Omnia Fertilizer Ltd Nitrous Oxide Reduction Project (UNFCCC Reg No. 0752) Eden Jack 19 May 2011 CDM Awareness Raising Workshop Presentation Outline • • • • • • • Introduction Omnia Nitric Acid Plant Project Evaluation Project Execution EnviNox CDM Process Summary Omnia Group Fertilizers • Bulk Fertilizers (eg) • LAN • 4:3:4 / 2:3:2 • Greensulph • Speciality Products (eg) • CN (FBG Technology) • MgNO3 • Liquid Fertilizer (eg) • UAN Explosives /Chemicals • Ammonium Nitrate based explosives • Detonators • Protea Chemicals • Zetachem • JV Nalco Omnia Responsible Care Signatory ISO 9001 ISO14001 OSHAS 18001 ISO 17025 Omnia • Process of building New Facilities: • Ammonia Logistics • Nitric Acid Plant • Ammonium Nitrate • Solution • Porous • Estimated cost R1.4bn • Fertilizer and Explosives Market • Commissioning 2012 2008 Nitric Acid Plant • • • • Ostwald Technology Built 1982 UHDE Process Dual Pressure Technology • Low pressure NH3 Conversion • High pressure Absorption • 650 tpd, re-rated 750tpd, 100% acid Converter Primary Reactions • 4 NH3 + 5 O2 → 4 NO + 6 H2O • 4 NH3 + 3 O2 → 2 N2 + 6 H2O • 4 NH3 + 4 O2 → 2 N2O + 6 H2O Reactions Downstream of Converter • Oxidation of NO • 2NO + O2 • Absorption • 3NO2 + H2O • N2O4 + H2O • 3HNO2 2NO2 N2O4 2HNO3 + NO HNO2 + HNO3 HNO3 + H2O + 2NO Reactions Downstream- Converter • 2 NH3 + 8 NO → 5 N2O + 3 H2O • 4 NH3 + 4 NO + 3 O2 → 4 N2O + 6 H2O • Nitric Acid Plant Basis • Combustion of NH3, over Pt/Rh catalyst • NOx 94-96% • N2O 4-6% Study • • • • • Kyoto Protocol Methodology AM0028 was completed 2005 GWP 310 Specific to Selective Catalytic Reduction (SCR) Feasibility 2005 Basis for EnviNOx Installation • Reduce Greenhouse Gas Emission (GHG) • Legislation • South Africa non Annex 1 Country Project Evaluation • UHDE technology • Primary, Secondary or Tertiary • Primary Abatement • Secondary/Tertiary Abatement • Capital cost • Catalyst Leased/ Own • Efficiency Guarantees • Retrofit Design • Installation Process • Plant Availability • Approved Methodologies Tertiary Abatement (considerations) • Capital Cost • Analyser • Delta-V • Structure and Reactor • Catalyst • Plant Availability • Lower Tail Gas Temperature Tertiary Abatement • • • • • Superior Product- Guarantees Proven Technology Does not hamper the process- end of pipe design Retrofit design CDM UNFCCC considerations Nitric Acid Plant Basis • Combustion of NH3, over Pt/Rh catalyst • NOx 94-96% • N2O 4-6% • UHDE technology • Primary, Secondary or Tertiary • Economics • Social Responsibility Project Execution • • • • • Project initiated 2006 UHDE Omnia Project Department Emerson Management (CDM) Project Boundary for N2O Destruction Facility at Omnia’s Nitric Acid Plant heat exchanger Project Boundary To atmosphere tail gas Air Ammonia Gas Process Water N2 O2 H2O cooling water Ammonia Ammonia Oxidation catalyst Ammonia Oxidation Reactor Natural gas Tail gas turbine absorption tower N20 destruction facility Boiler Clean tail gas N2O destruction facility process gas with N2O, NO2 & NOx Heat exchanger nitric acid Project Boundary For N2O Destruction Facility at Omnia’s Nitric Acid Plant Fig.2 EnviNox Structure Empty Envinox Reactor Tail Gas Flow Measurement EnviNox EnviNox EnviNox Unit NOx Nox in Nox out 350.0 300.0 ppm 250.0 200.0 150.0 100.0 50.0 0.0 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 Day EnviNox EnviNox Unit N2O N2O In N2O Out 1400.0 1200.0 ppm 1000.0 800.0 600.0 400.0 200.0 0.0 1 4 7 10 13 16 19 22 25 28 31 34 37 40 43 46 49 52 55 58 Day EnviNox EnviNox Efficiency 100.0 99.0 98.0 96.0 95.0 94.0 93.0 Months 2008 - 2011 m ar ja n no v se p ju l m ay m ar ja n no v se p ju l m ay m ar ja n no v 92.0 se p % 97.0 Nitric Acid Plant Stack Process • Omnia Project • Prior Consideration Form • Project Identification Note (PIN) • Letter of Approval (LoA) South African DNA • Project Design Document • Validation • Registered May 2007 • Plant commissioned February 2008 CDM Process • Safety and training • Completed a preliminary verification audit • Successful Audit • 400k t CER’s delivery, CDM Process Table 9: Estimated Ex-ante Emissions Reduction during the first 7-year crediting period (tCO2e) Year (1) Project Emissions Leakage Baseline Emissions Emissions Reduction 2008 32,797 0 512,188 479,391 2009 33,417 0 521,872 488,455 2010 53,284 0 512,188 458,904 2011 52,389 0 503,580 451,191 2012 33,417 0 521,872 488,455 2013 32,797 0 512,188 479,391 2014 54,292 0 521,872 467,580 292,391 0 3,605,759 3,313,368 Total Notes: (1) Year is defined as the time period between April 1 and March 31 of subsequent year CDM Process Verification Reports Number From To Audit CER's Issuance 1 26/02/2008 17/03/2008 Jul-08 26276 Mar-09 2 18/03/2008 08/07/2008 Jul-08 157285 Jan-09 3 09/07/2008 31/01/2009 Feb-09 321234 Sep-10 4 01/02/2009 31/05/2009 Nov-09 151795 5 01/06/2009 31/10/2009 Nov-09 169105 6 01/11/2009 31/05/2010 Aug-10 251999 7 01/06/2010 30/11/2010 Feb-11 204089 8 01/12/2010 31/04/2011 Jun-11 191359 Total 1473142 CDM Process • Verification 1 – 3 • Installation didn’t match Methodology • Installation did not match PDD • Preliminary audit did not pick up either • DOE’s were pedantic about process • Monitoring report and plan were sophisticated and complex • Reports generated from the system • Communication and back ups CDM Process • • • • Unable to change PDD Unable to change installation retrofit Process - Request for Deviation from UNFCCC Process took approximately 6 months CDM Process • Verification 4 – 6 • New DOE appointed • New Criteria • New criteria from EB • Request for deviation does not apply • Re-submit Request for Revision • Change Hardware • Change PDD • Change Monitoring Report and Monitoring Plan • Revision completed 14 months April 2011 • Verification 4 Completeness check CDM Process • Verification 7 onward • Template change for Monitoring Report • EB requirements change • DOE requirements change • Process change and focus Summary • Achieved Greenhouse Gas Reduction • Stack Emissions clear • Omnia Social Responsibility/ Responsible Care • • • • • • Kyoto and Post 2012 CDM and UNFCCC CER prices and market Methodology DOE requirements Africa not capitalized on the framework effectively Concerns /Comments Thank You www.omnia.co.za [email protected]
© Copyright 2026 Paperzz