JUBILEE, NORTHERN, AND PICCADILLY LINES London, UK KEY B E N E F I TS •Fully automated operation •Passenger service frequency enhancement • Re-signalling with no disruption to existing service • One of the world’s largest re-signalling projects “The SelTrac train control system offers the reliability passengers on the London Underground rightly demand. More frequently trains will reduce the time people spend waiting on platforms, and faster trains mean quicker journeys.” Terry Morgan Chief Executive, Tube Lines The Challenge One of the oldest and largest subway systems in the world, London’s Tube is in the process of significant overhaul and upgrading to accommodate growing passenger demand. Tube Lines is responsible for the maintenance and upgrade of the infrastructure on the Jubilee, Northern and Piccadilly lines, and in 2002 promised www.thalesgroup.com/security-services to deliver an outstanding Tube for London through a massive improvement program. This included upgrading the train control and signalling system to achieve a 20% improvement in capability improvement leading to a more frequent and less crowded service. This significant undertaking, lasting over the next seven years includes upgrades to the 37 km, 27 station, 63 train Jubilee line and to the 58 km, 50 station, 106 train Northern line, and to the 63 km, 46 station, 92 train Piccadilly line. All depots on the lines are to be signaled separately. Test tracks are allocated for each line. JUBILEE, NORTHERN, AND PICCADILLY LINES London, UK The Solution: SelTrac CBTC The Result Only Communication-based Train Control could cost efficiently meet Tube Lines’ needs for throughput enhancement. In 2003, SelTrac CBTC with proven moving-block technology and central control was selected. The system solution provides automatic train operation, supervision and protection, however Tube Lines will retain attendant drivers on-board. Thales has established a partnering/team process that assures efficient project management as proved with the DLR, DLR Extension and Jubilee Line Extension projects. In recognition of this unique contract and its requirements, distinct project teams were assembled on both sides of the Atlantic. The teams are located as single entities and include project professionals from the major subcontractor. This together with the inclusion of the customer’s Resident Engineers and direct, open communications contributes to the transparency and willingness to focus on achieving the project goals with a minimum of distraction. The new CBTC equipment will be installed and commissioned successively in sections before the old signalling system is disabled and removed. Our sophisticated NetTrac MT central control equipment, to be integrated with passenger information and SCADA systems, will allow the operator to easily track and control train movements and routes, and automatically launch more trains at peak service times. For passengers, this will mean more reliable and convenient train service. Stanmore The train control design is similar to the Docklands Light Rail (DLR) SelTrac CBTC system operating successfully since 1994, and proven to provide safe, reliable short headway between trains for improved throughput. The technology is upgradable and provides reduced operating and maintenance costs. Mill Hill East Uxbridge Piccadilly Line Northern Line Jubilee Line Wembley Park Finsbury Park Belize Park Angel Sudbury Town Warren Street Bond Street Green Park West Ham Goodge Street Piccadilly Circus Acton Town Westminster South Kensington Leicester Square Charing Cross Canada Water Borough Elephant & Castle Oval Morden 1235 Ormont Drive • Toronto, Ontario, Canada • M9L 2W6 tel: 1.416.742.3900 • fax: 1.416.742.1136 London Bridge Southwark Waterloo Heathrow Terminals 1,2,3 Stratford Old Street Heathrow Terminal 4 Rail Signalling Solutions Cockfosters High Barnet Edgware South Wimbledon Canary Wharf North Greenwich
© Copyright 2025 Paperzz