Manufacturer of Premium Quality Bathroom, Kitchen and

Manufacturer of Premium Quality
Bathroom, Kitchen and Hot Press Pods
Contents
COMPANY PROFILE
Innovation
02
BATHROOM PODS
03
KITCHEN PODS
09
SOLAR POWERED HOT PRESS PODS
12
DESIGN AND PROCESS
14
TECHNICAL
17
Company Profile
Polypod was formed to satisfy the increasing demand for greater pre-fabrication in the construction
industry, specifically in the design, development and installation of ‘pod’ units for a wide variety of
formats. The concept of off-site construction of modules or pods for installation at the appropriate stages
of a construction project, first developed in Japan in the 1960s, and is not only more practical, but has
wider cost and time-saving implications. Critical paths in project management of large construction
programmes are reduced significantly and the quality is greatly enhanced, with the ensuing benefits
and savings passed on to developers. Polypod’s aim is to produce kitchen, bathroom and hot press
pods to the highest industry standards while ensuring that they are designed to cater for every aspect of
use in residential, commercial, institutional or hospitality environments. Regardless of size, complexity
or design constraints, Polypod constantly strives for excellence in every project undertaken. Always
endeavouring to be innovative in design, the company operates a hands-on management role, fully
committed to workingclosely with clients to focus on the successful delivery of every project on time.
Polypod has extensive experience in the construction industry and an indepth knowledge which ensures
high standards to provide a unique, costeffective pod solution for each individual project.
01
Creativity
02
Bathroom Pods
Hotels
Hotels and Suites
In an age of comfort and convenience, innovative and
imaginative designs to maximise the available space
in bathrooms are increasingly demanded by both
developers and home owners.
Whether it’s a small en-suite unit or a large hotel
suite, Polypod builds bathroom pods to the highest
industry standards, sourcing a wide range of fixtures
and accessories from leading manufacturers around
the world. Requiring the minimum of maintenance,
Polypod bathroom pods are highly practical units and
are delivered fully finished, tested and certified to all
relevant building regulations.
VIsitor toilet pods for public use in hotels.
Hotel bathroom suite example with inset detailed selection of fittings
03
04
Residential
Residential
(Including Houses, Apartments and Villas)
University
• En-Suite Shower Cubicles
• Disabled Access Toilet & Cloakroom Pods
• Bathroom Pods
• Kitchen Pods
• Hot Press Pods
Residential University accommodation for teaching staff
Bathroom pod delivered to Dubai Silicon Oasis Project
05
Bathroom pod for Princess Nora University, Riyadh, Kingdom of Saudi Arabia
06
Special Needs
Hospitals, Clinics and Nursing Homes
HTM special needs specification for private hospital in UK
07
Special Needs
Hotel and Hospitals
Document M in specification bathroom pod for hotel sector. Also inset ADA specification for hospital bathrooms
08
Kitchen Pods
Residential
Pre-fabricated kitchen pods offer developers many advantages over traditional on-site construction such as cost-effectiveness, consistent quality and convenience. Regardless of whether the pod is an entrylevel unit or a luxury high-end residential unit, Polypod can supply a diverse range of fully finished, tested and certified kitchen pods to site on schedule with a minimum of fuss. Working closely with leading
kitchen manufacturers, the Polypod process ensures high build quality, uniformity and security without the need for several trades to work on-site.
09
Open Plan Kitchen Pods
Fully furnished kitchen pods pre built in open plan layout of in two parts with independant kitchen island and bespoke selection of finishes and fittings
10
Kitchen Pods
Residential
Solar Powered Hot Press Pods
The logistics of getting perhaps 500 water cylinders (with all the associated pumps, copper piping, cables, switchgear etc.) delivered to the right site at the right time for Hot Presses
in a particular development can be a daunting task. Such difficulties can be easily resolved by using Polypod Hot Press Pods, complete with water cylinder, pump, pipe work and
electrical connection points, an industry ‘first’ which is built to a consistent high quality and signed-off to meet agreed MEP specifications. Batches of fully finished (inside and out)
pod units are delivered on site on agreed dates, locked and secured and covered with a robust weatherproofing material, in readiness for craning into position.
The Polypod Solar Hot Press Pod incorporates
• Client specific water cylinder, typically including dual immersion heaters, thermostatic relays to mass boiler, controller and timer;
• Pre-formed manifolds and connections for ease of access, commissioning and installation;
• Booster pump for supply to all areas;
• Central manifold including MWS stop-cock for the entire dwelling/apartment, ensuring minimal amount of connection on site;
• Fully integrated air extraction system replacing smaller units in kitchen/bathroom/en-suites.
Located above hot press to save space.
• Solar thermal heating panel with closed circuit heating coil.
• Produces energy to heat water at zero cost when compared to electricity cost.
• Reduces carbon foot print with use of renewable energy resources.
