4 3 2 1 REVISION HISTORY DESCRIPTION DATE 1/29/2010 INITIAL RELEASE REV A NOTES AUTHOR DSalerno APPROVED 1. ALL DIMENSIONS ARE IN INCHES UNLESS OTHERWISE NOTED. 2. THIS IS ONLY A CONCEPT DRAWING. THE DESIGNER MUST DETERMINE WHETHER THIS APPLICATION WILL WORK IN HIS SYSTEM AND MUST ENSURE COMPLIANCE WITH CODE REQUIREMNTS. 3. PIPE DIMENSIONS ARE IDENTIFIED BY PLAIN LEADER. 4. SYSTEM FLOW SHOULD ALWAYS REMAIN HIGHER THAN THE REQUIRED FLOW FOR THE BOILERS WHEN TRHE WOILERS ARE IN OPPERATION TO PREVENT SHORT CYCLING AND HIGH LIMIT ISSUES. D D 2 2 4 FLOW PROOF 1.5 P1 S2 4 P2 BP1 BP2 BP3 1.5 C C 1.5 1 20 0.5 22 24.00 B B 4 58 53 20 46 41 26 32 58 53 2 2 3DS-3B SERIES 80 3x3x7B 50 46 46 45 43 41 33 32 26 22 2 1 1 1 3 2 6 4 3 PL 36 PDV-3 TEK132 TEX275 UFFWN-HL RB-24 SSS119 BALL FLANGE WEBSTONE UNION DRAIN BALL 420C TRIPLE DUTY VALVE STANDARD_SEAL_125#_FLANGE_ODP_3_PHASE_M OTOR_143_FRAME PUMP PRESSURE DIFFERENTIAL VALVE PUMP SEQUENCER BOILER CONTROL ULTRA FUEL FLEX FLEXIBLE GAS CONNECTOR LOW WATER CUTTOFF LOCHINVAR INDIRECT WATER HEATER Brass Ball Valve Brass Ball Valve Y STRAINER 21 20 1 5 BACKFLOW PREVENTOR SA 1.5 FLOW CONTROL VALVE - STRAIGHT ANGLE 19 3 PL 55 PUMP 14 1 FB38 PRESSURE REDUCING VALVE 13 12 1 2 WEBSTONE UNION BALL WEBSTONE UNION BALL 7 1 4 1 3 3 1/5 HP 3300 RPM 13.6 GPM 1 1/2" 1 1/2" MAXIMUM PRESSURE: 400 PSIG 11.5 FT HD PRESSURE DROP BODY CONSTRUCTION: IRON 2/5 HP MAX TEMPERATURE: 150 F 3250 RPM RANGE: 10-25 PSIG Brass Ball Valve Brass Ball Valve FACTORY SETTING: 12 PSIG 1" 1/2" D120V EXPANSION TANK TANK: 68 GAL ACCEPTANCE: 34 GAL PSH-4 PRIMARY/SECONDARY HEADER MAX FLOW: 247 GPM CONNECTION: 4" KBN500 LOCHINVAR BOILER MODEL KBN500 INPUT: 100-500 MBH GROSS OUTPUT: 467 MBH A A 12 21 14 20 12 ITEM QTY PART NUMBER DESCRIPTION 13 COMMENTS 4 7 3 26 3 COMMENTS PARTS LIST DRAWN 33 FLUID INDUSTRIAL DSalerno ASSOCIATES CHECKED 7 SIXTH ROAD WOBURN, MA 01801 APPROVED TEL: 1-781-938-8900 FAX: 1-781-933-3965 19 2 TITLE 1/27/2010 ROCKLAND LRV SIZE E SCALE 1 REV DWG NO A 0001-2A SHEET 1 OF 2 4 3 2 1 NOTES 1. ALL DIMENSIONS ARE IN INCHES UNLESS OTHERWISE NOTED. 2. THIS IS ONLY A CONCEPT DRAWING. THE DESIGNER MUST DETERMINE WHETHER THIS APPLICATION WILL WORK IN HIS SYSTEM AND MUST ENSURE COMPLIANCE WITH CODE REQUIREMNTS. 275 Dip Pump Sequencer Fixed Last Fixed Lead First On / Last Off First On / First Off EMS Setback BTC I Off Rotate 3. REFER TO THE WIRING DIAGRAM FOR WIRING AND DIP SETTINGS. Exercise Demands Off D D 5A BP1-BP3=BOILER PUMPS BP1&P2=BUILDING PUMPS S1=OUTDOOR SENSOR S2=BOILER SUPPLY SENSOR 5A 5A 5A 5A 5A 5A Do not apply power 1 2 3 4 5 6 7 8 9 10 11 12 tN4 Com Out Boil Com Bret/ Mod1 + Sup DHW + Mod2 Mod3 + + Mod4 + 275 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Relay 1 Relay 2 Relay 4 Relay 3 C.A. / DHW Prim Power Alert / P2 P1 L N Pump 1 2 Auto 27 28 29 30 31 Boiler