ventilation, and Air Conditioning System (HVAC): Heating and cooling for the school will be provided via a two-pipe water source hydronic heat pump (HHP) system. Heat pump units will be located in small mechanical closets to facilitate maintenance. A geothermal field located under the athletic fields, consisting of 400 to 450 wells, will be provided as a heat sink for the geothermal heat pumps. The required outdoor air ventilation will be provided by utilizing roof mounted energy recovery units. These will be provided with supplemental gas-fired duct furnaces for emergency heat in the event of a power outage. The HVAC design will be compliant with the latest International Mechanical Code. Plumbing System: Plumbing fixtures will comply with ADA requirements and will be based on occupancy mix and population. Storm sewer, sanitary sewer, and domestic water systems will be provided in accordance with the latest Washington Suburban Sanitary Commission (WSSC) Plumbing Regulations. A new combined fire and water service will be provided with an outside below-grade water meter as required to serve the new facility. A new gas service is required to serve the kitchen equipment, the emergency generator, and the emergency gas-fired furnaces on the energy recovery units. The plumbing design will be compliant with the latest International Plumbing Code. Fire Protection System: The building will be fully-sprinklered with a wet system in accordance with the National Fire Protection Association Code (NFPA-13) and will be provided with a voice-annunciated fire alarm system. Energy Management System: Prime importance and consideration will be placed on energy conservation and will be reflected in the configuration and orientation of the building, the selection of materials, and the mechanical and electrical systems utilized. The new building will be compliant with LEED (Leadership in Energy and Environmental Design) for Schools and the HVAC and lighting designs exceed ASHRAE 90.1-2010 energy requirements and the International Mechanical Energy Conservation Code. Bethesda - Chevy Chase Middle School #2 Page 3I Project Information (continued) Building Design (continued) Electrical Systems Power System: Required electrical systems include lighting, power, public address system, fire alarm, emergency generator, separate dedicated power for computer outlets, and rough-in for telephone/data/video and security systems. These systems will be designed to comply with MCPS standards. A 277V/480V- 3 phase- 4 wire- 4,000 amp electrical service is anticipated for the new school. Emergency Power System: A 130 KW natural gas fired emergency generator will be required to power all life safety, fire alarm, and other equipment such as Internet Technology (IT), kitchen freezers, and the Energy Recovery Units (ERU) emergency gas heating. Emergency loads will be separated in accordance with the National Electric Code (NEC). Public Address System: A new public address system will be provided to serve the new building. Each classroom will have a call back switch and speakers. The corridors and restrooms will have speakers only. Building Security: The building will include a visitor management system that will provide office staff with the ability to monitor and control visitor access to the school. The visitor management system will include a computer-based visitor sign-in system that will monitor and track all visitors entering the school building. The new school also will have a new building security system consisting of motion and contact sensors at all exterior doors that will be monitored by the MCPS Department of Safety and Security. In addition, a secure entry vestibule will direct all visitors to check in at the front desk before entering the school with the second set of doors always locked during school hours. Bethesda - Chevy Chase Middle School #2 Page 3J Project Information (continued) Building Design (continued) Electrical Systems (continued) Technology Infrastructure: The building will be equipped with data/voice/video over internet protocol (VoIP), video and wireless systems. The network system design will include outlet boxes, conduits, surface raceways, conduit sleeves, and properly sized telecommunications closets for the low voltage systems. The infrastructure system will consist of a fiber-optic backbone cable system with category 5E UTP cable for station drop connectivity, supporting switched 10/100/1000 Mbps ethernet. With the improved switching systems these systems have the capability of providing a gigabyte ethernet system with provisions to accommodate future changes in technology. For video distribution, a 1,000 Mhz bi-directional, broadband distribution system with coax trunk cable and RG-6 quad-shielded coax drop cable will be utilized. The system allows full cable spectrum to every part of the building with five dedicated channels: one channel for school distribution from the studio, two channels for school distribution or two-way video from any point in the building, and two spare channels available for future use. Bethesda - Chevy Chase Middle School #2 Page 3K Littledale R d Con nec ticu t Ave Site Rd Saul r ch D Bea Cap ital Bel