Storstrømsbroen – 93200.001 PQ information meeting February 19th 2015 13.00 - 15.00 Park Inn Hotel, Copenhagen S Storstrømsbroen – PQ information meeting – 19th February 2015 Todays Agenda • Welcome and agenda Erik Stoklund Larsen, Construction Director • Background, overview and state of the project Niels Gottlieb, Chief Project Manager • PQ details Erik Stoklund Larsen, Construction Director • Process after the PQ Torkil Schrøder-Hansen, Legal Counsel • Supplier Portal Torkil Schrøder-Hansen, Legal Counsel • Closure Erik Stoklund Larsen, Construction Director Storstrømsbroen – PQ information meeting – 19th February 2015 This Information Meeting • • To give general information of the Storstrøm Bridge Project • As per DRD general policy • Dealing with a design & build project • Contract conditions will be based on Danish law and tradition Line out the requirements for the PQ process and explain the background hereof • To ensure that applicants do not make mistakes in the prequalification application • To clarify possible misunderstandings of the Contract Notice • To explain the background for the choices made in the Contract Notice Storstrømsbroen – PQ information meeting – 19th February 2015 Assumptions in the EIA 4 km long combined road and railway bridge including approach embankments and minor adjacent works • Segmental construction full span • 30-40 % pile foundation strengthening • Navigation span of 2x160 m and vertical clearance of 26 m • Back filling in all dredged temporary channels • Bridge type – cable stayed high bridge or low bridge – political decision • Site areas – Nakskov Port and at bridge site • Concrete structure • Environmental restrains for working in the marine environment • Well known requirements to noise during construction • Storstrømsbroen – PQ information meeting – 19th February 2015 Time schedule Political decision and process: 2011: November Political agreement: Start of a Feasibility Study for a new Storstrøm Bridge 2013: March • Political agreement: Construction of a new bridge and demolition of the existing bridge. 2014: November • • EIA published by the The Danish Road Directorate • Public hearing – Received comments from 35 stakeholders 2015: May • Expected approval by the Danish Parliament – Act of Construction Storstrømsbroen – PQ information meeting – 19th February 2015 Tentative Time Schedule 2014 • Technical dialogue and tender project formulation • Tender Process for the new bridge 2015 • PQ deadline March 2015 • Notice of the 5 prequalified May 2015 • Tender material mid June 2015 • First round of Competitive Dialogue - September-November 2015 • Second round of Competitive Dialogue – January-February 2016 • Tender deadline Spring 2016 • Contract Award Summer 2016 • Contract and start of works, mobilisation, establishment of construction /production site, etc. 2016 Storstrømsbroen – PQ information meeting – 19th February 2015 Questions • • Questions can be asked by the end of each theme to ensure the flow in the slide show • Questions and answers will be noted by DRD • Questions asked during this meeting can be sent via e-mail to [email protected] and [email protected] Further questions can be asked by the end of the presentation Background, overview and state of the project Storstrømsbroen – PQ information meeting – 19th February 2015 Background and overview • The Storstrøm Bridge connects Zealand and Falster • Part of railway line between Central Europe and Scandinavia • Existing bridge was built in 1937: • • Single track railway Zealand Repair of the old bridge is not feasible Falster Fehmarnbelt Tunnel Storstrømsbroen – PQ information meeting – 19th February 2015 Copenhagen – Fehmarn Belt - Railway All supported by EU-TEN New railway Copenhagen - Ringsted, New 55 km double track, 250 km/t 2013 - 2018 Ringsted - Holeby (Rødby) Upgrading of the railway up to 200 km/t 2013 - 2018 New Storstrøm Bridge 2016 - 2020 Storstrømsbroen – PQ information meeting – 19th February 2015 Storstrømsbroen The project covers: • Construction of a new Storstrøm Bridge • Demolition of the existing bridge Falster Storstrømsbroen – PQ information meeting – 19th February 2015 Storstrømsbroen • Length 4 km approx. • Railway with double rail tracks designed for high speed trains (up to 200 km/t) • 2 lane road • Foot- & bicycle track Storstrømsbroen – PQ information meeting – 19th February 2015 Local Scheme North - Masnedø Storstrømsbroen – PQ information meeting – 19th February 2015 Tender Packages • 93200.001 Storstrøm Bridge • 93200.002 Demolition of old bridge • 93200.200 Civil works Masnedø Storstrømsbroen – PQ information meeting – 19th February 2015 Local Scheme South - Orehoved Ny støjskærm Storstrømsbroen – PQ information meeting – 19th February 2015 Work Site Masnedø Storstrømsbroen – PQ information meeting – 19th February 2015 Work site Orehoved • Only some part of the marked area will be provided for work site Storstrømsbroen – PQ information meeting – 19th February 2015 Prefabrication at Nakskov Harbour Storstrømsbroen – PQ information meeting – 19th February 2015 Reference Design Concrete single girder bridge Storstrømsbroen – PQ information meeting – 19th February 2015 Cross Section Bridge Deck Rail and Road on same Bridge Storstrømsbroen – PQ information meeting – 19th February 2015 New Storstrøm Bridge - Spans • 2 Navigational spans (160 m x 26 m) • Approach spans – spans of 80 m (65 – 90m) Storstrømsbroen – PQ information meeting – 19th February 2015 Cable Stayed Bridge Storstrømsbroen – PQ information meeting – 19th February 2015 Concrete Girder Bridge Storstrømsbroen – PQ information meeting – 19th February 2015 Overall process § ? 1. Enquiry 2. Feasibility study The Ministry of Transport asks the Danish Road Directorate to look into the possibilities of constructing a new rail/road The Danish Road Directorate conducts feasibility studies, Environmental Impact Assessments etc. and submits the proposals for consultation with the public, businesses and the authorities 5. Final planning and design The Danish Road Directorate endeavours to obtain all the details regarding the location and design of the road/rail in place 3. Planning and design proposal The Danish Road Directorate submits a proposal to the Ministry of Transport as to where the rail/road is to be built and how it can be designed 4. Construction Act The Danish Parliament passes a construction act 6. Expropriation 7. Bridge works 8. Opening The Expropriation Committee acquires the land for the project The contractor builds the road/rail bridge under the supervision of the Danish Road Directorate The Danish Road Directorate opens the link Storstrømsbroen – PQ information meeting – 19th February 2015 State of the project • EIA submitted and published • Technical dialogue completed • Entering into the prequalification phase • Act of Construction • Preparation of the site • Expropriations, archaeological studies, approvals and relocating sea cables • Competitive dialogue and finalising the tender material • Deadline for tendering and evaluation of tenders • Contract Award • Start of the works Storstrømsbroen – PQ information meeting – 19th February 2015 Time schedule 2015 2016 PQ Tender period Contract award Contract ● Construction Tender documents Construction Act Approvals Expropriation (acquisition) Site preparation & utilities ● 2017 2018 2019 2020 PQ details Storstrømsbroen – PQ information meeting – 19th February 2015 II.1.5) Short description of the contract • Construction of a new 4 km combined road and double-track railway bridge crossing the Storstrømmen, including • Establishment of work site, production site, etc. including removal • Dredging of temporary work channels as well as remediation or other types of intermedia access possibilities along bridge alinement • Construction of foundation and bridge piers • Construction of superstructure of the bridge • Establishment of scour protection • Excavation work and construction of embankments • Completion of the bridge with railway tracks, roadway and path, safety barrier and guard rail, bearings, expansion joints, pavements, etc. • Construction of means of access roads, temporary roads, etc. • Construction of local roads and minor adjacent works Storstrømsbroen – PQ information meeting – 19th February 2015 III.1.3) Legal form for applicants • As a general rule no particular legal form is required, however • Consortia og JV’s • • If a group of economic operators (e.g. a consortium or JV) applies, the members of the group must undertake joint and several liability and appoint a joint representative. • Due to restrictions in the Danish public procurement rules based on the case law regarding changes in the composition of a prequalified applicant prior to submission of tender, all interested operators are encouraged to explore the possibilities of forming consortia prior to the deadline for submission of prequalification application. Subcontractors or other entities • If the applicant relies on the capacity of other entities, the applicant must provide proof that the applicant has at its disposal the necessary resources. • The DRD has provided a form which can be used for such declaration. The form is published on the Supplier Portal in Danish and English Storstrømsbroen – PQ information meeting – 19th February 2015 III.2.1) Information