CALIFORNIA STATE UNIVERSITY, NORTHRIDGE EDUCATIONAL RESOURCES COMMITTEE __ MINUTES OF MEETING 05-13-2014 APPROVED BY COMMITTEE 09-09-2014 Sub. To Exec. Comm. Approved by Exec. Comm. Sub. To Acad. Senate Approved by Acad. Senate POLICY ITEMS Members Present: Debi Prasad Choudhary, Nazaret Dermendjian, Michael Hoggan, Yanbo Jin, Garry Lennon, Linda Noblejas (recording), Jerry Schutte (Chair), Diane Stephens, Ward Thomas Member Excused: Doris Helfer, Greg Knotts, Veda Ward Guests: Barbara Gross, Harry Hellenbrand 1. Call to Order The meeting was called to order at 2.05 p.m. 2. Approval of the Agenda The agenda was approved by consensus. 3. Approval of the Minutes from April 15, 2014 The minutes of the April 15, 2014 meeting were approved with two abstentions. 4. Chair’s Report A. Electronic Coursework Resolution - Schutte reported that the finalized resolution from the Joint ERC/ATC meeting was submitted to Senate Executive Committee and was approved to be presented to Faculty Senate last month. There were a number of issues that were raised by the faculty and it was then tabled to the May meeting. Both Schutte and Sales contacted some of the faculty that raised the concerns and incorporated their concerns in the resolution. It was then presented to Faculty Senate with the changes on May 8th and it was approved (Attachment A). The approved resolution on the electronic submission of coursework is now posted on the Faculty Senate website. B. Ad Hoc Committee on Office Space Study – Schutte reported that an Ad Hoc Committee on Office Space was created due to the recommendations on the report that was submitted to the Provost by the Ad Hoc Committee on Academic Space Planning (ADCASP). The ADCASP, composed of junior faculty from each college, met nine times last semester to do an analysis of spaces (classroom, labs, office, and research) on campus and was charged to write a report with recommendations for the 1|Page effective and efficient use of space on campus. From that report came two committees: one for labs and one for office space. The Ad Hoc Committee on Lab Study has done an RFP for consultants to look at the allocation of labs on campus and determine how labs are used and how they are classified. The Ad Hoc Committee on Office Space Allocation, of which Schutte and Stephens are members, has met twice and met with the Council of Chairs in an effort to discuss best practices as well as raise issues such as occupying double offices for faculty who are chairs, FERP faculty having full offices, opportunities for doubling offices for research space, etc. We will have more information on these in the fall. C. Commencements – Schutte stated that graduation has been changed from eight to six events. Students were told that they will receive four tickets and Ticketmaster will provide the tickets. There were a lot of graduating students that never received an email informing them that they have to log on to Ticketmaster. Thus, they did not get any tickets. He said that a letter has been sent to Vice President Watkins with some concerns about commencement. Students are generally upset about the change in the commencement proceedings as well as the ticketing process. Stephens stated that at Provost’s Council they were updated that people without tickets will get some seats at venues where the commencement will be broadcasted. There were five large lecture rooms that will be used for the overflow. Tickets will not be required at those venues. 5. Election of Chair Nazaret Dermendjian was nominated and voted by acclamation to be the new Chair for the Educational Resources Committee for a one-year term, starting in September 2014. Discussion followed on suggestions of issues or items that can be brought to the agenda for next semester. Stephens stated that as a tradition the Provost attends the meeting in May and in October and provides an update on the budget and faculty hiring in May and an update on enrollment in October. Some of the suggestions are to bring the new Executive Director of the Valley Performing Arts Center to talk about his goals for the Center, how to build the infrastructure as the campus grows, etc. 6. Executive Secretary’s Report A. Budget Process for 2014-15 – The University, for the first time in several years, is having a budget process where requests for funding can be submitted. The decision was made in every division not to broadcast the submission of funding requests because of the large backlog of funding needs of which everyone is already aware. Academic Affairs is requesting enrollment funding and base funding for faculty positions which were not regularized in the 11-12 hiring process. Academic Affairs is also requesting an initiative to fund equipment and facilities projects that have been 2|Page in the list of projects submitted in the past. Each of the colleges was asked to take a look at the summary list of unfunded projects and see what they can fund from the carry forward balances at year-end and from the Lottery funds with the balance requested from the University. B. Update of IRA and Campus Quality Fee Processes – Stephens mentioned that she is on the Instructional Related Activities (IRA) Board and this year the Board received requests for $2.8M but have only $1.8M to fund after items that are fixed such as accounting fees, athletics scholarships, etc. There are a lot of unhappy people that submitted requests because there was not enough money to fund all. There are some that are not ineligible for IRA and Academic Affairs is picking up some of those requests. Stephens also gave an update on Campus Quality Fee. This committee, predominately composed of students, is very busy making sure they make wise recommendations. C. Lab Study Update – The committee is working on the selection of the vendor and coordinating the activities of the vendor to study all of the lab spaces. The space is being defined as anything that is not administrative space, an office, faculty office, lecture room or a field. All other Academic Affairs spaces are considered lab space. There were four qualified vendors and one has been selected. The committee had a good discussion with them and the contract and the scope of work are being negotiated. The desire is for the vendor to physically walk the campus during the summer and use the GIS mapping of all campus spaces as part of the inventory. Any spaces that are not obvious, will require interviews with affected faculty or staff. The committee will be meeting with administrative councils of the colleges to talk about the process. The goal is to finish the work by the end of the fall semester. Stephens also updated everyone on the office study as mentioned by Schutte. The Academic Resources staff is physically walking spaces that are not clearly defined and she also has asked the Managers of Academic Resources to find the stations in the shared spaces. They were asked to identify spaces that have multiple desks to count the spaces to make sure they match with our FTES. D. Room Utilization – The Ad Hoc Committee on Academic Space Planning only had 2012-13 utilization data available. She showed the data that was shared at Provost’s Council for 2013/14 (Attachment B). The data for Fall 2013 shows a slight underutilization of lecture rooms. Locked rooms were under as well but large lecture rooms and labs were generally okay. In Spring 2014, it shows below standards due to the non-admission of transfer students. The Chancellor’s Office does not audit the campus if space is underutilized. It also does not take into account the rooms that are used for the weekend. The internal utilization studies also include rooms that are primarily used for other purposes, such as conference rooms, so the data is sometimes 3|Page skewed by that. The Chancellor’s Office only uses the standard Monday to Friday classes. Our room utilization all in all is fine. However, there are some inaccuracies in the data that needs to be carefully looked at. The data coming from SOLAR needs to be cleaned up as it shows that there are 240 lecture rooms but in reality there are 211 rooms. Some of the labs are labeled incorrectly in terms of capacity that needs to be fixed. Locked rooms are commonly a problem as well because they are underutilized. 