Rochester Institute of Technology FY2016-FY2017 Final Capital Pending & Active Projects Summary Type Restricted: 1 2 3 4 5 6 7 8 Total Project Project EXPANSION (1) MAGIC Spell Studios ($13.5M NYS, $1.5M Gift, $2M RIT) (2) ADAPTATION University Center @ 40 Franklin Street ($1.5M Fed, $2.6M State, $2.6M RIT): F&A FMS 40 Franklin St. 1st & 3rd Floor CUE Renovation ($1.5M Fed, $2.37M NYS) F&A FMS 40 Franklin St. Building Improvements ($2.6M RIT, $0.23M NYS) NTID LBJ Hall Renovation to Support ICS Dept. ($1.63M Fed, NTID $0.55M) F&A FMS Jefferson Road Lighting ($574.5K NYS DOT, $9.6K Henrietta, $86.0K RIT) CIAS Gannett Hall 2nd Floor Computer Lab ($216K Gift) NTID Energy Audit ($130.9K Fed, $11.0K NYSERDA) DEFERRED MAINTENANCE (4) F&A FMS Carlson Bldg. Boilers Replacement ($100K NYS) Total Restricted 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Designated: EXPANSION (1) Global Village Expansion F&A FMS Substation Switchgear KGCOE Mechanical Engineering Machine Shop Upgrade Source (5) Project Balance $17,000,000 EX/RF $0 $17,000,000 3,866,350 2,833,650 EX EX/RF 2,306,478 831,465 1,559,872 2,002,185 2,180,654 670,137 215,818 141,900 EX/RF EX/RF EX EX 1,219,950 53,336 30,983 91,797 960,704 616,801 184,835 50,103 225,000 $27,133,509 EX/RF 0 $4,534,010 $18,000,000 2,980,000 300,000 ADAPTATION (2) NTID HLC Hall 1st Floor Renovation to support Access Services F&A Dining Grace Watson Hall Renovation F&A FMS 40 Franklin St. Urban Entrepreneur Center KGCOE Center for Micro Engineering MOCVD Clean Room AA Office of Graduate Studies Graduate Application Review System CIAS SAC Booth Rotoclone Exhaust Unit Gov’t. & Comm. Relations Event Management Software System CIAS Industrial Design Renovation COS Gosnell Hall Physics Room 3125 Renovation F&A FMS Energy Meters CLA Labs EMCS Bausch & Lomb Visitor Center Upgrade SCB Financial Management Lab Trading Room CODE (3) NTID Johnson Hall Restroom Refurbishment FMS OSHA Rooftop Fall Protection Phase 1 (Total Proj. Est. $1.5M) F&A FMS New Simplex Fire Alarm Software System NTID LBJ South Stair Tower Handicap Lift F&A FMS Carey Hall Fire Alarm System Replacement Project Expenditures 09/30/15 Bond RF RF 225,000 $22,599,499 $0 0 0 $18,000,000 2,980,000 300,000 1,125,000 650,000 28,859 6,882 201,600 24,999 75,000 93,608 99,859 100,000 100,000 100,000 100,000 570,000 409,500 97,712 250,000 100,000 1,125,000 650,000 463,407 352,268 201,600 199,092 169,635 110,000 105,885 100,000 100,000 100,000 100,000 RF RF RF RF RF RF RF RF RF RF RF RF RF 0 0 434,548 345,386 0 174,093 94,635 16,392 6,027 0 0 0 0 570,000 450,000 275,000 250,000 100,000 RF RF RF RF RF 0 40,500 177,288 0 0 (4) 30 31 32 33 34 35 36 37 38 39 40 41 42 43 DEFERRED MAINTENANCE NTID Ellingson Hall Window Replacement F&A FMS Quarter Mile TWC-CLA Walkway Design (Total Proj. Est. $1.5M) RIT Inn & Conference Center Phase 1 Window & Masonry Repair (Total Proj. Est. $1.7M) F&A FMS Gannett Hall Phase 1 Window Replacement (Total Proj. Est. $3.0M) F&A FMS Wiltsie Drive Reconstruction & Security Gate FMS Eastman Hall Elevator Modernization FMS Clark Gymnasium Roof Coating F&A FMS Pipe Repair F&A FMS Liberty Hill Barn and Red Barn Maintenance FMS Gannett Hall AHU-3 Replacement CIAS Breezeway Entrance Design F&A FMS Venture Creations Boiler Replacement F&A FMS Baker Hall & Heumann Hall Masonry Repair F&A FMS Gannett Hall Loading Dock Elevation Change Total Designated Projects Total Projects $2,500,000 147,000 1,007,300 770,000 850,000 344,840 255,000 240,000 200,000 200,000 200,000 135,000 115,000 100,000 $33,766,027 $60,899,536 RF RF RF RF RF RF RF RF RF RF RF RF RF RF $0 0 651,398 0 0 211,001 14,116 0 0 0 24,000 0 0 0 $2,189,384 $6,723,393 $2,500,000 147,000 355,902 770,000 850,000 133,839 240,884 240,000 200,000 200,000 176,000 135,000 115,000 100,000 $31,576,643 $54,176,143 END NOTES (3) (4) (5) Expansion and Adaptation – Alterations or additions to existing space, construction of additional square footage to the total plant for academic or university priorities, purchase and all associated costs for new property acquisitions in support of current or future development, purchase of major non-physical plant equipment in support (1) Expansion – Initiatives: Projects that expand the University’s physical plant or infrastructure; general improvements that impact the strategic nature of academic (2) Adaptation – Projects that directly support and improve the instructional and interactive relationships between students and faculty; projects that enhance lecture halls, classrooms, student life, computer labs, and other technological innovations; projects that further research opportunities Code - Code and Safety Compliance: Improvements necessary to enhance the safety of RIT’s people, equipment and buildings; projects that comply with the requirements of all regulatory agencies and appropriate statutes; projects that specifically address Americans with Disabilities and Section 504 rehabilitation standards. Deferred Maintenance – Correction of building problems to prevent further damage, loss of building use or negative impact on a program’s economic vitality. Source Legend - Bond=Debt Financed, EX=Externally Funded, RF=Reserves Funded 11/13/2015 12:03 PM
© Copyright 2026 Paperzz