of the applicant • Information of the company: • The full name of the business, address, business reg. no. (CVR no.), corporate form and ownership, including information about affiliated companies. • • Furthermore, the name, telephone and e-mail address of the contact person of the applicant should be stated. • It should be clearly stated in the application which legal entity is applying for prequalification • If the applicant several companies the information must be stated for each company, and it should be clearly stated in the application whether they apply as a consortium, JV or as supplier. If the applicant is a group of operators or the applicant relies on the capacity of other entities, a change of the composition of the applicant may only take place with the contracting authority’s prior written acceptance. Storstrømsbroen – PQ information meeting – 19th February 2015 III.2.2) Economic and financial ability • • The applicant must provide a solemn declaration regarding the total annual turnover for the 3 most recent financial years available. • The solemn declaration must either be certified by auditors or a copy of the three most recent financial statements must be enclosed. • For a group of operators (e.g. a consortium), the information must be submitted for each participating operator in the group. The minimum requirement is: • A total annual turnover of at least DKK 5 billion in each of the three most recent financial years available. • For groups, consortia's, JV’s or other entities the turnover is calculated as the total turnover. Storstrømsbroen – PQ information meeting – 19th February 2015 III.2.3) Technical capacity - Minimum requirements • The applicant must have experience in turnkey contracts – design and build – of the following types of tasks: • Road bridges longer than 1 km. • Railway bridges longer than 1 km. • Bridges over open water, rivers or lakes longer than 1 km. • Bridges with spans of more than 50 meter and longer than 1 km. • Foundation works below water • Pooling of projects can be accepted as long as the minimum requirement of each individual bullet is complied with by one single project. • The applicant must have experience in performing both road bridge and railway bridge projects. • If the applicant is a group of operators or relies on the capacity of other entities, the minimum requirement will be complied with if the references, overall show experience with the types of tasks required. Storstrømsbroen – PQ information meeting – 19th February 2015 III.2.3) Technical capacity (cont.) • The references can not be more than 5 years old due to the rules in the currently in force Public Procurement Directive • The Public Procurement Directive Article 48, 2 • • “Evidence of the economic operators' technical abilities may be furnished by one or more of the following means according to the nature, quantity or importance, and use of the works, supplies or services:” The Public Procurement Directive Article 48, 2 (a)(i) • “a list of the works carried out over the past five years, accompanied by certificates of satisfactory execution for the most important works. These certificates shall indicate the value, date and site of the works and shall specify whether they were carried out according to the rules of the trade and properly completed…” Storstrømsbroen – PQ information meeting – 19th February 2015 IV.1.2) Limitations on the number of operators who will be invited to tender or to participate: • A number of 5 applicants will be prequalified • The limitation of applicants invited to tender will take place after the evaluation of which applicants have documented the most relevant references/deliveries of the services covered by the contract, see section II.1.5). • Please note that each applicant should only submit one application for the prequalification, see section VI.3) Storstrømsbroen – PQ information meeting – 19th February 2015 IV.3.6) Language in which requests to participate may be drawn up • As a general rule the application must be submitted in Danish • The exception to the general rule is that annexes to the prequalification application in English, Norwegian or Swedish will be accepted. E.g. but not comprehensive. • Declarations of having the necessary resources at the applicants disposal of the capacity of other entities can be submitted in English, Norwegian or Swedish (III.1.3) • References can be submitted in English, Norwegian or Swedish (III.2.2) • Financial statements can be submitted in English, Norwegian or Swedish (III.2.3) • Statements on the company and affiliated companies • CV’s can be submitted in English, Norwegian or Swedish