7. Budget and Faculty Hiring – Provost Harry Hellenbrand presenting The Provost stated that the Governor released the May Revised Budget today. Overall, the CSU Budget will be fine. He stated that it will be interesting to see if there will be money for salaries in the budget. On campus, the budget really looks good at this stage. It is expected that our campus budget at year-end will be in the black again. The big change for us over the last couple of years is that we are doing more faculty hiring using both permanent funding and non-permanent funding. This year, Vice President Donahue has worked hard to make the budget transparent where all funds can be tracked. Hellenbrand suggested the Committee invite Vice President Donahue to speak to the group again in the fall. There will be approximately 70-80 hires next year. The campus has about 50-50 tenure track and part-time faculty. CSUN operates some ways different from the rest of the CSU where we work out the teaching loads of the faculty. In some ways, the status is more favorable if one is part-time rather than full-time. He wants to encourage people to do conversion to tenure track positions and to speak with Whiting and get the position description available. Discussion ensued on the money piece for the conversion of parttime faculty to tenure track, where the conversion is yearly or for three-year appointments, and seniority for those part-time faculty that have three year contracts. Hellenbrand also stated that new space will not be available to campus because the state does not have any capital bonds available. This is a statewide issue right now. As for enrollment, Hellenbrand shared that we are going to have a slightly fewer freshmen in Fall 2014 than this year. A bumper crop of transfer students will be coming because application was closed in the spring. Freshmen application will be down. However, international student applications will likely be robust. 8. Multi-Year Analysis of Reassigned Time Stephens showed the Multi-Year Analysis of Reassigned Time (Attachment C). She stated that the report is in two parts as shown in the chart. One section shows the reassigned time by category and the other is reassigned time by college. The reassigned time is based on the current replacement rate of $1689 per unit, so it adjusts for real 4|Page dollars over time. The analysis does not include research and department chairs. Discussion followed on questions regarding the research money that will be raised for the Nazarian College of Business and if it will be part of released time fund or TUC fund, APDB and SFR, instructional experimentation, and faculty fellows. It was suggested to invite Huber to the next meeting to talk about APDB. . 9. Annual Report 2013-2014 (Attachment D) The Annual Report for 2013-2014 was approved with the corrections noted by the members. 10. Adjournment The meeting was adjourned at 4:00 p.m. The next ERC meeting will be on Tuesday, September 9, 2014 at 2:00 – 4:00 p.m. in UN 211. Note: The Resolution on the Electronic Submission of Coursework was approved by the Faculty Senate on May 8, 2014. (Attachment A). 5|Page _____________________________________________________________ Faculty Senate Office Phone: 818/677-3263 FAX: 818/677-7174 California State University, Northridge Faculty Senate RESOLUTION ON THE ELECTRONIC SUBMISSION OF COURSEWORK (Approved by the Faculty Senate, May 8, 2014) WHEREAS, the Campus Sustainability Plan calls for reduced printing across campus; and WHEREAS, an Ad Hoc Committee on Lab Printing has presented recommendations, accepted by the Provost’s Council, to provide access to printing in Academic Affairs computer labs, with a default of duplex (twosided) printing and a uniform printing quota for students; therefore be it RESOLVED: that the Faculty Senate join the Academic Technology Committee and the Educational Resources Committee in recommending that, at the discretion of the individual instructor, faculty allow students to submit papers and other assignments electronically (e.g. email, learning management system); and be it further RESOLVED: that the Faculty Technology Center continue to offer support and specific instruction to faculty who wish to become more proficient in electronic grading of submitted papers and other assignments. The Senate encourages the allocation of resources (including reassigned-time) in support of faculty who seek such instruction. Attachment B Facility Id AC334 AC335 AK238 BH304 BH310 BH312 BH313 BH314 BH315 BH316 BP3100 CR5114 CR5117 CR5118 CR5119 CR5122 CR5123 CR5124 CR5125 CR5126 CR5127 CR5208 CR5209 CY103 CY105 CY111 CY113 CY119 CY215 CY217 CY265 CY266 CY270 ED1117 ED1121 ED1122 ED1123 ED1125 ED1126 ED1127 ED1129 ED1130 ED3111 ED3113 ED3115 ED3117 EDE106 EH2028 EH2132 EH2221 EH2225 EH2227 EH2228 JA100 JD1551 JD1552 JD1553 JD1555 JD1563 JD1593 JD1609 JD1610 JD2520 JD2522 JD2524 JD2528 JD3502 JD3504 College Allocation CAMC CAMC CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CSM CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC EDUC CSM CSM CSM CSM CSM CSM CHHD CECS CECS CECS CECS CECS CECS CECS CHHD CHHD CHHD CHHD CHHD CECS Facility Type LOCK LOCK CONF LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK LOCK LCTR LOCK LOCK OTHR LOCK LOCK LOCK LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK LCTR LCTR LOCK LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR Morning_8a m_2pm 22.0 11.0 1.3 23.3 21.2 24.6 23.4 22.8 22.8 18.7 15.5 13.7 21.6 13.5 10.8 25.5 19.2 16.8 23.0 9.4 22.9 19.2 2.5 2.8 15.5 10.0 17.8 0.0 1.7 11.1 9.2 7.5 6.7 21.9 12.7 16.1 9.2 10.7 17.8 10.0 20.3 13.9 0.0 11.8 10.4 10.3 0.0 15.2 21.1 15.2 24.8 21.3 20.8 25.5 19.7 15.2 18.7 20.4 18.6 16.5 21.1 17.1 22.9 15.5 15.3 18.0 19.7 15.3 Morning Utilization 73.3% 36.7% 4.2% 77.5% 70.6% 81.9% 78.1% 75.8% 75.8% 62.2% 51.7% 45.6% 71.9% 45.0% 36.1% 85.0% 63.9% 55.8% 76.7% 31.4% 76.4% 63.9% 8.3% 9.2% 51.7% 33.3% 59.2% 0.0% 5.6% 36.9% 30.6% 25.0% 22.2% 73.1% 42.2% 53.6% 30.6% 35.6% 59.2% 33.3% 67.5% 46.4% 0.0% 39.4% 34.7% 34.4% 0.0% 50.6% 70.3% 50.6% 82.5% 70.8% 69.4% 85.0% 65.6% 50.6% 62.2% 68.1% 61.9% 55.0% 70.3% 56.9% 76.4% 51.7% 50.8% 60.0% 65.6% 50.8% Afternoon _2pm_7p m 13.0 9.5 0.0 12.7 13.1 13.3 7.5 10.0 9.3 15.5 2.5 14.0 14.8 10.3 6.0 16.8 13.5 12.9 12.8 6.7 12.5 12.3 10.5 4.4 5.3 4.4 6.7 0.0 0.0 5.0 1.7 1.7 0.0 13.8 13.6 12.8 13.5 14.6 17.5 12.3 18.3 11.5 8.3 10.3 16.3 16.2 2.5 19.0 15.3 7.5 10.3 10.0 7.7 16.0 19.6 10.5 17.8 13.4 16.1 15.1 16.8 17.6 11.4 16.9 16.1 13.6 18.8 12.8 Afternoon Utilization 52.0% 38.0% 0.0% 50.7% 52.3% 53.3% 30.0% 40.0% 37.0% 62.0% 10.0% 56.0% 59.0% 41.0% 24.0% 67.3% 54.0% 51.7% 51.3% 26.7% 50.0% 49.0% 42.0% 17.7% 21.3% 17.7% 26.7% 0.0% 0.0% 20.0% 6.7% 6.7% 0.0% 55.3% 54.3% 51.0% 54.0% 58.3% 70.0% 49.0% 73.0% 46.0% 33.0% 41.3% 65.3% 64.7% 10.0% 76.0% 61.0% 30.0% 41.0% 40.0% 30.7% 64.0% 78.3% 42.0% 71.0% 53.7% 64.3% 60.3% 67.0% 70.3% 45.7% 67.7% 64.3% 54.3% 75.0% 51.0% Evening_7p m_10pm 3.5 7.0 0.0 5.5 4.4 5.5 0.0 8.3 0.0 8.3 0.0 1.5 1.5 1.5 1.5 5.5 0.0 1.5 1.5 0.0 0.0 1.5 0.0 5.5 3.3 0.0 2.8 5.5 0.0 0.0 0.0 0.0 0.0 8.3 7.0 11.1 11.0 8.0 9.3 8.3 8.3 8.3 5.5 11.1 11.2 8.3 0.0 3.0 5.3 0.0 0.0 0.0 0.7 11.0 11.0 5.5 8.3 11.0 8.3 8.0 5.5 8.0 8.3 11.0 10.5 8.3 10.5 8.3 Evening Utilization 23.3% 46.7% 0.0% 36.7% 29.4% 36.7% 0.0% 55.0% 0.0% 55.0% 0.0% 10.0% 10.0% 10.0% 10.0% 36.7% 0.0% 10.0% 10.0% 0.0% 0.0% 10.0% 0.0% 36.7% 21.7% 0.0% 18.3% 36.7% 0.0% 0.0% 0.0% 0.0% 0.0% 55.0% 46.7% 73.9% 73.3% 53.3% 61.7% 55.0% 55.6% 55.6% 36.7% 73.9% 74.4% 55.0% 0.0% 20.0% 35.0% 0.0% 0.0% 0.0% 4.4% 73.3% 73.3% 36.7% 55.0% 73.3% 55.0% 53.3% 36.7% 53.3% 55.0% 73.3% 70.0% 55.0% 70.0% 55.0% Weekly Room Hrs 38.5 27.5 1.3 41.4 38.7 43.4 30.9 41.0 32.0 42.4 18.0 29.2 37.8 25.3 18.3 47.8 32.7 31.2 37.3 16.1 35.4 32.9 13.0 12.7 24.1 14.4 27.2 5.5 1.7 16.1 10.8 9.2 6.7 44.0 33.3 39.9 33.7 33.3 44.5 30.5 46.8 33.8 13.8 33.3 37.9 34.8 2.5 37.2 41.6 22.7 35.0 31.3 29.2 52.5 50.3 31.2 44.7 44.8 42.9 39.6 43.3 42.7 42.6 43.4 41.8 39.8 48.9 36.3 % of Overall_Hrs_ Standard Rm utilization Hrs Expected 55.0% 72.6% 39.3% 51.9% 1.8% 5.7% 59.2% 78% 