Waste Generated = (2000) TPD 2015 – 2016 Generation Rate

08/07/2016
Presented by
Dr Aung Myint Maw
Assistant Chief Engineer.
1
YCDC. 8‐Jul‐16
Profile
Area
: The administrative boundary of YCDC, in 1985 ( 133.643 Sq‐Miles) and now a day ( 292.426 ) Square Miles. Population
: 6 million (2014)
Township ; 33 Tsps
Generation Rate ; 0.41 Kg / Capita / Day
Household Waste Generated : 2000 tons per day
Industrial Waste
:150 tons per day
1
08/07/2016
Area Map
4
2
08/07/2016
Yangon People Dry Waste
&
House Hold
Wet Waste
Source Separation
Waste Define in Yangon
Organic Waste
Household waste
Waste
Industry
Inorganic Waste
Construction
Hazardous
Hospital
Others
3
08/07/2016
Collection and Transportation
Carts
Truck
Dust Bins
Truck
Public (Household)
FDS
Trucks
Truck
Containers
RORO
Household Waste Management
Landfill Gas Plant
Household waste
Sorting the Recyclable Materials
Incineration Plant
4
08/07/2016
Industrial Waste Management
Tipping Fee at site, 5000 kyat par tons and exceed ton about added 2000 kyat.
Containers
Industries
On call System
FDS
Structure of Recycling Market
House Hold and Waste Generator
Collector/ Local Buyer
Household Collectors
Whole Sellers
Factory/ Recycle
Export
Domestic User
10
5
08/07/2016
Integrated Solid Waste Management
Final Disposal Site Management
Check List at the FDS office
FDS
Dumping
Leveling
Compacting
PCCD Recycle Factory
Recyclable
Material Sorting
Private Factory
6
08/07/2016
2015– 2016GenerationRate
0.267 Kg/capita/day
Kg/capita/day
3.2% OF CITY POPULATION
TOWNSHIP OF CITY
0.396 Kg/capita/day
0.312 Kg/capita/day
7.5 % OF CITY POPULATION
DATA BASED ON C.B.D OF CITY
0.395
Column6
Kg
0.45
0.4
0.35
0.3
0.25
0.2
0.15
0.1
0.05
0
0.287 Kg/capita/day
2% OF CITY POPULATION
0.411 Kg/capita/day
10 % OF CITY POPULATION
Column6
Budget Years
2016-2017…Waste Generated = (2000) TPD
Yearly Waste Collected
Tons
800000
700000
600000
500000
400000
300000
200000
100000
0
Waste Collected
Waste Collected
2007‐2008
456344
2008‐2009
433764
2009‐2010
437472
2010 ‐ 2011
426999
2011 ‐ 2012
479280
2012 ‐ 2013
553719
2013‐2014
506657
2014‐2015
590632
2015‐2016
716051
Waste Collected
Budget Years
7
08/07/2016
Proposed area for SSIP (15) acre
Note:
(1) Total capital investment about (16) million US $,
( 2)YCDC allocated (8) which fixed (1.4) at 2015-2016, (6.6) at 2016-2017
(3) Leap Frog program about (8) million, 3-year program from MoEJ.
(4) Joint Crediting Mechanism about from MoFAJ, ongoing stage.
Existing Used Main ( 2 ) Final Disposal Sites & ( 4 ) Temporary Small
FDS
N Location of
O FDS site
Constructed
Year
Planned Site ( Plant)
Capacity Area
Dispose Ton
Per Day
( Current)
Remark
1
HtainBin
2002
-
150- Acre
Used- 70 Ac
950
Open
Dumping
2
Htwei
Chaung
2001
-
147 – Acre
Used-47.4 Ac
800
Open
Dumping
3
Dala
2003
-
1.3- Acre
20
Low Landfill
Temporary site
4
Seikkyi
Khanaung
To
2003
-
0.25 - Acre
5
Low Landfill
Temporary site
5
Mingalardon
2003
-
0.91 - Acre
60
Low Landfill
Temporary site
6
Shwe
8‐Jul‐16
2005
-
1 - Acre
60
Low Landfill
16
Temporary site
Pyi
Thar
8
08/07/2016
2040 ..Selected FDS
3
HLEGU
2
HLAWGAR
5
KYI SU
4
HTAWE CHAUNG
1
HTAINBIN
NORTH DAGON
7
6
9
THNN LYIN
THAKETA
DALA
8
To Sustain Our Planet, Do Our Best
18
9