Matakuliah Tahun : A0304 - Evaluasi Efektivitas Sistem Informasi : 2006 IT Cost Control Pertemuan 19-20 1 Direct Project Cost 1. 2. 3. 4. 5. 6. 7. Environmental operating costs Hardware cost Software cost Installation and configuration cost Overhead Training cost Maintenance cost 2 Indirect human cost • Administration, Fringe, G&A, Sr. Management. Etc. • These are usually outside of your control, however, items to look for in budget roll ups include; – Purchasing Labor Charge backs – Hiring Cost Charge Backs – G&A Changes 3 Indirect organizational cost 4 IS Department Budget 5 Situational Audit • What is the organization actually doing with its IT? • Why is the organization doing these things? • How is the organization utilizing the components of its IT resources? 6 IS Strategic Plan • What next does the organization want to do with its IT? • Why does it want to do this? • How does the organization want to implement these plans? 7 Methods for cost improvement 1. Systems may be wholly or in part outsourced 2. Systems may be wholly or in part downsized or right sized 3. IT may be harvested 8 Strategic Matrix 9
© Copyright 2026 Paperzz