WP2 Land Land--based longlong-term multidisciplinary monitoring Paolo Favali (INGV) Francesco Italiano (INGV), Heiko Woith (GFZ), Onur Tan (TUBITAK), Cemil Seyis (TUBITAK) General Assembly - KOERI, Istanbul (Turkey) 1 2nd - 3rd December 2013 WP2 Objectives The objective of this WP is to collect, manage, and integrate all kinds of useful data for monitoring of the Marmara region Collection and integration of seismological, geochemical, and geodetic data to detect and model the interactions between fluids, crustal deformation and ruptures of the active tectonic structures of the Marmara area Monitoring of pre-earthquake transients by data recorded from the already established stations and networks Integration existing seismological networks General Assembly - KOERI, Istanbul (Turkey) 2 2nd - 3rd December 2013 WP structure Task 1. Land-based geochemical and geophysical monitoring Task 2. In-situ measurement of fluid expulsions using existing/improved systems Task 3. Integration of real-time networks data for Marmara area Task 4. Multi-parameter data analysis, physical models for correlating geochemical, geodetic and seismic activity General Assembly - KOERI, Istanbul (Turkey) 3 2nd - 3rd December 2013 WP2 deliverables DELIVERABLE PERSON- DELIVERY MONTHS DATE D2.1 Report on multi-parameter data collection and integration from the Marmara area 23 36 D2.2 Report on the status and improvement of the continuous fluid monitoring system 15 30 D2.3 Report on multi-parameter data analysis including natural degassing distribution (CO2, CH4, Rn) 16 34 D2.4 Report on interpretative models for correlating gas, crustal deformation and seismic activity 21 34 General Assembly - KOERI, Istanbul (Turkey) 4 2nd - 3rd December 2013 Partners involved WP leader: INGV Task leaders: INGV, GFZ, TUBITAK PARTNER MAN MONTHS KOERI GFZ TUBITAK 10 2 29 IFREMER INGV 6 16 KOU 12 General Assembly - KOERI, Istanbul (Turkey) 5 2nd - 3rd December 2013 Developments and Actions Taken (May 2013-October 2013) Task 1 Land-based geochemical and geophysical monitoring Task leader: Francesco Italiano - INGV Partners involved: KOERI, TUBITAK, KOU Actions taken in the past 6 months: Common field work with TUBITAK and GFZ for: 1) field measurements; 2) samples collection (gases and thermal waters); 3) check the status of the automatic stations and data download (May-June 2013) Laboratory work for gas and water analyses (chemical and isotopic) (June-October 2013) Water chemistry data produced by TUBITAK and INGV laboratories are perfectly comparable General Assembly - KOERI, Istanbul (Turkey) 6 2nd - 3rd December 2013 Developments and Actions Taken (May 2013-October 2013) Task 2 In-situ measurement of fluid expulsions using existing/improved systems Task leader: Heiko Woith - GFZ Partners involved: TUBITAK, INGV, KOU Actions taken in the past 6 months : Common field work with TUBITAK and INGV for checking the status and data download from the automatic stations of the ARNET and TUBITAK networks (May-June 2013) Monthly visits for collecting water sampling/performance control and maintenance of on-line soil radon and spring water monitoring network General Assembly - KOERI, Istanbul (Turkey) 7 2nd - 3rd December 2013 Sampling sites General Assembly - KOERI, Istanbul (Turkey) 8 2nd - 3rd December 2013 Sampling sites Gas sampling at Kırkgeçit - Biga TUBITAK monitoring station at Kırkgeçit - Biga ARNET monitoring station at Hegbeli-Afyon General Assembly - KOERI, Istanbul (Turkey) 9 2nd - 3rd December 2013 Developments and Actions Taken (May 2013-October 2013) Task 3 Integration of real-time networks data for Marmara area Task leader: Onur Tan - TUBITAK Partners involved: KOERI, GFZ, INGV, KOU Actions taken in the past 6 months: Setting up of the Main Data Server (MDS) real/near-real time networks: Setting up Guralp Scream! server for real-time seismology data transmission (from TUBITAK, KOU, and PIRES networks) A ftp server is also established for near-real time data such as cGPS, spring water and soil radon gas time series data A new seedlink server to receive online seismology data of REFTEK instruments used in CINNET and TUBITAK networks. GPRS modems were tested for converting CINNET from off-line to online structure General Assembly - KOERI, Istanbul (Turkey) 10 2nd - 3rd December 2013 Developments and Actions Taken (May 2013-October 2013) Task 3 Integration of real-time networks data for Marmara area Task leader: Onur Tan - TUBITAK Partners involved: KOERI, GFZ, INGV, KOU Actions taken in the past 6 months: The MDS is located in KOERI campus to make the data available to partners; one more has been established under marsite.eu web site. Access is through secure connection via user name and passwords provided to the partners. Monitoring of real time data acquisition of seismological stations fetched from KOU, TUBITAK, PIRES and CINNET networks is in place General Assembly - KOERI, Istanbul (Turkey) 11 2nd - 3rd December 2013 MARsite Multi-Disciplinary Networks (already installed) General Assembly - KOERI, Istanbul (Turkey) 12 2nd - 3rd December 2013 Developments and Actions Taken (May 2013-October 2013) Task 4 Multi-parameter data analysis, physical models for correlating geochemical, geodetic and seismic activity Task leader: Cemil Seyis - TUBITAK Partners involved: KOERI, IFREMER, INGV, KOU Actions taken in the past 6 months: Daily evaluation of online spring water and soil radon gas data considering seismic activity For this purposes, earthquake activity is analysed daily and the microearthquake catalogue is kept up-to-date General Assembly - KOERI, Istanbul (Turkey) 13 2nd - 3rd December 2013 Action Plan (November 2013-April 2014) Task 1 Task leader: INGV Partners involved: KOERI, TUBITAK, KOU Common evaluation of the produced geochemical data (chemical and isotopic composition of gases and thermal waters). Data produced by TUBITAK and INGV laboratories are perfectly comparable Second fluid sampling campaign (April 2014) involving all the partners for degassing measurements, samples collection, check the status of the automatic stations and data download General Assembly - KOERI, Istanbul (Turkey) 14 2nd - 3rd December 2013 Action Plan (November 2013-April 2014) Task 2 Task leader: GFZ Partners involved: TUBITAK, INGV, KOU Second fluid sampling campaign (April 2014) involving all the partners for degassing measurements, samples collection, check the status of the automatic stations and data download Selection of key monitoring sites where new / additional / improved sensors will be installed and tested General Assembly - KOERI, Istanbul (Turkey) 15 2nd - 3rd December 2013 Action Plan (November 2013-April 2014) Task 3 Task leader: TUBITAK Partners involved: KOERI, GFZ, INGV, KOU CINNET network data will be uploading to the server when the stations become online via GPRS modems General Assembly - KOERI, Istanbul (Turkey) 16 2nd - 3rd December 2013 Action Plan (November 2013-April 2014) Task 4 Task leader: TUBITAK Partners involved: KOERI, IFREMER, INGV, KOU Combined analysis of daily seismic activity and data from online spring water and soil radon continuous monitoring stations General Assembly - KOERI, Istanbul (Turkey) 17 2nd - 3rd December 2013
© Copyright 2026 Paperzz