Environmental Health Division Drinking Water Protection Section 625 Robert Street North, P.O. Box 64975 St. Paul, MN 55164-0975 651-201-4700 Grants Awarded for Fiscal Year 2015 Minnesota Department of Health - Drinking Water Protection Source: Administratering Agency: Legal Citation: Appropriation Language: Fiscal Year: Status Legend: Clean Water Fund Minnesota Department of Health M.L. 2013; Chapter 137; Art 2; Sec. 8 (b) $1,615,000 the first year and $1,615,000 the second year are for protection of drinking water sources. 2015 Completed In Process * Application Project Name Year (Grant 2015 Competitive * County Recipient Recipient Type Project Manager Start Date Pipestone City of Pipestone Local/Regional Government Joel Adelman 5/1/2015 507 825 2506 [email protected] m 12/14/2015 Remove two septic systems and drainfields Local/Regional Government Jason Hillman 218 745 5471 [email protected] 11/5/2015 Purchase a 25kW emergency standby diesel $10,000.00 generator 5/1/2015 End Date Project Overview Founding Amount $10,000.00 Status Completed 2015 Competitive Marshall Marshall Polk Rural Water System 2015 Competitive Anoka City of Blaine (Anoka County Local/Regional Municipal Wellhead Government Protection Group) Kate Thunstrom 12/22/2014 4/30/2016 Seal wells on private property 763 323 5714 [email protected] n.us $30,000.00 In Process 2015 Competitive Stearns City of Cold Spring Local/Regional Government Paul Hoeschen 12/9/2014 320 685 3524 [email protected] fice.com 4/30/2016 Nutrient reduction program $9,997.10 In Process 2015 Competitive Hennepin City of Bloomington Local/Regional Government Scott Anderson 12/9/2014 952-563-4867 smanderson@bloomingtonm n.gov 3/5/2015 $10,000.00 Completed 2015 Competitive Martin City of Fairmont Local/Regional Government Doug Rainforth 507 235 6789 [email protected] 12/15/2014 4/30/2016 Replace the damaged Solar Bee, floating, solar powered mixing unit in Budd Lake $10,000.00 In Process 2015 Competitive Traverse City of Browns Valley Local/Regional Government Thomas Schmitz 320 695 2110 [email protected] 12/15/2014 8/10/2015 Seal 3 unused wells on private property $1,152.50 Completed 2015 Competitive Dakota City of New Trier Local/Regional Government Mitchell Berg 651 231 0357 [email protected]; [email protected] 12/16/2014 9/15/2015 Remove buildup and debris from well casing $6,692.50 and bottom of the well Completed 2015 Competitive Norman City of Ada Local/Regional Government Brian Rasmusson 218 784 5537 [email protected] 6/12/2015 In Process Seal irrigation well 4/30/2016 Seal 2 wells (#00239751; #00220498) $4,300.00 Completed Page 1 of 7 2015 Competitive Clay Moorhead Public Service Local/Regional Government Kevin Young 218 477 8072 [email protected] 5/5/2015 2015 Competitive Morrison City of Little Falls Local/Regional Government Dwayne Heinen 6/19/2015 320 616 5530 [email protected] 8/18/2015 Install raw water piping from the new well field to the treatment plant $10,000.00 Completed 2015 Competitive Lac qui Parle Lac qui Parle Valley School District K-12 Education Renae Tostenson 320 752 4835 [email protected] 9/17/2015 Construct new well $10,000.00 Completed 2015 Competitive St. Louis Cherry School K-12 Education Tom Cundy 5/20/2015 218 742 8102 [email protected] 4/30/2016 Construct new well $6,872.99 In Process 2015 Competitive Morrison City of Randall Local/Regional Government Matt Pantzke 320 749 2159 [email protected]; [email protected]; [email protected] 11/5/2015 Drill test wells to determine location of new well due to nitrate contamination $6,841.68 Completed 2015 Competitive Traverse City of Wheaton Local/Regional Government Kris Krenz 5/25/2015 320 563 4110 cityadministrator@cityofwhe aton.com 9/9/2015 $10,000.00 Completed 2015 Competitive Nobles City of Wilmont Local/Regional Government Rita Cowan 507 926 5235 [email protected] 6/30/2015 