55.2% 73.0% 62.0% 81.9% 44.2% 58.3% 58.6% 77.4% 45.7% 60.4% 60.6% 80.0% 25.7% 34.0% 41.7% 55.0% 54.0% 71.4% 36.1% 47.6% 26.2% 34.6% 68.3% 90.3% 46.7% 61.6% 44.5% 58.8% 53.3% 70.4% 23.0% 30.3% 50.6% 66.8% 47.0% 62.1% 18.6% 24.5% 18.1% 23.9% 34.4% 45.4% 20.6% 27.2% 38.8% 51.3% 7.9% 10.4% 2.4% 7.6% 23.0% 30% 15.5% 20.4% 13.1% 17.3% 9.5% 12.6% 62.9% 83.0% 47.5% 62.7% 57.0% 75.3% 48.1% 63.5% 47.5% 62.7% 63.6% 84.0% 43.6% 57.5% 66.9% 88.4% 48.2% 63.7% 19.6% 25.9% 47.5% 62.7% 54.2% 71.5% 49.6% 65.6% 3.6% 4.7% 53.1% 70.1% 59.4% 78.5% 32.4% 42.8% 50.0% 66.0% 44.6% 59.0% 41.7% 55.0% 75.0% 99.1% 71.8% 94.8% 44.5% 58.8% 63.8% 84.3% 64.0% 84.6% 61.3% 81.0% 56.5% 74.7% 61.9% 81.8% 61.0% 80.5% 60.8% 80.3% 62.0% 81.9% 59.8% 78.9% 56.9% 75.2% 69.9% 92.3% 51.8% 68.4% Total Sections Sched 7 5 1 19 16 16 17 16 12 13 7 11 18 12 11 21 18 12 17 7 21 14 6 6 10 8 11 4 1 7 8 6 5 25 14 15 14 17 19 14 17 12 5 15 16 15 1 14 18 21 16 17 18 23 20 15 19 19 23 18 20 19 18 19 23 16 28 16 Total Avg Enroll 23.7 18.8 18.0 29.5 28.3 30.4 30.1 28.8 28.6 30.2 93.3 28.2 24.9 26.0 27.4 116.5 31.4 27.0 90.9 48.0 46.7 27.5 22.2 9.0 42.1 24.3 33.0 8.0 8.0 25.6 20.8 34.8 18.8 22.0 16.2 21.4 20.4 14.7 23.4 20.6 24.4 19.3 16.2 16.1 16.2 19.7 11.0 35.5 115.0 29.8 71.1 44.4 48.7 118.1 32.7 22.7 28.3 29.4 26.8 25.9 26.4 27.6 24.5 22.7 22.0 27.0 35.9 32.7 Room Capacity 40 32 25 45 45 45 39 39 39 55 100 40 38 38 38 155 40 40 120 76 59 40 30 39 49 55 45 30 38 40 25 40 24 50 27 36 27 27 36 42 35 40 25 30 25 40 18 48 130 49 78 78 75 150 65 25 48 47 37 31 32 45 38 30 33 36 65 49 Station Occupancy % 59.3% 58.8% 72.0% 65.5% 62.9% 67.5% 77.1% 73.9% 73.3% 54.8% 93.3% 70.5% 65.5% 68.4% 72.0% 75.1% 78.6% 67.5% 75.7% 63.2% 79.1% 68.8% 73.9% 23.1% 85.9% 44.1% 73.3% 26.7% 21.1% 63.9% 83.0% 87.1% 78.3% 44.1% 60.1% 59.4% 75.7% 54.5% 65.1% 49.0% 69.7% 48.1% 64.8% 53.6% 64.8% 49.2% 61.1% 74.0% 88.5% 60.8% 91.1% 56.9% 65.0% 78.7% 50.2% 90.9% 58.9% 62.6% 72.5% 83.7% 82.5% 61.4% 64.5% 75.6% 66.8% 75.0% 55.2% 66.7% Weekly Station Hrs 22.8 16.2 0.9 27.1 24.3 29.3 23.8 30.3 23.5 23.3 16.8 20.5 24.8 17.3 13.2 35.9 25.7 21.0 28.3 10.2 28.0 22.6 9.6 2.9 20.7 6.4 19.9 1.5 0.4 10.3 9.0 8.0 5.2 19.4 20.0 23.7 25.5 18.1 29.0 14.9 32.7 16.2 8.9 17.8 24.6 17.1 1.5 27.5 36.8 13.8 31.9 17.8 18.9 41.3 25.2 28.3 26.3 28.1 31.1 33.1 35.8 26.2 27.5 32.8 27.9 29.9 27.0 24.2 % of Standard Station Hrs Expected 65.2% 46.2% 5.1% 78% 69.5% 83.7% 68.1% 86.5% 67.0% 66.4% 48.0% 58.7% 70.8% 49.4% 37.7% 102.7% 73.4% 60.1% 80.8% 29.0% 80.0% 64.7% 27.4% 8.4% 59.1% 18.2% 56.9% 4.2% 2.0% 29% 25.7% 22.8% 14.9% 55.4% 57.1% 67.8% 72.8% 51.7% 82.7% 42.7% 93.3% 46.4% 25.5% 50.9% 70.1% 48.8% 4.4% 78.5% 105.1% 39.4% 91.1% 50.8% 54.1% 118.1% 72.1% 81.0% 75.1% 80.2% 88.9% 94.7% 102.1% 74.9% 78.4% 93.8% 79.8% 85.4% 77.1% 69.1% Univ Seat Util (based on 23 sections) 18.0% 12.8% 3.1% 54.1% 43.8% 47.0% 57.0% 51.4% 38.2% 31.0% 28.4% 33.7% 51.3% 35.7% 34.4% 68.6% 61.5% 35.2% 56.0% 19.2% 72.2% 41.8% 19.3% 6.0% 37.4% 15.3% 35.1% 4.6% 0.9% 19.5% 28.9% 22.7% 17.0% 47.9% 36.6% 38.8% 46.1% 40.3% 53.7% 29.8% 51.6% 25.1% 14.1% 34.9% 45.0% 32.1% 2.7% 45.0% 69.2% 55.5% 63.4% 42.1% 50.8% 78.7% 43.7% 59.3% 48.6% 51.7% 72.5% 65.5% 71.7% 50.7% 50.5% 62.5% 66.8% 52.2% 67.2% 46.4% Attachment B Facility Id JD3508 JD3510 JD3514 JD3516 JD3520 JH1103 JH1107 JH1117 JH1119 JH1121 JH1123 JH1125 JH1127 JH1129 JH1131 JH1133 JH1202 JH1204 JH1206 JH1208 JH1210 JH1212 JH1228 JH1230 JH1232 JH1234 JH1236 JH1238 JH1240 JH2204 JH2232 JH4117 JR115 JR117 JR118 JR119 JR120 JR130 JR132 JR134 JR201 JR202 JR203 JR204 JR212 JR214 JR215 JR217 JR218 JR221 JR242 JR243 JR244 JR245 JR246 JR247 JR301 JR302 JR303 JR304 JR315 JR330 JR348 JR352 JR354 LA181 LO1117 LO1124 College Allocation CECS CECS CHHD CHHD CECS COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE COBE HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN HUMAN CSM CSM Facility Type LOCK LCTR LCTR LCTR LCTR LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK CONF LCTR LCTR LCTR LCTR LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR Morning_8a m_2pm 13.0 18.0 20.4 18.0 17.3 12.5 10.0 18.3 11.9 16.4 12.8 20.5 16.9 13.6 18.8 14.4 14.4 18.6 15.3 15.5 18.5 12.3 10.0 24.5 15.6 19.4 18.3 16.3 14.0 14.8 2.5 0.0 25.5 23.0 20.5 25.5 2.5 25.5 25.5 25.5 20.0 25.5 23.8 20.3 19.4 23.0 25.5 25.5 17.8 25.5 23.8 22.8 24.0 21.9 24.7 23.8 20.6 22.8 24.0 24.7 23.0 19.7 17.8 25.5 24.0 23.0 16.1 17.0 Morning Utilization 43.3% 60.0% 68.1% 60.0% 57.5% 41.7% 33.3% 60.8% 39.7% 54.7% 42.5% 68.3% 56.4% 45.3% 62.5% 48.1% 48.1% 61.9% 50.8% 51.7% 61.7% 41.1% 33.3% 81.7% 51.9% 64.7% 60.8% 54.2% 46.7% 49.2% 8.3% 0.0% 85.0% 76.7% 68.3% 85.0% 8.3% 85.0% 85.0% 85.0% 66.7% 85.0% 79.4% 67.5% 64.7% 76.7% 85.0% 85.0% 59.2% 85.0% 79.4% 75.8% 80.0% 73.1% 82.3% 79.2% 68.6% 75.8% 80.0% 82.2% 76.7% 65.6% 59.2% 85.0% 80.0% 76.7% 53.6% 56.7% Afternoon _2pm_7p m 11.7 12.2 18.2 15.8 10.2 10.4 7.8 5.3 9.5 11.5 10.5 8.0 7.5 1.7 7.8 7.5 11.5 12.4 13.3 10.8 11.2 13.0 10.5 13.3 12.1 12.5 12.8 8.9 13.3 3.3 0.0 2.8 10.7 16.8 15.8 16.0 0.0 16.0 18.8 18.6 10.8 11.9 18.3 13.0 13.3 16.0 14.1 13.4 10.3 16.0 18.8 15.8 16.0 11.9 18.8 8.3 12.4 18.8 16.0 16.3 18.8 7.5 16.0 16.0 16.0 11.1 8.3 5.0 Afternoon Utilization 46.7% 48.7% 72.7% 63.0% 40.7% 41.7% 31.0% 21.3% 38.0% 46.0% 42.0% 32.0% 30.0% 6.7% 31.0% 30.0% 46.0% 49.7% 53.0% 43.3% 44.7% 52.0% 42.0% 53.0% 48.3% 50.0% 51.0% 35.7% 53.0% 13.0% 0.0% 11.0% 42.7% 67.3% 63.3% 64.0% 0.0% 64.0% 75.0% 74.3% 43.0% 47.7% 73.0% 52.0% 53.0% 64.0% 56.3% 53.7% 41.0% 64.0% 75.0% 63.0% 64.0% 47.7% 75.3% 33.3% 49.7% 75.0% 64.0% 65.0% 75.3% 30.0% 64.0% 64.0% 64.0% 44.3% 33.0% 20.0% Evening_7p m_10pm 11.0 8.3 11.0 6.7 2.8 1.3 2.8 5.5 8.3 8.3 2.8 8.3 5.5 8.3 6.9 11.0 8.3 8.3 11.0 8.3 11.0 11.0 5.5 8.3 11.0 5.6 11.0 8.3 8.3 11.0 0.0 2.8 2.8 5.5 4.1 0.0 0.0 5.5 8.3 2.8 0.0 2.8 5.5 0.0 2.8 2.8 5.5 0.0 2.8 0.0 2.8 5.5 2.8 5.5 0.0 2.8 2.8 2.8 0.0 8.3 0.0 0.0 8.3 2.8 0.0 0.0 0.8 0.0 Evening Utilization 73.3% 55.0% 73.3% 44.4% 18.3% 8.9% 18.9% 36.7% 55.0% 55.0% 18.3% 55.0% 36.7% 55.0% 46.1% 73.3% 55.0% 55.0% 73.3% 55.0% 73.3% 73.3% 36.7% 55.0% 73.3% 37.2% 73.3% 55.0% 55.0% 73.3% 0.0% 18.3% 18.3% 36.7% 27.2% 0.0% 0.0% 36.7% 55.0% 18.3% 0.0% 18.3% 36.7% 0.0% 18.3% 18.3% 36.7% 0.0% 18.3% 0.0% 18.3% 36.7% 18.3% 36.7% 0.0% 18.3% 18.3% 18.3% 0.0% 55.0% 0.0% 0.0% 55.0% 18.3% 0.0% 0.0% 5.6% 0.0% Weekly Room Hrs 35.7 38.4 49.6 40.4 30.2 24.3 20.6 29.1 29.7 36.2 26.0 36.8 29.9 23.5 33.4 32.9 34.2 39.3 39.5 34.6 40.7 36.3 26.0 46.0 38.7 37.5 42.0 33.4 35.5 29.0 2.5 5.5 38.9 45.3 40.4 41.5 2.5 47.0 52.5 46.8 30.8 40.2 47.6 33.3 35.4 41.8 45.1 38.9 30.8 41.5 45.3 44.0 42.8 39.3 43.5 34.8 35.8 44.3 40.0 49.2 41.8 27.2 42.0 44.3 40.0 34.1 25.2 22.0 % of Overall_Hrs_ Standard Rm utilization Hrs Expected 51.0% 67.3% 54.9% 72.5% 70.8% 93.6% 57.7% 76.3% 43.1% 56.9% 34.6% 45.8% 29.4% 38.8% 41.5% 54.9% 42.4% 56.0% 51.7% 68.2% 37.1% 49.1% 52.5% 69.3% 42.7% 56.4% 33.6% 44.3% 47.7% 63.1% 47.0% 62.1% 48.8% 64.5% 56.1% 74.1% 56.4% 74.5% 49.4% 65.3% 58.1% 76.7% 51.9% 68.6% 37.1% 49.1% 65.7% 86.8% 55.2% 73.0% 53.6% 70.8% 60.0% 79.2% 47.7% 63.1% 50.7% 67.0% 41.4% 54.7% 3.6% 4.7% 7.9% 25.0% 55.6% 73.4% 64.8% 85.5% 57.7% 76.3% 59.3% 78.3% 3.6% 4.7% 67.1% 88.7% 75.0% 99.1% 66.9% 88.4% 43.9% 58.0% 57.4% 75.8% 68.0% 89.8% 47.5% 62.7% 50.6% 66.8% 59.6% 78.8% 64.4% 85.1% 55.6% 73.4% 43.9% 58.0% 59.3% 78.3% 64.8% 85.5% 62.9% 83.0% 61.1% 80.7% 56.2% 74.2% 62.2% 82.1% 49.8% 65.7% 51.1% 67.5% 63.2% 83.5% 57.1% 75.5% 70.2% 92.8% 59.8% 78.9% 38.8% 51.3% 60.0% 79.2% 63.2% 83.5% 57.1% 75.5% 48.7% 64.3% 36.0% 47.5% 31.4% 41.5% Total Sections Sched 14 17 21 18 12 9 8 11 12 15 11 15 12 9 15 13 16 19 16 15 13 16 10 15 15 15 17 13 15 12 1 8 17 17 15 16 1 18 21 20 12 15 18 14 14 16 17 16 13 17 19 17 19 16 19 16 14 17 16 20 16 11 16 17 16 14 12 10 Total Avg Enroll 24.9 30.2 40.8 41.5 41.9 25.1 18.6 36.3 37.0 36.2 31.3 37.1 32.4 30.7 51.9 41.1 28.7 24.3 23.3 24.7 30.3 28.4 28.7 29.2 23.6 33.0 29.2 23.2 31.1 52.8 31.0 29.3 21.4 22.0 41.4 25.1 12.0 31.2 33.7 32.3 22.1 30.5 24.6 29.5 21.4 33.3 22.5 22.6 21.2 31.4 22.6 28.4 30.0 22.1 31.7 20.9 22.9 28.5 24.3 27.2 45.4 27.1 29.0 31.1 22.4 192.6 35.3 19.4 Room Capacity 39 49 73 72 75 32 32 48 48 48 48 48 48 48 56 56 42 42 42 42 42 42 42 42 42 42 42 42 42 73 30 40 34 35 57 37 20 40 41 42 