DHW Com Pr. Demand /Setp Dem Dem Off Stand-by 10A Off Stand-by 10A 10A 2-Stage 30 Second Delay Excercising Alarm per Pump Alarm Levels Off 10 Second Delay Pump 1 2 Auto 2-Stage 30 Second Delay Excercising Alarm per Pump Alarm Levels Off 10 Second Delay 132 10A 10A 10A 10A 132 10A No Power No Power 1 2 3 4 5 6 S1 Pump 2 Stage Demand Demand S3 Flow Proof 7 8 9 10 11 12 Pump Power Alarm 2 N A 1 2 17 18 1 2 3 4 5 6 7 8 9 10 11 12 Alarm Outdoor Pump Power Alarm Sensor Pump 2 Stage Demand Demand Pump B 1 2 N A 13 14 15 16 Pump 1 L A B Flow Proof 1 2 L 13 14 15 16 A 17 18 Alarm Outdoor B Sensor B S2 Class II Transformer 24V (ac) C R 120V (ac) L N C C EMS SETBACK BTC l PUMP SEQUENCER FIXED LAST FIRST LEAD FIRST ON/ LAST OFF OFF ROTATE OUTDOOR 62° BOILER DEMAND DHW/SETPOINT DEMAND PROOF DEMAND FIRST ON / FIRST OFF OFF EXERCISE DEMANDS ZONE LEAD SHEDDING TEST PRIORITY OVERIDE EMS INPUT SIGNAL 120V SUPPLY SYS PUMP BOIL PUMP BOIL PUMP BOIL PUMP DHW PUMP DHW PUMP DHW PUMP BP2 BP1 24VA C GND RUNTIME CONTACTS RUNTIME CONTACTS DHW THERMOSTAT ROOM THERMOSTAT ZONE CONTROL AUX. DEVICE PILOT SUPPLY AUX. DEVICE PROVING GAS PRESSURE SWITCH FLOW SWITCH AUX. DEVICE PROVING RUNTIME CONTACTS DHW THERMOSTAT ROOM THERMOSTAT ZONE CONTROL SYSTEM SENSOR AUX. SENSOR AUX. SENSOR AUX. SENSOR OUTDOOR SENSOR OUTDOOR SENSOR OUTDOOR SENSOR SEQUENCING SHIELD GROUND-MASTER 0-10VDC EXTERNAL SHIELD COMMON-SLAVE GND CONTROL A B ITEM SIGNAL WIRING MUST BE RATED AT LEAST 300 V. ONE TN4, FOUR MODULATING BOILER & DHW / SETPOINT Do not apply power tN4 2 Com 3 Out + Boil Sup B MEETS CLASS B: CANADIAN ICES POWER 115 V ±10% 60HZ 7 VA, 1150 VA FCC PART 15 RELAYS 230 V (AC) 5 A 1/3 DEMANDS 20 TO 260 V (AC) 2 VA BOILER CONTROL 275 1 FOR MAXIMUM HEAT, PRESS AND HOLD TEST BUTTON FOR 3 SECONDS. 4 5 Com Bret/ DHW 6 Mod1 + 7 Mod2 + 8 Mod3 + 9 Mod4 + 5A 5A 5A 5A 5A 5A 5A 13 14 15 16 17 18 19 20 21 22 23 24 25 26 Relay Relay Relay Relay C.A. / DHW Prim 1 2 3 4 Alert / P2 P1 Power L N 27 28 29 30 31 Boiler DHW Com Pr. Demand /Setp Dem Dem SYSTEM SENSOR SYSTEM SENSOR SHIELD COMMON-SLAVE MADE IN CANADA TEKMAR CONTROL SYSTEMS LTD TEKTRA 1020-01 tekmar 24VA C GND R WR W ROOM THERMOSTAT ZONE CONTROL AUX. DEVICE PROVING R WR W R WR W DHW THERMOSTAT FLOW SWITCH MENU LOCHINVAR KNIGHT BOILER AUX. DEVICE PROVING AUX. DEVICE PILOT SUPPLY AUX. DEVICE PROVING GAS PRESSURE SWITCH LOCHINVAR KNIGHT BOILER FLOW SWITCH BP3 24VA C GND LOCHINVAR KNIGHT BOILER AUX. DEVICE PILOT SUPPLY AUX. DEVICE PROVING GAS PRESSURE SWITCH A B 120V SUPPLY SYS PUMP SYS PUMP B L N L N L N 120V SUPPLY OFF NOT TESTING RED TESTING ≡RED≡ TESTING PAUSED SHIELD COMMON-SLAVE A B SEQUENCING SEQUENCING SHIELD GROUND-MASTER 0-10VDC EXTERNAL SHIELD GROUND-MASTER 0-10VDC EXTERNAL GND CONTROL GND CONTROL A A REV SIZE DWG NO E 0001-2A SCALE 4 3 2 1 A SHEET 2 OF 2
© Copyright 2026 Paperzz