4/30/2016 Seal abandoned municipal well $1,532.50 In Process 2015 Competitive Martin City of Truman Public Utilities Local/Regional Government Justin Anderson 507 776 6501 [email protected] 6/30/2015 1/5/2016 $450.00 Completed 2015 Competitive Scott City of Prior Lake Local/Regional Government Katy Gehler 5/29/2015 952 447 9890 [email protected] 4/30/2016 Replace the casing and grout for one of the City's production wells $10,000.00 In Process 2015 Competitive Anoka City of Fridley Local/Regional Government James Kosluchar 6/30/2015 763 572 3552 [email protected] 4/30/2016 Seal wells within the City DWSMA $6,000.00 In Process 6/8/2015 6/4/2015 1/6/2016 Purchase correct dual circuit breaker docker $10,000.00 station with kirk-key interlocks and installation Rehabilitate well #2 Seal old municipal well Sub Total For: Competitive 2015 Application Project Name Year (Grant 2015 Plan Implementation County Recipient Recipient Type Project Manager Start Date End Date Project Overview Dakota City of Lakeville Local/Regional Government Chris Petree 952 985 2701 [email protected] 11/15/2014 8/28/2015 Groundwater sampling; Public education about chemical storage and waste handling; Public education about ISTS Completed $163,839.27 Founding Amount $2,443.64 Status Completed 2015 Plan Implementation Carlton City of Wrenshall Local/Regional Government Alieca Johnson 218 384 3680 [email protected] 5/1/2015 12/16/2015 Wire the well house for the generator; Build $4,760.74 permanent display at City Hall for informational WHP materials; Purchase sorbent kits to be used in case of a spill; Televise well #1 Completed 2015 Plan Implementation Ramsey White Bear Township Local/Regional Government Bill Short 651 747 2777 [email protected] 5/5/2015 4/30/2016 Identify and investigate unverified PCSI sites; Update the verified PCSI; Update City website with information on wellhead protection; Monitor for locations of shallow disposal wells within the DWSMA In Process $10,000.00 Page 2 of 7 2015 Plan Implementation Cottonwood Red Rock Rural Water System Local/Regional Government Dominic Jones 5/1/2015 507 628 4201 dominicredrock@centurytel. net 4/30/2016 Purchase data loggers and pressure $10,000.00 transducers and collect data on groundwater and surface water In Process 2015 Plan Implementation Itasca City of Taconite Local/Regional Government Mike Troumbly 218 245 1831 [email protected]; [email protected] 5/6/2015 4/30/2016 Notify MDH about new high capacity wells; $3,451.40 Notify MDH about class V wells; Research data on class V wells; Educate tank owners about leak prevention; Provide information to property owners about wells sealing; Conduct static water level measurements on wells #1 and #2; Review and update PCS in IWMZ; Monitor setbacks for new PCS ; IWMZ daily monitoring reportwithin the IWMZ; Prepare annual summary of WHP efforts In Process 2015 Plan Implementation Carver City of Waconia Local/Regional Government Craig Eldred 952 442 4265 [email protected] 5/6/2015 4/30/2016 Seal wells on private property $10,000.00 In Process 2015 Plan Implementation Lincoln Lincoln Pipestone Rural Water System Local/Regional Government Jason Overby 507 368 4248 [email protected] 12/1/2014 4/30/2016 Promote landowner enrollment into easement programs $10,000.00 In Process 2015 Plan Implementation Crow Wing City of Ironton Local/Regional Government Amy Baratto 218 546 5625 [email protected] 11/15/2014 12/15/2014 Seal well #9 $1,435.00 Completed 2015 Plan Implementation Marshall Marshall Polk Rural Water System Local/Regional Government Jason Hillman 218 745 5471 [email protected] 11/19/2014 7/24/2015 Build a WHP website; Develop and distribute $5,206.50 WHP informational brochure; Distribute information about unsealed wells to owners within the DWSMA Completed 2015 Plan Implementation Benton City of Sauk Rapids Local/Regional Government