33 41 34 41 33 43 35 35 28 49 35 40 47 33 47 24 33 40 34 41 85 34 49 45 33 231 60 60 Station Occupancy % 63.7% 61.7% 55.8% 57.6% 55.9% 78.5% 58.2% 75.6% 77.1% 75.4% 65.2% 77.4% 67.5% 63.9% 92.7% 73.4% 68.3% 57.8% 55.5% 58.9% 72.2% 67.6% 68.3% 69.5% 56.2% 78.6% 69.6% 55.3% 74.0% 72.3% 103.3% 73.1% 62.8% 62.9% 72.6% 67.9% 60.0% 77.9% 82.1% 76.8% 66.9% 74.3% 72.4% 72.0% 64.9% 77.3% 64.4% 64.5% 75.5% 64.0% 64.5% 70.9% 63.8% 66.9% 67.5% 87.2% 69.3% 71.3% 71.5% 66.2% 53.4% 79.7% 59.2% 69.0% 68.0% 83.4% 58.8% 32.3% Weekly Station Hrs 22.7 23.7 27.7 23.3 16.9 19.0 12.0 22.0 22.9 27.3 16.9 28.4 20.2 15.0 31.0 24.1 23.3 22.7 21.9 20.4 29.3 24.5 17.8 32.0 21.7 29.5 29.2 18.5 26.3 21.0 2.6 4.0 24.4 28.5 29.4 28.2 1.5 36.6 43.1 36.0 20.6 29.8 34.4 23.9 23.0 32.3 29.0 25.1 23.2 26.6 29.2 31.2 27.3 26.3 29.4 30.4 24.8 31.6 28.6 32.6 22.3 21.6 24.9 30.5 27.2 28.4 14.8 7.1 % of Standard Station Hrs Expected 65.0% 67.7% 79.1% 66.6% 48.2% 54.4% 34.2% 62.8% 65.3% 77.9% 48.4% 81.2% 57.7% 42.9% 88.5% 69.0% 66.7% 64.8% 62.6% 58.2% 83.8% 70.1% 50.8% 91.4% 62.1% 84.2% 83.5% 52.8% 75.0% 59.9% 7.4% 22.9% 69.8% 81.4% 83.9% 80.5% 4.3% 104.6% 123.2% 102.7% 58.8% 85.3% 98.4% 68.4% 65.7% 92.2% 82.9% 71.7% 66.4% 75.9% 83.6% 89.1% 78.0% 75.1% 84.0% 86.8% 70.7% 90.2% 81.7% 93.0% 63.8% 61.8% 71.0% 87.3% 77.7% 81.2% 42.2% 20.3% Univ Seat Util (based on 23 sections) 38.8% 45.6% 51.0% 45.1% 29.2% 30.7% 20.2% 36.1% 40.2% 49.2% 31.2% 50.5% 35.2% 25.0% 60.5% 41.5% 47.5% 47.7% 38.6% 38.4% 40.8% 47.0% 29.7% 45.3% 36.6% 51.2% 51.4% 31.3% 48.2% 37.7% 4.5% 25.4% 46.4% 46.5% 47.4% 47.2% 2.6% 61.0% 75.0% 66.8% 34.9% 48.5% 56.6% 43.8% 39.5% 53.8% 47.6% 44.8% 42.7% 47.3% 53.3% 52.4% 52.7% 46.5% 55.8% 60.7% 42.2% 52.7% 49.7% 57.6% 37.1% 38.1% 41.2% 51.0% 47.3% 50.8% 30.7% 14.1% Attachment B Facility Id LO1125 LO1127 LO1219 LO1231 LO1328 MH101 MH304 MH341 MZ101 MZ103 MZ111 MZ112 MZ113 MZ114 MZ115 MZ122 MZ124 MZ130 MZ170 MZ212 MZ215 MZ361 MZ363 NA101 NH104 NH113 NH209 OV001 OV002 OV025 RE104 RE151 RE153 RE155 RE157 RE274 SG100 SG101 SG103 SG105 SG108 SG109 SG110 SH102 SH104 SH106 SH108 SH120 SH130A SH160 SH182 SH184 SH186 SH192 SH198 SH203 SH205 SH207 SH209 SH221 SH224 SH225 SH234 SH264 SH265 SH266 SH267 SH268 College Allocation CSM CSM CSM CSM CSM CHHD CHHD CHHD CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CAMC CHHD CHHD CHHD CHHD CHHD CHHD CAMC CAMC CAMC CAMC CAMC CAMC CAMC CSBS CSBS CSBS HUMAN CSBS CSBS CSBS CSBS CSBS CSBS HUMAN HUMAN CSBS HUMAN HUMAN CSBS HUMAN HUMAN CSBS CSBS CSBS CSBS CSBS CSBS CSBS Facility Type LCTR LCTR LCTR LCTR LOCK LOCK LOCK LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR OTHR CONF LOCK LCTR LCTR LCTR LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR CONF LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK LCTR LCTR LCTR CONF LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR Morning_8a m_2pm 24.0 5.0 19.6 18.6 23.3 22.9 5.8 5.3 23.0 20.8 25.5 21.0 25.5 16.9 22.8 24.4 22.9 23.0 26.8 5.0 0.0 18.7 14.2 25.3 0.8 20.3 12.8 20.3 20.3 25.5 19.7 18.0 4.2 21.3 25.5 0.0 16.1 20.5 18.5 20.0 20.5 15.3 17.8 15.0 4.6 17.8 18.3 25.5 0.0 16.9 16.9 17.8 17.8 22.8 20.5 21.8 13.3 15.0 18.5 16.1 15.3 19.3 16.3 16.1 16.9 21.0 13.3 17.5 Morning Utilization 80.0% 16.7% 65.3% 61.9% 77.8% 76.4% 19.2% 17.5% 76.7% 69.2% 85.0% 70.0% 85.0% 56.4% 75.8% 81.4% 76.4% 76.7% 89.2% 16.7% 0.0% 62.2% 47.2% 84.2% 2.8% 67.5% 42.5% 67.5% 67.5% 85.0% 65.6% 60.0% 13.9% 71.1% 85.0% 0.0% 53.6% 68.3% 61.7% 66.7% 68.3% 50.8% 59.2% 50.0% 15.3% 59.2% 60.8% 85.0% 0.0% 56.4% 56.4% 59.2% 59.2% 75.8% 68.3% 72.5% 44.4% 50.0% 61.7% 53.6% 50.8% 64.2% 54.4% 53.6% 56.4% 70.0% 44.2% 58.3% Afternoon _2pm_7p m 12.5 9.9 5.8 11.4 16.8 10.0 2.5 5.0 18.8 16.0 16.0 17.7 12.3 16.0 16.0 13.3 16.0 15.8 7.9 1.7 2.8 10.7 13.0 16.1 10.0 10.5 10.8 6.7 5.0 17.3 15.3 11.0 10.3 13.3 20.3 0.0 10.5 17.5 9.8 8.0 10.5 13.5 8.8 9.9 0.4 6.1 11.1 14.8 1.0 13.3 11.3 13.3 13.3 14.2 13.3 19.8 19.6 13.0 9.8 8.6 11.8 9.7 14.5 9.2 13.3 9.5 9.8 10.5 Afternoon Utilization 50.0% 39.7% 23.3% 45.7% 67.3% 40.0% 10.0% 20.0% 75.3% 64.0% 64.0% 70.7% 49.3% 64.0% 64.0% 53.0% 64.0% 63.0% 31.7% 6.7% 11.0% 42.7% 52.0% 64.3% 40.0% 42.0% 43.0% 26.7% 20.0% 69.0% 61.3% 44.0% 41.3% 53.0% 81.0% 0.0% 42.0% 70.0% 39.0% 32.0% 42.0% 54.0% 35.3% 39.7% 1.7% 24.3% 44.3% 59.0% 4.0% 53.0% 45.3% 53.0% 53.0% 56.7% 53.0% 79.0% 78.3% 52.0% 39.3% 34.3% 47.0% 38.7% 58.0% 36.7% 53.0% 38.0% 39.3% 42.0% Evening_7p m_10pm 0.0 0.0 0.0 0.0 2.3 5.5 0.0 0.0 5.5 5.5 11.0 8.3 11.0 8.3 8.3 0.0 11.0 8.3 11.0 5.5 0.0 10.0 5.5 11.3 1.0 0.0 0.0 0.0 0.0 5.5 2.8 5.5 2.8 2.8 1.3 2.8 0.0 0.3 2.8 2.8 0.0 5.5 0.0 4.2 2.8 0.0 2.8 3.5 1.8 3.0 2.8 11.0 8.3 8.3 2.8 1.5 5.5 0.0 2.2 0.0 1.8 0.0 10.3 2.0 2.8 1.3 8.3 8.3 Evening Utilization 0.0% 0.0% 0.0% 0.0% 15.6% 36.7% 0.0% 0.0% 36.7% 36.7% 73.3% 55.0% 73.3% 55.0% 55.0% 0.0% 73.3% 55.0% 73.3% 36.7% 0.0% 66.7% 36.7% 75.0% 6.7% 0.0% 0.0% 0.0% 0.0% 36.7% 18.3% 36.7% 18.3% 18.3% 8.9% 18.3% 0.0% 2.2% 18.3% 18.3% 0.0% 36.7% 0.0% 27.8% 18.3% 0.0% 18.3% 23.3% 11.7% 20.0% 18.3% 73.3% 55.0% 55.0% 18.3% 10.0% 36.7% 0.0% 14.4% 0.0% 11.7% 0.0% 68.3% 13.3% 18.3% 8.9% 55.0% 55.0% Weekly Room Hrs 36.5 14.9 25.4 30.0 42.5 38.4 8.3 10.3 47.3 42.3 52.5 46.9 48.8 41.2 47.0 37.7 49.9 47.0 45.7 12.2 2.8 39.3 32.7 52.6 11.8 30.8 23.5 26.9 25.3 48.3 37.8 34.5 17.3 37.3 47.1 2.8 26.6 38.3 31.0 30.8 31.0 34.3 26.6 29.1 7.8 23.8 32.1 43.8 2.8 33.2 31.0 42.0 39.3 45.2 36.5 43.0 38.4 28.0 30.5 24.7 28.8 28.9 41.1 27.3 32.9 31.8 31.3 36.3 % of Overall_Hrs_ Standard Rm utilization Hrs Expected 52.1% 68.9% 21.3% 28.1% 36.3% 48.0% 42.9% 56.6% 60.7% 80.2% 54.9% 72.5% 11.8% 15.6% 14.6% 19.3% 67.6% 89.3% 60.4% 79.7% 75.0% 99.1% 67.0% 88.5% 69.8% 92.1% 58.8% 77.7% 67.1% 88.7% 53.8% 71.1% 71.3% 94.2% 67.1% 88.7% 65.2% 208% 17.4% 55% 3.9% 5.2% 56.2% 74.2% 46.7% 61.6% 75.1% 99.2% 16.9% 22.3% 43.9% 58.0% 33.6% 44.3% 38.5% 50.8% 36.1% 47.6% 68.9% 91.0% 53.9% 71.2% 49.3% 65.1% 24.6% 32.5% 53.3% 70% 67.3% 88.8% 3.9% 12.5% 38.0% 50.2% 54.8% 72.3% 44.3% 58.5% 43.9% 58.0% 44.3% 58.5% 48.9% 64.6% 38.0% 50.2% 41.5% 54.9% 11.1% 14.6% 34.0% 45.0% 45.8% 61% 62.5% 82.5% 3.9% 12.5% 47.4% 62.6% 44.3% 58.5% 60.0% 79.2% 56.1% 74.1% 64.5% 85.2% 52.1% 68.9% 61.4% 81.1% 54.9% 72.5% 40.0% 52.8% 43.6% 57.5% 35.2% 46.5% 41.1% 54.2% 41.3% 54.6% 58.7% 77.5% 38.9% 51.4% 47.0% 62.1% 45.5% 60.1% 44.8% 59.1% 51.8% 68.4% Total Sections Sched 16 7 13 13 17 16 3 4 18 16 28 21 27 17 28 16 25 21 10 10 1 17 20 25 5 13 13 11 10 20 19 17 10 16 19 1 11 16 13 10 12 14 11 13 10 11 19 18 1 16 15 17 15 20 14 17 16 11 14 10 12 19 17 15 17 12 11 14 Total Avg Enroll 50.2 24.4 45.3 44.2 50.2 37.9 10.0 26.8 35.2 32.2 22.8 32.3 23.6 36.2 24.3 41.5 22.2 108.3 21.5 9.1 32.0 48.0 21.3 145.4 6.8 154.1 25.0 25.6 27.9 127.8 27.4 23.2 12.5 42.4 40.7 14.0 59.3 27.8 37.8 30.6 25.0 32.4 28.3 29.4 27.5 23.6 26.7 76.4 12.0 24.3 31.9 31.6 38.3 27.2 38.8 58.2 26.9 22.0 39.4 27.5 16.2 33.4 23.0 23.3 32.4 26.4 23.5 18.8 Room Capacity 70 60 60 60 72 75 20 36 47 49 29 48 30 48 30 64 31 121 25 20 30 70 30 166 20 185 30 32 55 140 42 31 25 57 57 20 70 45 49 49 49 58 49 41 41 41 41 84 15 42 41 49 49 36 49 65 34 31 48 34 25 48 35 42 49 41 45 42 Station Occupancy % 71.7% 40.7% 75.5% 73.7% 69.8% 50.6% 50.0% 74.3% 74.8% 65.7% 78.6% 67.3% 78.8% 75.4% 80.8% 64.8% 71.7% 89.5% 86.0% 45.5% 106.7% 68.6% 70.8% 87.6% 34.0% 83.3% 83.3% 80.1% 50.7% 91.3% 65.3% 75.0% 50.0% 74.3% 71.4% 70.0% 84.7% 61.7% 77.2% 62.4% 51.0% 55.9% 57.7% 71.7% 67.1% 57.6% 65.1% 90.9% 80.0% 57.7% 77.9% 64.6% 78.2% 75.4% 79.2% 89.5% 79.0% 71.0% 82.1% 80.9% 64.7% 69.6% 65.7% 55.6% 66.0% 64.4% 52.1% 44.7% Weekly Station Hrs 26.2 6.1 19.2 22.1 29.7 19.4 4.1 7.6 35.4 27.8 41.3 31.6 38.5 31.0 38.0 24.4 35.8 42.1 39.3 5.5 2.9 27.0 23.1 46.0 4.0 25.6 19.6 21.6 12.8 44.0 24.6 25.9 8.6 27.8 33.6 1.9 22.5 23.6 23.9 19.2 15.8 19.1 15.3 20.8 5.2 13.7 20.9 39.8 2.2 19.1 24.1 27.1 30.7 34.1 28.9 38.5 30.4 19.9 25.1 20.0 18.6 20.1 27.0 15.1 21.7 20.5 16.3 16.2 % of Standard Station Hrs Expected 74.8% 17.4% 54.8% 63.2% 84.7% 55.5% 11.8% 21.8% 101.2% 79.3% 117.9% 90.2% 109.9% 88.6% 108.5% 69.8% 102.3% 120.2% 223% 31% 8.4% 77.1% 66.1% 131.6% 11.5% 73.2% 56.0% 61.6% 36.6% 125.8% 70.4% 73.9% 24.6% 79% 96.0% 10.9% 64.3% 67.5% 68.4% 54.9% 45.2% 54.7% 43.8% 59.6% 14.9% 39.3% 60% 113.7% 12.5% 54.7% 69.0% 77.5% 87.7% 