Matakuliah : A0214/Audit Sistem Informasi Tahun : 2007 Pertemuan 23-24 AUDIT METHODS AND TECHNIQUES FOR OPERATIONS Bina Nusantara DISASTER RECOVERY PLAN • To help a business recover in the wake of an event that disrupts normal business operations. Bina Nusantara Audit of DRP Steps 1. 2. 3. 4. 5. 6. 7. Bina Nusantara Steps put in writing Hot site/cold site selected Full and incremental system backups made on a daily or weekly basis Data backed up Test and drills scheduled Data and system backups stored off site Disaster recovery chairperson and committee appointed Audit of DRP Steps 8. 9. 10. 11. 12. 13. 14. Bina Nusantara Emergency telephone number listed Critical applications identified Operating system, utilities, and application files backed up Insurance coverage in place Communication plan made 13. Up to date system and operation documentation confirmed Employee relocation plan made for alternate work site Audit of DRP Steps 15. 16. 17. 18. 19. 20. 21. Bina Nusantara Food and water stocked Key personnel positions baked up CPR/first aid education in place Care planned for families in an emergency List made of hardware and software Mission statement drawn up for disaster recovery plan Contractual arrangements signed with cleanup crew to remove debris DRP Tests • Begin testing by using desk checks inspections and walk-through • A disaster can be simulated at a convenient time. Personnel also might be given prior notice of the test so they are prepared • Simulate a disaster without warning Bina Nusantara Recovery process of the data warehouse • • • • Identifying that the database is in an erroneous, damaged, or crashed state Suspending normal processing Determining the source and extent of the damage Taking corrective action like : – Restoring the system resources to a useable state – Correcting the damage or removing invalid data – Restarting or continuing the interrupted process, including the reexecution of interrupted transactions • Resuming normal processing Bina Nusantara
© Copyright 2026 Paperzz