Maracaibo 2nd fixed link project Venezuela Services • Conceptual design studies • Design basis, safety concept and risk analyses • Concrete durability and mix design investigations • Design of permanent tunnel, bridge and island structures • Design of mechanical and electrical installations • Design of tunnel element casting basin and temporary installations • Supervision of ground investigations and interpretation of results • Environmental impact assessment (EIA). 43 m 0233-1706-044e-09c The project site is located in Maracaibo, Venezuela. The link crosses the Maracaibo Lake at Santa Cruz de Mara on the west shore and at Punta de Palmas on the east shore. The combined road and railway crossing comprises a 5.6 kilometres long low-level bridge and a 4.4 kilometres long tunnel connected by a 1.5 kilometres long artificial island. The bridge will have 75 metres long spans constructed with pre-stressed concrete on pile group foundations. The tunnel comprises an immersed tunnel with a length of 3.7 kilometres and cut and cover tunnels at each end with a total length of 0.7 kilometres. The typical tunnel cross-section is a six-bore structure with four traffic tubes, two of which contain two road lanes each while the other two contain the railway. The remaining two bores contain a service gallery and a gallery for a high-voltage cable, respectively. The island has an elliptical shape to minimise the blockage of water flow, thereby securing that the link will be neutral to the marine environment. Project period: 2006-ongoing Client: Construtora Norberto Odebrecht S.A.
© Copyright 2026 Paperzz