97.3% 82.5% 110.0% 86.8% 56.8% 71.6% 57.0% 53.1% 57.5% 77.1% 43.3% 62.1% 58.6% 46.7% 46.3% Univ Seat Util (based on 23 sections) 49.9% 12.4% 42.7% 41.7% 51.6% 35.2% 6.5% 12.9% 58.6% 45.7% 95.7% 61.4% 92.5% 55.7% 98.4% 45.1% 78.0% 81.7% 37.4% 19.8% 4.6% 50.7% 61.6% 95.2% 7.4% 47.1% 47.1% 38.3% 22.1% 79.4% 53.9% 55.4% 21.7% 51.7% 59.0% 3.0% 40.5% 42.9% 43.7% 27.2% 26.6% 34.0% 27.6% 40.5% 29.2% 27.6% 53.8% 71.2% 3.5% 40.2% 50.8% 47.7% 51.0% 65.6% 48.2% 66.2% 55.0% 33.9% 50.0% 35.2% 33.7% 57.5% 48.6% 36.2% 48.8% 33.6% 24.9% 27.2% Attachment B Facility Id SH270 SH276 SH279 SH280 SH284 SH285 SH286 SH287 SH288 SH290 SH302 SH305 SH307 SH309 SH310 SH312 SH314 SH321 SH322 SH342 SH365 SH371 SH380 SH382 SH384 SH386 SH390 SH391 SQ100 SQ101 SQ102 SQ103 SQ104 SQ109 SQ210 College Allocation CSBS CSBS CSBS CSBS CSBS CSBS CSBS CSBS CSBS CSBS CSBS HUMAN HUMAN CSBS CSBS HUMAN HUMAN HUMAN CSBS CSBS CSBS CSBS CSBS CSBS HUMAN CSBS HUMAN CSBS CHHD CHHD CHHD CHHD CHHD CHHD Facility Type LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LOCK LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR LCTR CONF Morning_8a m_2pm 23.0 22.8 18.6 20.3 20.3 22.9 16.1 21.6 10.3 5.3 10.2 16.1 20.0 23.0 19.2 17.8 16.9 16.1 13.4 20.0 22.8 11.0 17.0 18.3 20.3 23.0 20.5 13.5 18.0 23.0 17.7 17.2 20.5 20.1 1.7 Morning Utilization 76.7% 76.1% 61.9% 67.5% 67.5% 76.4% 53.6% 71.9% 34.2% 17.5% 33.9% 53.6% 66.7% 76.7% 63.9% 59.2% 56.4% 53.6% 44.7% 66.7% 75.8% 36.7% 56.7% 60.8% 67.5% 76.7% 68.3% 45.0% 60.0% 76.7% 58.9% 57.2% 68.3% 66.9% 5.6% Afternoon _2pm_7p m 15.8 9.8 15.5 13.3 12.1 12.0 10.0 11.3 5.5 2.5 8.0 15.2 18.8 15.3 16.2 10.4 16.0 13.3 5.8 12.5 14.2 11.4 10.5 7.8 18.8 11.5 16.0 11.3 8.3 16.0 16.9 18.8 18.8 17.9 3 Afternoon Utilization 63.0% 39.0% 62.0% 53.0% 48.3% 48.0% 40.0% 45.3% 22.0% 10.0% 32.0% 60.7% 75.0% 61.0% 64.7% 41.7% 64.0% 53.0% 23.0% 50.0% 56.7% 45.7% 42.0% 31.0% 75.0% 46.0% 64.0% 45.0% 33.0% 64.0% 67.7% 75.0% 75.0% 71.7% 0 Evening_7p m_10pm 11.0 7.5 2.8 2.8 7.3 5.5 5.5 5.5 5.5 8.3 2.8 0.5 0.0 0.0 5.6 2.3 2.8 0.0 0.7 8.3 0.0 5.5 3.8 5.6 0.0 1.8 0.0 4.0 11.0 8.3 7.2 2.8 8.3 11.0 0 Evening Utilization 73.3% 50.0% 18.3% 18.3% 48.3% 36.7% 36.7% 36.7% 36.7% 55.0% 18.3% 3.3% 0.0% 0.0% 37.2% 15.0% 18.3% 0.0% 4.4% 55.0% 0.0% 36.7% 25.6% 37.2% 0.0% 11.7% 0.0% 26.7% 73.3% 55.0% 47.8% 18.9% 55.0% 73.3% 0 Weekly Room Hrs 49.8 40.1 36.8 36.3 39.6 40.4 31.6 38.4 21.3 16.0 20.9 31.8 38.8 38.3 40.9 30.4 35.7 29.3 19.8 40.8 36.9 27.9 31.3 31.6 39.0 36.3 36.5 28.8 37.3 47.3 41.8 38.8 47.5 49.0 4.4 % of Overall_Hrs_ Standard Rm utilization Hrs Expected 71.1% 93.9% 57.3% 75.6% 52.6% 69.5% 51.8% 68.4% 56.5% 74.7% 57.7% 76.3% 45.1% 59.6% 54.9% 72.5% 30.4% 40.1% 22.9% 30.2% 29.9% 39.5% 45.4% 59.9% 55.4% 73.1% 54.6% 72.2% 58.5% 77.2% 43.5% 57.4% 51.0% 67.3% 41.9% 55.3% 28.3% 37.4% 58.2% 76.9% 52.7% 69.7% 39.9% 52.7% 44.8% 59.1% 45.1% 59.6% 55.7% 73.6% 51.8% 68.4% 52.1% 68.9% 41.1% 54.2% 53.2% 70.3% 67.5% 89.2% 59.6% 78.8% 55.4% 73.1% 67.9% 89.6% 70.0% 92% 6.3% 20.1% Lecture Lab 239 0 % of Overall_Hrs_ Standard Rm utilization Hrs Expected 7,990.27 48% 63% #DIV/0! #DIV/0! Large Lec Open Lock 10 201 28 439.42 7,059.93 490.92 No. of Rooms OVERALL_HRS_UTILIZATION % STD RM HRS EXPECTED % STD STN HRS EXPECTED Weekly Room Hrs 70 53 35 22 17.6 63% 50% 25% 83% 66% 33% Total Sections Sched 20 13 15 17 17 18 13 17 9 7 34 13 16 17 20 13 14 11 8 20 14 14 13 12 15 15 14 13 21 18 21 16 18 20 2 Total Sections Sched 190 Total Avg Enroll 35.2 30.3 24.5 76.5 27.2 21.4 29.8 20.3 16.7 18.0 15.7 24.9 22.1 62.5 18.2 20.7 26.5 27.0 15.6 45.2 32.5 19.4 37.0 25.3 36.1 78.5 39.8 16.7 36.5 44.1 24.8 24.3 103.6 41.4 14.0 Room Capacity 43 42 40 84 47 35 49 35 25 30 20 31 34 74 33 27 39 40 25 62 48 27 48 41 41 82 49 30 60 60 35 35 125 60 12 Station Occupancy % 81.7% 72.2% 61.2% 91.0% 57.8% 61.1% 60.8% 58.0% 66.7% 60.0% 78.5% 80.4% 64.9% 84.4% 55.2% 76.6% 67.9% 67.5% 62.5% 72.9% 67.7% 72.0% 77.1% 61.6% 88.1% 95.8% 81.2% 55.6% 60.9% 73.5% 70.9% 69.3% 82.8% 68.9% 116.7% Weekly Station Hrs 40.7 28.9 22.5 33.0 22.9 24.7 19.2 22.3 14.2 9.6 16.4 25.5 25.1 32.3 22.6 23.3 24.2 19.8 12.4 29.7 25.0 20.1 24.2 19.5 34.4 34.7 29.6 16.0 22.7 34.7 29.6 26.8 39.4 33.8 5.2 % of Standard Station Hrs Expected 116.2% 82.6% 64.4% 94.3% 65.4% 70.6% 54.8% 63.6% 40.5% 27.4% 46.9% 72.9% 71.8% 92.3% 64.5% 66.6% 69.2% 56.6% 35.4% 84.9% 71.4% 57.4% 69.0% 55.6% 98.2% 99.2% 84.7% 45.7% 64.8% 99.3% 84.6% 76.7% 112.4% 96% 29.3% 7,999.60 - 11,398.00 - 70% #DIV/0! 5,536.66 - % of Standard Station Hrs Expected 66% #DIV/0! 1,272.17 6,018.23 709.20 1,523.00 8,833.00 1,042.00 84% 68% 68% 367.87 4,853.02 315.77 105% 69% 4% Total Avg Enroll Room Capacity Station Occupancy % Weekly Station Hrs Univ Seat Util (based on 23 sections) 71.1% 40.8% 39.9% 67.3% 42.7% 47.8% 34.3% 42.9% 26.1% 18.3% 116.1% 45.4% 45.1% 62.4% 48.0% 43.3% 41.4% 32.3% 21.7% 63.4% 41.2% 43.8% 43.6% 32.1% 57.5% 62.5% 49.4% 31.4% 55.6% 57.5% 64.7% 48.2% 64.8% 59.9% 10.1% California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY REASSIGNED TIME CATEGORY Fall 2003 REASSIGNED TIME Spring 2004 Cost 1 FT PT Instructional Experimentation 452 31 3 486 $ 821,192 459 9 0 468 $ 789,776 $ 1,610,968 Instructional Related Services 202 79 12 293 $ 495,046 145 97 6 247 $ 417,859 $ 912,905 Student Advisor 133 18 1 151 $ 255,039 196 77 0 273 $ 460,759 $ 715,798 Excess Enrollments 98 56 0 154 $ 259,262 81 60 3 144 $ 243,554 $ 502,815 Spec Instructional Prog 55 8 6 69 $ 116,541 111 19 0 129 $ 218,557 $ 335,098 New Preparations 161 27 9 197 $ 331,889 152 38 0 190 $ 321,586 $ 653,474 Curricular Planning 66 15 0 81 $ 136,809 48 15 0 63 $ 106,407 $ 243,216 Instructional Related Committee 62 18 0 80 $ 135,120 72 0 0 72 $ 121,270 $ 256,390 Instruction Supp Grad Students 48 0 0 48 $ 81,072 23 7 0 30 $ 50,501 $ 131,573 Course or Supervision Overload 31 7 0 38 $ 64,182 27 0 0 27 $ 44,927 $ 109,109 Nontraditional Instruction 0 0 0 0 $ - 0 9 0 9 $ 15,201 $ 15,201 Accreditation Responsibility 24 4 0 28 $ 47,968 9 0 0 9 $ 15,201 $ 63,169 CFA Activities 3 0 0 3 $ 5,067 3 0 0 3 $ 5,067 $ 10,134 In-Service Training for K12 9 0 0 9 $ 14,357 22 0 0 22 $ 36,314 $ 50,670 Instructional Related Facilities Plan 0 0 0 0 $ - 0 1 0 1 $ 1,689 $ 1,689 1,342 263 31 1,636 $ 2,763,542 1,346 331 9 1,687 $ 2,848,667 $ 5,612,209 FT PT FT PT Fall 2004 REASSIGNED TIME OTH Total FY Cost 1 PT Total OTH Total Cost 1 FT Spring 2005 Cost 1 OTH Total Cost 1 OTH Total FY Cost 1 % Change from Prior Year Instructional Experimentation 448 8 8 463 $ 782,683 552 3 0 555 $ 938,071 $ 1,720,753 7% Instructional Related Services 214 83 12 309 $ 521,901 149 89 9 246 $ 416,001 $ 937,902 3% Student Advisor 180 48 0 228 $ 384,416 142 58 0 200 $ 337,462 $ 721,879 1% Excess Enrollments 105 37 3 145 $ 244,567 122 44 0 165 $ 278,685 $ 523,252 4% Spec Instructional Prog 110 4 6 120 $ 201,836 159 15 6 180 $ 303,851 $ 505,687 51% New Preparations 119 33 0 151 $ 255,546 110 13 0 123 $ 208,085 $ 463,631 -29% Curricular Planning 43 19 0 62 $ 103,874 52 15 0 67 $ 112,487 $ 216,361 -11% Instructional Related Committee 60 0 0 60 $ 101,340 44 0 0 44 $ 74,992 $ 176,332 -31% Instruction Supp Grad Students 26 0 0 26 $ 43,914 25 0 9 34 $ 56,582 $ 100,496 -24% Course or Supervision Overload 6 3 0 9 $ 14,525 31 9 0 40 $ 67,560 $ 82,085 -25% Nontraditional Instruction 6 16 0 22 $ 37,158 0 15 3 18 $ 30,402 $ 67,560 344% Accreditation Responsibility 10 0 0 10 $ 16,890 8 0 0 8 $ 12,836 $ 29,726 -53% CFA Activities 0 0 0 0 $ - 12 0 0 12 $ 20,268 $ 20,268 100% In-Service Training for K12 7 0 0 7 $ 12,161 2 0 0 2 $ 3,378 $ 15,539 -69% 700% Instructional Related Facilities Plan Total 1 4 0 0 4 $ 6,756 1,336 251 29 1,615 $ 2,727,566 1 3 0 4 $ 6,756 $ 13,512 1,408 263 27 1,698 $ 2,867,415 $ 5,594,981 0% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY REASSIGNED TIME CATEGORY Fall 2005 REASSIGNED TIME FT PT Spring 2006 Cost 1 OTH Total FT PT Cost 1 OTH Total FY Cost 1 % Change from Prior Year Instructional Experimentation 415 5 0 420 $ 709,380 585 22 0 607 $ 1,025,899 $ 1,735,279 Instructional Related Services 138 23 0 161 $ 271,760 146 36 0 182 $ 306,554 $ 578,314 -38% Student Advisor 123 32 0 155 $ 261,795 155 40 0 196 $ 330,368 $ 592,163 -18% Excess Enrollments 156 45 3 204 $ 344,556 129 27 3 159 $ 269,227 $ 613,783 17% Spec Instructional Prog 111 24 0 135 $ 228,015 116 36 0 152 $ 256,897 $ 484,912 -4% New Preparations 62 9 0 71 $ 119,919 59 10 1 69 $ 117,217 $ 237,136 -49% Curricular Planning 54 3 0 57 $ 95,597 57 0 0 57 $ 95,935 $ 191,533 -11% Instructional Related Committee 33 0 0 33 $ 55,737 23 0 0 23 $ 39,185 $ 94,922 -46% Instruction Supp Grad Students 8 4 3 15 $ 24,491 19 0 0 19 $ 32,767 $ 57,257 -43% Course or Supervision Overload 0 3 0 3 $ 5,067 16 3 0 19 $ 31,247 $ 36,314 -56% Nontraditional Instruction 0 13 0 13 $ 21,957 0 15 0 15 $ 25,335 $ 47,292 -30% Accreditation Responsibility 9 0 0 9 $ 15,201 24 0 0 24 $ 39,692 $ 54,893 85% CFA Activities 15 0 0 15 $ 25,335 15 0 0 15 $ 25,335 $ 50,670 150% In-Service Training for K12 4 1 0 5 $ 8,445 3 1 0 4 $ 6,756 $ 15,201 -2% Instructional Related Facilities Plan 10 0 0 10 $ 16,214 7 2 0 9 $ 15,201 $ 31,415 133% 1,137 162 6 1,305 $ 2,203,469 1,354 192 4 1,550 $ 2,617,612 $ 4,821,082 -14% FT PT FT PT Instructional Experimentation 454 23 0 477 $ 805,653 495 15 0 510 $ 861,728 $ 1,667,381 -4% Instructional Related Services 173 43 0 216 $ 365,162 177 51 3 231 $ 389,821 $ 754,983 31% Student Advisor 123 46 0 169 $ 285,103 137 39 0 176 $ 296,926 $ 582,029 -2% Excess Enrollments 168 38 0 206 $ 347,934 118 32 3 153 $ 258,417 $ 606,351 -1% Spec Instructional Prog 153 36 0 189 $ 319,221 182 27 0 209 $ 352,325 $ 671,546 38% New Preparations 148 21 0 169 $ 285,779 132 26 0 158 $ 266,524 $ 552,303 133% Curricular Planning 60 4 0 64 $ 108,772 57 0 0 57 $ 96,273 $ 205,045 7% Instructional Related Committee 47 0 0 47 $ 79,890 67 0 0 67 $ 112,825 $ 192,715 103% Instruction Supp Grad Students 23 0 0 23 $ 38,847 15 13 0 28 $ 46,616 $ 85,463 49% Course or Supervision Overload 7 0 0 7 $ 11,823 3 1 0 4 $ 6,756 $ 18,579 -49% Nontraditional Instruction 3 12 0 15 $ 25,335 0 15 0 15 $ 25,335 $ 50,670 7% Accreditation Responsibility 23 6 0 29 $ 48,981 30 4 0 34 $ 57,764 $ 106,745 94% CFA Activities 9 0 0 9 $ 15,201 11 0 0 11 $ 19,255 $ 34,456 -32% In-Service Training for K12 8 0 0 8 $ 14,188 6 1 0 7 $ 11,147 $ 25,335 67% 0 0 0 0 $ - $ 3,378 -89% 1,430 223 6 1,659 $ 2,801,713 $ 5,556,979 15% Total Fall 2006 REASSIGNED TIME Instructional Related Facilities Plan Total 1 Spring 2007 Cost 1 OTH Total 2 0 0 2 $ 3,378 1,403 229 0 1,631 $ 2,755,266 Cost 1 OTH Total FY Cost 1 1% % Change from Prior Year Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY REASSIGNED TIME CATEGORY Fall 2007 REASSIGNED TIME Spring 2008 Cost 1 FT PT Instructional Experimentation 433 24 0 457 $ Instructional Related Services 188 44 0 233 $ Student Advisor 121 27 0 148 Excess Enrollments 163 50 0 Spec Instructional Prog 183 21 0 New Preparations 170 16 Curricular Planning 90 Instructional Related Committee Instruction Supp Grad Students Course or Supervision Overload Cost 1 % Change from Prior Year PT 771,366 618 10 0 628 $ 1,060,692 $ 1,832,058 392,861 176 32 0 208 $ 351,312 $ 744,173 -1% $ 250,479 150 11 0 161 $ 271,929 $ 522,408 -10% 213 $ 360,433 170 45 0 215 $ 363,135 $ 723,568 19% 203 $ 343,543 180 58 0 238 $ 401,982 $ 745,525 11% 0 186 $ 314,830 148 6 0 154 $ 260,106 $ 574,936 4% 4 0 94 $ 158,428 84 5 0 89 $ 150,321 $ 308,749 51% 32 3 0 35 $ 58,777 46 13 0 59 $ 99,651 $ 158,428 -18% 33 0 0 33 $ 55,737 27 3 0 30 $ 50,670 $ 106,407 25% 3 2 0 5 $ 8,445 9 1 0 10 $ 16,890 $ 25,335 36% Nontraditional Instruction 6 9 0 15 $ 25,335 11 9 0 20 $ 33,780 $ 59,115 17% Accreditation Responsibility 22 9 0 31 $ 51,852 18 7 0 25 $ 42,225 $ 94,077 -12% CFA Activities 6 0 0 6 $ 10,134 6 0 0 6 $ 10,134 $ 20,268 -41% In-Service Training for K12 5 0 0 5 $ 8,783 9 0 0 9 $ 15,201 $ 23,984 -5% Instructional Related Facilities Plan 2 0 0 2 $ 4,054 2 0 0 2 $ 3,378 $ 7,432 120% 1,458 209 0 1,667 $ 2,815,056 1,654 200 0 1,854 $ 3,131,406 $ 5,946,462 FT PT FT PT Instructional Experimentation 492 44 0 536 $ 905,473 570 30 0 600 $ 1,012,556 $ 1,918,028 Instructional Related Services 177 31 0 208 $ 350,468 212 38 0 250 $ 422,250 $ 772,718 4% Student Advisor 164 27 0 191 $ 323,106 170 46 0 216 $ 364,824 $ 687,930 32% Excess Enrollments 222 66 0 287 $ 484,912 171 42 0 213 $ 360,433 $ 845,345 17% Spec Instructional Prog 149 37 0 186 $ 313,985 161 35 0 196 $ 331,044 $ 645,029 -13% New Preparations 185 12 0 197 $ 332,057 206 6 0 212 $ 357,224 $ 689,281 20% Curricular Planning 78 0 0 78 $ 132,080 84 4 0 88 $ 148,463 $ 280,543 -9% Instructional Related Committee 47 3 0 50 $ 84,450 71 5 0 76 $ 128,195 $ 212,645 34% Instruction Supp Grad Students 44 26 0 70 $ 118,737 56 40 0 96 $ 162,651 $ 281,387 164% Course or Supervision Overload 10 0 0 10 $ 16,890 12 0 0 12 $ 20,268 $ 37,158 47% Nontraditional Instruction 13 0 0 13 $ 21,450 14 0 0 14 $ 23,646 $ 45,096 -24% Accreditation Responsibility 29 7 0 37 $ 61,986 45 12 0 57 $ 95,766 $ 157,753 68% CFA Activities 6 0 0 6 $ 10,134 14 0 0 14 $ 24,322 $ 34,456 70% In-Service Training for K12 2 0 0 2 $ 3,378 4 0 0 4 $ 6,925 $ 10,303 -57% Instructional Related Facilities Plan 2 0 0 2 $ 4,054 11 4 0 15 $ 25,673 $ 29,726 300% 3 0 0 3 $ 5,067 $ 5,067 1,804 262 0 2,066 $ 3,489,305 $ 6,652,464 Fall 2008 REASSIGNED TIME Credit by Exam/Evaluation Total 1 OTH Total FY Cost 1 FT Total OTH Total Spring 2009 Cost 1 OTH Total 0 0 0 0 $ - 1,620 253 0 1,873 $ 3,163,159 Cost 1 OTH Total FY Cost 1 10% 7% % Change from Prior Year 5% 12% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY REASSIGNED TIME CATEGORY Fall 2009 REASSIGNED TIME Spring 2010 Cost 1 FT PT OTH Total Instructional Experimentation 460 26 9 495 $ Instructional Related Services 191 42 0 233 $ Student Advisor 189 45 0 234 Excess Enrollments 193 83 0 Special Instructional Programs 143 25 0 Cost 1 OTH Total % Change from Prior Year FY Cost 1 FT PT 836,055 439 38 9 486 $ 820,854 $ 1,656,909 393,537 187 50 0 237 $ 400,293 $ 793,830 3% $ 395,226 170 59 0 229 $ 386,781 $ 782,007 14% 276 $ 466,164 180 58 0 238 $ 401,982 $ 868,146 3% 168 $ 283,752 164 46 0 210 $ 354,690 $ 638,442 -1% -11% -14% New Preparations 176 6 0 182 $ 307,398 169 13 0 182 $ 307,398 $ 614,796 Curricular Planning 48 0 0 48 $ 81,072 104 7 0 111 $ 187,479 $ 268,551 -4% Instructional Related Committee 50 5 0 55 $ 92,895 45 0 0 45 $ 76,005 $ 168,900 -21% Instructional Support Graduate Stu 26 31 0 57 $ 96,273 42 39 0 81 $ 136,809 $ 233,082 -17% Course or Supervision Overload 5 0 0 5 $ 8,445 48 101 0 149 $ 251,661 $ 260,106 600% Nontraditional Instruction 8 0 0 8 $ 13,512 7 0 0 7 $ 11,823 $ 25,335 -44% Accreditation Responsibility 20 13 0 33 $ 55,737 18 3 0 21 $ 35,469 $ 91,206 -42% CFA Activities 15 0 0 15 $ 25,335 5 0 0 5 $ 8,445 $ 33,780 -2% In-Service Training for K12 1 0 0 1 $ 1,689 2 0 0 2 $ 3,378 $ 5,067 -51% Instructional Related Facilities Plan 10 0 0 10 $ 16,890 0 0 0 0 $ - $ 16,890 -43% Credit by Exam/Evaluation 0 0 0 0 $ - 0 0 0 0 $ - $ - 1,535 276 9 1,820 $ 3,073,980 1,580 414 9 2,003 $ 3,383,067 $ 6,457,047 FT PT FT PT Instructional Experimentation 504 29 11 544 $ 918,816 598 41 9 648 $ 1,094,472 $ 2,013,288 22% Instructional Related Services 133 58 0 191 $ 322,599 164 43 3 210 $ 354,690 $ 677,289 -15% Student Advisor 181 65 0 246 $ 415,494 183 73 0 256 $ 432,384 $ 847,878 8% Excess Enrollments 249 75 0 324 $ 547,236 200 142 0 342 $ 577,638 $ 1,124,874 30% Special Instructional Programs 184 39 0 223 $ 376,647 165 31 0 196 $ 331,044 $ 707,691 11% New Preparations 100 1 0 101 $ 170,589 61 10 0 71 $ 119,919 $ 290,508 -53% Curricular Planning 81 8 0 89 $ 150,321 105 17 0 122 $ 206,058 $ 356,379 33% Instructional Related Committee 49 0 0 49 $ 82,761 54 3 0 57 $ 96,273 $ 179,034 6% Instructional Support Graduate Stu 50 30 0 80 $ 135,120 57 0 0 57 $ 96,273 $ 231,393 -1% Course or Supervision Overload 3 0 0 3 $ 5,067 8 3 0 11 $ 18,579 $ 23,646 -91% Nontraditional Instruction 8 0 0 8 $ 13,512 6 4 0 10 $ 16,890 $ 30,402 20% Accreditation Responsibility 25 3 0 28 $ 47,292 39 0 0 39 $ 65,871 $ 113,163 24% CFA Activities 9 0 0 9 $ 15,201 9 0 0 9 $ 15,201 $ 30,402 -10% In-Service Training for K12 0 0 0 0 $ - 0 0 0 0 $ - $ - Instructional Related Facilities Plan 2 0 0 2 $ 3,378 3 0 0 3 $ 5,067 $ 8,445 Total Fall 2010 REASSIGNED TIME Credit by Exam/Evaluation Total 1 Spring 2011 Cost 1 OTH Total 0 0 0 0 $ - 1,578 308 11 1,897 $ 3,204,033 Cost 