Craig Nelson 320 258 5318 [email protected] 12/4/2014 $9,900.00 Completed 2015 Plan Implementation Morrison City of Little Falls Local/Regional Government Dwayne Heinen 5/1/2015 320 616 5530 [email protected] 8/11/2015 Locate potential abandoned municipal wells; $9,676.58 Seal wells Completed 2015 Plan Implementation Stearns City of Paynesville Local/Regional Government Ron Mergen 320 243 3714 [email protected] 12/4/2014 4/30/2016 Seal abandoned, unused wells; Educate $9,736.00 students; Water festival; Educate storage tank owners; Develop "Groundwater News" newsletter In Process 2015 Plan Implementation Itasca City of Calumet Local/Regional Government April Serich 218 247 7542 [email protected] 5/15/2015 7/30/2015 Install fence around city municipal wells Completed 2015 Plan Implementation Wabasha City of Wabasha Local/Regional Government Chad Springer 507 565 4568 [email protected] 11/18/2014 3/13/2015 Collect data, perform inspections and create $10,000.00 a storm sewer map for the City Completed 2015 Plan Implementation Clay Moorhead Public Service Local/Regional Government Kris Knutson 218 477 8072 [email protected] 12/4/2014 2015 Plan Implementation Hennepin City of Richfield Local/Regional Government Robert Hintgen 12/9/2014 612 861 9165 [email protected] 9/17/2015 Install sensors to monitor static and pumping levels of groundwater in wells #2 and #3 $8,846.00 4/27/2015 Televise well, perform maintenance and reinstall equipment (well#1 and well #2) $9,600.00 Completed 4/30/2016 Inspect commercial properties to prevent cross connections $10,000.00 In Process Page 3 of 7 2015 Plan Implementation Le Sueur City of Kasota Local/Regional Government Ross Petit 507 931 3290 [email protected] 11/19/2014 4/30/2016 Seal private well within the DWSMA $1,530.00 In Process 2015 Plan Implementation Carlton City of Cromwell Local/Regional Government LuAnn Freiermuth 11/15/2014 9/4/2015 218 644 3570 cityofcromwell@frontiernet. net $5,000.00 Completed 2015 Plan Implementation Stearns City of Sauk Centre Public Utilities Local/Regional Government Marty Sunderman 320 352 6538 [email protected] 11/19/2014 7/18/2015 Develop emergency response plan; Well survey - locate missing or unknown wells in the DWSMA $10,000.00 Completed 2015 Plan Implementation Crow Wing City of Baxter Local/Regional Government Trevor Walter 218 454 5110 [email protected] 12/10/2014 4/30/2016 Add WHP information on City website; Include WHP strategies and actions in the City newsletter; Move leaf composting site from the 1-year TOT area; Survey and well inventory; Survey shallow disposal wells; Training about BMP in the DWSMA $9,927.00 In Process 2015 Plan Implementation Murray City of Fulda Local/Regional Government Julie Burchill 507 425 2504 [email protected] 6/30/2015 $10,000.00 Completed 2015 Plan Implementation Dakota City of Randolph Local/Regional Government Robert Appelgren 12/9/2014 651 492 7818 cityofrandolphmn@northfiel dwifi.com 4/30/2016 Install fencing around municipal well site; $9,309.00 Update PCSI; Contact Randolph Township and Dakota County regarding land use permits and zoning; Research to identify site for new municipal well In Process 2015 Plan Implementation Chisago City of Chisago Local/Regional Government John Pechman 6/30/2015 651 257 7634 [email protected] 4/30/2016 Furnish and install a submersible level transducer in well #3 $8,650.00 In Process 2015 Plan Implementation Pine City of Hinckley Local/Regional Government Mark Perry 320 384 7491 [email protected] 5/1/2015 4/30/2016 Geo-log well prior to sealing $1,580.00 In Process 2015 Plan Implementation Crow Wing City of Riverton Local/Regional Government Cari Johnson 218 546 5225 [email protected] 6/30/2015 4/30/2016 Televise wells #2 and #3; Post signs identifying the DWSMA $7,450.00 In Process 2015 Plan Implementation Dakota City of Rosemount Local/Regional