By Resolution of Commonwealth Transportation LIMITED ACCESS HIGHWAY PROJECT MANAGER: TIMOTHY HARTZELL, P.E. (703) 259-2749 (NOVA District) SURVEYED BY, DATE: PRECISION MEASUREMENTS, INC., 9/2015 (804) 340-5229 DESIGN BY: HNTB CORPORATION (703) 824-5100 SUBSURFACE UTILITY BY, DATE SO-DEEP, 9/2015 (703) 361-6005 Board dated January 18, 2001 REVISED STATE STATE SHEET NO. ROUTE VA. 66 PROJECT (FO) 0066-96A-358, P101 2D(01) TOLL GANTRY GENERAL NOTES: DESIGN FEATURES RELATING TO CONSTRUCTION Specifications: Structural Steel: Construction: Virginia Department of Transportation Road and Bridge Specifications, 2007. OR TO REGULATION AND CONTROL OF TRAFFIC HSS round sections: MAY BE SUBJECT TO CHANGE AS DEEMED Gantry overhead truss transverse rotation from level: ASTM A500, Grade B, Fy = 42 ksi WT shapes: ASTM A709, Grade 50, Fy = 50 ksi in fully loaded condition, rotation to be limited to All other shapes and plates: ASTM A36, Fy = 36 ksi 0.2 (~) degrees from level. NECESSARY BY THE DEPARTMENT Design: AASHTO Standard Specifications for Structural Supports Structural members shall be galvanized in accordance with ASTM A123. Gantry overhead truss - deflection criteria: in fully loaded condition, 4th Edition, 2001. Structural connection bolts and hardware shall be galvanized in AASHTO Standard Specifications for Highway 2' -0" for Highway Signs, Luminaires and Traffic Signals, deflection of truss element to be limited to L/150 where L is the truss span length. C L Truss accordance with ASTM A153. Gantry natural frequency/resonance: Bridges, 16th Edition, 1996; 1997 and 1998 Interim Specifications; and VDOT Modifications. 40 Hz upper bound Connection bolts in superstructure shall be in accordance with ASTM A325, on natural (resonant) frequency of the gantry and slip critical. gantry individual members. Shop drawings for gantry structural steel, including foundation anchor Foundation lateral deflection: bolts, shall be submitted to the Engineer for review and approval. foundations, C L Top chord 8'-0" (typ.) These plans are incomplete unless accompanied by the Supplemental Specifications and Special Provisions included in the contract documents. Using single drilled shaft shaft maximum lateral displacement = •" C L Bottom measured at ground surface. Design Loads: chord Construction Tolerances: Maximum roadway cross slope at toll collection line: Maximum Self weight of structure. Gantry height tolerance at completion of construction shall be Equipment load: See Toll Gantry Design Parameters, this sheet. fall from the high point of road is limited to 30". 2" (~) measured from the highest point of the road under the Minimum clearance between gantries and other major gantry to the bottom chord centerline. infrastructure: Ice load: 3 lb/sq. ft. on the structure and equipment surface area. Basic wind load: 100 miles/hour based on 3 second gust speed at 33 ft. above ground for Exposure C category with 50 year mean recurrence interval. The top of drilled shaft elevations shall be field verified by Contractor before fabrication of toll gantry steel structures. If needed Contractor shall adjust the height of the column to hold 21'-0" vertical clearance other major structures that may cause interference anchor bolt group (centerline of gantry column) shall be 1•". (e.g. signs, roadway lighting, etc.) EQUIPMENT SPACING ENVELOPE Toll Gantry overhead truss assemblies are equipped with bolted Not To Scale end strut/brace members to allow for erection of the truss assembly with post members in place. COMBINED EQUIPMENT LOADING PER LANE Overhead truss gusset plates shall be protected during erection operations. Py LOAD CASE removed, temporary bracing shall be provided as indicated in requirements of S1. The washers shall be per ASTM F436 and nuts per ASTM