Figure 1. Approximate 10ft bedrock step at the end of the culvert.

Figure 1. Approximate 10ft bedrock step at the end of the culvert.
Figure 2. Downstream and upstream of ODOT culvert.
Page 2
Figure 3. Culvert under Chewaucan Lane 50ft above the ODOT culvert.
Page 3
Figure 4. Concrete structure roughly 200ft up from the ODOT culvert.
Page 4
Figure 5. Typical stream habitat above ODOT culvert.
Page 5
Figure 6. Concrete chute roughly 1,550ft up from the ODOT culvert.
Page 6