Government Andy Brotzler 6/30/2015 651 322 2025 [email protected]. mn.us 4/30/2016 Construct observation well $10,000.00 In Process 2015 Plan Implementation Scott City of Prior Lake Local/Regional Government Katy Gehler 6/30/2015 952 447 9890 [email protected] 4/30/2016 Connect to City infrastructure, seal existing wells and properly abandon septic systems $10,000.00 In Process 2015 Plan Implementation Hennepin City of St. Louis Park Local/Regional Government Mark Hanson 952 924 2557 [email protected] 4/30/2016 Seal private wells $10,000.00 In Process 2015 Plan Implementation Kandiyohi Green Lake Sanitary Sewer and Water District Local/Regional Government Nathan Reed 6/30/2015 320 796 4523 [email protected]; [email protected]. mn.us 5/1/2015 Wiring and setting up well house to be compatible with the generator 10/14/2015 Remove building; redrill and seal well 9/8/2015 Install security fencing and signage around $9,790.00 one of the wells and the GLSSWD Water Plan wellhead area Completed Page 4 of 7 2015 Plan Implementation Washington City of St. Paul Park Local/Regional Government Rob Weldon 651 459 3730 [email protected] 6/30/2015 4/30/2016 Miscellaneous public education activities 2015 Plan Implementation Dakota City of Eagan Local/Regional Government Jon Eaton 651 675 5215 [email protected] 7/22/2015 4/30/2016 Install test pits to delineate extent of dump $10,000.00 material; collect and analyze soil samples to determine if contamination may be present In Process 2015 Plan Implementation Jackson City of Jackson Local/Regional Government Jennifer Bromeland 5/6/2015 507 847 4410 jbromeland@cityofjacksonm n.com 12/22/2015 Abandon and seal a former test well that was used in 1980 $1,045.00 Completed 2015 Plan Implementation Hennepin City of Bloomington Local/Regional Government Robert Cockriel 6/25/2015 952 563 4867 smanderson@bloomingtonm n.gov 4/30/2016 Update the PCSI $10,000.00 In Process 2015 Plan Implementation Stearns City of Brooten Local/Regional Government Jeanne Kinne 320 346 2524 [email protected] 8/27/2016 Educate residents about wellhead protection; Identify proper location for gate valves and installation $10,000.00 Completed 2015 Plan Implementation Washington City of Oak Park Heights Local/Regional Government Eric Johnson 5/6/2015 651 439 4469 eajohnson@cityofoakparkhei ghts.com 4/30/2016 Develop a spill response plan; Survey unused $9,311.50 wells in the DWSMA In Process 2015 Plan Implementation Anoka City of Centerville Local/Regional Government Mike Ericson 5/1/2016 651 429 3232 [email protected] m 4/30/2016 Sealing wells on private property In Process 2015 Plan Implementation St. Louis Hibbing Public Utilities Local/Regional Government Corey Lubovich 218 262 7725 [email protected] 5/1/2015 4/30/2016 Update PCSI; Manage sites with $7,400.00 documented environmental contamination; Seal unused well In Process 2015 Plan Implementation Stearns City of Avon Local/Regional Government James Thares 320 356 7922 [email protected] 5/1/2015 4/30/2016 Educational materials about well sealing and $4,606.00 drinking water; Develop WHP website; Sponsor Middle Sauk Water Festival; Promote water conservation to residents In Process 2015 Plan Implementation Dakota City of Burnsville Local/Regional Government Steve Albrecht 6/30/2015 952 895 4534 [email protected]. mn.us 4/30/2016 Complete the development of the City's $10,000.00 wellhead Protection Overlay Zoning District; Update PCSI In Process 5/6/2015 Sub Total For: Plan Implementation 2015 Application Project Name Year (Grant 2015 Transient County Recipient Recipient Type Project Manager Start Date Fillmore Elstad Lutheran Church Non-Profit Business/Entity Duane Bakke 5/1/2015 507 467 2971 [email protected] End Date Project Overview $5,000.00 $10,000.00 In Process $305,654.36 Status 6/25/2015 Install treatment Founding Amount $3,174.50 