Wootton Parkway Bridge Rehab

Wootton Parkway Bridge Rehabilitation
Construction Planned
Project
Description:
The Wootton Parkway Bridge Rehabilitation project will repair the steel beams and supports
underneath the bridge and perform minor repairs on top of the bridge. Repairs will include
cleaning and painting the steel beams, sealing cracks in the concrete, replacing spalled (bad)
concrete, and replacing traffic barriers. Due to its size, the Wootton Parkway Bridge is
considered a long span, making it part of the city’s Bridge Rehabilitation Program.
The majority of the work will be under the bridge. There will be traffic impacts along Wootton
Parkway during concrete repairs to the topside of the bridge. One northbound lane of the
three-lane bridge may be closed weekdays between 9 a.m. and 4 p.m. Daytime and nighttime
closures of the one northbound lane are permitted in summer when school is out of session.
Adjacent sidewalks and the asphalt bike path are required to remain open at all times.
Purpose:
As part of Rockville’s Bridge Rehabilitation program, the Department of Public Works will repair
bridges within City Rights-of-way. Inspections of the 19 City-owned long span bridges (longer
than 20 feet) are federally funded and occur every two years. The program meets the Mayor and
Council’s goal of sustainable infrastructure. Bridge repair priorities are based on structural
improvements recommended in the bridge inspection reports.
Location:
Wootton Parkway between Thomas S. Wootton High School and Greenplace Terrace. See the
map on the reverse side of this advisory.
Timeline:
Construction is scheduled to begin in early 2016. Another advisory will be mailed at least two
weeks before construction begins.
Cost:
$750,000 (construction cost estimated).
Contact:
John Hollida, City of Rockville Project Manager, at 240-314-8526 or [email protected]
Hjarman Cordero, City of Rockville Neighborhood Resources Coordinator, 240-314-8344
or [email protected]
October 6, 2015
1815
7
8
CH
CT
1844
1842
R
1834
1836
5
1840
7
9
11
13
0
KY
Maryland
1832
1838
WOOTTON P
Rockville
City of
1830
Department of Public Works
Engineering Division
111 Maryland Avenue
!
Rockville, Maryland 20850-2364
Phone 240.314.8500
!
Fax 240.314.8539
8
100
Wootton Parkway Bridge
(MR-04) Rehabilitation
200
Feet 15
DISCLAIMER:
CT
AN
1846
1828
CT
TE
EN
PL
A
RE
BR
G
1
AN
1852
1850 1848
NC
1854
1851
6
G
CE
ON PKY
W OOT T
S
1837
DU
1853
1849
1847
IN
1835
2
1826
1829
13
4
1822
1827
ES
12
3
5
PR
1820
1825
2
J AM
11
1818
1823
3
10
1816
1821
4
9
Wootton Parkway Bridge
1819
5
PIP
ES
TE
M
2100
1817
6
N
8
12
This drawing is intended to be used for reference and illustrative
purposes only. This drawing is not a legally recorded plan, survey, or
engineering schematic and it is not intended to be used as such. This
drawing is a compilation of records, information and data developed and
maintained in various City offices. Map layers were created from different
sources at different scales, and the actual or relative geographic position
of any feature is only as accurate as the source information.
DATE: 10/2/2015
Utilities.xmd
AUTHOR: sdesantis