A563. The anchor bolts, nuts and washers to be hot-dipped operations and shall remain in place until end strut/brace members (kips) Vz Mx My Mz (kips) (kips) (k-ft) (k-ft) (k-ft) Group I-DL -0.666 0.000 0.000 0.752 0.000 0.000 Group II-DL+W (wind normal to truss) -0.666 0.000 0.521 2.308 0.000 0.000 Group II-DL+W (wind parallel to truss) -0.666 0.501 0.000 0.752 1.044 0.827 Group III-DL+Ice+ •(W) (wind normal to truss) -0.933 0.000 0.260 2.405 0.000 0.000 Group III-DL+Ice+ •(W) (wind parallel to truss) -0.933 0.251 0.000 1.626 0.522 0.413 are fully bolted in place. End strut/brace members removed for erection purposes shall be fully bolted in place prior to placement of the truss assembly on Concrete in drilled shafts shall have a minimum compressive strength of Vx the plans. Temporary bracing shall be placed prior to erection galvanized in accordance with ASTM A153. The anchor plates shall be per ASTM A709 Grade 36 (min). envelope (see notes) TRANSVERSE TRUSS ELEVATION Gantry Erection: During erection, if end strut/brace members are temporarily The anchor bolts shall be per AASHTO M314 Grade 55, with supplemental Equipment spacing A distance of 30'-0" is to be held to The tolerance between centerline of drilled shaft and center of between as-built highest point of roadway below the gantry and the centerline of lower chord of gantry. 4' -0" Dead load: the post connection plates. 4000 psi. All drilled shaft construction shall be in accordance with the The Contractor shall have the option of erecting the toll gantries Special Provisions. onto shaft foundations fully assembled. COMBINED EQUIPMENT LOADING PER LARGE SHOULDER (EXCEEDING 6' IN WIDTH) All concrete used in the construction of the drilled shafts shall be Gantry erection shall be performed within work durations defined low permeability concrete. in the Traffic Control Setup and Takedown Special Provisions. Py LOAD CASE (kips) Deformed reinforcing bars shall conform to ASTM A615, Grade 60. The base of each shaft shall have less than 1•" of sediment or loose material at the time of placement of concrete. Vx Vz Mx My Mz (kips) (kips) (k-ft) (k-ft) (k-ft) Group I-DL -0.541 0.000 0.000 0.118 0.000 0.000 Group II-DL+W (wind normal to truss) -0.541 0.000 0.149 0.211 0.000 0.000 Group II-DL+W (wind parallel to truss) -0.541 0.104 0.000 0.118 0.091 0.070 Group III-DL+Ice+ •(W) (wind normal to truss) -0.668 0.000 0.074 0.287 0.000 0.000 Group III-DL+Ice+ •(W) (wind parallel to truss) -0.668 0.052 0.000 0.241 0.045 0.035 TOLL GANTRY DESIGN PARAMETERS AND EQUIPMENT MOUNTING REQUIREMENTS Construction joints shall be constructed in accordance with Section 404.03h of the VDOT Road and Bridge Specifications. Equipment loading for toll Construction joints shall not be made within 6" of the tip of the anchor bolts or conduit exiting the drilled shafts. gantry design is based upon the following assumed equipment types and counts: Antennas: 1 each centered over each lane and 1 each positioned over each lane line. MAXIMUM EQUIPMENT DESIGN LOAD Orientation of steel conduits in the drilled shaft shall be determined in the field. Location of conduits to be coordinated with the opening Cameras and illumination strobes: in the base plate of gantry column. and one centered over large shoulders (over 6' in width). The depth of the steel conduits in the drilled shaft shall be determined Scanners: in the field by Electrical Contractor. centered over large shoulders (over 6' in width). For additional conduit information, see toll and traffic management plans. Enforcement Beacons: 1 each centered over each lane. Steel conduits in drilled shaft concrete shall not be bundled together. Light Sensors: One per gantry. Cable Troughs: 1 each running the full length of the overhead 1 each centered over each