• Before cool down • Cool down • Powering test 18/10/2007 M.Solfaroli 1 Before co ool down ACTIVITIES RISKS • Pressure test • Cryo valves reconfiguration • Leak test (with pressure) • Consolidation Pressure • ELQA_TP4A Electrical • Purging and Flushing He+Pressure • ELQA_TP4B Electrical 18/10/2007 M.Solfaroli 2 Before cool dow wn: Pressu ure test • High Hi h pressure in i the th CRYO lines li • During the week week-end end • Access forbidden to all the areas involved • Engineering Specification for each sector 18/10/2007 M.Solfaroli 3 Removal of mechanical blocking of: Beforre cool do own: CRYO O valves reeconfiguraation • PV930 and d CV930 b between the h QRL and d the h DFBs ((normally ll closed) l d) • CV920 between line C and Cold Mass (normally closed but forced open during the pressure tests) NO INTERFERENCES In the shade of leak tests ((with pressure) p ) P t Changing of the poppets of the CV910 (before QUI) This activity must be done only as soon as all lines have been depressurized p ((consolidation)) 18/10/2007 M.Solfaroli 4 Beforre cool do own: leak tests and consolidaation DURING THIS PERIOD: • The lines can be pressurized and depressurized on a frequent basis • Somebody can be touching a cryogenic circuits t NO WORKS ON: • any line (B, C, D, E, F) • QUI • cryogenic part of DFBs Main actors: VAC+MCS helped by ACR 18/10/2007 P M.Solfaroli 5 WHAT AND WHEN Before cool dow wn: ElQA TP4A • 4 electrical tests on circuits (1 with HT) • Normally 1 week • Everything is grounded NO WORK ON: • QHPS • PCs (60A included) • DFBs BALISAGE • DFBs areas fenced off by ElQA team • PCs areas to be fenced off LHC-DE-TP-0007-00-10 “ELQA QUALIFICATION OF THE SUPERCONDUCTING CIRCUITS DURING HARDWARE COMMISSIONING” EDMS n. 788197 18/10/2007 M.Solfaroli S also See l Davide’s id ’ slides… lid 6 Before coo ol down: P Purging an nd Flushing SITUATION • Interconnection closed • Cryogenic circuits closed • DO NOT OPEN ANYTHING Possible interferences with cryo activities 18/10/2007 M.Solfaroli 7 WHAT AND WHEN Before cool dow wn: ElQA TP4B • normally 2 days • HT (up to 1.9kV) • Everything h is grounded d d NO WORK ON: • QHPS • PCs (60A included) • DFBs BALISAGE • Access to all sector restricted • PCs areas fenced off by HCC • DFBs side fenced off by ElQA team LHC-DE-TP-0007-00-10 “ELQA QUALIFICATION OF THE SUPERCONDUCTING CIRCUITS DURING HARDWARE COMMISSIONING” EDMS n. 788197 18/10/2007 M.Solfaroli See also l Davide’s id ’ slides… lid 8 • Before cool down • Cool down • Powering test 18/10/2007 M.Solfaroli 9 ACCESS 300 300K 80 80K Cool d down • Access allowed onlyy to CRYO operators p • Access managed by AT/ACR 80K 1.9K • Access restricted • Access managed by HCC • All the intervention MUST be coordinated and approved by HCC 18/10/2007 M.Solfaroli 10 • Before cool down • Cool down • Powering test 18/10/2007 M.Solfaroli 11 • Organization of the HC team Powerin ng tests • Roles • Responsibilities See Roberto’s slides… • Management of safety • Access to the underground • Interference between incompatible activities • Tracking and informing about the activities 18/10/2007 M.Solfaroli 12 P Powering tests: safeety – acceess to the underground areass Personal authorisation using personal CERN access card, after having requested through EDH the “LHC Hardware Commissioning (LHC-HC)” access zone authorisation. Special temporary authorisation, using special access cards distributed by the Engineer in charge (EIC). These cards must be brought back to the EIC once the intervention is p completed. Access key Blue chip token Engineering specification LHC-S-ES-0018 rev 0.2 02 “ACCESS PROCEDURES FOR THE LHC TUNNEL AND THE RELATED UNDERGROUND AREAS DURING POWERING TESTS AND ELQA AT COLD” EDMS n. 857641 18/10/2007 M.Solfaroli 13 Powerring tests: safety – IInteraction betweeen incomp patible acttivities CONSTRAINTS: • Access to the Uas restricted during all the period of powering; • Access to the tunnel controlled by HCC during all the period of powering; i • Access to a powering subsector forbidden when a main circuit is powered above 1kA or the QH are being discharged; • Access forbidden around the QHPS during IST of the QPS; • No access to a DFB even when only one circuits located on it is being powered (balise area); • Access restricted around the switches of the EE system when a main circuit is being powered at high level current (noise protection). 18/10/2007 M.Solfaroli 14 Pow wering testts: safety – Trackingg and info orming ab bout activiities morning i shift hift afternoon shift 7.00 15.00 16.30 22.00 8 30 8.30 PTC Point Owner EIC All the activities MUST be announced! 18/10/2007 M.Solfaroli 15 Pow wering testts: safety – Trackingg and info orming ab bout activiities http://p2n.web.cern.ch/p2n/ 18/10/2007 M.Solfaroli 16 Pow wering testts: safety – Trackingg and info orming ab bout activiities What has been already done 18/10/2007 M.Solfaroli 17 Pow wering testts: safety – Trackingg and info orming ab bout activiities What is happening now 18/10/2007 M.Solfaroli 18 Pow wering testts: safety – Trackingg and info orming ab bout activiities War Map TEAMS 18/10/2007 Cryo/DFBs Light blue CL team Green ElQA team Yellow QPS team Blue EE Red PCs team Black RF team White M.Solfaroli 19 Conclusions Conclu usions Good coordination is crucial to avoid incidents All the activities in the field must be announced and reported See Roberto’s slides… 18/10/2007 M.Solfaroli 20
© Copyright 2026 Paperzz