Project Overview /CTOBER Geraldton North South Highway – Alignment Definition Study Community feedback is being sought on the planning of a transport route for the future Geraldton North South Highway (GNSH). -AIN2OADSISMANAGINGAPLANNINGSTUDYTODEFINEA RESERVATIONFORTHISHIGHWAYWHICHWILLPROVIDEANALTERNATIVE future north south regional road route for the Geraldton area. 4HEAIMISTOREMOVEREGIONALTHROUGHTRAFFICPARTICULARLY HEAVYVEHICLESFROMTHEEXISTING.ORTH7EST#OASTAL(IGHWAY and Brand Highway within the Geraldton city area. 4HE'ERALDTON2EGION0LANIDENTIFIESTHELOCATIONOFFUTURE MAJORROADSIN'ERALDTONINCLUDINGTHE'.3(ASSHOWNIN the Locality Plan in this brochure. The Department of Planning is currently undertaking a study to develop a structure plan FORTHEEXPANSIONOFTHE.ARNGULU)NDUSTRIAL!REAWHICH is being taken into account as part of the GNSH planning. The structure plan was the subject of recent community consultation. The southern section of the GNSH route between Brand (IGHWAYAND'ERALDTON3OUTHERN4RANSPORT#ORRIDOR'34# currently under construction) is strategically more important than the northern section because it will provide a high standard LINKTOTHE'ERALDTON0ORT.ARNGULU)NDUSTRIAL!REAANDTHE PROPOSEDOUTER.ARNGULUn/AKAJEE)NFRASTRUCTURE#ORRIDOR !7ORKING'ROUPHASBEENESTABLISHEDTOOVERSEETHISSTUDYAND INCLUDESREPRESENTATIVESFROMTHE#ITYOF'ERALDTON'REENOUGH $EPARTMENTOF0LANNING$EPARTMENTFOR%NVIRONMENTAND #ONSERVATIONANDTHE-ID7EST$EVELOPMENT#OMMISSION Purpose of this Brochure This brochure presents a preliminary concept plan and reservation for the future GNSH. This planning will allow a road reservation to be defined and protected for construction of the highway at some time in the future. There is no funding at this stage to build the road. Funding can only be considered after the reservation has been defined and planning finalised. #OMPLETINGTHISPLANNINGPROCESSSHOWNPROVIDESCERTAINTY for landowners and a framework for land use planning and development. 9OUAREINVITEDTOHAVEYOURSAYONTHEPROPOSALWHICHCANBE done using the comment sheet in this brochure. PLANNING PROCESS ALIGNMENT SELECTION STUDY (COMPLETE) !LIGNMENTIN'ERALDTON2EGION0LAN ALIGNMENT DEFINITION STUDY (THIS STUDY) $EFINETHEHIGHWAYRESERVATIONREQUIREMENTSFORTHE deviation in consultation with stakeholders and affected landowners. PROTECTION OF ROAD RESERVATION (NEXT STAGE) Action to include the road reservation in the local statutory planning scheme. Government of Western Australia Department of Planning Comment Sheet Geraldton North South Highway Planning Study Feedback from the community is welcomed by the Study Team. If you would like to make a submission on the study, please complete this comment sheet. It would be appreciated if you could send comments by 20 November 2009 to the following postal address: GNSH Planning Study #AROLYN7ALKER0UBLIC2ELATIONS PO Box 178 #OMO /RFAXTO Or email to [email protected] Name: Address: %MAIL Telephone: #OMMENT Comment Sheet Geraldton North South Highway Planning Study How can I be involved? What happens next? Active community involvement is an essential element of the study and the community is encouraged to participate by identifying issues or concerns and providing feedback on the preliminary GNSH concept plan. All directly affected landowners will be engaged to clarify specific issues. You are able to provide comment by completing the comment sheet in this brochure. Additional information is available by: 1) Visiting a public display (from 26 October) at: s THE#ITYOF'ERALDTON'REENOUGH#ATHEDRAL!VENUE Geraldton; or s -AIN2OADS7!-IDWEST2EGIONAL/FFICE%ASTWARD 2OAD'ERALDTON #ONTACTING#AROLYN7ALKERONORBYEMAIL [email protected] to discuss further. 