CITY OF WELLAND Infrastructure and Development Services Building Division NO. ___________ 60 East Main Street, Welland, ON L3B 3X4 Phone: 905-735-1700 Fax: 905-735-8772 E-mail: [email protected] www.welland.ca ALTERNATIVE SOLUTION/OBJECTIVE BASED CODE DESIGN Required for Submission of a Proposed Alternative Solution/Objective Based Code Design 1 2 3 A description of the proposed alternative solution [Div. A, 1.2.1.1.(1)(b)] 4 Code Analysis (documentation under Div. C, Article 2.1.1.1.) Establish on the basis of past performance, tests described in Div. C Article 2.1.1.2., or other evaluation that the proposed alternative solution will achieve the level of performance required under Div. B, by way of Div. A, Article 1.2.1.1. Submitted YES Proponent(s) name, company, address, contact information Designer’s qualification appear on Schedule 1, or Architect or P. Eng. A Identification of applicable Division B provisions (acceptable solutions) B Identification of applicable linked pairs of objectives and functional statements C An evaluation of the level of performance of applicable Division B provisions D An evaluation of the level of performance of the proposed alternative solution E F Identification of any assumptions, limiting or restricting factors Identification of testing procedures, engineering studies, building performance parameters etc. to support the assessment of compliance 5 Information concerning any special maintenance or operation requirements, including commissioning, necessary for the integrity of the alternative solution after construction is complete Optional Items That Would Be Helpful In The Review 6 A list of submitted documents: These could include a concept report, calculations, fire modelling, test reports, precedents, fire scenario evaluation, alternate Codes and standards, drawings, etc. 7 8 9 10 A reason for the proposed alternative solution 11 Other: (specify) PAGE 1 A list of applicable sections of referenced documents (standards) Resume of designer with details of qualifications A list of other projects where a similar Alternative Solution or Building Code Commission proposal, etc. was accepted. May 4, 2016 NO WORKSHEET FOR THE EVAULATION OF ALTERNATIVE SOLUTIONS Project Location: Project Information and Contacts: Owner/Designer/Agent: Summary of Proposal: Provide brief description below to summarize proposal which is attached in more detail as required in Item 4. Applicable Division B Provisions: Numeric Reference Summary of Provision Objectives/Functional Statements/”Areas of Performance” Sentence PAGE 2 F.S. Obj. Summary of “Areas of Performance” N/A? May 4, 2016 “AREAS OF PERFORMANCE” WORKSHEET Applicable Provisions FS OBJ Functional Statement To <function> What/from LINK Objective People/building Not <harmed> due to OR can <action> so that so that so that so that so that so that so that so that so that so that so that so that so that so that so that PAGE 3 May 4, 2016 FOR OFFICE USE ONLY Confirmation of Level of Performance of: Division B Provisions What is the level of performance of Division B in the “areas of performance” defined by the applicable objectives and functional statements? Proposed Alternative Solution • • • What is the level of performance of the proposed alternative solution that is established by the applicant? Does the supporting documentation adequately support this level of performance? Do you agree with the established level of performance? Evaluation: Conditions of Approval, if any Circulation of Accepted Alternative Solution Proponent Province Chief Building Official Central Registry Inspector File Fire Department Owner Accepted by: BCIN: PAGE 4 Other (specify) Date: May 4, 2016 APPLYING THE 2006 BUILDING CODE COMPENDIUM (*OBC) 1 Start Receive Application Div A, 1.2.1.1.(1)(a) 4a Confirm Compliance with Applicable Division B Provisions Tools and Information to Assess Level of Performance Legend Acceptable Solution Steps indicated by an “a” Alternative Solution Steps indicated by a “b” 4b Confirm Applicable Division B Provisions 3 Confirm Method of Compliance 5a Optional Consult Functional Statements & Objectives Common Steps Apply to both Evaluations Div A, 1.2.1.1.(1)(b) • • • • • • • • • • Code Analysis Engineering Analysis Mathematical Modeling Computer Modeling Peer Review Published Standards Not in Code Product or Material Test Results Evaluation of Scenarios Previous Approvals from Other Authorities Risk Analysis This chart is a tool for the application of the 2006 Code. Your principal authority may have additional policies and procedures for reviewing Permit Applications. The chart does not attempt to capture administrative processes or the path of Permit refusal and appeal. (*OBC) – MEANS 2006 ONTARIO BUILDING CODE, AS AMENDED PAGE 5 Approved/Database Solution Applicable Optional Clarify or Discuss with Applicant [Return to process if resolved] Compliance Using Alternative Solutions 2 Confirm Compliance to other Division C OBC Provisions 5b Check Databases or Previously Approved Alternative Solutions (Where Applicable) 6b Confirm Applicable Objectives & Functional Statements 7b Confirm level of Performance of Applicable Division B Provision(s) 8b Confirm Level of Performance of Proposed Alternative Solution(s) Resubmittal Required Compliance Using Div. B Acceptable Solutions Optional Clarify or Discuss with Applicant [Retrurn to process if resolved] Level of Performance of Division B Not Met 9b Compare Levels of Performance Level of Performance of Division B Met or Exceeded Final Step 10b Establish Conditions of Acceptance, if any Acceptance or Refusal & Document Retention May 4, 2016
© Copyright 2026 Paperzz