All units are pressure-tested and IEEE/ASTM certified by Polypod before despatch.
Developed through liaison with clients, each Pod is a bespoke unit for each development
to ensure seamless integration into the structure with minimal commissioning.
Use of renewable energy reduces carbon foot print and impact on environment
Large selection of contemporaray kitchen finishes available from coloured glass panels to technical stone finishes including mood lighting
11
12
Design and Process (OSM)
Polypod has achieved its position as a major manufacturer in the Off-site Construction sector by
consistently offering OSM’s core benefits such as:
1. Cost Savings - Built in a controlled factory environment with streamlined logistics
2. Time Savings - A time saving of up to 20% over traditional builds
3. Higher Quality - Active Process Controls and quality assurance
4. Reducing Project Management - a single point of reference between the client, main contractor, architect and M & E consultants.
The company is focused on driving the process forward, fully coordinating everything from initial
contact to pod production to hand-over of documentation on completion and delivery. While pods
are designed or a specific purpose, we can also provide a range of standard pods for general
usage. From the architect’s specification, Polypod creates a shop drawing (Part 1) detailing all the
positions of tap ware, sanitary ware, tiling, light fittings and switches, accessories, etc. Part 2 of
the drawings will be an exact representation of the mechanical & electrical services such as wiring
and plumbing routes, cable specifications and dimensions of supply and waste pipes.
Following drawings sign-off, a full-size prototype of the unit is produced by Polypod, after
which all parties involved inspect the pod for final sign-off. From the Pod Schedule, each pod
is assigned a specific numerical code which will be used to ensure that it is placed at the exact
coordinates within the structure.
Compact but accessible, client specific and fully tested.
13
The connections of hot & cold mains water supplies, waste outlets, extraction fans and electrical
supply are among the critical consderations with bathroom and kitchen design. Through close
liaison with all parties, Polypod acts as a central hub to bring focus to an area which is fraught
with potential problems. The integration of Polypod units into the main structure is a seamless
process, with the finished pods leaving the factory fully fitted-out, fully tested and built to the
exact specification, with every detail considered and checked.
Bathroom pods manufactured in controlled factory environment render many significant
advantages to contractor, client and project
14
Process
Full MEP design pre planned and agreed with consultant
One of the Middle East Factory Facilities
Polypod is focused on driving the process forward, fully co-ordinating
everything from initial contact to pod production to handover of
documentation on completion
15
Structure Fabrication, Storage and logistics
16
Technical Department
Polypod’s Technical Department underpins the company’s continuing strides for manufacturing excellence.
Shop drawings, for instance, are prepared with painstaking detail, as a small error on paper could cause serious
problems in production or commissioning on site.
Polypod’s benchmarks for Quality Assurance are:
• Shop drawings utilising the latest versions of AutoCAD and 3D modelling software;
Our modern methods of construction,
in conjunction with continuous innovation, have
propelled Polypod to the forefront of the Off-Site
Pod Construction Industry
• Fabrication carried out by trained technical staff to the relevant best industry codes of practice
(e.g. POS EN1011 Part 3) using MIG welding equipment;
• Plumbing pressure tests - all supply lines within the Pod are WRAS-approved, capable of a 10-bar working pressure, tested and certified to 10-bar;
• Electrical tests carried out in accordance with ADWEA and DEWA regulations as well as comply with all relevant IEEE UK and Asian standards. Polypod is registered to issue certificates in this regard;
• All designs tested for light levels to achieve a minimum of Lux 200;
• QA programme involving all staff and not reliant on supervisors’ spot checks. Each stage of Pod manufacture is a progression towards a previously defined standard;
• Active Process Control is used to ensure that specified components are fitted at right time to the right location, achieved with a team benchmark system utilising Polypod’s most valuable resource - our staff.
• Full technical design and compliance with relevant building regulations of project’s country.
• Issue full working shop drawings and maintenance manuals from in house design team. 5 Year general building works warranties for all Pods. Our modern method of construction, in conjunction with continuous innovation, have propelled Polypod to the forefront of the Off-Site Pod Construction industry.
17
A comprehensive maintenance and safety
certification manual and CD supplied with each
project upon completion.
18
Polypod Group
CYPRUS
UK/IRELAND
MIDDLE EAST
Parkview House
P.O.Box 25207,
Nicosia 1307, Cyprus
Tel: +357 22496000
Fax:+357 22493000
Email: [email protected]
145-157
St. John Street
London EC1V 4PY
Tel: +44 207 6085 789
Fax: +44 203 0514 676
Email: [email protected]
P.O.Box: 9547
Mussafah
Abu Dhabi, UAE
Tel: +971 2 551 4008
Fax: +971 2 551 4917
Email: [email protected]
P.O.Box: 127987
Jebel Ali Industrial Area 1,
Dubai, UAE
Tel: +971 4 8804417
Fax: +971 4 8804418
Email: [email protected]