twa y Jones Mill Rd Kensin gton Pk wy Vicinity Map Bethesda-Chevy Chase Middle School #2 3701 Saul Road Kensington, MD 20895 Bethesda - Chevy Chase Middle School #2 Page 4 Existing Site Plan Bethesda - Chevy Chase Middle School #2 Page 5 Proposed Site Plan Bethesda - Chevy Chase Middle School #2 Page 5A Proposed First Floor Plan 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Bethesda - Chevy Chase Middle School #2 Administration Suite In-School Suspension Room Conference Room Work Room Staff Development Office Health Services Suite Guidance Suite Staff Toilet Health Classroom Special Education Classroom Science Laboratory Science Prep Room 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. EL G B Mechanical Storage Classroom Security Office Gymnasium Storage Auxiliary Gymnasium Laundry Gymnasium Locker Room Physical Education Office Art Room Kiln Room Music Suite Music Office School Store Student Dining Stage Kitchen Building Service Team Resource Center/Workroom Technology Laboratory Multipurpose Laboratory Computer Support Telecom Room Chemical Storage Speech OT/PT Special Education Team Room Resource Developmental Reading Instructional Media Center Multimedia Production Room Staff Room Arts Planning Security Vestibule Elevator Girl’s Toilet Boy’s Toilet Page 6 Proposed Second Floor Plan BUS LOOP Bethesda - Chevy Chase Middle School #2 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Administration Suite In-School Suspension Room Conference Room Work Room Staff Development Office Health Services Suite Guidance Suite Staff Toilet Health Classroom Special Education Classroom Science Laboratory Science Prep Room 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. EL G B Mechanical Storage Classroom Security Office Gymnasium Storage Auxiliary Gymnasium Laundry Gymnasium Locker Room Physical Education Office Art Room Kiln Room Music Suite Music Office School Store Student Dining Stage Kitchen Building Service Team Resource Center/Workroom Technology Laboratory Multipurpose Laboratory Computer Support Telecom Room Chemical Storage Speech OT/PT Special Education Team Room Resource Developmental Reading Instructional Media Center Multimedia Production Room Staff Room Arts Planning Security Vestibule Elevator Girl’s Toilet Boy’s Toilet Page 7 Proposed Third Floor Plan 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Bethesda - Chevy Chase Middle School #2 Administration Suite In-School Suspension Room Conference Room Work Room Staff Development Office Health Services Suite Guidance Suite Staff Toilet Health Classroom Special Education Classroom Science Laboratory Science Prep Room 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. EL G B Mechanical Storage Classroom Security Office Gymnasium Storage Auxiliary Gymnasium Laundry Gymnasium Locker Room Physical Education Office Art Room Kiln Room Music Suite Music Office School Store Student Dining Stage Kitchen Building Service Team Resource Center/Workroom Technology Laboratory Multipurpose Laboratory Computer Support Telecom Room Chemical Storage Speech OT/PT Special Education Team Room Resource Developmental Reading Instructional Media Center Multimedia Production Room Staff Room Arts Planning Security Vestibule Elevator Girl’s Toilet Boy’s Toilet Page 8 Proposed Fourth Floor Plan 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Bethesda - Chevy Chase Middle School #2 Administration Suite In-School Suspension Room Conference Room Work Room Staff Development Office Health Services Suite Guidance Suite Staff Toilet Health Classroom Special Education Classroom Science Laboratory Science Prep Room 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. 41. 42. 43. 44. 45. 46. 47. EL G B Mechanical Storage Classroom Security Office Gymnasium Storage Auxiliary Gymnasium Laundry Gymnasium Locker Room Physical Education Office Art Room Kiln Room Music Suite Music Office School Store Student Dining Stage Kitchen Building Service Team Resource Center/Workroom Technology Laboratory Multipurpose Laboratory Computer Support Telecom Room Chemical Storage Speech OT/PT Special Education Team Room Resource Developmental Reading Instructional Media Center Multimedia Production Room Staff Room Arts Planning Security Vestibule Elevator Girl’s Toilet Boy’s Toilet Page 9 Proposed Elevations East Elevation North Elevation Bethesda - Chevy Chase Middle School #2 6’ 18’ 30’ Page 10 Proposed Elevations South Elevation West Elevation Bethesda - Chevy Chase Middle School #2 6’ 18’ 30’ Page 10A Project Team, Schedule, and Estimated Construction Costs Design Team Member Architect: Civil Engineer: Mechanical/Electrical/Plumbing Engineer: Structural Engineer: Kitchen Consultant: Samaha Associates, P.C. A. Morton Thomas & Associates, Inc. Obenchain, Linkous, Daniels & Sowick, Inc. Rathgeber/Goss Associates Nyikos Associates, Inc. Project Schedule Preliminary Plans Presentation: Construction Documents Completed: Award Construction Contract: Building Completed: January 2014 April 2015 June 2015 August 2017 Estimated Construction Costs New Construction: 155,087 square feet Construction Cost Estimate: $47,916,000 Bethesda - Chevy Chase Middle School #2 Page 11
© Copyright 2026 Paperzz