Review of Queensland Rail’s Line Diagrams 11 April 2017 Review of Queensland Rail’s Line Diagrams – 11 April 2017 Contents Page 1. Introduction _______________________________________________________________ 2 2. References _______________________________________________________________ 2 Table 1 – Summary of Line Diagram Changes ______________________________________ 3 1 Review of Queensland Rail’s Line Diagrams – 11 April 2017 1. Introduction With approximately $7 billion in fixed and other assets, and more than 6500 kilometres of railway track, Queensland Rail is an integrated passenger and rail infrastructure access business servicing the public transport, tourism, resources and freight customer markets throughout Queensland. Queensland Rail’s line diagrams are a diagrammatical representation of Queensland Rail’s network. The line diagrams identify: • The configuration of the network; and • The existing Private Infrastructure connection points to the network. Consistent with clause 1.2.3 of Queensland Rail’s Access Undertaking 1 (AU1), Queensland Rail publishes the line diagrams on its website. Queensland Rail reviews and amends the line diagrams at no greater than six monthly intervals (where necessary) to reflect changes that have been made to the configuration or management of the rail network. This report summarises the changes between the current version of the line diagrams as at 11 April 2017 and the previous version effective 11 October 2016. 2. References For further information on the definitions contained in this report and the line diagram reporting requirements, please refer to AU1, a copy of which is available at: http://www.queenslandrail.com.au/forbusiness/access/access-undertaking 2 Review of Queensland Rail’s Line Diagrams – 11 April 2017 Table 1 – Summary of Line Diagram Changes Reference (Drawing No.) Station KM Alteration Sheet 1 Mayne Yard North N/A Works were undertaken to make two additional unwired roads available for rail traffic being 15 road and 16 road 2 loop sidings were removed, dead end removed siding removed and dead end provided: Doomben Yard 3.444 Banyo Workshops Portion of siding track between existing No. 6 and No. 11 turnouts removed • Portion of siding track between existing No. 5 and No. 9 turnouts shortened to a length of 200 meters and a stop block installed at end of this siding • Portion of siding track designated as “Goods Yard” and “Dead End” removed 1.361 New uncommissioned 1:12 tangential right-hand crossover installed between the Down Shorncliffe Line at 1.361km and the Up Shorncliffe Line at 1.423km at Bindha (Turnouts 920/921) 2.293 The existing uncommissioned left-hand crossover between the Up Shorncliffe Line and the Down Shorncliffe Line between the 2.293km to 2.361km at Banyo had swing nose components installed and were clipped and secured in the normal position (Turnouts 929A/B / 930A/B) - Aurizon sidings removed Bindha Sheet 2 • Yard rationalisation including: Pinkenba Sheet 3 Caboolture - - • The removal and straight railing of manual points No. 12, No. 19, No. 20, No. 30, No. 33, No. 34 and No. 36 • Manual points No. 21, No. 22 and No. 37 leading to Grainco sidings to remain secured and locked away from sidings until further notice • Manual Points No. 13, No. 14, No. 15, No 23, No. 24, No. 25, No. 29 and No. 31 to remain secured, spiked and locked for removal at a later date • Turnouts 792 / 798A / 798B removed • Turnout 792A/B installed 3 Review of Queensland Rail’s Line Diagrams – 11 April 2017 Reference (Drawing No.) Station KM Alteration Elimbah 56.264 Stabling Yard commissioned Sheet 4 - - No Change Sheet 5 - - No Change Sheet 6 350 Yard rationalisation Note - most of the tracks impacted were those belonging to Aurizon Sheet 7 Bundaberg Rockhampton Sheet 8 - - Port Curtis Area - Dead end siding removed No Change Removal of surplus turnouts from No 2 and No 3 Roads Mackay Sheet 9 Mackay 958 Sheet 10 - - No Change Sheet 11 - - No Change Sheet 12 - - No Change Sheet 13 - - No Change Sheet 14 - - No Change Sheet 15 - - No Change Sheet 16 - - No Change Sheet 17 - - No Change Sheet 18 - - No Change Sheet 19 - - No Change Sheet 20 Wallangarra - 358 - Additional "Heritage" track updated Oakey - 31.326 - Oakey Cattle Siding commissioned Sheet 21 Sheet 22 Sheet 23 • Turnouts 7,9,10,20,21,22,23,24 (5 Crossovers) removed No Change No Change 4 Review of Queensland Rail’s Line Diagrams – 11 April 2017 Reference (Drawing No.) Sheet 24 Sheet 25 Sheet 26 Sheet 27 Station KM Alteration - - No Change Nandi 11.216 Maintenance siding removed Ducklo 27.828 Maintenance siding removed Goranba 71.107 Maintenance siding removed Dalby West - 3.01 - Turnout / track to property boundary removed Robina 81.096 Stabling Roads 8, 9, 10, 11 commissioned Varsity Lakes 88.38 - Crossover installed [uncommissioned] No Change Turnout 483 removed (near Turnout 31) Sheet 28 Moolabin Sheet 29 - - No Change Sheet 30 - - No Change Sheet 31 - - No Change Sheet 32 - - No Change Sheet 33 - - No Change Sheet 34 Mount Isa - Balloon Loop - Aurizon ownership changes to other private ownership Turnouts 17 & 16 removed (between 2 Road & 3 Road) 5
© Copyright 2026 Paperzz