lane (SERVICE LOADS) Up to 3 each centered over each lane and one Y-axis Z-axis into page X-axis A minimum of 3" clear spacing shall be maintained between steel conduits. Drilled shafts shall be installed in general accordance with project specifications and Special Provisions for Drilled Shafts, dated August 29, 2008. Provisions relating to: the technique shaft, permanent casing, nondestructive evaluation, cross-hole sonic logging (CSL) tests and CSL tubes, and O-Cell load testing do not apply to drilled shafts for toll gantry foundations with drilled shafts of 40' or less In depth. Separate CSL testing and CSL tube provisions for drilled shafts in excess of 40' in depth will apply as indicated on the plans and in the Special Provisions. Equipment mounted to the gantry overhead truss shall be fully Large shoulder defined contained within a placement envelope as defined in the Transverse Truss Elevation Equipment Spacing Envelope, this sheet. by width > 6'-0" Submitted equipment parameters falling outside of this envelope shall be subject the excavated soils are generally consistent with those described in the approved ECS Mid-Atlantic, strata need not be verified. LLC Geotechnical Report. Tip bearing The quality control inspector shall also size, bottom condition and alignment prior to placement of concrete in accordance with the VDOT Special Provision for Drilled Shafts, dated August 29, 2008. to rejection. 6: 41 : 39 AM Pen Tabl e = LD_v95. t bl 1 /5/201 6 Lane Lane Lane patterns vary shall fall within maximum acceptable load groups, as defined in the Maximum Equipment Design Load Tables, this sheet. Sign conventions are defined in the Truss Elevation - Equipment Load Axis Definition detail, this sheet. TRUSS ELEVATION Loads were conservatively defined based on the equipment types, counts and placement envelope defined above. EQUIPMENT LOAD AXIS DEFINITION Submitted equipment type and placement resulting in loads in excess of those indicated in the table below shall be subject to the Not To Scale review and approval of the Engineer and may be subject to rejection. REFERENCES COMMONWEALTH OF VIRGINIA Performance standards used in the design of toll gantries follow: shaft excavation. d1 07371 02d( 01 ) . dgn 12'-0" to the review and approval of the Engineer and may be subject Groundwater, including perched water, may be encountered during drilled Drill shafts in place, level and remove all loose material from bottom of Gantry truss vertical control: shaft before concrete is placed. of roadway to the bottom chord centerline see construction keep shaft free of water. 12'-0" Design loadings for equipment mounted to the gantry overhead truss A qualified drilled shaft quality control inspector shall log and verify verify the overall depth, truss member. When dry construction method is used, Remove all laitance material from top of shaft DEPARTMENT OF TRANSPORTATION ( PROFILES, DETAIL & DRAINAGE DESCRIPTION SHEETS, ETC. ) 21'-0" (measured from highest point I-66 MULTIMODAL IMPROVEMENTS INSIDE THE BELTWAY tolerances, above). TOLL GANTRY GENERAL NOTES prior to further construction. Gantry overhead truss - twist about transverse axis: Temporary casing may be used to stabilize a drill hole. be removed while placing the concrete. The casing shall During casing removal, concrete In fully loaded condition, twist to be limited to 0.5 (~) degrees. HNTB CORPORATION THESE PLANS ARE UNFINISHED should be maintained at least 10 feet above the bottom edge of AND UNAPPROVED AND ARE NOT the casing. TO BE USED FOR ANY TYPE ARCHITECTS ENGINEERS & PLANNERS ARLINGTON, VIRGINIA SCALE NOT TO SCALE PLAN NO. OF CONSTRUCTION OR THE ACQUISITION OF RIGHT OF WAY. A DATE DEC. 2015 PROJECT 0066-96A-358 SHEET FILE NO. OF SHEET NO. 2D(01)
© Copyright 2026 Paperzz