1 OTH Total -3% % Change from Prior Year FY Cost 1 0 0 0 0 $ - $ - 1,652 367 12 2,031 $ 3,430,359 $ 6,634,392 -50% 3% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY REASSIGNED TIME CATEGORY Fall 2011 REASSIGNED TIME Spring 2012 Cost 1 FT PT OTH Total Instructional Experimentation 487 43 15 545 $ Instructional Related Services 191 29 5 225 $ Student Advisor 183 45 3 231 Excess Enrollments 323 72 0 395 Special Instructional Programs 232 9 15 New Preparations 266 0 Curricular Planning 55 Instructional Related Committee 37 Instructional Support Graduate Stu Cost 1 % Change from Prior Year PT 920,505 632 27 15 674 $ 1,138,386 $ 2,058,891 2% 380,025 208 9 9 226 $ 381,714 $ 761,739 12% $ 390,159 190 32 0 222 $ 374,958 $ 765,117 -10% $ 667,155 266 78 0 344 $ 581,016 $ 1,248,171 11% 256 $ 432,384 227 9 17 253 $ 427,317 $ 859,701 21% 3 269 $ 454,341 300 0 3 303 $ 511,767 $ 966,108 233% 6 3 64 $ 108,096 61 7 3 71 $ 119,919 $ 228,015 -36% 0 0 37 $ 62,493 93 3 1 97 $ 163,833 $ 226,326 26% 62 3 0 65 $ 109,785 112 15 0 127 $ 214,503 $ 324,288 40% Course or Supervision Overload 16 0 0 16 $ 27,024 36 4 0 40 $ 67,560 $ 94,584 300% Nontraditional Instruction 22 0 0 22 $ 37,158 8 3 0 11 $ 18,579 $ 55,737 83% Accreditation Responsibility 28 6 0 34 $ 57,426 49 3 0 52 $ 87,828 $ 145,254 28% CFA Activities 12 3 0 15 $ 25,335 12 3 0 15 $ 25,335 $ 50,670 67% In-Service Training for K12 0 0 0 0 $ - 0 0 0 0 $ - $ - - Instructional Related Facilities Plan 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% 0 0 0 0 $ - 1,914 216 44 2,174 $ 3,671,886 FT PT Instructional Experimentation 597 23 21 641 $ Instructional Related Services 167 41 19 227 Student Advisor 205 35 0 240 Excess Enrollments 294 121 0 415 Credit by Exam/Evaluation Total 0 0 0 0 $ - $ - 2,194 193 48 2,435 $ 4,112,715 $ 7,784,601 FT PT 1,082,649 737 22 24 783 $ 1,322,487 $ $ 383,403 142 27 18 187 $ 315,843 $ 405,360 193 41 0 234 $ 395,226 $ 700,935 292 120 0 412 $ 695,868 Fall 2012 REASSIGNED TIME OTH Total FY Cost 1 FT Spring 2013 Cost 1 OTH Total % Change from Prior Year % Change from 2003/04 2,405,136 17% 49% $ 699,246 -8% -23% $ 800,586 5% 12% $ 1,396,803 12% 178% Cost 1 OTH Total 17% FY Cost 1 Special Instructional Programs 274 17 0 291 $ 491,499 210 21 0 231 $ 390,159 $ 881,658 3% 163% New Preparations 248 0 3 251 $ 423,939 234 0 2 236 $ 398,604 $ 822,543 -15% 26% Curricular Planning 79 13 4 96 $ 162,144 62 4 0 66 $ 111,474 $ 273,618 20% 13% Instructional Related Committee 71 3 1 75 $ 126,675 82 0 3 85 $ 143,565 $ 270,240 19% 5% Instructional Support Graduate Stu 106 30 0 136 $ 229,704 47 30 0 77 $ 130,053 $ 359,757 11% 173% Course or Supervision Overload 25 0 0 25 $ 42,225 19 3 0 22 $ 37,158 $ 79,383 -16% -27% Nontraditional Instruction 6 0 0 6 $ 10,134 6 0 0 6 $ 10,134 $ 20,268 -64% 33% Accreditation Responsibility 56 3 0 59 $ 99,651 53 3 0 56 $ 94,584 $ 194,235 34% 207% CFA Activities 15 3 0 18 $ 30,402 12 3 0 15 $ 25,335 $ 55,737 10% 450% In-Service Training for K12 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% -100% Instructional Related Facilities Plan 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% -100% Credit by Exam/Evaluation 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% -100% 2,143 289 48 2,480 $ 4,188,720 2,089 274 47 2,410 $ 4,070,490 $ 8,259,210 6% 47% Total 1 Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY REASSIGNED TIME CATEGORY Fall 2013 REASSIGNED TIME Spring 2014 Cost 1 FT PT Instructional Experimentation 766 16 27 809 $ Instructional Related Services 226 36 8 270 $ Student Advisor 213 38 0 251 Excess Enrollments 259 148 0 Special Instructional Programs 296 37 New Preparations 192 Curricular Planning 41 Instructional Related Committee Cost 1 % Change from Prior Year PT 1,366,401 808 31 17 856 $ 1,445,784 $ 2,812,185 17% 456,030 220 56 0 276 $ 466,164 $ 922,194 32% $ 423,939 219 28 0 247 $ 417,183 $ 841,122 5% 407 $ 687,423 242 179 0 421 $ 711,069 $ 1,398,492 0% 9 342 $ 577,638 267 21 9 297 $ 501,633 $ 1,079,271 22% 1 7 200 $ 337,800 176 3 0 179 $ 302,331 $ 640,131 -22% 7 0 48 $ 81,072 71 3 0 74 $ 124,986 $ 206,058 -25% 39 0 0 39 $ 65,871 65 6 0 71 $ 119,919 $ 185,790 -31% Instructional Support Graduate Stu 92 30 0 122 $ 206,058 74 30 0 104 $ 175,656 $ 381,714 6% Course or Supervision Overload 21 0 0 21 $ 35,469 12 0 0 12 $ 20,268 $ 55,737 -30% Nontraditional Instruction 9 17 0 26 $ 43,914 33 31 1 65 $ 109,785 $ 153,699 658% Accreditation Responsibility 27 0 0 27 $ 45,603 37 6 0 43 $ 72,627 $ 118,230 -39% CFA Activities 15 3 0 18 $ 30,402 21 3 0 24 $ 40,536 $ 70,938 In-Service Training for K12 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% Instructional Related Facilities Plan 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% Credit by Exam/Evaluation 0 0 0 0 $ - 0 0 0 0 $ - $ - -100% 2,196 333 51 2,580 $ 4,357,620 2,245 397 27 2,669 $ 4,507,941 $ 8,865,561 1 OTH Total FY Cost 1 FT Total OTH Total 27% 7% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY COLLEGE WTU AREA FT AMC 143 BE 358 EDU 154 ECS 51 HHD 107 HUM 180 SM 189 SBS 161 Total 1,342 AREA FT AMC 124 BE 337 EDU 187 ECS 59 HHD 116 HUM 203 SM 167 SBS 144 Total 1,336 AREA FT AMC 33 BE 234 EDU 145 ECS 71 HHD 82 HUM 237 SM 171 SBS 163 Total 1,137 AREA FT AMC 20 BE 255 EDU 143 ECS 56 HHD 137 HUM 289 SM 282 SBS 222 Total 1,403 1 PT Fall 2003 OTH Total 74 10 227 33 6 397 23 9 186 2 0 53 54 0 161 22 0 202 15 0 204 40 6 206 263 31 1,636 PT 6 158 22 3 362 17 14 217 4 0 63 84 6 206 36 0 239 28 0 196 32 0 175 251 29 1,615 0 33 3 0 237 22 0 167 0 3 74 46 0 128 44 0 281 11 0 182 36 3 202 162 6 1,305 $ $ $ $ $ $ $ $ $ 0 29 3 0 258 18 0 161 3 0 59 65 0 202 28 0 317 63 0 345 40 0 262 229 0 1,631 266,186 611,080 367,189 106,069 347,258 403,333 330,368 296,082 2,727,566 Cost 1 $ $ $ $ $ $ $ $ $ Fall 2006 OTH Total 9 382,896 670,533 314,154 90,193 271,085 341,178 345,232 348,272 2,763,542 Cost 1 Fall 2005 OTH Total 0 PT $ $ $ $ $ $ $ $ $ Fall 2004 OTH Total 28 PT Cost 1 55,737 400,293 282,063 125,324 216,192 474,609 307,398 341,854 2,203,469 Cost 1 $ $ $ $ $ $ $ $ $ 49,488 435,086 271,253 99,651 340,334 534,737 582,705 442,011 2,755,266 Spring 2004 OTH Total FT PT 101 67 0 168 305 32 0 337 186 40 0 226 42 9 0 51 133 82 2 217 258 35 4 296 149 13 0 162 172 54 3 228 1,346 331 9 1,687 FT PT 121 12 12 145 338 21 0 359 165 38 6 210 83 2 0 85 Cost 1 $ $ $ $ $ $ $ $ $ Spring 2005 OTH Total 92 102 3 196 249 36 6 291 200 14 0 214 160 38 0 198 1,408 263 27 1,698 PT 50 4 0 54 330 3 0 333 158 28 0 186 82 2 0 84 107 54 0 161 274 40 0 314 194 22 1 216 160 39 3 202 1,354 192 4 1,550 FT PT $ $ $ $ $ $ $ $ $ 59 5 0 63 3 0 254 107 17 0 123 76 10 0 86 142 74 0 216 291 45 3 339 270 52 0 322 235 18 3 256 1,430 223 6 1,659 245,581 605,507 353,846 144,072 331,720 491,499 360,770 334,422 2,867,415 91,713 562,437 314,323 141,200 271,085 529,502 365,500 341,854 2,617,612 $ $ $ $ $ $ $ $ $ 107,083 429,006 207,916 144,578 364,993 572,571 543,182 432,384 2,801,713 511,767 1,216,587 721,034 250,141 678,978 894,832 691,139 630,504 5,594,981 FY Cost 1 $ $ $ $ $ $ $ $ $ Cost 1 $ $ $ $ $ $ $ $ $ 666,479 1,240,402 695,699 177,007 638,104 841,798 618,850 733,871 5,612,209 FY Cost 1 Cost 1 $ $ $ $ $ $ $ $ $ Spring 2007 OTH Total 251 FY Cost 1 $ $ $ $ $ $ $ $ $ Cost 1 Spring 2006 OTH Total FT 283,583 569,869 381,545 86,815 367,020 500,620 273,618 385,599 2,848,667 147,450 962,730 596,386 266,524 487,277 1,004,111 672,898 683,707 4,821,082 FY Cost 1 $ $ $ $ $ $ $ $ $ 156,570 864,092 479,169 244,229 705,326 1,107,308 1,125,887 874,395 5,556,979 % Change from Prior Year -23% -2% 4% 41% 6% 6% 12% -14% 0% % Change from Prior Year -71% -21% -17% 7% -28% 12% -3% 8% -14% % Change from Prior Year 6% -10% -20% -8% 45% 10% 67% 28% 15% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY COLLEGE WTU AREA FT AMC 86 BE 288 EDU 127 ECS 60 HHD 159 HUM 255 SM 262 SBS 220 Total 1,458 AREA FT AMC 68 BE 373 EDU 184 ECS 55 HHD 154 HUM 239 SM 296 SBS 252 Total 1,620 AREA FT AMC 49 BE 314 EDU 193 ECS 57 HHD 169 HUM 250 SM 283 SBS 220 Total 1,535 AREA FT AMC 98 BE 291 EDU 147 ECS 69 HHD 177 HUM 256 SM 305 SBS 235 Total 1,578 1 PT Fall 2007 OTH Total 10 0 97 3 0 291 26 0 152 2 0 62 53 0 212 44 0 299 33 0 295 39 0 259 209 0 1,667 PT 68 13 0 386 18 0 202 9 0 