Storstrømsbroen – PQ information meeting – 19th February 2015 IV.3.4) Deadline for requests to be prequalified • • The deadline for submissions of applications to be prequalified is: • The 27th of March 2015 at 14:00 at the Danish Road Directorate in Fløng - Guldalderen 12, 2640 Hedehusene • If changes please be aware of TED and the Supplier Portal The Danish Road Directorate will appreciate that the application for prequalification is submitted in 3 paper copies as well as digital PDF on USB or the like. Reference point is as listed in section I.1) "Application for participation Storstrømsbroen - 93200.001 att. Torkil SchrøderHansen - Do not open at the postal receipt“ • Applications received later than given date on the Supplier Portal will not be taken into consideration. Storstrømsbroen – PQ information meeting – 19th February 2015 Questions for the PQ process • It is possible to ask questions via e-mail to [email protected] and [email protected] concerning the prequalification. • Questions should refer "Storstrømsbroen - 93200.001" in the subject field. • Questions received later than 10 days before the application deadline as well as questions relating to the tender documents will not be answered. • Please send the questions as soon as possible. • Questions and answers will be published on the Supplier Portal Process after the PQ Storstrømsbroen – PQ information meeting – 19th February 2015 Competitive dialogue • Background • An important and complex infrastructural project – both rail and road • A very fruitful and giving technical dialogue has made the Danish Road Directorate more knowledgeable of different technical and legal solutions • From the time of the technical dialogue to the start of competitive dialogue the Danish Road Directorate and our principal consultant has obtained more knowledge about the complexity of the project e.g. the soil conditions, which will lead to the basis of the competitive dialogue • The tender material needs to be tested to ensure no new, smart or innovative solutions is ruled out • A traditional tender process could create a greater risk for misconceptions og discrepancies in a project of this complexity Storstrømsbroen – PQ information meeting – 19th February 2015 Competitive dialogue (cont.) • The purpose of the competitive dialogue is to: • Clarify the technical, legal and financial solutions the market can offer • Minimizing the complexity of the project and clarify risks • After the more thorough considerations within the project group and the many excellent technical and legal inputs in the technical dialogue, the Danish Road Directorate wishes to ensure the most market-conforming tender material with the proportionate degree of freedom • To ensure the needs and requirements of the Danish Road Directorate can be fulfilled within an acceptable financial framework • A better tender material Storstrømsbroen – PQ information meeting – 19th February 2015 Competitive dialogue (cont.) • A descriptive document will be made as a part of the tender material to describe the base and the rules of the competitive dialogue • As for now the Danish Road Directorate expects: • Two rounds of competitive dialogue • • Possibility of a third round • DRD will set out the themes for the dialogue to ensure that the time management and the costs for the contractors are kept down • A fee is given for participating in the rounds of competitive dialogue • There will be no reduction of the number of operators during the competitive dialogue as per Contract Notice IV.1.3) DRD are aware that the cost of this procedure is higher but intend to keep the costs for the contractors as low as possible Storstrømsbroen – PQ information meeting – 19th February 2015 Language • The language of the contract is Danish • Working language will be Danish and/or English • The tender material will be in Danish as well as a service translation in English • Some documents will be in English only e.g. the geotechnical reports • The Danish version is the contractually legal binding version • Tenders must be submitted in Danish • • However appendixes, CV’s and other documents can be submitted in English – this will be stated in the tender material Disputes are settled in Danish Courts or Danish Arbitration Courts Storstrømsbroen – PQ information meeting – 19th February 2015 III.1.5) Deposits and guarantees required • • Bid bond • A bid bond of DKK 100 million must be provided after award of contract but before the signing of the contract. • The bid bond will be replaced by the performance guarantee. The guarantee must be provided by a third party. No possibility for Parent Company Guarantee (PCG) • The bind bond will be superseded by the ABT § 6 guarantee Performance guarantee • A performance guarantee of 15 % of the contract sum must be provided after signing of the contract as per ABT § 6. • The guarantee must be provided by a third party. No possibility for Parent Company Guarantee (PCG) Storstrømsbroen – PQ information meeting – 19th February 2015 III.1.5) Deposits and guarantees required (cont.) • • Rating of the guarantor’s credit standing • A requirement is made for the level of the guarantor’s credit rating at the time of providing the guarantee. • The rating must as a minimum correspond to Standard & Poor’s BBB rating, Moody’s Baa2 rating or equivalent rating from other recognized rating agencies. • The requirement will continue in the contract. The rules here for will be given in the tender material. The purpose of the guarantees and the rating of the guarantor is a wish to ensure that DRD if needed can make use of the guarantee in all stages of the project. Storstrømsbroen – PQ information meeting – 19th February 2015 Social clauses • • ILO-convention no. 94 • No social dumping • Equal wages Clauses about apprentices/interns/trainees • • • A clause that obligates the contractor to have a number of apprentices measured in Full-Time-Equivalent (FTE) of 1924 hours/year Registration of foreign workers working in Denmark • RUT register – Register of Foreign Services Providers • https://indberet.virk.dk/myndigheder/stat/ERST/Register_of_Foreign_Service_Provider s_RUT Danish regulations to health and safety Storstrømsbroen – PQ information meeting – 19th February 2015 Contract and award criteria • The contract is made in accordance with Danish law • Design and build contract – ABT93 • English version: http://www.danskbyggeri.dk/Servicebutik/Vis%20vare?docid=23590 • • Project specific conditions - “SB” based on • • Agreed document between contractors and employers http://www.vejdirektoratet.dk/DA/vejsektor/leverandoerportal/Retningslinjerogparadigm er/Inkoeb/Udbud-kontrahering/udbudsh%C3%A5ndbog/Sider/SBTE.aspx#.VAo6e_l_u4I Award criteria • Most economically advantageous tender (MEAT) • based upon price and technical proposal Storstrømsbroen – PQ information meeting – 19th February 2015 Two Envelope System • The award criteria is Most economically advantageous tender (MEAT) based upon price and technical proposal • The bid shall be submitted in two parts in two sealed packages • Part 1 – Price • Part 2 – Technical proposal • DRD will open Part 2 – Technical Proposal and assess the qualitative sub-criteria. The grades based on the evaluation will be notified to the bidders before Part 1 - Price are opened • Afterwards Part 1 - Price will be opened and the sub-criteria Price is assessed • Notification of awarding of the contract will be issued • All conditional tenders except the winner will receive fee for their bid Supplier Portal Storstrømsbroen – PQ information meeting – 19th February 2015 Supplier Portal • DRD homepage for tenders - ”Supplier portal” • • • http://vejdirektoratet.dk/en/roadsector/supplierportal/pages/default.aspx#.V AuVDPl_u4L All DRD tenders are available here • Forthcoming tenders • Ongoing tenders • Awarded Contracts Road standards • English translations coming up Storstrømsbroen – PQ information meeting – 19th February 2015 Supplier Portal Storstrømsbroen – PQ information meeting – 19th February 2015 Supplier Portal Storstrømsbroen – PQ information meeting – 19th February 2015 Supplier Portal Closure Storstrømsbroen – PQ information meeting – 19th February 2015 The project website Storstrømsbroen – PQ information meeting – 19th February 2015 The project homepage • The link http://www.vejdirektoratet.dk/DA/vejprojekter/storstroemsbro/Side r/default.aspx#.VOS2HPmG9HN • The homepage is in Danish • Contains all the publicly available documents such as: • The EIA • Time schedule for project • Documents from the technical dialogue • News from the project Storstrømsbroen – PQ information meeting – 19th February 2015 Today • • To give general information of the Storstrøm Bridge Project • As per DRD general policy • Dealing with a design & build project • Contract conditions will be based on Danish law and tradition Line out the requirements for the PQ process and explain the background hereof • To ensure that applicants do not make mistakes in the prequalification application • To clarify possible misunderstandings of the Contract Notice • To explain the background for the choices made in the Contract Notice Thank you for attending. For more information please see www.vejdirektoratet.dk www.vejdirektoratet.dk/DA/vejprojekter/storstroemsbro
© Copyright 2026 Paperzz