4HISBROCHUREISALSOAVAILABLEONTHE-AIN2OADSWEBSITE at www.mainroads.wa.gov.au (follow the ‘Projects’ link to @2EGIONAL0ROJECTS A report will be prepared summarising community feedback and comments on the preliminary GNSH concept plan presented. Issues raised will be further examined and discussed with the 7ORKING'ROUPTOFINALISEAPREFERREDCONCEPTANDRESERVATION PLANFORENDORSEMENTBYTHE#ITYOF'ERALDTONn'REENOUGH ANDTHE7!0#34#!CTIONWILLTHENSTARTWITHTHE#ITYTO include the road reservation in the local statutory planning scheme. Timeline and further information: 0LEASESENDYOURCOMMENTSBY.OVEMBERTO #AROLYN7ALKER0UBLIC2ELATIONS 0/"OX#OMO or by email to [email protected] &ORFURTHERINFORMATIONPLEASECONTACT#AROLYN7ALKERON 0H &AX %MAILICWALKER VIANETNETAU or visit www.mainroads.wa.gov.au Project Overview Why is the Planning needed? "OTHTHE"RAND(IGHWAYAND.ORTH7EST#OASTAL(IGHWAY .7#(CARRYAMIXTUREOFLIGHTANDHEAVYVEHICLESANDTHERE are various residential and commercial activities along these routes. There is increasing conflict between regional and LOCALTRAFFICTHATISRESULTINGINREDUCEDSAFETYAMENITYAND EFFICIENCYMAKINGTHEROADLESSSUITABLEFORHEAVYVEHICLES 4RAFFICISEXPECTEDTOINCREASEPARTICULARLYFROMTHENORTHWITH the development of the proposed Oakajee Port and Industrial area north of Geraldton. The proposed Geraldton North South Highway will: s Improve the safety and efficiency of the road network in Geraldton for all road users. This includes minimising conflict between regional and local traffic. s Improve access to and from the port of Geraldton and INDUSTRIALAREASINCLUDINGFUTUREEXPANSIONOFTHE.ARNGULU )NDUSTRIAL!REAFORHEAVYVEHICLES s 2EMOVEHEAVYVEHICLESTRAVELLINGTHROUGHTHE'ERALDTON region from residential areas along Brand Highway and .ORTH7EST#OASTAL(IGHWAY s -AINTAINSAFEACCESSTOTHE#ITY#ENTRE s %NHANCEFUTUREREGIONALEXPANSION What work has been done previously? s !NINDICATIVEALIGNMENTFORTHE'ERALDTON.ORTH South Highway was released in the Greater Geraldton Structure Plan. s n!N!LIGNMENT3ELECTION0LANNING3TUDY was undertaken which included extensive stakeholder and community consultation to select the preferred alignment for the GNSH. s 4HEPREFERREDHIGHWAYALIGNMENTWASENDORSEDBY THE7ESTERN!USTRALIAN0LANNING#OMMISSION3USTAINABLE 4RANSPORT#OMMITTEE7!0#34# Current Planning Concept 4HE'.3(7ORKING'ROUPHASBEENASSESSINGANDDEVELOPING the proposed alignment and associated access points and this work has resulted in the production of a preliminary planning concept and reservation plan. The GNSH concept is planned as a four lane divided highway with a central median and pedestrian and cyclist facilities. It will have no direct frontage property access and only limited side road access. Limited side road access enhances safety and maximises the highway’s efficiency as a transport route. Grade separated interchanges (roads that intersect on different LEVELSAREPLANNEDATTHEJUNCTIONSWITHTHE'34#ANDTHE FUTURE.ARNGULU!CCESS2OAD4HESEINTERCHANGESINCLUDE PROVISIONFORBRIDGESTOSEPARATETHROUGHTRAFFICANDONOFF ramp connections to cater for all turning traffic movements. At grade intersections (roads that intersect on the same level) are proposed with the majority of the existing side road connections. The configuration of some intersections may change in the future to integrate with existing and future land use proposals for the area. The diagram included in this brochure shows the preliminary '.3(CONCEPTANDRESERVATIONREQUIREMENTSANDINTERSECTION access points for public comment. Access to the future highway is proposed at the following locations: 1 $EVLIN0OOL2OAD 2. Brand Highway *ANDANOL2OADEASTONLY 2UDDS'ULLY2OAD .ARNGULU!CCESS2OAD 6 'ERALDTON3OUTHERN4RANSPORT#ORRIDOR 7 'ERALDTON-OUNT-AGNET2OAD 8 %IGHTH3TREET 0LACE2OAD 1 &UTURE3TRATHALBYN3TREET 1 !NDERSON3TREETAND#RAWFORD3TREET 12. Newman Street. 1 &LORES2OADSOUTHONLY !TTHEINTERSECTIONOFTHE.ORTH7EST#OASTAL(IGHWAYTHE GNSH would be a T-junction.
© Copyright 2026 Paperzz