63 82 0 236 27 0 266 46 0 341 58 0 310 253 0 1,873 0 0 49 0 326 36 0 229 6 0 63 85 0 254 36 0 286 38 9 330 63 0 283 276 9 1,820 5 0 103 0 306 35 0 182 2 0 71 122 0 299 47 0 303 19 11 335 63 0 298 308 11 1,897 114,514 651,954 340,840 107,083 398,773 449,274 576,625 524,097 3,163,159 Cost 1 $ $ $ $ $ $ $ $ $ Fall 2010 OTH Total 15 163,326 492,175 257,235 104,718 357,224 505,011 497,917 437,451 2,815,056 Cost 1 $ $ $ $ $ $ $ $ $ Fall 2009 OTH Total 12 PT $ $ $ $ $ $ $ $ $ Fall 2008 OTH Total 0 PT Cost 1 82,761 550,614 386,781 106,407 429,006 483,054 557,370 477,987 3,073,980 Cost 1 $ $ $ $ $ $ $ $ $ 173,967 516,834 307,398 119,919 505,011 511,767 565,815 503,322 3,204,033 Spring 2008 OTH Total FT PT 113 17 0 130 329 3 0 332 163 19 0 182 59 6 0 65 150 39 0 189 357 33 0 390 283 38 0 321 200 45 0 245 1,654 200 0 1,854 FT PT 0 0 109 353 12 0 365 171 32 0 202 63 11 0 75 207 104 0 310 246 30 0 276 315 31 0 346 340 43 0 383 1,804 262 0 2,066 PT 50 20 0 70 13 0 354 180 146 0 326 67 12 0 79 195 84 0 279 245 58 0 303 289 38 9 336 213 43 0 256 1,580 414 9 2,003 PT 65 4 0 69 51 0 296 206 64 0 270 76 12 0 88 189 78 0 267 291 40 3 334 325 21 9 355 255 97 0 352 1,652 367 12 2,031 $ $ $ $ $ $ $ $ $ 184,439 615,809 341,347 125,831 524,266 466,164 584,225 647,225 3,489,305 $ $ $ $ $ $ $ $ $ 118,230 597,906 550,614 133,431 471,231 511,767 567,504 432,384 3,383,067 116,541 499,944 456,030 148,632 450,963 564,126 599,595 594,528 3,430,359 298,953 1,267,763 682,187 232,913 923,039 915,438 1,160,850 1,171,322 6,652,464 FY Cost 1 $ $ $ $ $ $ $ $ $ Cost 1 $ $ $ $ $ $ $ $ $ 382,896 1,052,923 564,633 214,503 676,445 1,163,721 1,040,086 851,256 5,946,462 FY Cost 1 $ $ $ $ $ $ $ $ $ Cost 1 Spring 2011 OTH Total 245 219,570 560,748 307,398 109,785 319,221 658,710 542,169 413,805 3,131,406 FY Cost 1 Cost 1 $ $ $ $ $ $ $ $ $ Spring 2010 OTH Total 341 FT $ $ $ $ $ $ $ $ $ Spring 2009 OTH Total 109 FT Cost 1 200,991 1,148,520 937,395 239,838 900,237 994,821 1,124,874 910,371 6,457,047 FY Cost 1 $ $ $ $ $ $ $ $ $ 290,508 1,016,778 763,428 268,551 955,974 1,075,893 1,165,410 1,097,850 6,634,392 % Change from Prior Year 145% 22% 18% -12% -4% 5% -8% -3% 7% % Change from Prior Year -22% 20% 21% 9% 36% -21% 12% 38% 12% % Change from Prior Year -33% -9% 37% 3% -2% 9% -3% -22% -3% % Change from Prior Year 45% -11% -19% 12% 6% 8% 4% 21% 3% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 California State University, Northridge Academic Affairs DRAFT Reassigned Time WTUs by Faculty Type SUMMARY BY COLLEGE WTU AREA AMC BE EDU ECS HHD HUM SM SBS Total AREA AMC BE EDU ECS HHD HUM SM SBS Total FT PT Fall 2011 OTH Total Cost 1 PT Spring 2012 OTH Total Cost 1 FY Cost 1 % Change from Prior Year 124 6 0 130 $ 219,570 115 0 0 115 $ 194,235 $ 413,805 42% 382 18 0 400 $ 675,600 321 3 0 324 $ 547,236 $ 1,222,836 20% 216 48 0 264 $ 445,896 290 38 0 328 $ 553,992 $ 999,888 31% 57 3 3 63 $ 106,407 112 3 0 115 $ 194,235 $ 300,642 12% 205 41 11 257 $ 434,073 295 52 16 363 $ 613,107 $ 1,047,180 10% 240 24 12 276 $ 466,164 279 30 12 321 $ 542,169 $ 1,008,333 -6% 337 16 18 371 $ 626,619 355 16 17 388 $ 655,332 $ 1,281,951 10% 38% 353 60 0 413 $ 697,557 1,914 216 44 2,174 $ 3,671,886 FT PT Fall 2012 OTH Total Cost 1 427 51 3 481 $ 812,409 $ 1,509,966 2,194 193 48 2,435 $ 4,112,715 $ 7,784,601 FT PT Spring 2013 OTH Total Cost 1 FY Cost 1 17% % Change from Prior Year % Change fr. 03/04 (10 yrs) -43% 129 6 0 135 $ 228,015 87 3 0 90 $ 152,010 $ 380,025 -8% 344 21 0 365 $ 616,485 304 30 0 334 $ 564,126 $ 1,180,611 -3% -5% 301 28 0 329 $ 555,681 243 27 0 270 $ 456,030 $ 1,011,711 1% 45% 116 2 0 118 $ 199,302 119 0 0 119 $ 200,991 $ 400,293 33% 126% 298 79 24 401 $ 677,289 329 75 26 430 $ 726,270 $ 1,403,559 34% 120% 200 29 3 232 $ 391,848 214 36 3 253 $ 427,317 $ 819,165 -19% -3% 321 26 15 362 $ 611,418 362 28 15 405 $ 684,045 $ 1,295,463 1% 109% 434 98 6 538 $ 908,682 2,143 289 48 2,480 $ 4,188,720 Fall 2013 OTH Total Cost 1 AREA FT PT AMC BE EDU ECS HHD HUM SM SBS Total 122 12 0 134 $ 392 51 0 443 $ 292 33 9 334 74 4 0 280 88 255 36 370 411 2,196 1 FT 431 75 3 509 $ 859,701 $ 1,768,383 17% 141% 2,089 274 47 2,410 $ 4,070,490 $ 8,259,210 6% 47% Spring 2014 OTH Total Cost 1 FY Cost 1 % Change from Prior Year FT PT 226,326 104 21 0 125 $ 211,125 $ 437,451 15% 748,227 315 54 0 369 $ 623,241 $ 1,371,468 16% $ 564,126 288 32 9 329 $ 555,681 $ 1,119,807 11% 78 $ 131,742 71 3 0 74 $ 124,986 $ 256,728 -36% 21 389 $ 657,021 345 106 0 451 $ 761,739 $ 1,418,760 1% 0 291 $ 491,499 295 44 0 339 $ 572,571 $ 1,064,070 30% 11 18 399 $ 673,911 376 13 18 407 $ 687,423 $ 1,361,334 5% 98 3 512 $ 864,768 451 124 0 575 $ 971,175 $ 1,835,943 4% 333 51 2,580 $ 4,357,620 2,245 397 27 2,669 $ 4,507,941 $ 8,865,561 7% Based on current replacement rate of $1689 per unit. 2003-Present Reassigned Time Analysis 5/2/2014 Attachment D California State University, Northridge Educational Resources Committee Annual Report – AY 2013-2014 1. Committee Charge “This committee shall make general policy recommendations in order to guide the allocation of all University resources which impact educational programs. In carrying out its charge, the committee may review and advise on current and proposed allocation of faculty positions; the allocation and the projected needs for space; support equipment and operating expense budgets; the allocation of resources for technology; the assignment and projected needs of support staff; the recommendations of other faculty governance committees which have significant educational resource implications; additionally, at the request of an appropriate University committee or an Associate Dean, independently evaluate proposals for new programs with regard to their impact on the available educational resources of the University.” — from ERC Bylaws 2. Committee Membership AY 2013-2014 • • • • • • • • • • • Jerald Schutte (Chair) Debi Prasad Choudhary Nazaret Dermendjian Doris Helfer Michael Hoggan Yanbo Jin Greg Knotts Garry Lennon Veda Ward Ward Thomas Diane Stephens (Executive Secretary – Non-voting) 3. Meetings a. The Educational Resources Committee met as a Committee on the following dates: 09/10/13; 10/08/13; 11/01/13 (with Academic Technology Committee); 12/10/13; 02/11/14; 03/11/14 (with Academic Technology Committee); 04/15/14; and 05/13/14. b. The ERC Chair and ERC Staff met for planning on the following dates: 08/27/13; 09/23/13; 10/29/13; 11/25/13; 01/28/14; 02/27/14; 04/01/14; and 04/29/14. 4. Highlights and Other Activities a. Throughout this academic year, we examined the resource implications of the following: i. ii. iii. iv. v. vi. vii. viii. ix. x. xi. xii. xiii. xiv. xv. xvi. xvii. xviii. xix. xx. xxi. xxii. xxiii. xxiv. Lottery Budget Campus Quality Fee Process – William Watkins Tseng Building – Joyce Feucht-Haviar Budget – Colin Donahue, Harry Hellenbrand Enrollment – Bettina Huber The University Corporation – Rick Evans, John Griffin, and Georg Jahn Research Expenditures and Work-to-Date Challenges – Crist Khachikian Lab Printing – Michael Neubauer Best Practices for Faculty regarding Student Printing Proposed CSU Bond Process – Ken Rosenthal CSU Budget and Campus Budget Process – Sharon Eichten Valley Performing Arts Center Budget – Steven Thachuk IT Survey re: Printing and Moodle – Hilary Baker Senate Standing Committees Web Pages Learning Management System Status – Hilary Baker Ad Hoc Committee on Academic Space Planning re: Labs Exchange Email Upgrade – Chris Ice Network Equipment Refresh myCSUNtablet - Deone Zell Waitlist/Enrollment – Fall 2014 – Elizabeth Adams Nazarian Gift – Ken Lord Faculty Hiring – Harry Hellenbrand Multi-Year Analysis of Reassigned Time Multi-Purpose Facility b. Activities that the committee acted on or are still outstanding for next semester: i. Joint ERC/ATC Resolution on Electronic Submission of Classwork c. Issues to watch for: i. Lab Printing ii. Results of the Room Reservations Schedule Modeling iii. Multi-Purpose Facility iv. Multi-Year Budgeting v. Proposed CSU Bond Process vi. Ad Hoc Committee on Office Space vii. Ad Hoc Committee on Lab Study viii. Senate Standing Committees Website in the Web-One environment 5. Committee Minutes http://www.csun.edu/erc
© Copyright 2026 Paperzz