Completed 2015 Transient St. Louis Sunset Resort For-Profit Business/Entity John Goraczkowski 218 374 3161 [email protected] 5/1/2015 4/30/2016 Construct new well $5,868.00 In Process 2015 Transient Pope St. John's Lutheran Church Non-Profit Business/Entity Larry Zarbok 320 201 0072 5/13/2015 6/25/2016 Reconstruct, clean existing well $1,035.00 Completed Page 5 of 7 2015 Transient Houston Money Creek Haven For-Profit Business/Entity Wayne Fitting 5/1/2015 507 896 3544 moneycreekhaven@acegrou p.cc 8/20/2015 Construct new well; Seal existing well $10,000.00 Completed 2015 Transient Cass Woman Lake Lodge For-Profit Business/Entity Jeff Burks 218 682 3237 [email protected]; [email protected] 9/17/2015 Seal well $455.00 Completed 2015 Transient Mahnomen Evergreen Acres Cooperative K-12 Education Association Kim Kochmann 5/1/2015 218 261 1308 [email protected] .mn.us 12/15/2015 Seal well; Replace septic system $3,920.15 Completed 2015 Transient Scott Scott County Fair For-Profit Business/Entity Norman Pint 952 492 5440 [email protected] 6/30/2015 4/30/2016 Construct new well $10,000.00 In Process 2015 Transient Beltrami Break on the Lake For-Profit Business/Entity Steve Ballou 218 335 2422 [email protected] 11/19/2014 6/1/2015 Construct a new well; Seal existing well $5,882.50 Completed 2015 Transient Cook Way of the Wilderness Canoe Outfitters For-Profit Business/Entity Bud Darling 218 388 2212 [email protected] 5/1/2015 1/5/2016 Construct a new well $10,000.00 Completed 2015 Transient Washington Jesuit Retreat House For-Profit Business/Entity Christopher Maring 651 249 3937 [email protected] 5/1/2015 4/30/2016 Seal 3 wells $6,404.00 In Process 2015 Transient Stearns Paynesville Evangelical Free Church Non-Profit Business/Entity Brad Hopman 320 894 4752 [email protected] 11/1/2014 1/14/2015 Construct new well and water lines; Seal existing well; RO removal $6,922.50 Completed 2015 Transient Big Stone Big Stone Lake State Park Non-Profit Business/Entity Terri Dinesen 12/22/2014 6/30/2015 Construct a new well; Seal existing well 320 839 3663; 320 734 4450 [email protected] $8,401.50 Completed 2015 Transient Fillmore Hidden Valley Campground For-Profit Business/Entity Tom Kraetsch 507 378 5413 [email protected] 11/3/2014 4/30/2016 Construct new well; Seal existing well $10,000.00 In Process 2015 Transient Sherburne Oaks on the River Campground For-Profit Business/Entity Gene Earney 763 263 2074 [email protected] 11/1/2014 4/30/2016 Extend well casing; replace well cap; install $474.00 new conduit for electrical wiring serving the submersible pump In Process 2015 Transient Becker Runeberg Apostolic Lutheran Non-Profit Church Business/Entity John Tormanen 12/9/2014 218 616 3521 johntormanen@catholichealt h.net 4/28/2015 Construct a new well; Seal existing well $2,877.87 Completed 2015 Transient Houston Camp Winnebago Non-Profit Business/Entity Anne Selness 12/1/2014 507 724 2351 [email protected] rg; Anne Selness <campwinnebagodirector@g mail.com> 6/26/2015 Construct a new well; Seal existing well; Eliminate buried pressure tank and pit removal $7,514.84 Completed 2015 Transient Washington Hope Glen Farm LLC For-Profit Business/Entity Michael Bushilla 612 751 0300 [email protected] 11/19/2014 5/29/2015 Construct a new well; Seal existing well $7,820.00 Completed 5/1/2015 Page 6 of 7 2015 Transient Koochiching Thunderbird Lodge For-Profit Business/Entity Rod Haanen 12/1/2014 218 286 3151; 218 324 1382 (cell) [email protected] 9/22/2015 Construct new well $9,033.83 Completed 2015 Transient Fillmore First Lutheran Church of Highland Non-Profit Business/Entity Dean Berland 507 251 7951 [email protected] 4/30/2016 Investigate well integrity, camera well casing; cleaning $1,800.00 Completed 1/15/2015 Sub Total For: Transient 2015 Grant Total For: 2015 $111,583.69 $581,077.32 Page 7 of 7
© Copyright 2026 Paperzz